1 DOTC Projects Investing in Transport Infrastructure: Architecture to Economic Development 10 October 2012
2 Situation before the construction / rehabilitation / expansion of Atimonan Port:
3 Situation after the construction / rehabilitation / expansion of Atimonan Port:
4 LRT Line 1 South Extension Project: Extension of existing LRT Line 1 from Baclaran to Bacoor, Cavite providing 11.7 km. of rail, 8 stations (+2 future stations), 3 intermodal facilities, 1 satellite depot and up to 156 rolling stock Project Cost: Php B Funding: Hybrid PPP (Civil Works and Systems), ODA (Rolling Stock) Current Daily Traffic 500,000 Forecasted Daily Traffic (2015) 750,000 4
5 LRT Line 1 South Extension Project: Extension of existing LRT Line 1 from Baclaran to Bacoor, Cavite providing 11.7 km. of rail, 8 stations (+2 future stations), 3 intermodal facilities, 1 satellite depot and up to 156 rolling stock Project Cost: Php B Funding: Hybrid PPP (Civil Works and Systems), ODA (Rolling Stock) Current Daily Traffic 500,000 Forecasted Daily Traffic (2015) 750,000 5
6 LRT Line 2 East Extension Project: Extension of existing LRT Line 2 from Santolan to Masinag, Antipolo providing 4.2 km. of rail and 2 stations. Project Cost: Php 9.76 B Funding: GAA (Civil Works), ODA (Systems), PPP (Operations & Maintenance) Current Daily Traffic 212,600 Forecasted Daily Traffic (2015) 312,600 6
7 Contactless Automated Fare Collection System Project: Replacement of current magnetic stripe ticketing system on LRT 1, LRT 2, MRT 3 with a contactless AFCS. Project Cost: Php 1.7 B Current traffic on all 3 lines: 1.2 million passengers daily 7
8 Cebu Bus Rapid Transit (BRT) Project Project: Establishment of the first BRT system in the Philippines 23-km demonstration corridor in Cebu City, with 33 stations 176 buses that will run through dedicated and exclusive bus-ways from Bulacao to Talamban, with a link to Cebu s South Road Property Bus projected to be available every 3 to 5 minutes at every station Forecasted traffic: 330,000 passengers daily (2015) 8
9 Integrated Transport System Project Project: Construction of 3 terminals to connect provincial buses with other modes of transportation Current provincial bus traffic: 7,800 Terminals: 2 south, 1 north 9
10 Mactan-Cebu International Airport Project: Construction of new international PTB to accommodate 3.5 MPA and upgrading of existing PTB for domestic operations Project Cost: Php 10.2 B AIR TRAFFIC PTB* Current 6.2 MPA 38,000 sq. m Forecast / After Project Dom (2025) 6.2 MPA (additional) 5,487 sq. m Int l (2025) 1.9 MPA (new) 27,000 sq. m 10
11 Project: Construction of a new airport at Panglao Island, Bohol, to replace the Tagbilaran Airport New Bohol Airport Project Cost: Php 7.4 B AIR TRAFFIC PTB Current 756,197 passengers 850 sq. m Forecast / After Project Up to A320 (2025) 1.7 MPA* (new) 8,271 sq. m 11 *MPA Million Passengers per Annum
12 Puerto Princesa Airport Project: Capacity expansion and improvement of runway, navigational aids, and utility systems Project Cost: Php 4.5 B AIR TRAFFIC PTB Current 988,972 passengers 2,366 sq. m Forecast / After Project (2025) 2.0 MPA (new) 10,000 sq. m Up to A330 12
13 Bicol International Airport Project: Construction of a new airport at Daraga, Albay, to replace the existing Legaspi Airport Project Cost: Php 4.7 B AIR TRAFFIC PTB* Current 514,630 passengers 910 sq. m Forecast / After Project Up to A320 (2025) 428,000 passengers (new) 5,487 sq. m 13 *PTB Passenger Terminal Building
14 Project: Development of new airport to replace domestic airports at Lumbia and Iligan Laguindingan Airport Project Cost: Php 7.9 B AIR TRAFFIC PTB Current (Lumbia) 1,442,959 passengers 3,872 sq. m Forecast / After Project (2023) 3.9 MPA (new) 7,984 sq. m Up to A320 14
15 Project: Capacity expansion through construction of new PTB, runway, apron, taxiway and VPA Tacloban Airport Project Cost: Php 2.9 B AIR TRAFFIC PTB Current 1,009,575 passengers 4,890 sq. m Forecast / After Project (2025) 2.8 MPA (new) 10,960 sq. m Up to A320 15
16 Clark Airport Project: Development of FS for Clark Airport Present traffic: 767,109 passengers Current PTB Size: 9,000 sq. m Expanded PTB (2013): 15,000 sq. m Forecasted traffic: 4.5 M passengers (2020)* Clark Civil Aviation Area: 2,367 has. *Study on the Airport Strategy for the Greater Capital Region in the Republic of the Philippines, JICA, Nov
17 Commuter and Airport Express Alignments: PNR ROW and NLEX ROW Clark International Airport (CIA) NLEX Alignment 108 kms Bulacan PNR Alignment 86kms Caloocan Central CBD NAIA Southrail 17
