1 Johannesburg International Airport Update of the Airport Master Plan Initial Runway & Land Use Alternatives 15 February 2006

2 BACKGROUND

3 JNB current Master Plan Approved by ACSA Board in mppa? Develop Western Precinct to its maximum processing capacity 20 mppa? Cargo Thereafter develop Midfield to balance of runway system capacity The subtle point is runway system capacity

4 Key Western Precinct Developments Target 2010 : World Cup Soccer But what about the airport s s future after 2010? International Pier & Echo Apron Central Terminal Building MSP extension International Departures Upgrade ABSA ITB Gautrain

5 TRAFFIC FORECASTS & CAPACITY OUTLOOK

6 Dec TOTAL Strong traffic growth continued into % 20.00% 15.00% 10.00% 5.00% 0.00% % growth Year-on-year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov month domestic international total

7 Actual traffic significantly above previous forecasts 17,000 16,000 15,000 14, million pax 13,000 12,000 11,000 10,000 9,000 8, Actual traffic volume Volume forecast (IATA)

8 36,000 31,000 26,000 21,000 16,000 11,000 6, Passengers ('000) 2015 TRL forecast: most likely ACTUAL PAX VOLUME IATA FORECAST VOLUME TRL FORECAST VOLUME

9 Macro Capacity Outlook 2005 Major conclusions Terminals Likely to become saturated from 2012 onwards Landside parking >2015 achievable, but over capacity and over capitalisation Landside access roads Previously demonstrated to achieve 20 mppa Assuming modal split change towards public transport (Gautrain) and increased transfer activity: >20mppa 2012? Apron parking All aprons on West eroded before 2010 With cargo stands reverted to passenger aircraft and additional C & E parking in the Midfield, West can reach 2013 Cargo landside Can reach maximum 2010 with current improvements Operationally not ideal No commensurate apron parking

10 Capacity limits Western Precinct saturated from 2012 onwards 2012 be treated as the target year of the first phase migration to Midfield passenger complex Cargo earlier (2010) because Insufficient terminals (±2010) Insufficient aprons (<2010!)

11 New forecast: capacity saturation implication 36,000 31,000 MCO 2005 Passengers ('000) 26,000 21,000 16, MCO ,000 6, years lost as a result of traffic growth ACTUAL PAX VOLUME IATA FORECAST VOLUME TRL FORECAST VOLUME

12 Development Programme CTB/A International Pier & Echo Apron MSP2 & 3 World Cup development cycle Staff parking NAR Further aprons for domestic traffic (Sierra) Midfield aprons (cargo) Taxiway Charlie Midfield developments now reality Airside ring road Midfield connectivity Midfield cargo complex phase 1 (landside) & phase 2 (landside + aprons) Midfield passenger complex enablement Midfield passenger complex (Terminal, Aprons, Parking, Roads for 5-15 mppa)

13 UPDATE OF THE MASTER PLAN

14 Master Plan defined Presents the planner s conception of the ultimate development of a specific airport. It effectively presents the research and logic from which the plan was evolved and artfully displays plan in a graphic and written report. Master plans are applied to the modernization and expansion of existing airports and to the construction of new airports, regardless of their size or functional role (ICAO)

15 Master Plan objective To provide guidelines for future development which will satisfy aviation demand in a financially feasible manner and will be compatible with: Environment Community development Other modes of transportation Hence external consultation

16 Master Plan Update Forms part of a bigger JIA consolidation process, with national government focus: Long range forecasts & land needs Consolidation/Rationalisation of land needs Clusters & Synergies Disposal of non-core SOE properties Two distinct aspects Land use plan Technical master plan of individual precincts (e.g. terminal concept, taxiway configuration etc.)

17 Consultation & Participation Fundamental part of process Have started consultation process with e.g. Central government to ensure macro-economic benefits are maximised (airport the catalyst) Land use and transportation planners from both Province and Ekurhuleni to ensure that good fit is obtained with ITP s, SDF s and other planning initiatives Airlines (AASA & BARSA), SAA ATNS Cargo Operators

18 Provisional Master Plan Programme Information gathering & Analytical phase initial consultation Inventory Capacity & Capability Requirements Land Use Plan by April-May 2006 Master Plan by July-Aug 2006 Creative phase Land Use Plan Master Plan Permission Application Finalised

