1 Edmonton International Airport Master Plan Open House Display Boards April 16, 2011
2 Welcome to the EIA Master Plan Open House We invite your feedback about our plans for the next 25 years. Please sign our guest book when you arrive and pick up your free parking voucher. Agenda: Open 11:00 a.m. to 3:00 p.m. Presentation 11:30 a.m. to 11:50 a.m. Refreshments provided. Talk to our staff one-on-one about the plan for future airport facilities and infrastructure. View our display materials, take-home materials and several copies of the full EIA Draft Master Plan
3 What is a Master Plan? EIA is growing because the Edmonton region is growing. The updated Master Plan will help us map out the next 25 years of EIA s development. The Master Plan gives us the framework to sustainably develop EIA facilities and infrastructure. The Master Plan is a living document so we can adapt to changing economic, social, environmental and regulatory conditions. EIA published its first Master Plan in We will submit the updated Master Plan to Transport Canada in 2011.
4 Edmonton Capital Region is growing Exhibit 2.3 Population Growth Rates (Statistics Canada) % 5% 4% Percentage 3% 2% 1% 0% Saint John (NB) Kingston (ON) London (ON) Québec (QC) Barrie (ON) 1 Halifax (NS) Montréal (QC) Winnipeg (MN) Ottawa-Gatineau (ON-QC) Toronto (ON) Regina (SK) Kelowna (BC) 1 Vancouver (BC) Edmonton (AB) Source: Statistics Canada The Edmonton Capital Region is expected to attract approximately 500,000 more people by Edmonton is welcoming more immigrants every day, which stimulates demand for more international destinations. Edmonton s GDP growth is set to rise faster than the Canadian average, posting 4 per cent growth rates over the next four years and 3.2 per cent
5 EIA will grow with the Edmonton Capital Region Exhibit 3.1 Annual Passenger Traffic ,000,000 6,400,000 Passengers 4,800,000 3,200,000 1,600, EIA has experienced tremendous growth over the past 15 years, and now serves more than six million passengers annually. We expect to serve nine million passengers by 2020 and 13 million by EIA has over 50 non-stop domestic, U.S. and international destinations the best air service in the region s history.
6 Expansion 2012 Exhibit 5.18 New Air Traffic Control Tower and EIA Offices (C.O.T.) Expansion 2012 is a $1 billion investment in meeting our region s air-service needs. See our brochure for the complete overview. Exhibit 4.1 Terminal Expansion 2012 Departures Level New airside corridor Expanded domestic Moving sidewalks to 13 new gates: Total expansion In-terminal design Modern architecture to allow flexible use of gates US, domestic or international flights passenger lounge (additional 5,500 square metres) reduce walking distances for domestic passengers 7 for US departures 5 for US, domestic or international 1 dedicated domestic size: 45,000 square metres theming to highlight our region offers ample natural light and great airside viewing Expanded US passenger Expanded retail services, Moving sidewalks to 7 pre-board screening Pre-board screening Ability to drop off bags lounge (additional 5,100 food and beverage reduce walking distances lines in the US departures before US Customs and at Airline check in from square metres) choices, and other for US-bound passengers area (expanded from Border Protection more US departures more passenger amenities current 3) convenient for passengers convenient for passengers Existing Terminal Terminal Expansion Dedicated Domestic/ International Gates United States/ Domestic Swing Gates Dedicated United States Gates Feature Concession Service Spaces Washrooms
