2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016
|
|
- Shauna Sybil McCarthy
- 5 years ago
- Views:
Transcription
1 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only th Street East The Project: 15 th Street East is a vital north-south corridor west of I-75 in Manatee and Sarasota Counties serving downtown Bradenton to the north and Sarasota Bradenton International Airport at the southern terminus. Approximately 4.5 miles in length, the project will widen 15 th Street East and 301 Boulevard East from two to three lanes, incorporating a central turn lane, between Tallevast Road and US 41. The project scope will incorporate Complete Street elements, including the addition of bicycle lanes, 10 sidewalks, bus stops, lighting, landscaping, mid-block pedestrian crossings, and roundabouts. Progress: Unfunded The 15th Street East project is currently in the Project Development & Environmental (PD&E) phase, with design funded in FY 2016/17. The Right-of-Way (ROW) and construction phases are not currently funded. Estimated project cost remaining is $68.9M. Funding Request: $68.9M for ROW and construction. 2. SR 50 Improvements The Project: SR 50 (Cortez Blvd) is a corridor in Hernando County that provides an integral east-west connection between the Nature Coast, Tampa Bay, and Central Florida regions. Segments of SR 50 west of US 98 are programmed to be widened to six lanes; segments east of US 98 are programmed to be widened to four lanes, as identified in the Hernando/Citrus MPO 2040 Cost Affordable Plan. Improvements into Sumter County are needed to provide an enhanced interregional corridor. Progress: Partially Funded Construction is currently underway widening SR 50 to 6 lanes between Lockhart Rd. to Windmere Road and in 2019 construction is scheduled from Windmere Road to US 301. Portions currently in PD&E include the section from SR 50 Bypass to Lockhart and the FDOT District 5 segment from the Hernando/Sumter County line east to CR 33. SR 301 to Burwell Rd. is funded for design in and right-of-way in Funding Request: Support current roadway improvements along SR 50 and request funding for design, ROW acquisition, and construction along entire corridor in Hernando & Sumter County. 3. Central Avenue Bus Rapid Transit The Project: The Bus Rapid Transit (BRT) service in St. Petersburg's Central Avenue corridor from downtown St. Petersburg to the Gulf Beaches will provide expedited, limited-stop travel from downtown to the beaches, seven days a week on 1 st Ave N (westbound) and 1 st Ave S (eastbound). The BRT will only serve major stops in the corridor, cutting the current transit travel time from downtown to the beaches by more than a third, using a semi-dedicated travel lane. Progress: Funded As of Fall 2016, the Central Avenue BRT Pilot is fully funded and is finalizing the final corridor recommendation among three beach communities. PSTA is currently completing preliminary design, service plan, and requirements to satisfy the National Environmental Policy Act. Funding Request: Funding to expand the pilot program to a permanent transit route.
2 4. Pinellas County Interstate Improvements (I-275) The Project: FDOT has identified lane continuity improvements along I-275 from Gandy Boulevard to 54 th Avenue South in Pinellas County, as well as adding express lanes from south of Gandy Boulevard to north of 4 th Street North. There is currently one continuous through lane in the northbound direction, and no continuous lanes in the southbound direction. Progress: Unfunded FDOT completed PD&E and Design along 16.3 miles of I-275. The Design/Build Request for Proposal (RFP) of express lanes from south of Gandy Boulevard to north of 4 th Street North has been advertised. Funding Request: $100 million for design and construction of the lane continuity improvements on I-275 and express lane extension with accommodations for regional express bus and TBARTA vanpools. 5. I-75/I-4 Interchange Improvements The Project: The I-75/I-4 interchange is a vital link in the regional transportation network. FDOT District Seven is currently conducting two PD&E Studies along I-75 and I-4 and identified proposed interim operational improvements. Progress: Unfunded The I-75/I-4 interim operational interchange improvements are split into nine separate phases, which are in various stages of project development. Preliminary engineering is funded in the Five-Year Work Program ( ) and construction was identified in the Strategic Intermodal System (SIS) Cost Feasible Plan. Funding Request: $123 million to implement the interchange improvements. 6. US 41 Multimodal Emphasis Corridor The Project: Multimodal projects have been defined along US 41 from 17th Street in the City of Palmetto to the Sarasota/Charlotte County Line. Projects include transit improvements, roundabouts, pedestrian crossings, bicycle racks, and new sidewalks. Progress: Unfunded In June 2014, the Sarasota/Manatee MPO adopted a priority list of 18 projects totaling $31.4 million along the US 41 corridor. Of that, eight received funding for PD&E studies. The next phase is preliminary engineering and construction. Funding Request: $31.4 million to design and construct the multimodal corridor improvements along US 41 following completion of PD&E studies. 