2011 Illinois Department of Transportation. I-290 PHASE I STUDY Additional Round 1 Alternatives Descriptions

Size: px
Start display at page:

Download "2011 Illinois Department of Transportation. I-290 PHASE I STUDY Additional Round 1 Alternatives Descriptions"

Transcription

1 2011 Illinois Department of Transportation I- PHASE I STUDY Additional Round 1 s Descriptions

2 Blue Line I- > Blue Line Extension from CTA Terminal to Mannheim Road ID: HRT 3 Heavy Rail Transit (HRT) West Point I- Study Area At-Grade ew Stations Bus Service Enhancements Midway *ot to scale DESCRIPTIO: > Via I- Median (at-grade) from CTA terminal to Mannheim Road. > 3.5 miles TRASIT SERVICE EHACEMETS: > Added 3 ew Blue Line Stations: Mannheim Road, 25th Avenue and 1st Avenue. > Added 10 new stops at new stations on routes: CTA Bus Route #17, Pace Bus Routes #317, #325, #330, #331, #391, #747, #757, #877, and #8. TRASIT SERVICE EHACEMETS: (con t) > Rerouted existing Pace Bus Route #331 from 5th Avenue to 1st Avenue station. > Truncated 6 existing bus routes to new terminal stop: #317, #391, #747, #757, #877 and #8 to Mannheim station. > Optimized 2 existing Pace express bus routes to provide express shuttle service: #877 and #8 > Included future Pace Bus Route art89 along Cermak Road ( to CTA Pink Line)

3 BRT I- > From Lombard to CTA Terminal ID: BRT 5 Bus Rapid Transit (BRT) West Point Loyola Hospital I- Study Area At-Grade Elevated Guideway ew Stations Bus Service Enhancements Midway *ot to scale DESCRIPTIO: > Adjacent to Butterfield Road, 22nd Street, I-, and I- from Lombard ( ) to Mannheim Road (elevated). > Via I- median from Mannheim Road to CTA terminal. > 11.2 miles TRASIT SERVICE EHACEMETS: > Added 7 ew Blue Line stations:, 22nd Street, York Road, Wolf Road, Mannheim Road, 25th Avenue and 1st Avenue. TRASIT SERVICE EHACEMETS: (con t) > Added new stops at new stations on routes: CTA Bus Route #17, Pace Bus Routes # 301, #310, #317, #325, #330, #331, #332, #747, #757, #877, and #8. > Rerouted existing Pace Bus Route # 331 from 5th Avenue to 1st Avenue station. > Truncated 3 existing Pace bus routes to new terminal stop: #391and #757 to Wolf Road station and #747 to York Road station. > Optimized 2 existing Pace express bus routes to provide express shuttle service: #877 and #8. > Included future Pace Bus Route art89 along Cermak Road ( to CTA Pink Line).

4 HOV 2+ Long Long > From Oak Brook to Racine Avenue ID: HOV 2LL High Occupancy Vehicle Lanes (HOV) 2+ Occupants West Point I- Study Area Add Lanes Convert Existing Lanes Midway *ot to scale DESCRIPTIO: > HOV lane restricted to vehicles with 2 or more occupants (no toll). > Convert 2 existing General Purpose Toll Lanes to HOV (1 lane each direction) on I- from Oak Brook (IL 83) to I-/ split. > Add 2 HOV lanes (1 lane each direction) on I- from I-/ Split to Central Avenue. DESCRIPTIO: (con t) > Convert 2 existing General Purpose lanes to HOV (1 lane each direction) on I- from Central Avenue to Racine Avenue. > 16.5 miles

5 HOV 3+ Long Long > From Oak Brook to Racine Avenue ID: HOV 3LL High Occupancy Vehicle Lanes (HOV) 3+ Occupants West Point I- Study Area Add Lanes Convert Existing Lanes Midway *ot to scale DESCRIPTIO: > HOV lane restricted to vehicles with 3 or more occupants (no toll). > Convert 2 existing General Purpose Toll Lanes to HOV (1 lane each direction) on I- from Oak Brook (IL 83) to I-/ split. > Add 2 HOV lanes (1 lane each direction) on I- from I-/ Split to Central Avenue. DESCRIPTIO: (con t) > Convert 2 existing General Purpose Lanes to HOV (1 lane each direction) on I- from Central Avenue to Racine Avenue. > 16.5 miles

