UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION REGION 4 SALT LAKE CITY, UTAH. May 29, 1958
|
|
- George Harrington
- 5 years ago
- Views:
Transcription
1 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION REGION 4 SALT LAKE CITY, UTAH May 29, 1958 FACT SHEET ON PRIME CONTRACT FOR CONSTRUCTION OF FLAMING GORGE DAM GENERAL INFORMATION Bids will be received by the Bureau of Reclamation on June 10 for the construction of the Flaming Gorge Dam and Powerhouse on the Green River in the northeast corner of Utah. Project Construction Engineer Jean R. Walton will open the bids at 2:30 p. m. on June 10 at the Manila High School building in 1vianila, Utah, the town nearest to the damsite. Flaming Gorge Darn will be the 7th highest concrete dam in the United States and create a reservoir which will rank 14th in size. The dam will rise about 490 feet above bedrock, and its gracefully curved crest will extend for 1180 feet across the canyon of the Green River. Flaming Gorge Dam will create the first storage reservoir on the Green River to provide control and regulation of river flows. fhe Flaming Gorge Storage Unit is one of the four units pres1:::ntly authorized for construction. The Glen Canyon Storage Unit on the Colorado River is now under construction and about 15 percent con1ph:tej. Bils will be opened on June 19 at Farmington, New Mexico, ior co'l'l.&truction of Navajo Dam on the San Juan River. The fourth
2 storage unit, the Curecanti Unit on the Gunnison River is western Colorado, is in the final stages of study required before construction can be undertaken. Nearly 1 million cubic yards of concrete will be placed in Flaming Gorge Dam, Powerhouse, and other related features. Five of the six dams which are higher than Flaming Gorge Dam were built by the Bureau of Reclamation. Included are such giants as Grand Coulee Dam on the Columbia River in the State of Washington, Hoover Dam on the lower Colorado River in Arizona and Nevada, Glen Canyon Dam which is now under construction on the Colorado River in Arizona, and Shasta Dam on the Sacramento River in California. The Flaming Gorge Reservoir will extend 91 miles upstream nearly to the town of Green River, Wyoming, and will store about 3, 800, 000 acre-feet of water. The flows of the Green River, a major tributary of the Colorado River, will be regulated by Flaming Gorge Dam. The powerplant at the toe of the dam will accommodate three generators of 36, 000 kilowatts installed capacity each. The total capacity of the powerplant, when all three generators are installed, will be 108, 000 kilowatts. Headquarters for the construction of Flaming Gorge Dam are located at Dutch John, Utah--the state's newest permanent town now being constructed about 2 miles from the damsite. Housing, shopping z
3 facilities, schools, and the like will be provided at Dutch John for contractors' and Government forces. the prime contract. Five years will be allowed for the completion of work under LOCATION OF FLAMING GORGE DAM (See attached map) Flaming Gorge Dam is located on the Green River where it has cut the deep and beautiful ' Red Canyon" in the north flanks of the Uinta Mountains. The Ashley National Forest surrounds the damsite and borders the lower ZS miles of the reservoir area. Cold, mountain trout streams and abundant wildlife are found in the open forested country of the dam and reservoir area. Located in the extreme northeast part of Utah, the Flaming Gorge dam site is just 6 miles south of the Wyoming State line and 20 miles west of the Colorado State line. Green River and Rock Springs, Wyoming, on U.S. Highway 30 and Vernal, Utah, on U.S. Highway 40 are the cities nearest to the damsite. The nearest railroad to the Flaming Gorge dam site is at Green River, Wyoming, a distance of about 60 miles. An existing paved highway (Wyoming State Highway 530) extends 43 miles south from Green River to Linwood, Utah. The Bureau of Reclamation is building a temporary access road for about 15 miles from Linwood to Dutch John. This access road is nearly completed and will be surfaced this year. The temporary timber bridge on the 3