18
19 Thank you.
Philippine Transport Sector. September 2015
Philippine Transport Sector September 2015 Philippine Transport Sector: Developments and Project Pipeline Department of Transportation and Communications September 2015 2 Transport development plan Data
More informationNEW BOHOL (PANGLAO) AIRPORT
NEW BOHOL (PANGLAO) AIRPORT This is the country s first eco-airport. It will be equipped with solar panels to cover one-third of the airport s energy requirement. It is designed to facilitate natural lighting
More informationUrban and Inter-urban Rail Projects. 26 April 2018 AmCham Hall
Urban and Inter-urban Rail Projects 26 April 2018 AmCham Hall 4 From 77-km. to 1,900-km. in 2022 Map Timeline Length Funding 5 From 77-km. to 1,900-km. in 2022 Map Timeline Length Funding Operational LRT-1
More informationTAPP II: Infrastructure Tracker (projects and policy reforms) As of April 3, 2018
Improve, upgrade, and enhance the operational efficiencies of the airport. Unsolicited 1 2 3 TIOL CAPITAL REGION TIOL CAPITAL REGION TIOL CAPITAL REGION IA Project / IA Rehabilitation Project IA Rapid
More informationAviation and Airports
Aviation and Airports Sector Updates Arangkada Joint Chamber of Commerce Undersecretary Roberto C.O. Lim AIM, Legazpi Village 15 February 2017 1 Philippines Aviation and Airports Strategy Developing Aviation
More informationTAPP II: Infrastructure Tracker (hard and soft) As of February 25, 2018 Funding Type
NAIA Project / NATIONAL CAPITAL 1 NAIA Redevelopment REGION Project NATIONAL CAPITAL 2 NAIA Rapid Exit Taxiways REGION 74.56 Unsolicited Improve, upgrade and enhance the operational efficiencies of all
More informationRepublic of the Philippines Department of Transportation
Republic of the Philippines Department of Transportation Airports and Aviation \ Railways \ Road Transport \ Maritime 19 June 2018 Tokyo, Japan Number of Airports for Construction / Rehabilitation /
More informationAccording to the newly appointed Department of
51 DOTC clarifies stance on controversial projects During the Quarterly Roundtable Discussion organized by the Wallace Business Forum, Transportation Secretary Mar Roxas clarified the government s stance
More informationEx-Ante Evaluation Southeast Asia Division 5 Southeast Asia and Pacific Department, JICA 1. Name of the Project
Ex-Ante Evaluation Southeast Asia Division 5 Southeast Asia and Pacific Department, JICA 1. Name of the Project Country: Republic of the Philippines Project: New Bohol Airport Construction and Sustainable
More informationAn Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018
s An Overview of GMR Megawide Consortium s Unsolicited Proposal March 2018 1 Metro Manila requires a multi-airport system and NAIA shall continue to play an anchor role in this system. Multi-Airport system
More informationSTATUS OF PPP PROJECTS AS OF 05 OCTOBER 2011
1. Daang Hari SLEx Link Project P 1.956 B ROW P 177.3 M Publication of Invitation to Participate and Bid July 20, 27 $ 43.5 M IC P 10.635 M and August 3, 2011 New 4 kilometer, 4-lane paved toll road that
More information100 Days Roadmap of The Department of Transportation. July 2016 Manila
100 Days Roadmap of The Department of Transportation July 2016 Manila 1 Roadmap to Improve Traffic Congestion The Passage of a Special Power is imperative Acquire right of way (ROW) Use of alternate roads
More informationThe implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.
