1 NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008

2 OUTLINE About DFW Airport What Led to RNAV Departure Procedures at DFW How RNAV Was Implemented by FAA Operational Effects What Is Working Well What Issues, If Any Community Effects What Is Working Well What Issues, If Any 2

3 ABOUT DFW DFW is the 3 rd busiest airport in the World DFW ranks 7 th in the world in terms of annual passengers DFW has over 18,000 acres of land (larger than the island of Manhattan) Seven runways! 279 VFR Ops per Hour Highest in US Five Passenger terminals 155 Gates 20 Passenger Airlines serving DFW 20 Cargo Airlines; International growing at 11% annually Enough capacity to last until 2020 without building any more infrastructure 9,000 Acres of pristine, undeveloped land DFW Airport is situated halfway between its owner cities of Dallas and Fort Worth but is not contiguous to either city. 3

4 DFW S NOISE HISTORY Before Airport was built, North Central Texas Council of Governments commissioned a study in 1971 to create a noise contour forecasting noise exposure with 1985 level operations. Noise Contour and Draft Land Use Ordinance was promulgated to DFW s surrounding cities to control land use in flight corridors. Cities adopted and most still use TODAY! IMPLEMENTING RNAV DEPARTURE PROCEDURES AT DFW AIRPORT 4

5 EIS & New Runways In the late 1980s, DFW updated its Airport Development Plan, which projected a need for two new north/south runways one on DFW s east side and one on the west. DFW completed an Environmental Impact Statement in 1992 and received approval from the FAA to build the two new runways conditioned on Specified Mitigation. DFW built the East Runway which opened in There was much controversy and lawsuits on the EIS and proposed runways that was eventually resolved in the mid-1990s. The West Runway has yet to be built. Proposed West Runway Area of Required Mitigation for East Runway Proposed East Runway 5

6 East-Side Mitigation Program DFW was required to provide mitigation to those in the 65 DNL noise contour or higher because of the proposed runway. Before DFW could open its 7 th runway (17L/35R), the majority of the mitigation program phases had to be complete. Mitigation for approximately 1,700 parcels which consisted of: Acquisition of over 500 parcels in the 70 DNL (mandatory and voluntary) Sound insulation of 23 parcels (apartments, churches, and schools), and Acquisition of easements and additional compensation of 1,200 parcels in 65 DNL. 6

7 Other Approved Projects from the EIS: Expansion of Class B Airspace Metroplex Air Traffic System (MATS) Plan Airspace Redesign Approved in 1992; Implemented in Doubled Airspace Capacity by enabling aircraft to fly parallel arrival routes into DFW, regardless of weather. MAJOR AIRSPACE CHANGE went unnoticed by communities as it was dwarfed by the controversy over the two proposed new runways. 7

8 Other Approved Projects from the EIS: Expanded Runway Headings Expanded Runway Departure Headings and Waiver Increased options for Departure Throughput FAA did not adopt the additional fanned headings Existing Headings Expanded Headings 8

9 Pre-RNAV Departure Procedures IMPLEMENTING RNAV DEPARTURE PROCEDURES AT DFW AIRPORT 120 o 130 o Jets departures were spaced at 1.5 minute intervals (at a minimum) to ensure requisite separation in trail. Departing Jets turned to initial assigned headings shortly after take off, often before reaching the departure end of the runway. 155 o The initial headings were flown for 5 nautical miles or more before the jets were allowed to turn on course. 174 o ~ 5 n.m. Slower turboprop aircraft were given early turnouts to keep them clear of the faster jet traffic. Excerpt from Runway Use Plan 170 o Actual flight tracks from May 26, 2004 Subsequent ground tracks vary depending on various factors including wind. 9

10 RNAV Drivers: Transition from Turboprops to Jets TP s 27% TP s 5% Between 1999 and 2004, airlines replaced turboprop aircraft with Regional Jets. As jets must fly for five miles before turning, the effect was an increase in the volume of traffic on the jet corridors. Jets 73% May 1999 Jets 95% May Jets ---- Turboprops ---- Props 10

11 RNAV DRIVERS Departure delays increased DFW Airport again called upon the FAA to implement the Expanded Fanned Headings Conventional procedures and current waivers limited FAA s ability to use the expanded headings. FAA turned to RNAV for an effective solution 11

12 RNAV DEVELOPMENT Local Air Traffic Control reviewed do s/don t s from other RNAV airports i.e. Las Vegas Worked closely with airlines in design SIDS linked to departure gates route assignment based on destination. Tested procedures in simulators Refined through multiple flight testing scenarios. DFW RNAV Departures are NOT Noise Abatement Procedures.. 98 EAST GATE RNAV DEPARTURES AUGUST 9, Z-1700Z N 12

13 Noise Affects of RNAV FAA requested DFW s help with NEPA requirements; DFW developed noise contours with and without RNAV Airport developed before/after RNAV contours to determine course of action: EA or Cat-X. No significant impacts with RNAV. FAA instead used data to prepare written re-evaluation of previous NEPA work. With RNAV Without RNAV 13

14 Communicating RNAV to the Community No requirement for public communication but DFW chose to brief local cities. FAA and DFW Noise Staff conducted briefings to cities as they desired, i.e. city staff only, city council, both. One City, Coppell, wanted Council briefed and local reporter picked up on story. Negative Headlines about Procedures went to local Coppell residents Announcing the then proposed start date of October 12,

15 Community Response: Announced Date vs. Actual Start Date 24 Complaints received week of Oct 12, 2004: Date RNAV expected to start by Coppell Residents per newspaper article. [Coppell in blue]. Eight Complaints from week of actual start date of Nov. 1, 2004: The 3 Coppell complaints of Nov. 1 were not related to departures. 15

