1 Johannesburg International Airport Update of the Airport Master Plan Initial Runway & Land Use Alternatives 15 February 2006

2 BACKGROUND

3 JNB current Master Plan Approved by ACSA Board in mppa? Develop Western Precinct to its maximum processing capacity 20 mppa? Cargo Thereafter develop Midfield to balance of runway system capacity The subtle point is runway system capacity

4 Key Western Precinct Developments Target 2010 : World Cup Soccer But what about the airport s s future after 2010? International Pier & Echo Apron Central Terminal Building MSP extension International Departures Upgrade ABSA ITB Gautrain

5 TRAFFIC FORECASTS & CAPACITY OUTLOOK

6 Dec TOTAL Strong traffic growth continued into % 20.00% 15.00% 10.00% 5.00% 0.00% % growth Year-on-year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov month domestic international total

7 Actual traffic significantly above previous forecasts 17,000 16,000 15,000 14, million pax 13,000 12,000 11,000 10,000 9,000 8, Actual traffic volume Volume forecast (IATA)

8 36,000 31,000 26,000 21,000 16,000 11,000 6, Passengers ('000) 2015 TRL forecast: most likely ACTUAL PAX VOLUME IATA FORECAST VOLUME TRL FORECAST VOLUME

9 Macro Capacity Outlook 2005 Major conclusions Terminals Likely to become saturated from 2012 onwards Landside parking >2015 achievable, but over capacity and over capitalisation Landside access roads Previously demonstrated to achieve 20 mppa Assuming modal split change towards public transport (Gautrain) and increased transfer activity: >20mppa 2012? Apron parking All aprons on West eroded before 2010 With cargo stands reverted to passenger aircraft and additional C & E parking in the Midfield, West can reach 2013 Cargo landside Can reach maximum 2010 with current improvements Operationally not ideal No commensurate apron parking

10 Capacity limits Western Precinct saturated from 2012 onwards 2012 be treated as the target year of the first phase migration to Midfield passenger complex Cargo earlier (2010) because Insufficient terminals (±2010) Insufficient aprons (<2010!)

11 New forecast: capacity saturation implication 36,000 31,000 MCO 2005 Passengers ('000) 26,000 21,000 16, MCO ,000 6, years lost as a result of traffic growth ACTUAL PAX VOLUME IATA FORECAST VOLUME TRL FORECAST VOLUME

12 Development Programme CTB/A International Pier & Echo Apron MSP2 & 3 World Cup development cycle Staff parking NAR Further aprons for domestic traffic (Sierra) Midfield aprons (cargo) Taxiway Charlie Midfield developments now reality Airside ring road Midfield connectivity Midfield cargo complex phase 1 (landside) & phase 2 (landside + aprons) Midfield passenger complex enablement Midfield passenger complex (Terminal, Aprons, Parking, Roads for 5-15 mppa)

13 UPDATE OF THE MASTER PLAN

14 Master Plan defined Presents the planner s conception of the ultimate development of a specific airport. It effectively presents the research and logic from which the plan was evolved and artfully displays plan in a graphic and written report. Master plans are applied to the modernization and expansion of existing airports and to the construction of new airports, regardless of their size or functional role (ICAO)

15 Master Plan objective To provide guidelines for future development which will satisfy aviation demand in a financially feasible manner and will be compatible with: Environment Community development Other modes of transportation Hence external consultation

16 Master Plan Update Forms part of a bigger JIA consolidation process, with national government focus: Long range forecasts & land needs Consolidation/Rationalisation of land needs Clusters & Synergies Disposal of non-core SOE properties Two distinct aspects Land use plan Technical master plan of individual precincts (e.g. terminal concept, taxiway configuration etc.)