The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10
More informationMetro Green Line to LAX. January, 2012
Metro Green Line to LAX 2 Agenda Context Airport Connection Types Project Process Questions and Discussion Los Angeles Lacks a Strong Airport Transit Connection 3 Airports in the U.S. with current or planned
More informationMegawide Construction Corporation FY 2016 Analysts Briefing 06 April 2017
Megawide Construction Corporation FY 2016 Analysts Briefing 06 April 2017 FY 2016 CONSOLIDATED HIGHLIGHTS +14% P17.7B Revenue +19% P3.6B EBITDA +30% P1.9B Net Income 1 1 CONSOLIDATED INCOME STATEMENT 2
More informationPress Release March 1, Refer to: Anna Salgado
Press Release March 1, 2018 Refer to: Anna Salgado 63 917 5637629 asalgado@megawide.com.ph MEGAWIDE GMR offers an alternative solution to NAIA congestion Aligned with the government strategy to develop
More informationMegawide Construction Corporation FY 2017 Analysts Briefing 12 April 2018
Megawide Construction Corporation FY 2017 Analysts Briefing 12 April 2018 CONSOLIDATED INCOME STATEMENT In Php M FY 2017 FY 2016 Mov t % Remarks Total Revenues 19,159 17,658 1,501 9% Exceeded guidance
More informationANALYST BRIEFING Financial Highlights As of 1H 2018
ANALYST BRIEFING Financial Highlights As of 1H 2018 DISCLAIMER This presentation was prepared solely and exclusively for discussion purposes. This presentation and/or any part thereof may not be reproduced,
More informationTERMINAL DEVELOPMENT PLAN
5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,
More informationAnnual Shareholders Meeting Presentation
Annual Shareholders Meeting Presentation JUNE 28, 2017 44 SHOPPING CENTERS STRONG CASHFLOW CONSUMER PLAY 13 OFFICE BUILDINGS LEADING BPO OFFICE SPACE PROVIDER 67 RESIDENTIAL BUILDINGS 35 HOUSING SUBDIVISIONS
More informationUPDATES ON THE NATIONAL TOURISM DEVELOPMENT PLAN
UPDATES ON THE NATIONAL TOURISM DEVELOPMENT PLAN International KEY PERFORMANCE Visitor INDICATORS Arrivals INTERNATIONAL VISITOR ARRIVALS 2012 Korea USA Japan China Taiwan Australia Singapore Canada Hong
More informationJAIPUR METRO. One of the world s fastest project completions. A presentation by. Nihal Chand Goel Chairman & MD Jaipur Metro Rail Corporation
JAIPUR METRO One of the world s fastest project completions A presentation by Nihal Chand Goel Chairman & MD Jaipur Metro Rail Corporation Jaipur The political and economic capital of State of Rajasthan
More informationALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY
ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY Revitalising Passenger Transport Increasing traffic congestion in our cities and a lack of transport services in our regional towns is frustrating
More informationPRIVATE SECTOR WISHLIST
Your Gateway to the World PRIVATE SECTOR WISHLIST CLARK INTERNATIONAL AIRPORT 2013 TO DEVELOP CLARK INTERNATIONAL AIRPORT INTO A VIABLE PASSENGER AND LOGISTICS HUB TO DEVELOP CLARK INTERNATIONAL AIRPORT
More informationRecord-high arrivals sustain occupancy
Colliers Quarterly MANILA HOTEL 8 February 218 Record-high arrivals sustain occupancy Joey Roi Bondoc Research Manager Manila Foreign arrivals to the Philippines reached a recordhigh in 217 and this sustained
More informationLaguna. There are two trunklines connecting the province of Laguna with Metro Manila. These are:
TECHNICAL REPORT No. 3: URBAN / TRANSPORTATION DEVELOPMENT CONDITION IN ADJOINING AREAS Laguna There are two trunklines connecting the province of Laguna with Metro Manila. These are: The South Luzon Expressway
More informationAviation, Rail, & Trucking 6-1
6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be
More informationLinking Modes to Transform the Perth Public Transport Network. Mark Burgess Managing Director, Public Transport Authority
Linking Modes to Transform the Perth Public Transport Network Mark Burgess Managing Director, Public Transport Authority The Public Transport Authority Provides public transport In Perth To the regional
More informationInfrastructure Projects in Mumbai Metropolitan Region & Maharashtra
Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra 20 th March 2013 By: SVR Srinivas (IAS), Addl Metropolitan Commissioner & MD MMRC & PRK Murthy, Chief T&C Division MMRDA & Director MMRC
More informationEdmonton International Airport Master Plan Open House Display Boards April 16, 2011
Edmonton International Airport Master Plan Open House Display Boards April 16, 2011 Welcome to the EIA Master Plan Open House We invite your feedback about our plans for the next 25 years. Please sign
More informationPUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT
PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International
More informationIntroduction. Market Opportunity
Introduction The Philippines is one of the most amazing and fascinating tourist destinations due to its varied charms which enthralls tourists from all over the world. It offers a wide array of entertainment
More informationWhangarei Airport. Prepared by Carine Andries 10/20173
Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2
More informationProject Advisory Group. May 23, 2013
Project Advisory Group May 23, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delay the Open
More informationDOWNTOWN BRT ALTERNATIVE - 19th AVE
DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing
More informationAuckland Airport: the next 20 years and beyond
ISSUEBRIEF March 2006 Auckland Airport: the next 20 years and beyond Masterplan: 2005 to 2025 This is a summary of the latest Auckland Airport masterplan review. It is Auckland Airport s growth strategy
More informationPresentation to the DRCOG Board August 16, 2017
Presentation to the DRCOG Board August 16, 2017 Systemwide FY 2015-2016 July June FY 2016-2017 July June Riders 102,577 155,864 Revenue $1,014,781 $1,551,435 Fare Recovery FY = State Fiscal Year. 38% 53%
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT
More informationComparison of Bangkok & Kuala Lumpur
Mass Transit: Comparison of Bangkok & Kuala Lumpur Session on Yong Hee Kong PPP Resource & Research Centre, Kuala Lumpur KL: Historical Background Study by JICA 1987 Appeared in Mid-Term Review of 6th
More informationCurrent and Forecast Demand
Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual
More informationBirmingham Airport 2033
Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted
More informationHyderabad Metro Rail in PPP Mode
Hyderabad Metro Rail in PPP Mode Presentation to the 6 th Global Infrastructure Leadership Forum New York Feb 2013 NVS Reddy Managing Director w w w. h Hyderabad m r. g o Metro v. i Rail n Ltd. Hyderabad
More informationPage 1 of 5 As of 20 March 2009
Page 1 of 5 DOMESTIC FLIGHT SCHEDULE MANILA BACOLOD BACOLOD - MANILA 5J 473 Daily A320 0455 0605 5J 474 Daily A320 0640 0750 5J 475 Daily A320 0850 1000 5J 476 Daily A320 1030 1140 5J 477 Daily 1400 1510
More informationBadgery s Creek Airport Presention. Revised from NAN 2015 AGM
Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline
More informationFAQ RAPID KL AIRPORT SHUTTLE (updated as of 31th Jan 2019)
No. Questions Answer 1. When is the shuttle service starting? The shuttle service is starting soon. We will announce the start date on all Rapid KL communication channels soon. 2. What is Rapid KL airport
More informationTechnical Advisory Committee. May 14, 2013
Technical Advisory Committee May 14, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delayed
More informationDuring Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects
Page 1 of 5 May 21, 2007 HOME PROFILE SECTORS & SERVICES CAREERS SEMINARS & PAPERS LINK airport development Description of Service transportatio services link Airport Developm Pre-Construction Area Development
More informationCity of Sacramento Sacramento Intermodal Transportation Facility Draft WP # 3 Transit Operational Requirements
Sacramento Intermodal Transportation Facility Draft WP # 3 Transit Operational Requirements Contents 1 Introduction 1 2 Capitol Corridor Rail 3 2.1 Existing Operations 3 2.2 Future Plans 6 3 Amtrak Rail
More informationCASE STUDY The New Guayaquil International Airport
www.jacobs.com worldwide CASE STUDY The New Guayaquil International Airport Prepared for ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 September 11, 2018 Outline Existing
More informationRonan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX
Ronan Delaney Profession Structural Engineer Current Position Associate Principal Global Aviation Skills Leader Joined Arup 1988 Years of Experience 25+ Nationality Irish Qualifications Bsc (Eng), Dip
More informationAviation Summit Design and Construction Services
Aviation Summit 2017 Design and Construction Services Agenda: Terminal 3 Modernization PHX Sky Train Stage 2 Terminal 4 S1 Concourse & Apron Other Capital Program Projects Terminal 3 Modernization Processor
More informationWhy we re here: For educational purposes only
Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)
More informationOn March 8, 1996, a little more than a year after the airline industry was liberalized by the government, History.
