KIRKLAND LAKE GOLD REPORTS RECORD ANNUAL AND QUARTERLY PRODUCTION

Size: px
Start display at page:

Download "KIRKLAND LAKE GOLD REPORTS RECORD ANNUAL AND QUARTERLY PRODUCTION"

Transcription

1 KIRKLAND LAKE GOLD REPORTS RECORD ANNUAL AND QUARTERLY PRODUCTION Trnt, Ontari January 11, Kirkland Lake Gld Ltd. ( Kirkland Lake Gld r the Cmpany ) (TSX:KL) (NYSE:KL) (ASE:KLA) tday annunced recrd annual and quarterly prductin fr the full-year and furth quarter ( Q ) f 2017, respectively. Cmparative infrmatin fr the full-year and furth quarter ("Q4 2016") f 2016 includes results fr the Fsterville, Csm and Stawell mines prir t the merger between Kirkland Lake Gld Inc. and Newmarket Gld Inc. n Nvember 30, 2016 and results fr the Hlt and Taylr mines prir t the acquisitin f St. Andrew Gldfields Ltd n January 26, All dllar amunts are expressed in U.S. dllars, unless therwise nted. Highlights f 2017 and Q perating results: Cnslidated full-year 2017 prductin f 596,405 unces, beating imprved guidance f 580, ,000 unces Recrd full-year prductin at all perating mines, including 263,845 unces at Fsterville, 194,237 unces at Macassa, 66,677 unces at Hlt and 50,764 unces at Taylr Cnslidated quarterly prductin in Q ttaling 166,579 unces, a 9% increase frm Q and 20% higher than Q Recrd quarterly prductin in Q at Fsterville (79,157 unces), Hlt (19,263 unces) and Taylr (16,538 unces), secnd best quarter ever at Macassa (51,608 unces). Other 2017 highlights: Strng grwth in mineral reserves Fsterville mineral reserves mre than dubled in 2017 t 1,030,000 unces at an average grade f 17.9 grams per tnne ( g/t ) Macassa mineral reserves increased 37% t 2,010,000 unces at an average grade f 20.8 g/t Imprved balance sheet strength Cash and cash equivalents f apprximately $230 millin at December 31, 2017 Debt eliminated: 6.0% cnvertible debentures repaid June 30, 2017; 7.5% cnvertible debentures matured December 31, 2017 (cnverted int 4,505,393 cmmns shares) Industry-leading sharehlder returns KL tp perfrming stck n S&P/TSX Cmpsite Index in 2017 with share price increasing 174.5% (fr full-year 2017) Quarterly dividend payment annunced in March, dubled t $0.02/share fr January 15, 2018 payment 5.4 millin cmmn shares repurchased fr C$76.5 millin thrugh nrmal curse issuer bid Tny Makuch, President and Chief Executive Officer f Kirkland Lake Gld, cmmented: We had a successful year in 2017, achieving recrd results at all f ur perating mines, beating ur imprved cnslidated prductin guidance, which had been increased three times during the year, and reprting slid grwth in mineral reserves. Particularly encuraging was ur strng finish t the year, with Q being ur best quarter ever fr prductin. Leading the way was Fsterville, where full-year prductin increased 74% frm the previus year, and recrd furth quarter results reflected an average grade f 21.5 g/t, by far the highest quarterly average ever achieved by the mine. Over the last year, Fsterville has jined ur Macassa mine as ne f the wrld s highest-grade gld prducers, with mineral reserve unces and the average reserve grade mre than dubling and annual prductin capacity increasing t ver a quarter millin unces per year, with mre grwth t cme. 1

2 Lking ahead, we plan t keep building mmentum thrugh additinal prductin grwth, imprved unit csts, as well as further increases t mineral reserves and resurces based and cntinued explratin success. We will als remain fcused n generating sharehlder returns thrugh cntinued peratinal effectiveness, strng financial perfrmance and disciplined investment fr future grwth. In additin, we ffer a cmpetitive quarterly dividend, with grwth ptential, and will be pprtunistic when it cmes t future share repurchases. Supprting all f ur activities is a strng balance sheet, with cash and cash equivalents f apprximately $230 millin at December 31, 2017 and n debt. Furth Quarter and Full-Year 2017 Operating Results Q Q Q FY 2017 FY 2016 Fsterville Ore Milled (tnnes) 118, , , , ,066 Grade (g/t Au) Recvery (%) Gld Prductin (zs) 79,157 44,406 61, , ,755 Macassa Ore Milled (tnnes) 119, ,288 93, , ,633 Run-f-Mine 119,130 74,745 92, , ,353 Lw-Grade n/a 27,543 1,014 22,011 65,280 Grade (g/t Au) Run-f-Mine Lw-Grade n/a Recvery (%) Gld Prductin (zs) 51,608 52,318 48, , ,167 Hlt Ore Milled (tnnes) 127, , , , ,048 Grade (g/t Au) Recvery (%) Gld Prductin (zs) 19,263 15,761 16,995 66,677 57,086 Taylr Ore Milled (tnnes) 89,297 48,254 71, , ,231 Grade (g/t Au) Recvery (%) Gld Prductin (zs) 16,538 10,048 11,066 50,764 42,639 Operatins n Care & Maintenance 2 Csm Gld Prductin (zs) n/a 13,307 1,290 20,595 55,765 Hllway Gld Prductin (zs) 13 9,825 n/a ,135 Stawell Gld Prductin (zs) n/a 6,971 n/a n/a 32,204 Gld Prductin (excluding peratins n care and maintenance r sld in 2017) 166, , , , ,647 Ttal Cnslidated Prductin (zs) 166, , , , ,751 1) The Cmpany s Csm Mine in Australia was placed n care and maintenance effective June 30, 2017 (see News Release dated May 4, 2017). The Cmpany s Hllway Mine in Canada was transitined t care and maintenance effective December 31, 2016 (see News Release dated December 12, 2016). The Cmpany s Stawell Mine in Australia was put n care and maintenance effective December 13, 2016 (see News Release dated December 12, 2016) and was subsequently sld n December 21, 2017 (see News Release dated December 11, 2017). 2) Prductin numbers may nt add t ttal due t runding. 2

