1 City of Colorado Springs Open Space Stewardship Services (TOPS) Contract #C Annual Project Report January 4, 2018 Report prepared by: Hannah Millsap, Field Instructor 815 South 25th Street, Suite 101 Colorado Springs, CO Dedicated to the conservation and stewardship of public lands in the Pikes Peak Region

2 SUMMARY 2 Over the course of 2017, (RMFI) conducted its second season of stewardship work on many of the City of Colorado Springs parks properties acquired with revenue from the Trails, Open Spaces, and Parks tax (TOPS). After a successful first year in 2016, RMFI continued to work in conjunction with Colorado Springs Parks, Recreation, and Cultural Services (CSPRCS) to improve sustainable access and uses of these properties. Between March and December 2017, RMFI worked with CSPRCS staff, community volunteers, and local park support groups ( Friends of groups) to complete work on 8 TOPS properties: Red Rock Canyon Open Space Blodgett Peak Open Space Ute Valley Park Open Space Stratton Open Space University Park Open Space Austin Bluffs Open Space High Chaparral Open Space Property managed adjacent to the Manitou Incline Connector (Incline Connector Trail) The RMFI staff-based TOPS stewardship crew coordinated with CSPRCS land management staff to assess stewardship requirements (implementing available Master/Management Plan provisions), to manage and conduct stewardship projects, to monitor those projects for success, and to discuss necessary adaptations of techniques to suit local conditions and park uses. Priority locations on each property and top-level work objectives for key locations within each property were established by CSPRCS staff. These were then assessed by RMFI staff and the respective park staff to further delineate specific work sites and objectives. Typical objectives included closure and restoration of social trails, stabilization of areas impacted by significant erosion, building in-trail structures to improve trail durability and safety, and new trail construction. The overall goal of this work was to implement aspects of each property s master planning process, which seeks to facilitate public visitation and sustainable use in these natural areas while applying best practices to reduce visitor impact to the area s resources. Over the course of the 2017 work season, a total of 522 volunteers donated 2,783 hours to TOPS stewardship work over the course of 44 volunteer-based workdays for an estimated value of $72,275 (at $25.97 per hour, independentsector.com). The RMFI TOPS stewardship crew and supporting staff contributed another 3,112 work hours during those 44 volunteer workdays and during an additional 44 staff-based workdays. In total 5,895 person-hours were focused on the TOPS properties over 88 workdays of RMFI-led stewardship work. Highlights of this work include the closure and restoration of 11,909 linear feet (2.3 miles) of social trails and 14,208 square feet of other impacted areas (including use of 1,005 native transplants), construction of 4,823 linear feet (0.9 miles) of new trail, and improvements to 2,988 linear feet of existing trail. Other specific improvements include installation of 699 linear feet of fencing and 600 square feet of rock wall, construction of 62 check dams, construction of 55 steps and multiple accompanying bike ramps, and the construction or maintenance of 61 drainage structures. These accomplishments will be described in more detail in the work narrative section below. The work completed in 2017 proved to be an invaluable addition to work completed in the previous year. BACKGROUND The City of Colorado Springs TOPS program was developed in 1997 to acquire and preserve public areas for trails, open spaces, and parks throughout the Pikes Peak Region. The program is funded through a sales tax that takes 1/10 th of every cent. Since the inception of the TOPS program, over 6,200 acres of

3 3 open space lands on over 30 properties have been acquired for natural resource conservation and public recreation. These natural spaces are also offered additional protection under the provisions of conservation easements entered into by the City with the Palmer Land Trust and other land trusts. For more information on individual properties acquired and managed under the City s TOPS program, visit the City of Colorado Springs website at Stratton Open Space Stratton Open Space is a acre property located along the Ute Pass Fault on the southwest edge of Colorado Springs at the transition from residential neighborhoods to the east and expansive public lands to the west including North Cheyenne Canyon Park and Pike National Forest. The property is an invaluable ecological and recreational asset, with a trail system leading through a variety of shrublands, grasslands, and forest (Figure 1). The property is popular among local residents and tends to attract hikers, mountain bikers, and pet owners with its vast network of trails that also act as a gateway to a larger regional trail system. Unfortunately, social trails continue to present an issue as many of these undesignated trails pre-date the City s acquisition of the property and trail users are reluctant to discontinue using their favorite trails. Many smaller social trails were also discovered this year leading from the surrounding neighborhoods into the greater trail system. Figure 1. Stratton Open Space. This year, the Stratton Open Space property saw significant forest management activity carried out by the City s Forestry Department as a preventative measure to mitigate risks from catastrophic wildfire. Vegetation thinning activities changed the short-term vegetation profile of large portions of the park and highlighted the importance of closing social trails as they became much more visible and accessible in the treated areas throughout the park. Blodgett Peak Open Space Blodgett Peak Open Space features 167 acres of diverse wildlife habitat and trail systems adjoining the Pike National Forest. The open space is located directly beneath Blodgett Peak, offering trail access to that peak, and abuts the United States Air Force Academy (USAFA) to the north. The property is wellknown for its geological formations including sedimentary rock from Manitou Limestone, Fountain, and Pierre Shale Formations. The open space predominantly attracts users from the local residential area and sees use from hikers and mountain bikers. Sustainable access presents a challenge on this property in particular due to its steep slopes, fall-line trail alignments, undesignated homeowner access trails, and a slew of other undesignated social trails. Successful slope stabilization and restoration efforts, subsequent to the 2012 Waldo Canyon Fire, enabled the City to re-open this property in 2013 to a steady Figure 2. Blodgett Peak Open Space during RMFI postfire stabilization work in early Re-opened in August 2013, the park enjoys steady visitation once again.

