OPERA study. Operational Requirements and Business Case. Iris public event Oct 11 th, The OPERA Consortium is SITA and SES
|
|
- Leonard Lester
- 6 years ago
- Views:
Transcription
1 OPERA study Operational Requirements and Business Case Iris public event Oct 11 th, 2011 The OPERA Consortium is SITA and SES OPERA Iris Public Event October 2011 slide 1 SITA
2 Disclaimer note The following data have been issued as a part of the model elaboratedfor the OPERA technico-operationalstudy. SITA and SES decline all liability in connection with any use of any information contained in this presentation. OPERA Iris Public Event October 2011 slide 2 SITA
3 About the presentation Design and Operational Requirements Business case presentation Presentation of the ecosystem: the ISSP Timeline Revenues (Top Down analysis) Elaboration of a service model (Bottom-Up analysis) Business case attractiveness OPERA Iris Public Event October 2011 slide 3 SITA
4 OPERA STUDY DESIGN AND OPERATIONAL REQUIREMENTS OPERA Iris Public Event October 2011 slide 4 SITA
5 Design and Operational Requirements Design drivers Safety (RAMS) Scalability (growth) Interoperability (with other systems) Flexibility Security Interface Quality of Service Operational drivers Safety (RAMS) Compatibility (non-interference with existing systems) Timeline Flexibility Security OPERA Iris Public Event October 2011 slide 5 SITA
6 Mandatory and Optional Coverage Areas Mandatory coverage Optional coverage OPERA Iris Public Event October 2011 slide 6 SITA
7 Influence of Orbital Position Satellites Located at 4 deg W to 31 deg E 4 degrees West 19 degrees East OPERA Iris Public Event October 2011 slide 7 SITA 5 degrees East 31 degrees East
8 OPERA STUDY ECOSYSTEM OPERA Iris Public Event October 2011 slide 8 SITA
9 Focal point for the provision of Iris Communication Services A single commercial entityacting as the provider of Iris services for all ANSPs The ISSP will be certified according to SES regulations(ec 550/2004) The ISSP willrelyuponservices providedby the DSP and the SSP Stakeholders of the ISSP are ANSPs and the industry OPERA Iris Public Event October 2011 slide 9 SITA
10 Ecosystemfor the business case Airlines AOC ATC ANSP AIRLINES pay for ANS Charges, (including COMMUNICATIONS, that become REVENUES for the ANPS, and indirectly for ISSP, DSP and SSP) Provision of ATC services (National or FAB-based) incl. COMMUNICATIONS CAPEX and OPEX in relation with Iris-related AOC SatComs DSP ISSP bulk Provision of Iris Services, including SAFETY + CERTIFICATION CAPEX and OPEX in relation with ATC SatComs (incl. Ground connectivity) bulk SSP OPERA Iris Public Event October 2011 slide 10 SITA CAPEX and OPEX in relation with Iris-related SATELLITES (ground + space segments)
11 OPERA STUDY TIMELINE OPERA Iris Public Event October 2011 slide 11 SITA
12 Main important milestones T0 estimated 2011 T0+5 T0+10 T0+15 T0+20 T0+25 T0+30 Source: ESA EC decision on COCR/2: 2016 ANSP mandate: 2020 Forward fit mandate: 2020 Retrofit mandate: 2025 Development phase Pre-operational phase Operational phase 2 scenarios: Pessimistic with plain forms Optimistic with dash lines ATC revenues ramp-up depends on ATC incentivization End of ATC revenues ramp-up with actual implementation of the ANSP mandate CAPEX OPEX MAIN HOT STANDBY COLD STANDBY INDUSTRY ESA #1 ESA s OPEX Initial operations OPERA Iris Public Event October 2011 slide 12 SITA #2 Nominal operations #3 #4 OPEX ATC REVENUES AOC REVENUES #5 #6
13 OPERA STUDY REVENUES OPERA Iris Public Event October 2011 slide 13 SITA
14 Elements framing the revenue model No extra-costs for the end-users (CRCO charges) ATC refers to cost recovery mechanisms (cf. regulation) Common Charging scheme: EC 1794/2006 (+EC1191/2010) Revenues are proportional to the volume of service units AOC grounds in price-based competition between technologies (VHF vs. SatComs) The negotiation between airlines and the DSP/CSP occurs for each route and each technology and each type of aircraft When transitioning to IP-based technologies, volume fees are abandoned and flat fees are installed OPERA Iris Public Event October 2011 slide 14 SITA
15 (Sat)COMs in ANS: revenue analysis parametric analysis OPERA Iris Public Event October 2011 slide 15 SITA
16 AOC contribution to IRIS per technology assumptionsand parameters When? TECHNOLOGIES ORP CONTINENTAL TODAY SATELLITE 100% 0% CONTINENTAL 0% 100% TOMORROW ie LEGACY SATELLITE 90% 0% NEW SATELLITE (IRIS) 10% 25% LEGACY CONTINENTAL 0% 50% NEW CONTINENTAL (LDACS) 0% 25% Yearly growth for AOC Continental (total) revenues: Z% per year Our assumption: minimum Z=5%, target value = 6% OPERA Iris Public Event October 2011 slide 16 SITA