3 Perfrmance Against Full-Year 2017 Prductin Guidance Canadian Mines Australian Mines Macassa Hlt Taylr Fsterville Csm Cnslidated 2017 Guidance (,000 zs) Prductin (zs) 194,237 66,677 50, ,845 20, ,405 Full-year 2017 prductin frm currently perating mines ttaled 575,523 unces, an increase f 35% frm cmparable full-year 2016 levels. Including prductin frm mines currently n care and maintenance, including the Stawell mine, which was sld n December 21, 2017, ttal cnslidated prductin fr 2017 ttaled 596,405 unces, 10% higher than the 542,751 unces prduced in Ttal prductin frm mines n care and maintenance (including Stawell prir t its sale) ttaled 20,882 unces in 2017 cmpared t 116,104 unces in Prductin in Q frm perating mines ttaled 166,566 unces, an increase f 36% frm cmparable prductin f 122,533 unces in Q and 21% higher than the 137,801 unces prduced the previus quarter. Including prductin frm Csm, Hllway and Stawell, ttal cnslidated prductin in Q ttaled 166,579 unces, a 9% increase frm Q and 20% higher than Q Review f Operating Mines Fsterville The Fsterville Mine achieved a recrd quarter in Q4 2017, prducing 79,157 unces f gld, an increase f 78% frm 44,406 unces in Q and 29% frm 61,535 unces the previus quarter. The average grade fr the quarter f 21.5 g/t was the highest average quarterly grade ever reprted by the mine, and cmpared t average grades f 8.5 g/t in Q and 14.1 g/t in Q A ttal f 118,877 tnnes were prcessed during Q with average recveries f 96.3%, which cmpared t 176,242 tnnes and average recveries f 92.4% in Q and 143,326 tnnes at average recveries f 94.7% the previus quarter. The lwer ttal tnnes cmpared t bth prir perids reflected a fcus n maximizing the extractin f higher-grade stpes within the Lwer Phenix system during Q Fr full-year 2017, Fsterville prduced a recrd 263,845 unces, a 74% increase frm full-year 2016 prductin f 151,755 unces. A ttal f 547,476 tnnes was prcessed in 2017 at an average grade f 15.8 g/t and average recveries f 95.0%, which cmpared t 693,066 tnnes at an average grade f 7.6 g/t and average recveries f 90.1% the prir year. During 2017, undergrund mineral reserves mre than dubled at Fsterville, t 1,030,000 unces, with the average undergrund mineral reserve grade increasing t 17.9 g/t, which cmpared t 490,000 unces at an average grade f 9.8 g/t as at December 31, Macassa The Macassa Mine prduced 51,608 unces f gld in Q4 2017, the mine s secnd-best quarter f prductin ever. Prductin at Macassa in Q cmpared t recrd quarter prductin f 52,318 unces in Q and 48,206 unces in Q A ttal f 119,130 tnnes were milled during Q at an average grade f 13.9 g/t with average recveries f 96.8%, which cmpared t 102,288 tnnes at an average grade f 16.3 g/t and recveries f 97.6% in Q and 93,391 tnnes at an average grade f 16.5 g/t and average recveries f 97.4% the previus quarter. The imprvement in prductin frm Q reflected higher run-f-mine tnnes prcessed, which mre than ffset the impact f lwer average grades as a small number f high-grade stpes did nt perfrm as expected. 3

4 Fr full-year 2017, prductin at Macassa was a recrd 194,237 unces, a 11% increase frm full-year 2016 prductin f 175,167 unces. A ttal f 409,065 tnnes was prcessed in 2017 at an average grade f 15.2 g/t and average recveries f 97.1%, which cmpared t 396,633 tnnes at an average grade f 14.1 g/t and average recveries f 97.1% the prir year. A 17% increase in run-f-mine tnnes prcessed mre than ffset a significant reductin in tnnes prcessed frm lw-grade stckpiles in accunting fr the increase in ttal mill thrughput. The higher vlume f run-f-mine tnnes als accunted fr the imprvement in the average grade year ver year. Hlt During Q4 2017, the Hlt mine achieved recrd quarterly prductin f 19,263 unces, representing increases f 22% frm Q and 13% frm the previus quarter, mainly reflecting a cmbinatin f higher thrughput and an imprved average grade cmpared t bth prir perids. A ttal f 127,493 tnnes at an average grade f 5.0 g/t was prcessed frm the Hlt Mine at the Hlt Mill during Q4 2017, cmpared t 113,499 tnnes at an average grade f 4.6 g/t fr the same perid a year earlier and 124,394 tnnes at an average grade f 4.5 g/t in Q Recveries averaged 94.9% in Q4 2017, which cmpared t average recveries f 94.5% fr bth Q and Q Prductin at Hlt fr full-year 2017 was a recrd 66,677 unces, based n prcessing a ttal f 462,987 tnnes at and average grade f 4.7 g/t and average recveries f 94.8%. Prductin in 2017 increased 17% frm 57,086 unces in 2016, when 416,048 tnnes were prcessed at an average grade f 4.5 g/t and average recveries f 94.5 g/t. Higher prductin reflected a significant increase in tnnes prcessed due primarily t imprved stpe prductivity, a new mining hrizn being accessed in Zne 6 and favurable sequencing. Taylr Gld prductin frm the Taylr Mine during Q ttaled 16,538 unces, based n 89,297 tnnes prcessed at an average grade f 6.0 g/t and average recveries f 96.2%. Q prductin cmpared favurably t prductin f 10,048 unces in Q4 2016, based n prcessing 48,254 tnnes at an average grade f 6.7 g/t and average recveries f 96.1%, and prductin f 11,066 unces in Q3 2017, based n 71,897 tnnes prcessed at an average grade f 5.0 g/t and average recveries f 95.5%. The increase in ttal tnnes prcessed frm Q largely reflected the additin f a number f stpes t the mine plan fr the secnd half f 2017, while average grades reflected mine sequencing. The increase in prductin frm the previus quarter was mainly due t higher tnnes, which mre than ffset a reductin in the average grade. Prductin at Taylr fr full-year 2017 ttaled 50,764 unces, an increase f 19% frm the 42,639 unces prduced in A ttal f 292,003 tnnes were prcessed in 2017 at an average grade f 5.6 g/t and average recveries f 96.2%, which cmpared t ttal tnnes prcessed f 199,231 tnnes at an average grade f 6.9 g/t and average recveries f 96.5% in the prir year. The significant increase in tnnes prcessed reflected a higher number f stpes available fr mining, while the reductin in the average grade was cnsistent with planned stpe grades. Csm On June 30, 2017, Kirkland Lake Gld suspended peratins at the Csm Mine with the Mine being placed n care and maintenance. N prductin was recrded frm Csm in Q4 2017, which cmpared t prductin f 13,307 unces in Q (frm prcessing 157,770 tnnes at an average grade f 2.8 g/t and average recveries f 94.5%) and 1,290 unces in Q (frm prcessing 15,243 tnnes f stckpiled material at an average grade f 2.8 g/t and average recveries f 94.9%). Fr full-year 2017, a ttal f 20,595 unces was prduced at Csm frm prcessing 259,729 tnnes at an average grade f 2.6 g/t and average recveries f 95.0%, which cmpared t prductin f 55,765 unces in 2016 frm prcessing 646,848 tnnes at an average grade f 2.9 g/t and average recveries f 93.6%. 4

