Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016

Size: px
Start display at page:

Download "Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016"

Transcription

1 - Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016 Prepared by: Andy Riter, Program Coordinator, and Joe Lavorini, Program Director Rocky Mountain Field Institute 815 South 25 th street, suite 101 Colorado Springs, CO Dedicated to the conservation and stewardship of public lands

2 2 Background This interim 2016 report of progress on the construction of the upper third of the Dixon Trail is submitted at the request of the Friends of Cheyenne Mountain State Park, who funded the first week of construction occurring between July 26 and July 31, An annual 2016 report will follow, documenting the full year s progress on this project. Cheyenne Mountain State Park Open to the public in 2006, Cheyenne Mountain State Park (CMSP) is one of the newest additions to the State Park system and the first State Park located in El Paso County. Though the park is managed by Colorado Parks and Wildlife, three public entities own the lands that comprise CMSP: Colorado Parks and Wildlife, the City of Colorado Springs, and the State Land Board. The park is a popular location for hiking, biking, wildlife viewing, and camping, seeing between 120,000 and 150,000 visitors annually. CMSP is uniquely situated in a transitional zone between the Great Plains grassland and the forested Front Range Mountains, allowing multiple ecotones to exist within a relatively small area. Plant communities include mixed-grass prairie, oak shrubland, ponderosa pine forest, Douglas-fir forest, and mixed montane forest. The park also supports riparian forests, foothill prairie, lower montane grasslands, and successional aspen forest to a limited degree. The diverse plant communities within the park allow for an equally diverse population of wildlife. The eastern part of the park is dominated by grasslands that transition into shrublands and eventually move up Cheyenne Mountain at its western extent. CMSP encompasses 2,701 acres with approximately 20 miles of hiking and biking trails. The newest addition of the park is the Top of the Mountain (TOM) area, reaching 9,565 feet above sea level. Dixon Trail The Dixon Trail is approximately 3 miles in length and named after one of the area s original homesteaders, Thomas Dixon. The trail winds up the south ridge of Cheyenne Mountain (Figure 1), and when completed, will eventually tie the lower portion of the park into the Top of the Mountain (TOM) trail network in the upper portion of the park. RMFI completed the 3.2-mile TOM trail network in October 2015, and began work on the Dixon Trail from the top down in July The TOM and Dixon Trails have been high priorities for the community and the park managers for several years. Access to the TOM from the Dixon will offer visitors a stunning view of the Front Range, provide access to some of the park s more unique resources, and provide a strenuous physical challenge. The 6.2-miles of additional trail will eventually extend from the North Talon Trail to the TOM, and cross steep terrain with average slope greater than 30% grade at its top. The TOM area consists of approximately 1,021 acres acquired in 2009 through a partnership with the City of Colorado Springs and Colorado Parks and Wildlife.

3 3 Partner organizations have been working to build the new Dixon Trail since 2013, clearing corridor and constructing trail tread on the flatter, lower 2/3 rd of the trail. After completion of the TOM trail in 2015, RMFI turned its priorities to the upper portion of the Dixon. RMFI has decades of experience constructing trails in rugged and remote areas and have the capacity to lead and coordinate multi-day work projects with professional trails crews and staff camped on site. Based on labor estimates calculated during a fall 2014 site visit, RMFI anticipates the top 1/3rd of the Dixon Trail to require 30 days of work with a 10-person crew, plus necessary travel and camp set-up time (please note, 30 days is an estimate and subject to change due to weather, terrain, and volunteer availability, among other variables). Due to crew and funding availability, RMFI recommended and has planned to break the project up over the course of 2-3 years. RMFI hosted a 6-day volunteer work event in July 2016, and has contracted with a local youth conservation corps for an additional 3 weeks (12 days) of work yet to come in 2016, and anticipates a similar amount of work in Upper Dixon Trail Construction In June 2016, RMFI staff and representatives from the park and from the Friends of CMSP completed a site visit to confirm portions of an upper Dixon Trail alignment designed by Mr. Paul Mead. This alignment, initially traversing terrain of rock outcroppings and precipitous slopes, guided trail construction efforts in July 2016 and will also guide pending work in September and October The alignment twists and turns approximately 1.75 miles down the upper south-facing side of Cheyenne Mountain towards a major saddle topographical feature, where the upper trail segment will join with the lower segment which rises from the mountain s east face. The terrain throughout much of this upper trail alignment will necessitate construction of rock stabilizing structure including steps, risers, and retaining walls as well as skilled saw-work to clear trail corridor and to remove dead-fall, snags, and other hazards. Detailed construction notes for the upper trail alignment need to be written. RMFI anticipates developing construction notes in mid-september of 2016.