17 Revenue ramp-up scenarios ATC revenues: The ramp-up depends on the adoption of «new» ANS applications (e.g. 4D) for specific FIRs We endorse the assumption of a «big bang» approach for each FAB, with FABEC as the first mover The adoption schedule is aligned with the ANSP mandate AOC revenues: The ramp-up depends on the availability of on-board technology, i.e. on avionics certification and equipage We endorse the assumption of adoption schemes ruled by the important issue of cost-correlation for airlines Forward-fit aligns with procurement of new aircraft Retrofit associates with late adoption schemes OPERA Iris Public Event October 2011 slide 17 SITA
18 Top-down analysis: discountedrevenues AOC through Iris SatComs 2 parametric scenarios in reference to parameters introduced for AOC revenues traffic Results depend on AOC revenues growth over the period AOC Airlines DSP bulk ATC ANSP ISSP bulk TOTAL ATC COMs Terminal + En Route through Iris SatComs PRR2010 Total discounted cumulated ATC revenues ( ) only depend on parameters introduced in the model, and range between 189M when all parameters are set at the lowest minimum (the worst of worst cases) 3.5G when all parameters are set at the maximum (the best among the best) SSP OPERA Iris Public Event October 2011 slide 18 SITA
19 Available SatComs revenue per IFR movt Our own calculations for the revenue model translate into costs per IFR movement Assumptions for the volume of IFR movements in the ECAC zone are calculated as extrapolations from ECTRL prospective scenarios (4 options: A, B, C, D) A D Scenario MIN AVERAGE MAX SIGMA A Pessimistic A Optimistic D Pessimistic D Optimistic OPERA Iris Public Event October 2011 slide 19 SITA
20 OPERA STUDY FROMCAPEX + OPEX TO SERVICE MODEL OPERA Iris Public Event October 2011 slide 20 SITA
21 NO AOC in the BOTTOM-UP analysis Bottom-Up analysis: service model Airlines ATC DSP bulk SSP ANSP ISSP bulk SERVICE MODEL DSP + SSP TOTAL SERVICE MODEL cumulated for DSP + SSP Elements associate with 2+3 satellites procured by the private industry (SSP) Only the aspects in direct relation with Iris SatComs are computed in the DSP s service model OPERA Iris Public Event October 2011 slide 21 SITA SERVICE MODEL DSP + SSP + ISSP TOTAL SERVICE MODEL cumulated for ISSP + CSP + SSP The Certification service is assessed a flat 5% of the total service model incurred by the DSP+SSP The ISSP is supposed to introduce only a cost recovery mechanims, and not profit-driven scheme
22 OPERA STUDY BUSINESS CASE ATTRACTIVENESS SENSITIVITY ANALYSIS OPERA Iris Public Event October 2011 slide 22 SITA
23 Business case effectiveness TOTAL IRIS SatComs AOC Airlines ATC TOTAL ATC COMMs IRIS SatComs PRR2010 The AOC business is driven by price-led competition between technologies. Airlines select the most costefficient technology for each route ANSP ISSP DSP SSP It is alwayspossible to find out some parameters that make the business case effective Are these parameters actually realistic? The Cost for certification is assessed as a flat 5% of the DSP + SSP service model The centralizedmodel is the most efficient configuration SSP: 2+3 GEOs+1 pair of GES DSP: only the marginal costs in relation with Iris SatComs OPERA Iris Public Event October 2011 slide 23 SITA
24 Most important variables (sensitivity analysis) The OPERA sensitivity analysis has identified the most important variables in the business case: X: Annual variation of En-Route Communication revenues in the total ANS en route revenues (ie the growth of the size of the ANS cake ); AxB: Percentage of Ground-to-Mobile DataLink communications in En-Route ANS (ie the growth of the size of the COM slice in the ANS cake ) Z: Annual variation of Continental AOC revenues (not traffic) OPERA Iris Public Event October 2011 slide 24 SITA
25 Sensitivity analysis: Main conclusions SatComs for Terminal Ground to Mobile Datalink are much more uncertain than for En-Route Ground to Mobile Datalink. The business case effectiveness depends on the increase in communication revenue shares in ANS Coms (E-R, T). It does not depend only on the growing size of the ANS revenues; it does depend on the growth rate of the COMs slice (AxB%, or FxGxH%) in the also increasing ANS revenues (X%). The increase in communication revenues shares in ANS can be afforded on the basis of productivity gains ECAC-wide (FABs). The business case effectiveness depends on ca. 30% contribution from AOC revenues. Uncertainties and risks for AOC and ATC do not compare. OPERA Iris Public Event October 2011 slide 25 SITA
