Staff: C. Leqve, S. Skramstad, J. Lewis, D. Bitner, A. Nyren, J. Felger, J. Nelson

Size: px
Start display at page:

Download "Staff: C. Leqve, S. Skramstad, J. Lewis, D. Bitner, A. Nyren, J. Felger, J. Nelson"

Transcription

1 METROPOLITAN AIRPORTS COMMISSION MSP NOISE OVERSIGHT COMMITTEE MEETING MINUTES Wednesday,, 1:30 p.m. General Offices, Lindbergh Conference Room Call to Order A regularly scheduled meeting of the MSP Noise Oversight Committee (NOC), having been duly called, was held Wednesday,, in the Lindbergh Conference Room of the Metropolitan Airports Commission s General Offices. Chair Loeffelholz called the meeting to order at 1:30pm. The following were in attendance: Representatives: K. Hoffmann, K. Erazo, T. Valento, S. Holme, M. Kline, T. Beutell, M. Loeffelholz, E. Petschel, M. Otto, E. Glidden, T. Fitzhenry, J. Bergman Staff: C. Leqve, S. Skramstad, J. Lewis, D. Bitner, A. Nyren, J. Felger, J. Nelson Others: J. Teppen City of Inver Grove Heights; D. Rosemark City of St. Paul; C. Costello City of Richfield; T. Perillo Northwest Airlines/Delta; P. Dmytrenko City of Richfield; W. Eginton Inver Grove Heights; L. Moore - Bloomington 1. Approval of the Minutes of the 19 November 2008 and 21 January 2009 Meeting Minutes IT WAS MOVED BY REPRESENTATIVE BERGMAN AND SECONDED BY REPRESENTATIVE PETSCHEL TO APPROVE THE 18 NOVEMBER 2008 AND THE 21 JANUARY 2009 MEETING MINUTES. THE MOTION CARRIED BY UNANIMOUS VOTE. 2. Update on Runway 17 RNAV Departure Procedure Trial Chad Leqve, Technical Advisor, informed Committee members a 4-hour trial of the Runway 17 RNAV Departure Procedure was conducted on 24 February 2009 from 9:30am 1:30pm. Eighteen flights including regional jet, 757 and Airbus aircraft flew the procedure. Leqve reported that the trial was successful. He showed a graphic depicting flight tracks of aircraft that used the MCONL and RUMLE fixes; on the graphic, the swath of grey tracks are for flights that were vectored to those fixes, and the narrow green tracks are for flights that used the RNAV procedure. Leqve showed another graphic depicting the gate penetrations of the same tracks; on the graphic, the large cluster of blue diamonds show the penetrations by the vectored aircraft, and the narrow cluster of pink diamonds show the penetrations by aircraft using the RNAV procedure. Leqve stated that the average deviation to the left or right of the desired track by aircraft using the RNAV procedure is 150 feet. Leqve noted that the datum outlier depicted on the graphics was a flight on which the pilots were flying the procedure by hand and were momentarily distracted in the cockpit and overflew the desired RNAV track. He assured Committee members that discussions were held with the pilots of that flight to determine there was nothing inherently wrong with the RNAV concept.

2 Page 2 Leqve noted that utilization of the Runway 17 RNAV Procedure means there is a higher degree of concentration of overflights over specific geographic locations. Leqve showed a graphic depicting where the RNAV tracks overfly residential land uses southwest of Minneapolis-St Paul International Airport. He pointed out that the minimum altitude of aircraft flying the RNAV procedure during the trial was 3644 feet, while the maximum altitude was over 5700 feet, with the average altitude being approximately 4600 feet. Leqve noted that he will meet with representatives from the City of Burnsville regarding the RNAV procedure to make sure any questions they may have are addressed and that any concerns regarding the implementation of the Runway 17 RNAV Procedure are dealt with proactively. Representative Petschel, Mendota Heights, noted that the Runway 12L/12R RNAV Procedure tracks over Interstates 494 and 35E and asked if there is concern regarding overflights in that area. Leqve stated that MAC staff is in the process of evaluating that issue and that the results of the evaluation will be brought to the Committee for review. Petschel said it was her understanding the procedure replicates, to an extent, the Crossing-in-the- Corridor Procedure which has been in use for some time. She noted there have not been a significant number of complaints from residents regarding the use of the Crossing-in-the- Corridor Procedure. Leqve stated that the topic will be on the Committee s agenda for its next meeting. Leqve noted that the next step is a 24-hour test of the Runway 17 RNAV Procedure, which is planned to take place Tuesday and Wednesday, April He pointed out that that date may shift depending on weather. He noted that, if the 24-hour test is deemed successful, a 30-day trial of the procedure would be established. If the 30-day test is deemed successful, the necessary paperwork would be submitted to the Federal Aviation Administration (FAA) for approval to make the procedure public use. Leqve noted that Representative Wilcox, Bloomington, recently attended a meeting of the National Organization to Insure a Sound-controlled Environment (NOISE), at which interest was expressed in the efforts the MAC is making regarding RNAV at MSP. According to Leqve, Wilcox indicated that the NOISE is interested in advocating for the work the MAC is doing and has added RNAV at MSP to its legislative agenda for the year. Representative Valento, MBAA, asked if the 24-hour test on April 2009 will be conducted by general aviation aircraft. Leqve clarified that only airlines involved in the 4-hour trial on 29 February will be involved in the April test. Representative Beutell, Northwest Airlines/Delta Retired, asked if the MSP Air Traffic Control Tower (ATCT) had provided any feedback regarding the 29 February test. Leqve replied that he would characterize the MSP ATCT response as pleased, as was the response of individuals in the TRACON. Representative Bergman, At-large Representative, if the crew members participating in the April 2009 test will be the same crew members that participated in the 29 February trial. Leqve said it is possible they may be but that they will not necessarily be the same members.