17 Consultation & Participation Fundamental part of process Have started consultation process with e.g. Central government to ensure macro-economic benefits are maximised (airport the catalyst) Land use and transportation planners from both Province and Ekurhuleni to ensure that good fit is obtained with ITP s, SDF s and other planning initiatives Airlines (AASA & BARSA), SAA ATNS Cargo Operators

18 Provisional Master Plan Programme Information gathering & Analytical phase initial consultation Inventory Capacity & Capability Requirements Land Use Plan by April-May 2006 Master Plan by July-Aug 2006 Creative phase Land Use Plan Master Plan Permission Application Finalised

19 Midfield implementation: potential scope for Terminal complex with capacity range 5-15 million annual passengers Terminals, aprons, parking areas, kerb roads etc. This equates to replacing an airport similar to Cape Town International Airport. Consolidated cargo complex Increased logistics capacity Integration with IDZ and cargo complex Runway system capacity Access road systems Gautrain extension

20 Runway capacity is an early challenge Runway capacity of existing system (early assessment, worst case) As few as 30 million annual passengers As early as 2015 Additional 3 rd runway an early challenge Long term capacity & sustainability of airport and the region 3 rd runway for the Airport 2 nd international airport for the Province Critical: must be concluded to allow Land use planning On-airport Off-airport Access planning

21 Runway options: Add close parallel centre and close parallel east 8

22 Runway options: Add close parallel centre and independent parallel east

23 Runway options: Add close parallel centre and independent parallel east

24 Runway capacity gains (Early, rough assessment) 2: existing 3: close parallel centre 4: close parallel centre and east Interchangeable in terms of phasing 4: close parallel centre and independent parallel Maximum capacity: mppa

25 Summary: Runway options Maximum capacity (hourly air traffic movements) Maximum capacity (annual passengers) Approximate capacity saturation date 2 runways: Existing situation ± 30 million ± runways: Close parallel centre ± 40 million ± runways: Close parallel centre and close parallel east 4 runways: Close parallel centre and independent parallel east ± million ± million ±?? ±??

26 Land use option 1

27 Land use option 2

28 Land use option 3

29 Traffic split options Landside People Mover/ bus conncetion Landside People Mover/ bus conncetion T1 International 1 03L 21R 2 T1 Domestic 03L 21R 03C 21C 03C 21C T2 Domestic T2 International 03R Airside People Mover/ Bus connection 21L 03R Airside People Mover/ Bus connection 21L 03RR 21LL 03RR 21LL Landside People Mover/ bus conncetion Landside People Mover/ bus conncetion T1 Int/Dom L 21R T1 Dom 03L 21R 03C 21C 03C 21C T2 Int/Dom T2 Int/ Dom 03R Airside People Mover/ Bus connection 21L 03R Airside People Mover/ Bus connection 21L 03RR 21LL 03RR 21LL

30 Illustration: Sensitivity analysis on traffic split options Base Equalised Growth Domestic differentiation Ultimate development (50 mppa) T1 T Phase II T (40 mppa) T Phase I T (30 mppa) T Base (21 mppa) T1 T2 21 Sub-phases possible

31 Intra airport transportation Gautrain Gautrain T1 T1 03L 21R 03L 21R 03C 21C T2 03R 21L 03R Airside People Mover/ Bus connection 21L 03RR 21LL L

32 Intra airport transportation Gautrain Gautrain Landside People Mover/ bus connection Landside People Mover/ bus connection T1 T1 03L 21R 03L 21R 03C 21C 03C 21C T2 T2 03R Airside People Mover/ Bus connection 21L 03R Airside People Mover/ Bus connection 21L 03RR 21LL L 03RR 21LL L

33 Criteria in assessment of these alternatives Capacity gain and long term sustainability Capital Cost Operational Cost Phasing possibilities (short, medium and long term) Ground transportation accessibility Efficiency of airside operations Level-of-service Environmental impact Integration maximisation of land use (internal and external) Etc.

34 Next steps Airport capacity & capability studies being concluded Under way: Land and spatial needs studies Benchmarking Requirements analysis Land use alternatives by mid February Preferred Land Use Key objective of the national Identified by March government process Refined by April Extra-airport integration e.g. road access, IDZ, Gautrain Terminal concept development

35 Johannesburg International Airport THANK YOU Q & A Update of the Airport Master Plan Initial Runway & Land Use Alternatives 15 February 2006

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

International Transport Forum Paris February Jeffrey M. Zupan Regional Plan Association

International Transport Forum Paris February Jeffrey M. Zupan Regional Plan Association International Transport Forum Paris February 2013 Jeffrey M. Zupan Regional Plan Association Who Are We? Regional Plan Association Not for profit research, planning and advocacy organization in the New

