1
2 Rail and Facilities Program Update
3 Metrolink Service Expansion Program Fullerton Turnback Facility Laguna Niguel Turnback Facility New Control Points & Signals Anaheim Layover Facility Orange Siding Rehabilitation SUBTOTAL Equipment (locomotives, cab cars and trailers) TOTAL Schedule Notes Legend: Final Design Construction Fullerton Turnback Facility Laguna Niguel Turnback Facility New Control Points & Signals* Anaheim Layover Facility February 2011 (Required for service start up) September 2010 (Required for service start up) August 2011 Orange Siding Rehabilitation* ti July 2011 Rail Equipment Delivery Through December 2011 * schedule adjusted to accommodate acceleration of Rail-Highway Grade Crossing Safety Enhancement Program 2
4 Grade Crossing Safety Enhancements City of Orange City of Anaheim City of Tustin City of Santa Ana City of Irvine City of San Juan Capistrano City of Dana Point City of San Clemente City of Fullerton Right-of-way & Utilities Total Number of Crossings Schedule Notes Legend: Final Design Construction Date: September 2010 City of Orange City of Anaheim City of Tustin City of Santa Ana City of Irvine City of San Juan Capistrano City of Dana Point City of San Clemente City of Fullerton Group 1 in service by September 30, Group 2 in service by December 31, Construction deferred to later date. Note: The cost associated w ith Fairhaven and Santa Clara Avenues are not included. It is funded under remaining w ork for the Santa Ana Main Track. 3
5 Station Improvements Fullerton Parking Structure (810 Spaces) Orange Parking Structure (800 Spaces) Tustin Parking Structure (825 Spaces) Laguna Niguel/Mission Viejo (LN/MV) Station Amenities and Parking Lots (500 Spaces) Fullerton Video Surveillance System (VSS) Santa Ana VSS Tustin VSS TOTAL Schedule Notes Fullerton Parking Stucture Contract awarded for Design/Build August 17, 2010 Legend: Orange Parking Structure City lead RFP for design issued June 2010 PA/ED Tustin Parking Structure Construction contract awarded August 23, 2010 Final Design LN/MV Station/Parking Improvements Coop to Board October 25, 2010 Construction Fullerton VSS City lead design/build contract RFP expected September 2010 Santa Ana VSS Design/build contract award September 13, 2010 Tustin VSS Design/build contract RFP expected September
6 LOSSAN Grade Separation s 17th Street - Santa Ana (Proposed) Orangethorpe Avenue - Anaheim (Proposed) Ball Road - Anaheim (Proposed) Grand Avenue - Santa Ana (Proposed) Main Street t- Orange (Proposed) State College Boulevard - Anaheim Sand Canyon Avenue - Irvine Santa Ana Boulevard - Santa Ana TOTAL Schedule Legend: 17th Street - Santa Ana Concept Orangethorpe Ave - Anaheim Approval Ball Road - Anaheim Final Design Grand Avenue - Santa Ana Construction Main Street - Orange State College Boulevard Sand Canyon Ave Santa Ana Boulevard * Schedules assumes future funding availability. Note: State College project approval has been completed by the City of Anaheim 5
7 Anaheim Regional Transportation Intermodal Center Funding Source: Renewed Measure M Measure M Transit Revenue State Transportation Improvement Program Federal TOTAL Current Status Schedule Draft Environmental Impact Report Released for Public and Agency Comments Architectural & Engineering Underway ARTIC and California High-Speed Train Teams Coordinating Design Efforts to Ensure Seamless Integration of Both s Environmental Clearance Architectural & Engineering Design Right-of-Way Next Major Milestone: Notice of Intent/Notice of Preparation Construction Env Clear Final Design Construction 6