4 4 Figure 1. Representation showing the proposed trail system, including the Dixon Trail and the Top of the Mountain trail network. (Cheyenne Mountain State Park 2013 Master Plan, pg. 6) Project Accomplishments To Date Between July 26-31, RMFI led a 6-day Volunteer Vacation to kick-off trail construction, beginning at the connection with the TOM trail system and quickly diving over the south side of the mountain along Mr. Mead s alignment. Over the course of 4, 10-hour work days, the 7 volunteers and 2 RMFI staff members cut-in 450 linear feet of trail tread, cleared the same length of trail corridor, installed 2 rock steps, and built 3 switchbacks. In this particularly steep section, each switchback required substantial rock retaining wall construction to form the switchback turns. Some 135 square feet of rock retaining wall was built for these switchbacks. The portion of trail worked on by the Volunteer Vacation crew represents the steepest and most technical terrain we expect this project to transit. Lower portions of the upper segment of trail include more moderate terrain, which should result in quicker progress on trail construction.

5 5 In September and October 2016, RMFI anticipates overseeing 3 weeks of youth corps crews to continue trail construction from where the July Volunteer Vacation crew left off. July 2016 Work Statistics Dixon Trail Upper Segment Construction Volunteer Vacation Segment o Approximately 450 linear feet of trail tread (24 inch wide) o Approximately 450 linear feet of corridor clearance (6 feet wide, 8 feet high) o 2 rock steps o 3 switchbacks o 135 square feet of rock retaining wall July 2016 Time on Task Statistics 7 volunteers engaged 280 hours on task o Valued at $7, (@$25.96/hour via independentsector.com) 2 RMFI staff 80 hours on task * Note that the time given above does not include time spent in volunteer recruitment and coordination, planning, transportation, establishing camp, and recovering equipment.

6 6 July 2016 Dixon Trail Construction Photos

7 7 Contact Information Joe Lavorini RMFI Program Director (719) ext. 3#

Kit Carson-Challenger Ridge Trail Project

Kit Carson-Challenger Ridge Trail Project Kit Carson-Challenger Ridge Trail Project Project Accomplishments Report-USFS December 15, 2015 Photo courtesy of Justin Peterson 815 South 25 th Street, Suite 101 Colorado Springs, CO 80904 Dedicated

More information

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015 Summary Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015 Managed by the BLM Royal Gorge Field Office, Shelf

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

Bear Creek Watershed Restoration Project Final Project Report December 21, 2016

Bear Creek Watershed Restoration Project Final Project Report December 21, 2016 Bear Creek Watershed Restoration Project Final Project Report December 21, 2016 Dedicated to the conservation and stewardship of public lands in Southern Colorado Rocky Mountain Field Institute 815 South

More information

Rocky Mountain Field Institute

Rocky Mountain Field Institute Rocky Mountain Field Institute Palmer Park Stewardship Project 2016 Annual Project Report December 20, 2016 Report prepared by: Andy Riter, Program Coordinator and Alex Hladkyj, Field Instructor 815 South

More information

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 1 Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 Willow Lake and Kit Carson Peak 2 SUMMARY The Rocky Mountain Field Institute began Phase 1 of a multi-phase,

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

Rocky Mountain Field Institute City of Colorado Springs Open Space Stewardship Services (TOPS) Contract #C Annual Project Report

Rocky Mountain Field Institute City of Colorado Springs Open Space Stewardship Services (TOPS) Contract #C Annual Project Report City of Colorado Springs Open Space Stewardship Services (TOPS) Contract #C008169 2017 Annual Project Report January 4, 2018 Report prepared by: Hannah Millsap, Field Instructor 815 South 25th Street,

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

Hartsel Springs Ranch 4,637 Acres Park County, Colorado $4,780,000

Hartsel Springs Ranch 4,637 Acres Park County, Colorado $4,780,000 Hartsel Springs Ranch 4,637 Acres Park County, Colorado $4,780,000 Presented By: Farm, Ranch & Recreational Real Estate Hartsel Springs Ranch 4,637 Acres Park County, Colorado $4,780,000 Property Description

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

US Forest Service Bears Ears Trail - NFST 1144 California Park to Hole in Wall Creek. Good (1) 2 3

US Forest Service Bears Ears Trail - NFST 1144 California Park to Hole in Wall Creek. Good (1) 2 3 Trail Maintenance Endowment Fund Trail Criteria Form The Trail Maintenance Endowment Fund (TMEF) grant criteria form is used in determining the use of funds available on an annual basis. Decisions on how