More information

Pre-Coordination Runway Scheduling Limits Winter 2014

Pre-Coordination Runway Scheduling Limits Winter 2014 Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

Greater Orlando Aviation Authority Board Meeting. Wednesday, January 17, 2018

Greater Orlando Aviation Authority Board Meeting. Wednesday, January 17, 2018 Greater Orlando Aviation Authority Board Meeting Wednesday, Award Recognition South Terminal Complex Phase 1 and Phase 2 Planning Overview Greater Orlando Aviation Authority AGENDA PASSENGER TRAFFIC

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

Airport Planning and Terminal Design

Airport Planning and Terminal Design Airport Planning and Terminal Design Major Terminal Design Considerations Passenger Terminal Configuration Passenger Terminal Concepts Major Design Considerations 1 Terminal Configuration Centralised processing

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Tampa International Airport Master Plan Update. December 12, 2012

Tampa International Airport Master Plan Update. December 12, 2012 Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

Let s Fly. Fort McMurray Airport Authority

Let s Fly. Fort McMurray Airport Authority Let s Fly Fort McMurray Airport Authority The Largest Industrial Project in World History Canada s oil sands are found in three deposits the Athabasca, Peace River and Cold Lake deposits in Alberta and

More information

24-26 March 2014 Cairo, Egypt. Technology. Session #6 Presentation #2

24-26 March 2014 Cairo, Egypt. Technology. Session #6 Presentation #2 24-26 March 2014 Cairo, Egypt Technology Session #6 Presentation #2 Queen Alia International Airport Introduction of AIG WILDLIFE FOD Queen Alia International Airport Airport International Group (AIG)

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

Damon Hylton Vice President

Damon Hylton Vice President ACI-NA Commissioners Conference Air Service Development in a Tough Market Damon Hylton Vice President May 19, 2008 Today s Agenda Background Now What? Questions and Answers 2 Background 3 Current Industry

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

THAI AIRWAYS INTERNATIONAL PCL

THAI AIRWAYS INTERNATIONAL PCL THAI AIRWAYS INTERNATIONAL PCL 2Q2017 analysts briefing 16-Aug-2017 1 DISCLAIMER The information contained herein is intended to represent the Company s operating and financial position at a given point

More information

Coast to coast. STR Coastal Town Review Coastal Towns Market Review Report_JE.indd 3

Coast to coast. STR Coastal Town Review Coastal Towns Market Review Report_JE.indd 3 Coast to coast. STR Coastal Town Review 16 Coastal Towns Market Review Report_JE.indd 3 4//17 8:31:38 AM Table of Contents Introduction...3 United Kingdom...4 Blackpool...6 Bournemouth...8 Brighton...

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION EXPANSION UPDATE THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION DECEMBER 2017 In October 2016, the Government announced that a north west runway at Heathrow is its preferred scheme for the expansion

More information

Singapore Airlines Group Analyst/Media Briefing HALF YEAR FY RESULTS 5 NOVEMBER 2012 THE PARENT AIRLINE 1H FY2012/13 RESULTS

Singapore Airlines Group Analyst/Media Briefing HALF YEAR FY RESULTS 5 NOVEMBER 2012 THE PARENT AIRLINE 1H FY2012/13 RESULTS Singapore Airlines Group Analyst/Media Briefing HALF YEAR FY2012-13 13 RESULTS 5 NOVEMBER 2012 THE PARENT AIRLINE 1H FY2012/13 RESULTS THE PARENT AIRLINE COMPANY RESULTS 2Q & 1H FY12/13 2Q/12 $million

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Public Workshop #7 Land Use Planning June 28, 2016

Public Workshop #7 Land Use Planning June 28, 2016 Public Workshop #7 Land Use Planning June 28, 2016 Land Use Planning and Vision 2040 What is Land Use Planning in the context of the Vision 2040 process? Vision 2040 Aeronautical Development Land Use Compatibility