6 Toll Existing I- > From I-/ Split to Cicero Avenue ID: TOL1 Toll Existing I- West Point I- Study Area Toll Lanes Midway *ot to scale DESCRIPTIO: > Toll existing I- lanes from I-/I- split to Cicero Avenue. > 8.5 miles

7 Toll I- with Add Lane > From I-/ Split to CiceroAvenue ID: TOL2 Toll I- with Add Lane West Point I- Study Area Add Lanes Toll Lanes Midway *ot to scale DESCRIPTIO: > Toll I- lanes from I-/ split to Cicero Avenue. > Add 2 lanes (1 in each direction) along I- from I-/ split to Central Avenue. > 8.5 miles

Main Line System Recommendations

Main Line System Recommendations (Existing) Main Line System Recommendations This system recommendation focuses mobility investment in a central main line corridor proximate to I-290. A bus rapid transit (BRT) line at each end of the

More information

DOWNTOWN BRT ALTERNATIVE - 19th AVE

DOWNTOWN BRT ALTERNATIVE - 19th AVE DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing

More information

405 TERMINAL AVENUE OTTAWA, ON

405 TERMINAL AVENUE OTTAWA, ON 405 TERMINAL AVENUE OTTAWA, ON NEW OFFICE DEVELOPMENT FOR LEASE Up to 160,000 sf GET YOUR ORGANIZATION ON TRACK 405 TERMINAL AVENUE New Office Development for Lease Building on the monumental success of

More information

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),

More information

A History of the Construction of the Radial Expressway System in Cook County

A History of the Construction of the Radial Expressway System in Cook County ILLINOIS ASSOCIATION OF STATE HIGHWAY ENGINEERS 2017 ANNUAL CONFERENCE SEPTEMBER 29, 2017 A History of the Construction of the Radial Expressway System in Cook County 1948-1964 Andrew Plummer Transportation

More information

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605. ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate

More information

2nd Annual Historic L Station Tour. November 19, Presented By: The Illinois Historic Preservation Agency

2nd Annual Historic L Station Tour. November 19, Presented By: The Illinois Historic Preservation Agency 2nd Annual Historic L Station Tour November 19, 2000 Presented By: The Illinois Historic Preservation Agency With: Chicago-L.org The Chicago Design Consortium 2nd Annual Historic L Station Tour Guide Dearborn-Milwaukee

More information

Travel Time Estimates

Travel Time Estimates Travel Time Estimates Common Assumptions Kirkland - Seattle Kirkland - Bellevue Houghton - Seattle Houghton - Bellevue Common assumptions: I-405 BRT is built with a station at NE 85th St. (Sound Transit

More information

e: w: remingtoncorp.com Quarry Park News More on page 1 & 2.

e: w: remingtoncorp.com Quarry Park News More on page 1 & 2. e: QuarryParkLOA@remingtoncorp.com w: remingtoncorp.com Quarry Park News INSIDE: New Amenities Set For 2016 Openings More on page 1 & 2. Amenities Opening in 2016 The Remington YMCA Quarry Park Recreation

More information

* New Meelng, needs your support

* New Meelng, needs your support 1 # Town / City General Area Day Time Mee5ng Loca5on Notes 1 Beloit, WI Wisconsin, South Mon 6:00p St. Paul's Episcopal Church, 212 W. Grand Avenue, Beloit, WI Park in rear / Use back door 2 Blue Island,

More information

* New Meekng, needs your support

* New Meekng, needs your support + Maps 1 # Town / City General Area Day Time Mee5ng Loca5on Notes 1 Beloit, WI Wisconsin, South Mon 6:00p St. Paul's Episcopal Church, 212 W. Grand Avenue, Beloit, WI Park in rear / Use back door 2 Blue

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The

More information

Recommendation on bus/rail bus/rail experiments #78 Montrose Bus Six University of Chicago bus routes Six Westside/W est estside/w Suburban

Recommendation on bus/rail bus/rail experiments #78 Montrose Bus Six University of Chicago bus routes Six Westside/W est estside/w Suburban PRESIDENT S REPORT March 12, 2008 This spresentation tato Recommendation on 3 bus/rail experiments #78 Montrose Bus Six University of Chicago bus routes Westside/West Suburban Service Plan New CTA Chief

More information

Phase II for Lease or Sale from 65, ,372 S.F Acre Build-to-Suit Site Accommodating up to 350,000 S.F. Available.