4 4 stream of visitors (Figure 2). This year, CSPRCS coordinated with the U.S. Forest Service, who manages the national forest bordering the open space to the west, to close social trails between the two properties and for better wayfinding on approved trails. This was an important development for the many hikers who unknowingly use these undesignated trails to hike to the summit of Blodgett Peak. The trail is in very poor condition and has had extensive impact to the ecological resources. Moving forward, the designated trail system in the open space and between the two properties should continue to become clearer to users and will hopefully diminish the perceived need to use social trails for summit and neighborhood access. Blodgett Peak Open Space was also the location of one of four Bioblitz events across Colorado Springs this summer as part of the 20 th anniversary of the TOPS initiative. A Bioblitz is a unique opportunity for scientists and the general public to come together to record existing species in a given location to provide a more detailed understanding of an ecological community. In 24 hours, community members participating in the event recorded a total of 294 individual species in the open space including mammals, reptiles, flowers, fungi, and invertebrates (Blodgett, 2017). RMFI supported this event with staff members leading a guided hike to view restoration sites as well as hosting a stewardship outreach information table. Ute Valley Park Open Space The recently acquired Ute Valley Park Open Space contains 200 acres of property directly adjacent to Ute Valley Park and represents one of the most popular mountain biking locations within the City. The open space is very popular amongst residents of the northwest quadrant of Colorado Springs (Figure 3). The property is underlain by the Laramie Formation and is characterized by brittle rock outcrops and heavily weathered soils, which create highly erodible surfaces. The area is sparsely vegetated and therefore social trails form quickly as users seek access to new vantage points or an unclaimed route for bike riding. In some areas of the property, the alignment of trails up steep slopes in combination with moderate to heavy rain events have led to severe incision and the formation of erosion gullies in impacted off-trail locations. Figure 3. Ute Valley Park Open Space. Photo by Darcy Kiefel. This year, RMFI completed the southern segment of the East Loop Trail network, which opened up an eastern trailhead to runners, hikers, and bikers. The new trail has been a great addition to this TOPS property as evidenced by a very positive reception by the public. Ute Valley Park Open Space also hosted a Bioblitz event this year in which RMFI provided stewardship outreach support while community members observed 363 species living in the ecosystem (Milito, 2017). Red Rock Canyon Open Space Red Rock Canyon Open Space (RRCOS) shares most of the same geology and natural features as its more famous and heavily-visited neighbor, the Garden of the Gods Park. With fewer out-of-town visitors than the Garden, RRCOS remains a favorite of local outdoor enthusiasts throughout the year. Situated at the foot of the Ute Pass, its dramatic sedimentary rock formations and foothills vegetation frame great views of the Front Range rising to the west. A majority of trails on the property are designated multi-use

5 5 including its connection with the regional Palmer Trail (also referred to as Section 16 ). Some areas are designated to accommodate special pursuits, including rock climbing and off-leash pet areas. Red Rock Canyon is one of the few TOPS open spaces with an active Friends group. RMFI enjoyed an opportunity to partner with the Friends of Red Rock Canyon and its trained Crew Leaders on the White Acres Trail project this year. The development of that new trail, in the southeast section of the property, offered improved designated access to the area known as White Acres. This part of the open space was not used heavily previously but is now seeing increased use since the new trail opened. University Park Open Space/Austin Bluffs Open Space University Park Open Space (74.6 acres) and Austin Bluffs Open Space (584 acres) together make up a complex of open space properties in north central Colorado Springs, and is home to an array of geological formations, mesas, bluffs, valleys, and shrublands that create a unique ecological framework. The land is surrounded by residential area and the University of Colorado at Colorado Springs (UCCS), with primary users of the open space including local residents and students of the university (Figure 5). Figure 4. Red Rock Canyon Open Space. Photo by Friends of Red Rock Canyon. The 2017 season was the first in which RMFI spent a significant amount of time working on these properties under the Open Space Stewardship Services contract. Goals for the management of this open space complex include the enhancement of diversity and health of native vegetation, protection of wildlife and wildlife habitat, as well as the management of trails and infrastructure. High Chaparral Open Space High Chaparral Open Space is a 54-acre parcel of land located in the northeastern part of Colorado Springs vegetated with scrub oak and prairie grasses. As the highest point on the City s eastside, this area is a local favorite of hikers and mountain bikers who love the area for its scenic views and trails that are easy to navigate on foot and bike (Figure 6). Figure 5. University Park Open Space. Photo by Go Hike Colorado. This year, much of RMFI s work in High Chaparral Open Space was funded by another source. However, two workdays toward the end of the season were funded by TOPS and addressed feedback from trail users. Figure 6. High Chaparral Open Space. Photo by Jessie Emslie.

6 OPEN SPACE STEWARDSHIP PROGRAM GOALS 6 In support of the City s stewardship goals for its open space properties, the primary goals of RMFI s Open Space Stewardship Services (TOPS) program are to: Plan, implement, and manage open space stewardship projects at various open spaces acquired through the City s TOPS program, guided by the City s master/management plans for these properties. Complete critical restoration work in the most severely degraded areas of each property. Complete essential trail improvement and construction work to provide for designated enjoyable and sustainable access throughout each property. Provide stewardship opportunities for a broad spectrum of the community including individuals, local schools, community organizations, businesses, and other groups. Foster community awareness about the ecology, natural history, and current threats to each property. PUBLIC PERCEPTION OF 2017 STEWARDSHIP WORK Between daily interactions with visitors in the field and feedback through social media and public outreach, the RMFI TOPS crew received a broad range of comments from the public regarding its 2017 stewardship work; however, a majority of feedback has been quite positive and appreciative. The completion and opening of the south segment of the Eastern Loop Trail in Ute Valley Park Open Space was especially well-received by trail users mountain bikers in particular for implementing many features designed specifically for mountain biking. The White Acres Trail in Red Rock Canyon Open Space has also been a popular new destination for trail users who seem to be very happy with the access it provides over the Niobrara Formation (Figure 7). Though most of this trail was built by another contractor, RMFI played a significant role by organizing and leading an inaugural Colorado Public Lands Day stewardship event to conduct trail-finishing with 4 other community non-profit partners. Figure 7. Volunteers working hard on Public Lands Day in Red Rock Canyon Open Space. Photo by George Lee. Though most have been happy with the work completed, there have been a few instances of trail users and members of the general public expressing frustration over changes on favorite trails and to closures of favored social trails. Most of these interactions were in reference to work done in Stratton Open Space to affect social trail closures, especially those leading to the open space from the surrounding residences. Some individuals felt that this was unnecessary and potentially a waste of tax dollars, expressing that they preferred their particular social trail to stay open for easy access to their local park. This has been a recurring issue that has carried over from the 2016 season with some individuals going so far as to destroy restoration measures and structures put in place by the RMFI TOPS crew. Park staff have sought to reduce such tension in 2017 by distributing educational notices to neighboring residences in both Stratton and High Chaparral Open Spaces, and we feel this has been helpful. Another example of feedback comes from a small project to reduce erosion at one short, sloped section of trail at High Chaparral Open Space by adding timber box steps. A concerned individual stated, understandably, that these new steps ruined the flow of the trail system for bike users. The Park staff promptly allocated TOPS funding for the RMFI crew to build an accompanying bike ramp in parallel with the box steps. Consideration of such feedback will help ensure that funds are used to improve trails