More information

SIA ANALYST/MEDIA BRIEFING Q2 and 1H FY17/18 Results 8 November 2017

SIA ANALYST/MEDIA BRIEFING Q2 and 1H FY17/18 Results 8 November 2017 SIA ANALYST/MEDIA BRIEFING Q2 and 1H FY17/18 Results 8 November 2017 THE PARENT AIRLINE Q2 AND 1H FY17/18 RESULTS THE PARENT AIRLINE COMPANY OPERATING PERFORMANCE Q2 % 1H % FY17/18 Change FY17/18 Change

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

Classification: Public

Classification: Public Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

Ground Handling Social Dialogue Support. The limitation of ramp handling licenses at Rome Fiumicino Airport

Ground Handling Social Dialogue Support. The limitation of ramp handling licenses at Rome Fiumicino Airport Ground Handling Social Dialogue Support The limitation of ramp handling licenses at Rome Fiumicino Airport Final conference Copenhagen 27-2 April 2017 2 A quick look at history at Rome Fiumicino After

More information

TRANSPORTATION ENGINEERING AND PLANNING Vol. I - Airport Design and Development - Yeong Heok Lee, Kwang Eui Yoo, Chang-Ho Park

TRANSPORTATION ENGINEERING AND PLANNING Vol. I - Airport Design and Development - Yeong Heok Lee, Kwang Eui Yoo, Chang-Ho Park AIRPORT DESIGN AND DEVELOPMENT Yeong Heok Lee and Kwang Eui Yoo Hankuk Aviation University, Korea Chang-Ho Park Seoul National University, Korea Keywords: airport design, airport planning, airport development,

More information

Runway Status Lights (RWSL) in Japan. July 2015

Runway Status Lights (RWSL) in Japan. July 2015 Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU OF JAPAN Runway Status Lights (RWSL) in Japan July 2015 Table of contents Civil Aviation Bureau Japan What is RWSL Background

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Aircraft Staging & Parking Plan

Aircraft Staging & Parking Plan Aircraft Staging & Parking Plan Aviation Services Creation Date: 14 September 2015 Version: 3.3 Document Control Version History Version Date Changes 3.0 1 July 2014 Updated to current style. LDS Section

More information

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline

More information

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will

More information

Thailand ATFM Operations at Sub- Regional Level

Thailand ATFM Operations at Sub- Regional Level Thailand ATFM Operations at Sub- Regional Level From BOBCAT to Cross-Border ATFM ICAO Middle East ATFM Seminar 13 15 December 2016 Dubai, United Arab Emirates Piyawut Tantimekabut Air Traffic Management

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017

Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017 Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY Agenda (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR

More information

European Action Plan for the Prevention of Runway Incursions v3.0

European Action Plan for the Prevention of Runway Incursions v3.0 European Action Plan for the Prevention of Runway Incursions v3.0 2017 ICAO GRSS, Lima, Peru Tzvetomir BLAJEV Operational Safety Coordinator November 2017 In this briefing: History Change Drivers Collaborative

More information

Airport forecasting is used in master planning to guide future development of the Airport.

Airport forecasting is used in master planning to guide future development of the Airport. Airport Forecasts Airport forecasting is used in master planning to guide future development of the Airport. 4.1 INTRODUCTION Airport forecasting ensures development is appropriate for passengers, ground

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop 17 18 November 2015 Bangkok, Thailand Piyawut Tantimekabut (Toon) Air Traffic Management Network Manager Network

More information

General Aviation Master Plan Update

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System

More information

EXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2.

EXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2. MASTER PLAN UPDATE Phase 2/3 Draft Final Summary Report Report Issued 2010 in association with Prepared for Broward County Aviation Department Main Office 555 Airport Blvd., Suite 300 Burlingame, CA 94010

More information

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10 The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are

More information

Tourism in South Africa A statistical overview

Tourism in South Africa A statistical overview Tourism in South Africa A statistical overview Purpose of presentation Purpose of the presentation is to present different tourism statistics produced by Stats SA People like to travel we are a country

More information

Assessment of the 2003/04 Handling Capacity of Dublin Airport

Assessment of the 2003/04 Handling Capacity of Dublin Airport Assessment of Handling Capacity of Dublin Airport May 2005 Assessment of the 2003/04 Handling Capacity of Dublin Airport Report By On behalf of the Commission for Aviation Regulation May 2005 Table of