3 3. Runway 12L/30R Reconstruction Communication Plan Page 3 Chad Leqve, Technical Advisor, reminded the Committee that the center section of the south parallel runway was reconstructed in 2007 and noted that the center section of the north parallel runway is now scheduled to be reconstructed. He noted that the plan is to close Runway 12L/30R on 17 August 2009 and to re-open it on or about 30 October Leqve noted that airport operations will be modified during this period, and reminded Committee members that various operational scenarios were discussed at the Committee s 21 January 2009 meeting. He reminded Committee members that one Visual Flight Rules (VFR) scenario calls for arrivals on Runways 17 and 22 and departures off of Runway 12R; it is anticipated this scenario will be utilized 41-45% of the time. The second VFR scenario calls for arrivals on Runways 35 and 30L and departures off of Runway 17; it is anticipated this scenario will be utilized 21-23% of the time during the reconstruction period. The third scenario calls for arrivals on Runways 35 and 30L and departures off of Runway 30L; it is anticipated this scenario will be utilized 21-23% of the time. Leqve noted that, in addition, there are two marginal VFR scenarios that may be utilized. In the first scenario, arrivals would be on Runways 35 and 30L with departures off of Runway 4; it is anticipated this scenario would be utilized 1-6% of the time. In the second scenario, arrivals would be on Runways 17 and 22 with departures off of Runway 12R; it is anticipated this scenario would be utilized 1-6% of the time. Leqve noted that there was more inclement weather during the 2007 reconstruction project period than had been anticipated, which skewed how often Instrument Flight Rules (IFR) scenarios were utilized from what had been anticipated. There are two IFR scenarios that may be used during the 2009 reconstruction project period. In the first, arrivals would be on Runway 35 and departures would be off of Runway 22; it is anticipated this scenario would be utilized 2-4% of the time. In the second scenario, arrivals would be on Runway 12R and departures would be off of Runway 17; it is anticipated this scenario would be utilized 2-3% of the time during the 2009 reconstruction project period. Leqve noted that in determining the VFR and IRF scenarios, weather data from were analyzed and runway use percentages were calculated for each scenario by calculating Runway Utilization Constraints and FAR Weather Minimums. First priority was given to the scenario(s) with the least amount of delay. Leqve summarized that, during the 2009 reconstruction project period: Arrivals on Runway 17 should occur, typically, 30-31% of the time Arrivals on Runway 35 should occur, typically, 24-25% of the time Arrivals on Runway 4 should occur, typically, 21-22% of the time Arrivals on Runway 22 should occur, typically, 0% of the time Arrivals on Runway 30L should occur, typically, 2-3% of the time Arrivals on Runway 12R should occur, typically, 20-21% of the time Departures off of Runway 17 should occur, typically, 21-23% of the time Departures off of Runway 35 should occur, typically, 16-18% of the time Departures off of Runway 4 should occur, typically, <1% of the time Departures off of Runway 22 should occur, typically, 5-9% of the time Departures off of Runway 30L should occur, typically, 31-33% of the time Departures off of Runway 12R should occur, typically, 21-23% of the time

4 Page 4 Leqve noted that noticeable operational changes will include no operations on Runway 12L/30R, arrivals on Runway 17 with flights queuing over downtown Minneapolis, arrivals on Runway 22 and departures off of Runway 35 (which should be minor due to consistency with existing routes off of Runway 30R). Leqve stated that the plan to communicate operational changes during the 2009 reconstruction period to residents is identical to the plan that was used for the 2007 reconstruction period. The four elements of the plan are as follows: MSP Noise News Newsletter The first and second quarter 2009 editions of the newsletter will provide details regarding the modified operations at MSP during the construction. The newsletter is mailed to approximately 4,400 households around MSP. Web Page A web page will be developed on the MAC Noise Program website detailing how the airport will be operated during construction, areas that should anticipate increased operations, and contact information for further information. MAC staff will coordinate with the impacted cities to ensure a link connects city websites to the runway construction web page. Post Card A total of two postcards will be mailed to residents in impacted areas (including elected officials). One postcard will be mailed in mid-may 2009 and one will be mailed to arrive two weeks prior to the first planned community open house. The postcard will include a general announcement of the operational changes, notification of the community open houses, an Internet address for the construction web page and MAC staff contact information to receive more detailed information. MAC staff will coordinate with the impacted cities to establish appropriate postcard distribution areas. Community Open Houses A total of four community open houses will be conducted prior to the commencement of construction. Two community open houses will be held two weeks prior to the beginning of construction and two will be held one week prior to construction. The open house locations will include sites in the cities of Minneapolis, St. Paul, Eagan and Bloomington. Representative Glidden, Minneapolis, asked if cities will receive information regarding the areas to which the postcard mailings are sent. Leqve said areas for mailing will be determined and vetted through the appropriate cities for consultation and coordination. Glidden asked if Leqve could give a sense of the difference between the runway use percentages that were projected for the 2007 reconstruction period and the actual runway use percentages. Leqve pointed out that those percentages were determined by HNTB and stated that he believes there is consensus that use of historic weather data for determining VFR and IFR scenarios is the most credible approach to take. Glidden noted that residents have expressed safety concerns regarding sight line issues and the way aircraft depart or approach the airport. She asked how confident the MAC is that there is no safety concern. Leqve stated that the Federal Aviation Administration has set criteria for establishing a safe operational environment at an airport and that those criteria will not change during the reconstruction period. Representative Beutell, Northwest Airlines/Delta Retired, noted that the same concerns were expressed prior to the 2007 reconstruction period and he pointed out that there were no operational issues in terms of safety during that reconstruction. He added that there is little maneuverability available when an aircraft is taking off; the FAA is aware of that and sets