7 7 and open spaces for all users while protecting the resource. CSPRCS staff, in managing these open spaces, continue to be extremely helpful in collecting feedback from community users and in finding solutions. WORK NARRATIVE Stratton Open Space From August 8 to September 9, RMFI spent 14 workdays on several objectives spread across the property, primarily closing social trails and improving drainage. In addition to these priorities, RMFI also maintained previously installed structures including timber drop structures and timber risers. Project objectives at each site were accomplished with a combination of RMFI TOPS crew workdays, open enrollment volunteer workdays, and corporate and youth/school group volunteer days. For a complete map of Stratton Open Space, including site names, see Appendix A. Management Areas 1 and 2: This season, RMFI continued to maintain timber drop structures that were previously installed to address the erosive potential of heavy precipitation events and sedimentation originating from storm water draining from the Stratton Forest Heights neighborhood. RMFI and volunteers moved 1 ton of rock and armored the areas beneath 2 of these structures to avoid further undercutting. These measures proved to be effective with no additional scouring observed during our 90- day monitoring period. Ponderosa Trail and Site D: Along Ponderosa Trail, RMFI installed check dams and grade dip drains in response to a sizeable gully beginning to form within the trail. Treating the cause, staff and volunteers were successful in improving drainage in this area. However, without significant on-site fill materials to restore the tread, the tread remains incised and should be addressed in the future. This trail also had several short social trails diverging from it that were restored and closed. Upper Meadow Loop and Arroyo Grande Trails: These two trails see a significant amount of water flow, made evident by rill formation along the trails. Staff and volunteers installed 12 grade dip drains along the Upper Meadow Loop site to prevent further rill formation and worked to fill in the center-of-trail rill where possible (Figure 8). Along the Arroyo Grande site, RMFI installed 5 sub-surface stabilization timbers (SSST) as well as 7 other drainage structures to stabilize the tread. These additions are working really well and have successfully kept water off the trail. Figure 8. Before (left) and after (right) tread work and filling of rill along Upper Meadow Loop. The addition of trail drains above this section (not pictured) should help to reduce further rilling.

8 8 Gold Camp Path and Management Areas 7 and 8: Main priorities for these 2 areas included the repair of non-functioning timber steps, stabilization of steep and eroding segments of trail, and the closure and restoration of several rogue trails. A total of 7 timber riser steps were installed and 2 more replaced on the Gold Camp Path to address the steep slope and the undercutting of existing timber risers. Staff and volunteers also closed and restored several long social trails in Management Areas 7 and 8. These closures are holding up and discouraging further use by hikers. Blodgett Peak Open Space The RMFI TOPS crew worked 12 days in Blodgett Peak Open Space between June 20 to July 27. Work at this property focused on improving trail drainage, improving trail durability, and closing social trails. Many volunteers helped on this property including several youth organizations on summer service programs. Another special volunteer event engaged a large group of area educators when RMFI partnered with the Colorado Parks and Wildlife (CPW) Teaching Environment Naturally series to host a half-day stewardship event, which also included the exhibition of the CSPRCS fire-education trunk set. The teachers departed the workday with more options for introducing students to stewardship practices. For a complete map of Blodgett Peak Open Space, including trail names, see Appendix B. Chickadee Trail: Several improvements were made to the Chickadee Trail this year. Two drains were installed and tread was restored in areas that were incised from water-born erosion prior to drainage improvements (Figure 9). RMFI also installed timber box steps on a direct line leading from Blodgett Trail to the Chickadee Trail (as an addition to the existing bike-accessible trail segment) in hopes that hikers will use the steps instead of short-cutting across unimpacted areas. Red Squirrel Trail: At the intersection of the Red Squirrel Figure 9. Before (left) and after (right) of drain installation and tread work on Chickadee Trail. Trail and Chickadee Trail, RMFI put in several SSSTs as well as a timber box step/bike ramp combination to better facilitate hike and bike users. This intersection was previously suffering from major degradation from erosion and general wear and tear from hikers and bikers. Gamble Oak Trail: Along the Gamble Oak Trail, several social trails were successfully closed and restored. The area had several well-established social trails winding through the property as well as some newer social trails that are believed to have originated from off-trail mountain bike use. Staff and volunteers used restoration techniques to camouflage and re-vegetate these areas. These techniques have been effective with significant growth of native grasses noted on our last monitoring visit.

9 9 Dry Creek Trail: At the intersection of the Dry Creek Trail with West Woodmen Road, RMFI designed a unique solution to stop the sloughing of tread material from the steep trail onto the sidewalk and road. Staff and volunteers installed 11 timber box steps and incorporated timber wings to form a parallel ramp of tread material for mountain bike use. By out-sloping the trail above the steps, water was forced to drain over onto the vegetated hillside rather than down the new step-ramp combination. RMFI also restored the parts of this hill that lost vegetation during the building period (Figure 10). Figure 10. RMFI staff and Next Step Ministries pause for a picture during the construction of the timber box steps and bike ramp at the Dry Creek trailhead (left photo by George Lee). The completed staircase and bike ramp to its right (right photo). Hummingbird Trail: Along the Hummingbird Trail, staff closed and restored several social trails that had been used as shortcuts to the summit access trail. Two sections of post and dowel fencing were installed to close these routes. The restoration of these deeply-incised trails on steep slopes took considerable effort by volunteers. Upon determining that some hikers were going around the fencing and still using these closed routes, Park staff installed wayfinding signage to help trail users better understand which trails are designated and how best to access the summit. In the future, more fencing could be installed in these areas to make this more difficult for rogue trail users and to encourage use of the proper designated route to the Blodgett Peak summit. Peregrine Trail: North of the water tower, staff and volunteers closed an extensive social trail that connected Peregrine Trail to Hummingbird Trail. It was noted in monitoring visits that some of the larger obstacles (branches and logs) used to cover the closed trails had been moved or broken, suggesting continued use. There has, however, been some new plant growth from restoration efforts that will hopefully discourage further use next season. Water Tower: South of the water tower, at the top of Blodgett Trail, staff and volunteers closed and restored a wide social trail scrambling straight up a steep slope to the Hummingbird Trail. RMFI used restoration techniques as well as erosion control matting (EC) to encourage regrowth on the bare soil. Post and dowel fencing was also installed at the bottom of the trail with signage to discourage use. This area was closed successfully and is experiencing abundant growth of native grasses (Figure 11).

10 Wagon Wheel Trail: Along the Wagon Wheel Trail, RMFI installed several grade dip drains to treat a significant rill that runs the entire length of the trail, making that trail less enjoyable for users. Staff have observed that the grade dips have worked very well here, yet the rill itself remains to be filled and regraded. This treatment would require large amounts of fill as well as rock or timbers for sub-surface structure construction, none of which is readily available from the surrounding area. It is possible that a better long-term solution here would be a re-route of segments of the trail to a more sustainable alignment. Ute Valley Park Open Space 10 Figure 11. Before and after photos of successful social trail restoration located south of the water tower at Blodgett Peak Open Space. Native grasses can be seen germinating through restoration matting on the right. From March 30 to June 9, and December 1 to December 12, RMFI staff and volunteers worked 33 days in Ute Valley Park Open Space (Appendix C). Primary goals were to complete construction of the south portion of the Eastern Loop Trail (begun in late 2016), to decommission and restore the old hazardous social trail it replaced, and to improve limited sections of the north segment of Eastern Loop Trail. As it frequently passed over rough terrain and required significant structure, RMFI staff felt the completion of the Eastern Loop Trail was one of the most rewarding achievements of the year. It was also the project that received the best reception from the public. Mountain bikers in particular have expressed a great deal of appreciation for the new trail and the features that were designed with their use in mind (Figure 12). Figure 12. Before and after photos of the construction of a climbing turn on the Eastern Loop Trail. Eastern Loop Trail (south segment) Construction: Between March and May, RMFI and volunteers built 3,880 linear feet of new trail, to finish the Eastern Loop Trail, which was opened to the public in the spring of 2017 (Figure 13). Staff and volunteers also spent a significant amount of time closing the social trail network that paralleled the new trail. In total, RMFI closed 3,474 linear feet of undesignated trails and restored an additional 721 square feet of impacted area. Other highlights of the work completed at this site include building 411 linear feet of retaining wall, installing 27 check dams, installing 216 linear