4 access road which crosses the Green River east of Linwood and a section of this road will be flooded when the Flaming Gorge Reservoir fills. A:n. improved road and Forest Service highway extends 30 miles north from Vernal, Utah, nearly to what is known as Greendale Junction. The State of Utah opened bids on May Z7 for the first 2-1/ 2- mile section of a 7-mile link from Greendale to the damsite. Dutch John, the town at the damsite, is now under construction. Temporary offices, warehouses, garages, and a four-room school are completed or nearing completion. Work is proceeding on the construction of 50 permanent and temporary houses for Bureau of Reclamation employees. The construction of streets and utilities is on schedule. On May 15, the office of the Flaming Gorge Storage Unit moved from its temporary location at Vernal to Dutch John. WORK UNDER THE PRIME CONTRACT The prime contract calls for building the Flaming Gorge Dam and Powerhouse. The Bureau of Reclamation issued the invitation for bids on April 22 for opening on June 10. It is expected that the contract will be awarded before June 30. The contract between the Bureau of Reclamation and a construction company or combination of companies will call for the following work to be done : 1. Construct an arch-type concrete dam about 490 feet high and 1180 feet long at the crest. 4
5 2. Excavate and concrete line a diversion tunnel about 1100 feet long to carry the Green River around the damsite during construction. 3. Build the spillway-intake structure and the concrete-lined spillway tunnel. 4. Construct the powerhouse of reinforced concrete and steel to accommodate three generating units. 5. Build the necessary roads to the damsite proper. Under the contract, the successful bidder will be required to excavate a total of 393, 000 cubic yards of earth and rock for the dam and related works (not including roads from Dutch John to the damsite); and to place 922, 000 cubic yards of concrete in the dam proper, and another 44, 000 cubic yards in related works. Aggregate for the concrete will be obtained by the contractor from gravel deposits along Henrys Fork of the Green River near Linwood, Utah. The contractor will supply about 615,000 barrels (116,000 tons) of cement and 42,000 tons of pozzolan for the 966, 000 cubic yards of concrete required. Large quantities of steel will be used in building Flaming Gorge Dam; the largest quantities are 2200 tons of reinforcing bars, 425 tons of structural steel in the powerhouse, and 395 tons of structural steel as tunnel supports. 5
6 .. CONSTRUCTION CONTRACTS AT FLAMING GORGE DAMS!TE 1. Temporary access road -- First 7. 6 miles. Wangsgaard Construction Co., Logan, Utah -- $143,912 Completed May 14, To be hard surfaced under the prime contract. z. Temporary access road -- Second 7. 8 miles!2., reach Dutch John, Utah. Wangsgaard Construction Co., Logan. Utah -- $504, 642 Scheduled completion June 1958, including hard surfacing. 3. ~ John, Utah -- Streets, utilities, and 50 residences. Witt Construction Co., Provo, Utah -- $2, 152,956 Scheduled completion February Dutch John, Utah -- Temporary office~ warehouse buildings. Bethers and Stoker, Salt Lake City, Utah -- $47, 028 Completed April Dutch John, ~ -- Prefabricated metal garages. Dean R. Mayberry, Ogden, Utah -- $59, 793 Comple~ed January Electric Power -- ~~during construction of Flaming Gorge Dam and Powerplant. -- Moon Lake Electric Association -- $1,213,800 Service to begin December 1958.
7 DETAILED STATISTICS ON FLAMING GORGE DAM SIZE: Height. 490 feet above bedrock 450 feet above downstream river level Crest Length feet on the arc of the crest Crest Width. (width of roadway). Z1 feet RESERVOIR: POW ERP LANT: Crest Elevation. 6, 047 feet. Base Width. About 150 feet. -- Volume of Concrete. 966, 000 cubic yards in dam and related works; 9ZZ,OOO cubic yards in dam only. Capacity. 3, 800, 000 acre-feet. 14th in size in the United States. Area. 66 square miles. Length. 91 miles, or nearly to Green River, Wyoming. Maximum normal water surface elevation. 6, 040 feet. Generators. 3 units Installed capacity of each - 36, 000 kilowatts Turbines. 3 of 50, 000 horsepower each. Total Capacity «2f_Powerplant. 108, 000 kilowatts. DIVERSION TUNNEL (one tunnel through right abutment): Inside diameter. 23 feet, concrete lined. Length. About 1100 feet. EXCAVATION: Dam and powe rplant, Related works {not roads) Total.... Cubic yards 296,000 96, ,790
Guide to the L. F. Manis Photographs
This finding aid was created by Lindsay Oden on February 27, 2018. Persistent URL for this finding aid: http://n2t.net/ark:/62930/f1vk60 2018 The Regents of the University of Nevada. All rights reserved.
More informationGuide to the L. F. Manis Photographs
This finding aid was produced using ArchivesSpace on February 29, 2016. English 2016 The Regents of the University of Nevada. All rights reserved. University of Nevada, Las Vegas. University Libraries.
