THE GREAT MAN-MADE RIVER PROJECT
|
|
- Julian Sullivan
- 5 years ago
- Views:
Transcription
1
2
3 WATER RESOURCES IN LIBYA Only 5% of the entire area of Libya exceeds 100 mm GROUND WATER 95.6% (4 in) annually. Evaporation rates are also high ranging SURFACE from WATER 700 mm (28 in) 2.3% in the north to 6000 mm DESALINATION 1.4% (236 in) in the south WATER TREATMENT 0.7%
4 Jefara Mediterranean Sea Tripoli Benghazi Sirt Ajdabiya Green Mountains Hamada In a recent study conducted under the supervision of the UN Over Centre extraction for Environment in These these & Development basins contain has in resulted the Arab in Region seawater & intrusion Europe CEDARE, in the 10,000 coastal the Nubian aquifers 12,000 Basin cubic with (of Km. TDS which levels Kufra is reaching part) 7000ppm was in estimated the of Tripoli economically at region containing extractable water x 10^12 m 3. If the neighboring countries extract water at a rate of 1380 MCMY it is calculated that the reserve would last 4860 years. Murzug Sirt Kufra
5 Cost Comparison Between Different Water Supply Alternatives 0.79 m 3 Desalination 1.05 m 3 Transportation by ships 9.00 m m 3 Quantity of water per One Libyan Dinar Great Man-Made River Project Pipeline from South Europe to Tripoli
6 03 October 1983 The General People's Congress held an extraordinary session to draft the resolutions of the basic people's Congresses, which decided to fund and execute the Great Man-Made River Project. 28 August 1984 The leader of the Revolution lays the foundation stone in Sarir area for the commencement of the construction of the Great Man-Made River Project.
7 Gedammes Conveyance - Length No. of Wells Km (119 Miles). - Diameter Total Production MCMY m (13 ft.). Mediterranean Sea Tripoli Benghazi Sirt Ajdabiya Jaghboub No. of Wells 40 Total Production 50 MCMY Tobruk Ghadames Jaghboub NE Jebel Hasouna Sarir & Tazerbo Well Fields E Jebel Hasouna Kufra - Total Production 2.0 MCMD - No. of Wells No. of 234 Wells Length Total 1926 Production Km ( Miles MCMD ). of mainly 4.0 m (13 ft.) diameter pipes Sarir East & NEJebel Hasouna s - No. of Wells Total Production 2.5 MCMD - Length of Km (1,083 Miles) of mainly 4.0 m (13 ft.) diameter pipes Tazerbo Tazerbo Kufra
8 Ghadames / Al Zawia System Break Pressure Tank Ghadames Abu Kammash Break Pressure Tank Pump Station 3 Nalut Pump Station 1 Pump Station 2 Sinawn Zwara Flow Control Station Al Zawia Tripoli * 144 wells Km (130 miles) wellfield collector pipe line. * 626 Km (389 miles) main conveyance and distribution line - 4 no s pump stations - 4 no s storage tanks - 3 no s pressure breaking tanks. - 1 no elevated tanks no s turnouts. * Communication and control system. * 3 operation and maintenance centres. * Electrical distribution system for the wellfield.
9 Tripoli Mediterranean Sea Benghazi Sirt Ajdabiya 3 Pump Station 1 Pump Station Tobruk Ghadames - Add 1.68 MCMD to existing phase I conveyance. NE Jebel Hasouna wells in Kufra well field Km (238 miles) conveyance. - Mainly 4.0 m (13 ft.) diameter pipes. - 7 no. inline booster pumping station. E Jebel Hasouna Km (250 miles) hall road. - Permanent communication & control system. - Cathodic protection system. - Operation, support and maintenance facilities. 2 Pump Station Sarir Tazerbo Tazerbo Jaghboub Pump Station Kufra
10 Mediterranean Sea Tripoli Tobruk Benghazi Sirt Ajdabiya Ghadames Jaghboub NE Jebel Hasouna Sarir Tazerbo E Jebel Hasouna Tazerbo Kufra
11 Reservoirs Ajdabiya Holding Reservoir - Capacity 4.0 mcm Al Gardabiya Reservoir - Capacity 6.8 mcm Omar Mukhtar Reservoir - Capacity 4.7 mcm The Grand Al Gardabiya Reservoir - Capacity 15.4 mcm The Grand Omar Mukhtar Reservoir - Capacity 24.0 mcm Total Storage Capacity = 54.9 mcm
12 Two Pipe Manufacturing Plants Sarir Plant Three lines producing 120 pipes daily Brega Plant Two lines producing 80 pipes daily
13 Cut-away Section of a Pre-stressed Concrete Cylinder Pipe (PCCP) PIPE MAKE-UP MORTAR COATING STEEL PRE-STRESSING WIRE OUTER CONCRETE CORE STEEL LINER INNER CONCRETE CORE Length of Pipe = 7.52 meters Pipe Diameters meters Weight of Pipe = tonnes Pressure Rates 6-26 bar km of prestressed Wire tonnes of Cement