8 Go Local Fixed-Guideway Program Step Two Activities Underway: Conceptual Engineering, Alternatives Analysis, State/Federal Environmental Clearance Step Two Schedule Award Anaheim Rapid Connection: ARTIC-Platinum Triangle-Anaheim Resort 5.90 Connector Santa Ana/Garden Grove Fixed-Guideway: id SARTC to Harbor Boulevard/Garden Grove 5.90 (Final design/construction schedule shown for initial operating segment:sartc to Bristol) TOTAL Step Two Activities * Phases not currently funded. Preliminary Engineering/ Final Design* Construction* Anaheim Rapid Connection Santa Ana/Garden Grove Fixed-Guideway 7
9 Facilities Engineering g Ana, GG, SA Bases - Workers Fall llprotection ti Ana, GG, Irv SC Bases - Steam Clean Area Vehicle Lifts Ana, GG, Irv CC, Irvine SC Bases - Security Upgrades Ana, GG, Irv SC Bases - Elevator Upgrades Ana Base - Pavement Reconstruction Irv SC Base - Workers Fall Protection Irv SC Base - Bus Wash Building Modifications Ana, GG, Irv SC, SA Bases - EVR Phase II Upgrades TOTAL RFP Preliminary Design Final Design Schedule Construction OCTA Facility Legend: Ana Anaheim Bus Base GG Garden Grove Bus Base Irv CC Irvine Construction Circle Bus Base Irv SC Irvine Sand Canyon Bus Base SA Santa Ana Bus Base GWTC Golden West Transportation Center PEROW Pacific Electric Right-of-Way 8
Capital Programs Update
Capital Programs Update Capital Programs Summary 2 Grade Separations - Overview Seven grade separation projects planned on the BNSF Orangethorpe corridor Cost: from $65 to $117 million Current Status:
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3
ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Transit System Study Pilot Project Implementation Plans. Attachment A
ORANGE COUNTY TRANSPORTATION AUTHORITY Transit System Study Pilot Project Implementation Plans Attachment A ATTACHMENT A 1 Transit System Study Pilot Projects Implementation Plan Report May 25, 2012 Background
More informationIntegrated Transportation and Capacity Building Plan
Anaheim Resort Transportation Integrated Transportation and Capacity Building Plan Imagine the Possibilities DRAFT FINAL REPORT June 2017 Draft Integrated Transportation & Capacity Building Plan Table
More informationCapital Improvement Program Fiscal Year
Capital Improvement Program Fiscal Year 2013-2014 Tustin City Council Mayor Al Murray Mayor Pro Tem Charles E. Chuck Puckett Council Members John Nielsen Rebecca Beckie Gomez Allan Bernstein CITY OF TUSTIN
More informationDriving Directions to the Anaheim Convention Center
Driving Directions to the Anaheim Convention Center Anaheim Convention Center: 800 W. Katella Avenue Anaheim, CA 92802 (714) 765-8950 FROM POINTS NORTH Take I-5 South. Take the HARBOR BLVD. exit. Keep
More informationIRVINE VAQUERO FOOTBALL All Time Season Schedules and Results
2016 2015 2014 15 Esperanza 22 15 Esperanza 39 0 Calvert Hall 47 17 Western 17 44 Rim of the World 24 28 Esperanza 25 21 Estancia 17 27 Estancia 17 21 Rim of the World 12 5 Laguna Hills 40 7 Laguna Hills
More information59,230 Sq. Ft. on 3.03 Acre Land Site
FOR SALE High Image Corporate HQ/R&D Building 9,230 Sq. Ft. on 3.03 Acre Land Site 1642 Millikan Ave., CA PROPERTY FEATURES High Image, with Extensive Two-Story Glassline +20,000 SF Two-Story Corporate
More informationSTADIUM LANDING E. Howell Avenue, Anaheim, CA. ±550 SF - ±8,600 SF Multi-Tenant Units For Lease
STADIUM LANDING 2020-2120 E. Howell Avenue, Anaheim, CA ±550 SF - ±8,600 SF Multi-Tenant Units For Lease SITE PLAN HOWELL AVENUE 2100 East Howell Avenue 2120 East Howell Avenue C 111 112 113 B 416-417
More informationNorwalk H.S. Norwalk Green Line Station. Lakewood Green Line Station NORWALK. Bellflower H.S. Studebaker Rd. Cerritos College. Gahr H.S.