11 11 feet of new fencing, and transplanting 329 native plants. RMFI s monitoring of this site suggests that the new trail is wearing-in and holding very well despite frequent use. Figure 13. Before and after photos of single-track trail construction. The trail alignment often traversed narrow private land access easements in steep cross-slope areas requiring careful consideration of final alignment and structure. Eastern Loop Trail (north segment) Improvements: At the end of the 2017 season, the RMFI TOPS crew completed improvements to the well-built north segment of the Eastern Loop Trail (built by another contracted entity). Staff improved 96.5 linear feet of trail through the addition of a new grade dip drain, back-slope and tread refinement, armoring of a small segment of trail, and armoring of an alternate line banking turn (Figure 14). Figure 14. Before and after photos of paving and armored grade dip construction at the trailhead of the north segment of the Eastern Loop Trail. Drainage from Tech Center Road (in background) was concentrated onto the trail here. Red Rock Canyon Open Space Over 15 workdays between May 20 and September 28, RMFI TOPS crew and volunteers worked in Red Rock Canyon Open Space (RRCOS). Primary objectives for this property included trail tread refinement on newly-cut trail, social trail closure (including measures to discourage trail-users from entering sensitive wildlife areas and from unauthorized rock-scrambling), and erosion control in areas of concentrated drainage. A new fencing technique was utilized (buck and rail fencing using pressure-treated wood), which was particularly useful where a rustic and durable fence was desired and where rock

12 12 prevented installation of fence posts. For a map of Red Rock Canyon Open Space, see Appendix D. For a map of work sites within the open space, see Appendix E. Site 1-Connection to Dog Loops: The objective of work at Site 1 was to close multiple social trails that led up the ridge and over to the Lower Dog Loop. These trails led from the parking lot up the eroded face of steep bluff and, if left untreated, may have degraded into large gullies. RMFI staff and volunteers installed check dams to mitigate washouts and halt the incision process. Though bedrock is very close to the surface at points in this site, restoration efforts seem to be slowly taking hold and will hopefully better disguise the area next season. Figure 15. Before and after photos of social trail closure in a shortcut segment leading from the parking lot to the Upper Dog Loop. Site 2-Lower Dog Loop: The objective at this site was to close a social trail that followed the ridge and led to Site 1 and the Upper Dog Loop. Post and dowel fencing was installed at this site, though we suggest using other fencing methods in the future as it proved to be very difficult to properly install fencing here due to the existence of bedrock very close to the surface. Site 3-Upper Dog Loop: At Site 3, RMFI staff and volunteers closed and restored a social trail that led to an overlook of RRCOS and Garden of the Gods Park. Some post and dowel fencing was installed, though it was not tied in to any other structures or natural obstacles due to the issues presented by bedrock. Although the fence doesn t extend very far, duff and other restoration measures are doing an effective job at keeping people away from the social trail. As of November, CSPRCS staff had begun installation of heavy-duty fencing around the whole perimeter of the specially designated off-leash dog loops to better designate these as special use areas. This work supplements the fencing and closures implemented by RMFI and will hopefully allow sensitive areas surrounding these trails an opportunity to restore. Site 4-Ridgeline Overlook: The priority at Site 4 was again to close small social trails leading to an overlook of RRCOS and Garden of the Gods Park. Staff and volunteers restored the area. Transplants and native seed are doing well in the area compared to other sites with similar conditions. Site 5-West Upper Dog Loop: Site 5 contained a social trail that led down the ridge and which passes Site 1 and connects to Lower Dog Loop. Staff and volunteers closed and restored this trail and installed erosion control (EC) matting on the downslope leading to the ridge. Three sections of buck and rail fencing were also built in this area to discourage trail use and were more appropriate than post and dowel fencing due to near-surface bedrock. Though the EC matting doesn t appear to have fostered new growth as of November, possibly due to a dry fall, the sight of the matting alongside fencing and other restoration measures have successfully stopped foot traffic in the area, which may in turn help healthy soils and vegetation eventually return to the area.

13 13 Site 6-West Parking Lot Gullies: Near the west parking lot, several gullies have begun to form from concentrated water movement. RMFI and volunteers installed check dams in the area to minimize further incision (Figure 16). These dams have proven to be effective, though some are undercutting slightly in sandy locations. The area could use more check dams in the future to help slow down water and prevent further undercutting. Site 7-Dakota Ridge: Site 7 contains many popular social trails that are heavily used to access the sandstone ridges in the center of RRCOS. Staff installed buck and rail fencing, post and dowel fencing, and signs to close off this ridge and also restored social trails. Some of the more heavily fenced-off areas seem to be successfully closed. Other fenced-off trails are still being used, with clear signs that trail users are disregarding fencing and signage and walking around to continue to access these areas. University Park Open Space and Austin Bluffs Open Space Figure 16. Before and after photos of check dam construction on a sharply-defined gully at Site 6 in Red Rock Canyon Open Space. Over time, areas behind check dams will fill with sedimentation. From September 12-November 29, the RMFI TOPS crew and volunteers worked 18 days in the University Park Open Space/Austin Bluffs Open Space complex to construct and to improve re-routed segments of a multi-use single track trail spanning both open space properties. This trail was partially built on 2 separate Volunteers for Outdoor Colorado (VOC) workdays. Priority objectives at this site were to re-route large segments of old trail to a new, more sustainable trail, close and restore the old trail, and install drainage structures, rock walls, rock armoring, and rock steps to improve durability and accessibility for hikers and bikers. For a complete map of the University Park Open Space and Austin Bluffs Open Space complex, see Appendix F. For a map of new trail construction and re-route, see Appendix G. Trail Construction and Re-route: Staff and volunteers spent a majority of the time working on new trail construction and re-routing old trail segments that were deemed unsustainable due to poor alignment with the surrounding sloped terrain. In total, RMFI built 975 linear feet of new trail, improved upon 767 linear feet of existing trail, and closed 1,763 linear feet of old trail and social trails in the area. New and improved trail segments were adjusted to better fit the natural contour of the area and now include new drainage and rock features to better suit trail users, and to improve sustainability through very sandy and erosion-prone terrain. Drainage Structures: In an effort to make the redesigned trail more sustainable over time, RMFI built 3 drainage structures, including a paved cross-trail drain and trail transitions to under-trail culverts, and better contoured the trail to allow water to sheet off the trail and down into the valley below. Proper back slope and out-sloping techniques were also applied to the new and improved trail to help with drainage.