26 Conclusions about PPPs: PPPs are not relevant for this ecosystem In PPPs, current construction or availability risks are traded against the uncertainty about revenues There is no economic justification for PPPs with Iris SatComs: Demand risks in ATC only depend on the issue of the mandate that impacts the whole project. Construction risks, and Availability risks are null because ESA endorses the SatComs for ATS concept validation costs, and the first CAPEX. The transfer of ownership from ESA to the industry for the 1 st CAPEX requires contractual modalities that look like a PPP, require the investigation of PPP-like issues, yet are NOTa PPP contract because it remains a service model contract. OPERA Iris Public Event October 2011 slide 26 SITA
ESA Iris Programme Overview of results from Iris Phase 1. Briefing 28 July
ESA Iris Programme Overview of results from Iris Phase 1 Briefing 28 July 2009 - Nathalie.Ricard@esa.int 1 ESA Iris Programme: Satellite communications for ATM Dedicated ESA programme to support SESAR
More informationSatcom for ATM. Iris workshop ESTEC, 18th September 2007
Satcom for ATM Iris workshop ESTEC, 18th September 2007 Objectives The objective of this study is to specifically investigate whether or not a satellite system dedicated to safety communications can be
More informationESA Iris Programme: satellite communications for Air Traffic Management
ESA Iris Programme: satellite communications for Air Traffic Management Noordwijk, 10-11 October 2011 Purpose of ESA To provide for and promote, for exclusively peaceful purposes, cooperation among European
More informationPENS Symposium How to join PENS
PENS Symposium How to join PENS Speaker Organisation Date and venue Jacky POUZET Head of Communications and Frequency Coordination EUROCONTROL 17 th October 2012, Brussels The European Organisation for
More informationThe contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011
The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011 Why SESAR needs SATCOM? Controllers need real time information... Past
More informationAir traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning
Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming
More informationInitial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg
Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg Feb 5, 2013 Background: Inmarsat Aviation Services With more than 11,000 aircraft relying on global in-flight connectivity from Inmarsat,
More informationNext Generation Airspace Developments: Key Operational Trends and Enablers
Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory
More informationCertification Procedure
Certification Procedure Frequentis AG Final Presentation, ESTEC, Dec. 06 th 2009 Thales Alenia Space Espana Thales Alenia Space France Thales Alenia Space Italia Topics 1 Overview 2 Key points 3 Conclusions
More informationEUR/SAM corridor airspace concept
TWENTYENTH MEETING ON THE IMPROVEMENT OF AIR TRAFFIC SERVICES OVER THE SOUTH ATLANTIC (SAT21) (Lisbon, Portugal, 8 to 10 June, 2016) Agenda Item 2: Air traffic management (ATM) RNP 4 IN THE EUR/SAM CORRIDOR
More informationOverview of Worldwide Data Link Equipage Mandates
Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording
More informationACAS on VLJs and LJs Assessment of safety Level (AVAL) Outcomes of the AVAL study (presented by Thierry Arino, Egis Avia)
ACAS on VLJs and LJs Assessment of safety Level (AVAL) Outcomes of the AVAL study (presented by Thierry Arino, Egis Avia) Slide 1 Presentation content Introduction Background on Airborne Collision Avoidance
More informationHoneywell Advanced Technologies Europe Radek Zaruba, May, ANTARES WP33 User Terminal for General Aviation
Honeywell Advanced Technologies Europe Radek Zaruba, May, 2010 ANTARES WP33 User Terminal for General Aviation What is GA? - GA Definitions are ambiguous: The British Business and General Aviation Association:
More informationStrategic airspace capacity planning in a network under demand uncertainty (COCTA project results)
Strategic airspace capacity planning in a network under demand uncertainty (COCTA project results) Prof. Dr. Frank Fichert Worms University of Applied Sciences Joint work with: University of Belgrade (Dr
More informationPBN and airspace concept
PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations
More information2. Our response follows the structure of the consultation document and covers the following issues in turn:
Virgin Atlantic Airways response to the CAA s consultation on Economic regulation of capacity expansion at Heathrow: policy update and consultation (CAP 1658) Introduction 1. Virgin Atlantic Airways (VAA)
More informationWorkshop. SESAR 2020 Concept. A Brief View of the Business Trajectory
SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels
More information1/2 July Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability SPI)
SSC/14/54/5 Agenda Item 4.1 16 June 2014 54 th SINGLE SKY COMMITTEE 1/2 July 2014 Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE
More informationFinancing Infrastructure: Working with your Users. Julie Garg Manager Airport & ATC Charges
Financing Infrastructure: Working with your Users Julie Garg Manager Airport & ATC Charges International Air Transport Association, who are we? Our VISION : To be the provider of global leadership and
More informationEUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013
EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationHOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING
HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING Ms. Grace Fattouche Abstract This paper outlines a scheduling process for improving high-frequency bus service reliability based
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationEUROCONTROL AVAL Project. AVAL Phase 1 findings (presented by Thierry Arino)
EUROCONTROL AVAL Project AVAL Phase 1 findings (presented by Thierry Arino) Slide 1 Presentation content Introduction Safety benefits of ACAS VLJs and LJs below 5,700 kg: what are they? What are the safety
More informationSurveillance Opportunities and Challenges
Services Info Days Brussels, 6-7 December 2017 Opportunities and Challenges Christos Rekkas Head of SUR Modernisation TLP: GREEN 1 SUR Applications list extending PSR/SSR Mode S Elementary Enhanced ADS-C
More informationElectronic visibility via ADS-B for small aircraft. John Korna, NATS
Electronic visibility via ADS-B for small aircraft John Korna, NATS The SESAR General Aviation challenge SESAR is predominantly aimed at scheduled commercial air traffic and 100M+ airframes How is SESAR
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationRoadmapping Breakout Session Overview
Roadmapping Breakout Session Overview Ken Goodrich October 22, 2015 Definition Roadmap: a specialized type of strategic plan that outlines activities an organization can undertake over specified time frames
More informationEuropean ATM Development The Big Idea
European ATM Development The Big Idea Bo Redeborn Principal Director ATM EUROCONTROL CANSO Data Communications Conference Amsterdam, 6-8 th Sept 2011 The European Organisation for the Safety of Air Navigation
More informationOVERVIEW OF ADS-B COST BENEFIT STUDY
ADS-B Workshop SP/15 The Global Voice of ATM OVERVIEW OF ADS-B COST BENEFIT STUDY Presentation Outline Background & Objectives Project Scope Study Assumptions Traffic Forecast & Aircraft Equipage Benefits
More informationMANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project
MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project Presented by Mohammad Al Dossari Director Air Navigation & Aerodromes Department General Civil Aviation Authority United Arab
More informationAeronautical Communications: Changes Ahead - FCI
Aeronautical Communications: Changes Ahead - FCI Aviation Electronics Europe Munich, Germany 25-26 March 2015 Nikos Fistas EUROCONTROL v 1.0 Agenda Current Status Future Communication Infrastructure (FCI)
More informationOperators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11
Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance
More informationEfficiency and Automation
Efficiency and Automation Towards higher levels of automation in Air Traffic Management HALA! Summer School Cursos de Verano Politécnica de Madrid La Granja, July 2011 Guest Lecturer: Rosa Arnaldo Universidad
More informationMandates. Airbus Fleet Implementations. AEEC 19 th June 2018
Mandates Airbus Fleet Implementations AEEC 19 th June 2018 Roadmap of operational mandates DATA-LINK NAT-SPG EC EC 20% ELT ADS-B EC HUD 50% 10% 100% A/C Tracking GADSS* Recording Mandates Operationnal
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally
More informationOperational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)
International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901
More informationIAC 2011 Cape Town, October th