7 Third Runway Exhibit 5.11 Third Runway Location A third runway was first considered in EIA s 1999 Master Plan. A third runway parallel to the existing is the most efficient option to meet the demands of EIA. EIA will need a third runway by 2030 based on current air movement forecasts. Boundary Distances Between Runways Future Runway Supporting Development for Runway 11-29
8 Air Terminal Building Future Expansion Exhibit 6.10 Terminal Capactiy - Number of Stands Stands 6.0 MAP MAP MAP MAP MAP Domestic Contact Gates Transborder Contact Gates International Contact Gates Subtotal Ground Loaded Stands Remote Parking Stands Total EIA Million Passengers 9 MAP Infrastructure EIA Million Passengers Planned Expansion 12 MAP Infrastructure Planned Expansion
9 Cargo Exhibit 7.6 Air Cargo Volumes Forecasts 100 Domestic Transborder International Millions of Kilograms Exhibit 7.4 Airport North and South Cargo Facilities Future Cargo Area 2035 Exhibit 7.5 Proposed Port Alberta Development Plan Boundary Boundary 2028
10 Business Aviation Business aviation (BA) includes corporate flights, small aircraft charter flights, flight training, air ambulances, pipeline inspection flights, nonscheduled services to remote camps and crop spraying aircraft. Exhibit 8.2 Existing Business Aviation Facilities EIA Hangar 2 Executive Flight Centre North Caribou Air Terminal 2 Executive Flight Centre Shell Aerocentre Executive Flight Centre Existing Business Aviation Facilities Boundary Exhibit 8.4 Annual Business Aviation Movements 120,000 Low 100,000 High Baseline Movements 80,000 60,000 40,000 20,
11 Parking and Ground Transportation Exhibit 9.11 EIA Parking Plan 2035 and beyond (16 MAP) Boundary Surface Parking Requirement Parking Requirement Exhibit 9.13 LRT Alignment Options Exhibit 9.8A Projected Vehicular Traffic Impact on the Regional Road Network E Port Alberta Highway 19 A Ai rp Alt. 5 Alt. 4 or t Se rv Al t. 1 ice Ro ad Alt. 6 Alt. 3 Airport Road C Boundary Highway II Queen Elizabeth Way Boundary Exhibit 9.15 Preferred High Speed Rail Corridor LRT Station D B Alt. 2 LRT Station HSR Station LRT Alignment HSR Alignment Regional Road Network
12 Airline Support Facilities Airline support facilities include: Catering Fuel De-icing Snow removal Rescue and firefighting EIA s fuel storage has recently expanded by 200%. EIA s fuel storage facility currently handles 235 million litres of fuel each year. New fuel facilities will be required as EIA grows.
13 Utilities Exhibit 11.2 Electrical Power Demand 2035 Exhibit 11.5 Proportion Of Gas Used On The Site 2035 Other EA buildings parking lots 2.7 MW CUP/ATB complex 10.2 EA ground tenants MW 20.4 MW ATB (terminal) 200 CMH EA ground tenants CUP 1,500 CMH Other EA buildings 200 CMH 8,772 CMH The power chart indicates a large increase in groundside tenant power over the next 25 years EIA s current and anticipated growth increased the demand for power, gas, water and telecommunications services. EIA has built a new 25-kilovolt substation to supply Expansion 2012 projects. EIA is developing a Transportation Utilities Corridor to route utilities to EIA. Exhibit 9.13 TUC Cross Section
14 Environment and Sustainability Exhibit 12.2 Airport Vicinity Protected Area (AVPA) EIA Core Value We are committed to responsibly managing all of our assets to advance our region s environmental stewardship, social well-being and economic prosperity. 40 NEF 35 NEF 30 NEF 25 NEF AVPA The provincial Airport Vicinity Protection Area Regulation (AVPA) ensures that only compatible land uses are located around the airport. EIA operates with a rigorous Environmental Management Plan.
