ESA Iris Programme Overview of results from Iris Phase 1. Briefing 28 July

Size: px
Start display at page:

Download "ESA Iris Programme Overview of results from Iris Phase 1. Briefing 28 July"

Transcription

1 ESA Iris Programme Overview of results from Iris Phase 1 Briefing 28 July Nathalie.Ricard@esa.int 1

2 ESA Iris Programme: Satellite communications for ATM Dedicated ESA programme to support SESAR under the umbrella of ESA s Advanced Research in Telecommunication Systems programme (ARTES 10), named Iris : Commitment of ESA Member States in Sept Definition Phase (Phase 1) completed in Jan Development Phase (Phase 2) approved by ESA Member States in Nov.2008, with funding committed for Phase 2.1 until 2011 Why Iris? In Greek mythology, Iris is the personification of the rainbow and messenger of the gods: Iris links the Sky to the Earth 2

3 Stakeholders in Iris activities Iris Participating States ARTES 10 funding ESA/EC and ESA/SJU relations Requirements Aeronautical stakeholders incl. ANSPs, Airspace Users, Eurocontrol, EASA, ICAO, EUROCAE Raise awareness Advice from aviation Iris programme activities Iris programme contractors European industry Non-commercial Aerospace Telecom Aerospace & Telecom R&D institutes 3

4 System design 4

5 Satellite Communications services in SESAR Continental airspace + oceanic Airport Terminal Manoeuvering Area / En-route (continental area: dual link ) Oceanic, Remote & Polar Login (no traffic) Airport network Future terrestrial network System Wide Information Management (SWIM) Satcom European AOC Centre European Air Traffic Control Centre 5

6 Work carried out during Iris Phase 1 Demonstrate the feasibility of meeting requirements: Define a new communication system o Analyse requirements o Define communication protocols => Identified design drivers + proposed preliminary design Deduce requirements for the satellite system (i.e. Infrastructure options): o Service provision and governance model o Options for satellite system architecture and deployment o Business case o Validation: define required subset of the architecture to be financed by ESA => Identified options Support frequencies allocation o Contribute to estimates of aviation spectrum requirements (prepare ITU WRC11) 6

7 Communication traffic profile per aircraft Based on Eurocontrol/FAA Communications Operational Concept and Requirements (COCR) for 2020+: Various message sizes From 77 to bytes long Short messages with stringent latency requirements Implies peak rates > 14 kbps Receive and transmit is infrequent and not predictable Ad-hoc reservation of capacity required Average throughput per aircraft is a few bps low volume of information per aircraft 7

8 Capacity Requirements: ATS&AOC applications X air traffic growth cruise departure arrival flight - 1 flight path / phases time at airport at airport flight - 2 time Amount of data From one flight airport departure cruise arrival airport flight - i... time begin end time flight - N... Communication pattern of one aircraft (cf. COCR) X Total instantaneous throughput time time 00:00 24:00 Traffic density in 2025 (cf.eurocontrol Long Term Forecast) Traffic Model: calculation of the information throughput for all aircraft flying simultaneously over a given area during the busiest day of the year 8

9 Iris new Satellite Communications Standard Based on Eurocontrol/FAA Communications Operating Concept and Requirements (COCR) for with design optimisation hypotheses: Cost of equipage and use to be kept low Meet performance for continental airspace + capacity needs for Flexible and scalable architecture: no constraint on the number of Ground Earth Stations Interoperable standard supporting multiple Service Providers Use protected radio-spectrum in L-band (AMS(R)S band: 1,545-1,555 MHz and 1, ,656.5 MHz) Support voice and data System specifically designed for aeronautical Air/Ground Satcoms Quality of Service management Light terminals: small antenna and reduced High Power Amplifiers Improved spectrum efficiency Can be used with any type of satellite (GEO, LEO, HEO) Similar to AMSS NEW 9

10 Boundaries of Communication System Design Space Segment Pilot HMI CMU CPDLC AES ATN/IPS MAC ATC Centre Controller HMI FDP ATN/IPS PHY CPDLC ATN/IPS GES MAC PHY MAC PHY NMC/NCC Boundaries of the Iris System SWIM Infrastructure 10

