Investment Opportunities in Public Works and Highways

Size: px
Start display at page:

Download "Investment Opportunities in Public Works and Highways"

Transcription

1 Investment Opportunities in Public Works and Highways Secretary MARK A. VILLAR Imperial Hotel, Tokyo, Japan February 28, 2017

2 PHILIPPINES INFRASTRUCTURE BUDGET (Billions and % of GDP) TARGET INFRASTRUCTURE SPENDING 7% of GDP $16.9B P B (5.3%) $3.5B P B (1.8%) FY 2017 FY US $ - P (as of Feb. 20, 2017)

3 SOURCE:

4 Traffic Decongestion Program (Construct / widen national roads and bridges; Construct by-passes/diversion roads; Construct flyovers; interchanges and underpasses) Integrated and Seamless Transport System (Construct/improve logistics infrastructure network in Northern Mindanao, Davao, SOCSARGEN and CARAGA (MLIN); Construct/improve roads leading to growth corridors in Western Mindanao; Study and implement Inter-island linkage projects through long-span bridges; Connect gaps along national roads; Construct/replace bridges; Initiate studies on tunneling technology) Public-Private Partnership Program (Augment and complement Locally-Funded and Foreign-Assisted projects; Construct High- Standard Highway Network based on Masterplan and Technical Studies.) Convergence and Rural Road Development Program (Construct/upgrade local access roads to designated tourism destinations, RORO ports / seaports and airports; Construct Farm to Market Roads (FMRs); Construct/improve roads leading to industrial trade corridors.)

5 Livable, Sustainable and Resilient Communities Integrated Water Resources Management Program (Construct/rehabilitate flood mitigation structures along major river basins and principal rivers; Construct water impounding projects to optimize water resources; Construct water supply/septage & sewerage/rain collectors; Upgrade/improve drainage capacity) Disaster Risk Reduction and Climate Change Adaptation Program (Rehabilitate, retrofit and strengthen existing bridges; Provide safe access to highly vulnerable areas; Improve national roads vulnerable to flooding, landslide and slope failure; Build evacuation centers; Upgrade quality standards based on Design Guidelines, Criteria & Standards (DGCS) 2015) Infrastructure Support for Marginalized Sectors (Construct support facilities for marginalized sectors (senior citizens, physically challenged persons, women sector, etc.) Create Environment-Friendly Communities (Build more bike lanes and pedestrian infrastructure.)

6 DPWH FY 2017 INFRASTRUCTURE PROGRAM (Amount in Billion) P107.8 B ($2.2B) Traffic Decongestion Program $1.8B P90.7B FY 2011 $8.6B P428.4B FY 2017 P18.8 B ($0.4B) Convergence and Rural Road Development Program (TRIP, ROLL-IT) P95.9 B ($1.9B) Integrated and Seamless Transport System (Includes P31.1 B for Mindanao Logistics Infrastructure Network, MLIN) P104.4 B ($2.1B) Livable, Sustainable and Resilient Communities 1 US $ - P (as of Feb. 20, 2017)

7 Traffic Decongestion Program

8 6.90 km 4 lane elevated expressway from the end point of NAIA Expressway Phase I to PAGCOR Entertainment City. It will provide access to NAIA Terminals 1, 2 and 3 as well as an interface with the Skyway and Cavitex. Will reduce travel time between Skyway and Terminal 1 from 24 minutes to 8 minutes. Will benefit 80,000 travelers per day. Project Cost: P20.45 B ($ M) Schedule:

9 Widening/Concreting of 3.24 kilometers section of Radial Road 10 (R-10) into 6 lanes road including lateral and cross drainage. 2,107 Informal Settler Families (ISFs) were relocated and 427 ISFs availed financial assistance. Will reduce travel time between Manila and Navotas City from 1hour to 30 minutes. Project Cost: P M ($7.56 M) Schedule:

10 5.65 km -6 lanes elevated expressway connecting McArthur Highway and C-3. It will utilize the existing PNR railroad tracks that cut across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing through EDSA or the Balintawak Toll Plaza and improve movement of cargo between NLEX and Radial Road 10. Project Cost: P9.00 B ($ M) Schedule:

11 8 km- four lane expressway from C3 Road in Caloocan City to PUP, Sta. Mesa, Manila and will connect to common alignment of Skyway Stage 3. Will reduce travel time between SLEX and NLEX from hours to minutes. Will reduce travel time between Clark and Calamba from 3 hours to 1 hour and 40 minutes. Will benefit 35,000 travelers per day. Project Cost: P23.30 B ($ M) Schedule:

12 14.8km - 6lane expressway that will connect Balintawak, Quezon City to Buendia, Makati Will decongest EDSA and other major roads in Metro Manila (e.g., Quezon Ave., Araneta Ave., Nagtahan, Quirino Ave) by as much as 55,000 vehicles daily. Will reduce travel time from Buendia to Balintawak from 2 hours to 15 to 20 minutes Project Cost: P37.43 B ($748.79M) Schedule:

13 Construction/widening of two (2) bridges, rehabilitation/concreting of existing 7.46 kms road with provision of additional two lanes, including construction of 2-meter wide planting strips and 3 meter bike lane. Will reduce travel time from Taytay via C-5 to Bicutan from 1 hour to 30 minutes via Laguna Lake Highway. Project Cost: P1.068 B ($21.36 M) Schedule:

14 34 kms - 6-lanes expressway from Skyway FTI, Paranaque City to Batasan, Quezon City. Its alignment will connect to Skyway Stage 1 at FTI, towards C5/Diego Silang, going towards Laguna de Bay, intersecting Ortigas extension at Tikling intersection in Antipolo City midway, crossing Marcos Highway and terminating in Batasan Complex. Project Cost: P31.32 B ($ M) Schedule:

15 50 expressway that will connect Bataan with Metro Manila and providing direct access to the provinces of Bulacan and Pampanga. City Flood Control in the coastal waters of Navotas City. Coastal Sea Barrier through the northern part of Manila Bay covering the coastal areas of Bulacan, Pampanga and Bataan. Project Cost: P B ($7, M)

16 88.85-km expressway from Tarlac City to Rosario, La Union. Will reduce travel time between Tarlac City and Rosario, La Union from 3.5 hours to 1 hour. Will benefit 20,000 travelers per day. Project Cost: P24.42 B ($ M) Schedule:

17 30 km four lane expressway from Tarlac City to Cabanatuan City, Nueva Ecija. Will reduce travel time between Tarlac City and Cabanatuan City from 70 minutes to 20 minutes. Will benefit 11,200 motorists per day. Decongest traffic by about 48% passing thru Daang Maharlika Project Cost: P14.94 B ($ M) Schedule:

18 44.2 km four lane expressway with 8 interchanges and 12,207 lm bridges (inclusive of 4,618 lm viaduct) Will connect CAVITEX in Kawit, Cavite and SLEX-Mamplasan interchange in Biñan, Laguna. Will reduce travel time between CAVITEX and SLEX from 1.5 hours to 45 minutes Project Cost: P35.68 B ($ M) Schedule:

19 56.87 km 4 lane expressway extension from Sto. Tomas, Batangas to Tayabas / Lucena, Quezon Will facilitate faster and safer travel to Laguna, Batangas, Quezon and Bicol Region. Will reduce travel time from Sto. Tomas, Batangas to Lucena, Quezon from 4 hrs to 1 hour. Will benefit 17,000 travelers per day Project Cost: P13.10 B ($ M) Schedule:

20 180 kilometer expressway that will start about two (2) kilometers from the end of the proposed TR-4 project and will end before the start of the proposed Camarines Sur Expressway. To provide a direct and fast route between both provinces, the trade of goods will also prosper not only between Quezon and Bicol but also in the Northern part of Luzon because travel time for trucks will be reduced.

21 Four (4) lane divided underpass along Senator Gil Puyat Avenue passing through the Makati Avenue and Paseo de Roxas intersections. Underpass/Covered tunnel-570m; approaches and At-grade Transition-310m (Length = 880 m) It will relieve traffic congestion along EDSA, Kalayaan Ave and Osmena Highway in Makati City and nearby C-5 Road, Pres Quirino Ave and Roxas Boulevard. Project Cost: P1.01 B ($20.21 M) Schedule:

22 Four (4) lane 2nd level flyover along Gov. Forbes St. from Alcantara St. crossing Fajardo St., Loyola St., Espana Blvd., and Laong Laan St. and down ramp at mid-point of Maria Clara St. and Aragon St. in the City of Manila. It also involves the construction of a 433 lm down ramp along Dimasalang St. and road improvement along Espana Blvd. (1,600 m) The project will benefit from the reduction of intersection delays using at-grade controlled C- 2/R-7 intersection. Project Cost: P2.30B ($46.01 M) Schedule:

23 EDSA/North Ave.-West Ave. Interchange North Ave.-Mindanao Ave. Interchange C-5/Greenmeadows / Acropolis / Calle Industria Interchange EDSA/Roosevelt-Congressional Avenue Interchange Project Cost: P4.02 B ($80.42 M) Schedule:

24 Sta. Monica-Lawton Bridge: 614 m - 4 lane bridge across Pasig River connecting Lawton Ave. in Makati City and Sta. Monica St. in Pasig City. Lawton Ave.-Global City Viaduct: 337 m 4 lane viaduct structure traversing Lawton Avenue onwards to the entrance of Bonifacio Global City in Makati City. Will decongest traffic from EDSA and C-5 particularly along the section of Guadalupe Bridge and Bagong Ilog Bridge respectively. Project Cost: P1.95 B ($39.01 M) Schedule:

25 Bridges crossing Pasig River (6) North and South Habor Bridge Binondo-Intramuros Bridge 2nd Ayala Bridge (Carlos Palanca-San Marcelino) Beata-F.Y. Manalo Bridge (Pandacan-Sta. Ana) F. Blumentritt-Antipolo Bridge Estrella-Pantaleon Bridge Bridges crossing Marikina River (4) Kabayani-Katipunan Bridge Reposo-Guatemala Bridge J.P. Rizal-Yale Bridge G. Gabriel St.-Mercury Ave. Bridge Bridges crossing Manggahan Floodway (2) East Bank-West Bank Bridge 1 East Bank-West Bank Bridge 2 Project Cost: P18.98 B ($ M)

26 Construction of a 4-lane 3rd Level Flyover at the intersection of EDSA and Taft Ave. It starts between F.B. Harrison and Roxas Blvd. and ends from near approach of Tramo left turning flyover on EDSA. 1,696 m (Northbound), 1,046 m (Southbound). Travel time will be reduced by half to cross the intersection. Project Cost: P2.70 B ($54.01 M) DPWH has put the project on hold to give way to the construction of NAIA Expressway Phase II.

27 1,844 m - 4 lane viaduct along C-5/Katipunan Avenue, Quezon City Travel time in Katipunan and CP Garcia will be reduced by 80%. Will mitigate vehicle congestion in the C- 5/Katipunan areas since the viaduct will cater all the thru traffic skipping the choke points along the Ateneo and Miriam schools, and the intersection of CP Garcia Avenue, as well as UP Town Center. Project Cost: P2.96 B ($59.22 M) Schedule:

28 9.96-km bypass road including 4 bridges, drainage facilities, and slope stabilization works. Traverses the municipalities of Balagtas, Guiguinto, Plaridel, Bustos and San Rafael in Bulacan and connects NLEX in Balagtas, Bulacan with Maharlika Highway in San Rafael, Bulacan. Will reduce average travel time between Burol, Balagtas and Maasim, San Rafael in Bulacan from 69 minutes to 24 minutes. Will benefit 15,132 motorists per day. Project Cost: P3.34 B ($66.82 M) Schedule:

29 South Section (Road) and Center Section (Tunnel) JICA PH-P261- P B Road: 28.8 km Tunnel: 2.28 km Improvement of existing two connector (local) roads: km North Section (Road) - P5.58 B Road: km Will reduce travel time from 1 hour and 44 minutes via Pan-Philippine Highway and Diversion Road to 49 minutes via Davao By pass road. Project Cost: P19.81 B ($396.30) Schedule:

30 Integrated and Seamless Transport System (Inter-Island Linkage Projects)

31 Construction of a bridge across Panguil Bay connecting the City of Tangub in Misamis Occidental and Municipality of Tubod in Lanao del Norte. Center span (main bridge): 320 meters Approach viaduct: 2,040 meters Approach roads: Tubod-856 meters; Tangub City -260 meters Project Cost: P4.86 B ($97.22 M) Schedule:

32 Construction of 23 km long bridges linking the Visayas islands of Panay, Guimaras and Negros. Estimated Project Cost: P21.67B ($ M) Project Duration: Six Years

33 Construct/improve logistics infrastructure network in Northern Mindanao, Davao, SOCSARGEN and CARAGA (Length-2,074 km) Aims to enhance the agribusiness competitiveness in Mindanao by developing an intermodal logistics system that will address the constraints caused by high cost of transport and inadequate logistics infrastructure, among others. Project Cost: P80.41 B ($1.61 B) Schedule:

34 Livable, Sustainable and Resilient Communities (Integrated Water Resources Management Program) Name of Project Php B $ M Pasig-Marikina River Improvement and Dam Construction , Meycauayan River Improvement Malabon-Tullahan River Improvement South Parañaque-Las Piñas River Improvement East Mangahan Floodway (Cainta & Taytay River Improvement) West Laguna Lakeshore Land Raising Land Raising for Small Cities around Laguna Lakeshore Improvement of the Inflow Rivers to Laguna Lake Manila Core Area Drainage Improvement West Mangahan Area Drainage Improvement Valenzuela-Obando-Meycauayan (VOM) Improvement Total Estimated Requirement: P351.7 B $7,036.6M

35 Channel improvement works consisting of revetments, parapet walls, riverbank excavation, dredging works, dike embankment, drainage improvement, sluice structures, bridge foundation protection at remaining sections of Pasig River and priority critical sections of Lower Marikina River. Will decrease flood inundation by 18%. Will reduce flood damages by P14.3 billion. Will reduce affected population by 0.2 million. Project Cost: P7.55 B ($ M) Schedule:

36 Modernization of Drainage Areas. Minimizing Solid Waste in Waterways. Participatory Housing and Resettlement. Project management, support, and coordination. Project Development Objective is to reduce flood risks in flood-prone areas of Metro Manila that are served by targeted pumping stations. Approximately 2 million beneficiaries. Project Cost: P23.47 B ($ M) Schedule:

37 Cagayan River: Revetment structures for the most eroded river banks located at Brgy. Alibago and Cataggaman, Tuguegarao City to address serious bank erosion resulting to loss of valuable lands in the targeted areas of Tuguegarao City and parts of Cagayan Province. Tagoloan River: Construction of river dikes and partial excavation of river channel together with drainage channel improvement. Imus River: Construction of two (2) off-site retarding basins along Imus River and Bacoor River located in Brgy. Buhay na Tubig and Brgy. Anabu. Project Cost: P6.18 B ($ M) Schedule:

38 Earth dike: 11,928 meters (left and right bank); Concrete Flood Wall: 3,259 meters (left and right bank) including 1,449 meters reinforced concrete/masonry slope protection; Gates and Drainage Outlets: 3 steel slide gates; 19 flap gates; 3 reinforced concrete box culverts; 18 reinforced pipe culverts; and 1 reinforced concrete headwall; Retarding basins: preserved 97 hectares of natural retarding basin; developed 13 hectares of natural retarding basin; New Road and Raising of Existing Road for Evacuation: 2,756 m; Improved Kagayan Bridge Project Cost: P8.55 B ($ M) Schedule:

39 Excavating and dredging of km. Third River and Eastern Branch Improving the flow of 23.0 km Caduang Tete River and Sapang Maragul River Repair of Eight (8) sluice gates Will lessen the area affected by flooding from 4,150 hectares (ha) to 23,780 ha; Will reduce flood depth from m to m; Will shorten flood duration from 66 days to 17 days. Project Cost: P4.22 B ($84.42 M) Schedule:

40 Livable, Sustainable and Resilient Communities (Disaster Risk Reduction and Climate Change Adaptation Program)

41 The rehabilitation of super structure of Quezon Bridge, along Quezon Boulevard Extension has major scope of work underneath the steel bridge which involved sand blasting, replacement of fire damaged structural components and painting of structural steel members, installation of carbon fiber. The scope on the bridge proper are asphalt overlay, application of epoxy on deck slab, repair of steel railings & lamp post and repair & painting of pylons including parapet walls/center island. Project Cost: P M ($1.56 M) Schedule: March 2016-February 2017

42 Replacement of outer bridges amd replacement of substructure including foundation of inner bridge of Guadalupe Bridge. Replacement of Lambingan Bridge with vertical geometry improvement of both sides approach road. Project Cost: P4.29 B ($85.82 M) Schedule:

43 Target Infrastructure Spending: 7% of GDP Improve expenditure performance Organize Infrastructure Monitoring and Advisory Group (IMAG). Create a multi-media citizens feedback mechanism including 24/7 Secretary s hotline. Expedite ROW resolution based on new ROW Law. Streamline procurement process based on New Procurement Manual. Institutionalize 24/7 operations. Update and expand coverage of masterplans on road network system and flood & drainage system. Initiate studies on tunneling technology. Fast-track project implementation thru new construction methodology such as one-day curing of concrete pavement. Augment infrastructure spending thru Public-Private Partnership (PPP) projects. DPWH will continue and pursue investments in: Traffic decongestion programs/projects (expressways, diversion roads, by-passes, flyovers, interchanges and underpasses). Logistics infrastructure network in Northern Mindanao, Davao, SOCSARGEN and CARAGA. Access roads leading to growth corridors in Western Mindanao. Inter-Island Linkage projects through long-span bridges. Access roads leading tourism destinations, RORO ports/seaports and airports. Roads leading to industrial trade corridors. Disaster risk reduction and climate change adaptation & mitigation programs/projects. Infrastructure support for marginalized sector. Bike lanes and pedestrian infrastructure. Institutionalization of reforms on anti-corruption program.