5 Page 5 aircraft separation to take that into account. He stated that all pilots are trained to look out the cockpit windows when they can and to use automation as quickly as possible after take-off so that they can look out the window. Glidden noted that the City of Minneapolis will likely request an update on the runway reconstruction at its committee meetings and have information available on it local cable access channels. Leqve stated that he would be happy to help with those efforts. Representative Petschel, Mendota Heights, noted that residents often obtain information through city television and she encouraged the MAC to attend various city council meetings to convey reconstruction information to as many people as possible. IT WAS MOVED BY REPRESENTATIVE FITZHENRY AND SECONDED BY REPRESENTATIVE HOLME TO APPROVE THE MSP CONSTRUCTION OPERATIONS COMMUNICATION PLAN AS OUTLINED. THE MOTION CARRIED BY UNANIMOUS VOTE. 4. Annual MSP Noise Contour Report 2008 Actual Noise Contour Chad Leqve, Technical Advisor, reminded Committee members that a noise contour report for the previous year will be generated annually in satisfaction of the requirements of the Consent Decree. He noted that the report will contain information on INM Grid Point Analysis, and comparison of 2008 actual noise to the 2007 forecast mitigated noise contour. Leqve noted this year s report was completed on 25 February He pointed out that the format of the report and the types of information contained in it were determined cooperatively by the cities involved in the noise mitigation litigation that eventually gave rise to the Consent Decree. Leqve pointed out that the 2007 forecast noise contour called for 582,366 total operations at MSP, while the actual number of operations was 449,972 a reduction of approximately 22.7% in operations. He noted that the bulk of the reductions occurred in scheduled passenger air carrier and in cargo operations. He stated that the 2008 actual operations are down slightly from the 2007 actual number of operations of 453,567 (a 0.8% reduction). Leqve stated that the 2008 actual average daily operations of hushkitted Stage 3 aircraft were down from the 2007 forecast mitigated number. In 2008 there were average daily number of hushkitted aircraft at MSP compared to in He noted that 2008 actual nighttime operations increased by 5.2 average daily operations from the 2007 forecast mitigated number. In 2008 the average daily number of total nighttime operations was 128.5, down from average daily nighttime operations in Leqve noted that the use of Runway 12L for departure operations is higher and departure operations on Runway 12R are lower than what was forecasted. In addition, the use of Runway 30L for departures and the use of Runway 12R for arrivals, especially at night, are higher than the percentage use numbers forecasted. Leqve noted that the 2008 actual contours are smaller than the 2007 actual contours, due to hushkitted and nighttime operations being reduced. He pointed out that the 2008 contours were developed using the most current version of the Integrated Noise Model (INM) (7.0a) and that previous contours were developed using older versions of INM. Capabilities incorporated

6 Page 6 into INM 7.0a have the effect of increasing the size of the 2008 actual noise contour by as much as 3-10% over what INM 6.1 would have modeled. Leqve added that the MAC used new flight analysis methodology radar-to-inm flight track correlation that provides the ability to directly match radar flight tracks to the appropriate INM tracks. The enhanced ability to interpret similarities along a track, rather than solely at a gate location, provides the ability to analyze all INM tracks as core tracks. Leqve pointed out that, when comparing the 2008 actual noise contour to the 2007 forecast mitigated contour, a small lobe of the 2008 contour extends past the 2007 contour. He reminded Committee members that arrival operations on Runway 12R are higher than what was forecast, which accounts for the lobe extension. In addition, the 2008 lobe extension to the north, beyond the 2007 forecast contour, is a function of updated flight track modeling capabilities. The small 2008 lobe extension beyond the 2007 forecast contour in Richfield is the result of increased use of Runway 30L for departures during nighttime hours. Leqve noted that, in total, the 2008 actual noise contour is smaller than the 2007 forecast mitigated contour by 2, acres (a 17.4% reduction) in the 60 DNL contour. The 2008 actual noise contour is smaller than the 2007 forecast mitigated contour by 1, acres (a 21% reduction) in the 65 DNL contour. Leqve pointed out that there is an overall decrease of 1,089 residential units in the 65 DNL contour and of 323 residential units in the DNL contours when comparing the 2008 actual noise contour and the 2007 forecast mitigated contour. Leqve reminded Committee members there are 39 remote monitoring towers (RMT) around the airport that collect data 24 hours a day, 365 days a year. Actual aircraft DNL levels at each RMT site for 2008 were compared to the model impact noise level indicated in the model; close correlation was determined, with an average difference of 1.6 db between and an absolute difference of 1. Leqve noted that the 2008 count of residential units within the actual 60 DNL noise contour that have not received noise mitigation around MSP is 6,749, a reduction of 26.1% from the total of 9,128 in There are no unmitigated homes in the 2008 actual 65 DNL noise contour around MSP. Chair Loeffelholz asked what the progress is on the DNL contour of the noise mitigation program. John Nelson, MAC Airport Development, stated that as part of Phase 1 and as of 23 March 2009 designs had been completed for 274 of 453 homes. He noted that by 1 July 2009, the MAC is to have entered all homes in the pre-construction phase, and that that requirement had been met as of 19 March Nelson stated that a letter to that effect will be sent to plaintiffs council and city managers as appropriate. He stated that the construction phase must be completed for 250 homes by 1 July Nelson noted that that goal has been exceeded. He stated that approximately 325 more homes must be completed by 1 September Nelson said the MAC will meet that target. He noted the final deadline for all homes to be completed by 31 December 2009; Nelson projects the MAC will achieve that goal in mid-october Nelson stated that over 125 homes have been invited to participate in Phase 2 of the project ($4K or air-conditioning package, or the $14,625 package with no air-conditioning) and those services have been contracted. Nelson stated that the target is for 715 homes to be completed and he estimates that 435 will have windows and doors installed in the 5 db phase of the project. He noted that it may take 6-7 weeks to completion if a homeowner chooses to