11 User terminal key design drivers Mobile link in L-band Mature, reliable, proven equipment (e.g. no cause of interference) Low cost Key assumptions Use omni-directional aircraft antennas (suitable for all IFR aircraft) Low power consumption, highly reliable, low drag No forced air-cooling required Power limited at 40 to 60W Co-primary mean of communication Software certification probably at level C 11

12 Critical parameters for the system design The size of the antenna for the return link is driven by the user terminal peak rate Whatever the volume of info, the size will be the same The payload mass+power is driven by the capacity on the forward link i.e. the number of carriers 12

13 Satellite System Architecture LEO, HEO or MEO based architecture were considered not cost effective Number of LEO/HEO/MEO satellites required is larger that number of GEO satellites. Non-GEO based solutions might be considered if using a 3 rd -party satellite system Baseline: 2 GEOs in hot redundancy to cover ECAC Peak Instantaneous Aircraft Count (PIAC) over ECAC ~6000 a/c Non-GEO based solutions can be considered as additional components (e.g. Polar coverage) PIAC over northern latitudes ~70 a/c 13

14 Service Provision requirements: geographical area Iris focus on SES/ECAC service area but the communication system is foreseen to become a worldwide standard (ICAO standardisation) so that other world regions could implement compatible systems using the very same terminals on-board aircraft Possible extensions of coverage considered in Iris studies: - Visible Earth from GEO orbit - Northern latitudes areas by agreement with other countries operating HEO satellite systems 14

15 Dependability requirements: consequence on system design A 2+1 (spare) Hot Redundant satellite constellation is required to meet the target system availability Replenishment: a 3rd satellite should be operational by the time the system availability requirement is not met 15

16 Operational System Architecture 16

17 Iris Subset: Minimum infrastructure required for validation Subset Space Segment Test flights Deployment Subset Ground Segment (2 GES, NMC, NCC) System validated (2015) Pre-operational phase for Certification Operational System (2020) 17

18 Service model and business case options 18

19 Iris Programme Fundamental assumptions All Iris Phase 1 studies assume that: (1) Satcom becomes co-primary means of communication in high-density airspace (Dual link) and primary means in ORP (2) Mandatory carriage of Satcom applies as of 2020 in SES/ECAC airspace and concerns IFR traffic (incl. GA) (3) The satellite communications operational system is a component of the European ATM System, which is financed by a mix of public budgets, private investments and cost recovery from end users: ANSP route charges for ATS communication services and airspace users charges for AOC services (4) Deployment of the satellite communications operational infrastructure in 2 steps: ESA Iris Programme finances the minimum system required for validation (except satellite platform and launch), deployed by 2014, which is also the first element of the fully operational system. The remaining elements (incl. redundant space segment) are deployed between the time that the mandate is announced and its effective date 19

20 Revenue model for a Public-Private Partnership Revenues AOC charges AOC Equity Return Additional Equity Return Equity Reurn Revenue from Route Charges ATS Debt repayment Interest & Tax Guaranteed minimum revenue 8% Equity return Operational Costs Source: AVISAT study ATC revenues must guarantee a minimum revenue for the Satellite Service Provider from 2020 onwards to cover operational costs, interest and tax, repayment of the debt for the invesment AOC revenues are subject to market risk but make the business case attractive enough to private operators 20

21 Financing Scenarios: different types of PPP Feasibility studies considered a Public Procurement or Public-Private Partnerships Scenario-1 Scenario-2 Scenario-3 Initial development costs Paid by ESA Paid by ESA Paid by ESA 1st Satellite costs public guaranteed loan. Only repayable if the Mandate materialises First satellite paid by the public. Not repayable. Remains property of oversight body First satellite paid by the public. Not repayable. Remains property of oversight body 2nd Satellite costs 2nd CAPEX payable by SSP as investment. Debt in 2018 is lower risk for investors as returns guaranteed after nd satellite paid by the public. Not repayable. Remains property of oversight body 2nd satellite paid by the public. Not repayable. Remains property of oversight body Assets belong to SSP Asset transfer Assets handed to SSP in 2020 Assets become the responsibility of the SSP in 2020 to operate and provide the service Replacement of assets Replacement assets paid by SSP Replacement assets paid by SSP Replacement assets paid by public Source: AVISAT study 21

22 Sensitivity analysis in the business case: Satellite service provider revenue EUROCONTROL EMOSIA methodology was used to analyse the impact of changing assumptions: Source: Samara study AOC services price per flight [2-10EUR], the percentage of revenue from route charges allocated to the SSP [ %], a/c equipage date and the market penetration of the Satcom service for AOC [25-65%] have the largest impact. 22