More information

Colorado Life Zone Scavenger Hunt

Colorado Life Zone Scavenger Hunt Colorado Life Zone Scavenger Hunt Below are worksheets created for all the habitats or life zones. They were designed with the intention of breaking the class up into small groups, and having students

More information

Youth Corps Project Report BUREAU OF LAND MANAGEMENT COLORADO STATE OFFICE

Youth Corps Project Report BUREAU OF LAND MANAGEMENT COLORADO STATE OFFICE Youth Corps Project Report BUREAU OF LAND MANAGEMENT COLORADO STATE OFFICE FISCAL YEAR 2013 Colorado Youth Corps Association www.cyca.org 1 Table of Contents Program Summary 3 Individual Project Summaries

More information

DOYLE SPRINGS PLANNING UNIT Kern-Tule River Watershed

DOYLE SPRINGS PLANNING UNIT Kern-Tule River Watershed Existing Conditions & Uses Overview Consists of a mostly forested parcel with small hydropower developments and part of a private recreation cabin development, along with two small transmission line corridor

More information

Chapter 2: El Dorado County Characteristics and Demographics

Chapter 2: El Dorado County Characteristics and Demographics Chapter 2: El Dorado County Characteristics and Demographics 2.1 Geographic Area and Demographics El Dorado County comprises 1,805 square miles with over half of the area in the Eldorado National Forest

More information

SHASTA WEST PLANNING AREA

SHASTA WEST PLANNING AREA 2016 SHASTA COUNTY COMMUNITY WILDFIRE PROTECTION PLAN SHASTA WEST PLANNING AREA Covering the communities of: Centerville Redding (west & downtown) Shasta I. PROPOSED PROJECTS A. THE PLANNING AREA SHASTA

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

ANAGEMENT. LAN November, 1996

ANAGEMENT. LAN November, 1996 M ANAGEMENT P LAN November, 1996 for Paul Lake Provincial Park Ministry of Environment, Lands and Parks BC Parks Department Paul Lake Provincial Park M ANAGEMENT P LAN Prepared by BC Parks Kamloops Area

More information

Recreation News. Welcome. Chris Jackson. In this Issue: O S U C o l l e ge F o r e s t s

Recreation News. Welcome. Chris Jackson. In this Issue: O S U C o l l e ge F o r e s t s Recreation News O S U C o l l e ge F o r e s t s In this Issue: Welcome New tree identification posts... New Arboretum Trails New Interpretive Signs Ridge Trail Seasonal Closures Leave No Trace reminder

More information

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC REQUEST FOR QUALIFICATIONS: PROFESSIONAL, EXPERIENCED TRAIL BUILDERS FOR THE CONSTRUCTION OF THE FONTA FLORA STATE TRAIL LAKE JAMES SECTION BURKE COUNTY COMMUNITY DEVELOPMENT INTRODUCTION Burke County

More information

Rocky Mountain Youth Corps Garfield County Conservation Corps Crews Final Report 2013

Rocky Mountain Youth Corps Garfield County Conservation Corps Crews Final Report 2013 Rocky Mountain Youth Corps Garfield County Conservation Corps Crews Final Report 2013 Rock wall construction with gabion baskets, East Elk 2013 RMYC Garfield County Crews - End of Session Rocky Mountain

More information

Friends of the Peak Board Meeting Minutes, August 14, 2012

Friends of the Peak Board Meeting Minutes, August 14, 2012 Friends of the Peak Board Meeting Minutes, August 14, 2012 Attending: Carol Beckman, Mike Cotter, Jim Strub, Eric Swab, Brian VanValkenburg. Meeting was called to order at 6:40 p.m. Minutes from the previous

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

2019 Work Week Crew. Schedule and Descriptions

2019 Work Week Crew. Schedule and Descriptions 2019 Work Week Crew WAWONA WW1 Mariposa Grove Restoration and Invasive Plant Removal June 2 June 8 YOSEMITE VALLEY YV1 Washington Column Climber s Trail Rehabilitation June 9 June 15 YV2 Weed Warriors/

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

Other Agencies and Organizations

Other Agencies and Organizations Daniel Boone National Forest 1700 Bypass Road WInchester, KY 40391 859-745-3100 Location Northern terminus is near Morehead, Kentucky. Southern terminus is located in the Big South Fork NRRA in Tennessee.