Phase II for Lease or Sale from 65, ,372 S.F Acre Build-to-Suit Site Accommodating up to 350,000 S.F. Available. FULLY LEASED PHASE II NOW AVAILABLE 20.5-ACRE BUILD-TO-SUIT SITE Project Highlights New construction 65,000 to 385,372 square feet available 386 vehicle stalls (expandable) 38 dock-high doors (expandable)

More information

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 CBT Phase 1/Wave Extensions AGENDA What is the CBT Phase 1 Project? Who are the Project Partners? Where is the Project Located?

More information

THE STATE OF GRAYSLAKE

THE STATE OF GRAYSLAKE THE STATE OF GRAYSLAKE Presented by: Mayor Rhett Taylor January 23, 2014 The State of Grayslake Economic Development Transportation Village Center Plans Economic Development Cost Savings Programs: Village

More information

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives June 1, 2018 Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level

More information

Hampton Roads Express Lane Network

Hampton Roads Express Lane Network More Choices For Travelers Hampton Roads Express Lane Network James Utterback, PMP Hampton Roads District Administrator Presented to HRTPO Board July 20, 2017 Regional Express Lane Network 2 History of

More information

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014 National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration

More information

INTERVIEW WITH ED ROGERS FOR THE FOREST PARK HISTORICAL SOCIETY-INTERVIEW BEGAN MIDSENTANCE, NO INTRODUCTIONS, DATE,

INTERVIEW WITH ED ROGERS FOR THE FOREST PARK HISTORICAL SOCIETY-INTERVIEW BEGAN MIDSENTANCE, NO INTRODUCTIONS, DATE, INTERVIEW WITH ED ROGERS FOR THE FOREST PARK HISTORICAL SOCIETY-INTERVIEW BEGAN MIDSENTANCE, NO INTRODUCTIONS, DATE, ETC. ER: previous was the town of Harlem, and Harlem has been around since 1853. It

More information

A Public Transportation Review Evaluating Metro s Operational Efficiency, Service Capacity and Fiscal Impact

A Public Transportation Review Evaluating Metro s Operational Efficiency, Service Capacity and Fiscal Impact A Public Transportation Review Evaluating Metro s Operational Efficiency, Service Capacity and Fiscal Impact Minneapolis St. Louis Denver Indianapolis Louisville Austin Cleveland Pittsburgh Columbus Cincinnati

More information

Professional Providers Near You

Professional Providers Near You Professional Providers Near You Please note: Not all providers offer all services. Please confirm what services are offered with the provider when making your appointment. EYE CARE ASSOCIATES 10215 W ROOSEVELT

More information

MEDICAL FACILITIES/LOCATIONS

MEDICAL FACILITIES/LOCATIONS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 FACILITIES Michael Esposito DDS MacNeal Hospital Family Practice

More information

Part 1 Facility Description, Hours, Access and Occupancy (5) Type [5]

Part 1 Facility Description, Hours, Access and Occupancy (5) Type [5] Sponsor [15] (1) ID [1] (2) State ID (YearOpen) [2] (3) Facility [3] (4) Length (C/L) (Lane) [4] Part 1 Facility Description, Hours, Access and Occupancy (5) Type [5] (6) Hours of Operation [6] (7) Separation

More information

2075 W 43RD ST. CHICAGO, IL. chicago s largest industrial spec development

2075 W 43RD ST.   CHICAGO, IL. chicago s largest industrial spec development 2075 W 43RD ST CHICAGO, IL chicago s largest industrial spec development EST. 2018 www.marinacrossings.com IMMEDIATE 633,057 SF AVAILABILITY PREMIER INFILL DEVELOPMENT IDEAL FOR: LAST-MILE FULFILLMENT

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications on Van Ness Avenue

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

Metrolink Service Expansion Program

Metrolink Service Expansion Program Rail and Facilities Program Update Metrolink Service Expansion Program Fullerton Turnback Facility 23.90 Laguna Niguel Turnback Facility 28.20 New Control Points & Signals Anaheim Layover Facility 18.30