19 Midfield implementation: potential scope for Terminal complex with capacity range 5-15 million annual passengers Terminals, aprons, parking areas, kerb roads etc. This equates to replacing an airport similar to Cape Town International Airport. Consolidated cargo complex Increased logistics capacity Integration with IDZ and cargo complex Runway system capacity Access road systems Gautrain extension

20 Runway capacity is an early challenge Runway capacity of existing system (early assessment, worst case) As few as 30 million annual passengers As early as 2015 Additional 3 rd runway an early challenge Long term capacity & sustainability of airport and the region 3 rd runway for the Airport 2 nd international airport for the Province Critical: must be concluded to allow Land use planning On-airport Off-airport Access planning

21 Runway options: Add close parallel centre and close parallel east 8

22 Runway options: Add close parallel centre and independent parallel east

23 Runway options: Add close parallel centre and independent parallel east

24 Runway capacity gains (Early, rough assessment) 2: existing 3: close parallel centre 4: close parallel centre and east Interchangeable in terms of phasing 4: close parallel centre and independent parallel Maximum capacity: mppa

25 Summary: Runway options Maximum capacity (hourly air traffic movements) Maximum capacity (annual passengers) Approximate capacity saturation date 2 runways: Existing situation ± 30 million ± runways: Close parallel centre ± 40 million ± runways: Close parallel centre and close parallel east 4 runways: Close parallel centre and independent parallel east ± million ± million ±?? ±??

26 Land use option 1

27 Land use option 2

28 Land use option 3

29 Traffic split options Landside People Mover/ bus conncetion Landside People Mover/ bus conncetion T1 International 1 03L 21R 2 T1 Domestic 03L 21R 03C 21C 03C 21C T2 Domestic T2 International 03R Airside People Mover/ Bus connection 21L 03R Airside People Mover/ Bus connection 21L 03RR 21LL 03RR 21LL Landside People Mover/ bus conncetion Landside People Mover/ bus conncetion T1 Int/Dom L 21R T1 Dom 03L 21R 03C 21C 03C 21C T2 Int/Dom T2 Int/ Dom 03R Airside People Mover/ Bus connection 21L 03R Airside People Mover/ Bus connection 21L 03RR 21LL 03RR 21LL

30 Illustration: Sensitivity analysis on traffic split options Base Equalised Growth Domestic differentiation Ultimate development (50 mppa) T1 T Phase II T (40 mppa) T Phase I T (30 mppa) T Base (21 mppa) T1 T2 21 Sub-phases possible

31 Intra airport transportation Gautrain Gautrain T1 T1 03L 21R 03L 21R 03C 21C T2 03R 21L 03R Airside People Mover/ Bus connection 21L 03RR 21LL L

32 Intra airport transportation Gautrain Gautrain Landside People Mover/ bus connection Landside People Mover/ bus connection T1 T1 03L 21R 03L 21R 03C 21C 03C 21C T2 T2 03R Airside People Mover/ Bus connection 21L 03R Airside People Mover/ Bus connection 21L 03RR 21LL L 03RR 21LL L

33 Criteria in assessment of these alternatives Capacity gain and long term sustainability Capital Cost Operational Cost Phasing possibilities (short, medium and long term) Ground transportation accessibility Efficiency of airside operations Level-of-service Environmental impact Integration maximisation of land use (internal and external) Etc.

34 Next steps Airport capacity & capability studies being concluded Under way: Land and spatial needs studies Benchmarking Requirements analysis Land use alternatives by mid February Preferred Land Use Key objective of the national Identified by March government process Refined by April Extra-airport integration e.g. road access, IDZ, Gautrain Terminal concept development

35 Johannesburg International Airport THANK YOU Q & A Update of the Airport Master Plan Initial Runway & Land Use Alternatives 15 February 2006

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 1 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

International Transport Forum Paris February Jeffrey M. Zupan Regional Plan Association

International Transport Forum Paris February Jeffrey M. Zupan Regional Plan Association International Transport Forum Paris February 2013 Jeffrey M. Zupan Regional Plan Association Who Are We? Regional Plan Association Not for profit research, planning and advocacy organization in the New

More information

CASE STUDY The New Guayaquil International Airport

CASE STUDY The New Guayaquil International Airport www.jacobs.com worldwide CASE STUDY The New Guayaquil International Airport Prepared for ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 September 11, 2018 Outline Existing

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

Runway Scheduling Limits Summer 2015

Runway Scheduling Limits Summer 2015 Appendix 1 Runway Scheduling Limits Summer 2015 Arrivals Hour (UTC) 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 Average Total Summer 2014 38 39 37 40 40 41 40 43 43 41 41 44 44 43 38 44 20 39.8

