1 Emilio Rangel Woodyard Director General Water and Sewerage Service of Monterrey Tel: y/o MONTERREY VI PROJECT Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 1

2 Background. Providing basic services to the population of Nuevo Leon has been a challenge that the Water and Sewerage Services of Monterrey has successfully taken over a hundred years. Over the decades, various sources have been added to meet the requirements of a metropolis growing to unprecedented levels, particularly in the last 10 years, in order to meeting the needs of both the population and services, industrial and commercial sectors. Monterrey, the state capital, is particularly located in the watershed of San Juan River, in a semi-desert region of transition between subtropical and desert, with cyclic periods of recurrent prolonged droughts and in contrast, sporadic heavy rains. Water supply to the Metropolitan Area has always been a challenge, given the ongoing economic and population growth that characterises and represents a cornerstone in the economic development and job creation in Mexico. With the support from the private banking sector, the Federal government and State resources, priority projects were carried out in the past to build dams, water treatment plants, aqueducts, storage tanks, distribution networks, pumping stations, collectors and sub-collectors sanitary sewerage, wastewater treatment plants, and other primary drinking water, sewerage and sanitation infrastructure for the benefit of the population of Nuevo Leon. Monterrey metropolitan area comprises 16 municipalities with a population of 4.2 million. We have a supply capacity of litres per second, which comes from surface sources (El Cuchillo, Cerro Prieto and La Boca dams) supplying the metropolitan area on a 60% average of drinking water. The remaining 40% comes from a series of shafts and galleries located in different systems, such as the Mina and Huasteca. From 2004 to 2006 growth rates of 5.4% were registered and from 2007 to 2010 the rate reached 8%. This is why a dynamic infrastructure has been created to supply water for the entire population of the city and metropolitan area that has a steadily growth under a strategic plan on a long-term vision. Strategic Project. In the search for new sources, the State Government convened an interagency working group, comprised of federal and state agencies, universities and research institutes that have thoroughly discussed various supply options, since according to current water supply of 11,500 litres per second, and projected growth of the city, which is an additional 250 litres per second per year, the Committee identified the need to incorporate a new source of supply by The State Governor, Rodrigo Medina de la Cruz, from the earliest days of his administration, began the necessary arrangements with the Federal Government through the National Water Commission, to find a reliable source for the orderly and sustainable growth of Nuevo Leon. Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 2

3 Alternativas Más Factibles 1. Acueducto Presa Falcón, 5.0 m³/ seg (Río Bravo) 2. Intercambio agua tratada-río Pilón 2.0 m³/ seg 3. Acueducto Cuchillo II, 5.0 m³/ seg 4. Acueducto Río Tampaón 5 15 m³/ seg 5. Desalación: Agua de Mar Actions. The surface water availability published by the National Water Commission, show deficit in the Rio Grande basin, low availability in the San Fernando and Soto La Marina River, and abundant availability in the Panuco River basin of 442 cubic meters per second. The Panuco River Basin is the one with better availability for water supply, and greater technical and legal feasibility. The alternatives for Falcon, Cuchillo II and Exchange Pilon River have 2 common features: It is supplied from the Rio Grande Basin and the last two from San Juan River, therefore given the drought periods, all will be affected in their supply capacity. Additionally, they present problems on availability, and social and political viability. The desalination of seawater is estimated to cost $ per cubic metre. The alternative Tampaon Cerro Prieto is in a different basin, thus it is the most economically feasible with sufficient availability. For the aforementioned and thanks to the excellent coordination on water issues between the Federal and State Governments, the National Water Commission decided to assign to the State of Nuevo Leon a volume of 15 cubic metres per second, i.e. 15 thousand litres per second from the Rio Panuco Basin, which means having a higher water volume. OFFICIAL GAZZETEE Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 3

4 *Diario Oficial de la Federación. Enero 21, Acuerdo por el que se da a conocer el resultado de los Estudios de Disponibilidad Media Anual de las Aguas Superficiales en las Cuencas Hidrológicas. *Título de Asignación In other words, this is equivalent to 130% of the total current supply, thus with this assignment the growth and economic and social development possibilities are guaranteed not only for Nuevo Leon, but for the entire north-eastern region of Mexico. In order to access these volumes of national waters, the State Government is negotiating through a private public partnership, with the support from BANOBRAS Bank through the National Infrastructure Fund (FONADIN) to carry out "Monterrey VI" project, consisting of a 84 inch diameter pipeline, unprecedented in Latin America, with kilometres long from the Tampaon River in the State of San Luis Potosi (Panuco Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 4