44 THANK YOU!!!

STATUS OF PPP PROJECTS AS OF 05 OCTOBER 2011

STATUS OF PPP PROJECTS AS OF 05 OCTOBER 2011 1. Daang Hari SLEx Link Project P 1.956 B ROW P 177.3 M Publication of Invitation to Participate and Bid July 20, 27 $ 43.5 M IC P 10.635 M and August 3, 2011 New 4 kilometer, 4-lane paved toll road that

More information

Republic of the Philippines Department of Transportation

Republic of the Philippines Department of Transportation Republic of the Philippines Department of Transportation Airports and Aviation \ Railways \ Road Transport \ Maritime 19 June 2018 Tokyo, Japan Number of Airports for Construction / Rehabilitation /

More information

REGION REGION 3 (CENTRAL LUZON) NEGROS OCCIDENTA L

REGION REGION 3 (CENTRAL LUZON) NEGROS OCCIDENTA L BC NAME Angeles 2 Angeles Nepo Antipolo Bacolod ADDRESS TOWN/MUNICIPALI TY PROVINCE Place Angeles Balibago St. Angeles ANGELES PAMPANGA Level 1 Nepomall Dona Teresa Corner, St. Joseph Sto. Rosario Angeles

More information

NEW BOHOL (PANGLAO) AIRPORT

NEW BOHOL (PANGLAO) AIRPORT NEW BOHOL (PANGLAO) AIRPORT This is the country s first eco-airport. It will be equipped with solar panels to cover one-third of the airport s energy requirement. It is designed to facilitate natural lighting

More information

100 Days Roadmap of The Department of Transportation. July 2016 Manila

100 Days Roadmap of The Department of Transportation. July 2016 Manila 100 Days Roadmap of The Department of Transportation July 2016 Manila 1 Roadmap to Improve Traffic Congestion The Passage of a Special Power is imperative Acquire right of way (ROW) Use of alternate roads

More information

MAPS FOR SHUTTLE AND PICK UP SERVICES

MAPS FOR SHUTTLE AND PICK UP SERVICES Ninoy Aquino International Airport MAPS FOR SHUTTLE AND PICK UP SERVICES NAIA Terminal 1 Pick Up Shuttle NAIA Terminal 2 Pick Up Shuttle NAIA Terminal 3 Pick Up Shuttle Bridgeway to Newport Complex Hotel

More information

STAGE MAP. Quezon City - Palayan City km Sunday 20 May 2018 PALAYAN CITY QUEZON CITY. Maria Aurora. San Jose City. Science City of Muñoz

STAGE MAP. Quezon City - Palayan City km Sunday 20 May 2018 PALAYAN CITY QUEZON CITY. Maria Aurora. San Jose City. Science City of Muñoz STAGE MAP Quezon City - Palayan City 157.15 km Sunday 20 May 2018 Gerona KOM COURSE FEATURES TYPE SPRINT START DRINK START FEED ZONE FINISH COURSE COURSE NEUTRAL ZONE Tarlac City Guimba Science City of

More information

CRESCENT PARK RESIDENCES, BONIFACIO GLOBAL CITY CROWN REGENCY TOWER, PRES. OSMEÑA AVE., CEBU DILIMAN COMMERCIAL CENTER, COMMONWEALTH AVENUE, QUEZON

CRESCENT PARK RESIDENCES, BONIFACIO GLOBAL CITY CROWN REGENCY TOWER, PRES. OSMEÑA AVE., CEBU DILIMAN COMMERCIAL CENTER, COMMONWEALTH AVENUE, QUEZON STARBUCKS 18TH ST. COR LACSON ST., BRGY. 4, BACOLOD CITY 6750 BUILDING AYALA AVENUE ABREEZA MALL ADB LIBRARY, ADB AVENUE, MANDALUYONG CITY AGUIRRE AVE. COR. FRANCISCO CRUZ ST., PARAÑAQUE ALI MALL CUBAO

More information

Urban and Inter-urban Rail Projects. 26 April 2018 AmCham Hall

Urban and Inter-urban Rail Projects. 26 April 2018 AmCham Hall Urban and Inter-urban Rail Projects 26 April 2018 AmCham Hall 4 From 77-km. to 1,900-km. in 2022 Map Timeline Length Funding 5 From 77-km. to 1,900-km. in 2022 Map Timeline Length Funding Operational LRT-1

More information

LAND BASED SOURCES; RIVER STATIONS & WATER BASED SOURCES. National Capital Region EMB

LAND BASED SOURCES; RIVER STATIONS & WATER BASED SOURCES. National Capital Region EMB LAND BASED SOURCES; RIVER STATIONS & WATER BASED SOURCES National Capital Region EMB RIVER SYSTEMS MONITORED PARAñAQUE RIVER SYSTEM NMTT RIVER SYSTEM MEYCAUAYAN-VALENZUELA RIVER PASIG RIVER (PRUMS) PARANAQUE

More information

BPI Extended Banking Hours

BPI Extended Banking Hours BPI Extended Banking Hours Agusan Del Norte Butuan City Butuan Montilla Montilla Blvd, Butuan City 8600 09:00 AM to 06:00 PM Aklan Kalibo City Kalibo Corner S. Martelino & XIX Martyrs Streets, Kalibo Aklan

More information

Aviation and Airports

Aviation and Airports Aviation and Airports Sector Updates Arangkada Joint Chamber of Commerce Undersecretary Roberto C.O. Lim AIM, Legazpi Village 15 February 2017 1 Philippines Aviation and Airports Strategy Developing Aviation

More information

UP TO 50% OFF AT THE PLAINS & PRINTS PURPLE SALE! January 6 to 31, 2018

UP TO 50% OFF AT THE PLAINS & PRINTS PURPLE SALE! January 6 to 31, 2018 ALABANG TOWN CENTER 2/F Alabang Town Center, Brgy. Ayala Alabang, Muntinlupa City (02) 842-8403 ALIMALL UGF Unit 25 Alimall, Brgy. Socorro, Cubao, Quezon City (02) 912-3321 FAIRVIEW TERRACES G/F Ayala

More information

BPI BRANCHES - EXTENDED BANKING HOURS

BPI BRANCHES - EXTENDED BANKING HOURS BPI BRANCHES - EXTENDED BANKING HOURS Agusan Del Norte Butuan City Butuan Montilla Montilla Blvd, Butuan City 8600 Aklan Kalibo City Kalibo Corner S. Martelino & XIX Martyrs Streets, Kalibo Aklan 5600

More information

Annual Shareholders Meeting Presentation

Annual Shareholders Meeting Presentation Annual Shareholders Meeting Presentation JUNE 28, 2017 44 SHOPPING CENTERS STRONG CASHFLOW CONSUMER PLAY 13 OFFICE BUILDINGS LEADING BPO OFFICE SPACE PROVIDER 67 RESIDENTIAL BUILDINGS 35 HOUSING SUBDIVISIONS