5 Sale f Stawell Gld Mines Pty Ltd. On December 21, 2017, the Cmpany cmpleted a transactin t sell t an affiliate f Arete Capital Partners Ltd. ( Arete ) all the issued and utstanding cmmn shares f its indirectly held whlly wned subsidiary, Stawell Gld Mines Pty Ltd., which hlds the Stawell mine. Pursuant t the terms f the transactin, the Cmpany received $6.25 millin in cash cnsideratin upn clsing and retains a 2.5% net smelter return ryalty n the Stawell mine. Nrmal Curse Issuer Bid ( NCIB ) During Q4 2017, the Cmpany invested C$26,263,786 related t the purchase 1,553,500 Kirkland Lake Gld cmmn shares under the Cmpany s NCIB. Since the cmmencement f the NCIB prgram in May 2017, the Cmpany has purchased a ttal f 5,443,400 cmmn shares fr cancellatin at an average price f C$14.05 fr a ttal f C$76,479,700. Under the NCIB, a maximum f 15,186,571 Kirkland Lake Gld shares can be purchased fr cancellatin. Accrdingly, the Cmpany may purchase an additinal 9,743,171 cmmn shares fr cancellatin thrugh the NCIB until the prgram s expiry in May % Cnvertible Debentures The C$61.0 millin in 7.5% unsecured cnvertible debentures f Old Kirkland Lake Gld matured n December 31, In accrdance with the terms f the trust indenture, during Q4 2017, debenture hlders elected t cnvert apprximately C$61,724,000 at a cnversin price f $13.70 per share, being a cnversin rate f cmmn shares fr each $1,000 in principal held. As a result, the Cmpany issued an aggregate f 4,505,393 cmmn shares with respect t the cnversin f the debentures. In additin, the Cmpany paid an aggregate amunt f C$324,116 in cash with respect t the utstanding debentures nt cnverted and interest ttaling C$2,139,968 with respect t all f the debentures. The debentures frmerly traded n the TSX under the symbl KLG.DB.A. Qualified Persns Pierre Rcque, P.Eng., Vice President, Canadian Operatins and Ian Hlland, FAusIMM, Vice President Australian Operatins are qualified persns as defined in Natinal Instrument and have reviewed and apprved disclsure f the technical infrmatin and data in this news release. Abut Kirkland Lake Gld Ltd. Kirkland Lake Gld Ltd. is a mid-tier gld prducer with ttal prductin in 2017 f 596,405 unces f gld frm mines in Canada and Australia. The prductin prfile f the cmpany is anchred frm tw high-grade, lwcst peratins, including the Macassa Mine lcated in Nrtheastern Ontari and the Fsterville Mine lcated in the state f Victria, Australia. Kirkland Lake Gld's slid base f quality assets is cmplemented by district scale explratin ptential, supprted by a strng financial psitin with extensive management and peratinal expertise. Fr further infrmatin n Kirkland Lake Gld and t receive news releases by , visit the website Cautinary Nte Regarding Frward-Lking Infrmatin This press release cntains frward lking statements and "frward-lking infrmatin" within the meaning f applicable securities laws, including statements regarding the plans, intentins, beliefs and current expectatins f Kirkland Lake Gld with respect t future business activities and perating perfrmance. Frward-lking infrmatin is ften identified by the wrds "may", "wuld", "culd", "shuld", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" r similar expressins and include infrmatin regarding: (i) the amunt f future 5

6 prductin ver any perid; (ii) assumptins relating t revenues, perating cash flw and ther revenue metrics set ut in the Cmpany's disclsure materials; and (iii) future explratin plans. Investrs are cautined that frward-lking infrmatin is nt based n histrical facts but instead reflect Kirkland Lake Gld's management's expectatins, estimates r prjectins cncerning future results r events based n the pinins, assumptins and estimates f management cnsidered reasnable at the date the statements are made. Althugh Kirkland Lake Gld believes that the expectatins reflected in such frward-lking infrmatin are reasnable, such infrmatin invlves risks and uncertainties, and undue reliance shuld nt be placed n such infrmatin, as unknwn r unpredictable factrs culd have material adverse effects n future results, perfrmance r achievements f the cmbined cmpany. Amng the key factrs that culd cause actual results t differ materially frm thse prjected in the frward-lking infrmatin are the fllwing: the ability f Kirkland Lake Gld t successfully integrate the peratins and emplyees f its Canadian and Australian peratins; the future develpment and grwth ptential f the Canadian and Australian peratins; the future explratin activities planned at the Canadian and Australian peratins and anticipated effects theref; changes in general ecnmic, business and plitical cnditins, including changes in the financial markets; changes in applicable laws; and cmpliance with extensive gvernment regulatin. This frward-lking infrmatin may be affected by risks and uncertainties in the business f Kirkland Lake Gld and market cnditins. This infrmatin is qualified in its entirety by cautinary statements and risk factr disclsure cntained in filings made by Kirkland Lake Gld, including its annual infrmatin frm, financial statements and related MD&A fr the financial year ended December 31, 2016 and the financial statements and related MD&A fr the third quarter ended September 30, 2017, filed with the securities regulatry authrities in certain prvinces f Canada and available at Shuld ne r mre f these risks r uncertainties materialize, r shuld assumptins underlying the frward-lking infrmatin prve incrrect, actual results may vary materially frm thse described herein as intended, planned, anticipated, believed, estimated r expected. Althugh Kirkland Lake Gld has attempted t identify imprtant risks, uncertainties and factrs which culd cause actual results t differ materially, there may be thers that cause results nt t be as anticipated, estimated r intended. Kirkland Lake Gld des nt intend, and d nt assume any bligatin, t update this frward-lking infrmatin except as therwise required by applicable law. FOR FURTHER INFORMATION PLEASE CONTACT Anthny Makuch, President, Chief Executive Officer & Directr Phne: tmakuch@klgld.cm Mark Utting, Vice-President, Investr Relatins Phne: mutting@klgld.cm 6

UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, DC FORM 8-K

UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, DC FORM 8-K p UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, DC 20549 FORM 8-K CURRENT REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE SECURITIES EXCHANGE ACT OF 1934 Date f reprt (Date f earliest event

More information

Cairo, August 11, 2010 TMG Holding reports for 1H 2010: EGP 3.5 BN consolidated revenue,11% higher than same

Cairo, August 11, 2010 TMG Holding reports for 1H 2010: EGP 3.5 BN consolidated revenue,11% higher than same TMG Hlding First Six Mnths and Secnd Quarter ending June, Earning Release Cair, August 11, TMG Hlding reprts fr 1H : EGP 3.5 BN cnslidated revenue,11% higher than same perid f last year, EGP 662 MN cnslidated

More information

ASISA STANDARD ON UNCLAIMED ASSETS

ASISA STANDARD ON UNCLAIMED ASSETS ASISA STANDARD ON UNCLAIMED ASSETS 1. Backgrund This Standard prvides guidance fr members n the treatment f unclaimed assets. The LOA Cde n Unclaimed Assets was used as the basis t develp this Standard

More information

Forest and Prairie Protection Act and Regulations Parts I and II - Legislative Review and Regulatory Reform Discussion Paper

Forest and Prairie Protection Act and Regulations Parts I and II - Legislative Review and Regulatory Reform Discussion Paper Discussin Paper Alberta Agriculture and Frestry Frest and Prairie Prtectin Act and Regulatins Parts I and II - Legislative Review and Regulatry Refrm Discussin Paper The Alberta gvernment is reviewing

More information

PBN Route Structure Alaska Sub-Committee AACA Co-Chair Dennis Parrish

PBN Route Structure Alaska Sub-Committee AACA Co-Chair Dennis Parrish ALASKA AIR CARRIERS ASSOCIATION 2301 Merrill Field Drive A-3, Anchrage, Alaska 99501 907-277-0071 www.alaskaaircarriers.rg PBN Rute Structure Alaska Sub-Cmmittee AACA C-Chair Dennis Parrish d.parrish@cp.cm

More information

Joyce Corporation Ltd

Joyce Corporation Ltd Jyce Crpratin Ltd - est 1886 Jyce Crpratin Ltd Infrmatin Handut May 2012 1 Jyce Crp Brief Overview Jyce is listed n the Australian Securities Exchange as JYC. Jyce's business has links back t 1886. An

More information

SUNWAY REIT PROPOSES TO ACQUIRE AN INDUSTRIAL PROPERTY FOR RM91.5 MILLION IN SHAH ALAM, SELANGOR

SUNWAY REIT PROPOSES TO ACQUIRE AN INDUSTRIAL PROPERTY FOR RM91.5 MILLION IN SHAH ALAM, SELANGOR MEDIA RELEASE 11 January 2017 SUNWAY REIT PROPOSES TO ACQUIRE AN INDUSTRIAL PROPERTY FOR RM91.5 MILLION IN SHAH ALAM, SELANGOR Maiden fray int prime industrial prperty in a strategic lcatin Lng tenure

More information

Terra Nova Development

Terra Nova Development Canada-Newfundland and Labradr Industrial Benefits Public Quarterly Reprt April 01, 2013 June 30, 2013 Table f Cntents Sectin 1.0 Intrductin... 3 Sectin 2.0 Prject Activity and Benefits Accmplishments...