5 River Basin) to the "Cerro Prieto" dam in Linares, Nuevo León to obtain bulk water supply service for the metropolitan area of Monterrey and ensure the supply needs for the coming years. Characteristics. In the first stage, an aqueduct of 84 inches in diameter will be constructed, to a maximum flow of 6 cubic metres per second of capacity, with a length of kilometres from the intake, 6 pumping stations and additional works, up to the Cerro Prieto Dam, hence the water will be conducted through the existing pipeline, which has a capacity of 6 cubic metres per second, with an availability of 3.5 cubic meters per second to reach the San Roque water treatment, distributing water to the Metropolitan Area of Monterrey through the two existing transfer rings. *Sistema de Distribución AMM ( Anillos de Transferencia ) For the construction of the aqueduct, it is intended to make a trench three meters wide at the sides of the rights-of-way, with an average depth of 3.50 metres. It is estimated that the total length of km for the proposed section for the pipeline, approximately 244, correspond to federal rights-of-way, i.e., 68%. It is planned to place the pipeline in parallel with these federal rights-of-way in order to avoid unnecessary speculation in land-use or land tenure conflicts, favouring the legitimate social and political interest of the communities where this infrastructure will run along. Also, it would prevent affecting the ecological balance of the areas near the aqueduct, as it would take advantage of existing federal rights roads. It also intends to leverage existing rights-of-way state and local roads and other entities. Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 5

6 *Trazo Acueducto Tampaón Cerro Prieto As of September 2011, the summary of the progress of studies is as follows: Socioeconomic study 90%, Environmental Feasibility Study 40% Financial-Legal Study 85% and Basic Engineering studies 90%. The many meetings and negotiations personally led by the Governor with the heads of the Ministry of Finance, SCT, CONAGUA, BANOBRAS, among others, have led for the Governor s Executive Office and the Water and Sewerage Services of Monterrey to held meetings to follow up the project studies at the Investments Unit of the Ministry of Finance, in order to submit registration in that unit. Investment. This project shall be constituted as a Public Private Partnership (PPP). It is considered of great strategic importance and will cost approximately $ billion (one billion dollars). All relevant studies are currently in process, with the allocation of the required financial resources of $ 36 million pesos VAT excluded, of which $ 18 million pesos are provided by BANOBRAS Infrastructure National Fund. In line to the projects and plans established for the development of this project, it is estimated works to commence in February Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 6

7 Impact on Society. Thanks to the continued work to raise awareness in water conservation, the water culture of Nuevo Leon outstands. In the last 10 years the population has grown by 47%, while water supply only 13%, average household consumption has been reduced from 20 m3 to 16 m3 by the end of The Government of Nuevo Leon, through the Water and Sewerage Services of Monterrey, is committed to maintain the capacity to provide uninterrupted 24-hours service, since this vital resource should be no more a challenge but an opportunity and a right for all. For the first time in the country, a project of this nature is going to be carried out, being a milestone in the history of water by providing it from another basin. Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 7

INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO

INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO CHARACTERISTICS OF THE U.S.-MEXICO BORDER Land Boundary 674 miles Colorado River 24 miles Rio Grande 1,254 miles Over 12 million residents

More information

WEFTEC 2014 DOING BUSINESS IN THE WATER INDUSTRY OF MEXICO PROBLEMS, NEEDS AND OPTIONS FOR SOLUTIONS

WEFTEC 2014 DOING BUSINESS IN THE WATER INDUSTRY OF MEXICO PROBLEMS, NEEDS AND OPTIONS FOR SOLUTIONS WEFTEC 2014 DOING BUSINESS IN THE WATER INDUSTRY OF MEXICO PROBLEMS, NEEDS AND OPTIONS FOR SOLUTIONS MR. MANUEL BECERRA LIZARDI NEW ORLEANS, LA, SEPT 29, 2014 GENERAL INFORMATION ON THE WATER SECTOR IN

More information

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina 4th World Water Forum, México, 2006 Session FT 3.48: Public Policies for Water and Sanitation Services Convener: Comisión Nacional del Agua, México. Successes and Failures of the Policies of Water Supply

More information

DROUGHT AND SCARCITY PLANS IN THE BRAVO RIVER BASIN

DROUGHT AND SCARCITY PLANS IN THE BRAVO RIVER BASIN DROUGHT AND SCARCITY PLANS IN THE BRAVO RIVER BASIN Sergio Soto-Priante Deputy Director General Sub Direction of Hydraulic Infrastructure for Agriculture National Water Commission (Mexico) February 2009.