7. Tampa Bay Express (Ultimate) The Project: FDOT District Seven is studying variably priced express lanes on the interstate system, including I-275, I-75, and I-4. The projects will be split into two phases; the first phase is the starter project and the second phase known as the Ultimate. The project supports express bus service between Pinellas, Hillsborough, and Pasco Counties as well as preserving a premium transit corridor in the center median of I-275 and I-4. Progress: Unfunded The Forward Pinellas and Hillsborough MPO Boards have adopted Tampa Bay Express as part of their Transportation Improvement Programs. FDOT held public hearings for the Tampa Bay Express in 2015 and 2016 and are continuing to hold public meetings. Funding Request: Support FDOT in moving the $6 billion Ultimate project towards Design/Build or seeking a Public-Private Partnership. 8. Tampa Streetcar Extension & Modernization The Project: Modernization of the TECO Line Streetcar system and extending it further north into downtown Tampa from its current western terminus at Whiting Station to the Marion Transit Center
3 and other destinations beyond the downtown. Modernizing and extending the existing historic streetcar is estimated to cost $146M. The Hillsborough MPO s 2040 Cost-Feasible Plan estimates an extension to the Westshore Intermodal Center will cost $456M. Progress: Unfunded FDOT and the City of Tampa are providing a combined $1,667,390 for a Feasibility Study. Currently underway, Phase I will identify alternatives for extension and modernization of the existing system. This will culminate with submittal of a request letter to the Federal Transit Administration (FTA) for entry into the Small Starts Project Development phase. Funding Request: Federal and State funding for construction of the Streetcar extension and modernization project. 9. Regional Express Bus Service (Pilot Projects) The Project: A Regional Express Bus network would efficiently link Hillsborough, Pasco, and Pinellas County residents, commuters, and visitors with key destinations, including: a) The Beach Express Bus pilot project would connect major employment destinations along SR 60, and complement local service, with expedited, limited-stop travel connections between Tampa International Airport (TIA) and Clearwater Beach. b) The AirPorter pilot project would connect TIA to Downtown Tampa, Carillon, and Downtown St. Petersburg with an application based, frequent premium transit service. c) The Veterans/Suncoast Express Bus pilot project from SR 54 at the Suncoast Expressway interchange in Pasco County to Westshore and beyond, would be the first project to begin inter and cross-county Express Bus service using variably priced toll lanes in the Tampa Bay Region. Progress: Unfunded The Pinellas Suncoast Transit Authority (PSTA) is requesting $5.1M for capital and operating costs for the Beach Express Bus from the Florida Legislature. Concurrently, Forward Pinellas is working with FDOT and PSTA on a SR 60 corridor study from Clearwater Beach to TIA. The Hillsborough Area Regional Transit Authority (HART) is requesting $3M annually for operating costs of the AirPorter premium transit service. The Veterans Expressway is scheduled for completion in 2017 and, when combined with the Suncoast Parkway, will provide variably priced, time reliable tolled express lanes from Pasco into Hillsborough County. Funding Request: Funding for PSTA's requests for a total of $5.1M in capital and operating costs for the Beach Express Bus. Funding for HART s request for a total of $3M in operating costs for the AirPorter. Through a partnership with FDOT, capital and operational funding for the Veterans/Suncoast Express Bus pilot project from SR 54 to Westshore and Downtown Tampa, and the Gateway area in Pinellas County via the Howard Frankland Bridge. 10. Florida Coast-to-Coast Trail and Connections The Project: A locally connected, statewide network of multi-use trails along, and linked to, the Coastto- Coast (C2C) Trail in Citrus, Hernando, Pasco, Pinellas, and Polk Counties. When completed, the C2C will be a 275-mile multi-use trail between the Cities of St. Petersburg, on the west coast, and Titusville, on the east coast of Florida. Two trail gaps remain in the Tampa Bay region; they include the six-mile Good Neighbor Trail (Hernando County) and the seven mile Starkey Trail Gap (Pasco and Pinellas Counties) from SR 54 in Pasco County to the Pinellas Trail at East Lake/Keystone Road in Pinellas County. Progress: Partially Funded The Florida Greenways & Trails Council (FGTC) and FDOT will allocate 33% of annual SUN Trail funding to complete the C2C. In FY , the Good Neighbor Gap was allocated $5.5 million for design/build for an alignment that goes through the City of Brooksville. The Withlacoochee-Dunnellon Trail Connector, a segment that creates a direct connection to the C2C, received design funding for FY The Pinellas segment of the Starkey Trail Gap is funded for