14 14 Rock Structures: Sections of the new re-routed trail included several areas where the critical edge was difficult to establish in sandy soils as well as several steep climbing turns that were showing signs of erosion and seemed somewhat unsafe for users. RMFI installed several new rock structures to address these issues. Over the course of the work period in this area, staff and volunteers built 44 square feet of retaining wall and 77 linear feet of mono wall to help stabilize tread and discourage the creation of new social trails by highlighting the designated trail. To address the steep climbing turns, RMFI installed 26 new rock steps of native rock and 3 paved bike ramps using siloam pavers or native rock (Figure 17). These ramps in addition to a cobbled switchback and a paved grade dip totaled 255 square feet of cobbled/paved area. Figure 17. Before and after photos of rock step and bike ramp construction in University Park Open Space on a climbing turn. Structure like this help to harden the trail surface and improve long-term sustainability. High Chaparral Open Space From November staff completed work in High Chaparral Open Space (Appendix H) to supplement another 28 days of work completed earlier in the year under a separate funding agreement. These two days spent under TOPS funding were in direct response to feedback from trail users regarding the location of the installation of a short timber staircase at the intersection of Prairie Loop Trail and Ridgetop Trail. Here, steps made a short, steep segment of trail more durable for hikers and runners. However, the addition made the section of trail less accessible for bike users to ride. In response to this, TOPS funding was allocated to build an accompanying bike ramp to improve the cyclists experience. Staff used siloam pavers to build the 47 square foot ramp, installed gargoyle rocks, and restored the adjacent area to discourage users from cutting around the path (Figure 18). Figure 18. Before and after photos of timber step and paved bike ramp construction in High Chaparral Open Space. Addition of the paved ramp will make this trail junction more accessible to cyclists.

15 WORK ACCOMPLISHMENTS Stratton Open Space 425 linear feet of designated trail improved 6 timber riser steps built 26 drainage structures built and 15 more maintained 5 sub-surface stabilization structures installed 2,280 linear feet of social trails closed and restored including 187 native transplants 11 check dams installed 56 linear feet of fencing installed 4 erosion control structures maintained Blodgett Peak Open Space 115 linear feet of designated trail improved 23 timber box steps built and 2 parallel bike ramps 6 drainage structures built and 3 more maintained 4 sub-surface stabilization structures installed 2,432 linear feet of social trails closed and restored including 224 native transplants 1,457 square feet of off-trail impacted area stabilized 6 check dams installed 90 linear feet of fencing installed 2 log erosion barriers built 3 erosion control structures maintained Ute Valley Park Open Space 3,881 linear feet of new trail built 3,800 linear feet of trail corridor cleared 97 linear feet of designated trail improved 6 drainage structures built and 1 more maintained 411 square feet of retaining wall built 29 linear feet of mono wall built 3,474 linear feet of social trails closed and restored including 329 native transplants 721 square feet of off-trail impacted area stabilized 27 check dams installed 216 linear feet of fencing installed 1 erosion control structure maintained Red Rock Canyon Open Space 1,584 linear feet of designated trail improved 1 drainage structure maintained 1,960 linear feet of social trails closed and restored including 265 native transplants 12,030 square feet of off-trail impacted area stabilized 14 check dams installed 317 linear feet of fencing installed

16 16 University Park/Austin Bluffs Open Spaces 942 linear feet of new trail built 480 linear feet of corridor cleared 767 linear feet of designated trail improved 255 square feet of cobbling/paving 1,763 linear feet of old trail closed and restored 3 drainage structures built 26 rock steps built and 3 parallel paved bike ramps 90 square feet of retaining wall built 83 linear feet of mono wall built 4 check dams installed 20 linear feet of fencing installed High Chaparral Open Space 1 rock-paved bike ramp built (47 square feet) (additional work at this property was completed this season using funding from other sources and is documented in a separate report, available from RMFI) 2017 VOLUNTEER STATISTICS Volunteer workdays: 44 Number of volunteers engaged: 522 Total volunteer hours: 2,783 Value of volunteer time: $72,275 (at $25.97 per hour, independentsector.com) Volunteer Organizations Engaged: 1. Next Step Ministries (Figure 19) 2. Colorado Parks and Wildlife, Teaching Environmental Science Naturally (TEN) Program 3. RoundUp Fellowship 4. Cheyenne Mountain Resort 5. T. Rowe Price 6. Colorado Springs Early Colleges 7. Widefield School District transition students 8. Griffith Centers for Children 9. CIVA Charter High School 10. Shriever Air Force Base 4 th Space Ops Squadron 11. UCCS Conservation Biology Class 12. Atlas Preparatory School 13. SRAM Bike Shop 14. Echopark Automotive 15. FedEx Cares Figure 19. Volunteers from Next Step Ministries at Blodgett Peak Open Space.

17 FUTURE WORK 17 In 2018, RMFI will continue work under Option Year 2 of the Open Space Stewardship contract in partnership with the City of Colorado Springs. RMFI and the City are planning to meet in late January 2018 to discuss 2018 Open Space Stewardship work priorities. In this discussion, results of the post-work monitoring visits to many of the 2017 properties should inform 2018 priorities. Among several priority work locations in consideration by Parks staff for 2018 is the Incline Connector Trail. It has been suggested that a 2018 objective may be to complete installation of remaining fencing requirements along this trail to substantially reduce switchback cutting, a stubborn issue that threatens the enjoyment of users. CONTACT INFORMATION Andy Riter RMFI Program Manager andy@rmfi.org

18 Appendix A Stratton Open Space 18

19 Appendix B Blodgett Peak Open Space 19

20 Appendix C Ute Valley Park Open Space (East Loop Trail (south segment) alignment in white) 20

21 Appendix D Red Rock Canyon Open Space Trail Map 21

22 Appendix E Red Rock Canyon Open Space Site Map 22

23 Appendix F University Park Open Space Trail Map 23

24 24 Appendix G University Park Open Space Trail Construction Map

25 Appendix H High Chaparral Open Space 25

26 26 REFERENCES Blodgett Open Space Colorado Springs, 2017, inaturalist website: bioblitz-bioblitz Sharon Milito, 2017, 2017 Bioblitz Presentation to City of Colorado Springs TOPS Working Committee and Parks Board

Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016

Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016 - Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016 Prepared by: Andy Riter, Program Coordinator, and Joe Lavorini,

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

Rocky Mountain Field Institute

Rocky Mountain Field Institute Rocky Mountain Field Institute Palmer Park Stewardship Project 2016 Annual Project Report December 20, 2016 Report prepared by: Andy Riter, Program Coordinator and Alex Hladkyj, Field Instructor 815 South