More information

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

CORPORATE STEVE BOOKING SMITH CHANNELS

CORPORATE STEVE BOOKING SMITH CHANNELS JAPAN AIRLINES: NAVIGATING THE FUTURE Steve Myer, Tokyo September 30, 2016 CORPORATE STEVE BOOKING SMITH CHANNELS VICE PRESIDENT, GLOBAL & STRATEGIC SALES, THE AMERICAS SEPTEMBER 20, 2016 RENO, NEVADA

More information

Planned Procurement Opportunities Report. June 2017

Planned Procurement Opportunities Report. June 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

TRANSPORTATION: Airports and Aviation Services

TRANSPORTATION: Airports and Aviation Services TRANSPORTATION: Airports and Aviation Services Profile Our background GIBB is a leading multi-disciplinary engineering consulting firm based in South Africa with 67% Black ownership. The firm has a strong

More information

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th

More information

AIRPORT OPERATIONS TABLE OF CONTENTS

AIRPORT OPERATIONS TABLE OF CONTENTS AIRPORT OPERATIONS TABLE OF CONTENTS Module 1 Understanding the Airport... 3 1.0 Understanding the Airport...5 1.1 Overview of the Air Transport System...6 1.1.1 The Importance of the Air Transportation

More information

Regional Jets ,360 A319/ , , , ,780

Regional Jets ,360 A319/ , , , ,780 Excel Tab Name: Seats (18 MAP) PASSENGER AIRLINE FLIGHT SCHEDULE CALCULATION RECORD Summary 17.2 MAP flight schedule* (with Southwest Airlines B737-800s changed to B737-700s) Number of Total Seats Avg.

More information

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013 LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development

More information

AirportInfo. ACI-NA 2011 Traffic Report

AirportInfo. ACI-NA 2011 Traffic Report AirportInfo ACI-NA 2011 Traffic Report July 2012 2011 ACI World Airport Traffic Summary North America 2011 % Change 2010 Worldwide 2011 % Change 2010 Total Passengers 1.5B Up 1.8% 5.1B Up 5.2% Total International

More information

Sydney Airport Master Plan

Sydney Airport Master Plan Sydney Airport Master Plan This document is printed on ecostar and is manufactured from 100% post consumer recycled paper in a process chlorine free environment under the ISO 14001 environmental management

More information

LAMP 2 - FASI(S) Network

LAMP 2 - FASI(S) Network Future Airspace Strategy Implementation South: ATS Route Network managed by NERL under London Airspace Management Programme 2 LAMP 2 - FASI(S) Network Stage 1 Assessment Meeting Friday 23 rd February 2018

More information

Ted Stevens Anchorage International Airport

Ted Stevens Anchorage International Airport Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the

More information

ASDA Session 3: Airport Performance More Punctuality. 11-November-2016 Chris Schneider

ASDA Session 3: Airport Performance More Punctuality. 11-November-2016 Chris Schneider ASDA Session 3: Airport Performance More Punctuality 11-November-2016 Chris Schneider Content: ACARE Mobility challenge The aviation environment The punctuality (and predictability) challenge ACARE Mobility

More information

Benefits Analysis of a Runway Balancing Decision-Support Tool

Benefits Analysis of a Runway Balancing Decision-Support Tool Benefits Analysis of a Runway Balancing Decision-Support Tool Adan Vela 27 October 2015 Sponsor: Mike Huffman, FAA Terminal Flight Data Manager (TFDM) Distribution Statement A. Approved for public release;

More information

AIRPORT MASTER PLANNING PROCESS

AIRPORT MASTER PLANNING PROCESS CHAPTER 1 AIRPORT MASTER PLANNING PROCESS Introduction 1.1 An airport master plan provides recommendations for the future development of an airport, often over a 20-year horizon. The master plan serves

More information

State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update

State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update Enabling Inter-Island Improvements for Mauka CC Honolulu International Airport Before After Mauka Concourse

More information

Implementation of SESAR Pilot Common Project. - expected effects

Implementation of SESAR Pilot Common Project. - expected effects Implementation of SESAR Pilot Common Project - expected effects (2014-2024) European Commission May 20, 2014 - Oslo 1 SESAR SESAR - Technological Pillar of the Single Technological pillar of the SES European