4 Design/Build and the Pasco County portion is under design and will have 100% plans complete by spring Funding Request: Funding for construction of the Starkey Trail Gap Connector in Pasco County. Funding for construction other trails with direct connection to the C2C, including the Orange Belt Trail (Pasco) and Upper Tampa Bay Trail (Hillsborough). 11. Southwest Coastal Regional Trail and Connections The Project: The Southwest Coastal Regional Trail (SWC) corridor goes from St. Petersburg, through Tampa, and south to Naples, making a connection with the C2C along the Pinellas Trail. The SWC will provide a 300-mile spine for local connections along the Gulf Coast of Florida. There are 11 TBARTA Regional Multi-Use Trail Priority Projects along, or connecting to, the SWC trail corridor. Progress: Partially Funded/Unfunded On March 31, 2016, the SWC was recognized as one of the top state priority corridors and five projects along the corridor were awarded over $10 million in SUN Trail funding for FY , which amounted to nearly 23% of the total statewide funding allotment. Funding Request: Funding for all 11 TBARTA Regional Multi-Use Trail Priority Projects along, or connecting to, the SWC trail corridor. 12. Tampa Bay Premium Transit Feasibility Study Implementation The Project: The goal of this feasibility study is to evaluate opportunities for premium transit and to identify and build consensus around the strategies needed to construct those premium regional transit connections in the region. The study will evaluate a wide variety of corridors and technologies such as, variably priced toll lanes, existing freight rail corridors, bus rapid transit, autonomous vehicle technology, waterborne transportation, and many others, which may include preservation of rail corridors (see Preservation & Expanded Use of Freight Rail Corridors). Progress: Unfunded The Study, which is managed by HART and funded by FDOT, commenced in October 2016 and is expected to be complete in Fall Funding Request: Funding and implementation of the short and long-term (to be determined) of the Tampa Bay Premium Transit Feasibility Study. 13. I-275 and Selmon Expressway Limited Access Highway Connection The Project: Creating direct, interregional connections between the Selmon Expressway and I-275 in Pinellas County. The construction of a partially controlled access facility with frontage roads along Gandy Blvd. from I-275 to the Gandy Bridge joining with the Selmon Expressway Extension. Progress: Unfunded FDOT is proposing to include PE in the draft tentative work program for FY Funding Request: Funding for PE and construction of a partially controlled access facility along the Gandy Blvd. corridor connecting I-275 with the Selmon Expressway. 14. Preservation & Expanded Use of Freight Rail Corridors The Project: Preservation of freight rail corridors in the Tampa Bay Region for short and long term transportation purposes, including rail, trails, and Bus Rapid Transit. Rail corridors could potentially accommodate passenger service and make regional connections among Hillsborough, Hernando, Pasco, Pinellas, Manatee, and Sarasota Counties. Previously completed studies that included ridership forecasts indicate there is a high demand for service between key activity centers and the joint use of existing tracks for passenger rail or other transit can reduce construction costs by one-half to one-third compared to the cost of building new passenger rail lines.
5 Progress: Unfunded The Tampa Bay Premium Transit Feasibility Study, currently in progress, will study premium transit possibilities in the Tampa Bay Region, including existing freight rail corridors. The Sarasota/Manatee MPO 2040 LRTP Strategic Mobility Plan calls for the preservation of existing rail corridors for future freight rail, passenger rail, trails, and bus rapid transit. The Hillsborough MPO 2040 LRTP preliminary cost estimates for new passenger service on existing track using Diesel Multiple Unit (DMU) vehicles included $297M for service from Downtown Tampa to USF ($5.4M annual operation), $341M for service form Downtown Tampa to the Pinellas County line ($6.9M annual operation), and $175M for service to the Pasco County Line ($3.1M annual operation). Funding Request: Freight rail corridor preservation, and/or acquisition, throughout the Tampa Bay Region for transportation purposes and further study of the preliminary cost estimates for new passenger service on existing tracks. 15. Bartow Northern Connection Phase II The Project: Planned as a new four-lane roadway from US 17 to SR 60 to alleviate existing and future traffic congestion on three Strategic Intermodal System (SIS) roads in Bartow US 98, US 17, and SR 60. The project will serve freight traffic from the CSX Intermodal Logistics Center and other freight generators by improving access to I-4 and the regional road network. Phase I (2.1 miles) connecting US 98 to US 17, was completed in 2012 and is open to traffic; Phase II will extend the connector to SR 60. Progress: Partially Funded Project is construction ready and has partial funding for construction in FY 2018/19. Funding Request: Funding for construction of the interchange and extension from US 17 to SR 60.