Profile History On March 8, 1996, a little more than a year after the airline industry was liberalized by the government, Cebu Pacific (CEB), wholly owned by JG Summit Holdings, Inc. (JGSHI), flew for
More informationRapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019
Rapid Transit From Arbutus Street to UBC Policy and Strategic Priorities Council Meeting January 30, 2019 Agenda 1. A History of Planning for Broadway Rapid Transit 2. The Need for Broadway Rapid Transit
More informationTransport and Climate Change Week: SUSTAINABLE URBAN TRANSPORT DEVELOPMENT IN INDONESIA
Transport and Climate Change Week: SUSTAINABLE URBAN TRANSPORT DEVELOPMENT IN Ikhwan Hakim Director of Transportation Ministry of National Development Planning Indonesia Presented at Transport and Climate
More informationFramework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )
Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African (2017 2020) Activities and Actions AVIATION INFRASTRUCTURE PROGRAMMES/PROJECTS
More informationSOLIDARIDAD 2020 AGENDA
SOLIDARIDAD 2020 AGENDA A Four-Part National Development Agenda for the Philippines I. Solidaridad 2020 Main Agenda (Food and Bioenergy Park) II. Solidaridad 2020 River Basin Agenda III. Solidaridad 2020
More informationNORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012
NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012 INTRODUCTION The purpose of this report is to analysis the current schedule of operations and assumptions within the 2010
More informationCollier County Airport Authority. Joint Automated Capital Improvement Program
Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer
More informationMAPS FOR SHUTTLE AND PICK UP SERVICES
Ninoy Aquino International Airport MAPS FOR SHUTTLE AND PICK UP SERVICES NAIA Terminal 1 Pick Up Shuttle NAIA Terminal 2 Pick Up Shuttle NAIA Terminal 3 Pick Up Shuttle Bridgeway to Newport Complex Hotel
More informationLand Use Policy Considerations
Land Use Policy Considerations Challenges to Implementing Successful Land Use Strategies at Airports ACRP Insight Event: Washington DC Stephen D. Van Beek, Ph.D. April 11, 2018 Land Use Policy Considerations
More informationExisting Facilities. Current and Forecast Demand
Existing Facilities Albert Whitted Airport is owned and operated by the City of St. Petersburg ( City ). The airport property encompasses approximately 119 acres. The airport is served by two intersecting
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationMyanmar s CNS/ATM Development Master Plan
Myanmar s CNS/ATM Development Master Plan Assistance by JICA Project name Capacity Development on Communication, Navigation, Surveillance/ Air Traffic Management (CNS/ATM) Systems. JICA & DCA signed in
More informationZANZIBAR AIRPORTS AUTHORITY PROJECTS
ZANZIBAR AIRPORTS AUTHORITY PROJECTS ZANZIBAR AIRPORTS AUTHORITY INTRODUCTION Zanzibar is a part of United Republic of Tanzania It consists of two main Islands, Unguja and Pemba, and several other smaller
More informationAirRail Africa 2016 Conference Planning for Rail Connections to CTIA and KSIA
AirRail Africa 2016 Conference Planning for Rail Connections to CTIA and KSIA 6-7 October 2016 Hishaam Emeran, General Manager: Strategic Network Planning Content 1 PRASA Background 2 Cape Town International
More informationHOSPITALITY INVESTMENT CONFERENCE PHILIPPINES 2016 TOURISM INVESTMENT IN THE PHILIPPINES
HOSPITALITY INVESTMENT CONFERENCE PHILIPPINES 2016 TOURISM INVESTMENT IN THE PHILIPPINES TOURISM ENTERPRISE ZONES AND FLAGSHIP TEZS A New Look in Tourism Development R.A. 9593 Tourism Act of 2009 tourism
More informationImage Project Name Location Services Rendered
Image Project Name Location Services Rendered Aeon Tower Davao City and MEPF Peer Review Acqua Hotel and Residences Mandaluyong City Asian Terminals Manila Port Area and Batangas Port Area Manila and Batangas
More informationINFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE
INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease
More informationCOMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010