14 Pipe Transportation
15 Haul Roads Phase I Total Length 1,600 Km (1,000 Miles). Phase II Total Length 2,155 km (1,340 Miles).
16 Pipe Laying Depth of Trench 7.0 m (23 ft.). Capacity of Cranes Used up to 450 tons
17 Water Allocation in M 3 /Day 6.57 Million Cubic Metres Water per Day Transfer 2,398 Million Cubic Metres per Year All Phases in M 3 /Day 1,838,480 M 3 Municipal --> (28 %) 4,596,200 M 3 Agricultural --> (70 %) 131,320 M 3 Industrial --> (2 %)
18 Tunisia Tripoli Mediterranean Sea Benghazi Sirt Ajdabiya Tobruk Ghadames PCCP Plant Jaghboub Algeria Algeria NE Jebel Hasouna Sarir PCCP Plant Agricultural Land Developed 130,000 hectares Egypt Egypt E Jebel Hasouna The agricultural development projects are being carried out The in three agricultural regions development in Libya: plan aims to: Realize American Investors Benghazi the Plains with Companies highest experience Region possible have net rate in irrigated of already the self-sufficiency field area invested are 30,000 in invited grain hectares and the to fodder development participate 14,000 crops. hectares in: of to Large be developed Farm Projects: as large farm projects. Increase Jefara Plains Implementation the Hectares Region capital (Tripoli) Benghazi investment - net Plains and irrigated Region job area opportunities 80,000 hectares in the agricultural 1,500 (this hectares Operation will sector. be increased be developed to 14,000 as large Hectares farm projects. in the future) Maintenance Hectares Tarhouna Produce Al-Ghardabiya - Valmont Management raw materials Valley Plains supplying and Region for Kmthe product food Irrigation (Sirt) marketing processing - net equipment irrigated industry. area 20,000 hectares 5,400 hectares to be developed as large farm projects. Encourage Of the - Case large supplying and farm support projects agricultural agricultural equipment settlement. Tazerbo Tazerbo Kufra Sudan Sudan
19 19.58 Billion Dollars Project Cost Capital Phase Cost I - $5.53 $19.58 Billion Tunisia Operation Billion & Maintenance Cost $14.11 Billion Tripoli Mediterranean Sea Benghazi Total Phase Investment II - $8.05 Cost (50 Years) $33.69 Billion NE Jebel Hasouna Billion Expected Production Quantity E Jebel Hasouna 120 Billion m 3 Algeria Algeria Ghadames Unit Future rate/ Phase m 3 water - $6.0 to recover investment cost Billion over 50 years Sirt Ajdabiya Sarir Tazerbo Tazerbo Jaghboub Tobruk Egypt Egypt Kufra $0.28/m Km Sudan Sudan
20 PROJECT STATISTICS Volume Total of No. Trench of Pipes Excavation Total 240 Weight Million of MCement 3 585, Million Tonnes The length of pre-stressing wire used The The amount in total the number project of aggregate of is wells equivalent used is 1,350 in to the 220 project The times cement is the sufficient circumference used in to the build project of the 16is earth pyramids sufficient. the to construct size of the a concrete Great Pyramid road from. Tripoli to Bombay
21 Mediterranean Sea Tripoli Benghazi Tobruk Sirt Ajadibya England Germany Tazirbu France Al Kufrah Project Scale Project Scale Km
22 KANSAS Sirt Benghazi Ajadibya Tobruk OKLAHOMA LOUISIANA ARKANSAS MISSOURI Tazirbu TEXAS Al Kufrah Tripoli COLORADO Ghadames NEW MEXICO Project Scale Project Scale Km
23
Regional Centers as Knowledge Producers, Providers & Brokers
Web: water.cedare.int Nairobi Work Programme E-mail: on Impacts, Vulnerability & Adaptation to Climate Change Samoa, 2-5 March, 2010 Centre for Environment & Development for the Arab Region & Europe (CEDARE)
More informationAnnex III: Statistics
Annex III: Statistics Table A.3.1 Physical characteristics of Arab countries Country Area, 2011 (thousand square kilometres) Length of coast, 2005 (kilometres) Rainfall, 2002 (millimetres per year) Total
More informationSuccessful Experiences in Rio Grande/Rio Bravo Watershed Management
Successful Experiences in Rio Grande/Rio Bravo Watershed Management 5 th th World Water Forum Istanbul, Turkey March 22-23, 23, 2009 Introduction A watershed with many voices a medley of cultures, customs,
More informationFarm-level Irrigation Modernization Project - FIMP
Farm-level Irrigation Modernization Project - FIMP Improved Agriculture Water Use Workshop Mediterranean Agronomic Institute CIHEAM 28 to 31 Aug 2017 Presentation Outline Background of Water Resources
More informationServicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 1
Emilio Rangel Woodyard Director General Water and Sewerage Service of Monterrey Tel: +5181-2033-7001 E-mail: erangel@sadm.gob.mx y/o cavila@sadm.gob.mx MONTERREY VI PROJECT Servicios de Agua y Drenaje
More informationCYPRUS Country Report
CONFERENCE OF THE WATER DIRECTORS OF THE EURO-MEDITERRANEAN AND SOUTHEASTERN EUROPEAN COUNTRIES CYPRUS Country Report by Christodoulos Artemis Director Water Development Department Athens, 6 & 7 November
More informationGaza Terminals Overview
Gaza Terminals Overview There are six trade terminals at the Gaza strip borderlines, these terminals are utilized for the crossing in and out of imported commodities and exported goods. Four of the terminals
More informationAmended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort
Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance
More informationPopulation (million) % of Africa
FAO. Irrigation in in figures: AQUASTAT Survey 2005 TABLE 1 al distribution of cultivable and cultivated areas Cultivable areas Cultivated areas in 2002 In cultivable areas (ha) (ha) (%) Northern 65 320
More informationWater resources for Botswana
Water resources for Botswana David Stephenson Profstephenson@gmail.com Contents The water situation Sources Demands Existing supplies Chobe Zambezi Lesotho Alternatives Botswana s Rainfall distribution
More informationAswan Investment Opportunities
Aswan Investment Opportunities Project Sector 1 Phosphate fertilizers factory Industrial Sector 2 Marble and Granite Factory Industrial Sector 3 Clay Brick Factory Industrial Sector 4 Date Conservation
More informationBlocking Sea Intrusion in Brackish Karstic Springs
European Water 1/2: 17-23, 3. 3 E.W. Publications Blocking Sea Intrusion in Brackish Karstic Springs The Case of Almiros Spring at Heraklion Crete, Greece A. Maramathas, Z. Maroulis, D. Marinos-Kouris
More information6th Grade Social Studies Chapter 7: The Geography and Early Settlement of Egypt, Kush and Canaan
I. Introduction (7.1) A. Egyptians settled along the Nile River, in the NE corner of Africa B. civilization lasted from around 3100 B.C. to 350 C. E. C. Kushites settled to the south of Egypt, along the
More informationUnit 9 The Middle East SG 1 - Physical Geography, Population & Demographics
Unit 9 The Middle East SG 1 - Physical Geography, Population & Demographics I. Physical Geography A. The Middle East includes southwestern Asia and North Africa. 1. The name is Eurocentric. Middle East
More informationIntermediate report. Letter of agreement FAO - GCB/RAB/013/ITA
Treated waste water for sustainable production of valuable biomass, soil and water quality improvement and combating desertification in Algeria and Tunisia Letter of agreement FAO - GCB/RAB/013/ITA Intermediate
More informationJust how big is Africa?
The United States China India The United Kingdom Portugal Spain France Belgium Germany The Netherlands Switzerland Italy Eastern Europe Japan 11.7 million sq. miles Just how big is Africa? Chapter 18 Section
More informationSteel Mill Products 1999
Steel Mill Products 1999 Issued December 2002 MA331B(99)-1(RV) (Formerly Series No. MA33B) Information about the scope of the survey, methodology, explanation of terms and historical notes for this survey
More informationUNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION REGION 4 SALT LAKE CITY, UTAH. May 29, 1958
UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION REGION 4 SALT LAKE CITY, UTAH May 29, 1958 FACT SHEET ON PRIME CONTRACT FOR CONSTRUCTION OF FLAMING GORGE DAM GENERAL INFORMATION Bids will
More informationEni Field Trip Libya. October, 2004
Eni Field Trip Libya October, 2004 Wafa Coastal Plant Maremi Kashim Mellitah Complex Manager October 28 th, 2004 Western Libya Gas Project Overview Sabratha Platform Mediterranean Sea C1 C2 Gas Export
More informationWATER DESALINATION PROJECT IDENTIFICATION IN SINAI, EGYPT
WATER DESALINATION PROJECT IDENTIFICATION IN SINAI, EGYPT By Magdy Abou Rayan*, Berge Djebedjian* and Ibrahim Khaled** * Faculty of Engineering, Mansoura University, El-Mansoura 35516, Egypt E-mail: mrayan@usa.com,
More informationSouthwest Agribusiness Consulting, Inc.