6
TBARTA: 2015 Master Plan and Tampa Bay Express Project
TBARTA: 2015 Master Plan and Tampa Bay Express Project The Real Story Who: Tampa Bay Area Regional Transportation Authority What: Develop and implement a Regional Transportation Master Plan for the seven-county
More informationWestshore Development Forum April 9, 2014
Florida Department of TRANSPORTATION Westshore Development Forum April 9, 2014 District Seven Secretary Paul Steinman Agenda D7 Overview Current Projects Future Projects Vision Florida Department of TRANSPORTATION
More informationPASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 2016 LIST OF PRIORITY PROJECTS September 8, 2016
PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 2016 LIST OF PRIORITY PROJECTS September 8, 2016 PROJECT SELECTION AND PRIORITIZATION PROCESS OVERVIEW HIGHWAY PROJECTS: The project selection and prioritization
More informationMore than just express lanes
A N E W C H O I C E F O R A B E T T E R C O M M U T E Tampa Bay Regional Planning Council August 8, 2016 Florida Department of Transportation, District Seven More than just express lanes ALT 19 41 581
More informationCoast to Coast Connector Summit
Project Partners Welcome to the Coast to Coast Connector Summit Winter Garden, Florida City Hall October 1, 2014 1 Why are we here? Objectives 1. Inform key stakeholders on the current state of the C2C
More informationTRANSPORTATION IMPROVEMENT PROGRAM. This Year s Document: FY 2017/ /22 Effective October 1, 2017 September 30, 2018
TRANSPORTATION IMPROVEMENT PROGRAM This Year s Document: FY 2017/18 2021/22 Effective October 1, 2017 September 30, 2018 And Priorities for Next Year s Document What is the TIP? Transportation projects
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationCapital City to Sea Trail (CC2ST) SUMMARY
Capital City to Sea Trail (CC2ST) So far over $24M have been invested into the Capital City to Sea Trails. o $9M-Capital Region Transportation Planning Agency (CRTPA). Master Plan/Coastal Trail (Lighthouse
More informationFUNDED FOR CONSTRUCTION
Priority CENTRAL FLORIDA ALLIANCE 2016 SIS HIGHWAY PROJECTS FOR PRIORITIZATION FDOT Financial Project Phase(s) Estimated Management Project Name or Length Latest Project Remaining Remaining Cost Designation
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More informationFY 2018/19 CENTRAL FLORIDA MPO ALLIANCE - LIST OF PRIORITY PROJECTS
Priority FY 2018/19 CENTRAL FLORIDA ALLIANCE - LIST OF PRIORITY PROJECTS FY 2018-2019 SIS HIGHWAY PROJECTS FDOT Financial Management Number Project Name From To Work Description Latest Project Phase Funded
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationPenny for Pasco Renewal. FY2014/15 thru FY2024/25
Penny for Pasco Renewal FY2014/15 thru FY2024/25 1 Background Pasco Citizens Committee (PAC) Citizens Survey Results Coordination Activities Project Schedule Category Allocations Revenue Estimates Distribution
More informationSR 934 Project Development And Environment (PD&E) Study
SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW
More informationUpdate of MDX Open Road Tolling
Update of MDX Open Road Tolling Citizens Transportation Advisory Committee September 11, 2013 About MDX MDX is an agency of the state created by the State Legislature and the County Commission to assure
More informationToll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. West Central Florida
Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities West Central Florida Effective: October 29, 20 Veterans (SR 589) Hillsborough County Veterans SunPass
More informationProject Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville
First Coast Outer Beltway August 2012 Project Location DUVAL Jacksonville First Coast Outer Beltway CLAY ST. JOHNS Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll
More informationHillsborough MPO Technical Advisory Committee. Monday, February 20, 2017