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

MONTROSE REGIONAL AIRPORT

MONTROSE REGIONAL AIRPORT MONTROSE REGIONAL AIRPORT FEBRUARY 25, 2016 DRAFT AGENDA READY FOR TAKE OFF WHAT ARE WE GOING TO DO TODAY? Introductions Why conduct an airport master plan? Master Plan Process Deliverables Schedule Identify

More information

Pre-Coordination Runway Scheduling Limits Winter 2014

Pre-Coordination Runway Scheduling Limits Winter 2014 Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

Greater Orlando Aviation Authority Board Meeting. Wednesday, January 17, 2018

Greater Orlando Aviation Authority Board Meeting. Wednesday, January 17, 2018 Greater Orlando Aviation Authority Board Meeting Wednesday, Award Recognition South Terminal Complex Phase 1 and Phase 2 Planning Overview Greater Orlando Aviation Authority AGENDA PASSENGER TRAFFIC

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

HKIA : OPERATIONS AND CAPACITY

HKIA : OPERATIONS AND CAPACITY CHAPTER 3 HKIA : OPERATIONS AND CAPACITY Internal and External Transportation Links 3.1 Hong Kong International Airport (HKIA) is located right at the heart of passenger and cargo conveyance between Hong

More information

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land

More information

Tampa International Airport Master Plan Update. December 12, 2012

Tampa International Airport Master Plan Update. December 12, 2012 Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking

More information

Airport Master Planning Process & Update

Airport Master Planning Process & Update Airport Master Planning Process & Update David Stewart ICAO Airport Master Planning Task Force Subgroup Leader ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 1 Speaker: David

More information

AIRPORT OF THE FUTURE

AIRPORT OF THE FUTURE AIRPORT OF THE FUTURE Airport of the Future Which airport is ready for the future? IATA has launched a new activity, working with industry partners, to help define the way of the future for airports. There

More information

Oct-17 Nov-17. Travel is expected to grow over the coming 6 months; at a slower rate

Oct-17 Nov-17. Travel is expected to grow over the coming 6 months; at a slower rate Analysis provided by TRAVEL TRENDS INDEX OCTOBER 2018 CTI reading of 51.6 in October 2018 indicates that travel to or within the U.S. grew 3.2% in October 2018 compared to October 2017. LTI predicts travel

More information

Airport Planning and Terminal Design

Airport Planning and Terminal Design Airport Planning and Terminal Design Major Terminal Design Considerations Passenger Terminal Configuration Passenger Terminal Concepts Major Design Considerations 1 Terminal Configuration Centralised processing

More information

Performance monitoring report for 2014/15

Performance monitoring report for 2014/15 Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

THAI AIRWAYS INTERNATIONAL PCL

THAI AIRWAYS INTERNATIONAL PCL THAI AIRWAYS INTERNATIONAL PCL 1-March-2016 1 DISCLAIMER The information contained herein is intended to represent the Company s operating and financial position at a given point in time and may also contain

More information

49 May-17. Jun-17. Travel is expected to grow over the coming 6 months; at a slower rate

49 May-17. Jun-17. Travel is expected to grow over the coming 6 months; at a slower rate Analysis provided by TRAVEL TRENDS INDEX MAY 2018 CTI reading of 51.7 in May 2018 shows that travel to or within the U.S. grew 3.4% in May 2018 compared to May 2017. LTI predicts moderating travel growth

More information

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline Domestic Scheduled Enplaned Passengers by Airline Alaska Airlines 7,070 4,331 63.2% 59,552 42,265 40.9% 1.2% 1.0% Virgin America 0 803-100.0% 12,231 803 1423.2% 0.3% 0.0% Allegiant Air 1,333 2,063-35.4%

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

ACI perspective of The Airport Planning Challenge

ACI perspective of The Airport Planning Challenge ACI perspective of The Airport Planning Challenge Outline ACI Policies on Airport Planning Land Use Planning Airside and Apron Planning Challenges for Airport Operators Current cases of planning processes

More information

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018 s An Overview of GMR Megawide Consortium s Unsolicited Proposal March 2018 1 Metro Manila requires a multi-airport system and NAIA shall continue to play an anchor role in this system. Multi-Airport system

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes

Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes 29 October 2014 1 Purpose This document outlines Airways proposed price increase for new lights

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

Departures over the north-west, west and south-west from Runway 25. Arrivals from the south on Runways 34L and 34R.