More information

Opportunity and Function of Airport in Lowcost Aviation Development

Opportunity and Function of Airport in Lowcost Aviation Development Opportunity and Function of Airport in Lowcost Aviation Development Huang Wei Chongqing Airport Group Co., Ltd. October, 2014 The Vast West China is prosperous for low-cost aviation Low-cost aviation is

More information

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation

More information

ONE REMAINING OPPORTUNITY LAKE STREET, LOOKING SOUTHEAST

ONE REMAINING OPPORTUNITY LAKE STREET, LOOKING SOUTHEAST ONE REMAINING OPPORTUNITY LAKE STREET, LOOKING SOUTHEAST THE PROJECT SET TO OPEN FALL OF 2017, THE EMERSON IS A TRANSIT ORIENTED, MIXED-USE DEVELOPMENT ANCHORED BY TARGET AT THE BASE OF 271 NEW LUXURY

More information

1211, 1225, 1301 & ND STREET, OAK BROOK IL

1211, 1225, 1301 & ND STREET, OAK BROOK IL 1211, 1225, 1301 & 1315 22ND STREET, OAK BROOK IL Welcome to Oak Brook 22. The property consists of approximately 400,000 square feet of premier office and vibrant ground floor retail space, including

More information

STUDY PROCESS. Study. PHASE I Research. PHASE II Develop & Analyze Options. PHASE III Recommendations. Regional Transit

STUDY PROCESS. Study. PHASE I Research. PHASE II Develop & Analyze Options. PHASE III Recommendations. Regional Transit STUDY PROCESS PHASE I Research PHASE II Develop & Analyze Options PHASE III Recommendations February 2008 - July 2008 July 2008 - September 2008 September 2008 - December 2008 Analyze transit and projected

More information

1146 S. Cedar Crest Boulevard and 1148 S. Cedar Crest Boulevard Allentown, Pa 18103

1146 S. Cedar Crest Boulevard and 1148 S. Cedar Crest Boulevard Allentown, Pa 18103 Properties For Sale 1146 S. Cedar Crest Boulevard and 1148 S. Cedar Crest Boulevard Allentown, Pa 18103 610.709.6233 feinbergrea.com For Lease or Purchase SALE PRICE: $2,800,000.00 PROPERTY TYPE: Commercial

More information

South of Fraser Transportation Priorities March 2017 Engagement

South of Fraser Transportation Priorities March 2017 Engagement March 20 Engagement Welcome to the South of Fraser Transportation Priorities Engagement A robust and reliable highway network is needed to serve the needs of a growing population and diverse economy. The

More information

CENTRAL AND EAST CORRIDORS

CENTRAL AND EAST CORRIDORS HIGH-CAPACITY TRANSIT STUDY CENTRAL AND EAST CORRIDORS SEPTEMBER 2014 CORRIDOR REPORT: UNIVERSITY DISTRICT-KIRKLAND-REDMOND HIGH-CAPACITY TRANSIT CORRIDOR STUDY University District-Kirkland-Redmond Corridor

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

The following sections of the People Plaza RFP have been revised as per below:

The following sections of the People Plaza RFP have been revised as per below: DATE: 09/19/13 SUBJECT: People Plazas RFP REFERENCE: Addendum 1 The following sections of the People Plaza RFP have been revised as per below: Exhibit 1 People Plazas Map The following plazas were added:

More information

OPPORTUNITY LAND OF. Wisconsin: Open for Business. The Premier Development Sites in the Chicago/Milwaukee Region

OPPORTUNITY LAND OF. Wisconsin: Open for Business. The Premier Development Sites in the Chicago/Milwaukee Region LAND OF OPPORTUNITY Wisconsin: Open for Business The Premier Development Sites in the Chicago/Milwaukee Region Eric Fischer 773 425 9818 eric.fischer@avisonyoung.com Kelly Disser 630 317 0721 kdisser@hiffman.com

More information

Indianapolis - MIDTOWN - Redevelopment

Indianapolis - MIDTOWN - Redevelopment Rendering Indianapolis - MIDTOWN - Redevelopment 638 East 38th Street - Indianapolis, IN 46205 BROKER DEVELOPER FOR LEASE 638 East 38th Street Indianapolis, IN 46205 Gross Leaseable Area: 13,443 SF Available