Hillsborough MPO Technical Advisory Committee Monday, February 20, 2017 1 Study Purpose Support the vision for a livable, connected, and competitive downtown. Evaluate alternatives for the system s modernization
More informationList of Priority Projects
2012 List of Priority Projects Adopted August 9, 2012 TABLE OF CONTENTS LE OF CONTENTS Overview...2 List of Priority Projects Process.3 State Highway Capacity Projects...4 Mass Transit Projects Jacksonville
More information2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016
Florida Department of TRANSPORTATION 2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016 Jim Boxold, Secretary SECRETARY S CHALLENGE 2 2016 GENERAL
More informationWilliamsburg Town Hall Meeting
Williamsburg Town Hall Meeting DEVELOPMENT UPDATE ORANGE COUNTY PLANNING DIVISION November 30, 2017 1 AREA CONTEXT FUTURE LAND USE MAP MEADOW WOODS MEADOW WOODS GINN PROPERTY ZONING MEADOW WOODS MEADOW
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3
ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project
More informationBi-County Bicycle/Pedestrian (Orange Belt) Trail PD&E Study
2018 BUILD APPLICATION Bi-County Bicycle/Pedestrian (Orange Belt) Trail PD&E Study Pasco County, FL APPLICATION INFORMATION Type of Application: Planning Study Amount Requested: $1.38 Million E XECUTIVE
More informationCentral Broward Transit (CBT) Phase 1 Public Open House January 21, 2016
Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 CBT Phase 1/Wave Extensions AGENDA What is the CBT Phase 1 Project? Who are the Project Partners? Where is the Project Located?
More informationUS 19 Sunset Point Rd to Countryside Blvd.
Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationDISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com
DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationTolling New Capacity An Important Policy Direction for Florida DOT. Ed Regan CDM Smith
Tolling New Capacity An Important Policy Direction for Florida DOT Ed Regan CDM Smith Express Toll Lanes Express Toll Lanes: where tolling and transportation management come together in a way which redefines
More informationPinellas Suncoast Transit Authority Community Bus Plan
Pinellas Suncoast Transit Authority Community Bus Plan FINAL REPORT JANUARY 2014 Prepared by: TABLE OF CONTENTS Executive Summary... 2 Community Bus Plan Introduction... 22 Previous Studies... 25 Market
More informationThe Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.
The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. JOINT MEETING OF THE CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BOARD AND LEE
More informationHillsborough Metropolitan Planning Organization
Hillsborough Metropolitan Planning Organization 601 E Kennedy Boulevard, 18 th Floor,, Florida, 33602 813-272-590 planhillsborough.org Meeting of the Livable Roadway Committee Wednesday, February 18, 2015,
More informationUpdate on Palm Beach MPO Funded Projects
Update on Palm Beach MPO Funded Projects Presented February 3, 2016: Palm Beach Technical Advisory Committee (TAC) Citizens Advisory Committees (CAC) Tri-Rail Milestones Service began Jan 9, 1989 Double-tracking
More informationTolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division
Tolling in Washington State Craig J. Stone, P.E. Assistant Secretary, Toll Division Connecticut Department of Transportation Bridgeport, CT June 4, 2014 Tolling in Washington State Tolling is part of Washington
More information2017 LIST OF PRIORITY PROJECTS
0 LIST OF PRIORITY PROJECTS Adopted April, 0 Amended August, 0 by the Lake~Sumter MPO GOVERNING BOARD Coverage of Fiscal Years 0/ through 09/0 Prepared by the Lake~Sumter Metropolitan Planning Organization
More informationSR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5
SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.