More information

BPI FAMILY SAVINGS BANK BRANCHES NCR BRANCH NAME BRANCH ADDRESS BRANCH HOURS Nov. 13, Monday. Caloocan City

BPI FAMILY SAVINGS BANK BRANCHES NCR BRANCH NAME BRANCH ADDRESS BRANCH HOURS Nov. 13, Monday. Caloocan City BPI FAMILY SAVINGS BANK BRANCHES NCR BRANCH NAME BRANCH ADDRESS BRANCH HOURS Nov. 13, Monday Caloocan Nov. 14, Tuesday Nov. 15, Wednesday EDSA - Monumento MCU Compound, EDSA Monumento, Caloocan 1400 Las

More information

Philippine Transport Sector. September 2015

Philippine Transport Sector. September 2015 Philippine Transport Sector September 2015 Philippine Transport Sector: Developments and Project Pipeline Department of Transportation and Communications September 2015 2 Transport development plan Data

More information

Laguna. There are two trunklines connecting the province of Laguna with Metro Manila. These are:

Laguna. There are two trunklines connecting the province of Laguna with Metro Manila. These are: TECHNICAL REPORT No. 3: URBAN / TRANSPORTATION DEVELOPMENT CONDITION IN ADJOINING AREAS Laguna There are two trunklines connecting the province of Laguna with Metro Manila. These are: The South Luzon Expressway

More information

METRO MANILA METRO MANILA NEGROS OCCIDENTA L

METRO MANILA METRO MANILA NEGROS OCCIDENTA L BC NAME 168 8 Forbes Arvo Bacolod Baguio ADDRESS Basement 1,168 Shopping Mall Soler St.Binondo 8 Forbes Town Center Global Fort Bonifacio Taguig City TOWN/MUNICIPALI TY PROVINCE REGION CONTACT NUMBERS

More information

List of BDO Branches Authorized to Exchange Foreign Currencies as of (November 15, 2017)

List of BDO Branches Authorized to Exchange Foreign Currencies as of (November 15, 2017) 1 Angeles City-Miranda 1 A. Arnaiz Paseo 2 A. Santos - St. James 2 A. Santos - St. James 3 ADB Avenue Ortigas 3 ADB Avenue Ortigas 4 Alabang - Madrigal Ave 4 Alabang - Madrigal Ave 5 Angono M.L. Quezon

More information

The City s Strategic Economic Support Projects

The City s Strategic Economic Support Projects INTEGRATED FOOD TERMINAL The Integrated Food Terminal is envisioned as a strategic location of wholesale agricultural produce marketing facility with separate hog and cattle/goat/sheep abattoirs and a

More information

SHOP INSTANTLY, EARN DOUBLE KEY POINTS AND PAY LATER!

SHOP INSTANTLY, EARN DOUBLE KEY POINTS AND PAY LATER! SHOP INSTANTLY, EARN DOUBLE KEY POINTS AND PAY LATER! SHOP INSTANTLY, EARN DOUBLE KEY POINTS AND PAY LATER Promo Period: October 1 to December 31, 2009 Avail of items at 0% plus double rewards points when

More information

BPI ATMs for Express Cash Withdrawal

BPI ATMs for Express Cash Withdrawal CALOOCAN MONUMENTO BPI BLDG., SAMSON ROAD CORNER ARANETA AVE., KALOOKAN CITY CUBAO SHOPWISE FIESTA SHOPWISE FIESTA CARNIVAL, ARANETA CENTER 13TH ST. CORNER P. TUAZON, CUBAO, QUEZON CITY CUBAO GATEWAY MALL

More information

TAPP II: Infrastructure Tracker (hard and soft) As of February 25, 2018 Funding Type

TAPP II: Infrastructure Tracker (hard and soft) As of February 25, 2018 Funding Type NAIA Project / NATIONAL CAPITAL 1 NAIA Redevelopment REGION Project NATIONAL CAPITAL 2 NAIA Rapid Exit Taxiways REGION 74.56 Unsolicited Improve, upgrade and enhance the operational efficiencies of all

More information

Investing in Transport Infrastructure: Architecture to Economic Development 10 October 2012

Investing in Transport Infrastructure: Architecture to Economic Development 10 October 2012 DOTC Projects Investing in Transport Infrastructure: Architecture to Economic Development 10 October 2012 Situation before the construction / rehabilitation / expansion of Atimonan Port: Situation after

More information

BDO Branch Codes as of June 2016

BDO Branch Codes as of June 2016 BDO Branch Codes as of June 2016 001 Aurora Blvd. - Yale 002 C.M. Recto 003 Baclaran 004 SM Makati 005 España 006 Pasay 007 Bacoor - Zapote 008 Sto. Domingo 009 Makati Shangrila Hotel 010 Echague 011 Caloocan

More information

According to the newly appointed Department of

According to the newly appointed Department of 51 DOTC clarifies stance on controversial projects During the Quarterly Roundtable Discussion organized by the Wallace Business Forum, Transportation Secretary Mar Roxas clarified the government s stance

More information

REGION LOCATION ACCREDITED HOSPITAL ADDRESS CONTACT NO.

REGION LOCATION ACCREDITED HOSPITAL ADDRESS CONTACT NO. # REGION LOCATION ACCREDITED ADDRESS CONTACT NO. 1 NCR - METRO MANILA CALOOCAN OUR LADY OF GRACE 8Th Ave. Cor. F. Roxas, Grace Park West, Caloocan, 1400 Metro Manila (02)361-1124 2 NCR - METRO MANILA LAS

More information

Republic of the Philippines. Department of Public Works and Highways. Philippines

Republic of the Philippines. Department of Public Works and Highways. Philippines Republic of the Philippines Department of Public Works and Highways Philippines Maria Catalina E. Cabral, PhD Assistant Secretary for Planning and PPP September 2011 Right Project, Right Cost, Right Quality

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

FUN OPPORTUNITIES IN PHILIPPINE TOURISM TOURISM PERFORMANCE. Tourism Economic Impact. Verna C. Buensuceso Director for East Japan