More information

SOUTH LOOP RETAIL SPACE NEAR WINTRUST ARENA AND MCCORMICK PLACE

SOUTH LOOP RETAIL SPACE NEAR WINTRUST ARENA AND MCCORMICK PLACE SOUTH LOOP RETAIL SPACE NEAR WINTRUST ARENA AND MCCORMICK PLACE 1935 S WABASH CHICAGO, IL 60616 Wayne Caplan Senior Vice President 312.529.5791 wayne.caplan@svn.com SVN CHICAGO COMMERCIAL 940 WEST ADAMS

More information

Claremont Project Background and Update Community Meeting September 11, 2017

Claremont Project Background and Update Community Meeting September 11, 2017 Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions

More information

Hop-On, Hop-Off Bus (Intransit) Approximately 2 hours $

Hop-On, Hop-Off Bus (Intransit) Approximately 2 hours $ Hop-On, Hop-Off Bus (Intransit) $ Be the first to write a review Enjoy one of the easiest ways to explore Vancouver. Experience Vancouver with Big Pink Sightseeing aboard vintage double-decker and unique

More information

Civil and Enviromental Engineering, Gadjah Mada University. PUBLIC TRANSPORT PLANNING (Frequency, Headway, and Number of Bus)

Civil and Enviromental Engineering, Gadjah Mada University. PUBLIC TRANSPORT PLANNING (Frequency, Headway, and Number of Bus) Civil and Enviromental Engineering, Gadjah Mada University PUBLIC TRANSPORT PLANNING (Frequency, Headway, and Number of Bus) Introduction of Transport Planning Dr.Eng. Muhammad Zudhy Irawan, S.T., M.T.

More information

Main Street Station Upgrades

Main Street Station Upgrades Main Street Station Upgrades Public Meeting Hope United Church 1 Main Street Station Upgrades Bus diversions Planned improvements Construction staging Pedestrian flows 2 Main Street Station Aerial Bar

More information

Pace ADA Paratransit Service

Pace ADA Paratransit Service Pace ADA Paratransit Service City of Chicago Customer Guide July 15, 2016 (updated January 2018) To request a copy of this guide in an accessible format, please call Pace Customer Relations at 800-606-1282

More information

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Jan Perry Councilwoman, District 9 Welcome Remarks Arthur T. Leahy Chief Executive Officer, Metro Metro ExpressLanes Overview

More information

Transit / Accessibility

Transit / Accessibility Transit / Accessibility Total weekday boardings at East Garfield Park CTA stations (defined as stations within onehalf miles of the community) increased between 2000 and 2008, by approximately 44.8%. The

More information

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP October 31, 2012 INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP ADOT FHWA MAG City of Phoenix City of Tempe City of Chandler Valley Metro/RPTA October 31, 2012 1 Agenda Introductions Background Purpose

More information

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4. COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4 Recommendation The Commissioner of Engineering and Public Works and the

More information

THE WORLD BANK Washington, DC

THE WORLD BANK Washington, DC Transforming Cities with Transit Transit and Land-Use Integration for Sustainable Urban Development Hiroaki Suzuki Robert Cervero Kanako luchi THE WORLD BANK Washington, DC Contents Acknowledgments About

More information

Metro Green Line to LAX. January, 2012

Metro Green Line to LAX. January, 2012 Metro Green Line to LAX 2 Agenda Context Airport Connection Types Project Process Questions and Discussion Los Angeles Lacks a Strong Airport Transit Connection 3 Airports in the U.S. with current or planned

More information

ROLLER CURTAIN SIGN REQUEST GARAGE/TERMINAL. April 22, Date:

ROLLER CURTAIN SIGN REQUEST GARAGE/TERMINAL. April 22, Date: ROLLER CURTAIN SIGN REQUEST Date: April 22, 1985 _ TO: Transportation Director, Service Area Superintendent, Bus Service Area Superintendent, Training and Instruction Equipment Engineering and Maintenance

More information

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE The JFK AirTrain airport access system interfaces with two existing regional transit systems; the Long Island

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES #118404v1 Regional Transit Authority June 19, 2006 1 Presentation Overview Existing Public Transit Transit System Peer Comparison Recent Transit

More information

FAQ RAPID KL AIRPORT SHUTTLE (updated as of 31th Jan 2019)

FAQ RAPID KL AIRPORT SHUTTLE (updated as of 31th Jan 2019) No. Questions Answer 1. When is the shuttle service starting? The shuttle service is starting soon. We will announce the start date on all Rapid KL communication channels soon. 2. What is Rapid KL airport