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

AIR NEW ZEALAND ANNUAL RESULTS ANNUAL RESULTS

AIR NEW ZEALAND ANNUAL RESULTS ANNUAL RESULTS AIR NEW ZEALAND ANNUAL RESULTS 2008 1 HIGHLIGHTS Record operating revenue, up 9% Normalised earnings* $197m Net cash position of $1.3bn Launched direct service to Vancouver and Beijing Award winning product

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 2013

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 2013 NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 213 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

Auckland Airport: the next 20 years and beyond

Auckland Airport: the next 20 years and beyond ISSUEBRIEF March 2006 Auckland Airport: the next 20 years and beyond Masterplan: 2005 to 2025 This is a summary of the latest Auckland Airport masterplan review. It is Auckland Airport s growth strategy

More information

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Performance Metrics for Oceanic Air Traffic Management Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Agenda Metrics Team Michele Merkle, FAA AUA-600 Lynne Hamrick,

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

STATISTICAL REPORT. Aviation

STATISTICAL REPORT. Aviation STATISTICAL REPORT Aviation Domestic airline on time performance March 2017 Commonwealth of Australia 2017 ISSN: 1832-0759 Ownership of intellectual property rights in this publication Unless otherwise

More information

The Need and Urgency for a Three-Runway System (3RS) August 7, 2014

The Need and Urgency for a Three-Runway System (3RS) August 7, 2014 The Need and Urgency for a Three-Runway System (3RS) August 7, 2014 1 1 Need for 3RS? 2 Recent criticism HKIA is being managed inefficiently AA allows the proliferation of narrow-bodied aircraft and small

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

LATAM Airlines Group presents technical airport infrastructure requirements for the Northeast hub based on study by the consulting firm Arup

LATAM Airlines Group presents technical airport infrastructure requirements for the Northeast hub based on study by the consulting firm Arup LATAM Airlines Group presents technical airport infrastructure requirements for the Northeast hub based on study by the consulting firm Arup Study ordered by the Group indicates the airport infrastructure

More information

Los Angeles International Airport (LAX) Airside $907M

Los Angeles International Airport (LAX) Airside $907M Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 2011

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 2011 NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 211 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

Kansas City Aviation Department. Update to Airport Committee January 26, 2017

Kansas City Aviation Department. Update to Airport Committee January 26, 2017 Kansas City Aviation Department Update to Airport Committee January 26, 2017 1 Status of Customer Service Improvements Additional electric outlets in public areas Review Wi-Fi speed / coverage / study

More information

TAG Farnborough Airport

TAG Farnborough Airport TAG Farnborough Airport Farnborough Aerodrome Consultative Committee TAG Information Report November 2014 1. Aircraft Movements 1.1 The permitted movement numbers for 2014 are 43,000 movements of which

More information

AirportInfo. Economic Indicators & Traffic

AirportInfo. Economic Indicators & Traffic AirportInfo Economic Indicators & Traffic March 2012 U.S. & Canadian GDP Economic Focus 6% 4% US Canada 2% 0% -2% -4% -6% -8% -10% GDP growth improved slightly for both the U.S. and Canada in the third

More information

OCTOBER Tallahassee Regional Airport. International Airport Study. Executive Summary

OCTOBER Tallahassee Regional Airport. International Airport Study. Executive Summary OCTOBER 2014 Tallahassee Regional Airport International Airport Study Executive Summary Why should Tallahassee Regional Airport consider becoming International? As smaller airports are developing International

More information

08-JUL Innovation Challenges for Airports of the Future. ASDA Seminar 2013, Toulouse Chris Schneider

08-JUL Innovation Challenges for Airports of the Future. ASDA Seminar 2013, Toulouse Chris Schneider 08-JUL-2013 Innovation Challenges for Airports of the Future ASDA Seminar 2013, Toulouse Chris Schneider Airports as transport infrastructure and experience providers Airports... are the intermodal transition

More information

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators MEETING MINUTES Event: Date & Time: Venue: Attendees: Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2017 @ 2pm Brisbane Airport Meeting Room Ground Transport Operators Agenda Item