23 Iris Phase 1: Regulatory activities Coordination of a common position regarding AMS(R)S spectrum among European and National Frequency Management offices Support activities to seek a European consensus and establish extra-european alliances within ITU ESA participates in ICAO Working Group F and ITU Working Party 4C activities, to support the preparation of WRC11 agenda item on AMS(R)S Aviation communication needs Methodology to derive AMS(R)S spectrum requirements for WRC-11 A.I. 1.7 Satellite system parameters Status: methodology to estimate spectrum requirements based on ESA inputs has been proposed to ITU WP4C and ICAO WG-F Total bandwidth requirements for AI

24 Conclusions: requirements driving the design Communication System Design: Communication protocols to be designed to operate with different types of satellites (GEO, LEO, HEO) so that interoperability between operators is possible The design should be such that ICAO acceptability criteria can be met (e.g. IPR) The spectrum used should be minimised Analysis and Definition of the Satellite System: Dependability issues (esp. availability) are the main design driver Costs trade-off points towards a GEO solution, but Nordic countries request for high-latitude coverage led to consider complementary capacity from 3rd party satellites in Highly Elliptical or Low Earth Orbit. Antenna size and payload power are driven by ATS/AOC applications requirements Service provision: If satellite communication for ATS is mandated it guarantees long-term revenues for a satellite communications service provider; then the system and user terminals cost of ownership should be low Role of SESAR JU, as system architect, to define the system architecture and deployment process 24

25 Iris - Contact Points ESA Iris Programme Franco.Ongaro@esa.int Nathalie.Ricard@esa.int ESA Iris System Design Studies Andrea.Santovincenzo@esa.int (Satellite System) Domenico.Mignolo@esa.int (AVISAT, Samara) Catherine.Morlet@esa.int (ICOS, Phoenix) Piero Angeletti (Astrid: aircraft avionics study) Marco Chiappone (IDeAS: dependability study) Frank Zeppenfeldt (HEO study) Tony Azzarelli (Regulatory / frequency matters) Documentation available via 25

ESA Iris Programme: satellite communications for Air Traffic Management

ESA Iris Programme: satellite communications for Air Traffic Management ESA Iris Programme: satellite communications for Air Traffic Management Noordwijk, 10-11 October 2011 Purpose of ESA To provide for and promote, for exclusively peaceful purposes, cooperation among European

More information

OPERA study. Operational Requirements and Business Case. Iris public event Oct 11 th, The OPERA Consortium is SITA and SES

OPERA study. Operational Requirements and Business Case. Iris public event Oct 11 th, The OPERA Consortium is SITA and SES OPERA study Operational Requirements and Business Case Iris public event Oct 11 th, 2011 The OPERA Consortium is SITA and SES OPERA Iris Public Event October 2011 slide 1 SITA Disclaimer note The following

More information

Satcom for ATM. Iris workshop ESTEC, 18th September 2007

Satcom for ATM. Iris workshop ESTEC, 18th September 2007 Satcom for ATM Iris workshop ESTEC, 18th September 2007 Objectives The objective of this study is to specifically investigate whether or not a satellite system dedicated to safety communications can be

More information

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming

More information

Spectral Efficient COMmunications for future Aeronautical Services. Jan Erik Håkegård ICT

Spectral Efficient COMmunications for future Aeronautical Services. Jan Erik Håkegård ICT Spectral Efficient COMmunications for future Aeronautical Services Jan Erik Håkegård 1 Outline Overview aeronautical communication today International activities SECOMAS activities Impact on Norwegian

More information

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg Feb 5, 2013 Background: Inmarsat Aviation Services With more than 11,000 aircraft relying on global in-flight connectivity from Inmarsat,

More information

Honeywell Advanced Technologies Europe Radek Zaruba, May, ANTARES WP33 User Terminal for General Aviation

Honeywell Advanced Technologies Europe Radek Zaruba, May, ANTARES WP33 User Terminal for General Aviation Honeywell Advanced Technologies Europe Radek Zaruba, May, 2010 ANTARES WP33 User Terminal for General Aviation What is GA? - GA Definitions are ambiguous: The British Business and General Aviation Association:

More information

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL AeroMACS Why it is important for aviation AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL Introduction Context Standards Current Developments Benefits 2 Aeronautical Mobile

More information

SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink

SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P15.02.07 Airport Surface Datalink AERONAUTICAL COMMUNICATIONS PANEL (ACP) 6th Meeting of the Working Group S (Surface) Sendai, Japan

More information

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL AeroMACS Why it is important for aviation AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL Introduction Context Standards Current Developments Benefits 2 Aeronautical Mobile

More information

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe

More information

Single European Sky II

Single European Sky II Single European Sky II A European commitment to innovation IRIS INFORMATION EVENT 26 May 2010, Prague Nicolas Warinsko Single European Sky and ATM Modernisation Unit European Commission 1 Aviation at European

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

Electronic visibility via ADS-B for small aircraft. John Korna, NATS

Electronic visibility via ADS-B for small aircraft. John Korna, NATS Electronic visibility via ADS-B for small aircraft John Korna, NATS The SESAR General Aviation challenge SESAR is predominantly aimed at scheduled commercial air traffic and 100M+ airframes How is SESAR

More information

MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING

MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING International Civil Aviation Organization Global Tracking 2014-WP/1 5/5/14 WORKING PAPER MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING Montréal, 12 May to 13 May 2014 Agenda item 1: Explore the need

More information

Aeronautical Communications: Changes Ahead - FCI

Aeronautical Communications: Changes Ahead - FCI Aeronautical Communications: Changes Ahead - FCI Aviation Electronics Europe Munich, Germany 25-26 March 2015 Nikos Fistas EUROCONTROL v 1.0 Agenda Current Status Future Communication Infrastructure (FCI)

More information

Air4All Frequency Group Study on military spectrum allocations required for the Insertion into the GAT of the UAS

Air4All Frequency Group Study on military spectrum allocations required for the Insertion into the GAT of the UAS Air4All Study on military spectrum allocations required for the Insertion into the GAT of the UAS ESA-EDA Workshop Noordwijk, May 27th & 28th, 2009 Presented by Jean-Louis Roch, Thales Aerospace Objectives

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

Iris Information Event October Overview of SESAR P. Tavernise

Iris Information Event October Overview of SESAR P. Tavernise Iris Information Event 10-11 October 2011 Overview of SESAR P. Tavernise WHY SESAR? EUROPEAN CHALLENGES: Capacity: Air Traffic to double by 2030 Safety: Improvements linked to growth Environment: Growth

More information

The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011

The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011 The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011 Why SESAR needs SATCOM? Controllers need real time information... Past

More information

European Aeronautical Common Position WRC 2012

European Aeronautical Common Position WRC 2012 Ref. Ares(2015)1631050-16/04/2015 COVERNOTE UAS SPECTRUM POSITION PAPER FOR European Aeronautical Spectrum Frequency Consultation Group (ASFCG) European Aeronautical Common Position WRC 2012 This is an

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

IRTI/TF/1. DRAFT ICAO Position FOR WRC-15 Agenda Item 5 (WP/09)

IRTI/TF/1. DRAFT ICAO Position FOR WRC-15 Agenda Item 5 (WP/09) International Civil Aviation Organization DRAFT ICAO Position FOR WRC-15 Agenda Item 5 (WP/09) Presented by Prosper Zo o Minto o, ICAO RO/CNS, Secretary of NAFISAT Supervisory Committee, in coordination

More information

DVB-S2/RCS Suitability for the Provision of Air Traffic Management Services

DVB-S2/RCS Suitability for the Provision of Air Traffic Management Services DVB-S2/RCS Suitability for the Provision of Air Traffic Management Services Cristina Párraga, Núria Riera, Sandro Scalise, Christian Kissling Institute of Communications and Navigation, DLR, 14-15 September

More information

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

ADS-B via Low Earth Orbiting Satellites Benefits Assessment ADS-B via Low Earth Orbiting Satellites Benefits Assessment Jeff Dawson Director, Operational Support NAM/CAR ANI/WG/1 July 2013 Aireon LLC is a joint venture between NAV CANADA and Iridium to finance,

More information

European ATM Development The Big Idea

European ATM Development The Big Idea European ATM Development The Big Idea Bo Redeborn Principal Director ATM EUROCONTROL CANSO Data Communications Conference Amsterdam, 6-8 th Sept 2011 The European Organisation for the Safety of Air Navigation