Blvd Blvd Blvd EXISTING NETWORK Transit Hills Blue Metro Cabrillo 92 7 76 2 8 82 74 7 6 7 72 Poly 2 2 2 Mall 7s 3 4 4 46 8 s 3 Green Medical 2 2 76 92 73 7 9 9 94 Wilson 3 92 72 2 72 72 73 73 Norwalk Gahr
More informationDiscovery Gateway Spectrum - Phase II
JOHN ERICKSON LICENSE NO. 00977578 661 253 5202 john.erickson@colliers.com COLLIERS INTERNATIONAL 27200 Tourney Road Suite 300 Valencia, CA 91355 www.colliers.com Unit Features > > New construction > >
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT
More informationAbout This Report GAUGE INDICATOR. Red. Orange. Green. Gold
ATTACHMENT A About This Report The Orange County Transportation Authority (OCTA) operates a countywide network of local, community, rail connector, and express bus routes serving over 6, bus stops. OCTA
More informationLink Union Station (LINK US)
Link Union Station (LINK US) Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017 Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail Project Overview
More information50 Largest U.S. Metropolitan Areas
America s Racially : Opportunities and Challenges 50 rgest U.S. Metropolitan Areas Community types in the 50 largest metropolitan areas 39,333,003 26% 14,533,326 16,983,337 9% 10% 47,406,687 49,199,197
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationSTADIUM LANDING E. Howell Avenue, Anaheim, CA. ±550 SF - ±8,600 SF Mul -Tenant Units For Lease
STADIUM LANDING 2020-2120 E. Howell Avenue, Anaheim, CA ±550 SF - ±8,600 SF Mul -Tenant Units For Lease Building Address Unit SF Office SF AVAILABILITIES Warehouse SF GL Doors Asking Base Rent - Gross
More informationTrade School Space Ready for Occupancy
Trade School Space Ready for Occupancy For More Information Contact: Sima Shidfar, MSIE Tel: (714) 543-3289 sima@twsrealty.com Santa Ana Medical Arts Complex 1125 E. 17 th Street, Santa Ana, California
More informationCREATING CONNECTIONS IN CLARINGTON
CREATING CONNECTIONS IN CLARINGTON ANDRE MAROIS Director, RER Corridor Infrastructure Lakeshore East CHRIS BURKE Director, Service Planning, Planning & Development CLARINGTON GENERAL GOVERNANCE COMMITTEE
More informationAirport Round- Trip Transfer (SNA to Buena Park)
Airport Round- Trip Transfer (SNA to Buena Park) Airport Code Hotel Name Hotel Address City SNA Residence Inn Los Alamitos 4931 Katella Ave Los Alamitos SNA Best Western - Anaheim Hills 5710 E La Palma
More informationFOR LEASE ± 30,268 Square Feet
Subject Property Industry Circle Artesia Boulevard For Additional Information Please Contact: Steve Sprenger Executive Managing Director 949.608.20 ssprenger@ngkf.com CA Salesperson Lic. # 0202806 Candi
More informationSTART / FINISH Irvine Valley College. 100 Mile Course Map
START / FINISH Irvine Valley College 100 Mile Course Map ELEVATION MAP 100 MILE COURSE 100Mile Total Dist Direction / Street Name 0 Start at Irvine Valley College 0.2 Right onto Jeffrey Road 3.7 Left on
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting November 3, 2011 Introduction Local lead agency: Metro Federal lead agency: Federal Transit
More information1 (1) 2 (2) 3 (4) 4 (3) 5 (5) 6 (6) 7 (7) 9 (9) 10 (13) 11 (10) 12 (11) 12 (11) 14 (14)
16 ORANGE COUNTY BUSINESS JOURNAL Local breaking news: www.ocbj.com MAY 29, 2017 owner 1 Hilton Anaheim 2 (2) Anaheim Marriott 3 (4) Disney's Grand Californian & Spa 4 (3) Disneyland 5 (5) Hyatt Regency
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationORANGE COUNTY TRANSPORTATION AUTHORITY
ORANGE COUNTY TRANSPORTATION AUTHORITY Traffic Light Synchronization Program Project Results for Brookhurst Street, El Toro Road, and Katella Avenue Attachment A ATTACHMENT A Brookhurst Street Corridor
More informationAppendix L Technical Memorandum Aesthetics
Technical Memorandum Aesthetics 1.0 AESTHETICS This section provides a discussion of the aesthetic resources in the vicinity of ARTIC. Aesthetics pertain to the elements that make a certain view pleasing
More informationSANDAG s Regional Transportation Plan
SANDAG s Regional Transportation Plan Oceanside 5 Camp Pendleton Carlsbad P A C C I I F I C C O O C C E E A A N N 472 398 76 Encinitas 399 78 Solana Beach 472 Vista 15 San Marcos 399 399 470 610 Escondido
More informationCOMMERCIAL OFFICE. Arena Corporate Center Anaheim, California Three 2-story Office Buildings 382,000 SF Total
650 Newport Center Drive Newport Beach, California 20-story Office Tower totaling 387,500 SF. This project earned a LEED Silver Certification. 670 Newport Center Drive is the adjacent 8-Level parking structure
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationWelcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,
Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how
More information4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE
4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation
More informationCity of San Clemente NEW Business License Report By Issue Date For the Period 6/1/2017 thru 6/30/2017
City of San Clemente NEW Business License Report By For the Period 6/1/2017 thru 6/30/2017 LICENSE NUMBER BL-317509 317509 6/1/2017 8/31/2017 ACTIVE SPRINGTIME DEVELOPMENT CO 68779 QUISTA CT 68779 QUISTA
More informationRenovations Under Way! See Pg. 3 for more details.