COMOX VALLEY AIRPORT Strategic Plan 2011-2015 Summary October 2010 COMOX VALLEY AIRPORT Introduction History The Comox Airport was constructed by the Department of National Defence in 1942. The Comox Airport
More informationTRANSPORTATION: Airports and Aviation Services
TRANSPORTATION: Airports and Aviation Services Profile Our background GIBB is a leading multi-disciplinary engineering consulting firm based in South Africa with 67% Black ownership. The firm has a strong
More informationAIR TRAVEL AND ITS POTENTIAL FOR DEVELOPMENT OF THE SAARC REGION
AIR TRAVEL AND ITS POTENTIAL FOR DEVELOPMENT OF THE SAARC REGION Amal S. Kumarage Professor of Civil Engineering, University of Moratuwa Chairman, National Transport Commission Sri Lanka Seminar, University
More informationBloomberry Cruise Ship Port Under development
Bloomberry Cruise Ship Port Project Type New port Location Pasay City, NCR Cost US$ 308 billion Source of funds PPP, unsolicited Proponent Bloomberry Group Start of construction 2020 Target completion
More informationNATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *
NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * Shaban Buza,, PhD, Professor Ramadan Duraku,, MSc, Lecturer KEY NOTES Introduction The Transport S&T system Overview of Transport research activities
More informationUpdate of the Airport Master Plan. Initial Runway & Land Use Alternatives
Johannesburg International Airport Update of the Airport Master Plan Initial Runway & Land Use Alternatives 15 February 2006 BACKGROUND JNB current Master Plan Approved by ACSA Board in 1999 20-22 mppa?
More informationStrategic Transport Forum 21 st September 2018
Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by
More informationKhon Kaen Light Rail Transit
Khon Kaen Light Rail Transit Key information Key players Parameters Service area Population Network Annual ridership Rolling stock Fare system Signalling technology Track and power Details Khon Kaen 1.8
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Hazrat Shahjalal International Airport Expansion Project (I) Loan Agreement: June
More informationCreating Sustainable Communities Through Public Transportation
Creating Sustainable Communities Through Public Transportation 21 st Transportation Committee January 16, 2008 Keith T. Parker Chief Executive Officer Charlotte Area Transit System (CATS) Charlotte Mecklenburg
More informationConnect Oregon IV Final Review Committee Final Recommendation
ODOT 1A0217 Port of Portland 3R0192 Central Oregon & Pacific Railroad Project Selection, Administration, and Debt Service $ 500,000 $500,000 Air Trans Center Taxilane-Ph 3 $ 3,500,000 $ 14,800,000 $ 18,300,000
More information50th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS, Bangkok, Thailand, 1 4 July 2013
50th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS, Bangkok, Thailand, 1 4 July 2013 1 Contents Japan s International Cooperation in the Airport Sector Much experience, Advanced
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationTable of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update
Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East
More information1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE
1 Report No. 1 of the Chief Administrative Officer Regional Council Meeting of June 21, 2007 THE REGIONAL MUNICIPALITY OF YORK REPORT NO. 1 OF THE REGIONAL CHIEF ADMINISTRATIVE OFFICER For Consideration
More informationPFC Quarterly Status Report September 30, 2016
PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority
More informationConnecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017
Connecting Sydney Olympic Park and GPOP with Greater Sydney Final Summary Report 29 May 2017 GPOP sits at the core of the emerging Central City. East Sydney is at the centre of the established Eastern
More informationKittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016
Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West
More informationIntroduction of HANEDA and Infrastructure investment by Japan. Oct 18, 2014 Japan Airport Terminal Co., Ltd.