More informationGuide to the Virginia "Teddy" Fenton Photograph Collection on the Hoover Dam and Boulder City, Nevada
Guide to the Virginia "Teddy" Fenton Photograph Collection on the Hoover Dam and Boulder City, Nevada This finding aid was created by Lindsay Oden on April 27, 2018. Persistent URL for this finding aid:
More informationVisual Analysis Special Report Technical Appendix, Operation of Flaming Gorge Dam Final Environmental Impact Statement
Utah State University DigitalCommons@USU All U.S. Government Documents (Utah Regional Depository) U.S. Government Documents (Utah Regional Depository) 7-19-2002 Visual Analysis Special Report Technical
More informationGuide to the Boulder City 31ers Photograph Collection
Guide to the Boulder City 31ers Photograph Collection This finding aid was created by Lindsay Oden on April 27, 2018. Persistent URL for this finding aid: http://n2t.net/ark:/62930/f1fk7n 2018 The Regents
More informationG R E E N R I V E R - W Y O M I N G - S W E E T W A T E R C O U N T Y
G R E E N R I V E R - W Y O M I N G - S W E E T W A T E R C O U N T Y Minor Ranch All information contained herein is taken from sources considered reliable, but is not guaranteed by either seller nor
More informationGuide to the L. F. Manis Papers on Boulder Dam
This finding aid was created by Joyce Moore on February 28, 2019. Persistent URL for this finding aid: http://n2t.net/ark:/62930/f1f88x 2019 The Regents of the University of Nevada. All rights reserved.
More informationNAVAJO STATE PARK is a park that
Passes and Permits A Colorado State Parks Pass is required on all motor vehicles entering the park. All passes are to be displayed on the lower right inside of the windshield. An annual Pass is valid at
More information4180 acre-feet minimum conservation pool
MEMORANDUM Subject: Bear River Basin Plan SULPHUR CREEK RESERVOIR Date: July 20, 2000 Location: Section 34, Township 14N, Range 119W. Located on Sulphur Creek, tributary to the Bear River. Located approximately
More informationBerg Ridge BERG RIDGE 1
Berg Ridge BERG RIDGE 1 Berg Ridge: $13,650,000 ($75,000 / ERU) Jordanelle Basin Wasatch County, Utah LOCATION: North Central Utah in the Jordanelle Basin of Wasatch County a 45-minute drive from downtown
More informationDusty Boots Unit II. Available Parcels and Informational Summary
Dusty Boots Unit II Available Parcels and Informational Summary January 2008 Notice to Recipients Other Properties May be available upon Request. Please feel free to contact us with other requests as this
More informationCreatures Of Habitat. Mark Hengesbaugh. Published by Utah State University Press. For additional information about this book
Creatures Of Habitat Mark Hengesbaugh Published by Utah State University Press Hengesbaugh, Mark. Creatures Of Habitat: The Changing Nature of Wildlife and Wild Places in Utah and the Intermountain West.
More informationSECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN
SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which
More informationCASE NO. 2019CW10 (REF NO. 12CW118).
IN THE DISTRICT COURT IN AND FOR WATER DIVISION NO. 4 STATE OF COLORADO TO: ALL PERSONS INTERESTED IN WATER APPLICATIONS IN SAID WATER DIVISION NO. 4 Pursuant to C.R.S. 37-92-302, as amended, you are notified
More informationHISTORIC AMERICAN ENGINEERING RECORD COVE CREEK SPILLWAY BRIDGE. HAER No. AR-83
HISTORIC AMERICAN ENGINEERING RECORD COVE CREEK SPILLWAY BRIDGE LOCATION: Spanning Cove Creek Spillway at State Highway 309 (formerly Paris-Mt. Magazine Road), Corley vicinity, Logan County, Arkansas UTM:
More informationProject Update Utah Water Users Workshop March 14, 2012
Project Update Utah Water Users Workshop March 14, 2012 Jeffrey D. Budge, P.E. Operations and Engineering Manager Steven H. Cain Facilities and Lands Manager Organized in 1935 Deer Creek Division of the
More informationPrinciple Causes of Dam Failures. Structural failure. Cracking. Stability failure. BIA Summer Water Resources Training Dam Safety Inspections
BIA Summer Water Resources Training Dam Safety Inspections Principle Causes of Dam Failures Part 2 Dam Failures July 28, 2012 Presented by Michael Johnson, Ph.D., P.E. Overtopping Structural failure Stability
More informationA vacancy announcement for this position is expected to be posted in USAJOBS in late June or early July, 2016, with a duty station of Vernal, Utah.