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

PENS Symposium How to join PENS

PENS Symposium How to join PENS PENS Symposium How to join PENS Speaker Organisation Date and venue Jacky POUZET Head of Communications and Frequency Coordination EUROCONTROL 17 th October 2012, Brussels The European Organisation for

More information

International Civil Aviation Organization. Satellite spectrum to support the safe operation of Unmanned Aircraft Systems

International Civil Aviation Organization. Satellite spectrum to support the safe operation of Unmanned Aircraft Systems International Civil Aviation Organization Satellite spectrum to support the safe operation of Unmanned Aircraft Systems Loftur Jónasson, Air Navigation Bureau, ICAO 23 May 2012 Convention on International

More information

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010 The Single European Sky and SESAR, the European ATM modernisation programme Patrick Ky, Executive Director 26 May 2010 TODAY S SITUATION IN EUROPE 4 Fragmentation of the European AIrspace THE CONTEXT Traffic

More information

Future Communications Infrastructure - Technology Investigations. Evaluation Scenarios

Future Communications Infrastructure - Technology Investigations. Evaluation Scenarios Future Communications Infrastructure Version 1.0 EUROCONTROL/FAA Future Communications Study Operational Concepts and Requirements Team EUROCONTROL CONTENTS LIST OF TABLES... III LIST OF FIGURES... III

More information

OVERVIEW OF THE FAA ADS-B LINK DECISION

OVERVIEW OF THE FAA ADS-B LINK DECISION June 7, 2002 OVERVIEW OF THE FAA ADS-B LINK DECISION Summary This paper presents an overview of the FAA decision on the ADS-B link architecture for use in the National Airspace System and discusses the

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 28/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 1 The attached report has been approved by thee Committee for submission

More information

COMMUNICATIONS PANEL. WG-I 20 Meeting

COMMUNICATIONS PANEL. WG-I 20 Meeting International Civil Aviation Organization CP/WG-I20/WP-04 29/02/2016 WORKING PAPER COMMUNICATIONS PANEL WG-I 20 Meeting Montreal, Canada 29 Feb 4 Mar, 2016 Agenda Item xx: Title: IP Environment for UAS

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

S 2 BAS Space Services Benefits in Aviation Systems. 2 nd ARTES Applications Workshop April 19 th, 2012 Harwell, UK

S 2 BAS Space Services Benefits in Aviation Systems. 2 nd ARTES Applications Workshop April 19 th, 2012 Harwell, UK S 2 BAS Space Services Benefits in Aviation Systems April 19 th, 2012 Harwell, UK General Aviation and Business traffic will expand in the near future (4-6% per year. Source: Eurocontrol, 2011) Regional

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a

More information

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015 Space Based ADS-B Transforming the Way you See the Sky September 23, 2015 COPYRIGHT 2014 AIREON LLC. ALL RIGHTS COPYRIGHT RESERVED. 2014 AIREON LLC. ALL RIGHTS RESERVED. 1 For optimal operational ATM Performance

More information

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels

More information

ASPASIA Project. ASPASIA Overall Summary. ASPASIA Project

ASPASIA Project. ASPASIA Overall Summary. ASPASIA Project ASPASIA Project ASPASIA Overall Summary ASPASIA Project ASPASIA Project ASPASIA (Aeronautical Surveillance and Planning by Advanced ) is an international project co-funded by the European Commission within

More information

NEXT GENERATION SATELLITE SYSTEMS FOR AERONAUTICAL COMMUNICATIONS

NEXT GENERATION SATELLITE SYSTEMS FOR AERONAUTICAL COMMUNICATIONS NEXT GENERATION SATELLITE SYSTEMS FOR AERONAUTICAL COMMUNICATIONS Participating Units at U of Maryland: : National Center of Excellence for Aviation Operations Research : Center for Satellite and Hybrid

More information

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times

More information

IAC 2011 Cape Town, October th

IAC 2011 Cape Town, October th Cape Town, October 05 05 th Project Partners External Supporters and Sponsors The Problem The Solution Overview S 2 BAS Concept of Operations Architecture Possible Applications Stakeholders Flight Phases

More information

The support of an European ANSP

The support of an European ANSP The support of an European ANSP Euromed GNSS II project/medusa Final event on GNSS for aviation Patrizio Vanni (GNSS expert) International Strategies Office patrizio.vanni@enav.it MEDUSA final event on