Cape Town, October 05 05 th Project Partners External Supporters and Sponsors The Problem The Solution Overview S 2 BAS Concept of Operations Architecture Possible Applications Stakeholders Flight Phases
More informationDVB-S2/RCS Suitability for the Provision of Air Traffic Management Services
DVB-S2/RCS Suitability for the Provision of Air Traffic Management Services Cristina Párraga, Núria Riera, Sandro Scalise, Christian Kissling Institute of Communications and Navigation, DLR, 14-15 September
More informationPerformance Review Body 18
Performance Review Body 18 Performance Review Body 19 Performance Review Body 20 Conclusions Performance is the bottom line Major change under SES II Enforceable performance targets, incentives Significant
More informationEUROCONTROL and the Airport Package
European Economic and Social Committee Public Hearing Brussels, 20 February 2012 EUROCONTROL and the Airport Package François HUET EUROCONTROL Directorate Single Sky, Performance Review Unit The European
More informationNAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten
NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators
More informationASPASIA Project. ASPASIA Overall Summary. ASPASIA Project
ASPASIA Project ASPASIA Overall Summary ASPASIA Project ASPASIA Project ASPASIA (Aeronautical Surveillance and Planning by Advanced ) is an international project co-funded by the European Commission within
More informationEuropean ATM Master Plan Edition 2015
European ATM Master Plan Edition 2015 Providing a holistic view of SESAR s performance & investment ambition levels Methodology & key assumptions European ATM Master Plan Edition 2015 Performance and Business
More informationIris Information Event October Overview of SESAR P. Tavernise
Iris Information Event 10-11 October 2011 Overview of SESAR P. Tavernise WHY SESAR? EUROPEAN CHALLENGES: Capacity: Air Traffic to double by 2030 Safety: Improvements linked to growth Environment: Growth
More informationDANUBE FAB real-time simulation 7 November - 2 December 2011
EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid
More informationSpectral Efficient COMmunications for future Aeronautical Services. Jan Erik Håkegård ICT
Spectral Efficient COMmunications for future Aeronautical Services Jan Erik Håkegård 1 Outline Overview aeronautical communication today International activities SECOMAS activities Impact on Norwegian
More informationAeronautical METeorology in Europe
Aeronautical METeorology in Europe Weather Information Modelling Activities Dennis Hart Aeronautical Information Management Division EUROCONTROL European Organisation for the Safety of Air Navigation Overview
More informationEuropean Performance Scheme
European Performance Scheme Global Challenges to Improve Air Navigation Performance Asilomar Conference Grounds, Pacific Grove, CA 12 February 2015 Rolf TUCHHARDT European Commission, DG MOVE The SES policy
More informationSESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink
SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P15.02.07 Airport Surface Datalink AERONAUTICAL COMMUNICATIONS PANEL (ACP) 6th Meeting of the Working Group S (Surface) Sendai, Japan
More informationUnmanned Aircraft Systems (UAS) via Satellite
Unmanned Aircraft Systems (UAS) via Satellite Report Brief www.nsr.com 2013 NSR Report Description NSR s Unmanned Aircraft Systems (UAS) via Satellite is a new report providing comprehensive analysis of
More informationIntroducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014
Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014 NEFAB Programme Office organised customer consultation days on
More informationSRC POSITION PAPER. Edition March 2011 Released Issue
E U R O C O N T R O L SRC POSITION PAPER Safety Assessment of Optimised Operations in Low Visibility Conditions Utilising Landing Clearance Delivery Position and/or Landing Clearance Line Concept, Edition1.5,
More informationScreening Chapter 14 Transport. Single European Sky (SES) 18 December Transport
Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe
More information54 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS
DGCA 54/DP/6/17 Revision 1 54 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS Ulaanbaatar, Mongolia 07 11 August 2017 AGENDA ITEM 6: TECHNICAL AND REGIONAL COOPERATION IMPLEMENTATION
More informationUser Terminal certification process considerations
User Terminal certification process considerations Wilfred Rouwhorst Martijn Stuip NLR Cockpit and Flight Operations Department NLR Aircraft Systems Department ESA-Iris Information Event, 10-11 October