OUTREACH ANNOUNCEMENT USDA Forest Service Ashley and Uinta-Wasatch-Cache National Forests Northern Utah Zone TSA Resource Specialist, GS-1101-9/11 Vernal, Utah The Ashley and Uinta-Wasatch-Cache National
More informationIndian Creek. Plumas County, California. Proudly Offered By
Indian Creek Plumas County, California Proudly Offered By 707 Merchant Street, Suite 100, Vacaville, Ca 95688 (707) 455-4444 Office (707) 455-0455 Fax info@caoutdoorproperties.com Introduction House looking
More informationIntroduction to Arizona s Road Building History
Figure 2 Proposed 1912 State Highway Map (ADOT) Introduction to Arizona s Road Building History Special Centennial Edition Complied: Richard L. Powers, P.E. Contributor: Oscar T. Lyon Jr., P.E. Photos:
More information2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013
2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013 2014 Colorado River AOP Final Consultation Meeting Welcome and Introductions
More informationLake Mead Learning Guide
Lake Mead Learning Guide Author: Mary Beth Goff Editor: Karyn Travaglino Publisher: Road Trip Teacher, LLC by Mary Beth Goff Copyright 2015 Road Trip Teacher, LLC Pages may be copied for same household
More informationOutline of the Shinryu Head Works
Outline of the Shinryu Head Works Midori Network Water and farmland protection Midori Network Shinryu 1. History Land reclamation began in 1890 under the initiative of the Uryu Aristocratic Farm, headed
More informationII. THE BOULDER CREEK DRAINAGE BASIN
II. THE BOULDER CREEK DRAINAGE BASIN This section provides an overview of the watersheds and flood hazards associated with Boulder Creek and South Boulder Creek including descriptions of the drainage basins,
More informationUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. PacifiCorp Project No NOTICE OF INTENT TO FILE APPLICATION FOR NEW LICENSE
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION PacifiCorp Project No. 1744 NOTICE OF INTENT TO FILE APPLICATION FOR NEW LICENSE Pursuant to 18 C.F.R. 5.5, PacifiCorp notifies the Federal
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 21, 2018 To whom it may concern: The Colfax County
More informationApril 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark,
Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO 81301 Dear Mark, We are pleased to offer the following comments on the draft San Juan Public Lands Center management plans
More informationKurobegawa No.4 Power Plant Toyama Prefecture, Japan (Asia)
IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 14-02: Development of Regional Industries Kurobegawa No.4 Power Plant,
More information47I THE LAS ANIMAS GLACIER.
THE LAS ANIMAS GLACIER. ONE of the largest of the extinct glaciers of the Rocky Mountains was that which occupied the valley of the Las Animas river. This stream originates in the San Juan mountains in
More informationThe Covered Bridge of Pepperell
The Covered Bridge of Pepperell 1742 - An uncovered wooden bridge historically referred to as the cart bridge at Joseph Blood s Fordway, links Groton West Parish and Groton. Cost Unknown 1753 - As Pepperell
More informationColorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead Draft EIS
Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead Draft EIS Modeling Workshop Henderson, Nevada March 6, 2007 Sessions SESSION I (9:00
More informationARCHIVES MONTH in Washington!