More information

Runway Expansion Impact Assessment Oshawa Municipal Airport. Presentation To Development Services Committee City of Oshawa May 30, 2011

Runway Expansion Impact Assessment Oshawa Municipal Airport. Presentation To Development Services Committee City of Oshawa May 30, 2011 Runway Expansin Impact Assessment Oshawa Municipal Airprt Presentatin T Develpment Services Cmmittee City f Oshawa May 30, 2011 2 Agenda Airprt s Ecnmic Imprtance Backgrund Scpe f Wrk Prpsed Runway Expansin

More information

National Business Ethics Survey 2013 Summary - US

National Business Ethics Survey 2013 Summary - US INSTITUTE OF BUSINESS ETHICS Natinal Business Ethics Survey 2013 Summary - US Institute f Business Ethics 24 Greencat Place Lndn SW1P 1BE www.ibe.rg.uk The Natinal Business Ethics Survey f the US wrkfrce

More information

Terra Nova Development

Terra Nova Development Canada-Newfundland and Labradr Industrial Benefits Public Quarterly Reprt January 01, 2013 March 31, 2013 Table f Cntents Sectin 1.0 Intrductin... 3 Sectin 2.0 Prject Activity and Benefits Accmplishments...

More information

SUNWAY REIT PROPOSES TO ACQUIRE MIXED-USE SUNWAY CLIO PROPERTY TO CAPITALISE ON THE BUSINESS SYNERGIES OF OUR ASSETS PORTFOLIO IN SUNWAY CITY

SUNWAY REIT PROPOSES TO ACQUIRE MIXED-USE SUNWAY CLIO PROPERTY TO CAPITALISE ON THE BUSINESS SYNERGIES OF OUR ASSETS PORTFOLIO IN SUNWAY CITY MEDIA RELEASE 3 August 2017 SUNWAY REIT PROPOSES TO ACQUIRE MIXED-USE SUNWAY CLIO PROPERTY TO CAPITALISE ON THE BUSINESS SYNERGIES OF OUR ASSETS PORTFOLIO IN SUNWAY CITY The ttal purchase cnsideratin f

More information

Concur Travel Tips and Tricks

Concur Travel Tips and Tricks Cncur Travel Tips and Tricks Items cvered in this dcument: (can use the link t mve t the specific sectin) Main Search Page Air Results Page Upcming Trips Keybard / Tabbing Optin Time f day Identifiers

More information

APPENDIX D Safety Performance Review

APPENDIX D Safety Performance Review APPENDIX D Safety Perfrmance Review Safety Perfrmance Review Curtneypark Drive East Class EA & Preliminary Design Prepared fr: City f Mississauga Prepared by: Stantec Cnsulting Ltd. 300-675 Cchrane Dr,

More information

Attachments: Sample letter and addresses of Iowa s congressional delegation Airports United Airport Financing Priorities in 2015

Attachments: Sample letter and addresses of Iowa s congressional delegation Airports United Airport Financing Priorities in 2015 May 5, 2015 «AddressBlck» «GreetingLine» The FAA Reauthrizatin bill is at a critical juncture. It is vitally imprtant that ur Iwa Cngressinal delegatin understands the imprtance f this legislatin t Des

More information

Revenue up 4.8% in the first nine months of Quarterly financial information for the first nine months of

Revenue up 4.8% in the first nine months of Quarterly financial information for the first nine months of n 12/1/2009 at 4:25 PM Paris, 13 Nvember 2009 Revenue up 4.8% in the first nine mnths f 2009 Quarterly financial infrmatin fr the first nine mnths f 2009 1 4.8% increase in cnslidated revenue t 1,976.5

More information

For personal use only. Results Presentation H1FY13

For personal use only. Results Presentation H1FY13 Results Presentatin H1FY13 Andrew Bellamy, Chief Executive Officer 22 February 2012 Imprving margins driving perfrmance Margins cntinue t imprve at USA peratins 5.2% fr H1 cmpared with 1.2% fr the crrespnding

More information

For personal use only

For personal use only Fr persnal use nly Statement t Australian Securities Exchange August 23, 2018 FLIGHT CENTRE TRAVEL GROUP RELEASES RECORD FULL YEAR RESULTS Highlights Recrd underlying prfit befre tax (PBT) f $384.7millin

More information

Austal Ltd Andrew Bellamy Chief Executive Officer

Austal Ltd Andrew Bellamy Chief Executive Officer Austal Ltd Andrew Bellamy Chief Executive Officer ASX Sptlight Cnference Andrew Bellamy, Chief Executive Officer February 2013 Austal Funded in 1988 and listed n the Australian Stck Exchange in 1998, Austal

More information

Camp Scholarship Application

Camp Scholarship Application Please mail all crrespndence t: Camp Fire Minnesta Attn: Camp Schlarship 429 Minnetnka Blvd. Suite 202 St. Luis Park, MN 55416 Camp Schlarship Applicatin Please review these guidelines and cmplete the

More information

Investor Update Q4 FY14 (January March 2014)

Investor Update Q4 FY14 (January March 2014) Investr Update Q4 FY14 (January March 2014) Brand Business Highlights Grwth and Expansin Opened 3 Exclusive Brand Outlets (EBOs) expanding presence in new cities including Thrissur (Kerala), Ganganagar

More information

MISSION VISION VALUES

MISSION VISION VALUES MISSION VISION VALUES TO BRING PEOPLE TOGETHER SAFELY AND SMARTLY TO BE THE BEST AIRLINE TO FLY WITH, WORK FOR AND INVEST IN SAFETY, INNOVATION, CLIENT, FOCUS, RESULTS-DRIVEN AND SUSTAINABILITY GOL DAY

More information

Strand 3- Transportation: Airlines

Strand 3- Transportation: Airlines Strand 3- Transprtatin: Airlines Hw ppular is air travel? In times f peace, apprximately millin peple take a plane trip each day. Air Transprtatin Histry Wright brther s first plane: Passenger travel n

More information

Posting Open Date: 08/20/2018 Posting Close Date: 10/08/2018 (Please note the posting will close at 11:59pm)

Posting Open Date: 08/20/2018 Posting Close Date: 10/08/2018 (Please note the posting will close at 11:59pm) Bilingual Service and Sales Agent - Hme Based (Vancuver) Lking fr a great place t wrk? A place where an award-winning culture means empwerment, teamwrk and a passin fr what yu d? Then think WestJet. It's

More information

BACKGROUNDER Vancouver International Airport - Economic Generator for British Columbia

BACKGROUNDER Vancouver International Airport - Economic Generator for British Columbia BACKGROUNDER Vancuver Internatinal Airprt - Ecnmic Generatr fr British Clumbia Vancuver Internatinal Airprt (YVR) emplys mre than 23,600 peple and is hme t 400 businesses. In 2010 it cntributed $1.9 billin