More information

Kit Carson-Challenger Ridge Trail Project

Kit Carson-Challenger Ridge Trail Project Kit Carson-Challenger Ridge Trail Project Project Accomplishments Report-USFS December 15, 2015 Photo courtesy of Justin Peterson 815 South 25 th Street, Suite 101 Colorado Springs, CO 80904 Dedicated

More information

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015 Summary Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015 Managed by the BLM Royal Gorge Field Office, Shelf

More information

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 1 Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 Willow Lake and Kit Carson Peak 2 SUMMARY The Rocky Mountain Field Institute began Phase 1 of a multi-phase,

More information

Bear Creek Watershed Restoration Project Final Project Report December 21, 2016

Bear Creek Watershed Restoration Project Final Project Report December 21, 2016 Bear Creek Watershed Restoration Project Final Project Report December 21, 2016 Dedicated to the conservation and stewardship of public lands in Southern Colorado Rocky Mountain Field Institute 815 South

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

Rocky Mountain Field Institute Garden of the Gods Community Restoration Program 2015 Annual Project Report

Rocky Mountain Field Institute Garden of the Gods Community Restoration Program 2015 Annual Project Report Garden of the Gods Community Restoration Program 2015 Annual Project Report December 18 th, 2015 Report prepared by: Mark Tatro, Field Instructor 815 South 25 th Street, Suite 101 Colorado Springs, CO

More information

Rocky Mountain Field Institute Garden of the Gods Community Restoration Program 2017 Annual Project Report

Rocky Mountain Field Institute Garden of the Gods Community Restoration Program 2017 Annual Project Report 1 Garden of the Gods Community Restoration Program 2017 Annual Project Report December 21, 2017 Report prepared by: Kelly Kaufmann, Senior Field Coordinator 815 South 25 th Street, Suite 101 Colorado Springs,

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan Appendix C Tenderfoot Mountain Trail System Road and Trail Rehabilitation Plan All rehabilitation work would be under the direction of the District Fisheries Biologist, the Forest Hydrologist, and/or the

More information

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Colorado Mountain Club 2015 Stewardship Team Program Accomplishments

Colorado Mountain Club 2015 Stewardship Team Program Accomplishments Summary In 2015, CMC launched a new Stewardship Team program and hired a crew of young (25 and under), natural resource professionals to increase capacity of public land management agencies and coordinate

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

2. STAKEHOLDER FEEDBACK // What We Heard

2. STAKEHOLDER FEEDBACK // What We Heard 1. QUARRY ROAD TRAIL // Welcome to the Information Session PROJECT DESCRIPTION WHY WE ARE HERE Quarry Road Trail is a popular commuter trail and recreational area for Calgarians. 1. To report citizen feedback

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

GOLDEN EARS PROVINCIAL PARK

GOLDEN EARS PROVINCIAL PARK GOLDEN EARS PROVINCIAL PARK Trail Information as of October 10 th 2015 Do not underestimate the mountainous wilderness of Golden Ears Provincial Park. The combination of rugged terrain and rapidly changing

More information

Nov. 19 th Public Workshop Summary

Nov. 19 th Public Workshop Summary On November 19 th, more than 60 community members attended an Open Space Matters workshop at the Linen Building in downtown Boise for over two hours. Participants learned about reserves, discussed the

More information

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture United States Department of Agriculture Forest Service Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 6944 South 3000 East Salt Lake City, UT 84121 801-733-2660 File Code: 1950/2300 Date:

More information

American Conservation Experience

American Conservation Experience ACE Project Report For Tonto National Forest, Arizona Trail Association and Arizona State Parks Title of Project: 4 Peaks Trail Maintenance Award Contract Number: ASP NM11021 Project Partner: Paul Burghard

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

National Forests and Grasslands in Texas

National Forests and Grasslands in Texas United States Department of Agriculture Forest Service National Forests and Grasslands in Texas Sam Houston NF 394 FM 1375 West New Waverly, Texas 77358 Phone 936-344-6205 Dear Friends, File Code: 1950

More information

Bear Creek Watershed Restoration Project Final Project Report December 21, 2017

Bear Creek Watershed Restoration Project Final Project Report December 21, 2017 Bear Creek Watershed Restoration Project 2017 Report 1 Bear Creek Watershed Restoration Project Final Project Report December 21, 2017 Dedicated to the conservation and stewardship of public lands in Southern

More information

Chorley Park Trail Connection New Design Options. Information Booklet Prepared for June 9, 2014 Public Meeting

Chorley Park Trail Connection New Design Options. Information Booklet Prepared for June 9, 2014 Public Meeting Chorley Park Trail Connection New Design Options Information Booklet Prepared for June 9, 2014 Public Meeting Chorley Park Trail Booklet June 9, 2014 Page 1 of 12 Our Goals for the Chorley Park Trail Connection

More information

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT Santa Barbara Trails Council * Prepared by Ray Ford February 1,2012 The following notes accompany the Santa Barbara Trails Council map for the Las Varas

More information

Port Gamble Shoreline Area Conceptual Trail Proposal

Port Gamble Shoreline Area Conceptual Trail Proposal The North Kitsap Trails Association is pleased to be a partner to the Kitsap Forest and Bay Project and assist Kitsap County, Forterra, Olympic Property Group, Great Peninsula Conservancy and the Port

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

PROPOSED PARK ALTERNATIVES

PROPOSED PARK ALTERNATIVES 8 Chimne y Rock State Park M a ster Pl an 2011 PROPOSED PARK ALTERNATIVES Introduction Three different park development concepts were prepared and presented to the citizens of North Carolina through a

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Segment 2: La Crescent to Miller s Corner

Segment 2: La Crescent to Miller s Corner goal of the USFWS refuges is to conserve, protect and enhance fish, wildlife and plants and their habitats for the continuing benefit of the American people. Refuge lands are used largely for fishing,

More information

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies

More information

SOUTH INTERCHANGE AREA

SOUTH INTERCHANGE AREA Santaquin City General Plan 1 Location and Characteristics The South Interchange Area of Santaquin is located west of Interstate 15 and south of 500 South (Figure 1). It includes properties already annexed

More information

Stephens State Park Trails

Stephens State Park Trails TRAILS OF ALLAMUCHY MOUNTAIN & STEPHENS STATE PARKS Allamuchy Mountain and Stephens State Parks contain 28 marked trails providing access to diverse landscapes for walking, hiking, biking, bird-watching,

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands FINAL TESTIMONY 1 STATEMENT OF DALE BOSWORTH CHIEF Of the FOREST SERVICE UNITED STATES DEPARTMENT OF AGRICULTURE Before the SUBCOMMITTEE ON FORESTS AND FOREST HEALTH And the SUBCOMMITTEE ON NATIONAL PARKS,

More information

Thank you for the opportunity to comment on the proposed action to add trails and trailheads to the Red Rock District trail system.