Volume XVI, Issue 3D United Checkoff Program Weekly Basis Snapshot Page 1 Southwest Agribusiness Consulting, Inc. www.agconsult.net Country Elevators Region to Differential Avg. Basis Cash Price Avg. Basis
More informationEfficiency that delivers GENERAL PRESENTATION UCSD FRONTERA FRIDAY APRIL 1 ST. 2016
Puerto Port of De Ensenada Efficiency that delivers GENERAL PRESENTATION UCSD FRONTERA FRIDAY APRIL 1 ST. 2016 HINTERLAND In 2014, the port handled more than 2 millions tons for the industrial, maquila,
More informationWater resource situation of the Republic of Djibouti
Water resource situation of the Republic of Djibouti Omar ASSOWE DABAR Integrating Groundwater Management within River Basins 15-17 January 2019 Nairobi, Kenya Regional Training Workshop on Introduction
More information2005 Eni Field Trip - Libya
2005 Eni Field Trip - Libya Giorgio Moscatelli Projects Director Faisal Shita Senior Offshore Project Manager September 23 rd, 2005 Western Libya Gas Project: overall scheme Production start-up on schedule
More informationGTZ SUN ENERGY Project
ERG Ethio Resource Group ኢ ት ዮ ሪ ሶ ር ስ ግ ሩ ፕ GTZ SUN ENERGY Project Water Boiling Test Results Institutional Rocket and Tikikil Stoves (Draft) February 2010 1 1. Introduction This report presents Water
More informationWARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES
WARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES OPERATIVE FROM 1 JANUARY 2019 SCHEDULE OF CHARGES INDEX 1. PORT CHARGES ON SHIPS 2. PORT CHARGES ON GOODS 3. QUAY RENTS 4. WEIGHBRIDGE
More informationBIG HORN RIVER. Big Horn Canal Bluff Fritz Highland Hanover Kirby Lower Hanover Lucerne Tillard Upper Hanover
BIG HORN RIVER Big Horn Canal Bluff Fritz Highland Hanover Kirby Lower Hanover Lucerne Tillard Upper Hanover DESCRIPTION AND OPERATION MEMORANDUM BIG HORN CANAL USGS ID 4418 D1, 4418 C1, 4417 C8, 4418
More informationPRODUCT SPECIFICATION
Product Family Product Number Ages Rainbow Swing GS-RS3100 2 to 12 years 9 0 / 2.75 m Capacity 4 Size Use Zone W: 11 9 / 3.57 m H: 9 0 / 2.75 m L: 23 7 / 7.19 m W: 7 9 / 2.35 m Fall Height Shipping Weight
More informationMerowe Dam Archaeological Salvage Project (MDASP)
Merowe Dam Archaeological Salvage Project (MDASP) Salah Mohamed Ahmed Introduction The idea of building a dam at the 4 th Cataract of the Nile dates to the period of the Anglo-Egyptian administration in
More informationPERMA SKIRT AGAINST SEA LICE!
PRODUCTS 2017 PERMA SKIRT AGAINST SEA LICE! Botngaard is Norways leading producer of tarpaulin solutions to the aquaculture industry. BOTNGAARD Advantages with permanent skirts 50-80% less sea lice infestation
More informationBuilding Completion. Statistics Second Quarter. Building Completion Statistics I Second Quarter 2012
Building Completion Statistics 2012 Second Quarter Date of Release: September 2012 1 Table of Contents Introduction... 3 Key Points... 4 Distribution of Building Completions by Region... 5 Distribution
More informationSTUDY OF ALAQI SECONDARY CHANNEL IN LAKE NASSER
ABSTRACT STUDY OF ALAQI SECONDARY CHANNEL IN LAKE NASSER GamalSallam 1, Mohamed Ihab 2, and Waleed Emary 3 Associate Professor, National Water Research Center, Email: gasallam@yahoo.com Civil Engineer,
More informationImproving Access to Fertilizers
Improving Access to Fertilizers by Amit Roy IFDC Presented at the International Workshop on Strengthening and Widening Markets and Overcoming Supply Side Constraints for African Agriculture June 3-5, 2007
More informationPorts. Libya Port Contacts Commercial Ports Telephone Fax Marine Authorities (Tripoli Janzour)
Ports Source: This information has been extracted from the WFP Logistics Capacity Assessment for Libya. The full document can be found on the Logistics Cluster website at: http://www.logcluster.org/ops/northafrica/lby-lca/view.