ARCHIVES MONTH in Washington! We received an invitation in September from The State Archives to participate in Archives Month : 2014 is the 125th anniversary of Washington reaching statehood. It is a momentous
More informationBuffalo Springs Ranch
Buffalo Springs Ranch Acton, Montana For additional details, contact: SCOTT R. GROSSKOPF Broker / Owner Member Landmark of Billings 1925 Grand Avenue, Ste. 144, Billings, MT 59102 Office: (406) 248-3101
More informationDRAFT. Dorabelle Campground Rehabilitation
DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 September 14, 2018 The Colfax County Board of Commissioners
More informationFederal Land and Resource Management: A Primer 1
Federal Land and Resource Management: A Primer 1 RS20002 Coordinated by Ross W. Gorte Natural Resource Economist and Policy Specialist Environment and Natural Resources Policy Division December 22, 1998
More informationDOWNLOAD OR READ : UTAH NATIONAL PARKS MAP PACK BUNDLE ADVENTURE MAP PDF EBOOK EPUB MOBI
DOWNLOAD OR READ : UTAH NATIONAL PARKS MAP PACK BUNDLE ADVENTURE MAP PDF EBOOK EPUB MOBI Page 1 Page 2 utah national parks map pack bundle adventure map utah national parks map pdf utah national parks
More informationCentral Overland Trail Utah & Nevada Driving Guide, First Edition, 2016
Central Overland Trail Utah & Nevada Driving Guide, First Edition, 2016 Page 51 In the third paragraph, second sentence, change 0.4 miles to 0.1 miles. In the fourth paragraph, second sentence, change
More informationAgenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer
Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012
More information2.1 Physical and Biological Description Matabitchuan River Watershed
2.1 Physical and Biological Description Watershed 2.1.1 Physical Description The system watershed has a total area of about 933 km 2 and is a tributary system to Lake Temiskaming and the Ottawa River Drainage
More informationDiscontiguous Features Southern Adirondack Feeder Reservoirs
Section number 7 Page 191 Mile 17.32 Buoy R134 marking head of Cayuga-Seneca Canal at outlet of Seneca Lake limit of historic district boundary Discontiguous Features Southern Adirondack Feeder Reservoirs
More informationNational Parks and Beyond
National Parks and Beyond Canyons, Mesas and Hoodoos Nevada Utah Arizona Red Rock Canyon National Conservation Area Las Vegas, Nevada Begin your adventure under the neon lights of Las Vegas, an oasis in
More informationIS A BUDGET ONLY DESCRIPTION QUANTITY UNIT
Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION
More informationflyrideusa com Classic Routes Itineraries Motorcycle Vacations
flyrideusa com Classic Routes Itineraries Self-guided Tour Itineraries California Dreaming American Southwest American Rockies Canadian West American West Northwest Discovery flyrideusa com TM California
More informationA Timeline for Baltimore City Water
A Timeline for Baltimore City Water 1712 Local government at this time was transferred from Old Baltimore on the Bush River to Joppa on the Gunpowder River. Joppa, at this time was a town of four streets,
More informationEVERknowledgeable EVERresponsive EVERhonorable EVERGREEN.
7021 Johnson Drive Johnson County, KS 8450 & 8500 State Line Rd. Johnson County, Leawood, KS Property ID Size 48223 R1 34848 $100,000 Ryan Robertshaw allows for Group Home Smaller child care facility also
More informationDEVIL CANYON PROJECT RELICENSING FERC PROJECT NUMBER TRANSPORTATION SYSTEM MANAGEMENT PLAN November 2018
DEVIL CANYON PROJECT RELICENSING FERC PROJECT NUMBER 14797 TRANSPORTATION SYSTEM MANAGEMENT PLAN November 2018 State of California California Natural Resources Agency DEPARTMENT OF WATER RESOURCES Hydropower
More informationRoad Trip Map Book. America s Most Scenic Road Trip
America s Most Scenic Road Trip Road Trip Map Book A Publication of the US Route Appreciation Society Maps & Photographs by James Cowlin Introduction by Wayne Ranney 2018-2019 Edition Featuring interactive
More informationDATA BOOK IV : COST ESTIMATE
The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55
More informationDD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X
ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES
More informationA Timeline for Baltimore City Water
A Timeline for Baltimore City Water 1712 Local government at this time was transferred from Old Baltimore on the Bush River to Joppa on the Gunpowder River. Joppa, at this time was a town of four streets,