More information

TAYLOR CANYON RANCH COLORADO - ROUTT COUNTY - STEAMBOAT SPRINGS

TAYLOR CANYON RANCH COLORADO - ROUTT COUNTY - STEAMBOAT SPRINGS TAYLOR CANYON RANCH COLORADO - ROUTT COUNTY - STEAMBOAT SPRINGS Tucked up against the steep valley shaped by Mt. Pau and rising to the Routt National Forest, Taylor Canyon Ranch is an easily accessible,

More information

Route #2) Mt. Massive - Southwest Slopes

Route #2) Mt. Massive - Southwest Slopes Route #2) Mt. Massive - Southwest Slopes Difficulty: Class 2 Ski: Advanced, D6 / R2 / III Exposure: Summit Elevation: Trailhead Elevation: Elevation Gain: Round-trip Length: Trailhead: County Sheriff:

More information

The following criteria were used to identify Benchmark Areas:

The following criteria were used to identify Benchmark Areas: 7.0 BENCHMARK AREAS The Churn Creek Protected Area offers a significant opportunity to learn more about how grassland ecosystems function. One of the key tools that will be used to monitor larger grassland

More information

U.S. Army Corps of Engineers Fiscal Year 2013 Handshake Program Application

U.S. Army Corps of Engineers Fiscal Year 2013 Handshake Program Application U.S. Army Corps of Engineers Fiscal Year 2013 Handshake Program Application Please review instructions before completing application! Corps Lake/Project Name:Rathbun Lake/ North Shore Trail Handshake Proposal

More information

American Conservation Experience

American Conservation Experience ACE Project Report For Tonto National Forest, Arizona Trail Association and Arizona State Parks Title of Project: 4 Peaks Trail Maintenance Award Contract Number: ASP NM11021 Project Partner: Paul Burghard

More information

Bear Creek Watershed Restoration Project Final Project Report December 21, 2017

Bear Creek Watershed Restoration Project Final Project Report December 21, 2017 Bear Creek Watershed Restoration Project 2017 Report 1 Bear Creek Watershed Restoration Project Final Project Report December 21, 2017 Dedicated to the conservation and stewardship of public lands in Southern

More information

Colorado Mountain Club 2015 Stewardship Team Program Accomplishments

Colorado Mountain Club 2015 Stewardship Team Program Accomplishments Summary In 2015, CMC launched a new Stewardship Team program and hired a crew of young (25 and under), natural resource professionals to increase capacity of public land management agencies and coordinate

More information

2016 Trails Maintenance and Operating Costs

2016 Trails Maintenance and Operating Costs 2016 Trails Maintenance and Operating Costs Motorized Trails Maintenance for motorized trails comes from vehicle registration fees and a portion of the federal Recreation Trails Program (RTP) funds. The

More information

Cherokee Hiking Club Trail Blurb

Cherokee Hiking Club Trail Blurb Cherokee National Forest Trail #164 Distance: 6.2 miles Elevation Change: 2280 feet High Point: 3692 feet (Waucheesi Mountain) Low Point: 1412 feet (Wildcat Creek) Trail Rating: Moderately Strenuous (NW

More information

Trails Technical Committee

Trails Technical Committee Trails Technical Committee Winter 2017 Draft Report Alignment Proposals for the Inyo National Forest and the Town of Mammoth Lakes Map ID #S18 February 08, 2017 Map ID #S18 Key Agreements As of February

More information

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for AUBURN LAKE TRAILS FIRE SAFE COUNCIL ACTIVITIES

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for AUBURN LAKE TRAILS FIRE SAFE COUNCIL ACTIVITIES El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for AUBURN LAKE TRAILS FIRE SAFE COUNCIL ACTIVITIES Prepared for Inclusion in the: EL DORADO COUNTY FIRE SAFE COUNCIL Community Wildfire

More information

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands FINAL TESTIMONY 1 STATEMENT OF DALE BOSWORTH CHIEF Of the FOREST SERVICE UNITED STATES DEPARTMENT OF AGRICULTURE Before the SUBCOMMITTEE ON FORESTS AND FOREST HEALTH And the SUBCOMMITTEE ON NATIONAL PARKS,

More information

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan Appendix C Tenderfoot Mountain Trail System Road and Trail Rehabilitation Plan All rehabilitation work would be under the direction of the District Fisheries Biologist, the Forest Hydrologist, and/or the

More information

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark,

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO 81301 Dear Mark, We are pleased to offer the following comments on the draft San Juan Public Lands Center management plans

More information

2.0 Physical Characteristics

2.0 Physical Characteristics _ 2.0 Physical Characteristics 2.1 Existing Land Use for the Project The site is comprised of approximately 114 acres bounded by Highway 101 to the north, the existing town of Los Alamos to the east, State

More information

Outdoor Developed Areas

Outdoor Developed Areas The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

What s covered. What s not covered. Options for those not covered. ABA Coverage

What s covered. What s not covered. Options for those not covered. ABA Coverage The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