7 Page 7 have windows and doors installed as they must be manufactured, but that it may take only 3 weeks to completion if a homeowner chooses only air-conditioning. Loeffelholz asked if the MAC or homeowners are in line to receive any benefits from the recently passed federal economic stimulus package. Nelson said he does not any stimulus funding for this noise mitigation project, but that there is an energy savings tax credit within the stimulus package. He has requested that CenterPoint Energy and the Center for Energy and Environment prepare a report for him detailing how the credits may be utilized with respect to communications with homeowners. He noted that homeowners would generally be the recipients of the credits, but the MAC is making payments for the materials so clarity on the tax credit process needs to be achieved. Loeffelholz asked where the project will stand related to the overall budget for the noise mitigation project. Nelson said project target was $ M but that he ran the numbers recently and he is forecasting approximately $122M. He cautioned there are factors such as a consumer price index adjustment that must be done each year, escalating costs, and offsetting efficiencies that add elasticity to that figure. 5. Public Comment Period There were no public comments. The next meeting of the NOC is scheduled for Wednesday, 20 May The meeting adjourned at 1:57pm. Respectfully submitted, Christene Sirois Kron, Recording Secretary

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011

More information

3rd Quarter 2015 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting

3rd Quarter 2015 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting 3rd Quarter 2015 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting Metropolitan Airports Commission Noise Program Office July 28, 2015 Meeting Goals To hear the views and concerns of

More information

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP)

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP) 3 RD QUARTER 2016 MINNEAPOLIS-ST. PAUL INTERNATIONAL AIRPORT (MSP) PUBLIC INPUT MEETING Metropolitan Airports Commission Noise Program Office July 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the

More information

Minneapolis-St. Paul International Airport (MSP)

Minneapolis-St. Paul International Airport (MSP) 2 nd Quarter 2016 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting Metropolitan Airports Commission Noise Program Office April 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the

More information

MSP NOISE OVERSIGHT COMMITTEE MEETING MINUTES Wednesday, 22 July 2015, 1:30pm MAC General Offices Building Lindbergh Conference Room

MSP NOISE OVERSIGHT COMMITTEE MEETING MINUTES Wednesday, 22 July 2015, 1:30pm MAC General Offices Building Lindbergh Conference Room MSP NOISE OVERSIGHT COMMITTEE MEETING MINUTES Wednesday,, 1:30pm MAC General Offices Building Lindbergh Conference Room Call to Order A regularly-scheduled meeting of the, having been duly called, was

More information

National Transportation Safety Board Recommendation and FAA Air Traffic Orders

National Transportation Safety Board Recommendation and FAA Air Traffic Orders Page 1 of 8 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Chad E. Leqve, Director Environment (725.6326) SUBJECT: NOISE OVERSIGHT COMMITTEE (NOC) CONVERGING RUNWAY OPERATION (CRO)

More information

MEETING LOCATION NOTICE The March 18, 2015 Noise Oversight Committee will be begin at 1:30 p.m. at the Richfield Municipal Building, 6700 Portland

MEETING LOCATION NOTICE The March 18, 2015 Noise Oversight Committee will be begin at 1:30 p.m. at the Richfield Municipal Building, 6700 Portland MEETING LOCATION NOTICE The March 18, 2015 Noise Oversight Committee will be begin at 1:30 p.m. at the Richfield Municipal Building, 6700 Portland Avenue South, Richfield, MN. (The Committee Pre meeting

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee July 22, 2015 Audio recordings are made of this meeting 1 Noise Oversight Committee July 22, 2015 Item 1 Review and Approve Draft Meeting Minutes Minutes from May 20, 2015 Noise

More information

Metropolitan Airports Commission (MAC)

Metropolitan Airports Commission (MAC) Metropolitan Airports Commission (MAC) Minneapolis-St. Paul International Airport (MSP) Noise Oversight Committee (NOC) MAC General Office Building Lindbergh Conference Room 6040 28 th Avenue South Minneapolis,

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee March 18, 2015 Audio recordings are made of this meeting Noise Oversight Committee March 18, 2015 Item 1 Review and Approve Draft Meeting Minutes Minutes from January 21, 2015

More information

Turn before Runway End

Turn before Runway End Metropol litan Air rports Commission Runw way 12L Dep parture Turn before Runway End Runway 12L Departure Turn before Runway End Table of Contents Executive Summary... 2 Introduction... 3 Background...