More informationUSA SouthWest (CA, AZ, UT, NV) 1:1M By International Travel maps READ ONLINE
USA SouthWest (CA, AZ, UT, NV) 1:1M By International Travel maps READ ONLINE Luxury Southern Utah Resort, Luxury Resort Hotel - Amangiri is a luxury Southern Utah resort located on an expanse of travel
More informationAmended Application for New License Major Project Existing Dam
Amended Application for New License Major Project Existing Dam Exhibit A Project Description Security Level: Public Prepared by: Yuba County Water Agency 1220 F Street Marysville, CA 95901 www.ycwa.com
More informationWASHINGTON COUNTY WATER CONSERVANCY DISTRICT
WASHINGTON COUNTY WATER CONSERVANCY DISTRICT Minutes of Meeting of Board of Trustees April 4, 2018 Minutes of a public meeting of the board of trustees of the Washington County Water Conservancy District,
More informationGuide to the Bureau of Reclamation Photographs of the Hoover Dam and Boulder City, Nevada
Guide to the Bureau of Reclamation Photographs of the Hoover Dam and Boulder City, Nevada This finding aid was created by Lindsay Oden on April 27, 2018. Persistent URL for this finding aid: http://n2t.net/ark:/62930/f10w5z
More informationDeterioration Factors at Girder Ends
Deterioration Factors at Girder Ends Robert P. Zaffetti, P.E. Connecticut Department of Transportation September 29, 2010 Northeast Bridge Preservation Partnership Meeting Hartford, CT Overview One of
More informationDOWNTOWN, CHARLOTTE AMALIE
TOTAL VISITOR ARRIVALS TO THE USVI : DECEMBER YEAR TO DATE DECEMBER TOTAL VISITOR ARRIVALS 2,85, 2,8, 2,814,257 2,75, 2,7, 2,65, 2,6, 2,642,118 2,71,542 2,648,5 2,55, 212 213 214 215 Visitor arrivals ended
More informationENLOE HYDROELECTRIC PROJECT FERC PROJECT NO PUBLIC SAFETY PLAN. Final
ENLOE HYDROELECTRIC PROJECT FERC PROJECT NO. 12569 PUBLIC SAFETY PLAN Final November 18, 2013 Okanogan Public Utility District 1331 2nd Ave N PO Box 912 Okanogan, WA 98840 ENLOE HYDROELECTRIC PROJECT FERC
More information8/20/2015 Flagstaff Water Use and Utilization Commission Collection, AHS ND.49
Bookmark this page or copy and paste URL to Email message Flagstaff Water Use and Utilization Commission Collection, 1955 1967 AHS ND.49 Descriptive Summary Creator: Flagstaff (Ariz.) Flagstaff Water Use
More informationTHE GREAT MAN-MADE RIVER PROJECT
WATER RESOURCES IN LIBYA Only 5% of the entire area of Libya exceeds 100 mm GROUND WATER 95.6% (4 in) annually. Evaporation rates are also high ranging SURFACE from WATER 700 mm (28 in) 2.3% in the north
More informationSLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule
SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule Two sky bridges will connect the parking garage to the second level of the terminal, while an elevated roadway for depa will access
More informationBridge work done right
SPECIAL REPORT ENGINEERS WEEK Bridge work done right Lewiston-Queenston makeover was done quickly, efficiently and with minimal traffic disruption Business First of Buffalo - February 20, 2006 by Dale
More informationConstruction Staging Area Blue Jays Way (357 King Street West)
REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto
More informationBoulder Valley Farm. Colorado - Boulder County - Lafayette
Boulder Valley Farm Colorado - Boulder County - Lafayette 2 This rare and significant farm parcel is located in one of the most desirable places along the Colorado Front Range with agricultural benefits,
More informationOne Source, Multiple Challenges: The Future Evolution of Water Policy and the Case of the Colorado River
One Source, Multiple Challenges: The Future Evolution of Water Policy and the Case of the Colorado River David H. Getches Dean and Raphael J. Moses Professor of Natural Resources Law University of Colorado
More informationOPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee
OPEN CELL SHEET PILE TECHNOLOGY Presentation to Alaska State Legislature, House Finance Committee OPEN CELL SHEET PILE Technology Retaining Wall System Patents Obtained by PND Engineers ARRC Dock, Seward,
More informationELEPHANT BUTTE LAND 640 Acres of pristine land surrounded by BLM property Next to Coral Pink Sand Dune Area Southern Utah INVESTMENT OFFERING