Thank you for the opportunity to comment on the proposed action to add trails and trailheads to the Red Rock District trail system. July 14, 2010 Jennifer Burns Red Rock Ranger District PO Box 20429 Sedona, AZ 86341 Flagstaff Biking Organization PO Box 23851 Flagstaff, AZ 86002 Dear Jennifer- Thank you for the opportunity to comment

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

Assessing Your Trails, Keeping Them Safe and Enjoyable

Assessing Your Trails, Keeping Them Safe and Enjoyable Jon Wood, PLA, ASLA Associate Vice President Stewart Bert Lynn, PLA, ASLA, LEED AP Project Manager Mecklenburg County Asset and Facility Management Assessing Your Trails, Keeping Them Safe and Enjoyable

More information

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute I. Proposed Action: This project proposes to reroute approximately 1,800 feet of a 50 inch wide trail, off of private property

More information

SEGMENT ASSESSMENT REPORT

SEGMENT ASSESSMENT REPORT 2017 SEGMENT ASSESSMENT REPORT SEGMENT 3: MT ROSE / TAHOE MEADOWS TO SPOONER SUMMIT REPORT SUMMARY This report is a compilation of information collected on the Tahoe Rim Trail during assessments performed

More information

Trails Technical Committee

Trails Technical Committee Trails Technical Committee Winter 2017 Draft Report Alignment Proposals for the Inyo National Forest and the Town of Mammoth Lakes Map ID #S18 February 08, 2017 Map ID #S18 Key Agreements As of February

More information

10/25/2013. What is the SCORP?! 2013 Local Government Survey 2013 Statewide Public Survey Advisory Group Priority Areas Your Suggestions!

10/25/2013. What is the SCORP?! 2013 Local Government Survey 2013 Statewide Public Survey Advisory Group Priority Areas Your Suggestions! COLORADO OUTDOOR RECREATION TRENDS RESULTS FROM THE SCORP AND STATEWIDE Colorado Outdoor Recreation Resource Partnership September 2013 PRESENTATION What is the SCORP?! 2013 Local Government Survey 2013

More information

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE As the culmination of the first phase of the master planning process, this Program Development Report creates the framework to develop the Calero County

More information

South Colony Basin Recreation Fee Proposal

South Colony Basin Recreation Fee Proposal South Colony Basin Recreation Fee Proposal Purpose and Need for Collecting Fees in South Colony Basin: Forest Service appropriated funds have not been sufficient to maintain current recreational services

More information

Public Comment. Comment To consider extending State Park lands above River Mile 7.0

Public Comment. Comment To consider extending State Park lands above River Mile 7.0 Public To consider extending Park lands above River Mile 7.0 on the Little Spokane River for the conservation and limited recreation qualities they contain is this request. Could this be included in your

More information

The following criteria were used to identify Benchmark Areas:

The following criteria were used to identify Benchmark Areas: 7.0 BENCHMARK AREAS The Churn Creek Protected Area offers a significant opportunity to learn more about how grassland ecosystems function. One of the key tools that will be used to monitor larger grassland

More information

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for AUBURN LAKE TRAILS FIRE SAFE COUNCIL ACTIVITIES

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for AUBURN LAKE TRAILS FIRE SAFE COUNCIL ACTIVITIES El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for AUBURN LAKE TRAILS FIRE SAFE COUNCIL ACTIVITIES Prepared for Inclusion in the: EL DORADO COUNTY FIRE SAFE COUNCIL Community Wildfire

More information

Kelly Motorized Trails Project Proposed Action

Kelly Motorized Trails Project Proposed Action Kelly Motorized Trails Project Proposed Action November 28, 2011 The Flagstaff Ranger District of the Coconino National Forest is seeking public input on the proposed Kelly Motorized Trails Project (formerly

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

OWNED LAND ACTIVITIES REPORT February 2012

OWNED LAND ACTIVITIES REPORT February 2012 OWNED LAND ACTIVITIES REPORT February 2012 BULL RUN MOUNTAINS NATURAL AREA PRESERVE A tremendous number of projects are underway on the Preserve. Currently VOF is working with the Smithsonian Conservation

More information

Sibley LUPA. Board Executive Committee Meeting December 7, 2017

Sibley LUPA. Board Executive Committee Meeting December 7, 2017 Sibley LUPA Board Executive Committee Meeting December 7, 2017 Project Location & Project Area 1,318-acre Robert Sibley Volcanic Regional Preserve Project Area Purpose Project Purpose & Goals Append the

More information

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**: Recreation Opportunity Spectrum (ROS) Classes The Recreation Opportunity Spectrum (ROS) provides a way to describe the variations in the degree of isolation from the sounds and influences of people, and

More information

Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain

Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain Three ski or snowshoe routes are available from the Fernan Saddle Parking Lot which either do not cover routes ordinarily groomed for snow machine

More information

San Luis Obispo. Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas

San Luis Obispo. Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas San Luis Obispo Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas 1 JCT. ELEV. 72 400 00 0 FELSMAN LOOP GATE LOOP RIDGE 600 FENCE JCT. ELEV. 860 1000 1200 BISHOP PEAK

More information

CRAZY HORSE TRAIL GUIDE

CRAZY HORSE TRAIL GUIDE CRAZY HORSE TRAIL GUIDE Abridged Version: July 2016 This is a short form of our interpretive trail guide for the Crazy Horse Trail. The full version of the guide has a more detailed description of the

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information

USDA Trails Strategy WRI: ENGLISH PEAK SURVEY. Theodore Mendoza San Diego State University June 6 th 2016 August 18 th Advisor: Sam Commarto

USDA Trails Strategy WRI: ENGLISH PEAK SURVEY. Theodore Mendoza San Diego State University June 6 th 2016 August 18 th Advisor: Sam Commarto WRI: ENGLISH PEAK SURVEY Theodore Mendoza San Diego State University June 6 th 2016 August 18 th 2016 Advisor: Sam Commarto Klamath National Forest Submitted: March 21, 2017 Table of Contents Acknowledgements

More information

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R Cultural Resource Management Report R2015-05-03-10005 Undertaking Description: The proposes to perform road maintenance and meadow restoration on the Deer Valley 4wd trail and road maintenance on the Blue

More information

Little Grand Canyon near Pomona, Illinois

Little Grand Canyon near Pomona, Illinois Little Grand Canyon near Pomona, Illinois Below: View of the trail and the terrain created using the Map My Hike app Below: Summary of the hike created using the Map My Hike app Presented by: Jennifer

More information

13.1 REGIONAL TOURISM ISSUES AND SUMMARY OF FINDINGS

13.1 REGIONAL TOURISM ISSUES AND SUMMARY OF FINDINGS 13 REGIONAL TOURISM T he County of Mariposa s recreation needs and facilities fall within two categories: regional tourism and local recreation. This Element focuses on regional tourism issues related

More information

Tallahassee-St. Marks Historic Railroad Trail

Tallahassee-St. Marks Historic Railroad Trail Revitalizing a Historic Trail Designated as a National Recreation Trail, the 16-mile Tallahassee-St. Marks Historic Railroad Trail has been enjoyed by countless bicyclists, runners, and outdoor enthusiasts