Departures over the north-west, west and south-west from Runway 25. Arrivals from the south on Runways 34L and 34R. Mode 7 Method of operation Departures over the north-west, west and south-west from Runway 25. Arrivals from the south on Runways 34L and 34R. Departures over the north and northwest from Runway 34L for

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

Oct-17 Nov-17. Sep-17. Travel is expected to grow over the coming 6 months; at a slightly faster rate

Oct-17 Nov-17. Sep-17. Travel is expected to grow over the coming 6 months; at a slightly faster rate Analysis provided by TRAVEL TRENDS INDEX SEPTEMBER 2018 CTI reading of.8 in September 2018 indicates that travel to or within the U.S. grew 1.6% in September 2018 compared to September 2017. LTI predicts

More information

Jan-18. Dec-17. Travel is expected to grow over the coming 6 months; at a slower rate

Jan-18. Dec-17. Travel is expected to grow over the coming 6 months; at a slower rate Analysis provided by TRAVEL TRENDS INDEX DECEMBER 2018 CTI reading of 51.8 in December 2018 indicates that travel to or within the U.S. grew 3.6% in December 2018 compared to December 2017. LTI predicts

More information

Let s Fly. Fort McMurray Airport Authority

Let s Fly. Fort McMurray Airport Authority Let s Fly Fort McMurray Airport Authority The Largest Industrial Project in World History Canada s oil sands are found in three deposits the Athabasca, Peace River and Cold Lake deposits in Alberta and

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Presentation to Portfolio Committee on Tourism. September 1, Cape Town

Presentation to Portfolio Committee on Tourism. September 1, Cape Town ACSA WORLD CUP 2010 READINESS Presentation to Portfolio Committee on Tourism September 1, 2009 Cape Town Airport Operations September 09 Table of Contents Introduction Assumptions Methodology Results of

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee July 22, 2015 Audio recordings are made of this meeting 1 Noise Oversight Committee July 22, 2015 Item 1 Review and Approve Draft Meeting Minutes Minutes from May 20, 2015 Noise

More information

EXECUTIVE SUMMARY FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT (FLL) MASTER PLAN UPDATE PHASE 1

EXECUTIVE SUMMARY FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT (FLL) MASTER PLAN UPDATE PHASE 1 Workshop Briefing Package Airport Master Plan Update, Phase I Fort Lauderdale-Hollywood International Airport October 18, 2005 Leigh Fisher Associates A Division of Jacobs Consultancy Inc. EXECUTIVE SUMMARY

More information

O Hare Noise Compatibility Commission Technical Committee April 19, Proposed Interim Fly Quiet Runway Rotation Plan

O Hare Noise Compatibility Commission Technical Committee April 19, Proposed Interim Fly Quiet Runway Rotation Plan O Hare Noise Compatibility Commission Technical Committee April 19, 2016 Proposed Interim Fly Quiet Runway Rotation Plan O HARE MODERNIZATION ROD - FLY QUIET Record of Decision (ROD) was issued on September

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

THAI AIRWAYS INTERNATIONAL PCL

THAI AIRWAYS INTERNATIONAL PCL THAI AIRWAYS INTERNATIONAL PCL 2Q2017 analysts briefing 16-Aug-2017 1 DISCLAIMER The information contained herein is intended to represent the Company s operating and financial position at a given point

More information

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING May 15, 2018 Master Plan Schedule Overview Progress Since Last Master Plan

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Damon Hylton Vice President

Damon Hylton Vice President ACI-NA Commissioners Conference Air Service Development in a Tough Market Damon Hylton Vice President May 19, 2008 Today s Agenda Background Now What? Questions and Answers 2 Background 3 Current Industry

More information

State of the Aviation Industry

State of the Aviation Industry State of the Aviation Industry Presentation to the ACI Airport Economics & Finance 10 th 11 th February London, United Kingdom Laurie N. Price Director of Aviation Strategy Mott MacDonald Aviation Current

More information

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending August 31, Enplaned Passengers by Airline

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending August 31, Enplaned Passengers by Airline Enplaned Passengers by Airline Domestic Scheduled Alaska Airlines 3,797 4,077-6.9% 36,538 35,188 3.8% 1.0% 1.0% Allegiant Air 5,698 743 666.9% 41,738 14,843 181.2% 1.1% 0.4% American Airlines (US Air)

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Singapore Airlines Group Analyst/Media Briefing HALF YEAR FY RESULTS. 13 November 2013 THE PARENT AIRLINE 1H FY2013/14 RESULTS