More informationRegional Planning for Tri-Rail Coastal Link
2013 APTA Rail Conference Regional Planning for Tri-Rail Coastal Link William L. Cross, P.E. South Florida Regional Transportation Authority Director of Planning and Capital Development Pompano Beach,
More informationTransAction Overview. Introduction. Vision. NVTA Jurisdictions
Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments
More informationAPPENDIX A: Planning Consistency Checklist
APPENDIXA: PlanningConsistencyChecklist Planning Requirements for Environmental Document Approvals with Segmented Implementation Document Information: Date: 1/20/2015 Document Type: EA Document Status:
More informationINTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP
October 31, 2012 INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP ADOT FHWA MAG City of Phoenix City of Tempe City of Chandler Valley Metro/RPTA October 31, 2012 1 Agenda Introductions Background Purpose
More informationTransportation Supporting Dulles Airport
Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements
More informationWelcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010
Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final
More informationBroward Boulevard Transit Corridor Workshop. February 5, :00 AM 12:30 PM FDOT District IV Auditorium
Broward Boulevard Transit Corridor Workshop February 5, 2010 9:00 AM 12:30 PM FDOT District IV Auditorium Workshop Agenda 9:00 AM 9:15 AM Welcome/Introductions 9:15 AM 10:00 AM Study Background & Corridor
More informationElected Officials and Media Briefing I-395 Express Lanes Northern Extension
Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda
More informationUpdate on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan
Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Presentation Overview Introductions Susan Miller, Director of Projects, Contra
More informationLand O Lakes, FL Vacant Land for Commercial Development
FOR SALE Land O Lakes, FL Vacant Land for Commercial Development SR 52 & LAND O LAKES BLVD., LAND O LAKES, FL 34639 Tampa Bay Florida View of SR 52 Traffic westbound, west of US 41 Looking East at westbound
More informationFlorida Department of TRANSPORTATION. First Coast Expressway
Florida Department of TRANSPORTATION First Coast Expressway What is the (FCE)? Multi-lane, limited access toll expressway Connects I-10 in Duval County to I-95 in St. Johns County How does FCE connect
More informationPublic Information Meetings. October 5, 6, 7, and 15, 2015
Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound
More informationFLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016
FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and
More informationMeasure R Program Update
Item 1 Program Update March 17, 2011 Independent Taxpayers Oversight Committee February 18 th Meeting held: Reviewed Audits of FY10 Expenditures Set Public Hearing Date on Audit Findings for April 18th
More informationA Presentation to: Project Advisory Group Meeting #6
A Presentation to: Project Advisory Group Meeting #6 March 25, 2015 Agenda Introductions Action items from last PAG meeting (February 25, 2015) Public involvement update Status of April public meetings
More informationDraft Year 2040 Cost Feasible Plan
Year 2040 Plan Ranking of Desires Plan Projects And Matching of Available Revenues Palm Beach Metropolitan Planning Organization (MPO) Technical Advisory Committee (TAC) Citizens Advisory Committee (CAC)
More informationMEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting
COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation
More informationUpdate of the 2016 TDP and Community Involvement. HART Board Meeting September 14, 2015
Update of the 2016 TDP and Community Involvement HART Board Meeting September 14, 2015 Transit Development Plan (TDP) 10-year business plan FDOT requirement Major update every 5 years FY2012 major update
More informationHAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT
HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem
More informationTENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS
Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department
More informationArlington County Board Meeting Project Briefing. October 20, 2015
Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationPURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40
PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major
More informationPublic Informational Meeting
Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives
More informationIMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:
IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),
More informationMETRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017
METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017 Orange Line BRT Project What is the Orange Line project? 17-mile
More informationMain Line System Recommendations
(Existing) Main Line System Recommendations This system recommendation focuses mobility investment in a central main line corridor proximate to I-290. A bus rapid transit (BRT) line at each end of the
More informationKING STREET PILOT STUDY PUBLIC MEETING
KING STREET PILOT STUDY PUBLIC MEETING 2017.02.13 PUBLIC WORK with GEHL STUDIO / NEW YORK SWERHUN ASSOCIATES SAM SCHWARTZ CONSULTING LLC STARTING POINTS 17 1 - TRANSIT FIRST! Transit service is beyond
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The
More informationFirst Brainstorm Session Purpose & Need Tampa Bay History Center Tuesday March 7, 2016
First Brainstorm Session Purpose & Need Tampa Bay History Center Tuesday March 7, 2016 1 Welcome & Opening Remarks Jean Duncan, P.E., Director City of Tampa Transportation and Stormwater Services Department
More informationState Route 189 Project and Draft Resolution of Support. November 2014
State Route 189 Project and Draft Resolution of Support November 2014 Corridor Location Image sources: ADOT Statewide and National Importance: CANAMEX Corridor Image source: FHWA Statewide and National
More informationKING STREET TRANSIT PILOT
KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot UPDATE Average streetcar travel times in continued to show similar trends as first observed in November. The most significant
More informationA DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer
A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer Agenda Dashboard 2019 Project Advertisements for Construction 2019 New Projects
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationCLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet
CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS Policy Session Worksheet Presentation Date: 10/10/17 Approx. Start Time: 1:30 PM Approx. Length: 60 minutes Presentation Title: An Update on the Sunrise Highway
More informationCell: (408) Release MA June 25, 2012
VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara
More informationFLORIDA, TAMPA MSA, AND BRANDON OVERVIEW
, TAMPA MSA, AND BRANDON OVERVIEW OVERVIEW ECONOMY Florida s economy has undergone a metamorphosis over the past decade, shifting from the tourism industry to the high technology, life sciences, services,
More informationTRANSPORTATION PROGRAMS
High Speed Transit Corridor Studies Rail/Freight Session 2011 ITE/MSA Spring Conference Black Canyon Conference Center Phoenix, Arizona March 9, 2011 The Maricopa Association of Governments (MAG) is the
More informationTRANSPORTATION ELEMENT
Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...
More informationCharlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018
Charlotte Regional Express Lane Facilities: I-485 and US 74 North Carolina Turnpike Authority March 21, 2018 NC Turnpike Authority Overview Created in 2002 by the General Assembly Authorized to design,
More informationWhy we re here: For educational purposes only
Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)
More informationMemo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network
Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR
More informationScore. Category. Access Aesthetics Community Resources
NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The
More informationSCOPING INFORMATION PACKET
SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,
More informationUpdate on Route 1 Efforts
County of Fairfax, Virginia Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Route 1 Corridor 16- mile section
More informationROUTE 630 DIVERGING DIAMOND INTERCHANGE
ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,
More informationTHE RICHMOND REGION Transportation Priority Projects
Priority Order Project Description Estimated Need (in millions) 1* Main Street Station Phase III - Station facility improvements Route 360 East of I-295 Widen to 6 & 8 lanes (I-295 to Walnut Grove Rd)
More informationAPPENDIX G MULTI-USE TRAILS DOWNTOWN LAKELAND
MULTI-USE TRAILS DOWNTOWN LAKELAND POINCIANA PARKWAY Multi-Use Trails Trail Name From To Status Regional Network Surface Length Present Day Cost Chain-of-Lakes Trail Bridge South of US 17/92 North of US
More informationGeorgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.
Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide
More informationFuller/Fuller Heights Road Improvements
Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to
More informationDulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009
Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road
More informationDRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026
Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway
More information// Atlanta Streetcar System Plan
// Atlanta Streetcar System Plan Citywide Conversation April 23, 2015 4/23/2015 Atlanta BeltLine // 2015 Page 1 // Overview A Supplement to the Connect Atlanta Plan and the ABI Strategic Implementation
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationAPPENDIX A Florida Clerk of Court s Offices
APPENDIX A Florida Clerk of Court s Offices Alahua County Baker County Bay County 201 E. University Ave. 339 E. Macclenny Ave.P.O. Box 2269 Gainesville, FL 32602 Macclenny, FL 32063Panama City, FL 32402
More information2009 Summary Report for: Courtney Campbell
Page 1 of 7 2009 Summary Report for: Courtney Campbell Contact Information Full Name: Lori Snively Address: 11201 N. McKinley Drive, MS 7-500 City: Tampa State: FL Zip: 33612 Phone: 813-975-6405 Fax: 813-975-6443
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More informationPresented By: Deputy Executive Director February 17, 2011
TRANSPORTATION PROJECT PRIORITIZATION Presented By: Camelia Ravanbakht, Ph.D. Ca e a aaba t,.. Deputy Executive Director February 17, 2011 OVERVIEW 2034 Long-Range g Transportation Plan (LRTP) Process
More informationSANDAG s Regional Transportation Plan
SANDAG s Regional Transportation Plan Oceanside 5 Camp Pendleton Carlsbad P A C C I I F I C C O O C C E E A A N N 472 398 76 Encinitas 399 78 Solana Beach 472 Vista 15 San Marcos 399 399 470 610 Escondido
More informationChapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT
: Short Range Transit Plan Preferred Alternative August 2018 Table of Contents Executive Summary... 1 Preferred Alternative... 3 Best Practices for Route Design... 3 Project Goals... 4 Preferred Alternative...
More informationDRAFT Subject to Modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 9 From: Date: Subject: Staff May 16, 2013 Council Meeting Memorandum of Understanding for Tri-Rail Coastal Link