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

2013 Airport Noise Plan of Action

2013 Airport Noise Plan of Action 2013 Airport Noise Plan of Action Mendota Heights Airport Relations Commission Mendota Heights City Code (2-4-6) establishes the following powers and duties for the Mendota Heights Airport Relations Commission:

More information

2. 1:35 to 1:50 MSP Long-Term Comprehensive Plan Update. 3. 1:50 to 2:05 Update on Runway 17 RNAV Departure Procedure 24-Hour Trial

2. 1:35 to 1:50 MSP Long-Term Comprehensive Plan Update. 3. 1:50 to 2:05 Update on Runway 17 RNAV Departure Procedure 24-Hour Trial Minneapolis/St. Paul International Airport (MSP) Noise Oversight Committee (NOC) Meeting Agenda May 20, 2009 1:30 P.M. Lindbergh Conference Room MAC General Office Building 6040 28 th Avenue South Minneapolis,

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee May 8, 2014 Audio/Video recordings are made of this meeting 1 Item 1 Review and Approve Draft Meeting Minutes Minutes from March 19, 2014 2 Item 2 Review of Operations Report

More information

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 A Noise Compatibility Study, prepared under Part 150 of the Federal Aviation Regulations (FAR), is a voluntary program aimed at balancing

More information

Metropolitan Airports Commission (MAC)

Metropolitan Airports Commission (MAC) Metropolitan Airports Commission (MAC) Minneapolis-St. Paul International Airport (MSP) Noise Oversight Committee (NOC) MAC General Office Building Lindbergh Conference Room 6040 28 th Avenue South Minneapolis,

More information

S p NA, illil MINNEAPOLIS- ST. PAUL INTERNATIONAL AIRPORT ( MSP) NOISE OVERSIGHT COMMITTEE ( NOC) RESOLUTION #

S p NA, illil MINNEAPOLIS- ST. PAUL INTERNATIONAL AIRPORT ( MSP) NOISE OVERSIGHT COMMITTEE ( NOC) RESOLUTION # NA, S p illil r, MINNEAPOLIS- ST. PAUL INTERNATIONAL AIRPORT ( MSP) NOISE OVERSIGHT COMMITTEE ( NOC) RESOLUTION # 01-2014 REGARDING FUTURE FAA PERFORMANCE- BASED NAVIGATION ( PBN)/ AREA NAVIGATION ( RNAV)

More information

2. 1:45 to 1:50 Review and Approval of November 18, 2009 NOC Meeting Minutes

2. 1:45 to 1:50 Review and Approval of November 18, 2009 NOC Meeting Minutes Minneapolis/St. Paul International Airport (MSP) Noise Oversight Committee (NOC) Meeting Agenda January 2, 21 1:3 P.M. Lindbergh Conference Room MAC General Office Building 64 28 th Avenue South Minneapolis,

More information

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016 Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC December 8, 2016 Contents FAA/Massport RNAV MOU Context Boston Logan Context FAA RNAV MOU, Overview Q&A 12/8/2016 2 FAA/Massport RNAV

More information

MSP NOISE OVERSIGHT COMMITTEE MEETING MINUTES Wednesday, 18 th of July 2018 at 1:30pm MAC General Office Lindbergh Conference Room

MSP NOISE OVERSIGHT COMMITTEE MEETING MINUTES Wednesday, 18 th of July 2018 at 1:30pm MAC General Office Lindbergh Conference Room Item 1 MSP NOISE OVERSIGHT COMMITTEE MEETING MINUTES Wednesday, 18 th of July 2018 at 1:30pm MAC General Office Lindbergh Conference Room Call to Order A regularly-scheduled meeting of the, having been

More information

NOISE OVERSIGHT COMMITTEE January 16, Audio recordings are made of this meeting

NOISE OVERSIGHT COMMITTEE January 16, Audio recordings are made of this meeting January 16, 2019 Audio recordings are made of this meeting ITEM 1 REVIEW AND APPROVAL OF NOVEMBER 28 TH MEETING MINUTES ITEM 2 REVIEW OF MONTHLY OPERATIONS REPORTS MSP OPERATIONS 31,371 JAN-15 29,038 35,119

More information

Minneapolis St. Paul International Airport (MSP) 2018 Annual Noise Contour Report

Minneapolis St. Paul International Airport (MSP) 2018 Annual Noise Contour Report Minneapolis St. Paul International Airport (MSP) 2018 Annual Noise Contour Report Comparison of the 2018 Actual and the 2007 Forecast Noise Contours February 2018 MAC Noise Program Office and HNTB Corporation

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

Portable Noise Monitor Report

Portable Noise Monitor Report Portable Noise Monitor Report Chicago O Hare International Airport Site 2117 5843 N. Christiana Avenue, Chicago July 14, 217 through August 2, 217 USH5-ILH15-ILS8-CHI39 Visit the O Hare Noise webpage on

More information

Technical Report. Aircraft Overflight and Noise Analysis. Brisbane, California. December Prepared by:

Technical Report. Aircraft Overflight and Noise Analysis. Brisbane, California. December Prepared by: Aircraft Noise Abatement Office Technical Report Aircraft Overflight and Noise Analysis Brisbane, California Prepared by: P.O. Box 8097 San Francisco, California 94128 (650) 821-5100 Introduction In response

More information

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 ise Study Strategic Business Plan FAR Part 150 Meeting September 28, 2006 Agenda Introduction Part 150 Study Working Paper Two Operational Alternatives

More information

Portable Noise Monitor Report

Portable Noise Monitor Report Portable Noise Monitor Report Chicago O Hare International Airport Site 241 61 Grange Road, Elk Grove Village October 3, 215 through October 19, 215 USH8-ILH55-ILS28 Visit the O Hare Noise webpage on the