FUN OPPORTUNITIES IN PHILIPPINE TOURISM TOURISM PERFORMANCE. Tourism Economic Impact. Verna C. Buensuceso Director for East Japan FUN OPPORTUNITIES IN PHILIPPINE TOURISM Verna C. Buensuceso Director for East Japan TOURISM PERFORMANCE Tourism Economic Impact TOURISM PERFORMANCE INTERNATIONAL TOURIST ARRIVALS TOP 12 INBOUND TOURIST

More information

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is

More information

Annual Shareholders Presentation. April 29, 2015

Annual Shareholders Presentation. April 29, 2015 Annual Shareholders Presentation April 29, 2015 Strong cashflow, consumer play Leading BPO office space provider Multiple locations, multiple brands Diversified hospitality portfolio A LEADING PHILIPPINE

More information

Bloomberry Cruise Ship Port Under development

Bloomberry Cruise Ship Port Under development Bloomberry Cruise Ship Port Project Type New port Location Pasay City, NCR Cost US$ 308 billion Source of funds PPP, unsolicited Proponent Bloomberry Group Start of construction 2020 Target completion

More information

Convenient Banking with BDO Cash Acceptance Machines

Convenient Banking with BDO Cash Acceptance Machines A. Arnaiz - Paseo* ADB Avenue - Ortigas Airport Road Alabang - Madrigal Avenue Alabang - Muntinlupa Alfaro - Salcedo Village Angeles City - Miranda Angeles City - Nepo Mart Angeles - Balibago Angeles -

More information

A. MABINI ACROPOLIS ADB AVE GARNET ADRIATICO MANILA AGUIRRE BF HOMES ALABANG FILINVEST CORP CITY ALABANG MADRIGAL BUSINESS PARK

A. MABINI ACROPOLIS ADB AVE GARNET ADRIATICO MANILA AGUIRRE BF HOMES ALABANG FILINVEST CORP CITY ALABANG MADRIGAL BUSINESS PARK 168 MALL A. MABINI ACROPOLIS ADB AVE GARNET ADRIATICO MANILA AGUIRRE BF HOMES ALABANG ALABANG FILINVEST CORP CITY ALABANG MADRIGAL BUSINESS PARK AMORANTO ANGELES ANGELES - STO. CRISTO ANNAPOLIS GREENHILLS

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

TAPP II: Infrastructure Tracker (projects and policy reforms) As of April 3, 2018

TAPP II: Infrastructure Tracker (projects and policy reforms) As of April 3, 2018 Improve, upgrade, and enhance the operational efficiencies of the airport. Unsolicited 1 2 3 TIOL CAPITAL REGION TIOL CAPITAL REGION TIOL CAPITAL REGION IA Project / IA Rehabilitation Project IA Rapid

More information

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE BRIAN GALLAUGHER, DIRECTOR, PROJECT PLANNING RER ST. CATHARINES CITY COUNCIL NOVEMBER 13, 2017 A REGION

More information

Quezon City Development Bank. Former Owner. Former Owner. Former Owner. Former Owner. Former Owner. Former Owner. Former Owner.

Quezon City Development Bank. Former Owner. Former Owner. Former Owner. Former Owner. Former Owner. Former Owner. Former Owner. List of Acquired Assets For Sale. Location Title Status Possession Description as of vember 2016 GMA CALOOCAN 1 2-H & 2-G, 11th Ave. cor. MH del Pilar, Grace Park, Caloocan City Commercial / Residential

More information

BUNKHOUSE ASSESSMENT REPORT

BUNKHOUSE ASSESSMENT REPORT FEBRUARY 2014 EXECUTIVE SUMMARY As a response to the need to provide temporary shelters for the victims of Typhoon Haiyan, the Philippine government through the DSWD and the DPWH decided to build bunkhouses.

More information

Introduction. Market Opportunity

Introduction. Market Opportunity Introduction The Philippines is one of the most amazing and fascinating tourist destinations due to its varied charms which enthralls tourists from all over the world. It offers a wide array of entertainment

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS NIAGARA FALLS CITY COUNCIL NOVEMBER 28,

More information

#2 JUDGE JIMENEZ ST., COR. E. RODRIGUEZ SR. AVE., BRGY. PINAGKAISANHAN CUBAO Q.C. 9:00am to 3:00pm or

#2 JUDGE JIMENEZ ST., COR. E. RODRIGUEZ SR. AVE., BRGY. PINAGKAISANHAN CUBAO Q.C. 9:00am to 3:00pm or NO UCPB BRANCH NAME ADDRESS OPERATING HOUR PHONE NUMBER United Coconut Planters Bank (UCPB) 1 ANONAS HI-TOP SUPERMART AURORA BLVD., COR. F. CASTILLO ST. PROJ. 4 Q.C. 7992485 or 7992383 2 ARANETA AVE. #425

More information

MIMAROPA Regional Competitiveness Cities and Municipalities Competitiveness Index (CMCI) ROADSHOW - Palawan

MIMAROPA Regional Competitiveness Cities and Municipalities Competitiveness Index (CMCI) ROADSHOW - Palawan MIMAROPA Regional Competitiveness Cities and Municipalities Competitiveness Index (CMCI) ROADSHOW - Palawan KAREN I. LEANDER MIMAROPA RCC Focal Person Cities and Municipalities Competitiveness Index 2016

More information

Canada and Alberta announce 33 new infrastructure projects

Canada and Alberta announce 33 new infrastructure projects January 28, 2010 Canada and Alberta announce 33 new infrastructure projects Stimulus funding will create jobs, stimulate regional economy Calgary... Rob Merrifield, Minister of State (Transport), and Luke

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

Brands Store Address and Location of Store. Level 2, Stall L210, Ayala Center Cebu, Cebu Business Park, Cebu City

Brands Store Address and Location of Store. Level 2, Stall L210, Ayala Center Cebu, Cebu Business Park, Cebu City GRIND ARANETA GATEWAY GRIND AYALA ABREEZA GRIND AYALA CEBU GRIND AYALA CENTRIO GRIND AYALA GLORIETTA 5 GRIND AYALA HARBOR POINT GRIND AYALA MALLS LEGAZPI GRIND AYALA NUVALI GRIND BLUEBAY WALK GRIND EASTWOOD

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

BPI BRANCHES. NCR BRANCH NAME BRANCH ADDRESS BRANCH HOURS Nov. 13, Monday. Caloocan City

BPI BRANCHES. NCR BRANCH NAME BRANCH ADDRESS BRANCH HOURS Nov. 13, Monday. Caloocan City BPI BRANCHES NCR BRANCH NAME BRANCH ADDRESS BRANCH HOURS Nov. 13, Monday Nov. 14, Tuesday Nov. 15, Wednesday Grace Park 2nd Ave. Grace Park 11th Ave Caloocan Caloocan City Ever Pacific Bldg 191-193 Rizal

More information

GMA MAKATI. AUB Yes Res-Condo Unit ,810,700. AUB Yes Res-Condo Unit ,500,000 MANDALUYONG. AUB Yes Res-Condo Unit - 41.