More informationFROM: Donald J. Polmann, Director of Science and Engineering ( New Water Plan - Quarterly Report - Approve Submittal to SWFWMD
TAMPA WATER Supplying Water To The Region DATE: February 1,2008 TO: J err y L. Maxwell, General Manager AGENDA ITEM C18 FROM: Donald J. Polmann, Director of Science and Engineering ( SUBJECT: New Water
More informationEL PASO S DESALINATION EFFORTS
El Paso s Desalination Efforts WATER DESALINATION AND REUSE STRATEGIES FOR NEW MEXICO SEPTEMBER NEW MEXICO WATER RESOURCES RESEARCH INSTITUTE 2004 Bill Hutchison has more than 20 years of experience as
More informationState Five Year Tonnage Trend. Shipping Tons Receving Tons Within Tons Total Tons
U.S. ARMY CORPS OF ENGINEERS Louisiana BUILDING STRONG 2015 State Quick Facts (Tons in Millions) Tons Shipped - 243.4 Tons Received - 238.8 Tons Shipped Within State - 53.7 Total Commerical Docks - 835
More informationLouisiana BUILDING STRONG
U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG 2016 State Quick Facts (Tons in Millions) Tons Shipped - 256.7 Tons Received - 237.7 Tons Shipped Within State - 51.5 Total Commerical Docks - 781 Total Value
More informationPort Everglades Master/Vision Plan Update
1 Port Everglades Master/Vision Plan Update 3 rd Tenant & Stakeholder Meeting November 21, 2013 2 Agenda Project Process Overview Summary of the Market Assessments October 30 th Charrette Summary Industry
More information4180 acre-feet minimum conservation pool
MEMORANDUM Subject: Bear River Basin Plan SULPHUR CREEK RESERVOIR Date: July 20, 2000 Location: Section 34, Township 14N, Range 119W. Located on Sulphur Creek, tributary to the Bear River. Located approximately
More informationNew York Wheel Construction Update
NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, WITHIN, INTO OR IN THE UNITED STATES, AUSTRALIA, CANADA OR JAPAN. For Immediate Release Challenger Acquisitions Limited ("Challenger"
More informationNo UNITED ARAB REPUBLIC and SUDAN Agreement (with annexes) for the full utilization of the Nile waters. Signed at Cairo, on 8 November 1959
UNITED ARAB REPUBLIC and SUDAN Agreement (with annexes) for the full utilization of the Nile waters. Signed at Cairo, on 8 November 1959 Official text: Arabic. Registered by the United Arab Republic on
More informationNorth Africa. Chapter 25. Chapter 25, Section
Chapter 25, Section World Geography Chapter 25 North Africa Copyright 2003 by Pearson Education, Inc., publishing as Prentice Hall, Upper Saddle River, NJ. All rights reserved. Chapter 25, Section World
More informationHong Kong International Airport (Chek-Lap Kok Airport)
Hong Kong International Airport (Chek-Lap Kok Airport) General Information Hong Kong International Airport (HKIA) is the principal airport serving Hong Kong. As the world's fifth busiest (2004) international
More informationATEX NEWSLETTER. Share It. January 2011 ATEX - International Exhibition Organizers Issue No. 02. ATEX team Tripoli International Fairground
ATEX NEWSLETTER January 2011 ATEX - International Exhibition Organizers Issue No. 02 ATEX team Tripoli International Fairground Read in this issue... Libya signed a contract worth of $ 227million dollars
More informationAccident Report. Crane Failure Global Wind. 16-November-2006 Class B
Accident Report Crane Failure Global Wind 16-November-2006 Class B NARRATIVE On 15 November 2006 at 2209 hours NZDT (New Zealand Daylight Saving Time), Global Wind berthed port side to at No. 9 berth Mount
More informationCONTENTS Executive Summary... iii 1. Introduction Major Destinations for Zambia s Exports Major Source Countries for Zambia s
Bank of Zambia CONTENTS Executive Summary... iii 1. Introduction... 1 2. Major Destinations for Zambia s Exports... 1 3. Major Source Countries for Zambia s Imports... 3 4. Conclusion... 6 ii Executive
More informationNext Release: 13 April Next Release: 13 April December
43070 Next Release: 13 April 2018 Next Release: 13 April 2018 December Date of publication: 15 March 2018 TABLE OF CONTENTS Charts 1 Gross consumption of natural gas by OECD region 3 2 Indigenous production
More informationHARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York
HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York Harbor Location: Buffalo Harbor is located on the Eastern shore of Lake Erie in the City of Buffalo, NY. Authority: River & Harbor Acts of 1826,
More informationThe ITGI Project Gas Corridor through Turkey, Greece and Italy
ITALIAN REPUBLIC HELLENIC REPUBLIC TURKISH REPUBLIC The ITGI Project Gas Corridor through Turkey, Greece and Italy Rome, 26th July 2007 Umberto Quadrino, CEO, Edison 1 Gas demand/supply balance in Europe