More information

Infrastructure: Networks to Sustain Development

Infrastructure: Networks to Sustain Development Infrastructure: Networks to Sustain Development Agribusiness Biotechnology Renewable Energies INFRASTRUCTURE Automotive Agricultural Machinery Technical and Professional Services Software Infrastructure:

More information

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

Dr. Christopher Brown New Mexico State University GEF Project Rio Meeting Ciudad Juárez, México 3-5 October 2006

Dr. Christopher Brown New Mexico State University GEF Project Rio Meeting Ciudad Juárez, México 3-5 October 2006 Political and Institutional Aspects of Rio Grande/ Río Bravo Basin Management Dr. Christopher Brown New Mexico State University GEF Project Rio Meeting Ciudad Juárez, México 3-5 October 2006 Institutional

More information

Successful Experiences in Rio Grande/Rio Bravo Watershed Management

Successful Experiences in Rio Grande/Rio Bravo Watershed Management Successful Experiences in Rio Grande/Rio Bravo Watershed Management 5 th th World Water Forum Istanbul, Turkey March 22-23, 23, 2009 Introduction A watershed with many voices a medley of cultures, customs,

More information

URBAN TRANSPORT POLICY CHALLENGES-PRACTITIONER S PERSPECTIVE

URBAN TRANSPORT POLICY CHALLENGES-PRACTITIONER S PERSPECTIVE FONDO NACIONAL DE INFRAESTRUCTURA URBAN TRANSPORT POLICY CHALLENGES-PRACTITIONER S PERSPECTIVE Francisco Quiñones Manager of PROTRAM Programa de Apoyo Federal al Transporte Masivo February 202 0 0 GROWING

More information

Infrastructure in Mexico

Infrastructure in Mexico Infrastructure in Mexico Alonso Quintana Chief Financial Officer Empresas ICA, S.A.B. de C.V. Mexico City February 16, 2010 National Infrastructure Plan 2007-2012: Requirements and Goals by Sector Sector

More information

THE GREAT MAN-MADE RIVER PROJECT

THE GREAT MAN-MADE RIVER PROJECT WATER RESOURCES IN LIBYA Only 5% of the entire area of Libya exceeds 100 mm GROUND WATER 95.6% (4 in) annually. Evaporation rates are also high ranging SURFACE from WATER 700 mm (28 in) 2.3% in the north

More information

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation Rebuilding Puerto Rico Mr. Omar J. Marrero, Esq. Executive Director Puerto Rico Public-Private Partnerships Authority & Central

More information

Summary of Global Perspectives

Summary of Global Perspectives Baja California: California`s Partner José Guadalupe Osuna Millán Baja California State Governor October 2009 World Economic Outlook Summary of Global Perspectives Percentage change last year, except interest

More information

Intermediate report. Letter of agreement FAO - GCB/RAB/013/ITA

Intermediate report. Letter of agreement FAO - GCB/RAB/013/ITA Treated waste water for sustainable production of valuable biomass, soil and water quality improvement and combating desertification in Algeria and Tunisia Letter of agreement FAO - GCB/RAB/013/ITA Intermediate

More information

Port Cooperation & Logistic Development in Emerging Markets

Port Cooperation & Logistic Development in Emerging Markets New Exploration in the Transitional Era BIPC, 2017 Port Cooperation & Logistic Development in Emerging Markets Fernando Gamboa Director General of Ports Authorities Management & Development Coordination

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

WASTE PREVENTION AND MANAGEMENT PROGRAMME , MEXICO SERGIO GASCA - ALVAREZ MINISTRY OF THE ENVIRONMENT AND NATURAL RESOURCES 2013

WASTE PREVENTION AND MANAGEMENT PROGRAMME , MEXICO SERGIO GASCA - ALVAREZ MINISTRY OF THE ENVIRONMENT AND NATURAL RESOURCES 2013 WASTE PREVENTION AND MANAGEMENT PROGRAMME 2009 2012, MEXICO SERGIO GASCA - ALVAREZ MINISTRY OF THE ENVIRONMENT AND NATURAL RESOURCES 2013 The Environmental National Policy in Waste Management In July 2007,

More information

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) Operation

More information

Multi stakeholders interactions in resource allocation in arid and semi-arid areas

Multi stakeholders interactions in resource allocation in arid and semi-arid areas Multi stakeholders interactions in resource allocation in arid and semi-arid areas Dr Jaime M Amezaga Newcastle University The Challenge of Sustainable Water Futures Newcastle14-15 July 2011 Water Futures

More information

WATER-ENERGY-FOOD NEXUS

WATER-ENERGY-FOOD NEXUS WATER-ENERGY-FOOD NEXUS Namibian Interdependencies, Challenges and Development Opportunities Introduction & Teaser NamPower Convention Centre Dr Detlof von Oertzen What is a Nexus? a connection linking

More information

UNOPS IN THE CARIBBEAN

UNOPS IN THE CARIBBEAN UNOPS IN THE CARIBBEAN ENGLISH & DUTCH SPEAKING COUNTRIES / IWRM AIO SIDS UNOPS The United Nations Office for Project Services (UNOPS) is an operational arm of the United Nations, supporting the successful

More information

The Pilcomayo River Basin Argentina

The Pilcomayo River Basin Argentina The Pilcomayo River Basin Argentina Yangareko ( Janis Alcorn, Alejo Zarzycki, Alonzo Zarzycki, Luis Maria de la Cruz) Governance and Ecosystems Management for the CONservation of BIOdiversity www.gemconbio.eu