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

Introduction of Aireon: Value extraction from technical opportunity

Introduction of Aireon: Value extraction from technical opportunity Space based ADS B ADS B Seminar Hong Kong 22 April 2014 Introduction of Aireon: Value extraction from technical opportunity 1 Aireon LLC is a joint venture between NAV CANADA, IAA, ENAV, NAVIAR and Iridium

More information

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Version 1.0 Director NSS 14 February 2018 Guidance for Complexity and Density Considerations

More information

Overview of Worldwide Data Link Equipage Mandates

Overview of Worldwide Data Link Equipage Mandates Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

MANUAL FOR AERONAUTICAL MOBILE SATELLITE (ROUTE) SERVICE Part 1. DRAFT v March 2007

MANUAL FOR AERONAUTICAL MOBILE SATELLITE (ROUTE) SERVICE Part 1. DRAFT v March 2007 MANUAL FOR AERONAUTICAL MOBILE SATELLITE (ROUTE) SERVICE Part 1 DRAFT v1.0 21 March 2007 Date & Version 11/01/06 v0.1 v.0.2 v.0.3 v.1.0 Change Draft of Part 1 of ICAO AMS(R)S Manual Tempe, AZ WG-07 meeting

More information

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico INTEGRATION OF SPACE-BASED (SB ADSB) TECHNOLOGY INTO THE CANADIAN AIR NAVIGATION SYSTEM

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

Performance Analysis of Space-Based ADS-B

Performance Analysis of Space-Based ADS-B Performance Analysis of Space-Based ADS-B MIT Lincoln Labs ATC Workshop December 5 th, 2017 Dr. Michael Garcia and John Dolan 1 Agenda Aireon Overview On-Orbit Acceptance Test (OOAT) Performance Results

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services NextGen's ADS-B - the FAA's Plan to Modernize our National Air Transportation System, and What It Means to You To: Texas General Aviation Summit By: Tim Schroeder, SBS

More information

Official Journal of the European Union L 283/25

Official Journal of the European Union L 283/25 27.10.2007 Official Journal of the European Union L 283/25 COMMISSION REGULATION (EC) No 1265/2007 of 26 October 2007 laying down requirements on air-ground voice channel spacing for the single European

More information

Interim Report of the Preliminary Impact Assessment on the Safety of Communications for Unmanned Aircraft Systems (UAS)

Interim Report of the Preliminary Impact Assessment on the Safety of Communications for Unmanned Aircraft Systems (UAS) Interim Report of the Preliminary Impact Assessment on the Safety of Communications for Unmanned Aircraft Systems (UAS) 27 July 2009 Issue 1.0 Copyright EASA 2009 Prepared by: Title Signature Adrian Clough

More information

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee May 17, 2010 Rose Ashford Rose.Ashford@nasa.gov 1 Outline Key Technical Concepts in TBO Current

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

TERMS OF REFERENCE RTCA Special Committee 228 Minimum Performance Standards for Unmanned Aircraft Systems (Rev 4) REQUESTORS:

TERMS OF REFERENCE RTCA Special Committee 228 Minimum Performance Standards for Unmanned Aircraft Systems (Rev 4) REQUESTORS: TERMS OF REFERENCE RTCA Special Committee 228 Minimum Performance Standards for Unmanned Aircraft Systems (Rev 4) REQUESTORS: AUS Organization Earl Lawrence Person SPECIAL COMMITTEE LEADERSHIP: Position

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

Implementation of SESAR Pilot Common Project. - expected effects

Implementation of SESAR Pilot Common Project. - expected effects Implementation of SESAR Pilot Common Project - expected effects (2014-2024) European Commission May 20, 2014 - Oslo 1 SESAR SESAR - Technological Pillar of the Single Technological pillar of the SES European

More information

PRELIMINARY STUDY OF SATELLITE SPECTRUM REQUIREMENTS Overview of Civil Aviation Satellite Communications & Spectrum Requirement Refinement

PRELIMINARY STUDY OF SATELLITE SPECTRUM REQUIREMENTS Overview of Civil Aviation Satellite Communications & Spectrum Requirement Refinement AMCP WG-F WP/31 INTERNATIONAL CIVIL AVIATION ORGANIZATION Regional Preparatory Group Meeting for World Radiocommunication Conference 2003 (RPGM-2003) And AMCP WG-F Meeting AGENDA ITEM 8: 1.5/1.6 GHz bands