More information

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations Rapid Transit Facilities 1 1.T.2 Brookpark Road Station Reconstruct and reconfigure the Brookpark Road station. 1 1.T.5 Puritas Avenue Station Reconstruct and reconfigure the Puritas Avenue (West 150th

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Transportation Guide

Transportation Guide 2018 schedules Transportation Guide train pass to go here POWER HOUR: 5:30-6:30 pm, Saturday - Monday! (appointments recommended) An opportunity to extend meetings an additional hour after the 5:30 pm

More information

World-Class Bus Rapid Transit: New Foundations for Transit Oriented Development and Job Access

World-Class Bus Rapid Transit: New Foundations for Transit Oriented Development and Job Access World-Class Bus Rapid Transit: New Foundations for Transit Oriented Development and Job Access Michael Replogle Presented to New Partners for Smart Growth Conference February 4, 2010 Curitiba Guangzhou

More information

ADVANCED PLACEMENT SUMMER INSTITUTE (APSI) PARTICIPANT INFORMATION

ADVANCED PLACEMENT SUMMER INSTITUTE (APSI) PARTICIPANT INFORMATION ADVANCED PLACEMENT SUMMER INSTITUTE (APSI) PARTICIPANT INFORMATION Summer 2015 APSI Art History Session 1, June 22 25 APSI Art History Session 2, June 29 July 2 APSI Studio Art Session 1, July 20 24 APSI

More information

Metro Gold Line Eastside Extension Review Advisory Committee October 9, 2008

Metro Gold Line Eastside Extension Review Advisory Committee October 9, 2008 Review Advisory Committee October 9, 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground) Park & Ride Facility Direct Connection to the Pasadena Metro $898.8 million On-Time/Within

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

12 Million. annual visitors. North Riverside Park Mall is not. your average super regional mall. It is a thriving one-of-a-kind property

12 Million. annual visitors. North Riverside Park Mall is not. your average super regional mall. It is a thriving one-of-a-kind property 12 Million annual visitors North Riverside Park Mall is not your average super regional mall. It is a thriving one-of-a-kind property uniquely suited to serve a diverse and growing market. 3 THIS IS NORTH

More information

I-95/395 HOV/Bus/HOT Lanes Project Overview

I-95/395 HOV/Bus/HOT Lanes Project Overview I-95/395 HOV/Bus/HOT Lanes Project Overview 2 I-95/395 HOV/Bus/HOT Lanes Meetings Agenda 7 p.m. to 9 p.m. Open House Information Stations and Q&A With Project Staff 7:30 p.m. and 8:30 p.m. Project Overview

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

Mr. Leslie Rogers Administrator, FTA Region IX 201 Mission Street, Suite 1650 San Francisco, CA by

Mr. Leslie Rogers Administrator, FTA Region IX 201 Mission Street, Suite 1650 San Francisco, CA by December 20, 2011. Mr. Leslie Rogers Administrator, FTA Region IX 201 Mission Street, Suite 1650 San Francisco, CA 94105 by email: Leslie.Rogers@fta.dot.gov Mr. Rogers: We would like to bring to your attention

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

Amesbury Elementary School

Amesbury Elementary School Community Forum June 11, 2018 Amesbury Elementary School 2018 DiNisco Design, Inc. Agenda Project update Education goals Community and Faculty/Staff Survey Results Grade Configuration Schemes Next Steps!2

More information

EDGEWATER RETAIL WITH PARKING

EDGEWATER RETAIL WITH PARKING EDGEWATER RETAIL WITH PARKING 5423 N BROADWAY CHICAGO, IL 60640 Tim Rasmussen, CCIM Assistant Vice President 312.676.1875 trasmussen@svn.com Shane Sackett Associate Advisor 312.529.5795 ssackett@svn.com

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

Sound Transit. Tunnels and Underground Structures Committee January 24, 2011

Sound Transit. Tunnels and Underground Structures Committee January 24, 2011 Sound Transit 1 Tunnels and Underground Structures Committee January 24, 2011 Presentation Outline Overview of ST Construction Completed to date ST2 Plan Summary Construction Underway Commuter Rail Facilities

More information

25 th Avenue Grade Separation. December 13, 2017

25 th Avenue Grade Separation. December 13, 2017 25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010 Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final