15 Land-Use Planning Exhibit 13.4 Future Land-Use Plan A: Airport Reserve D: Low Intensity B: Airside Redevelopment E: Air Terminal Reserve C: Development F: Airport Reserve Protection The airport lands are summarized by land-use as: Airport Reserve (690 hectares) Air Terminal Building Reserve (130 hectares) Airside Development (370 hectares) Airport Reserve Protection (480 hectares) Development (990 hectares) Low Intensity (210 hectares)
The Saskatchewan Economic Outlook: On Solid Footing
The Saskatchewan Economic Outlook: On Solid Footing Saskatchewan Real Estate Forum Mario Lefebvre Director, Centre for Municipal Studies The Conference Board of Canada April 30, 2013 www.conferenceboard.ca
More informationAnnual General Meeting. April 15, 2010
Annual General Meeting April 15, 2010 AGENDA 2009 In Review Activity Levels Financial Overview Performance Measures Key Activities Moving Forward Activity Levels Passenger Activity (2009) Total Passengers
More informationVictoria International Airport Your Gateway to the World
Victoria International Airport Your Gateway to the World Not for profit corporation Incorporated under Part II of Canada Corporation Act Revenue invested in airport 60 year lease with option for 20 more
More informationAgenda. Introduction YYC. Looking Ahead in 2014
Agenda Introduction 2013 @ YYC Looking Ahead in 2014 Introduction The Airport Transfer Process in Canada From coast to coast: A Canadian success story $20 billion infrastructure investment Canadian airports
More informationTERMINAL DEVELOPMENT PLAN
5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,
More informationANNUAL GENERAL MEETING
ANNUAL GENERAL MEETING April 19, 2012 April 19, 2012 AGENDA 1. CORPORATE INTRODUCTION 2. BUSINESS METRICS 3. AIRPORT DEVELOPMENT PROGRAM UPDATE 4. OTHER YYC ACTIVITY IN 2011 5. SPRINGBANK AIRPORT 6. LOOKING
More informationBirmingham Airport 2033
Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted
More informationALBERTA ACCOMMODATION OUTLOOK 2018
ALBERTA ACCOMMODATION OUTLOOK 2018 ALBERTA HOTEL & LODGING ASSOCIATION APRIL 17, 2018 PRESENTATION OUTLINE National Western Canada Alberta Calgary & Edmonton Investment Trends Key Takeaways Questions NATIONAL
More informationThe Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th
The Calgary Airport Authority Parallel Runway Project Public Consultation Meetings April 30 th, May 2 nd & May 4 th 1 Welcome AGENDA The Airport Authority The Project The Environmental Assessment Process
More informationRunway Development Project Owner s Perspective. CAPTG Sept 17, 2012
Runway Development Project Owner s Perspective CAPTG Sept 17, 2012 Agenda 1.Who We Are 2.Why Do We Need A New Runway? 3.Planning 4.Implementation 1. Who We Are? 5,150 Acres 3 Runways (longest at 12,675
More informationNEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY
NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY AAPA Marine Terminal Management Training Program September 18, 2015 Tom Corsie, PPM Vice-President, Real Estate TODAY S AGENDA
More informationDRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary
Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will
More informationIndustry Update. ACI-NA Winter Board of Directors Meeting February 7, 2018 Palm Beach Gardens, FL
Industry Update ACI-NA Winter Board of Directors Meeting February 7, 2018 Palm Beach Gardens, FL 1Q2007 2Q2007 3Q2007 4Q2007 1Q2008 2Q2008 3Q2008 4Q2008 1Q2009 2Q2009 3Q2009 4Q2009 1Q2010 2Q2010 3Q2010
More informationOntario A Strategic Location & Innovation Corridor A Strategic location With just-in-time delivery the standard, location is critical and Ontario s is
Ontario A Strategic Location & Innovation Corridor A Strategic location With just-in-time delivery the standard, location is critical and Ontario s is ideal. In fact, for advanced manufacturers eager to
More information2016 Commercial Real Estate. Review and Forecast
2016 Commercial Real Estate Review and Forecast February 4, 2016 Colliers International Saskatchewan Economic Overview Real GDP Growth 6.0% 2014 2015 2016f 5.0% 4.0% 3.0% 2.0% 1.0% 0.0% -1.0% Vancouver