GMA MAKATI. AUB Yes Res-Condo Unit ,810,700. AUB Yes Res-Condo Unit ,500,000 MANDALUYONG. AUB Yes Res-Condo Unit - 41. List of Acquired Assets For Sale No. Location Title Status Possession Description 1 2 3 4 5 6 7 8 9 10 11 12 Unit 1809, 18th Flr, Laureano Di Trevi Tower 1 Condo., Pasong Tamo Ext., Pio del Pilar, Makati

More information

STATUS OF DOT-DPWH CONVERGENCE PROJECTS AS OF JULY 31, 2015

STATUS OF DOT-DPWH CONVERGENCE PROJECTS AS OF JULY 31, 2015 STATUS OF DOT-DPWH CONVERGENCE PROJECTS AS OF JULY 31, 2015 CY 2011-2012 PROJECT 1. Improvement of Pantabangan-Canili Bypass Road Phase 1, Aurora Province KO 195+717 to KO 196+640.15 with exception 2.

More information

UPDATES ON THE NATIONAL TOURISM DEVELOPMENT PLAN

UPDATES ON THE NATIONAL TOURISM DEVELOPMENT PLAN UPDATES ON THE NATIONAL TOURISM DEVELOPMENT PLAN International KEY PERFORMANCE Visitor INDICATORS Arrivals INTERNATIONAL VISITOR ARRIVALS 2012 Korea USA Japan China Taiwan Australia Singapore Canada Hong

More information

Maps for Shuttle and Pick Up

Maps for Shuttle and Pick Up Services Maps for Shuttle and Pick Up Hilton Manila is conveniently located in the Resorts World Manila complex and is adjacent to the Ninoy Aquino International Airport Terminal 3. To get in and around

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

One of the largest integrated property developer in Southeast Asia by market capitalization. US$18.54bn

One of the largest integrated property developer in Southeast Asia by market capitalization. US$18.54bn One of the largest integrated property developer in Southeast Asia by market capitalization Market Capitalization US$18.54bn The largest listed real estate developer on the PSE by market capitalization,

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

ATLAS FINAL REPORT ROADMAP FOR TRANSPORT INFRASTRUCTURE DEVELOPMENT (REGION III & REGION IV-A) FOR METRO MANILA, REGION III & REGION IV-A

ATLAS FINAL REPORT ROADMAP FOR TRANSPORT INFRASTRUCTURE DEVELOPMENT (REGION III & REGION IV-A) FOR METRO MANILA, REGION III & REGION IV-A JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) NATIONAL ECONOMIC DEVELOPMENT AUTHORITY (NEDA) ROADMAP FOR TRANSPORT INFRASTRUCTURE DEVELOPMENT FOR METRO MANILA AND ITS SURROUNDING AREAS (REGION III & REGION

More information

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018 TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND PNWER November 2018 INVESTING IN CANADA PLAN EXISTING FUNDS Of the $180+ billion, 12-year Investing in Canada Plan, $10.1 billion has been dedicated to

More information

Former Owner Res-Lot w/ Impv't Former Owner Res-Lot w/ Impv't ,000 Bulacan

Former Owner Res-Lot w/ Impv't Former Owner Res-Lot w/ Impv't ,000 Bulacan List of Acquired Assets For Sale No. Location Title Status Description 1 2 3 Unit 1809, 18th Flr, Laureano Di Trevi Tower 1 Condo., Pasong Tamo Ext., Pio del Pilar, Makati City Unit 3B, 3F Cluster 2 Montecito

More information

FY 2015 Analysts Briefing 19 February 2016

FY 2015 Analysts Briefing 19 February 2016 FY 2015 Analysts Briefing 19 February 2016 Outline 1. FY 2015 Results Financial Statements Margins Capex Operating Statistics 2. Updates on 2020-40 Plan 3. 2016 CAPEX 2 Outline 1. FY 2015 Results Financial

More information

Long water shutdown scheduled for Tuesday, September 18

Long water shutdown scheduled for Tuesday, September 18 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility

More information

Restoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City

Restoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City City of Sendai Restoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City Akira TAKAHASHI akira_takahashi_a@city.sendai.jp Director, Disaster-Resilient and Environmentally-Friendly

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane

More information

BAYAD CENTER BAYAD CENTER - LANDMARK ADDRESS CITY/PROVINCE OPERATING HOURS 2BZ CORPORATION BAYAD CENTER - SANTOLAN PASIG

BAYAD CENTER BAYAD CENTER - LANDMARK ADDRESS CITY/PROVINCE OPERATING HOURS 2BZ CORPORATION BAYAD CENTER - SANTOLAN PASIG BAYAD CENTER BAYAD CENTER - LANDMARK ADDRESS CITY/PROVINCE OPERATING HOURS 2BZ CORPORATION BAYAD CENTER - SANTOLAN PASIG Ground Floor, AD Center Square, A. Rodriguez St., Corner Evangelista St., Brgy.