More informationPlatte West Well Field A Protective Modeling Approach
Platte West Well Field A Protective Modeling Approach Presented to: 2007 Eastern South Dakota Water Conference / 52 nd Annual Midwest Ground Water Conference June 25, 2007 Presented by: Luca DeAngelis,
More information1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy
1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS 2. SECTOR Energy 3. LOCATION The term Upper Horizons means the undeveloped part of the hydropower system Trebišnjica, which is located above the
More informationCONTENTS Executive Summary... iii 1. Introduction Major Destinations for Zambia s Exports Major Source Countries for Zambia s
Bank of Zambia CONTENTS Executive Summary... iii 1. Introduction... 1 2. Major Destinations for Zambia s Exports... 1 3. Major Source Countries for Zambia s Imports... 4 4. Conclusion... 6 ii Executive
More informationCoastal Gas Link Project of Trans Canada Pipelines. Community Profile of Stellat en First Nation
Coastal Gas Link Project of Trans Canada Pipelines Community Profile of Stellat en First Nation What is the Coastal Gas Link Project? Trans Canada Pipeline is planning to build a 650 Km. natural gas pipeline
More information2013 LIBYA BUILD The 9 th International Building and Construction Exhibition
2013 LIBYA BUILD The 9 th International Building and Construction Exhibition E Brochure invitation to libya build 2013 libya build 2012 report Invitation To the 9 th International Building & Construction
More informationDRY- DOCK HULL INSPECTION OF NILE CRUISERS
18 th International Conference on Ships and Shipping Research 2015, June 24 th 26 th, Lecco, Italy M. Altosole and A. Francescutto (Editors) DRY- DOCK HULL INSPECTION OF NILE CRUISERS Arwa. W. HUSSEIN
More informationMONTHLY NATURAL GAS SURVEY. November 2009
MONTHLY NATURAL GAS SURVEY November 2009 INTERNATIONAL ENERGY AGENCY INTERNATIONAL ENERGY AGENCY Next Release: 12 March 2010 MONTHLY NATURAL GAS SURVEY - 1 CONTENTS TABLE 1 Natural Gas Balances in OECD
More informationCatchment and Lake Research
LARS 2007 Catchment and Lake Research Multilateral versus bilateral agreements for the establishment of river based organizations: comparison of legal, economic and social benefits in the Zambian experience.
More informationA Brief Overview of the Rio Grande Compact 04/26/06
A Brief Overview of the Rio Grande Compact 04/26/06 The New Mexico Interstate Stream Commission Investigate, Protect, Conserve, and Develop the State s Waters and Stream Systems Negotiate and Administer
More informationEconomic and Social Council
United Nations Economic and Social Council ECE/TRANS/SC.3/2017/16 Distr.: General 24 July 2017 English Original: Russian Economic Commission for Europe Inland Transport Committee Working Party on Inland
More informationState Five Year Tonnage Trend. Shipping Tons Receving Tons Within Tons Total Tons
U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG 2015 State Quick Facts (Tons in Millions) Tons Shipped - 25.2 Tons Received - 35.0 Tons Shipped Within State - 14.1 Total Commerical Docks - 182 Total Value
More informationHARBOUR DUES. The Port of Helsingborg
HARBOUR DUES The Port of Helsingborg Valid 1 January -- 31 December, 2018 1 Contents 1 Ships dues 2 Environmental discounts 3 Waste and environmental charge 4 Pumping charge 5 Harbour dues 6 Advance notification
More informationExports of Canadian Grain and Wheat Flour
Canadian Grain Commission Commission canadienne des grain JANUARY CROP YEAR 2011 Exports of Canadian Grain and Wheat Flour date Tonnes (millions) 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 4.0 3.5 3.0 2.5 2.0
More informationState Five Year Tonnage Trend. Shipping Tons Receving Tons Within Tons Total Tons
U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG 2015 State Quick Facts (Tons in Millions) Tons Shipped - 22.2 Tons Received - 19.6 Tons Shipped Within State - 0.4 Total Commerical Docks - 142 Total Value
More informationExports of Canadian Grain and Wheat Flour
Canadian Grain Commission Commission canadienne des grain JULY CROP YEAR 2012 Exports of Canadian Grain and Wheat Flour date Tonnes (millions) 14.0 12.0 10.0 8.0 6.0 4.0 2.0 0.0 9.0 8.0 7.0 6.0 5.0 4.0
More informationIS A BUDGET ONLY DESCRIPTION QUANTITY UNIT
Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION
More informationRiverWare User Group Meeting, february Migration Lerma-2004 model, from Stella to RiverWare
RiverWare User Group Meeting, february 2015 Migration Lerma-2004 model, from Stella to RiverWare RiverWare User Group Meeting, february 2015 Working Group Universidad Autónoma de Zacatecas: Dr. Ángel Alfonso