More informationOttawa-Gatineau s Economic Outlook
Ottawa-Gatineau s Economic Outlook Slow Growth, but Growth Nonetheless Mario Lefebvre Director, Centre for Municipal Studies The Ottawa Real Estate Forum October 11, 2012 Canadian Outlook The Canadian
More informationCanada s Airport Occupations: the important unseen workforce David Berrington 3 November 2010
strategic transportation & tourism solutions Canada s Airport Occupations: the important unseen workforce David Berrington 3 November 2010 Outline Key findings of the recently completed comprehensive analysis
More information2006 ANNUAL GENERAL MEETING
2006 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 19, 2006 Thank you Peter and good morning ladies and gentlemen and invited guests. Before proceeding
More information2005 ANNUAL GENERAL MEETING
2005 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 20, 2005 Before proceeding with my formal remarks, it is my great pleasure to introduce the other members
More informationCANADIAN ROCKIES INTERNATIONAL AIRPORT
CANADIAN ROCKIES INTERNATIONAL AIRPORT 2018 2022 FIVE YEAR BUDGET PROPOSAL AND 2018 WORK PLAN AIRPORT OVERVIEW Mission: To serve the region by becoming the airport of choice and to provide the City of
More informationAviation Development
Aviation Development Gold Coast Airport has efficient and cost effective passenger processing and aircraft turn-around times that is underpinned by a strong focus on safety. 6.1 INTRODUCTION This focus
More informationINTRODUCTION YYC LOOKING AHEAD
APRIL 21, 2016 INTRODUCTION 2015 @ YYC LOOKING AHEAD Introduction Across Canada Airports Drive the Economy 150,000 on-airport jobs 135 million passengers per year $25 billion infrastructure investment
More informationThe challenges of growth, the growth of challenges Airports Canada 2013 April 11, JAMES C. CHERRY CEO Aéroports de Montréal
The challenges of growth, the growth of challenges Airports Canada 2013 April 11, 2013 JAMES C. CHERRY CEO Aéroports de Montréal AGENDA THE CHALLENGES OF GROWTH, THE GROWTH OF CHALLENGES Trafic growth
More information2008 Annual General Meeting. YYC & YBW Airports in Motion
2008 Annual General Meeting YYC & YBW Airports in Motion April 16, 2008 AGENDA 2007 In Review Activity Levels Financial Overview Performance Measures Key Activities Moving Forward Ten Year Development
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationEdmonton Real Estate Forum
Edmonton Real Estate Forum On Solid Footing Shaw Conference Centre May 10, 2012 Mario Lefebvre Director, Centre for Municipal Studies lefebvre@conferenceboard.ca Uneven Growth in Global Economy (per cent
More informationThese fee changes have been established in order to establish base fee recoveries for expanding infrastructure and ongoing annual maintenance.
November 1, 2016 Attention: Airport Operators/Tenants/Stakeholders RE: Final Rates and Fees Changes Effective January 1, 2017 We have now concluded the consultation process with the Airline Consultative
More informationThe implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.
The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10
More informationMayor Dave Bronconnier cc: All City of Calgary Alderman. Eastbound Extension of Airport Trail and Related Works
May 7, 2009 Mayor Dave Bronconnier cc: All City of Calgary Alderman The City of Calgary Mr. John Hubbell, GM Transportation 700 Macleod Trail SE Calgary AB T2P 2M5 Re: Eastbound Extension of Airport Trail
More informationOverview. ONE Properties
Overview Border Business Park is a unique development located at the centre of Alberta s industrial hub. The Park is focused on the needs of end users and provides outstanding access, high visibility and
More informationApplewood Heights Community Open House
Applewood Heights Community Open House Agenda TORONTO PEARSON BACKGROUND Toronto Pearson: For you. The World. Our goal: To become North America s premier gateway airport. Our job is to get you better connected
More informationWe have attached a summary and the final revised changes and a new rates and fees schedule as posted to our website (www.yqr.ca).