More information

Metropolitan Airports Commission (MAC)

Metropolitan Airports Commission (MAC) Metropolitan Airports Commission (MAC) Minneapolis-St. Paul International Airport (MSP) Noise Oversight Committee (NOC) MAC General Office Building Lindbergh Conference Room 6040 28 th Avenue South Minneapolis,

More information

MSP NOISE OVERSIGHT COMMITTEE DRAFT MEETING MINUTES Wednesday, 19 th of September 2018 at 1:30pm MAC General Office Lindbergh Conference Room

MSP NOISE OVERSIGHT COMMITTEE DRAFT MEETING MINUTES Wednesday, 19 th of September 2018 at 1:30pm MAC General Office Lindbergh Conference Room Item 1 MSP NOISE OVERSIGHT COMMITTEE DRAFT MEETING MINUTES Wednesday, 19 th of September 2018 at 1:30pm MAC General Office Lindbergh Conference Room Call to Order A regularly-scheduled meeting of the MSP

More information

Christchurch PBN Flight Paths Trial. Interim Report

Christchurch PBN Flight Paths Trial. Interim Report Christchurch PBN Flight Paths Trial Interim Report Christchurch PBN Flight Paths Trial Interim Report PBN trial partners have prepared the following summary outlining progress of the PBN flight paths trial.

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Edmonton International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 January 2018 The information

More information

Portable Noise Monitor Report

Portable Noise Monitor Report Portable Noise Monitor Report Chicago O Hare International Airport Site 2198 5N67 Rochefort Lane, Wayne May 9, 218 through June 3, 218 USH6-ILH49-ILS25 Visit the O Hare Noise webpage on the Internet at

More information

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR This appendix sets forth the detailed input data that was used to prepare noise exposure contours for 2022 Baseline conditions. H.1 DATA SOURCES AND ASSUMPTIONS

More information

GOLD COAST AIRPORT - Runway 14 southern departures trial

GOLD COAST AIRPORT - Runway 14 southern departures trial Post Implementation Review GOLD COAST AIRPORT - Runway 14 southern departures trial Version 1 Effective January 2016 Airservices Australia 2016 1 of 13 Introduction At the request of the community, Airservices

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Winnipeg James Armstrong Richardson International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November

More information

Portable Noise Monitor Report

Portable Noise Monitor Report Portable Noise Monitor Report Chicago O Hare International Airport Site 299 93 Wilshire Avenue, Elk Grove Village June 27, 217 through July 1, 217 USH8-ILH55-ILS28 Visit the O Hare Noise webpage on the

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November 2017 The information

More information

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport

More information

RTIA Runway Utilization Discussion Paper

RTIA Runway Utilization Discussion Paper RTIA Runway Utilization Discussion Paper December 2003 1.0 Introduction The Airport Noise Advisory Panel (ANAP) is a voluntary committee formed by the Airport Authority of Washoe County (AAWC) Board of

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

The O Hare Noise Compatibility Commission (ONCC) Fly Quiet Committee met on August 23, 2018 in Chicago, IL.

The O Hare Noise Compatibility Commission (ONCC) Fly Quiet Committee met on August 23, 2018 in Chicago, IL. O HARE NOISE COMPATIBILITY COMMISSION Fly Quiet Committee August 23, 2018 Chicago Department of Aviation 10510 W. Zemke Road, Chicago, IL Approved Meeting Minutes The O Hare Noise Compatibility Commission

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Portable Noise Monitor Report

Portable Noise Monitor Report Portable Noise Monitor Report Chicago O Hare International Airport Site 213 475 W. Hutchinson Street, Chicago April 8, 217 through May 3, 217 USH5-ILH19-ILS1-CHI45 Visit the O Hare Noise webpage on the

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

Boston Logan. Airport Noise Study

Boston Logan. Airport Noise Study Boston Logan International Airport Boston Logan Airport Noise Study Level 3 Screening Analysis December 2012 Prepared by Ricondo & Associates, Inc. Prepared for Federal Aviation Administration in collaboration

More information

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority Noise Abatement 101 July 13, 2017 1 Objectives Provide context and a better understanding for how and why flights may operate at Tampa International Airport the way they do. Provide an overview of laws,

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

ACI-NA Airport Board Members and Commissioners Annual Conference

ACI-NA Airport Board Members and Commissioners Annual Conference ACI-NA Airport Board Members and Commissioners Annual Conference APRIL 27, 2009 O Hare Noise Compatibility Commission Reducing Aircraft Noise through Successful Community Partnerships ONCC Mission To assist

More information

Portable Noise Monitor Report

Portable Noise Monitor Report Portable Noise Monitor Report Chicago O Hare International Airport Site 2114 5516 N. Neenah Avenue, Chicago July 12, 217 through August 9, 217 USH5-ILH19-ILS1-CHI45 Visit the O Hare Noise webpage on the

More information

Metropolitan Airports Commission (MAC)

Metropolitan Airports Commission (MAC) NOC Committee Members Metropolitan Airports Commission (MAC) Minneapolis-St. Paul International Airport (MSP) Noise Oversight Committee (NOC) MAC General Office Building Lindbergh Conference Room 6040

More information

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004 Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

NOISE COMPLAINT HOTLINE

NOISE COMPLAINT HOTLINE 206 ANNUAL NOISE COMPLAINT HOTLINE REPORT Introduction The Columbus Regional Airport Authority (CRAA) owns and operates John Glenn Columbus International (CMH), Rickenbacker International (LCK) and Bolton