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

South of Fraser Transportation Priorities March 2017 Engagement

South of Fraser Transportation Priorities March 2017 Engagement March 20 Engagement Welcome to the South of Fraser Transportation Priorities Engagement A robust and reliable highway network is needed to serve the needs of a growing population and diverse economy. The

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

Presentation Overview

Presentation Overview DON NARROWS Historical and Existing Conditions March 29, 2008 Presentation Overview 1. Project Location and Background 2. Historical Context How did the Don Narrows Come to Be? 3. The Today 4. Next Steps

More information

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The

More information

25 th Avenue Grade Separation. December 13, 2017

25 th Avenue Grade Separation. December 13, 2017 25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

SECURITIES AND EXCHANGE COMMISSION

SECURITIES AND EXCHANGE COMMISSION SECURITIES AND EXCHANGE COMMISSION SEC FORM 17-C CURRENT REPORT UNDER SECTION 17 OF THE SECURITIES REGULATION CODE AND SRC RULE 17.2(c)(iii) THEREUNDER 1. Date of Report (Date of earliest event reported):

More information

Measure R Program Update

Measure R Program Update Item 1 Program Update March 17, 2011 Independent Taxpayers Oversight Committee February 18 th Meeting held: Reviewed Audits of FY10 Expenditures Set Public Hearing Date on Audit Findings for April 18th

More information

Interior of JP Rizal St., Poblacion, Pandi, Bulacan ATB Res'l Lot ,000. Quezon City Development Bank. Res-Vacant Lot & Impv't

Interior of JP Rizal St., Poblacion, Pandi, Bulacan ATB Res'l Lot ,000. Quezon City Development Bank. Res-Vacant Lot & Impv't List of Acquired Assets For Sale No. Location Title Status Description Floor Area GMA CALOOCAN 1 Lot 31 Blk 4 Princetown Subd., Brgy. Bagumbong Caloocan Res-Lot w/ Impv't 48 48 960,000 2 L10 B2 Queensville

More information

TGI FRIDAYS. TGIF ATC 3/F, Glorietta 3, TGIF BATAAN. G/F Vista Mall, Bataan Provincial Hi-Way, City of Balangan, Batangas. Ayala Center, Makati City

TGI FRIDAYS. TGIF ATC 3/F, Glorietta 3, TGIF BATAAN. G/F Vista Mall, Bataan Provincial Hi-Way, City of Balangan, Batangas. Ayala Center, Makati City TGI FRIDAYS TGIF ATC 3/F, Glorietta 3, Ayala Center, TGIF BATAAN G/F Vista Mall, Bataan Provincial Hi-Way, City of Balangan, Batangas TGIF CDO Level 1, Space 1144 & 1120 Centrio Mall, CM Recto Ave., Cagayan

More information

7-11 DASMARINAS OFFSITE P. Campos cor. Cantimbuhan St Dasmariñas, Cavite

7-11 DASMARINAS OFFSITE P. Campos cor. Cantimbuhan St Dasmariñas, Cavite Metro Manila TERMINAL NAME 1800 BLDG EASTWOOD OFFSITE 20TH AVE. - P. TUAZON AVE. List of ATMs Cardless Withdrawal Ready ADDRESS Eastwood Cyberpark, E. Rodriguez Jr Ave (C-5), Bagumbayan, Quezon No. 100,

More information

List of Acquired Assets For Sale 1 Lot 35 Block 6, Kingstown 2 Subd., Bagumbong, Caloocan, Res-Lot w/ Impv't 40.00 55.00 940,000 2 3 4 Lot 16-B, #63-B,K-7th St., Brgy East Kamias, Diliman District, Lot

More information

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

ANGELLA BLDG. CARRIEDO STREET, BARANGAY 307, MANILA CITY

ANGELLA BLDG. CARRIEDO STREET, BARANGAY 307, MANILA CITY STORE NAME ADDRESS EAST AVENUE #18 EAST AVENUE CORNER V. LUNA ROAD, BARANGAY PINYAHAN ROAD, QC ROCES CASA BELLA BUILDING, QUEZON AVENUE CORNER ROCES AVENUE, BARANGAY PALIGSAHAN, QC HEART CENTER PHILIPPINE

More information

Mondays to Fridays CALOOCAN Rizal Ave Extn ( between 6th & 7th Ave.), Brgy. 110 Gracepark, Caloocan City 1400

Mondays to Fridays CALOOCAN Rizal Ave Extn ( between 6th & 7th Ave.), Brgy. 110 Gracepark, Caloocan City 1400 METRO MANILA CITY ATM NAME ADDRESS BANKING SCHEDULE CALOOCAN CALOOCAN 1350-1352 Rizal Ave Extn ( between 6th & 7th Ave.), Brgy. 110 Gracepark, Caloocan City 1400 EDSA BALINTAWAK Ground Floor, PPI Bldg.,

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than an

More information

SOLIDARIDAD 2020 AGENDA

SOLIDARIDAD 2020 AGENDA SOLIDARIDAD 2020 AGENDA A Four-Part National Development Agenda for the Philippines I. Solidaridad 2020 Main Agenda (Food and Bioenergy Park) II. Solidaridad 2020 River Basin Agenda III. Solidaridad 2020

More information

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT PM DIVISION RESPONSIBILITIES FHWA MAJOR PROJECTS TOTAL PROJECT COST

More information

GF Unit E1 & E2, Tower One and Exchange Plaza, Ayala. open open open AYALA TRIANGLE

GF Unit E1 & E2, Tower One and Exchange Plaza, Ayala. open open open AYALA TRIANGLE Operating Metrobank Branches During the ASEAN SUMMIT Branch Address Banking Hours Nov. 13 Nov. 14 Nov. 15 G/F ALPAP Bldg. 140 LP Leviste Street, Salcedo Village, ALFARO Makati GF Unit E1 & E2, Tower One

More information

CITY / MUNICIPALI REGION TY PROVINCE HOSPITAL / CLINIC ADDRESS BUSINESS SCHEDULE LANDLINE/s

CITY / MUNICIPALI REGION TY PROVINCE HOSPITAL / CLINIC ADDRESS BUSINESS SCHEDULE LANDLINE/s Medical Operations Department NETWORK PROVIDERS CLINICS - main NPDF Disclaimer: *The list of hospitals & clinics may change accreditation status from time to time. *Please call the hospital or clinic for

More information

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018 s An Overview of GMR Megawide Consortium s Unsolicited Proposal March 2018 1 Metro Manila requires a multi-airport system and NAIA shall continue to play an anchor role in this system. Multi-Airport system

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Public Open House. Chief Peguis Trail Project

Public Open House. Chief Peguis Trail Project Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your

More information

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes SHORE STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH Re-connect the city to the waterfront and link the east and west Core Circle landscapes 126 LINE PUBLIC WORK 127 TRANSFORMATIVE IDEA 3. SHORELINE STITCH

More information