More information

Home About us Contact

Home About us Contact Page 1 of 5 Home About us Contact IN THIS EDITION 1. A message from IPA s Chief Executive Brendan Lyon 2. Added 3. Status Changes 4. Updates 1. A message from IPA s Chief Executive Brendan Lyon I am delighted

More information

Aswan Investment Opportunities

Aswan Investment Opportunities Aswan Investment Opportunities Project Sector 1 Phosphate fertilizers factory Industrial Sector 2 Marble and Granite Factory Industrial Sector 3 Clay Brick Factory Industrial Sector 4 Date Conservation

More information

About This Report. For More Information on These Opportunities

About This Report. For More Information on These Opportunities About This Report This report has been developed to provide potential U.S. exporters with an overview of México s infrastructure sectors, the sector development plans in place through 2018, and to provide

More information

A Brief Overview of the Rio Grande Compact 04/26/06

A Brief Overview of the Rio Grande Compact 04/26/06 A Brief Overview of the Rio Grande Compact 04/26/06 The New Mexico Interstate Stream Commission Investigate, Protect, Conserve, and Develop the State s Waters and Stream Systems Negotiate and Administer

More information

Gunnison Valley Air Service Strategic Plan. Strategic Priority #1: Creating a Collaborative Public-Private Partnership

Gunnison Valley Air Service Strategic Plan. Strategic Priority #1: Creating a Collaborative Public-Private Partnership Gunnison Valley Air Service Strategic Plan Strategic Priorities 1. Collaborative Public-Private Partnership 2. Ensuring Stable and Sustainable Funding 3. Air Service Results for the Valley 4. Valley Marketing

More information

USDBC MEXICO MONTHLY REPORT MAY 2017 NEW! FIRST 2017 MX BEAN PLANTING 2017 SPRING SUMMER CYCLE PROGRESS REPORT

USDBC MEXICO MONTHLY REPORT MAY 2017 NEW! FIRST 2017 MX BEAN PLANTING 2017 SPRING SUMMER CYCLE PROGRESS REPORT USDBC MEXICO MONTHLY REPORT MAY 2017 NEW! FIRST 2017 MX BEAN PLANTING 2017 SPRING SUMMER CYCLE PROGRESS REPORT 2017 Spring-Summer beans Irrigated beans, 5 to 10% of the total depending on the state: All

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

Slum Situation Analysis

Slum Situation Analysis Slum Situation Analysis Components of a slum upgrading programme 1. SLUM SITUATION ANALYSIS 2. REVIEW OF POLICIES AFFECTING SLUM AREAS 3. SLUM UPGRADING AND PREVENTION STRATEGY 4. RESOURCE MOBILISATION

More information

PERU WATER PROJECT: CERRO VERDE CASE STUDY

PERU WATER PROJECT: CERRO VERDE CASE STUDY PERU WATER PROJECT: CERRO VERDE CASE STUDY MINING-COMMUNITY PARTNERSHIP TO ADVANCE PROGRESS ON SUSTAINABLE DEVELOPMENT GOAL 6 (ACCESS TO CLEAN WATER AND SANITATION) By: Jocelyn Fraser, PhD University of

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name Rio Bogota Environmental Infrastructure Region LATIN AMERICA AND CARIBBEAN Sector Sewerage (70%); Flood protection

More information

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN Doc. 1S-26-O-11-5/1-2 ACTION PLAN FOR THE PERIOD 2011-2015 concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN April 2011 Table of Contents INTRODUCTION... 5 1.

More information

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid ACI EUROPE POSITION A level playing field for European airports the need for revised guidelines on State Aid 16 June 2010 1. INTRODUCTION Airports play a vital role in the European economy. They ensure

More information

OFFICE OF THE SECRETARY OF ECONOMIC DEVELOPMENT

OFFICE OF THE SECRETARY OF ECONOMIC DEVELOPMENT OFFICE OF THE SECRETARY OF ECONOMIC DEVELOPMENT Colima, Mexico Tel: +52 (312) 316-2028 Fax: +52 (312) 316-2034 E-mail: sefome@col.gob.mx Infrastructure Colima's modern and well-developed infrastructure

More information

TECHNICAL ASSISTANCE REPORT SEPTEMBER 2012

TECHNICAL ASSISTANCE REPORT SEPTEMBER 2012 NORTH AMERICAN DEVELOPMENT BANK TECHNICAL ASSISTANCE REPORT SEPTEMBER 2012 The North American Development Bank (NADB) uses a portion of its retained earnings to offer technical assistance and training

More information

Actual Climatic Conditions in ERB. Online Resource 1 corresponding to:

Actual Climatic Conditions in ERB. Online Resource 1 corresponding to: Actual Climatic Conditions in ERB. Online Resource 1 corresponding to: Article Title: Climatic Trends and Impact of Climate Change on Agriculture in an Arid Andean Valley. Journal Name: CLIMATIC CHANGE