640 Acres of pristine land surrounded by BLM property Next to Coral Pink Sand Dune Area Southern Utah PROPERTY DESCRIPTION Nestled within one of Southern Utah s picturesque red cliff valleys, with spectacular
More informationSliplining of Lock-Bar Steel Water Mains, Wilmington Delaware
Sliplining of Lock-Bar Steel Water Mains, Wilmington Delaware Andrew Jakubowitch, PE, Hatch Mott MacDonald Who is Hatch Mott MacDonald? An award-winning, full-service North American engineering consulting
More information2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS
1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS. SECTOR Energy 3. LOCATION The lower course of the Vrbas, i.e. the stretch from the city of Banja Luka to the mouth of the Vrbas, is planned to accommodate
More informationSIMON CANYON AREA OF CRITICAL ENVIRONMENTAL CONCERN (ACEC)
SIMON CANYON AREA OF CRITICAL ENVIRONMENTAL CONCERN (ACEC) Activities: Facilities: Season / Hours: Description: Hiking, backpacking, fishing, picnicking, watchable wildlife. A graveled parking area, picnic
More informationUtah Studies DOMINGUEZ AND ESCALANTE
Utah Studies THE WORLD IN THE 1400 S In the 1400 s merchants in Europe wanted to buy and sell goods with people in faraway places. Some of the reasons for this desire to trade with the world were: the
More informationBuilding Permit Application
Building Permit Application Co-Owner Name Lot # Address City State Zip Phone (home) (cell) Contractor (if applicable) The above named co-owner hereby makes application to Cedar Shores Campground Condominium
More informationFinal Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado
Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422
More informationRequest for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal
Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal I. Summary of Work Bids are solicited for the emergency removal of debris deposited in the
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More informationEPCG is seated at the address no 2 Vuka Karadžića St. in Nikšić
hpp Piva CONTENTS: About us 1 hpp "Piva" 3 Construction 5 Technical features 7 Generation 9 Reconstruction and modernization 11 Environment 13 Society 15 Contact 17 About us Elektroprivreda Crne Gore A.D.
More informationI INTRODUCTION AND BACKGROUND
I INTRODUCTION AND BACKGROUND INTRODUCTION AND BACKGROUND - I I INTRODUCTION AND BACKGROUND a. project setting Looking south to the project site The Davenport Cement Plant (also referred to as the Cemex
More informationPROVENANCE: Donated serially by the U.S. Bureau of Reclamation and individuals who worked on the projects.
TITLE: Colorado River Reclamation Projects DATE RANGE: 1825-1992 CALL NUMBER: Y-MS61 PHYSICAL DESCRIPTION: PROVENANCE: Donated serially by the U.S. Bureau of Reclamation and individuals who worked on the
More informationStructural Avalanche Defenses Chris Wilbur, P.E. Wilbur Engineering, Inc. SW Colorado Chapter ASCE February 15, 2012
Structural Avalanche Defenses Chris Wilbur, P.E. Wilbur Engineering, Inc. SW Colorado Chapter ASCE February 15, 2012 Outline Design Avalanche Types of Structures Deflecting/Diversion Dams & Retarders Snowsheds
More information4096 S. River Road. St. George, UT Southern Utah Distribution Center. For more information: FOR SALE SALE PRICE $4,000,000
4096 S. River Road St. George, UT 84790 FOR SALE Southern Utah Distribution Center SALE PRICE $4,000,000 Southern Utah s St. George is located in Washington County, which is ranked the 5th fastest growing
More informationWikiLeaks Document Release
WikiLeaks Document Release February 2, 2009 Congressional Research Service Report RL33827 Wilderness Laws: Permitted and Prohibited Uses Ross W. Gorte, Specialist in Natural Resources Policy January 7,
More information90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits
90 I-90 Snoqualmie Pass East September 2015 Annual Mega-Project Report Purpose of this Report The financial and schedule information in this document will assist the Office of Financial Management in meeting
More informationPort MacKenzie Rail Extension
Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough
More informationEPPERSON INDUSTRIAL PARK
EXCLUSIVE LISTING FUTURE INDUSTRIAL SITE ±680 ACRES SALT LAKE CITY, UTAH 3300 N Subject 40.54 acres 3200 W 550.46 acres 40.17 acres 2100 N 40.09 acres Sold Future State Prison Site ± 325 Acres Haul Road
More informationTHE GHOST ROSE RANCH. Randy J. Wood Qualifying Broker Cell:
Wild West Properties, LLC 7020 Santa Marisa, NE Albuquerque, NM 87113 505-836-4558 http://www.wildwestproperties.com/ Randy J. Wood Qualifying Broker Cell: 505-980-8019 E-mail: rjwood5@comcast.net THE
More informationHydro-Electric Schemes Compliance Report June June 2013
File Reference: 4.00212 Significance of Decision: Receives Only - No Decisions Report To: Operations, Monitoring and Regulation Committee Meeting Date: 20 June 2013 Report From: Nick Zaman, Pollution Prevention
More informationSTATE OF NEW MEXICO S INITIAL DISCLOSURES. The Plaintiff, State of New Mexico ex rel. State Engineer ( State ), hereby makes its
STATE OF NEW MEXICO COUNTY OF SAN JUAN ELEVENTH JUDICIAL DISTRICT STATE OF NEW MEXICO, ex rel. STATE ENGINEER, v. Plaintiff, THE UNITED STATES OF AMERICA, et al., Defendants, CV-75-184 HON. JAMES J. WECHSLER
More informationThe Holes Creek Bridge Replacement By Bradley McClelland
The Holes Creek Bridge Replacement By Bradley McClelland Each time there is a heavy rainstorm, the folks along Sheffield Road in the Dayton, Ohio suburb of West Carrollton have cause to be concerned. Holes
More informationLesson 1: Land and Climate of the West Land and Water of the West 1. There are 13 states in the West, divided into 3 regions a. Southwest: Nevada,
Lesson 1: Land and Climate of the West Land and Water of the West 1. There are 13 states in the West, divided into 3 regions a. Southwest: Nevada, Utah, Arizona, New Mexico b. Mountain States: Wyoming,
More informationKouga Dam serving the fertile Gamtoos valley
Kouga Dam serving the fertile Gamtoos valley In one of the most fertile valleys of the Eastern Cape lies the Kouga Dam, which for more than 50 years has played a pivotal role in water supply and flood
More informationSome Like It Hot, Some Like It Cold. When it comes to weather, the United States gets it all. Hail, rain, and snow fall
Name Letters Home Read the selection. Then answer the questions that follow. Some Like It Hot, Some Like It Cold When it comes to weather, the United States gets it all. Hail, rain, and snow fall in different
More information$850,000 Awarded to 20 Organizations
$850,000 Awarded to 20 Organizations The Conservation Alliance is pleased to fund the following organizations to support their efforts to protect wild lands and waterways for their habitat and recreation
More informationA Retrospective 50 Year Memory Tour of Western National Parks & Other Sites 1964 & 2014
A Retrospective 50 Year Memory Tour of Western National Parks & Other Sites 1964 & 2014 Introduction: In 1964, Paul & Marilyn Koch took a 10 week camping trip through National Parks and other locations
More informationPRESENTS A RARE AND UNIQUE DEVELOPMENT OPPORTUNITY THE HISTORIC WHITE CHIEF LODGE FISH CAMP, CALIFORNIA
MVP COMMERCIAL Hotel-Motel and Investment Brokerage PRESENTS John R. Reed, CCIM P. O. Box 338 Oakhurst, CA 93644 559.683.7474 Voice 559.683.7393 Fax 559.288.2488 Cell A RARE AND UNIQUE DEVELOPMENT OPPORTUNITY
More informationTOGETHER, MAKING BOATING THE PREFERRED CHOICE IN RECREATION RECREATIONAL BOATING ECONOMIC STUDY $ $
2012 TOGETHER, MAKING BOATING THE PREFERRED CHOICE IN RECREATION RECREATIONAL BOATING ECONOMIC STUDY In 2013 NMMA s Center of Knowledge contracted with the Recreational Marine Research Center at Michigan
More information- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses;
B710 - - OPSS 710 710.1 GENERAL 710.1.1 Tender Items Pavement marking may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationBear River ECC Final Meeting Notes April 20, 2016 Pocatello, ID
Bear River ECC Final Meeting Notes April 20, 2016 Pocatello, ID ECC Members Present Lynn Van Every, Idaho Department of Environmental Quality Jim DeRito, Trout Unlimited Corey Lyman, U.S. Forest Service
More informationAction Recommendation: Budget Impact:
City of Fayetteville Staff Review Form Matt Mihalevich 1/16/2019 DEVELOPMENT SERVICES (620) Submitted By 2019 0050 Legistar File ID February 5th, 2019 City Council Meeting Date Agenda Item Only N/A for
More informationFOR LEASE :: BUILDING 6 Blue Diamond Business Center. Scheduled Delivery Q SITE BLDG WEST WINDMILL LANE, LAS VEGAS, NV 89139
LAS VEGAS STRIP FOR LEASE :: BUILDING 6 Blue Diamond Business Center 3930 WEST WINDMILL LANE, LAS VEGAS, NV 89139 ±322,560 WAREHOUSE / DISTRIBUTION FACILITY VALLEY VIEW BLVD BLDG 5 SITE BLDG 6 BLDG FUTURE
More information