More information

DAKOTA CULTURE UPPER SIOUX COMMUNITY: AREA CHARACTER ANALYSIS ALIGNMENT STRATEGY

DAKOTA CULTURE UPPER SIOUX COMMUNITY: AREA CHARACTER ANALYSIS ALIGNMENT STRATEGY UPPER SIOUX COMMUNITY: AREA CHARACTER ANALYSIS ALIGNMENT STRATEGY 51 AREA CHARACTER ANALYSIS: OPPORTUNITIES & CONSTRAINTS RECREATIONAL VEHICLE PARK: A recreational vehicle park will be built to accommodate

More information

2019 Work Week Crew. Schedule and Descriptions

2019 Work Week Crew. Schedule and Descriptions 2019 Work Week Crew WAWONA WW1 Mariposa Grove Restoration and Invasive Plant Removal June 2 June 8 YOSEMITE VALLEY YV1 Washington Column Climber s Trail Rehabilitation June 9 June 15 YV2 Weed Warriors/

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

RED MOUNTAIN HISTORIC DISTRICT ENHANCEMENT Grand Mesa, Uncompahgre, Gunnison National Forests Ouray Ranger District

RED MOUNTAIN HISTORIC DISTRICT ENHANCEMENT Grand Mesa, Uncompahgre, Gunnison National Forests Ouray Ranger District RED MOUNTAIN HISTORIC DISTRICT ENHANCEMENT Grand Mesa, Uncompahgre, Gunnison National Forests Ouray Ranger District Project Summary The Red Mountain President s Initiative Project proposes a comprehensive

More information

Project Planning, Compliance, and Funding

Project Planning, Compliance, and Funding Project Planning, Compliance, and Funding The plans above offer high level guidance to ensure that the A.T. is managed effectively as a whole unit in a decentralized management structure. Cooperative management

More information

Connie Rudd Superintendent, Black Canyon of the Gunnison National Park

Connie Rudd Superintendent, Black Canyon of the Gunnison National Park National Park Service U.S. Department of the Interior Black Canyon of the Gunnison National Park and Curecanti National Recreation Area Information Brochure #1 Wilderness and Backcountry Management Plan

More information

RIVER ACCESS STRATEGY

RIVER ACCESS STRATEGY RIVER ACCESS STRATEGY The River Access Strategy is a 10-year plan the City of Edmonton is developing to inform future programming, operations and infrastructure improvements that support access to the

More information

Minnesota Off-Road Cyclists

Minnesota Off-Road Cyclists Minnesota Off-Road Cyclists MORC Mission Minnesota Off-Road Cyclists is a nonprofit volunteer organization dedicated to safeguarding the future of mountain biking in Minnesota through the promotion of

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What is being proposed? What are the details of the proposal? Where is the project area located?

More information

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C. Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final

More information

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark,

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO 81301 Dear Mark, We are pleased to offer the following comments on the draft San Juan Public Lands Center management plans

More information

Map 1.1 Wenatchee Watershed Land Ownership

Map 1.1 Wenatchee Watershed Land Ownership Map 1.1 Wenatchee Watershed Land Ownership Map 1.1 Wenatchee Watershed Land Ownership The Wenatchee watershed lies in the heart of Washington state in Chelan County. Just larger than the state of Rhode

More information

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts September 30, 2016 Superintendent Yosemite National Park Attn: Wilderness Stewardship Plan P.O. Box 577 Yosemite, CA 95389 RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan,

More information

LEAVE NO TRACE CENTER FOR OUTDOOR ETHICS CONSULTING SERVICES

LEAVE NO TRACE CENTER FOR OUTDOOR ETHICS CONSULTING SERVICES LEAVE NO TRACE CENTER FOR OUTDOOR ETHICS CONSULTING SERVICES LEAVE NO TRACE PURPOSE Americans love the outdoors. Today, more than 300 million people visit America s national parks and another 150 million

More information

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A safe crossing at 9000 South and 850 West Proposed 9000 South Underpass Parkway Timeline Parkway, Trail, and Tourism Facts Blueprint Jordan River 1971 1973

More information

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL COASTAL CONSERVANCY Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL File No. 04-057 Project Manager: Amy Hutzel RECOMMENDED ACTION: Authorization to disburse up to

More information

April 19-21, See below for Course Descriptions. Columbia Cascades Trail Skills College Cascades Locks, Oregon.

April 19-21, See below for Course Descriptions. Columbia Cascades Trail Skills College Cascades Locks, Oregon. Columbia Cascades Trail Skills College Cascades Locks, Oregon April 19-21, 2013 Friday, April 19 198, 199 First Aid and CPR 300 Basic Rock Work 302 Water Crossings and Seeps 398 Working with Pack Stock

More information

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown Launched April 27th, 2010 1 Table of Contents page 3 Long term Goals Project Scope Project History 4 User Groups Defined Trail Representative Committee 5 Trail Users Breakdown 13 Trail Users Desires 16

More information

Stephens Rd. Nature Preserve

Stephens Rd. Nature Preserve Stephens Rd. Nature Preserve History Stephens Road Nature Preserve (SRNP) is a 350-acre nature preserve in Huntersville that comprises nine properties purchased between 1994 and 2008. Parcels included

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

APPENDIX 5: JUNEAU NORDIC SKI CLUB MEMO

APPENDIX 5: JUNEAU NORDIC SKI CLUB MEMO APPENDIX 5: JUNEAU NORDIC SKI CLUB MEMO To all participants in the McDowell Eaglecrest nordic long-range planning meeting: It was good to meet with all of you last month and talk about our vision for the

More information

Land Management Summary

Land Management Summary photo credit: ANGAIR Anglesea Heath Land Management Summary The Anglesea Heath (6,501 ha) was incorporated into the Great Otway National Park in January 2018. This provides an opportunity to consider the

More information

Southwest Quadrant Distinctive Features

Southwest Quadrant Distinctive Features SOUTHWEST QUADRANT Southwest Quadrant Distinctive Features LAND USE The 31.17 square mile Southwest Quadrant includes all the area within the planning area west of I-5 and south of the Sacramento River.

More information

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design

More information

Continental Divide National Scenic Trail Legislative History and Planning Guidance

Continental Divide National Scenic Trail Legislative History and Planning Guidance Continental Divide National Scenic Trail Legislative History and Planning Guidance Legislation, Policy, and Direction Regarding National Scenic Trails The National Trails System Act, P.L. 90-543, was passed

More information

Ragged Mountain Natural Area. Public Planning Meeting #1 February 29 th, 2016

Ragged Mountain Natural Area. Public Planning Meeting #1 February 29 th, 2016 Ragged Mountain Natural Area Public Planning Meeting #1 February 29 th, 2016 Planning During dam construction P&R approached by various groups asking if the rules would be changed once the dam was complete

More information