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures Safety Enhancement Action: Implementers: Statement of Work: Safety Enhancement 213.5 RNAV Safe Operating and Design Practices for STARs and RNAV Departures To mitigate errors on Standard Terminal Arrival

More information

Technical Report. Aircraft Noise Analysis. Portola Valley and Woodside, California. July Prepared by: Aircraft Noise Abatement Office

Technical Report. Aircraft Noise Analysis. Portola Valley and Woodside, California. July Prepared by: Aircraft Noise Abatement Office Technical Report Aircraft Noise Analysis Portola Valley and Woodside, California Prepared by: San Francisco International Airport P.O. Box 8097 San Francisco, California 94128 (650) 821-5100 Introduction

More information

Master Plan & Noise Compatibility Study Update

Master Plan & Noise Compatibility Study Update Working Document-Subject to Change, March 2010 Master Plan & Noise Compatibility Study Update (14 CFR Part 150) TECHNICAL ADVISORY COMMITTEE March 24, 2010 Working Document-Subject to Change, March 2010

More information

Metropolitan Airports Commission (MAC)

Metropolitan Airports Commission (MAC) NOC Committee Members Metropolitan Airports Commission (MAC) Minneapolis-St. Paul International Airport (MSP) Noise Oversight Committee (NOC) MAC General Office Building Lindbergh Conference oom 6040 28

More information

1.0 OUTLINE OF NOISE ANALYSIS...3

1.0 OUTLINE OF NOISE ANALYSIS...3 Table of Contents 1.0 OUTLINE OF NOISE ANALYSIS...3 2.0 METHODOLOGY...3 2.1 BACKGROUND...3 2.2 COMPUTER MODELING...3 3.0 EXISTING NOISE ENVIRONMENT...4 3.1 EXISTING SANTA MONICA MUNICIPAL AIRPORT NOISE...4

More information

6.C.1 AIRPORT NOISE. Noise Analysis and Land Use Impact Assessment FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT

6.C.1 AIRPORT NOISE. Noise Analysis and Land Use Impact Assessment FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT 6.C.1 AIRPORT NOISE The existing land uses are described in Chapter Five, Affected Environment. The methodologies used to develop the Geographic Information System (GIS) land use database, the estimated

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

Permanent Noise Monitoring Act Quarterly Operations Report

Permanent Noise Monitoring Act Quarterly Operations Report Permanent Noise Monitoring Act 1st Quarter 2006 Prepared by: Noise Mitigation Programs Office Rhode Island Airport Corporation For further information, please contact: Helena S. Reid, 737-4000 ext. 297

More information

Forecast of Aviation Activity

Forecast of Aviation Activity DETROIT METROPOLITAN WAYNE COUNTY AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE CHAPTER B FORECAST OF AVIATION ACTIVITY Forecast of Aviation Activity Introduction This chapter summarizes past aviation

More information

Portland International Jetport FAR Part 150 Update

Portland International Jetport FAR Part 150 Update Portland International Jetport FAR Part 150 Update Part 150 Noise Advisory Committee Meeting 5 February 2003 Harris Miller Miller & Hanson Inc. In association with: Vanasse Hangen Brustlin, Inc. Simat,

More information

Portable Noise Monitor Report

Portable Noise Monitor Report Portable Noise Monitor Report Chicago O Hare International Airport Site 221 5716 N. Virginia Avenue, Chicago July 23, 214 through August 11, 214 Visit the O Hare Noise Management Webpage on the Internet

More information

Martin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010

Martin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010 Martin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010 Prepared for: Federal Aviation Administration (FAA) Orlando Airport District Office

More information

DCA Airport Noise. MWAA WG Dec 15, 2016

DCA Airport Noise. MWAA WG Dec 15, 2016 DCA Airport Noise MWAA WG Dec 15, 2016 BACKGROUND FAA Next Gen noise Analyzed on macro level Data below 3K Ft under estimated community level impacts Primary focus has been on departure procedures 1 part

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

STUDY OF RUNWAY 12L AND 12R ARRIVAL OPERATIONS. September 2016

STUDY OF RUNWAY 12L AND 12R ARRIVAL OPERATIONS. September 2016 STUDY OF RUNWAY 12L AND 12R ARRIVAL OPERATIONS September 2016 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis, MN 55450 MetroAirports.org

More information

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Public Information Workshop November 2017 1 14 CFR Part 150 Overview Establishes the methodology

More information

Airport Noise Management System

Airport Noise Management System July Monthly Report Airport Noise Management System Chicago O Hare International Airport City of Chicago Department of Aviation Visit the Community Noise Resource Center on the Internet at www.flychicago.com

More information

Noise Compatibility Year End, 2012

Noise Compatibility Year End, 2012 Year End, 2012 April 5, 2013 Noise Highlights of 2012 Airport operations for Year 2012 were down 3.97%, compared to Year 2011. The FAA issued a Record of Approval (ROA) for the new Program (NCP) Update

More information

Updates to Procedures at St. John s International Airport

Updates to Procedures at St. John s International Airport October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International

More information

14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY. Technical Committee Meeting #2 August 23, 2017

14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY. Technical Committee Meeting #2 August 23, 2017 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Technical Committee Meeting #2 August 23, 2017 1 Agenda Introductions Review of the Role of the TC Meeting Facilitator Review of TC Meeting No.1 Data

More information

Community Noise Consortium Newsletter January 22, 2015

Community Noise Consortium Newsletter January 22, 2015 Community Noise Consortium Newsletter January 22, 2015 Issue No.33 Message from the Chief Executive Officer Joseph Lopano Construction on Tampa International Airport s historic expansion is well underway.