Rocky Mountain Field Institute Garden of the Gods Community Restoration Program 2015 Annual Project Report

Rocky Mountain Field Institute Garden of the Gods Community Restoration Program 2015 Annual Project Report Garden of the Gods Community Restoration Program 2015 Annual Project Report December 18 th, 2015 Report prepared by: Mark Tatro, Field Instructor 815 South 25 th Street, Suite 101 Colorado Springs, CO

More information

Dan Dallas, Supervisor July 3, 2017 Rio Grande National Forest 1803 W. Highway 160 Monte Vista, CO 81144

Dan Dallas, Supervisor July 3, 2017 Rio Grande National Forest 1803 W. Highway 160 Monte Vista, CO 81144 Dan Dallas, Supervisor July 3, 2017 Rio Grande National Forest 1803 W. Highway 160 Monte Vista, CO 81144 Dear Supervisor Dallas: I am writing today on behalf of the Colorado Native Plant Society to express

More information

! Kilimanjaro Expedition

! Kilimanjaro Expedition ! Kilimanjaro Expedition Tanzania 2016 Climb Only: $4,350 (land costs) Feb 4-12; June 12-20; July 10-18; Aug 6-14; Sept 11-19; Dec 4-12 2016 Climb & Safari: $5,850 (land costs) Feb 4-15; June 12-23; July

More information

Steps in the Management Planning Process

Steps in the Management Planning Process Steps in the Management Planning Process Developing a management plan for Kalamalka Lake Park will follow a multi-stage process. The planning process for this park is currently in the Draft Management

More information

(Short Listing) DUPUYER ACREAGE, ROCKY MOUNTAN FRONT

(Short Listing) DUPUYER ACREAGE, ROCKY MOUNTAN FRONT (Short Listing) DUPUYER ACREAGE, ROCKY MOUNTAN FRONT This unique property is located 8½ miles northwest of Dupuyer, Montana and approximately thirty 30 miles northwest of Choteau, Montana. Great Falls

More information

Bureau of Land Management Public Lands Guide Northwest District

Bureau of Land Management Public Lands Guide Northwest District Bureau of Land Management Public Lands Guide Northwest District NORTHWEST Fee Site Restrooms Picnic Sites Developed Campgrounds Farmington Field Office (505) 564-7600 Alien Run Mountain Bike Trail Angel

More information

Roduner Ranch FOR SALE. 5,878± Acres Potential Development Land. Merced County, California. Offices Serving The Central Valley

Roduner Ranch FOR SALE. 5,878± Acres Potential Development Land. Merced County, California. Offices Serving The Central Valley FOR SALE 5,878± Acres Potential Development Land Merced County, California Offices Serving The Central Valley F R E S N O V I S A L I A B A K E R S F I E L D 7480 N. Palm Ave, Ste 101 3447 S. Demaree Street

More information

August 22, Carol Prentice

August 22, Carol Prentice Sacajawea s Bitterroot Field Summary Report MOSQUITO CONSOLIDATED GOLD MINES, LTD. CUMO MINERALS EXPLORATION PROJECT IDAHO CITY RANGER DISTRICT, BOISE NATIONAL FOREST August 22, 2011 Carol Prentice This

More information

South Colony Basin Recreation Fee Proposal

South Colony Basin Recreation Fee Proposal South Colony Basin Recreation Fee Proposal Purpose and Need for Collecting Fees in South Colony Basin: Forest Service appropriated funds have not been sufficient to maintain current recreational services

More information

BST Coalition Annual Report 2012 Table of Contents

BST Coalition Annual Report 2012 Table of Contents BST Coalition Annual Report 2012 BST Coalition Annual Report 2012 Table of Contents Introduction... 2 Progress Reports... 4 BST Committee General Efforts... 4 County by County Progress Reports... 5 Cache

More information

San Luis Obispo. Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas

San Luis Obispo. Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas San Luis Obispo Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas 1 JCT. ELEV. 72 400 00 0 FELSMAN LOOP GATE LOOP RIDGE 600 FENCE JCT. ELEV. 860 1000 1200 BISHOP PEAK

More information

Volunteer Project Report for May 14-20, 2017 Yosemite National Park Volunteer Trip. Executive Summary

Volunteer Project Report for May 14-20, 2017 Yosemite National Park Volunteer Trip. Executive Summary 120 Village Square #9, Orinda, California 94563 www.conservationvip.org info@conservationvip.org Tel: (925) 228-5946 A Non-Profit 501c3 Tax Exempt Organization Volunteer Project Report for May 14-20, 2017