April 1, 2018 Attention: Airport Operators/Tenants/Stakeholders RE: Final Rates and Fees Changes We have now concluded the consultation process with the Airline Consultative Committee (ACC); as a result
More informationKey Stats. Of 11 peer cities assessed, Calgary has the second highest level of economic power comparing GDP per capita
economy 20 Key Stats Of 11 peer cities assessed, Calgary has the second highest level of economic power comparing GDP per capita - Deloitte, Benchmarking Calgary s Competitiveness, 2015 Of 11 peer cities
More informationNORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012
NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012 INTRODUCTION The purpose of this report is to analysis the current schedule of operations and assumptions within the 2010
More informationNovember Attention: Airport Operators. Dear Sir/Madame: Re: Final Rates and Fees Adjustments January 1, 2013
November 2012 Attention: Airport Operators Dear Sir/Madame: Re: Final Rates and Fees Adjustments January 1, 2013 We have now concluded the consultation process with the Airline Consultative Committee (ACC);
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationParallel Taxiway and Apron Widening at Abbotsford International Airport
Business Case Briefing: Parallel Taxiway and Apron Widening at Abbotsford International Airport Prepared for Abbotsford International Airport Authority Prepared by Business Case Briefing: Parallel Taxiway
More informationINTRODUCTION YYC LOOKING AHEAD
APRIL 21, 2016 INTRODUCTION 2015 @ YYC LOOKING AHEAD Introduction Across Canada Airports Drive the Economy 150,000 on-airport jobs 135 million passengers per year $25 billion infrastructure investment
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationCurrent and Forecast Demand
Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual
More informationStimulating Airports is Stimulating the Economy
Stimulating Airports is Stimulating the Economy House of Commons Standing Committee on Finance Pre-budget 2010 Submission August 14 th, 2009 Executive Summary Atlantic Canada Airports Association s (ACAA)is
More informationInterim Growth Management Policies City of Brampton Council
Interim Growth Management Policies City of Brampton Council October 24, 2007 Agenda City of Brampton 2006 Official Plan Brampton s Growth Management Initiatives Provincial Growth Plan Brampton s Growth
More informationReal Estate Indicators Summary
real estate 103 Real Estate Indicators Summary Housing Starts Date Value Change/Rate (%) Year-to-Date Year-Over-Year C hange October 2017 Geography 9,347 24.2% Calgary CMA Total Value of Building Permits
More informationAnnual General Meeting May 8, 2008
Annual General Meeting May 8, 2008 Disclaimer CAUTION REGARDING FORWARD-LOOKING INFORMATION Certain statements in this presentation may contain statements which are forward-looking statements. These forward-looking
More informationThe Economic Impacts of the Open Skies Initiative: Past and Future
The Economic Impacts of the Open Skies Initiative Past and Future strategic transportation & tourism solutions The Economic Impacts of the Open Skies Initiative: Past and Future Prepared for Aéroports
More informationAirport Master Planning Process & Update
Airport Master Planning Process & Update David Stewart ICAO Airport Master Planning Task Force Subgroup Leader ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 1 Speaker: David
More informationAIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter
AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter MONTRÉAL, November 4, 2010 Air Canada today reported operating income
More informationCivil Aviation, Monthly Key Operating Statistics, Major Canadian Air Carriers
Catalogue no. 51-004-X Vol. 43, no. 1. Aviation Civil Aviation, Monthly Key Operating Statistics, Major Canadian Air Carriers January to December 2010. Highlights For the 12-month period, January to December
More informationTerminal Code Compliance Report
Terminal Code Compliance Report Executive Summary available in multiple formats This document and other Canadian Transportation Agency publications are available on our Web site at www.cta.gc.ca. For more
More informationToronto Pearson Master Plan Greater Toronto Airports Authority October 4, 2017
Toronto Pearson Master Plan 2017-2037 Greater Toronto Airports Authority October 4, 2017 Stakeholder engagement The GTAA has been proactively engaging stakeholders to outline how it is preparing to meet
More informationINFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE
INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease
More informationAnnual Public General Meeting. Report from the President and CEO. May 10, 2018
Annual Public General Meeting Report from the President and CEO May 10, 2018 Air Access is a Key Component of Economic Growth 15 Non-Stop Destinations 7,100 Seats Per Day Economic Impact of Canada s Airports
More informationSchiphol Group. Annual Report
Schiphol Group Annual Report 2013 Business model Business model Schiphol Group distinguishes four core activities: Aviation, Consumer Products and Services, Real Estate, and Alliances and Participations.