More informationExports of Canadian Grain and Wheat Flour
Canadian Grain Commission Commission canadienne des grain FEBRUARY CROP YEAR 2012 Exports of Canadian Grain and Wheat Flour date Tonnes (millions) 10.0 9.0 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 6.0 5.5 5.0
More informationDesert Locust Outbreak
Desert Locust Outbreak SW Libya and SE Algeria January - June 2012 Desert Locust Information Service, Rome www.fao.org/ag/locusts 1 June 2012 update Desert Locust outbreak in SW Libya: overview In early
More informationImport Summery Report United Arab Emirates
Import Summery Report United Arab Emirates Contents 1. 2. 3. 3.1 3.2 3.3 3. 3.5. 5. 5.1 5.2 Disclaimer Overview of UAE Imports Non-Oil Imports Overview of UAE Import Sectors Food Products Building Materials
More informationTOGETHER, MAKING BOATING THE PREFERRED CHOICE IN RECREATION RECREATIONAL BOATING ECONOMIC STUDY $ $
2012 TOGETHER, MAKING BOATING THE PREFERRED CHOICE IN RECREATION RECREATIONAL BOATING ECONOMIC STUDY In 2013 NMMA s Center of Knowledge contracted with the Recreational Marine Research Center at Michigan
More informationSpiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8
Contents Introduction 1 Duct & Fitting Range 2 Duct Sizes 3 Fittings 5 Round Duct Connector 7 Installation 8 Celmec International Pty Ltd ACN 005 850 546 Melbourne Tel: +61 3 8552 8200 Fax: +61 3 9555
More informationFederal Ministry of Transportation. Nigeria Business Investor Forum Briefing on Aviation Sector Reform and Investment Opportunities
Federal Ministry of Transportation Nigeria Business Investor Forum Briefing on Aviation Sector Reform and Investment Opportunities By Senator Hadi Abubakar Sirika Honourable Minister of State Aviation
More informationPort of Newcastle Schedule of Port Pricing
Port of Newcastle Schedule of Port Pricing Port of Newcastle Operations Pty Ltd (ACN 165 332 990) as Trustee for the Port Of Newcastle Unit Trust (ABN 97 539 122 070) (trading as Port of Newcastle) Effective
More informationFIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,
FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000
More informationStrategic Location DJIBOUTI
Strategic Location DJIBOUTI Infrastructures & Investments in Ports, Free Zones and Maritime related Business Activities Aboubaker Omar Hadi Chairman of Djibouti Ports and Free Zones Authority 1. Djibouti
More informationAncient Greek Buildings/ Fortifications. Matthew Jackson
Ancient Greek Buildings/ Fortifications Matthew Jackson What is a fortification? -The combination of terrain and available materials to form a means of defense against potential attackers -Represent the
More informationLand Figures & Spatial Data Infrastructure in KOSOVO
Land Figures & Spatial Data Infrastructure in KOSOVO Idriz SHALA idriz.shala@gmail.com GIS -expert Afrim SHARKU afrim.sharku@gmail.com Land Management - Expert Kick-off meeting of the Regional Expert Advisory
More informationSPECIAL SESSIONS MONDAY
SPECIAL SESSIONS MONDAY 9:30 12:20 Opening Ceremony Gran Cancun Room/ 12:40 14:10 HLP: Water and the SDGs Gran Cancun Room/ 14:10-15:30 LUNCH Lounge Zone Regular Session 1 Cozumel 1 SS-39(A): Sustainability
More informationCapable Accommodation work Barge with helideck. Large Work Deck with 400t deck crane. Accommodation for 165 pax. Mynx. Accommodation Work Barge
Capable Accommodation work Barge with helideck Large Work Deck with 400t deck crane Accommodation for 165 pax Mynx Accommodation Work Barge hnical Drawing Proven and Capable shallow water accommodation
More informationCOUNTRY CASE STUDIES: OVERVIEW
APPENDIX C: COUNTRY CASE STUDIES: OVERVIEW The countries selected as cases for this evaluation include some of the Bank Group s oldest (Brazil and India) and largest clients in terms of both territory
More informationState of South Africa s Maritime Industry Transport Portfolio Committee. 08 May 2012 Commander Tsietsi Mokhele Chief Executive Officer
State of South Africa s Maritime Industry Transport Portfolio Committee 08 May 2012 Commander Tsietsi Mokhele Chief Executive Officer An Overview of the SA Maritime Industry 3,000 km coastline in 3 oceans
More informationExports of Canadian Grain and Wheat Flour
Canadian Grain Commission Commission canadienne des grain MAY 2011 CROP YEAR Exports of Canadian Grain and Wheat Flour date Tonnes (millions) 14.0 12.0 10.0 8.0 6.0 4.0 2.0 0.0 7.0 6.0 5.0 4.0 3.0 2.0
More informationAnnual bulletin 2014
Annual bulletin 2014 1 --------------------------Temperature----------------------- January 2014 In January 2014 it was warmer than normal nearly over the complete region with exception of the northern