More information

SOUTH INTERCHANGE AREA

SOUTH INTERCHANGE AREA Santaquin City General Plan 1 Location and Characteristics The South Interchange Area of Santaquin is located west of Interstate 15 and south of 500 South (Figure 1). It includes properties already annexed

More information

The Frank Church River of No Return Wilderness

The Frank Church River of No Return Wilderness ALLIANCE FOR WILDERNESS EDUCATION AND STEWARDSHIP PO Box 2667, Bellingham, WA 98227-2667 Tele: 360-927-1804 Fax: 360-527-9679 bradt@wildernessalliance.org www.wildernessalliance.org STEWARDS OF AMERICA

More information

Section 2 North Slope Ecoregions and Climate Scenarios

Section 2 North Slope Ecoregions and Climate Scenarios Section 2 North Slope Ecoregions and Climate Scenarios North Slope Ecoregions The geographic/ecological scope of the workshop will be freshwater and terrestrial systems of the North Slope of Alaska, with

More information

Section 1 Introduction

Section 1 Introduction BST Coalition Annual Report 2014 Section 1 Introduction The Bonneville Shoreline Trail has been designated as Utah's Millennium Legacy Trail, as part of a White House initiative on the basis of our Governor's

More information

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013 Citrus Heights Creek Corridor Trail Project Trail Advisory Group Meeting #3 July 8, 2013 Agenda Introductions Recap: Community Workshop, Survey Findings, and TAG Field Trip Community Concern Discussion:

More information

WALKER RANCH MANAGEMENT PLAN

WALKER RANCH MANAGEMENT PLAN WALKER RANCH MANAGEMENT PLAN Boulder County Parks and Open Space Walker Ranch Management Plan July 2013 The Walker Ranch Management Plan provides guidance to Boulder County Parks and Open Space on management

More information

TREK THE ROCKIES ABOUT THE CHALLENGE TREK THE ROCKIES FOR HIGHLAND HOSPICE CANADA TREK DEMANDING

TREK THE ROCKIES ABOUT THE CHALLENGE TREK THE ROCKIES FOR HIGHLAND HOSPICE CANADA TREK DEMANDING TREK THE ROCKIES CANADA TREK DEMANDING ABOUT THE CHALLENGE The Canadian Rockies are justifiably world-famous for their magnificent scenery: the combination of impressive, jagged mountains, bright turquoise

More information

Subject to sale, withdrawal, or error.

Subject to sale, withdrawal, or error. The Crawford L Bar Ranch is located approximately 40 air miles west of Albuquerque, New Mexico. This ranch truly epitomizes the description of New Mexico being the Land of Enchantment. The topography and

More information

Mott Canyon Hazard Tree Incident

Mott Canyon Hazard Tree Incident Mott Canyon Hazard Tree Incident Lake Tahoe Basin Management Unit August 25, 2016 On August 25, 2016 while constructing a trail, John, a member of the Tahoe Rim Trail Association (TRTA) working under a

More information

Proposed Project 1: Kimble Loop East Horse Trail Reroute (1). Horse Trail Reroute: March 14, 2012

Proposed Project 1: Kimble Loop East Horse Trail Reroute (1). Horse Trail Reroute: March 14, 2012 Proposed Project 1: Kimble Loop East Horse Trail Reroute The Ironton District Ranger requests your comments on proposed trail project on National Forest System lands. (1). Horse Trail Reroute: The proposed

More information

Frizzell Creek Ranch Summerville, OR $1,400, ± Acres

Frizzell Creek Ranch Summerville, OR $1,400, ± Acres Frizzell Creek Ranch Summerville, OR $1,400,000 165± Acres 1 Introduction The Frizzell Creek Ranch is a beautiful 165± acre ranch located in northeast Oregon at the base of the Wallowa Whitman National

More information

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1 M E M O R A N D U M DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America RE: Accessible Trails Checklist 1 The purpose of the Accessible Trails Checklist (below) is to help the community review

More information

HIGH COUNTRY L-BAR RANCH

HIGH COUNTRY L-BAR RANCH HIGH COUNTRY L-BAR RANCH Sandoval and mckinley counties N e w m e x i c o Jim Haworth, Ranch Team Lead Broker ~ 505-235-5236 3613 NMSR 528 NW, Ste. H, Albuquerque, NM 87114 505-792-3713 www.wwrealty.com

More information

2.0 PARK VISION AND ROLES

2.0 PARK VISION AND ROLES 2.0 PARK VISION AND ROLES 2.1 Significance in the Protected Area System Marble Range and Edge Hills provincial parks protect 6.8% of the Pavillion Ranges Ecosection, which is located in the Southern Interior