More informationTampa International Airport Master Plan Update. December 12, 2012
Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking
More informationTRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018
TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND PNWER November 2018 INVESTING IN CANADA PLAN EXISTING FUNDS Of the $180+ billion, 12-year Investing in Canada Plan, $10.1 billion has been dedicated to
More informationA LBERTA ACCO MMO D ATIO N O UTLOOK Summary of the CBRE presentation to the AHLA On April 11, 2017 Jasper, Alberta
A LBERTA ACCO MMO D ATIO N O UTLOOK 2017 Summary of the CBRE presentation to the AHLA On April 11, 2017 Jasper, Alberta PRESENTA TIO N O UTLINE National Economic & Travel Outlooks National Supply & Demand
More informationTransportation & Trade Report
2002-2012 Transportation & Trade Report Alberta Transportation June 2014 1 of 69 2002-2012 Alberta Transportation and Trade Report Table of Contents Alberta Trade Overview Interprovincial Exports o Interprovincial
More informationGround Transportation Strategy. Victoria Airport Authority
Ground Transportation Strategy Victoria Airport Authority VAA Ground Transportation Strategy We live on an Island in the Pacific, but we are not isolated. A 15 minute flight from the Victoria International
More informationExecutive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,
More informationVilleneuve Airport. July 3, 2013 Steve Rumley Vice President, Operations & Infrastructure
Villeneuve Airport July 3, 2013 Steve Rumley Vice President, Operations & Infrastructure Purpose Villeneuve Strategic Plan Runway Extension Land Development Villeneuve Strategic Plan Consultation Consultation
More informationFederal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority
2018-2019 Federal Budget Submission Prepared for the House of Commons Standing Committee on Finance Greater Toronto Airports Authority - August 2017 - Contact: Lorrie McKee Director, Public Affairs and
More informationLet s Fly. Fort McMurray Airport Authority
Let s Fly Fort McMurray Airport Authority The Largest Industrial Project in World History Canada s oil sands are found in three deposits the Athabasca, Peace River and Cold Lake deposits in Alberta and
More informationA Master Plan is one of the most important documents that can be prepared by an Airport.
The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport
More informationReal Estate Indicators Summary
real estate 110 Real Estate Indicators Summary Housing Starts Date Value Change/Rate (%) Year-to-Date Year-Over-Year C hange; YTD September 2018 Geography 8,919 6.3% Calgary CMA Total Monthly Value of
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationState of the Economy St. John's Metro
State of the Economy St. John's Metro Published by: Department of Economic Development, Tourism & Culture City of St. John's Email: business@stjohns.ca Although every effort has been made to ensure the
More information2018 Accomplishments
CY2018 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the current and future needs of the community
More informationAirport Planning and Terminal Design
Airport Planning and Terminal Design Major Terminal Design Considerations Passenger Terminal Configuration Passenger Terminal Concepts Major Design Considerations 1 Terminal Configuration Centralised processing
More informationHalifax International Airport Authority ANNUAL BUSINESS PLAN
Halifax International Airport Authority 2019 ANNUAL BUSINESS PLAN Table of Contents A EXECUTIVE SUMMARY... 1 PLANNING PROCESS... 1 2019 BUSINESS PLAN... 2 B STRATEGIC OVERVIEW... 3 MISSION, VISION AND
More informationedmonton airports annual report 2000 going the distance
edmonton airports annual report 2000 going the distance sidney h. hanson, chairman scott clements, president and ceo Our Journey Continues The year 2000 was both the most challenging and successful in
More informationSTUDY WORK GROUP MEETING No. 4. July 12, 2017
STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,
More informationAIRPORT OF THE FUTURE
AIRPORT OF THE FUTURE Airport of the Future Which airport is ready for the future? IATA has launched a new activity, working with industry partners, to help define the way of the future for airports. There
More informationBadgery s Creek Airport Presention. Revised from NAN 2015 AGM
Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline
More informationBusiness Aviation: Operations and Service Quality by Provider Organisations. Macao, September Captain Scott Macpherson
Business Aviation: Operations and Service Quality by Provider Organisations Macao, September 2013 Captain Scott Macpherson Business Aviation: Operations and Service Quality by Provider Organizations Today
More informationRonan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX
Ronan Delaney Profession Structural Engineer Current Position Associate Principal Global Aviation Skills Leader Joined Arup 1988 Years of Experience 25+ Nationality Irish Qualifications Bsc (Eng), Dip