More information

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE From a landlocked to a land linked Zambia CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE Presented by Ministry of Transport Works Supply and Communications and October 2013 Presented to PUBLIC-PRIVATE DIALOGUE FORUM

More information

15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE

15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE 15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE General Manager responsible: General Manager City Environment, DDI 941-8608 Officer responsible: Authors: PURPOSE OF REPORT Transport

More information

Aladyr International Seminar on Reuse and Water Desalination

Aladyr International Seminar on Reuse and Water Desalination Aladyr International Seminar on Reuse and Water Desalination COLOMBIA EDITION May 10th & 11th, 2017 San Fernando Plaza Hotel, Medellín. http://aladyr.net/seminario-colombia/ Seminario Internacional Aladyr

More information

GREATER PARIS OUR SOLUTIONS FOR THE DEVELOPMENT OF YOUR REGIONS

GREATER PARIS OUR SOLUTIONS FOR THE DEVELOPMENT OF YOUR REGIONS GREATER PARIS OUR SOLUTIONS FOR THE DEVELOPMENT OF YOUR REGIONS The Caisse des Dépôts group at the service of the economic development and attractiveness of Greater Paris 1 PUBLIC INSTITUTION AND SUBSIDIARIES

More information

Outlıne of the Presentatıon

Outlıne of the Presentatıon Outlıne of the Presentatıon Background and Objectives What has been achieved National Perspective Regional Perspective Estimated Financing Requirements What is Needed Chingola-Solwezi-Jimbe Railway Line

More information

Buyondo Herbert. January 15 th to 18 th 2017

Buyondo Herbert. January 15 th to 18 th 2017 PILOTS FOR PERPETUAL CENSUSES: COMMUNITY BASED DATA COLLECTION UGANDAN EXPERIENCE Presentation made at the UN World Data Forum Cape Town South Africa By Buyondo Herbert Principal Statistician Uganda Bureau

More information

Regulating aviation in emerging markets

Regulating aviation in emerging markets Regulating aviation in emerging markets Strategy& is part of the PwC network Contacts About the authors Beirut Fadi Majdalani Partner +961-1-985-655 fadi.majdalani @strategyand.pwc.com Dubai Alessandro

More information

Seawater Desalination Plant Cabo San Lucas, B.C.S., Mexico

Seawater Desalination Plant Cabo San Lucas, B.C.S., Mexico Seawater Desalination as an alternative solution for potable water in Mexico Seawater Desalination Plant Cabo San Lucas, B.C.S., Mexico INTRODUCTION About 75% of Earth s surface is water, of this quantity,

More information

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI PPCR/SC.4/5 October 9, 2009 Meeting of the PPCR Sub-Committee Washington, D.C. October 28, 2009 REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI Proposed Sub-Committee Decision The Sub-Committee reviewed

More information

Distinguished guests, parliamentary colleagues, ladies and gentlemen.

Distinguished guests, parliamentary colleagues, ladies and gentlemen. Developing the Territory Keynote 16/06/14 Developing the Top End from the last frontier to the next frontier. Chief Minister Distinguished guests, parliamentary colleagues, ladies and gentlemen. The frontier

More information

DEPARTMENT OF CIVIL AVIATION

DEPARTMENT OF CIVIL AVIATION DEPARTMENT OF CIVIL AVIATION MISSION The Mission of the Department of Civil Aviation is to ensure safety of civil air navigation, to develop and operate a national civil air infrastructure and services,

More information

INFRASTRUCTURE GAP

INFRASTRUCTURE GAP INFRASTRUCTURE GAP 2016-2025 GAP BY SECTORS THROUGH 2025 Other 28% Transportion 36% Strategic pillar: Telecoms 17% Energy 19% Total gap: US$ 159,6 billion Source: AFIN NATIONAL INFRASTRUCTURE PLAN STATE

More information

DIRECT PUBLIC INVESTMENT

DIRECT PUBLIC INVESTMENT DIRECT PUBLIC INVESTMENT - Upgrade and Rehabilitation of Route 11 CH - Optimization of Route 41 CH - Improvement of Route E-30-F - Upgrade of Route 7 by sections - Provincial Hospital of Curicó - Calama

More information

Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy

Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy José Zozaya President, General Manager and Executive Representative Kansas City Southern de México General Overview of KCSM

More information

Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion (State Initiatives and Unsolicited proposals

Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion (State Initiatives and Unsolicited proposals Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion (State Initiatives and Unsolicited proposals projects) THE AMAZON WATERWAY (Second call) CALLED Loreto

More information

PPP Projects. Ministry of Finance. PPP Central Unit

PPP Projects. Ministry of Finance. PPP Central Unit PPP Projects Ministry of Finance PPP Central Unit Tendered Projects (2013) 1- Abu Rawash wastewater plant Upgrading level of treatment from primary to secondary treatment for Abu Rawash Wastewater plant

More information

1. Material terms of the major related-party transaction (a series of interrelated transactions).

1. Material terms of the major related-party transaction (a series of interrelated transactions). Conclusion of a major related-party transaction (a series of interrelated transactions) between PJSC Aeroflot, LLC Aviakapital-Service, PJSC Irkut Corporation and State Corporation Rostec, regarding operating

More information

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD 2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD The Transit Committee recommends the following: 1. Receipt of the presentation by Rick Takagi, Manager, Operations, York Region Transit;

More information

Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila.

Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila. Colombia (South America) Water use and drainage in Colombia Location: Case Study: The Stormwater Challenge in Barranquilla Source: Wikipedia The University of Alabama February 25, 2008 Population: 45 million

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011 Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA

More information

Peru: Investment Opportunities Infrastructure and public services

Peru: Investment Opportunities Infrastructure and public services Peru: Investment Opportunities Infrastructure and public services 2017-2018 Carlos Ganoza Chief of Advisors Ministry of Economy and Finance April 19th 1 PERU S STRONG MACROECONOMIC CREDENTIALS ALLOW FOR

More information

INDUSTRIAL TECHNOLOGY PARK 4. Guadalajara Metropolitan Area, El Salto Industrial Corridor, Jalisco.

INDUSTRIAL TECHNOLOGY PARK 4. Guadalajara Metropolitan Area, El Salto Industrial Corridor, Jalisco. INDUSTRIAL TECHNOLOGY PARK 4 Guadalajara Metropolitan Area, El Salto Industrial Corridor, Jalisco. Located in the Guadalajara Metropolitan Area El Salto Industrial Corridor, Jalisco. Class A Industrial

More information

Results of Tourism Activity. July, 2017

Results of Tourism Activity. July, 2017 Results of Tourism Activity July, 2017 Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO Minister

More information

The ITGI Project Gas Corridor through Turkey, Greece and Italy

The ITGI Project Gas Corridor through Turkey, Greece and Italy ITALIAN REPUBLIC HELLENIC REPUBLIC TURKISH REPUBLIC The ITGI Project Gas Corridor through Turkey, Greece and Italy Rome, 26th July 2007 Umberto Quadrino, CEO, Edison 1 Gas demand/supply balance in Europe

More information

Overview. Eero Ailio European Commission

Overview. Eero Ailio European Commission Overview Eero Ailio European Commission UN/US Expert Meeting Vienna 13-17 December 2004 1 Position and Galileo key features timing Services Galileo+GPS International Public Private Partnership 2 Galileo:

More information

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 April 2016 Title Brent Cross Cricklewood Gowling Wragge Lawrence Graham (UK) LLP Report of Commissioning Director, Growth and Development Wards Child s

More information

México-Monterrey. Aida Carolina Medina Gómez LNI

México-Monterrey. Aida Carolina Medina Gómez LNI México-Monterrey Aida Carolina Medina Gómez 685549 LNI Monterrey: Monterrey is the capital city of the northeastern Mexican state of Nuevo León. It has the second largest metropolitan area according to

More information

LOCAL CONTENT IN MOZAMBIQUE

LOCAL CONTENT IN MOZAMBIQUE LOCAL CONTENT IN MOZAMBIQUE IN ASSOCIATION WITH GREENFIELD TRAINING 28 TH SEPTEMBER 2017 TRAINING PROGRAM 01 / INTRODUCTION 02 03 04 05 06 / LC UNDER MOZAMBIQUE LAW / LC BILL / MONITORING AND ENFORCMENT

More information

Greene County Tourism Economic Impact Analysis and Strategic Goals

Greene County Tourism Economic Impact Analysis and Strategic Goals Greene County Tourism Economic Impact Analysis and Strategic Goals Summary of Findings and Recommendations October 2010 Prepared by: Tourism Economics 121, St Aldates, Oxford, OX1 1HB UK 303 W Lancaster

More information

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 Contact: Chris Wood, Airport General Manager cwood@regionofwaterloo.ca (519) 648-2256 ext. 8502 Airport Master

More information

State of Conservation of the Heritage Site. City of Potosí (Plurinational State of Bolivia) (ID Nº 420) (ii), (iv) y (vi)) EXECUTIVE SUMMARY

State of Conservation of the Heritage Site. City of Potosí (Plurinational State of Bolivia) (ID Nº 420) (ii), (iv) y (vi)) EXECUTIVE SUMMARY State of Conservation of the Heritage Site City of Potosí (Plurinational State of Bolivia) (ID Nº 420) (ii), (iv) y (vi)) EXECUTIVE SUMMARY 1. State party's response to the decision 39 of the World Heritage

More information

Results of Tourism Activity

Results of Tourism Activity Results of Tourism Activity Mexico, June Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

Brazil: Floods. DREF operation n MDRBR005 GLIDE FL BRA 9 April 2010

Brazil: Floods. DREF operation n MDRBR005 GLIDE FL BRA 9 April 2010 Brazil: Floods DREF operation n MDRBR005 GLIDE FL-2010-000067-BRA 9 April 2010 The International Federation s Disaster Relief Emergency Fund (DREF) is a source of un-earmarked money created by the Federation