More information

Study of Airport Winds and Aircraft Noise Complaints. January 2016

Study of Airport Winds and Aircraft Noise Complaints. January 2016 Study of Airport Winds and Aircraft Noise Complaints January 216 Environment Department, Noise Program Office Metropolitan Airports Commission 64 28th Avenue South, Minneapolis, MN 5545 MetroAirports.org

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) March 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:

More information

TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT

TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT Noise and the GTAA The GTAA is sensitive to the issue of aircraft noise and how it affects our neighbours. Since assuming responsibility for Toronto

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

Flying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance

Flying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance Flying Cloud Airport Joint Airport Zoning Board 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance Presentation Agenda Purpose & Goals Review of FCM Zoning Historical Timeline

More information

APPENDIX D MSP Airfield Simulation Analysis

APPENDIX D MSP Airfield Simulation Analysis APPENDIX D MSP Airfield Simulation Analysis This page is left intentionally blank. MSP Airfield Simulation Analysis Technical Report Prepared by: HNTB November 2011 2020 Improvements Environmental Assessment/

More information

Windmills & Airspace Can We Work Together?

Windmills & Airspace Can We Work Together? May 29, 2008 Windmills & Airspace Can We Work Together? J. Randolph Babbitt C O N F I D E N T I A L www.oliverwyman.com Windmills & Airspace Overview of Airspace Issues For Wind Turbine Sites The FAA s

More information

Part 150 Update Status and Recommendation

Part 150 Update Status and Recommendation Part 150 Update Status and Recommendation Presentation to: Noise Compatibility Committee October 26, 2010 Ted Baldwin 2 Topics Part 150 background Project status Noise Exposure Map Noise Compatibility

More information

Permanent Noise Monitoring Act Quarterly Operations Report

Permanent Noise Monitoring Act Quarterly Operations Report Permanent Noise Monitoring Act Quarterly Operations Report 1st Quarter 2010 Prepared by: Noise Mitigation Programs Office Rhode Island Airport Corporation For further information, please contact: Helena

More information

GREENVILLE-SPARTANBURG AIRPORT COMMISSION MINUTES March 9, 2011

GREENVILLE-SPARTANBURG AIRPORT COMMISSION MINUTES March 9, 2011 GREENVILLE-SPARTANBURG AIRPORT COMMISSION MINUTES March 9, 2011 The Greenville-Spartanburg Airport Commission met on March 9, 2011 at 9:00 a.m. in the Greenville-Spartanburg Airport Commission Office Conference

More information

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures VIA E-MAIL Date: To: From: Subject: Boston Technical Advisory Committee (BOS/TAC) Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures At the February 17, 2006 BOS/TAC meeting several issues

More information

Thursday, November 8, :15 p.m. 2:30 p.m. David Chetcuti Community Room Millbrae City Hall 450 Poplar Avenue Millbrae, CA 94030

Thursday, November 8, :15 p.m. 2:30 p.m. David Chetcuti Community Room Millbrae City Hall 450 Poplar Avenue Millbrae, CA 94030 Meeting Announcement Technical Working Group Thursday, November 8, 2018 12:15 p.m. 2:30 p.m. David Chetcuti Community Room Millbrae City Hall 450 Poplar Avenue Millbrae, CA 94030 Note: To arrange an accommodation

More information

Airport Noise Management System

Airport Noise Management System 4 th Quarter 2009 Quarterly Report Airport Noise Management System City of Chicago Department of Aviation Visit the Community Noise Resource Center on the Internet at www.flychicago.com Airport Noise Management

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation

More information

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter.

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter. LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter July 8, 2015 Southern California Metroplex Environmental Assessment Presentation

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

Massport CAC Meeting December 07, 2017

Massport CAC Meeting December 07, 2017 Massport CAC Meeting December 07, 2017 12/07/2017 Massport CAC 1 Agenda 1. Welcome and Introduction of New Members [5 minutes] 2. Public Comment [10 minutes] 3. Approval of the Minutes of the October 12,

More information

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival

More information

Planning, Development and Environment Committee

Planning, Development and Environment Committee Page 1 of 7 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Neil Ralston, Airport Planner Airport Development (726-8129) SUBJECT: 2035 MSP LONG TERM COMPREHENSIVE PLAN FORECAST, FACILITY

More information

Third Quarter 2014 Community Noise Consortium Meeting Thursday, October 23, 2014

Third Quarter 2014 Community Noise Consortium Meeting Thursday, October 23, 2014 Tampa International, Peter O. Knight, Plant City and Tampa Executive Airports Third Quarter 2014 Community Noise Consortium Meeting Thursday, Agenda Introductions Airport Master Plan Update Q3 2014 Review

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management 200 S. Spruce St. P.O. Box 20,000 Grand Junction, Colorado 81502-5022

More information

Noise Compatibility Report

Noise Compatibility Report ` Noise Compatibility Report 2018 1st Quarter May 22, 2018 Disclaimer Sound levels were unavailable between Oct. 6 th and May 22 nd, 2018. On May 22 nd, new state of the art monitors were installed. Adherence

More information

Portable Noise Monitor Report

Portable Noise Monitor Report Portable Noise Monitor Report Chicago O Hare and Midway International Airports Site 217 1149 Candlewood Drive, Downers Grove May 17, 214 through May 31, 214 Visit the O Hare and Midway Noise Management

More information