More information

Services for Air Transport. The mobile satellite company

Services for Air Transport. The mobile satellite company Services for Air Transport The mobile satellite company In-flight connectivity The intelligent way Inmarsat is the most experienced and widely used satellite communications operator in the air transport

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December 2001 - Mike Murphy ATN Systems, Inc. (ATNSI) 703-412 412-2900, 2900, Mike.Murphy@atnsi.com ATNSI, ATN Seminar 1 Presentation

More information

User Terminal certification process considerations

User Terminal certification process considerations User Terminal certification process considerations Wilfred Rouwhorst Martijn Stuip NLR Cockpit and Flight Operations Department NLR Aircraft Systems Department ESA-Iris Information Event, 10-11 October

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

PBCS Charter Concept

PBCS Charter Concept PBCS Charter Concept Global Operational Data Link (GOLD) Familiarization with Performance Based Communications and Surveillance (PBCS) Workshop Dakar, Senegal 11-15 September 2017 Prepared by: FAA WJH

More information

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well

More information

EUROCONTROL. Eric MIART Manager - Airport Operations Programme (APR)

EUROCONTROL. Eric MIART Manager - Airport Operations Programme (APR) Traffic Forecast for 20 Years Resulting Challenges for Airports Potential Solutions AIRNETH, The Hague 12 th of April 2007 EUROCONTROL Eric MIART Manager - Airport Operations Programme (APR) www.eurocontrol.int/airports

More information

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003 11/9/03 ELEVENTH AIR NAVIGATION CONFERENCE Montreal, 22 September to 3 October 2003 Agenda Item 7 : Aeronautical air-ground and air-to-air communications CURRENT TRENDS IN THE IMPLEMENTATION OF AIR TRAFFIC

More information

Digital transformation of aviation Marouan CHIDA

Digital transformation of aviation Marouan CHIDA Digital transformation of aviation Marouan CHIDA Digital Transformation & Innovation Manager SESAR Joint Undertaking 18th May 2018 SESAR ATM MASTER PLAN EXPLORATORY RESEARCH INDUSTRIAL RESEARCH AND VALIDATION

More information

NCSRPM for WRC-12 preparation. Presented by John Taylor

NCSRPM for WRC-12 preparation. Presented by John Taylor NCSRPM for WRC-12 preparation Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS Presented by John Taylor UAS Unmanned Aircraft Systems (UAS) consists of Unmanned Aircraft (UA) and associated Control

More information

Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster. Helsinki, IST Event /11/ 2006,16:00-17:30

Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster. Helsinki, IST Event /11/ 2006,16:00-17:30 Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster Helsinki, IST Event 2006 22/11/ 2006,16:00-17:30 Agenda 16:00 Welcome (Andrea Kurz, Airport Safety Cluster) 16:05 Setting

More information

Aeronautical METeorology in Europe

Aeronautical METeorology in Europe Aeronautical METeorology in Europe Weather Information Modelling Activities Dennis Hart Aeronautical Information Management Division EUROCONTROL European Organisation for the Safety of Air Navigation Overview

More information

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,

More information

Sven Kaltenhäuser, Frank Morlang, Dirk-Roger Schmitt German Aerospace Center DLR

Sven Kaltenhäuser, Frank Morlang, Dirk-Roger Schmitt German Aerospace Center DLR www.dlr.de/fl Chart 1 > Improved integration of SVO into ATM - 33rd Space Symposium > Kaltenhaeuser, Morlang, Schmitt > 2017-04-03 A concept for improved integration of Space Vehicle Operation (SVO) into

More information

ICAO EUR Region Civil/Military Cooperation Seminar/Workshop

ICAO EUR Region Civil/Military Cooperation Seminar/Workshop ICAO EUR Region Civil/Military Cooperation Seminar/Workshop ICAO Training Institute Kyiv and UkSATSE Boryspil, Ukraine, 28-31 October 2013 ICAO European and North Atlantic Office 6 November 2013 Page 1

More information

Surveillance Opportunities and Challenges

Surveillance Opportunities and Challenges Services Info Days Brussels, 6-7 December 2017 Opportunities and Challenges Christos Rekkas Head of SUR Modernisation TLP: GREEN 1 SUR Applications list extending PSR/SSR Mode S Elementary Enhanced ADS-C