More information

06.09 Lubelskie: SME development in Janow Lubelski

06.09 Lubelskie: SME development in Janow Lubelski 06.09 Lubelskie: SME development in Janow Lubelski 1. BASIC INFORMATION 1.1. CRIS Number: 2002/000-580-06.09 1.2. Title: SME development in Janów Lubelski 1.3. Sector: 1.4. Location: Town and Gmina of

More information

ITA AITES WORLD TUNNEL CONGRESS 2009

ITA AITES WORLD TUNNEL CONGRESS 2009 ITA AITES WORLD TUNNEL CONGRESS 2009 Budapest, Hungary, May 23 29, 2009 OF SAFE AND EFFICIENT UNDERGROUND URBAN ROAD AND RAIL INFRASTRUCTURES Manuel Arnáiz Ronda PhD. Civil Engineering President of AETOS

More information

Earnings Report 1 st Quarter 2016 Grupo Viva Aerobus

Earnings Report 1 st Quarter 2016 Grupo Viva Aerobus Earnings Report 1 st Quarter 2016 Grupo Viva Aerobus Grupo Viva Aerobus announces results for the first quarter of 2016 Mexico City, Mexico, April 29, 2016- Grupo Viva Aerobus S.A. de C.V. ( Grupo Viva

More information

Investment Highlights

Investment Highlights Third Quarter 2014 Investment Highlights 1 Mexican airport portfolio positioned to take full advantage of global growth. 2 Diversified business model contributing to earnings resilience. 3 Well-defined

More information

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Air Transport Connectivity Enhancement Project (RRP BHU 44239-013) SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Sector Road Map 1. Sector Performance,

More information

Rangitīkei District Council

Rangitīkei District Council Rangitīkei District Council Assets and Infrastructure Committee Meeting Agenda Thursday 9 August 2018 9:30 AM Contents 1 Welcome...3 2 Council Prayer...3 3 Apologies/leave of Absence...3 4 Members conflict

More information

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL 1 AUSTRALIA S LARGEST RAIL FREIGHT NETWORK OPERATOR ARTC is a company under the Corporations Act owned by the Commonwealth

More information

THE STATE OF ZACATECAS, MEXICO

THE STATE OF ZACATECAS, MEXICO THE STATE OF ZACATECAS, MEXICO ZACATECAS Zacatecas is a state with much to offer. Its capital city is one of the most beautiful colonial cities in Mexico. Thanks to its history and architecture, the UNESCO

More information

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal 30 th January 2016 Local Government s critical role in driving the tourism economy January 2016 de Waal Contents Local Government can make or break tourism in their jurisdiction... 3 TNQ Tourism Vision...

More information

OFFICIAL MEDIA & PRESS KIT Updated November 2014

OFFICIAL MEDIA & PRESS KIT Updated November 2014 OFFICIAL MEDIA & PRESS KIT Updated November 2014 This information packet will be useful in learning more about the Palmdale Water District. For further information, please visit our website at http://www.palmdalewater.org/

More information

BRAZIL FEDERAL ROADS GIF Advisory Council Meeting. April 18, 2018

BRAZIL FEDERAL ROADS GIF Advisory Council Meeting. April 18, 2018 BRAZIL FEDERAL ROADS GIF Advisory Council Meeting April 18, 2018 ROAD CONCESSIONS IN BRAZIL BRAZIL ROAD CONCESSIONS CONTEXT A set of Road Concessions Agreements from the 90s will expire over the next years

More information

INVITATION FOR EXPRESSION OF INTEREST

INVITATION FOR EXPRESSION OF INTEREST 1. Introduction INVITATION FOR EXPRESSION OF INTEREST Indah Water Konsortium Sdn Bhd (Company No. 211763-P) ( IWK ) is seeking for Expression of Interest (EOI) from consultants registered with the Ministry

More information

Colorado Springs Utilities Spring 2016 Update. CEO Jerry Forte Leon Young Service Center, April 13, 2016

Colorado Springs Utilities Spring 2016 Update. CEO Jerry Forte Leon Young Service Center, April 13, 2016 Colorado Springs Utilities Spring 2016 Update CEO Jerry Forte Leon Young Service Center, April 13, 2016 1 Spring 2016 Update Today s Discussion 2015 highlights Bright energy future Cleaner air Southern

More information

Dipl. Ing. Ansonia Lillo Tor Dean University of Santo Tomás - Arica Chile

Dipl. Ing. Ansonia Lillo Tor Dean University of Santo Tomás - Arica Chile Dipl. Ing. Ansonia Lillo Tor Dean University of Santo Tomás - Arica Chile In Chile, the environmental matters have been faced up intensely during the past years. Despite this, just in the last year it