Introduction of HANEDA and Infrastructure investment by Japan Oct 18, 2014 Japan Airport Terminal Co., Ltd. INDEX 1. Overview of HANEDA Airport and Functional Enhancement of Japan s Metropolitan Airports
More informationYOUR JOURNEY BEGINS WITH US.
GREATER SUDBURY AIRPORT YOUR JOURNEY BEGINS WITH US. ABOUT THE GREATER SUDBURY AIRPORT MISSION STATEMENT To provide first class service and facilities to commercial passengers, commercial carriers, and
More informationGATWICK AND WANDSWORTH
GATWICK AND WANDSWORTH 1. THE FUTURE OF AVIATION 2. GATWICK S VISION 3. WHY GATWICK IS BEST FOR WANDSWORTH THE TRANSFORMATION OF AVIATION Three current and future trends are transforming aviation: 1. Growth
More informationAIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018
AIRPORT PLANNING Joseph K CHEONG Technical Officer, Airport Operations & Infrastructure, ICAO HQ Secretary, Aerodrome Design and Operations Panel Lima, September 2018 TOPICS THE AVIATION SYSTEM CHICAGO
More informationAviation Development
Aviation Development Gold Coast Airport has efficient and cost effective passenger processing and aircraft turn-around times that is underpinned by a strong focus on safety. 6.1 INTRODUCTION This focus
More informationA Public Transportation Review Evaluating Metro s Operational Efficiency, Service Capacity and Fiscal Impact
A Public Transportation Review Evaluating Metro s Operational Efficiency, Service Capacity and Fiscal Impact Minneapolis St. Louis Denver Indianapolis Louisville Austin Cleveland Pittsburgh Columbus Cincinnati
More informationSTUDY ON SOEKARNO HATTA INTERNATIONAL AIRPORT EXPANSION AND UPGRADING PROJECT IN JAKARTA IN THE REPUBLIC OF INDONESIA
STUDY ON PRIVATE-INITIATIVE INFRASTRUCTURE PROJECTS IN DEVELOPING COUNTRIES IN FY2011 STUDY ON SOEKARNO HATTA INTERNATIONAL AIRPORT EXPANSION AND UPGRADING PROJECT IN JAKARTA IN THE REPUBLIC OF INDONESIA
More informationBase Governor (Updated 4/20/17) First Special Session HF 3 Transportation - Ch. 3. Conference Position 5/1/2017. Conf Position Changes FY 18-19
TRANSPORTATION - FY 2018-19 BUDGET, First Special Session HF 3 Appropriations/(Reductions) Tracking (all dollars in thousands, direct appropriations shown unless otherwise indicated) Agency/Program/Budget
More informationAirlake Airport 2035 Long Term Comprehensive Plan (LTCP)
Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan
More informationPage 1 of 7 FULL TRANSCRIPT: WESTERN SYDNEY AIRPORT ANIMATION VIDEO
Page 1 of 7 FULL TRANSCRIPT: WESTERN SYDNEY AIRPORT ANIMATION VIDEO 00:00 Opening information screen with Australian Government Department of Infrastructure and Regional Development logo. Text reads: Western
More informationCLARK INTERNATIONAL AIRPORT CORPORATION
Social Impact PES Form 4 CLARK INTERNATIONAL AIRPORT CORPORATION SO 1 SM 1 Increased Mobility and Connectivity of North Luzon Passenger Volume from Catchment Area (Regions I,II,III and CAR) passengers
More informationA Presentation to: Project Advisory Group Meeting #6
A Presentation to: Project Advisory Group Meeting #6 March 25, 2015 Agenda Introductions Action items from last PAG meeting (February 25, 2015) Public involvement update Status of April public meetings
More informationPLAN MAESTRO DE TRANSPORTE SOSTENIBLE EN GUATEMALA
PLAN MAESTRO DE TRANSPORTE SOSTENIBLE EN GUATEMALA 18 de Octubre, Club Alemánd Dr. Niklas Sieber Transport Economist Regional Planner www.niklas-sieber.de Plan Maestro de Transporte 2 Agenda 1. Transport
More information