More information

INTERIM MANAGEMENT STATEMENT FOR THE PERIOD FROM 1 JANUARY TO 25 APRIL 2012

INTERIM MANAGEMENT STATEMENT FOR THE PERIOD FROM 1 JANUARY TO 25 APRIL 2012 25 APRIL 2012 CAPITAL SHOPPING CENTRES GROUP PLC INTERIM MANAGEMENT STATEMENT FOR THE PERIOD FROM 1 JANUARY TO 25 APRIL 2012 David Fischel, Chief Executive f Capital Shpping Centres Grup PLC, cmmented:

More information

CHAPTER 1.0 INTRODUCTION

CHAPTER 1.0 INTRODUCTION CHAPTER 1.0 INTRODUCTION 1.1 PROPOSED AIR SERVICE AND FAA RESPONSIBILITY This dcument is the Envirnmental Assessment (EA) prepared by the Twn f Mammth Lakes and United Airlines t analyze, dcument, and

More information

Macquarie WA Forum Presentation

Macquarie WA Forum Presentation Macquarie WA Frum Presentatin Andrew Bellamy, Chief Executive Officer 17 Octber 2013 Austal verview Austal is a leading prime defence cntractr. Funded in 1988 and listed n the Australian Stck Exchange

More information

QUT Digital Repository:

QUT Digital Repository: QUT Digital Repsitry: http://eprints.qut.edu.au/27550 CRC fr Cnstructin Innvatin (2006) Submissin t Brisbane City Cuncil : Draft Brisbane Ecnmic Develpment Plan. The Participants f the CRC fr Cnstructin

More information

ALI ZAGHARI Deputy District Director Caltrans, District 7 Division of Traffic Operations

ALI ZAGHARI Deputy District Director Caltrans, District 7 Division of Traffic Operations ALI ZAGHARI Deputy District Directr Caltrans, District 7 Divisin f Traffic Operatins Backgrund Califrnia law permits ILEV (Inherently Lw Emissin Vehicles) and previusly hybrid vehicles t access HOV lanes

More information

THIS IS UNCHARTED ADVENTURE

THIS IS UNCHARTED ADVENTURE K i n g s W h a r f, B er m u d a THIS IS UNCHARTED ADVENTURE Send yur clients n a memr y making explre-a-thn with savings the whle family can dive int. Here s what yu need t knw: BOGO50 50% ff secnd guest.

More information

New York Action Team SWAP Federal Aviation Administration. Teterboro User Group Brief. Leo Prusak, Manager of Tactical Operations.

New York Action Team SWAP Federal Aviation Administration. Teterboro User Group Brief. Leo Prusak, Manager of Tactical Operations. New Yrk Actin Team SWAP 2013 Teterbr User Grup Brief By: Le Prusak, Manager f Tactical Operatins Date: March 21, 2013 New Yrk Actin Team bjectives Imprve the flw f traffic and airprt peratins in the New

More information

PORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE

PORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE PORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE REVIEW ITINERARY UPON RECEIPT Please review yur travel itinerary prvided by Prter upn receipt. Yu shuld cntact Prter within 24 hurs f receipt f yur itinerary

More information

Parks and Recreation. Goals

Parks and Recreation. Goals Parks and Recreatin Gals The City will: Ensure that new parks and recreatin facilities are designed and lcated t reinfrce and supprt the gals and plicies f the City s Cmprehensive Plan. Prvide parks that

More information

Aviation Business Development Program. Economic Development Committee May 18, 2015

Aviation Business Development Program. Economic Development Committee May 18, 2015 Aviatin Business Develpment Prgram Ecnmic Develpment Cmmittee May 18, 2015 Dallas Airprt System Develpment Aviatin Business Develpment Prgram Cmpanies cnsidering a relcatin r expansin r new aernautical

More information

Concern Worldwide Haiti

Concern Worldwide Haiti Cncern Wrldwide Haiti Transitinal Shelter Prgramme Tabarre Isse A family in their new shelter prvided by Cncern Wrldwide in Haiti Octber 2010 1 Prject Summary: Objective: T prvide safe, secure shelter

More information

STUDENT APPLICATION PROCESS: TIER 1 STUDENTS

STUDENT APPLICATION PROCESS: TIER 1 STUDENTS STUDENT APPLICATION PROCESS: TIER 1 STUDENTS A Tier 1 student must be enrlled in a NJ public schl in his r her Resident schl district fr the entire year (2012-13) immediately preceding enrllment in a Chice

More information

DOT 3 Hour Rule GoJet SOC Master Plan

DOT 3 Hour Rule GoJet SOC Master Plan DOT 3 Hur Rule GJet SOC Master Plan Backgrund The Department f Transprtatin s (DOT) rule establishes a hard time limit f three hurs after which airlines must allw passengers t deplane. While the rule applies

More information

INTERIM RESULTS 2016

INTERIM RESULTS 2016 Trinity Limitedit Stck Cde: 891 9 August Brand Activities Intrductin Cutting Our Clth T Suit Cnditins Highly efficient e stre netwrk Fcus n cre Chinese cnsumers Re-engineering cmpany and supply chain Refcused

More information

committee report Network Rail: Route Utilisation Strategy: Stations Draft for Consultation

committee report Network Rail: Route Utilisation Strategy: Stations Draft for Consultation cmmittee reprt Netwrk Rail: Rute Utilisatin Strategy: Statins Draft fr Cnsultatin Cmmittee Strategy and Prgrammes Date f Meeting 24 June 2011 Date f reprt 31 May 2011 Reprt by Assistant Chief Executive

More information

STATEMENT TO AUSTRALIAN SECURITIES EXCHANGE February 21, Flight Centre Travel Group Releases First Half Results

STATEMENT TO AUSTRALIAN SECURITIES EXCHANGE February 21, Flight Centre Travel Group Releases First Half Results STATEMENT TO AUSTRALIAN SECURITIES EXCHANGE February 21, 2019 Key Pints Flight Centre Travel Grup Releases First Half Results Recrd Sales Ttal transactin value (TTV) exceeded previus 1H recrd (FY18) by

More information

USE OF DURABLE PAVEMENT MARKINGS

USE OF DURABLE PAVEMENT MARKINGS Page 1 f 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION General Pavement markings prvide mtrists with valuable guidance and radway infrmatin. Pavement markings have specific functins; they guide the

More information

Tasmanian Tourism Snapshot

Tasmanian Tourism Snapshot Tasmanian Turism Snapsht Year ending December 2014 Intrductin The Tasmanian Turism Snapsht is published every quarter, using the latest figures frm the Tasmanian Visitr Survey, the Internatinal Visitr

More information

Tiger CAMPus REC WELCOME CAMPERS!

Tiger CAMPus REC WELCOME CAMPERS! Tiger CAMPus REC WELCOME CAMPERS! We are very excited that yu will be jining us this summer in this fun filled active yet educatinal fitness adventure. Our gal is t prvide the highest quality recreatinal

More information

CONTENTS. Aircraft Operations at Airports With FAA Traffic Control Service TABLES. 4. Total Revenue Aircraft Hours, United States Air Carriers..