More information

Watershed: Natural Scene for Integrated Water Resource Management in the jurisdiction of Corantioquia Antioquia, Colombia. SA

Watershed: Natural Scene for Integrated Water Resource Management in the jurisdiction of Corantioquia Antioquia, Colombia. SA Watershed: Natural Scene for Integrated Water Resource Management in the jurisdiction of Corantioquia Antioquia, Colombia. SA EURO-RIOC 2010 Luis Alfonso Escobar Trujillo RELOC - Colombia Corantioquia

More information

Statistical information summary of Geographical Information System for industrial parks

Statistical information summary of Geographical Information System for industrial parks Statistical information summary of Geographical Information System for industrial parks 1. GENERAL INFORMATION There are 178 operating and designed industrial parks in the Russian Federation. Dynamics

More information

UNF. Regional Oficce for

UNF. Regional Oficce for UNF. Regional Oficce for Latin AiTÍerica The preparation Acknowledgements MUNICIPAL WASTE WATER AS A LAND-BASED SOURCE OF POLLUTION IN COASTAL AND MARINE AREAS 1. Foreword The diagnosis presented in this

More information

Investment Highlights

Investment Highlights Second Quarter 2014 Investment Highlights 1 Mexican airport portfolio positioned to take full advantage of global growth. 2 Diversified business model contributing to earnings resilience. 3 Well-defined

More information

OPEN SEASON Phase 2 Rules. Project on the development and expansion of Bulgartransgaz EAD gas transmission system (GTS)

OPEN SEASON Phase 2 Rules. Project on the development and expansion of Bulgartransgaz EAD gas transmission system (GTS) OPEN SEASON Phase 2 Rules Non-binding offers for incremental capacity Project on development and expansion of Bulgartransgaz EAD gas transmission system (GTS) 27 March 2018 By filling out data on non-binding

More information

Czech Development Cooperation Plan indicative

Czech Development Cooperation Plan indicative Czech Development Cooperation Plan 2018 + indicative 2019-2020 Region / country Development Cooperation by the Czech Development Agency (CzDA) ODA PRIORITY COUNTRIES (Gov. Decision No. 631/2016) Sustainable

More information

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala 8.INFRASTRUCTURE #INVESTINGUATEMALA Industry in Guatemala General information of the country Capital City Currency Exchange Rate (2013) Official Language Population Labor Force (2013) GDP (2013) FDI inflows

More information

New free City connector bus service

New free City connector bus service The Adelaide City Council invites engagement from the community about New free City connector bus service 99C City Loop and Adelaide Connector free bus services to merge: Project Summary Adelaide City

More information

Poland. Tourism in the economy. Tourism governance and funding

Poland. Tourism in the economy. Tourism governance and funding Poland Tourism in the economy The total value of the tourism economy in Poland was estimated at PLN 87.4 billion in 2014, 11.7% down on 2013. This equates to a contribution of 5.1% to Poland s GDP. International

More information

SLOTS AND BUSINESS AVIATION - THE LEGAL POSITION

SLOTS AND BUSINESS AVIATION - THE LEGAL POSITION SLOTS AND BUSINESS AVIATION - THE LEGAL POSITION John Balfour Clyde & Co EUACA SEMINAR ON BUSINESS AVIATION 30 September 2009, Amsterdam THE SLOT REGULATION - SCOPE The Regulation is basically concerned

More information

Czech Republic. Tourism in the economy. Tourism governance and funding

Czech Republic. Tourism in the economy. Tourism governance and funding Czech Republic Tourism in the economy Tourism s share of GDP in the Czech Republic has been increasing over the last two years from 2.7% in 2012 to 2.9 % in 2013. The number of people employed in tourism

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/323 1 23/8/16 ASSEMBLY 39TH SESSION ECONOMIC COMMISSION Agenda Item 43: Other issues to be considered by the Economic Commission THE REPERCUSSIONS

More information

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National

More information

Updated on November 28, 2016

Updated on November 28, 2016 Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion (State Initiatives and Unsolicited proposals projects) 2016-2018 Updated on November 28, 2016 LONGITUDINAL

More information

Stainless Steel for Industrial Design Seminar

Stainless Steel for Industrial Design Seminar Stainless Steel for Industrial Design Seminar WHAT IS IMINOX? The Mexican Institute of Stainless, IMINOX, is a private non-profit association formed by a group of comapnies that prodeuce, distribute and

More information

Shenzhen Longhua MAINLAND AND OVERSEAS GROWTH. total route length of railway operations outside of Hong Kong

Shenzhen Longhua MAINLAND AND OVERSEAS GROWTH. total route length of railway operations outside of Hong Kong EXPANSION IN MOTION EXECUTIVE MANAGEMENT S REPORT MAINLAND AND OVERSEAS GROWTH 664.5 km total route length of railway operations outside of Hong Kong Shenzhen Longhua full line operation from 16 June 2011

More information