Singapore Airlines Group Analyst/Media Briefing HALF YEAR FY RESULTS. 13 November 2013 THE PARENT AIRLINE 1H FY2013/14 RESULTS Singapore Airlines Group Analyst/Media Briefing HALF YEAR FY2013-14 14 RESULTS 13 November 2013 THE PARENT AIRLINE 1H FY2013/14 RESULTS THE PARENT AIRLINE COMPANY RESULTS 2Q & 1H FY13/14 2Q/13 $million

More information

Heathrow Airport. Airport Charges for 2013/14. Consultation Document

Heathrow Airport. Airport Charges for 2013/14. Consultation Document Heathrow Airport Airport Charges for 2013/14 Consultation Document Date: 26 th October 2012 Prepared by: Heathrow Airport Limited [Page Intentionally Blank] Table of Contents EXECUTIVE SUMMARY... 2 CHAPTER

More information

IATA FUEL EFFICIENCY CAMPAIGN

IATA FUEL EFFICIENCY CAMPAIGN IATA FUEL EFFICIENCY CAMPAIGN Juergen Haacker Director, Operations Montreal, IATA Fuel Efficiency Campaign Jet fuel price driving airline fuel efficiency Increased 5% from 2003-2005 Industry is on track

More information

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness Stephen George Bruno Moitre Rapporteurs WG1 Remotely Piloted Aircraft Systems (RPAS)

More information

MONTROSE REGIONAL AIRPORT APRIL 12, 2016

MONTROSE REGIONAL AIRPORT APRIL 12, 2016 MONTROSE REGIONAL AIRPORT APRIL 12, 2016 AGENDA READY FOR TAKE OFF WHAT ARE WE GOING TO DO TODAY? Introductions Why conduct an airport master plan? Master Plan Process Deliverables Schedule Identify Goals

More information

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia Preparatory Course in Business (RMIT) SIM Global Education Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia Brief Outline of Modules (Updated 18 September 2018) BUS005 MANAGING

More information

COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010

COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010 COMOX VALLEY AIRPORT Strategic Plan 2011-2015 Summary October 2010 COMOX VALLEY AIRPORT Introduction History The Comox Airport was constructed by the Department of National Defence in 1942. The Comox Airport

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

24-26 March 2014 Cairo, Egypt. Technology. Session #6 Presentation #2

24-26 March 2014 Cairo, Egypt. Technology. Session #6 Presentation #2 24-26 March 2014 Cairo, Egypt Technology Session #6 Presentation #2 Queen Alia International Airport Introduction of AIG WILDLIFE FOD Queen Alia International Airport Airport International Group (AIG)

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Agenda» Website Update» Alternatives» Discussion» Evaluation» Schedule Agenda» Website Update» Alternatives» Discussion» Evaluation»

More information

Pacific Project. CPWG/8 - WP/6 Appendix A

Pacific Project. CPWG/8 - WP/6 Appendix A Pacific Project CPWG/8 - WP/6 Pacific Project Objective This project aims to substantially improve operational efficiency and environmental outcomes on the major air traffic flow between North America

More information

Tim Hunter Chief Executive. CCT Business Partner Update 3 March 2015

Tim Hunter Chief Executive. CCT Business Partner Update 3 March 2015 Tim Hunter Chief Executive CCT Business Partner Update 3 March 2015 A Great Summer Strong international arrival growth More flights and more beds Great weather = more visitors doing more Jan-10 Feb-10

More information

5 th MEXICO CITY Airport Consultative Committee (ACC) Consolidated Meeting Notes (Meeting date: June 15, 2017)

5 th MEXICO CITY Airport Consultative Committee (ACC) Consolidated Meeting Notes (Meeting date: June 15, 2017) 5 th MEXICO CITY Airport Consultative Committee (ACC) Consolidated Meeting Notes (Meeting date: June 15, 2017) 1. Airlines Only Session During the pre-meeting session the airlines community expressed their

More information

Coast to coast. STR Coastal Town Review Coastal Towns Market Review Report_JE.indd 3

Coast to coast. STR Coastal Town Review Coastal Towns Market Review Report_JE.indd 3 Coast to coast. STR Coastal Town Review 16 Coastal Towns Market Review Report_JE.indd 3 4//17 8:31:38 AM Table of Contents Introduction...3 United Kingdom...4 Blackpool...6 Bournemouth...8 Brighton...