More information

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air

More information

Excerpts from ICAO PBCS Manual

Excerpts from ICAO PBCS Manual IBAC Bulletin - 8 Dec. 2017 Attachment A Excerpts from ICAO PBCS Manual Chapter 4. Complying with and RCP/RSP specification 4-8 4.3.1.7 The ANSP should establish the following, subject to a bilateral,

More information

CASCADE OPERATIONAL FOCUS GROUP (OFG)

CASCADE OPERATIONAL FOCUS GROUP (OFG) CASCADE OPERATIONAL FOCUS GROUP (OFG) Use of ADS-B for Enhanced Traffic Situational Awareness by Flight Crew During Flight Operations Airborne Surveillance (ATSA-AIRB) 1. INTRODUCTION TO ATSA-AIRB In today

More information

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project Presented by Mohammad Al Dossari Director Air Navigation & Aerodromes Department General Civil Aviation Authority United Arab

More information

2 nd Stakeholders Consultation Workshop SES Interoperability Mandate on Air-Ground Voice Channel Spacing

2 nd Stakeholders Consultation Workshop SES Interoperability Mandate on Air-Ground Voice Channel Spacing 2 nd Stakeholders Consultation Workshop SES Interoperability Mandate on Air-Ground Voice Channel Spacing 5 th September 2006 EUROCONTROL HQ - Brussels 1 WELCOME OBJECTIVES OF THE WORKSHOP Jean-Luc Garnier

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013 International Civil Aviation Organization ATConf/6-WP/52 15/2/13 WORKING PAPER WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING Montréal, 18 to 22 March 2013 Agenda Item 2: Examination of key

More information

Home LIST OF ACRONYMS

Home LIST OF ACRONYMS LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

ICAO Performance Based Approach

ICAO Performance Based Approach ICAO Performance Based Approach Regional Performance Framework Workshop, Baku, Azerbaijan, 10-11 April 2014 ICAO European and North Atlantic Office April 2014 Page 1 Aviation Traffic Flow April 2014 Page

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

Agenda Item 1.17 Wireless Avionics Intra-Communications (WAIC)

Agenda Item 1.17 Wireless Avionics Intra-Communications (WAIC) Agenda Item 1.17 Wireless Avionics Intra-Communications (WAIC) Joseph Cramer The Boeing Company Presentation for Working Parties 5A, 5B, 5C Workshop on Preparations for WRC-15 May 23, 2012 WAIC and Next

More information

Historical background

Historical background Page Page 1 1 NAVISAT Presented By NAVISAT Chairman & CEO Contents Page Page 2 2 1. Historical background 2. NAVISAT Integration into the Global Infrastructure 3. NAVISAT Studies Status 4. NAVISAT Vision,

More information

IMPLEMENTATION OF ADS-B BY NAV CANADA

IMPLEMENTATION OF ADS-B BY NAV CANADA IMPLEMENTATION OF ADS-B BY NAV CANADA Carole Stewart-Green Manager, ATS Regulatory Coordination ABOUT NAV CANADA Private, non-share capital company Second largest ANSP in the world 12 million aircraft

More information

Harris Experience in the U.S. Surveillance Broadcast Systems (SBS)

Harris Experience in the U.S. Surveillance Broadcast Systems (SBS) Harris Experience in the U.S. Surveillance Broadcast Systems (SBS) Copyright 2015 Harris Corporation. This document is classified as EAR99 according to the EAR under Commerce Department jurisdiction. There

More information

SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T

SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T This document is part of a series of technical support documents to the green paper "TEN-T : A policy review Towards a better integrated trans-european transport

More information

Welcome to AVI AFRIQUE 2017

Welcome to AVI AFRIQUE 2017 Welcome to AVI AFRIQUE 2017 Single African sky and Functional Airspace Blocks: Improving Air Traffic Management The global ATM operational concept is fundamental framework drive ATM operational requirements,

More information

SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY. Owen DAVIES Brussels Representative Department of International Affairs, NATS

SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY. Owen DAVIES Brussels Representative Department of International Affairs, NATS SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY Owen DAVIES Brussels Representative Department of International Affairs, NATS Content of Presentation Introduction Overview of NATS involvement in SESAR Beyond

More information