More informationPerformance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA
Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information
More informationQueenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes
Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes 29 October 2014 1 Purpose This document outlines Airways proposed price increase for new lights
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationIMPLEMENTATION OF ADS-B BY NAV CANADA
IMPLEMENTATION OF ADS-B BY NAV CANADA Carole Stewart-Green Manager, ATS Regulatory Coordination ABOUT NAV CANADA Private, non-share capital company Second largest ANSP in the world 12 million aircraft
More informationRecommendations on Consultation and Transparency
Recommendations on Consultation and Transparency Background The goal of the Aviation Strategy is to strengthen the competitiveness and sustainability of the entire EU air transport value network. Tackling
More informationPBN, ADQ, ADQ2 IR EUROCONTROL Activities Status
PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR
More informationTrajectory Based Operations
Trajectory Based Operations Far-Term Concept Proposed Trade-Space Activities Environmental Working Group Operations Standing Committee July 29, 2009 Rose.Ashford@nasa.gov Purpose for this Presentation
More informationManaging through disruption
28 July 2016 Third quarter results for the three months ended 30 June 2016 Managing through disruption 3 months ended Like-for-like (ii) m (unless otherwise stated) Change 30 June 2016 30 June 2015 change
More informationDecision Strategic Plan Commission Paper 5/ th May 2017
Decision Strategic Plan 2017-2019 Commission Paper 5/2017 5 th May 2017 Commission for Aviation Regulation 3 rd Floor, Alexandra House Earlsfort Terrace Dublin 2 Ireland Tel: +353 1 6611700 Fax: +353 1
More informationEfficiency and Environment KPAs
Efficiency and Environment KPAs Regional Performance Framework Workshop, Bishkek, Kyrgyzstan, 21 23 May 2013 ICAO European and North Atlantic Office 20 May 2013 Page 1 Efficiency (Doc 9854) Doc 9854 Appendix
More informationTable of Content. Table of Contents Mobile Experts LLC. All Rights Reserved. 1
Table of Content Table of Contents 2015 Mobile Experts LLC. All Rights Reserved. 1 Table of Content List of Figures... 5 List of Tables... 9 Executive Summary...11 Synopsis of C-RAN Developments in the
More informationParadigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC)
1 Paradigm SHIFT Eurocontrol Experimental Centre Innovative Research June, 2005 Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) Khaled BELAHCENE (Math Mod., Airspace) Didier DOHY (ATM, System)
More informationA-CDM AT HONG KONG INTERNATIONAL AIRPORT (HKIA)
A-CDM AT HONG KONG INTERNATIONAL AIRPORT (HKIA) This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent.
More informationSTATEMENT OF THE NATIONAL BUSINESS AVIATION ASSOCIATION ED BOLEN PRESIDENT AND CEO BEFORE THE COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE
STATEMENT OF THE NATIONAL BUSINESS AVIATION ASSOCIATION ED BOLEN PRESIDENT AND CEO BEFORE THE COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE AVIATION SUBCOMMITTEE U.S. HOUSE OF REPRESENTATIVES REGARDING
More informationTHIRTEENTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,
More informationEUROCONTROL approach to the execution of the PBN IR Mandate
EUROCONTROL approach to the execution of the PBN IR Mandate Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation
More informationATM in Europe It s all about Performance
ATM in Europe It s all about Performance Facts and analysis from Performance Review World ATM Congress 2014, Madrid Xavier FRON Performance coordinator 5 March 2014 Topics ANS in aviation context European
More informationNEFAB Project Feasibility Study Report Operational Concept
NEFAB Project Feasibility Study Report Operational Concept Page 1 of 16 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. AIRSPACE DESIGN... 6 2.1 ATS Routes and Free Routes 6 2.2 Sectorisation 6 2.3 Airspace
More informationInmarsat GADSS Solutions Global Aeronautical Distress and Safety System
Inmarsat GADSS Solutions Global Aeronautical Distress and Safety System 30 November 2016 While the information in this document has been prepared in good faith, no representation, warranty, assurance or
More informationIATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018
IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry
More informationMULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING
International Civil Aviation Organization Global Tracking 2014-WP/1 5/5/14 WORKING PAPER MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING Montréal, 12 May to 13 May 2014 Agenda item 1: Explore the need
More informationMaster Plan Phase 2 Workshop
Master Plan Phase 2 Workshop Tampa Airport: A Legacy of Innovation and Convenience Tampa Airport: A legacy of Innovation and Convenience The world s first airport people mover Tampa Airport: A legacy of
More informationContent. Study Results. Next Steps. Background
Content Background Study Results Next Steps 2 ICAO role and actions in previous crisis time Background October 1973 oil crisis: oil price increased by 400% and oil production decreased by 240% Early 1974:
More informationTable of Contents 2015 Mobile Experts LLC. All Rights Reserved. 1
Table of Contents 2015 Mobile Experts LLC. All Rights Reserved. 1 List of Figures... 5 List of Tables... 8 Executive Summary... 9 Synopsis of C-RAN Developments in the Past Year (2014)... 13 Drivers of
More informationAeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL
AeroMACS Why it is important for aviation AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL Introduction Context Standards Current Developments Benefits 2 Aeronautical Mobile
More informationRMT.0464 ATS Requirements The NPA
RMT.0464 ATS Requirements The NPA Fabio GRASSO EASA ATM/ANS Regulations Officer IFISA - FISO Seminar #7 08.09.2016 TE.GEN.00409-001 ATM/ANS CRs Regulation 2016/1377 Main objectives are to: implement Essential
More informationPERFORMANCE MEASURE INFORMATION SHEET #16
PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days
More informationStatus of SESAR. Iris Public Event 04/02/2013 Peter Hotham (SESAR JU)
Status of SESAR Iris Public Event 04/02/2013 Peter Hotham (SESAR JU) Activating Deployment Set up a binding framework at EU level ATM Master plan Guidance Material & Common Projects With which instruments?
More informationPBCS Flight Plan RCP RSP Codes
Session 3 - Performance-based Communication and Surveillance (PBCS) PBCS Flight Plan RCP RSP Codes Presented to: (Accra, Ghana) By: Tom Kraft, FAA tom.kraft@faa.gov Date: 8 12 August 2016 Flight Plan RCP
More informationTAKEOFF SAFETY ISSUE 2-11/2001. Flight Operations Support & Line Assistance
TAKEOFF SAFETY T R A I N I N G A I D ISSUE 2-11/2001 Flight Operations Support & Line Assistance Flight Operations Support & Line Assistance Introduction The purpose of this brochure is to provide the
More informationGlobal ATM System ~Interoperability and Harmonization ~
SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case
More informationANNEX ANNEX. to the. Commission Implementing Regulation (EU).../...
Ref. Ares(2018)5478153-25/10/2018 EUROPEAN COMMISSION Brussels, XXX [ ](2018) XXX draft ANNEX ANNEX to the Commission Implementing Regulation (EU).../... laying down a performance and charging scheme in
More information> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96
Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken
More informationConcept of Operations Workshop
Concept of Operations Workshop CS#2 4DPP 4D Trajectory Calculation for Purposes Bernard Rausch CS2 Project Manager 03 September 2013 On the menu today. 1. Drivers for change 2. Objectives 3. Concept 4.
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION
APIRG/19 WP16D INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP NINETEENTH MEETING (APIRG/19) (Dakar, Senegal (28 to 31 October 2013) Agenda Item 3 Performance Framework
More informationSingle European Sky II
Single European Sky II A European commitment to innovation IRIS INFORMATION EVENT 26 May 2010, Prague Nicolas Warinsko Single European Sky and ATM Modernisation Unit European Commission 1 Aviation at European
More informationParadigm SHIFT. EEC Innovative Research Dec, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) Horst HERING (Engineering)
Paradigm SHIFT EEC Innovative Research Dec, 2004 Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) Horst HERING (Engineering) Khaled BELAHCENE (Math Mod., Airspace) Didier DOHY (ATM, System)
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More informationRussian Federation ATM modernization program
Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development
More informationOverview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge
ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN
More informationMeasure 67: Intermodality for people First page:
Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the
More information