More information

SCOPING INFORMATION PACKET

SCOPING INFORMATION PACKET SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

Fuller Road/Fuller Heights Road Improvements

Fuller Road/Fuller Heights Road Improvements Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

25 th Avenue Grade Separation. Community Meeting November 13, 2018

25 th Avenue Grade Separation. Community Meeting November 13, 2018 25 th Avenue Grade Separation Community Meeting November 13, 2018 Agenda I. Project Need II. Project Benefits III. Project Description IV. Funding V. Schedule VI. Construction VII. Next Steps 2 Project

More information

STATE OF ILLINOIS MONTHLY WARN ACTIVITY LISTING MONTH JUNE YEAR 2012 (In County Order)

STATE OF ILLINOIS MONTHLY WARN ACTIVITY LISTING MONTH JUNE YEAR 2012 (In County Order) STATE OF ILLINOIS MONTHLY WARN ACTIVITY LISTING MONTH JUNE YEAR 2012 (In County Order) COMPANY NAME: Cision U.S., Inc. TYPE OF EVENT: Closing COMPANY ADDRESS: 322 South Michigan Avenue WARN NOTIFIED DATE:

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)

More information

Public Information Meetings. October 5, 6, 7, and 15, 2015

Public Information Meetings. October 5, 6, 7, and 15, 2015 Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound

More information

Union Station Queens Quay Transit Link Study

Union Station Queens Quay Transit Link Study Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

Scoping Meeting LAX Landside Access Modernization Program

Scoping Meeting LAX Landside Access Modernization Program Welcome Scoping Meeting LAX Landside Access Modernization Program Thursday, February 19, 2015 5:00 p.m. to 8:00 p.m. Proud Bird Restaurant 11022 Aviation Boulevard Los Angeles, CA 90045 Welcome Scoping

More information

Call for Public Hearing August 2019 Service Changes

Call for Public Hearing August 2019 Service Changes Call for Public Hearing August 2019 Service Changes Committee-of-the-Whole January 22, 2019 Rob Smith, AVP Service Planning & Scheduling 1 Recommendation To call a Public Hearing on March 12, 2019 for

More information

UBC RAPID TRANSIT OPINION STUDY RESULTS. January 2019

UBC RAPID TRANSIT OPINION STUDY RESULTS. January 2019 UBC RAPID TRANSIT OPINION STUDY RESULTS January 2019 UBC RAPID TRANSIT OPINION STUDY RESULTS In field November 14 20, 2018 Conducted by Research Co. (Mario Canseco) Online survey of 1,900 adults in Metro

More information

East Farmingdale Fire Department 930 Conklin Street. Source: Parsons Brinckerhoff

East Farmingdale Fire Department 930 Conklin Street. Source: Parsons Brinckerhoff Route 110 Alternatives Analysis Public Meeting #2 April 27, 2015 East Farmingdale Fire Department 930 Conklin Street Source: Parsons Brinckerhoff Agenda Welcome/Project Background Jonathan Keyes Director,

More information

Study Overview and Context

Study Overview and Context Study Overview and Context North Shore Coordination Plan Study Study Highlights Early 2016 to December 2017 Consultant team assistance Steering Committee review Two rounds of public open house events Project

More information

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation Page 2 of 20 Background TPB staff has been managing data collection along the region s HOV facilities since the late 1990's, and documenting the results, which include counts of auto occupants, vehicles

More information

Home-Turf Report for 338 E North Avenue, Northlake, IL 60164

Home-Turf Report for 338 E North Avenue, Northlake, IL 60164 Home-Turf Report for 338 E North Avenue, Northlake, IL 60164 High School District: LEYDEN COM. HIGH SCHOOL DIST. 212 Grade School District: BERKELEY SCHOOL DIST. 87 Nearest Public High School(s) in District:

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business

More information

2.0 Miami-Dade Transit System Overview

2.0 Miami-Dade Transit System Overview 2.0 Miami-Dade Transit System Overview Miami-Dade Transit operates the 14 th largest transit system in the United States and is the largest transit system in the State of Florida. MDT is one of the largest

More information

Portable Noise Monitor Report

Portable Noise Monitor Report Portable Noise Monitor Report Chicago O Hare and Midway International Airports Site 217 1149 Candlewood Drive, Downers Grove May 17, 214 through May 31, 214 Visit the O Hare and Midway Noise Management

More information