More information

Public Workshop #7 Land Use Planning June 28, 2016

Public Workshop #7 Land Use Planning June 28, 2016 Public Workshop #7 Land Use Planning June 28, 2016 Land Use Planning and Vision 2040 What is Land Use Planning in the context of the Vision 2040 process? Vision 2040 Aeronautical Development Land Use Compatibility

More information

Air Berlin PLC AGM 06 June 2013 London

Air Berlin PLC AGM 06 June 2013 London Air Berlin PLC AGM 06 June 2013 London airberlin a strong European carrier Market position as of 31 December 2012 No. 2 in core market: Germany / Austria / Switzerland No. 7 in Europe with 33.3 m guests

More information

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION EXPANSION UPDATE THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION DECEMBER 2017 In October 2016, the Government announced that a north west runway at Heathrow is its preferred scheme for the expansion

More information

Airline Operations A Return to Previous Levels?

Airline Operations A Return to Previous Levels? Airline Operations A Return to Previous Levels? Prof. R John Hansman, Director MIT International Center for Air Transportation rjhans@mit.edu Impact of Sept on Demand Schedule Cutbacks -2% Currently about

More information

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012 Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns

More information

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term

More information

SIA ANALYST/MEDIA BRIEFING Q2 and 1H FY17/18 Results 8 November 2017

SIA ANALYST/MEDIA BRIEFING Q2 and 1H FY17/18 Results 8 November 2017 SIA ANALYST/MEDIA BRIEFING Q2 and 1H FY17/18 Results 8 November 2017 THE PARENT AIRLINE Q2 AND 1H FY17/18 RESULTS THE PARENT AIRLINE COMPANY OPERATING PERFORMANCE Q2 % 1H % FY17/18 Change FY17/18 Change

More information

FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017

FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017 FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY PAC Committee (PRELIMINARY DRAFT) WORK IN PROGRESS -

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Airport Master Plan Update

Airport Master Plan Update Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,

More information

FAA RECAT Phase I Operational Experience

FAA RECAT Phase I Operational Experience FAA RECAT Phase I Operational Experience WakeNet-Europe Workshop 2015 April 2015 Amsterdam, The National Aerospace Laboratory (NLR) Tittsworth (FAA Air Traffic Organization) Pressley (NATCA / IFATCA) Gallo

More information

aviation and airports

aviation and airports aviation and airports mva in asia MVA is a global transportation specialist and leading market research consultancy specializing in traffic engineering and transport planning and operations. In 1978, MVA

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018 AIRPORT PLANNING Joseph K CHEONG Technical Officer, Airport Operations & Infrastructure, ICAO HQ Secretary, Aerodrome Design and Operations Panel Lima, September 2018 TOPICS THE AVIATION SYSTEM CHICAGO

More information

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10 The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are

More information

Number of tourism trips of residents increased namely for leisure

Number of tourism trips of residents increased namely for leisure Tourism Demand of Residents 1 st Quarter 2018 25 July 2018 Number of tourism trips of residents increased namely for leisure In the 1 st quarter 2018, residents in Portugal took a total of 4.5 million

More information

Air traffic liberalization planning impact evaluation - case study

Air traffic liberalization planning impact evaluation - case study Air traffic liberalization planning impact evaluation - case study Dr Jan Malawko Assistant Professor Aviation Science ICM - Interdisciplinary Centre for Mathematical and Computational Modelling University

More information

Introduction to Airports and Their Characteristics Prof. Amedeo Odoni

Introduction to Airports and Their Characteristics Prof. Amedeo Odoni Introduction to Airports and Their Characteristics Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 3 May

More information

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011

More information

City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018

City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018 City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan Public Workshop #2 April 19, 2018 DISCUSSION TOPICS Introduction About the Master Plan Public Workshop #1 Recap

More information

MAXIMIZING INVESTMENT AND UTILIZATION

MAXIMIZING INVESTMENT AND UTILIZATION MAXIMIZING INVESTMENT AND UTILIZATION November 2013 Luis Ajamil Bermello, Ajamil & Partners Two perspectives How to increase use of the facility OPTIMIZATION How to improve the capacity of the facility

More information

MODAIR. Measure and development of intermodality at AIRport

MODAIR. Measure and development of intermodality at AIRport MODAIR Measure and development of intermodality at AIRport M3SYSTEM ANA ENAC GISMEDIA Eurocontrol CARE INO II programme Airports are, by nature, interchange nodes, with connections at least to the road

More information