More information

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa This document is scheduled to be published in the Federal Register on 02/26/2014 and available online at http://federalregister.gov/a/2014-04061, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF NATIONAL

More information

Introduction to Topographic Maps

Introduction to Topographic Maps Introduction to Topographic Maps DIRECTIONS: Read all of the following content. READ EVERYTHING!! At the end of the packet, you will find two topographic maps. Your task is to indentify each of the elevations

More information

MiSP Topographic Maps Worksheet #1a SLOPE AND TOPOGRAPHIC CONTOURS

MiSP Topographic Maps Worksheet #1a SLOPE AND TOPOGRAPHIC CONTOURS MiSP Topographic Maps Worksheet #1a Name Date Introduction: SLOPE AND TOPOGRAPHIC CONTOURS Topographic contours are shown by lines of different widths. Each contour is a line of equal elevation; therefore,

More information

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project USDA FOREST SERVICE Rocky Mountain Region (R2) Shoshone National Forest Wapiti and Greybull Ranger District Park County, Wyoming Background

More information

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement Kennesaw Mountain Trail Club Trail Skills Workshop ~ Dips and Drains Presented by: Jay M Dement KEY CONCEPTS: Control Erosion and Users Where Do Trails Come From, and How Do They Work: Concept of trail

More information

Segment 2: La Crescent to Miller s Corner

Segment 2: La Crescent to Miller s Corner goal of the USFWS refuges is to conserve, protect and enhance fish, wildlife and plants and their habitats for the continuing benefit of the American people. Refuge lands are used largely for fishing,

More information

Note: Coordinates are provided as Universal Transverse Mercator UTM Zone U21, North American Datum 1983 (NAD 83).

Note: Coordinates are provided as Universal Transverse Mercator UTM Zone U21, North American Datum 1983 (NAD 83). Northern Traverse Route Description The Northern Traverse (formerly the North Rim Traverse) is an unmarked and rugged backcountry hiking route. It is known be a demanding hike, because of its terrain and

More information

Coast to Crest Trail Corridor Hike

Coast to Crest Trail Corridor Hike Coast to Crest Trail Corridor Hike Jim Cunningham, Poway City Council member and Board Chair of the San Dieguito River Park in 2013 has embarked on a project to hike the entire 70-mile San Dieguito River

More information

Map 1.1 Wenatchee Watershed Land Ownership

Map 1.1 Wenatchee Watershed Land Ownership Map 1.1 Wenatchee Watershed Land Ownership Map 1.1 Wenatchee Watershed Land Ownership The Wenatchee watershed lies in the heart of Washington state in Chelan County. Just larger than the state of Rhode

More information

Driving Time: 3 hours (allow extra time for stops)

Driving Time: 3 hours (allow extra time for stops) Scenic Byways loop This journey takes visitors through the eastern edge of Mt. Rainier National Park and along two of Washington s most beloved scenic byways, the Chinook Byway and the White Pass Scenic

More information

Rogue Gorge (Mt. Stella) Roadless Area-- T30S R3E (primarily in portions of Sections 23, 26, 33, 34 & 35)

Rogue Gorge (Mt. Stella) Roadless Area-- T30S R3E (primarily in portions of Sections 23, 26, 33, 34 & 35) Rogue Gorge (Mt. Stella) Roadless Area-- T30S R3E (primarily in portions of Sections 23, 26, 33, 34 & 35) Rogue River-Siskiyou National Forest--High Cascades Ranger District Upper, higher elevation trail

More information

PROPOSED PARK ALTERNATIVES

PROPOSED PARK ALTERNATIVES 8 Chimne y Rock State Park M a ster Pl an 2011 PROPOSED PARK ALTERNATIVES Introduction Three different park development concepts were prepared and presented to the citizens of North Carolina through a

More information

Santa Barbara Sheriff s Office Date: July 5, 2016 Time: 5:00 p.m.

Santa Barbara Sheriff s Office Date: July 5, 2016 Time: 5:00 p.m. Kelly Hoover Public Information Officer (805) 681-4192 Santa Barbara Sheriff s Office Date: July 5, 2016 Time: 5:00 p.m. News Release Sheriff s Search and Rescue Team and SB County Air Support Rescue Bikers

More information

Pinellas County Environmental Lands

Pinellas County Environmental Lands Pinellas County Environmental Lands In addition to traditional parks and recreation facilities, Pinellas County owns and manages a system of environmental lands that provides specialized resource-based