More informationRepublic of Turkey - Ministry of Economy,
Republic of Turkey - Ministry of Economy, 2012 0 SHIPBUILDING INDUSTRY Turkey is surrounded by sea on three sides, is a natural bridge between Asia and Europe. Turkey borders the Black Sea, the Mediterranean,
More informationDove is a car carrier with a carrying capacity of 6,700 vehicles. STX Dove, each 25m wide and 11m long, can generate a maximum
STX Business Group Newsletter news World Best STX with the spirit of Creativity & Challenge 05 2012.5.1 No.132 www.stx.co.kr Solar power facilities to be built in the STX Dove, a 6,700 units Pure Car Truck
More informationPort of Newcastle 2016 TRADE REPORT. Port of Newcastle
Port of Newcastle 2016 TRADE REPORT Port of Newcastle SHIP VISITS COAL 2016-1,764 2015-1,704 CRUISE 2016-9 2015-8 NON COAL 2016-485 2015-455 2,258 vessel visits in 2016 2,167 ship visits in 2015 COAL TRADE
More information2009 Carole Marsh/Gallopade International
Live Work Play Learn LIVE LEARN WORK TM PLAY 2009 Carole Marsh/Gallopade International Permission is hereby granted to the individual purchaser or classroom teacher to reproduce materials in this book
More informationMolecular typing of Y. pestis strains: practical application
Molecular typing of Y. pestis strains: practical application Elisabeth Carniel Yersinia Research Unit National Reference Laboratory WHO collaborating Center Institut Pasteur France Y. pestis: very young
More informationFLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT
FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT Sherine S. Ismail Prof., Head of Lake Nasser studies department, Nile Research Institute, E-mail:sherine_shawky@yahoo.com ABSTRACT Nile water discharges
More information2015 Annual Water Report. City of Revelstoke Engineering and Public Works Department
2015 Annual Water Report City of Revelstoke Engineering and Public Works Department P a g e 1 Table of Contents Introduction... 3 Revelstoke Water Distribution System... 3 Greeley Creek Water Treatment
More informationHeavy Duty Suction Hose
Heavy Duty Suction Hose Heavy duty suction applications in agriculture industry and construction. Suitable for the conveyance of water, slurry, sewage, some solids and granules and gases. and alkalis.
More informationWINTERIZATION KIT. UNHCR Item No Item Application Sample. General Information and Description. Packing. Pallet Details
WINTERIZATION KIT Item Application Sample General Information and Description The Winterization Kit was developed to improve the insulation against cold for UNHCR Family Tents. The Winterization Kit includes
More informationInteriew: Tremendous potential for the development of Libyan tourism
Interiew: Tremendous potential for the development of Libyan tourism By Karen Dabrowska City Tourism Amelia Stewart, who set up the first company specialising in trips to Libya, talks about her experiences
More informationDr. Christopher Brown New Mexico State University GEF Project Rio Meeting Ciudad Juárez, México 3-5 October 2006
Political and Institutional Aspects of Rio Grande/ Río Bravo Basin Management Dr. Christopher Brown New Mexico State University GEF Project Rio Meeting Ciudad Juárez, México 3-5 October 2006 Institutional
More informationQATAR. Its total population is 2,123,160(2014) and it is at number 146 in the world.
QATAR Qatar, officially the State of Qatar, is a sovereign Arab country located in Southwest Asia. Its sole land border is with Saudi Arabia to the south with the rest of its territory surrounded by the
More informationProvincial Development and Physical Framework Plan Province of Capiz
3.2.3 Protection Areas Protection areas (Map 11) which include areas under the categories of NIPAS, Non-NIPAS, environmentally constrained and the military reservations are described as follows: a) NIPAS
More information2018 US Trade Mission to Algeria Algiers, Algeria- October 21-23, 2018
The US-Algeria Business Council & The Business Council for International Understanding, with the support of The Embassy of Algeria in Washington DC Proudly presents the 2018 US Trade Mission to Algeria
More informationProcurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods
I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam
More informationWater, Sewer and Stormwater General Facilities & Connection Charges
City of Snoqualmie Water, Sewer and Stormwater General Facilities & Connection Charges City Council Meeting March 9, 2015 Presented by: Sergey Tarasov, Project Manager Presentation Overview New customer
More information