FOR LEASE > ±48,326 SF INDUSTRIAL MANUFACTURING FACILITY Renovations Under Way! See Pg. 3 for more details. 10605SPRING VALLEY CA Jamacha Blvd Tucker Hohenstein, SIOR +1 760 930 7966 tucker.hohenstein@colliers.com
More informationA Presentation to: Project Advisory Group Meeting #6
A Presentation to: Project Advisory Group Meeting #6 March 25, 2015 Agenda Introductions Action items from last PAG meeting (February 25, 2015) Public involvement update Status of April public meetings
More informationAbbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd
Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:
More informationYork Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016
York Region Rapid Transit Corporation City of Vaughan Committee of the Whole June 1, 2016 0 Agenda Future rapid transit projects > Yonge North Subway Extension [YNSE] > Regional Express Rail [RER] Current
More informationLaguna Hills - San Clemente
91 bus time schedule & line map 91 Laguna Hills - San Clemente View In Website Mode The 91 bus line (Laguna Hills - San Clemente) has 3 routes. For regular weekdays, their operation hours are: (1) Laguna
More informationCOMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.
COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4 Recommendation The Commissioner of Engineering and Public Works and the
More information2013 Base Plan TransLink Technical Briefing
2013 Base Plan TransLink Technical Briefing September 17, 2012 0 A better place to live based on transportation excellence Reasons we are here today Demand is growing We are being fiscally responsible
More informationCreating Connections in Niagara Region
Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION
More informationPUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES
PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES #118404v1 Regional Transit Authority June 19, 2006 1 Presentation Overview Existing Public Transit Transit System Peer Comparison Recent Transit
More informationSite Location and Setting
Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and
More informationOverview. ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail
Overview ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail 1 What is Metro Doing? > Metro is building $30B in transit projects. > Regional Rail is building $1.2B
More informationCell: (408) Release MA June 25, 2012
VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationOrange County Transportation Authority Fare Integration Project A Regional Approach
Orange County Transportation Authority Fare Integration Project A Regional Approach APTA Fare Collection Workshop and TransITech Conference March 2012 Agenda Review our Regional Efforts Describe the Southern
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationMeasure R Program Update
Item 1 Program Update March 17, 2011 Independent Taxpayers Oversight Committee February 18 th Meeting held: Reviewed Audits of FY10 Expenditures Set Public Hearing Date on Audit Findings for April 18th
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT
More informationCity of San Clemente NEW Business License Report By Issue Date For the Period 3/1/2017 thru 3/31/2017
City of San Clemente NEW Business License Report By For the Period 3/1/2017 thru 3/31/2017 LICENSE NUMBER BL-317202 317202 3/1/2017 6/30/2017 ACTIVE DUSEK COOLING CO HEATING/VENTS/AC 435/1711 3457 ALTURA
More informationSelection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.
ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate
More informationTwin Oaks Valley Rd Windy Way
& Twin Oaks Valley Rd Windy Way NE Corner of Twin Oaks Valley Rd & Windy Way San Marcos, CA 92069 TUCKER HOHENSTEIN, SIOR +1 760 930 7966 tucker.hohenstein@colliers.com JOHN WITHERALL +1 760 930 7927 john.witherall@colliers.com
More informationALL LINES. Timetable EFFECTIVE APRIL 8, metrolinktrains.com VC AV SB RIV 91/PV OC IEOC
ALL LINES Timetable EFFECTIVE APRIL 8, 2019 VC AV SB RIV 91/PV OC IEOC metrolinktrains.com NOTES A MA Train does not stop at this station Express train Transfer Amtrak train. Only Metrolink Monthly Pass
More information- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and
More informationTransportation Supporting Dulles Airport
Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements
More informationDos Pueblos cs * Corona del Mar. * Lutheran/ Orange vs Corona del Mar Lutheran/ Orange Automatic Lutheran/ Orange vs * Foothill
DIVISION 1 Semifinal Round - 2/21 @ Wm. Woollett Jr. Aquatic Center Consolation Round - 2/20 @ Home Sites Dos Pueblos cs * Corona del Mar Dos Pueblos vs * Foothill Foothill Automatic * Lutheran/ Orange
More informationORANGE (LOS ANGELES), CALIFORNIA
ORANGE (LOS ANGELES), CALIFORNIA THE VISION Established Destination. Fresh Trends. As the premier and largest outlet shopping destination in Orange County, California, The Outlets at Orange features a
More informationTimetable VC AV SB RIV 91/PV OC IEOC ALL LINES EFFECTIVE OCTOBER 8, metrolinktrains.com
ALL LINES Timetable EFFECTIVE OCTOBER 8, 2018 VC AV SB RIV 91/PV OC IEOC metrolinktrains.com TABLE OF CONTENTS 3-4 Notes and Information 6-7 System Map 8-9 Ventura County Line (Mon-Fri) 10 Ventura County
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationGreat Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17
WHAT? Great Wolf Resorts has identified Gilroy, California as a potential location for a new Great Wolf Lodge family resort and has entered into a 60-day period of exclusivity with the City and community
More informationJEFF CHIATE Lic. #
AVAILABLE FOR SALE OR LEASE 5515 LA PALMA AVE ANAHEIM ORANGE COUNTY HIGH IMAGE OFFICE BUILDING Cushman & Wakefield of California, Inc. Lic. #00616335 2020 Main Street, Suite 1000, Irvine, CA 92614 www.cushwake.com
More informationCulpeper District. Albemarle County Monthly Report. September 2012
Culpeper District Albemarle County Monthly Report September 2012 Special Issues Bridges on Route 745, Arrowhead Valley Road The road will be closed at the Rail Road Bridge on the southern end of the road
More informationSAN MARTIN BUSINESS PLAN COMMUNITY MEETING
SAN MARTIN BUSINESS PLAN COMMUNITY MEETING Summary of Community Meeting Wednesday May 23, 2018 Santa Clara County Roads and Airports Department hosted a community meeting on Wednesday May 23 nd, 2018 from
More informationCity of San Clemente NEW Business License Report By Issue Date For the Period 2/1/2018 thru 2/28/2018
City of San Clemente NEW Business License Report By For the Period 2/1/2018 thru 2/28/2018 BL-318057 318057 2/1/2018 4/30/2018 ACTIVE AESTHETICS CONSORTIUM INC TILE CERAMIC & MOSAIC 434/1743 1880 TEMPLE
More information2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016
2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationPFC Quarterly Status Report September 30, 2016
PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority
More informationChicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014
Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980
More information4-Story, 30,000 to 250,000 SF Office Campus Available for Lease
4-Story, 30,000 to 250,000 SF Office Campus Available for Lease Overview Institutional Quality Office Campus 4-Story, 30,000 to 250,000 SF Available 5/1,000 Parking Ratio with new Parking Structure Solar-Powered
More informationCHAIR S RECEPTION. Thursday, June 20, :00 p.m. Pool North Tower Hyatt Regency Orange County Garden Grove, California
PACIFIC FISHERY MANAGEMENT COUNCIL CHAIR S RECEPTION Thursday, June 20, 2013 6:00 p.m. Pool North Tower Hyatt Regency Orange County Garden Grove, California TO BE RETAINED BY OPERATORS OF HOTELS MOTELS,
More informationMetrolink Improvements = A Better Commute for You
Metrolink Improvements = A Better Commute for You Metrolink is constantly working to improve your commute. Every improvement we make to the Metrolink system is meant to make your trip between home and
More informationDulles Corridor Improvements. Drive to Ride
Dulles Corridor Improvements Dulles Corridor Improvements Status Update v Condition assessment of Toll Road facilities is complete v Dulles Airport Access Highway/I-495 Interchange Safety Improvements
More informationREDONDO AVE
FOR SALE 6,673 SF INDUSTRIAL BUILDING 1345-1347 REDONDO AVE LONG BEACH, CALIFORNIA 90804 The information has been furnished from sources which we deem reliable, but for which we assume no liability. Any
More informationMain Line System Recommendations
(Existing) Main Line System Recommendations This system recommendation focuses mobility investment in a central main line corridor proximate to I-290. A bus rapid transit (BRT) line at each end of the
More informationCHAPTER 3.0 PROJECT DESCRIPTION
Pacific Coast Highway/Del Prado Avenue Phase I Street Improvement Project Chapter 3.0 Project Description CHAPTER 3.0 PROJECT DESCRIPTION 3.1 Project Location Regional Location The City of Dana Point is
More informationExpo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed
Expo E-News Keeping Our Community Informed Winter 2014 Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2 In this Issue : Page 4: Construction Update Page 6: Artist Profiles For more information
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationCongestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP
Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion Darren Henderson, AICP Today s s Discussion How bad is congestion? What has been done about it? What else can be done? How Bad is
More informationCREATING CONNECTIONS IN THE CITY OF ST. CATHARINES
CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE BRIAN GALLAUGHER, DIRECTOR, PROJECT PLANNING RER ST. CATHARINES CITY COUNCIL NOVEMBER 13, 2017 A REGION
More informationThe Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension
The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension by Bart Reed The Transit Coalition P.O. Box 567 San Fernando, CA 91341-0567 (818) 367-1661 1 Introduction Metro has released
More informationAbout the Foothill Gold Line
About the Foothill Gold Line Board of Directors Marisol Rodriguez Member (Los Angeles Appointee) John Fasana Member (Metro Appointee) Doug Tessitor Chair (Pasadena Appointee) Sam Pedroza Vice Chair (SGVCOG
More information5128 N FIGUEROA STREET
FOR SALE 2,093 SF BUILDING ON 12,994 SF OF LAND 128 N FIGUEROA STREET LOS ANGELES, CALIFORNIA 90042 The information has been furnished from sources which we deem reliable, but for which we assume no liability.
More informationWELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION
WELCOME AND AGENDA Welcome At tonight s open house you will have the opportunity to: See updated design plans for the southeast and downtown stations and track Help shape the look and feel of light rail
More informationIMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:
IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),
More informationVISTA AZUL- APPROVED 20 LOT TENTATIVE MAP
Expansive Views Entitlements for 20 Residential Lots Previously Graded Entitled for 14 Detached Lots, 6 Townhome Units DOWNTOWN SAN DIEGO ASKING PRICE: $1,395,000 - OFFERS DUE JULY 14, 2017 Monterey Heights
More informationMetropolitan Manifold
Metropolitan Manifold OFFICIAL PUBLICATION OF SO CAL METS www.socalmets.com Jul-Aug 2015 No. 27 President: Ron Bauman 1944 Spruce St. Riverside 951-202-9927 Vice President Gwen Tolleson 1949 Smokewood
More informationMedical and Dental Suites for Lease Santa Ana Medical Arts Complex
Medical and Dental Suites for Lease Santa Ana Medical Arts Complex 1125 E. 17 th Street, Santa Ana, California 92701 For More Information Contact: Sima Shidfar, MSIE Tel: (714) 543-3289 HIGHLIGHTS Medical
More informationFORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.
FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The
More informationState Route 189 Project and Draft Resolution of Support. November 2014
State Route 189 Project and Draft Resolution of Support November 2014 Corridor Location Image sources: ADOT Statewide and National Importance: CANAMEX Corridor Image source: FHWA Statewide and National
More informationNAIOP. Marcia McAllister Metropolitan Washington Airports Authority
NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business
More informationAnaheim Canyon Metrolink Station
February 7, 2018 Scott Peterson Hines 4000 MacArthur Boulevard, Suite 110 Newport Beach, CA 92660 BERKELEY CARLSBAD FRESNO IRVINE LOS ANGELES PALM SPRINGS POINT RICHMOND RIVERSIDE ROSEVILLE SAN LUIS OBISPO
More informationCREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS
CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS NIAGARA FALLS CITY COUNCIL NOVEMBER 28,
More informationSilver Line Rail Project Update
Silver Line Rail Project Update April 2013 Project Map 2 Silver Line, Phase 1 Service Pattern 3 Project Overview Silver Line Dulles Metrorail is a 23-mile extension of the existing Orange Line Total Project
More informationDulles Toll Road Rate Setting Process
Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On
More informationUpdate of MDX Open Road Tolling
Update of MDX Open Road Tolling Citizens Transportation Advisory Committee September 11, 2013 About MDX MDX is an agency of the state created by the State Legislature and the County Commission to assure
More informationCREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017
CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than an
More informationWest Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018
West Santa Ana Branch Transit Corridor Community Meetings March 12, 13, 17 & 19, 2018 Purpose of this Meeting > Update on Public Scoping comments received > Why Metro is revisiting the Northern Alignments
More informationNovember 9, Society of American Military Engineers
November 9, 2016 Society of American Military Engineers Transit Operator Transportation Planner Transportation Infrastructure Builder Transportation Funding Overseer 2 1,433 square-mile service area (nearly
More information