CONTENTS. Aircraft Operations at Airports With FAA Traffic Control Service TABLES. 4. Total Revenue Aircraft Hours, United States Air Carriers.. \ CONTENTS Page INTRODUCTION 1 AVIATION INDUSTRY TRENDS Air Carrier Trends Air Carrier Fleet General Aviatin Flying and Aircraft Fleet Dmestic Aviatin Fuel Cnsumptin Civil Aircraft and Engine Prductin

More information

Bushveld Minerals acquisition of Bushveld Vametco Limited. December 2017

Bushveld Minerals acquisition of Bushveld Vametco Limited. December 2017 Bushveld Minerals acquisitin f Bushveld Vametc Limited December 2017 Disclaimer 2 These presentatin slides and any ther material prvided with these slides (the Presentatin Materials ) d nt cmprise an admissin

More information

EDUCATIONAL PROGRAM AviationCV. The Better Way. to Fly

EDUCATIONAL PROGRAM AviationCV. The Better Way. to Fly EDUCATIONAL PROGRAM AviatinCV The Better Way t Fly Abut AviatinCV AviatinCV is a cmpany exclusively wrking in the aviatin industry aiming at helping airlines and aviatin prfessinals t get tgether fr a

More information

General Manager, Engineering General Manager, Parks, Recreation & Culture

General Manager, Engineering General Manager, Parks, Recreation & Culture CORPORATE REPORT NO: R069 COUNCIL DATE: MAY 11, 2015 REGULAR COUNCIL TO: Mayr & Cuncil DATE: May 6, 2015 FROM: General Manager, Engineering General Manager, Parks, Recreatin & Culture FILE: 0930-30/093

More information

SMSF Professionals webinar July 2016 update

SMSF Professionals webinar July 2016 update SMSF Prfessinals webinar July 2016 update But first, a little mre abut yu UNCLASSIFIED SMSF prfessinals webinar - July 2016 update 2 Overview Changes t cllectables Safe harbur guidelines fr LRBAs Supprting

More information

Manresa Island Reuse and Economic Impact Analysis Study Public Involvement Process & Summary June 2017

Manresa Island Reuse and Economic Impact Analysis Study Public Involvement Process & Summary June 2017 Manresa Island Reuse and Ecnmic Impact Analysis Study June 2017 The public invlvement prcess fr the Manresa Island Reuse Study used a variety f methds t engage key stakehlders and the public. The elements

More information

Alien Flight Student Program

Alien Flight Student Program Instructins t cmplete the applicatin prcess 1. Visit the TSA website at www.flightschlcandidates.gv 2. In the tp right f the screen click n Create New Student Accunt 3. Fill ut and submit the brief applicatin

More information

Camp BUCKO 2018 Volunteer Application

Camp BUCKO 2018 Volunteer Application Camp BUCKO 2018 Vlunteer Applicatin Thank yu fr yur interest in vlunteering at Camp BUCKO. We hpe yu will be able t jin us as we celebrate ur 23rd year!!! Camp week cmmences Sunday August 12, 2018 and

More information

Lower prices drive WA first time buyers on to the housing ladder

Lower prices drive WA first time buyers on to the housing ladder MEDIA RELEASE Embarged t 00.01 EST 05 December 2017 Lwer prices drive WA first time buyers n t the husing ladder Western Australia s first time buyers are injecting life int the state s prperty market,

More information

For personal use only. FY2013 results presentation

For personal use only. FY2013 results presentation Fr persnal use nly FY2013 results presentatin Andrew Bellamy, Chief Executive Officer 30 August 2013 Fr persnal use nly FY2013 highlights Financial Recrd revenue f $902.8 millin, a 38% increase n FY2012.

More information

WestJet (WJA-T) Last Call Before Takeoff

WestJet (WJA-T) Last Call Before Takeoff (WJA-T) Last Call Befre Takeff July 21, 2015 Gerge Trapkv, CFA Analyst - (416) 364-5148 gtrapkv@beacnsecurities.ca Ahmad Shaath, MBA Assciate - (416) 507-3964 ashaath@beacnsecurities.ca We are initiating

More information

Camp Caillet Crisis Response Plan

Camp Caillet Crisis Response Plan Camp Caillet Crisis Respnse Plan The Camp Caillet Operatinal Cmmittee recgnises Scuts Canada Plicy n having a Crisis Respnse Plan in place. In Charge Scuters that run prgrams n Camp Caillet prperty are

More information

CCI Resource and Construction Conference And Construction Industry Dinner 28 June 2018

CCI Resource and Construction Conference And Construction Industry Dinner 28 June 2018 CCI Resurce and Cnstructin Cnference And Cnstructin Industry Dinner 28 June 2018 CCI Resurce and Cnstructin Cnference and Cnstructin Industry Dinner Thursday, 28 June 2018, Crwn Perth Event Overview CCI

More information

International Airlines Group Capital Markets Day. 9 th November 2012

International Airlines Group Capital Markets Day. 9 th November 2012 Internatinal Airlines Grup Capital Markets Day 9 th Nvember 2012 Agenda Intrductin Q3 Results Financial Targets & Synergies Prpsed acquisitin f Vueling Iberia Transfrmatin British Airways Transfrmatin

More information

Tiger CAMPus REC WELCOME CAMPERS!

Tiger CAMPus REC WELCOME CAMPERS! Tiger CAMPus REC WELCOME CAMPERS! We are very excited that yu will be jining us this summer in this fun filled active yet educatinal fitness adventure. Our gal is t prvide the highest quality recreatinal

More information

ATM Network Performance Report

ATM Network Performance Report Netwrk Perfrmance Reprt ATM Netwrk Perfrmance Reprt 2018. Page 1 f 17 Netwrk Perfrmance Reprt 2018 Table f cntents Summary... 3 Netwrk Wide Perfrmance... 7 Airbrne delay... 7 Netwrk Delay Rati: 2018...

More information

Optional Practical Training - STEM Extension

Optional Practical Training - STEM Extension Optinal Practical Training - STEM Extensin F-1 students in pst-cmpletin Optinal Practical Training wh earned a bachelr s, master s r dctral degree in a science, technlgy, engineering r mathematics (STEM)

More information

Parliamentary Friends of Rail breakfast speech

Parliamentary Friends of Rail breakfast speech Parliamentary Friends f Rail breakfast speech Thursday 26 March 2015 I am here tday t speak t yu abut the imprtance f the private sectr s invlvement in rail. In Australia, private wnership f rail is seen

More information

Exhibitor Information Packet

Exhibitor Information Packet Exhibitr Infrmatin Packet 7 th Annual Lung Cancer Sympsium NEW 2 Day Prgram! Thursday - Friday, March 7-8, 2019 Dn t miss this Exhibit Opprtunity! Register Tday! COURSE CO-DIRECTORS: Ralph Zinner, MD;

More information

What You Must Know About Your Immigration Status. Presented by the Office of International Affairs (OIA)

What You Must Know About Your Immigration Status. Presented by the Office of International Affairs (OIA) What Yu Must Knw Abut Yur Immigratin Status Presented by the Office f Internatinal Affairs (OIA) What Yu Must Knw Abut Yur Immigratin Status Tpics OIA Overview SSN/ITIN/Taxes Maintaining Status Office

More information

Application for the Cleveland County Cattlemen's Association Dallas Ward Memorial Scholarship Deadline: April 15 of each year

Application for the Cleveland County Cattlemen's Association Dallas Ward Memorial Scholarship Deadline: April 15 of each year This schlarship was established by Cleveland Cunty Cattlemen's Assciatin, Inc. (CCCA) in 2000. Initial funding was prvided by members f CCCA and the lcal business cmmunity. At the present time, schlarships

More information

Paraglider Inspection Report

Paraglider Inspection Report Paraglider Inspectin Reprt Custmer Details Name: Sme Custmer Phne : Wing Details Manufacturer: Ozne Mdel: Mj Size: L Serial Number: S- Hurs f flight: Hr Checked by: Paul Zapparli Date f receipt : 9// Return

More information

8950 Cal Center Drive Bldg.3, Suite 300 Sacramento, CA phone fax

8950 Cal Center Drive Bldg.3, Suite 300 Sacramento, CA phone fax 8950 Cal Center Drive Bldg.3, Suite 300 Sacrament, CA 95826 916.564.4500 phne 916.564.4501 fax www.esassc.cm memrandum date t frm subject Part 150 Advisry Cmmittee, OSU Airprt FAR Part 150 Study Rn Seymur,

More information

This section outlines travel policies and procedures for international and in-country travel and related meals and incidental expenses payments.