More informationCOMMERCIAL AND GENERAL AVIATION
Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 07L/25R (10,500 feet long by 150 feet wide),
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationOctober 7, Mr. Geoffrey Wilson Chief Executive Officer PortsToronto 60 Harbour Street Toronto, Ontario M5J 1B7. Dear Geoff,
October 7, 2016 Mr. Geoffrey Wilson Chief Executive Officer PortsToronto 60 Harbour Street Toronto, Ontario M5J 1B7 Dear Geoff, On behalf of Nieuport Aviation Infrastructure Partners, the owner and operator
More informationExpo 2017: Good Intentions
Expo 2017: Good Intentions Scott Hennig Alberta Director & National Communications Manager Canadian Taxpayers Federation About the CTF Non-profit, non-partisan, taxpayer advocacy organization Founded in
More informationDenver International Airport Opportunities for Business
Denver International Airport Opportunities for Business Presented to The DIA Way Small Business Opportunities Forum by Kim Day, Manager of Aviation August 31, 2009 1 Presentation Outline An Overview of
More information2017 Accomplishments
CY2017 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the needs of the communities we serve. 2017
More informationPPP in the Canadian Roads Sector Presentation to PIARC Technical Committee A.2
www.pwc.com PPP in the Canadian Roads Sector Presentation to PIARC Technical Committee A.2 Johannesburg, November 4, 2010 Richard Deslauriers Overview of the Canadian Roads Market Canada is the second
More informationAppendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis
Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS
More informationMaster Plan 2045 Strategic Workshop. Kelowna City Council September 28, 2015
Master Plan 2045 Strategic Workshop Kelowna City Council September 28, 2015 Workshop Overview Background Outline of Airport Plans Economic Situation Airline Industry Overview Preliminary Master Plan Findings
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationConsider Canada s large cities for global trade and investment
Consider Canada s large cities for global trade and investment October 2013 Consider Canada City Alliance mission: a unified voice for Canada s large cities 11 cities working together to promote Canada
More informationPublic Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport
Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit
More informationRegular Board Meeting August 4, 2015
Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate
More informationRoberts Bank Terminal 2 Project
OCTOBER 2012 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new multi-berth container terminal at Roberts Bank in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot
More informationColbaNet. Distribution. #238 Ownership Broadcasting - CRTC
ColbaNet Distribution UPDATE CRTC 2010-754 approved Colba.Net Inc. s application for a Class 1 terrestrial broadcasting distribution undertaking to serve Montréal Island. Administrative Approval 2011-08-23
More informationCHAPTER 4: ALTERNATIVES
MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the
More informationUse P3 s For Municipal Projects: MTAG
1 of 5 18/03/2013 11:44 AM Bulldog Canadian Journalist Ken Gray looks at the issues that contribute to the national debate Use P3 s For Municipal Projects: MTAG Posted on March 11, 2013 by Ken Gray This
More informationKansas City Aviation Department. August 25, 2015
Kansas City Aviation Department August 25, 2015 KCI History Prior to the 1972 Charles B Wheeler Downtown Airport (MKC) was Kansas City s commercial airport Trans World Airlines (TWA) influenced the planning
More informationAviation Operating Administration/Executive
Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department to ensure continued efficiencies, effectiveness, and compliance with
More informationLodging Outlook. Canadian August What Does a Franchise Cost? computers and reservation personnel.
Canadian August 2005 Lodging Outlook SMITH TRAVEL RESEARCH What Does a Franchise Cost? By: Stephen Rushmore, MAI, CHA - HVS International - New York T he selection of an appropriate hotel franchise affiliation
More informationEconomic Impact Study
Nanaimo Airport YCD Economic Impact Study Final Report June 2007 Prepared by: Jocelyn Purcell, Executive Director Inside Canadian Airports 1070 Aubeneau Crescent West Vancouver, B.C. V7T 1T5 Phone: (604)
More informationAUSTRALIAN AIRPORTS ASSOCIATION AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH
AUSTRALIAN AIRPORTS ASSOCIATION AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH DRIVING ECONOMIC GROWTH In 2016-17 Australian airports added: $34.6 billion in economic
More informationTransborder Air Services Since 1994
Tri-Airport Open Skies Initiative Transborder Air Services Since 1994 strategic transportation & tourism solutions Prepared for Aéroports de Montréal, The Greater Toronto Airport Authority, and the Vancouver
More informationMASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4
MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis
More information