More information

MiSP Topographic Maps Worksheet #1a L2

MiSP Topographic Maps Worksheet #1a L2 MiSP Topographic Maps Worksheet #1a L2 Name Date SLOPE AND TOPOGRAPHIC CONTOURS Introduction: Topographic contours are shown by lines of different widths. Each contour is a line of equal elevation; therefore,

More information

BRYCE CANYON COUNTRY Boulder Mountain Scenic backways itinerary

BRYCE CANYON COUNTRY Boulder Mountain Scenic backways itinerary BRYCE CANYON COUNTRY Boulder Mountain Scenic backways itinerary Boulder Mountain Area The high plateaus of the Aquarius Plateau (Boulder Mountain), are heavily forested and covered in countless winding

More information

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for LAKEHILLS FIRE SAFE COUNCIL ACTIVITIES

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for LAKEHILLS FIRE SAFE COUNCIL ACTIVITIES El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for LAKEHILLS FIRE SAFE COUNCIL ACTIVITIES Prepared for Inclusion in the: EL DORADO COUNTY FIRE SAFE COUNCIL Community Wildfire Protection

More information

COASTAL CONSERVANCY. Staff Recommendation March 17, 2011 EAST-SLOPE SONOMA MOUNTAIN RIDGE TRAIL PLANNING

COASTAL CONSERVANCY. Staff Recommendation March 17, 2011 EAST-SLOPE SONOMA MOUNTAIN RIDGE TRAIL PLANNING COASTAL CONSERVANCY Staff Recommendation March 17, 2011 EAST-SLOPE SONOMA MOUNTAIN RIDGE TRAIL PLANNING File No. 11-008-01 Project Manager: Sam Jenniches RECOMMENDED ACTION: Authorization to disburse up

More information

4.0 Context for the Crossing Project

4.0 Context for the Crossing Project 4.0 Context for the Crossing Project This section provides background information about key features of the North Douglas Crossing project area, and opportunities and constraints. This information is important

More information

(/ 12 (/ 18 (/ 18 (/ 12 (/ 51 (/ 14 Æ%106 Æ% 106 Æ% 213 Æ% 104 Æ% 89 Æ% 26 Æ% 73 Æ% 59 Æ% 138 Æ% 92 Æ% 26 Æ% 67 Æ% 11 Æ% 11 Æ% 11. Æÿ H Æÿ Z.

(/ 12 (/ 18 (/ 18 (/ 12 (/ 51 (/ 14 Æ%106 Æ% 106 Æ% 213 Æ% 104 Æ% 89 Æ% 26 Æ% 73 Æ% 59 Æ% 138 Æ% 92 Æ% 26 Æ% 67 Æ% 11 Æ% 11 Æ% 11. Æÿ H Æÿ Z. WAUKESHA Existing Ice Age Trail, subject to change as it evolves toward completion Glacial Drumlin Rail-Trail 94 Ice Age Trail Rock, Walworth and Jefferson Counties Other Trail Unofficial Connecting Route

More information

Mission. Purpose. Idaho Trails Association promotes the continued enjoyment of Idaho s hiking trails.

Mission. Purpose. Idaho Trails Association promotes the continued enjoyment of Idaho s hiking trails. The Idaho Trails Association (ITA) is a non-profit 501(c)3. Mission Idaho Trails Association promotes the continued enjoyment of Idaho s hiking trails. Purpose To facilitate the active enjoyment of Idaho

More information

Stephens State Park Trails

Stephens State Park Trails TRAILS OF ALLAMUCHY MOUNTAIN & STEPHENS STATE PARKS Allamuchy Mountain and Stephens State Parks contain 28 marked trails providing access to diverse landscapes for walking, hiking, biking, bird-watching,

More information

PASSPORT. Discovering the Trails of Webster, NY

PASSPORT. Discovering the Trails of Webster, NY PASSPORT to family wellness Discovering the Trails of Webster, NY Join the Friends of Webster Trails, Webster Health and Education Network, The Town of Webster and Wegmans to get moving more and enjoy

More information

Lewis and Clark National Historic Trail

Lewis and Clark National Historic Trail National Trails System Land and Water Conservation Fund FY2014 Lewis and Clark National Historic Trail Total LWCF Request: $ 3,130,000 Project Name Agency District # Tracts Acres Total Cost Columbia River

More information

Rocky Mountain Field Institute Garden of the Gods Community Restoration Program 2017 Annual Project Report

Rocky Mountain Field Institute Garden of the Gods Community Restoration Program 2017 Annual Project Report 1 Garden of the Gods Community Restoration Program 2017 Annual Project Report December 21, 2017 Report prepared by: Kelly Kaufmann, Senior Field Coordinator 815 South 25 th Street, Suite 101 Colorado Springs,

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information