This section outlines travel policies and procedures for international and in-country travel and related meals and incidental expenses payments. 10. TRAVEL Cntents 10. Travel... 1 10.1 Rles and Respnsibilities... 1 10.2 Internatinal Travel... 1 10.2.A Air Travel Standards... 1 10.2.B Air Travel Arrangements... 2 10.2.C Travel Dcumentatin... 3 10.2.

More information

REFUND INFORMATION FOR TRAVEL AGENTS

REFUND INFORMATION FOR TRAVEL AGENTS REFUND INFORMATION FOR TRAVEL AGENTS REFUND INFORMATION FOR TRAVEL AGENTS...1 CONTACT INFORMATION...2 PROCESSING TIMEFRAME...2 REFUND PROCESSING ADMINISTRATION FEE...2 EXCHANGE WITH A REFUND (NEGATIVE

More information

Shuttles are scheduled ONLY when there is a reservation. Without reservations we DO NOT travel.

Shuttles are scheduled ONLY when there is a reservation. Without reservations we DO NOT travel. Custmer Agreement / Cmpany Plicies Shuttles are scheduled ONLY when there is a reservatin. Withut reservatins we DO NOT travel. (Excluding Hlidays) Reservatins must be prepaid with a credit card. Please

More information

National Search and Rescue Committee (NSARC) Secretariat Issue Paper

National Search and Rescue Committee (NSARC) Secretariat Issue Paper Natinal Search and Rescue Cmmittee (NSARC) Secretariat Issue Paper Status: Cntingency Airspace and Air Missin Management during a Disaster Respnse (13 June 2012) Issue The fllwing issue paper prvides infrmatin

More information

Over 18 years experience in Safety Management Systems including a specialist in investigations, database management, oversight and reporting

Over 18 years experience in Safety Management Systems including a specialist in investigations, database management, oversight and reporting Adrian Yung 64 Verbena Street, Munt Gravatt Q4122 0431052757 adrianyung@qantas.cm.au Summary Over 28 years aviatin experience including ver 10000 hurs f flying experience ranging frm aviatin training thrugh

More information

Distance Learning Course Information

Distance Learning Course Information Distance Learning Curse Infrmatin MAR20313 Certificate II in Maritime Operatins (Cxswain Grade1 Near Castal) Unit Cde MARB002 MARC005 MARC006 MARF001 MARF002 MARF004 MARF005 MARH001 Unit f Cmpetency Perfrm

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpse and Scpe The infrmatin presented in this reprt represents the study findings fr the 2015 Grand Frks Internatinal Airprt Master Plan Update prepared fr the Grand Frks Reginal

More information

Greek Orthodox Metropolis of Boston Iera Mhtropolis Bostwnhs

Greek Orthodox Metropolis of Boston Iera Mhtropolis Bostwnhs Greek Orthdx Metrplis f Bstn Iera Mhtrplis Bstwnhs February 2018 Timeline (As updated n February 13, 2018) Reverend Fr. Anthny S. Evangelats cmmences frmal duties as the new Parish Priest (Pristamens)

More information

NORFOLK INTERNATIONAL AIRPORT

NORFOLK INTERNATIONAL AIRPORT Prject Meeting Lcatin Nrflk Internatinal Airprt (ORF) Prject Kick-Off Meeting: Technical Advisry and Cmmunity Advisry Cmmittees (TAC and CAC) Nrflk Internatinal Airprt Date Wednesday, January 24, 2018

More information

Runway 35 South and West (Jet) Departure Flight Path Amendment

Runway 35 South and West (Jet) Departure Flight Path Amendment Pst Implementatin Review CANBERRA AIRPORT Runway 35 Suth and West (Jet) Departure Flight Path Amendment Versin 1 Effective February 2016 Airservices Australia 2015 1 f 5 Intrductin In 2014 at the request

More information

GYMNASTICS & NINJA SUMMER CAMPS 2018

GYMNASTICS & NINJA SUMMER CAMPS 2018 1 f 5 GYMNASTICS & NINJA SUMMER CAMPS 2018 GUIDE FOR PARENTS & CAREGIVERS Welcme t Chelsea Piers Summer Camp! Thank yu fr chsing us. Yur child will have a wnderful experience learning gymnastics and making

More information

Annual Report FY 2017/18 Port Hedland Ambient Air Quality Monitoring Program

Annual Report FY 2017/18 Port Hedland Ambient Air Quality Monitoring Program Annual Reprt FY 2017/18 Prt Hedland Ambient Air Quality Mnitring Prgram FINAL Prt Hedland Industries Cuncil Octber 2018 Prepared by Katestne Envirnmental Pty Ltd DOCUMENT CONTORL Deliverable Number: D17093-3

More information

Sec Future Interstate Study Panel on Passenger Travel. Presentation by: Gregory M. Cohen, P.E. President & CEO American Highway Users Alliance

Sec Future Interstate Study Panel on Passenger Travel. Presentation by: Gregory M. Cohen, P.E. President & CEO American Highway Users Alliance Sec. 6021 Future Interstate Study Panel n Passenger Travel Presentatin by: Gregry M. Chen, P.E. President & CEO American Highway Users Alliance Backgrund The Highway Users is a nn-prfit calitin funded

More information

Athens International Airport. Airport Terminal Operator Liability Stamatis Varsamos

Athens International Airport. Airport Terminal Operator Liability Stamatis Varsamos Athens Internatinal Airprt Airprt Terminal Operatr Liability Stamatis Varsams WALA - IX Cnference January 19, 2017 1. Intrductin - Airprt terminal peratr as an agent f the carrier (Vumbaca V. Terminal

More information

Agenda Joint Meeting of The Park Board & City Council

Agenda Joint Meeting of The Park Board & City Council Agenda Jint Meeting f The Park Bard & City Cuncil Parks & Recreatin Bard Visin A city with utstanding parks and recreatinal pprtunities within a valued natural envirnment. Parks & Recreatin Bard Missin

More information

Richard Stadlwieser is sending you the itinerary for your next trip from Edmonton to Was... Page 1 of 6

Richard Stadlwieser is sending you the itinerary for your next trip from Edmonton to Was... Page 1 of 6 Richard Stadlwieser is sending yu the itinerary fr yur next trip frm Edmntn t Was... Page 1 f 6 ****** PEASE DO NOT REPY TO THIS E-MAI****** AIR CANADA@ Itinerary/Receipt Frm: Richard Stadlwieser Yur bking

More information

Facilities Worker. Job Information Pack. Employment Conditions. This information package includes:

Facilities Worker. Job Information Pack. Employment Conditions. This information package includes: Facilities Wrker Jb Infrmatin Pack This infrmatin package includes: Emplyment cnditins Psitin Descriptin Selectin criteria Applicatin and recruitment prcess Emplyment Cnditins Emplyment basis: Casual emplyment

More information

ERA AIR SAFETY GROUP REPORT FOR 2016

ERA AIR SAFETY GROUP REPORT FOR 2016 ERA AIR SAFETY GROUP REPORT FOR 2016 Objectives f the Air Safety Grup The bjective f the Air Safety Grup (ASG) is t assist members f ERA t maintain and imprve the safety f peratins thrugh the analysis

More information

Tranquilo - 8 Days - Idea Private Escorted Cuba Tour Program

Tranquilo - 8 Days - Idea Private Escorted Cuba Tour Program Cuba is nt a hliday, it s an Experience! Tranquil - 8 Days - Idea Private Escrted Cuba Tur Prgram Yur Experts in Tailr Made Cuba Turs experiencecubaturs.cm.au inf@experiencecubaturs.cm.au 1300 79 55 31

More information

StART SEA-TAC STAKEHOLDER ADVISORY ROUND TABLE

StART SEA-TAC STAKEHOLDER ADVISORY ROUND TABLE StART SEA-TAC STAKEHOLDER ADVISORY ROUND TABLE StART FACILITATOR S MEETING SUMMARY AVIATION NOISE WORKING GROUP Mnday, January 14 2019 5:30-7:30PM, Cnference Center, Sea-Tac Airprt Member Jhn Resing Terry

More information

LNCS Weekly News October 26, 2018

LNCS Weekly News October 26, 2018 LNCS Weekly News Octber 26, 2018 Schl Ntes Keewaydin Basketball Sign Ups fr 6-8 th Graders Register t play basketball fr Keewaydin nw! There will be 1 bys team and 1 girls team and there is a $45 registratin

More information

S. 2312: The Helping Ensure Low-income Patients have Access to Care and Treatment (HELP) Act Original Sponsors: Sen. Bill Cassidy (R-LA)

S. 2312: The Helping Ensure Low-income Patients have Access to Care and Treatment (HELP) Act Original Sponsors: Sen. Bill Cassidy (R-LA) S. 2312: The Helping Ensure Lw-incme Patients have Access t Care and Treatment (HELP) Act Original Spnsrs: Sen. Bill Cassidy (R-LA) SEC. 2. MORATORIUM ON REGISTRATION OF NEW NON-RURAL SECTION 340B HOSPITALS

More information

White Paper Network Video Management System Ensuring end-to-end protection of video integrity

White Paper Network Video Management System Ensuring end-to-end protection of video integrity White Paper Netwrk Vide Management System Ensuring end-t-end prtectin f vide integrity Netwrk Vide Management System Octber 7, 2016 NVMSWP002 Revisin 1.0.0 White Paper Netwrk Vide Management System Ensuring

More information

Competition and regulatory issues in. the civil aviation sector. Liberty Mncube Chief Economist Competition Commission of South Africa

Competition and regulatory issues in. the civil aviation sector. Liberty Mncube Chief Economist Competition Commission of South Africa Cmpetitin and regulatry issues in the civil aviatin sectr Liberty Mncube Chief Ecnmist Cmpetitin Cmmissin f Suth Africa 04 Nvember 2014 Structure Cmpetitive landscape f the airline industry What des an

More information

Life Expectancy for Administrative Areas within Scotland,

Life Expectancy for Administrative Areas within Scotland, General Register Office fr S C O T L A N D infrmatin abut Sctland s peple Life Expectancy fr Administrative Areas within Sctland, 2005-2007 Published n 25 September 2008 A Natinal Statistics publicatin

More information

D. Aircraft Conformity Procedures. D.1 Formal Request to Add an Aircraft. D.2 Manual Submission

D. Aircraft Conformity Procedures. D.1 Formal Request to Add an Aircraft. D.2 Manual Submission Revisin: Original Page D-1 D. Aircraft Cnfrmity Prcedures These prcedures prvide guidance t peratins and maintenance fr adding an aircraft t the USAC Airways 694 LLC air carrier certificate. D.1 Frmal

More information

Pedestrian delay at Pelican crossings in areas operating under SCOOT

Pedestrian delay at Pelican crossings in areas operating under SCOOT TRANSPORT AND ROAD RESEARCH LABORATORY Department f Transprt RRL Cntractr Reprt 249 Pedestrian delay at Pelican crssings in areas perating under SCOOT by J G Hunt, J D Griffiths and K M Hughes (University

More information

OUTDOOR EDUCATOR Summit Educational Camps September, 2013

OUTDOOR EDUCATOR Summit Educational Camps September, 2013 PPOSSI ITTI ION DDEESSCCRRI IPPTTI ION OUTDOOR EDUCATOR Summit Educatinal Camps September, 2013 Outdr Educatr PD 13 Page 1 f 8 initial OUTDOOR EDUCATOR 1. MISSION STATEMENT AND PURPOSE: Crusaders is a

More information

CENTRALFESTIVAL PATTAYA BEACH SHOPPING COMPLEX

CENTRALFESTIVAL PATTAYA BEACH SHOPPING COMPLEX Factsheet CENTRALFESTIVAL PATTAYA BEACH SHOPPING COMPLEX With 240,000 sq.m. f cmprehensive mixed-use cmplex lcated n the wrldrenwned beach destinatin, CentralFestival Pattaya Beach is undubtedly the majr

More information

Avalanche accidents in back country terrain ofthe Swiss alps: New investigations of a 30 year database

Avalanche accidents in back country terrain ofthe Swiss alps: New investigations of a 30 year database Avalanche accidents in back cuntry terrain fthe Swiss alps: New investigatins f a 3 year database Stephan Harvey *, Chatrigna Signrell Swiss Federal Institute fr Snw and Avalanche Research (SLF), Davs

More information

Tips for attending the 11 th World IFYE Conference 8-16 September 2018 Cruisin with IFYE

Tips for attending the 11 th World IFYE Conference 8-16 September 2018 Cruisin with IFYE Tips fr attending the 11 th Wrld IFYE Cnference 8-16 September 2018 Cruisin with IFYE PLEASE NOTE: Infrmatin in GREEN is infrmatin added t this dcument since 12 July 2017 and is dated as such. TABLE OF

More information

UVA OR. UNIVERSITY OF VIRGINIA OUTDOOR RECREATION Field Programs / Rental Center / Poplar Ridge Challenge Course / Bouldering Wall/ COAR

UVA OR. UNIVERSITY OF VIRGINIA OUTDOOR RECREATION Field Programs / Rental Center / Poplar Ridge Challenge Course / Bouldering Wall/ COAR Field Prgrams / Rental Center / Pplar Ridge Challenge Curse / Buldering Wall/ COAR Cavalier Outdr Adventure Retreat (COAR) Meet and get t knw ther first year students n a backcuntry trip t Shenandah Natinal

More information

Peter Lovegrove Curriculum Vitae. Managing Director. 17 Brighton Road Highgate Hill QLD 4101

Peter Lovegrove Curriculum Vitae. Managing Director. 17 Brighton Road Highgate Hill QLD 4101 Peter Lvegrve Curriculum Vitae Managing Directr 17 Brightn Rad Highgate Hill QLD 4101 ph 0410050020 e-mail peter@cntinuumgrup.cm.au - www.cntinuumgrup.cm.au ph Backgrund Peter Lvegrve has ver 20 years

More information