More information

8 Aviation Support. 8.1 Aerodrome Rescue and Fire Fighting Services. 8.2 Aircraft Refuelling. 8.3 Air Cargo

8 Aviation Support. 8.1 Aerodrome Rescue and Fire Fighting Services. 8.2 Aircraft Refuelling. 8.3 Air Cargo 8 Aviation Support 8.1 Aerodrome Rescue and Fire Fighting Services CASA mandates that a permanent Aerodrome Rescue and Fire Fighting Service (ARFFS) is established for domestic aerodromes when more than

More information

Aviation Development

Aviation Development Aviation Development Gold Coast Airport has efficient and cost effective passenger processing and aircraft turn-around times that is underpinned by a strong focus on safety. 6.1 INTRODUCTION This focus

More information

STATISTICAL REPORT. Aviation

STATISTICAL REPORT. Aviation STATISTICAL REPORT Aviation Domestic airline on time performance August 2016 Commonwealth of Australia 2016 ISSN: 1832-0759 Ownership of intellectual property rights in this publication Unless otherwise

More information

Terminal Transformation Project. Airline consultation document March 2013

Terminal Transformation Project. Airline consultation document March 2013 Project Airline consultation document FOREWORD by Andrew Harrison, Managing Director Stansted is a great airport with great people; and importantly great infrastructure. The acquisition of Stansted Airport

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Passenger and Cargo Statistics Report

Passenger and Cargo Statistics Report Passenger and Cargo Statistics Report RenoTahoe International Airport December 2016 U.S. DOMESTIC INDUSTRY OVERVIEW FOR DECEMBER 2016 All RNO Carriers Domestic Systemwide year over year comparison Average

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

Passenger Traffic Achieves Strong Growth of 4.8% for the Month of August

Passenger Traffic Achieves Strong Growth of 4.8% for the Month of August Passenger Traffic Achieves Strong Growth of 4.8% for the Month of August Montréal, 7 October Passenger traffic experienced a slight surge in growth to almost +5% for August compared to previous months

More information

ROTORUA REGIONAL AIRPORT

ROTORUA REGIONAL AIRPORT ROTORUA REGIONAL AIRPORT TRANS-TASMAN DEMAND AND ECONOMIC IMPACT ASSESSMENT PREPARED FOR ROTORUA DISTRICT COUNCIL BY APR CONSULTANTS SEPTEMBER 2005 EXECUTIVE SUMMARY This report presents information on

More information

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami Date : 18 Nov., 2015 Venue : Furama Ballroom 1 SESSION 1 : A Decade of Partnerships in Sustainable Development of the Seas of East Asia: Synergies and Achievements WORKSHOP 1.1 : Managing Risks in Climate

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

Progress Report on the Gautrain Rapid Rail Link Portfolio Committee on Transport

Progress Report on the Gautrain Rapid Rail Link Portfolio Committee on Transport Progress Report on the Gautrain Rapid Rail Link Portfolio Committee on Transport Jack van der Merwe (Pr. Eng) CEO: Gautrain Management Agency 09 March 2010 Gautrain in a nutshell Scope Currently the largest

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

July 21, Mayor & City Council Business Session KCI Development Program Process Update

July 21, Mayor & City Council Business Session KCI Development Program Process Update July 21, 2015 Mayor & City Council Business Session KCI Development Program Process Update History of KCI 2 Airport Funding KCI Improvements are Funded by Airlines & Travelers City tax revenues do not,

More information

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director

More information

Tunnel design underneath the operating runway of Incheon airport

Tunnel design underneath the operating runway of Incheon airport Geotechnical Aspects of Underground Construction in Soft Ground Yoo, Park, Kim & Ban (Eds) 2014 Korean Geotechnical Society, Seoul, Korea, ISBN 978-1-138-02700-8 Tunnel design underneath the operating

More information

AIRCRAFT NOISE INFORMATION PACK: CANNING VALE

AIRCRAFT NOISE INFORMATION PACK: CANNING VALE AIRCRAFT NOISE INFORMATION PACK: Table of Contents CANNING VALE 1. Aircraft movements affecting Canning Vale... 2 2. Effects of wind on runway selection... 2 3. Seasonal winds... 2 4. Flight path illustrations...

More information