16 RNAV Issues: Loss of Separation RNAV flew for 2.5 days. Issues arose with track compliance by some aircraft resulting in a loss of required separation for aircraft on parallel tracks. There were also issues with separation criteria between RNAV and non-rnav. FAA had to suspend, redesign, and resubmit for publishing. Revised procedures began September 5, Variability of turn radius between 5 mile turn and 8 mile turn resulted in loss of required 3-mile separation for aircraft on parallel tracks. 16

17 Redesigned RNAV Before and After RNAV Flight Corridors RNAV DEPATURE ROUTES CONVENTIONAL DEPATURE ROUTES 17

18 RNAV Departures - Precision Flight Paths IMPLEMENTING RNAV DEPARTURE PROCEDURES AT DFW AIRPORT 5.0 Miles RNAV Departures 1.6 Miles 354 o 354 o 1.3 Miles Conventional Departures 340 o 010 o Width of RNAV Course Miles Wide with departing jets within the corridor. 18

19 Before and After RNAV Track Density NON-RNAV DEPATURES IMPLEMENTING RNAV DEPARTURE PROCEDURES AT DFW AIRPORT RNAV DEPATURES 19

20 RNAV Operational Effects What Works Well 14% Increased Departure Throughput: Turbojet flows increased from 2 to 4 Aircraft departing at <1.5 min. intervals. 95% of Fleet equipped Precise, consistent flight patterns Reduced Frequency Congestion More direct routing Enhances capability to segregate aircraft by route; less in trail 20

21 RNAV Operational Effects Issues Related to Increased Track Distance PRE-RNAV ROUTE TO SOLDO FIX RNAV procedures are published routes with built-in separation with other RNAV routes; In four specific cases, it lengthens the routes over conventional SIDS; To reduce flight time/fuel burn, FAA often vectors RNAV aircraft if there is no other aircraft on the parallel track. RNAV ROUTE TO SOLDO FIX Before RNAV, Aircraft flew an initial heading for 5 miles and then turned and were vectored to their departure gate 21

22 RNAV Operation Effects American Airlines Proposed Solution Proposed Route Existing Route 22

23 RNAV Operational Effects Issues Related to Flexibility During Weather 23

24 RNAV Operational Effects Issues Related to Flexibility During Weather 24

25 RNAV Community Effects Issues with Proximity of RNAV Corridors in NE Conventional Departure Tracks RNAV Departure Tracks 25

26 RNAV Community Effects Issues with Proximity of RNAV Corridors in SE Conventional Departure Tracks RNAV Departure Tracks 26

27 RNAV Noise Effects What Worked Well Advanced Notification of Community Leaders and Continued Transparency Enhanced Acceptance of Procedural Change Reduced Population Exposed in 65 DNL by 22% (mostly in multi-family) Substantially Reduced Areas of Overflights Areas where noise increased were less than FAA Thresholds Complaints Continued to Decline 27

28 DFW Noise Complaint Trends Today ay IMPLEMENTING RNAV DEPARTURE PROCEDURES AT DFW AIRPORT RNAV Implemented: September Complaints Year To Date = Only 82 (as of Oct. 10, 2008) 28

29 Summary RNAV Departure Procedures has greatly enhanced FAA s ability to optimize DFW s airfield and the DFW Airspace. RNAV could have been a very controversial implementation. RNAV s acceptance by the local communities is believed to be the direct result of good relations forged with local cities in the mid-1990s and continually nurtured today. DFW expects to incorporate RNAV or RNP into its arrival procedures in the future as part of the NextGen Evolution. 29

30 Thank You! FOR MORE INFORMATION CONTACT: SANDY LANCASTER PHONE:

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 A Noise Compatibility Study, prepared under Part 150 of the Federal Aviation Regulations (FAR), is a voluntary program aimed at balancing

More information

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter.

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter. LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter July 8, 2015 Southern California Metroplex Environmental Assessment Presentation

More information

Naples Airport Authority Board of Commissioners and Noise Compatibility Committee Special Meeting on Central/South Florida Metroplex

Naples Airport Authority Board of Commissioners and Noise Compatibility Committee Special Meeting on Central/South Florida Metroplex Naples Airport Authority Board of Commissioners and Noise Compatibility Committee Special Meeting on Central/South Florida Metroplex March 16, 2017 Ted Baldwin and Robert Mentzer Metroplex Overview: From

More information

Noise Programs & NextGen Briefing. Stan Shepherd, Manager Airport Noise Programs

Noise Programs & NextGen Briefing. Stan Shepherd, Manager Airport Noise Programs Noise Programs & NextGen Briefing Stan Shepherd, Manager Airport Noise Programs 1 Presentation Overview Noise Information Hotline Increased Operations Economic Impacts Noise Contours Noise Mitigation Programs

More information

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011

More information

Master Plan & Noise Compatibility Study Update

Master Plan & Noise Compatibility Study Update Working Document-Subject to Change, March 2010 Master Plan & Noise Compatibility Study Update (14 CFR Part 150) TECHNICAL ADVISORY COMMITTEE March 24, 2010 Working Document-Subject to Change, March 2010

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

Part 150 Update Status and Recommendation

Part 150 Update Status and Recommendation Part 150 Update Status and Recommendation Presentation to: Noise Compatibility Committee October 26, 2010 Ted Baldwin 2 Topics Part 150 background Project status Noise Exposure Map Noise Compatibility

More information

DCA Airport Noise. MWAA WG Dec 15, 2016

DCA Airport Noise. MWAA WG Dec 15, 2016 DCA Airport Noise MWAA WG Dec 15, 2016 BACKGROUND FAA Next Gen noise Analyzed on macro level Data below 3K Ft under estimated community level impacts Primary focus has been on departure procedures 1 part

More information

Optimization of Airspace and Procedures in the Metroplex

Optimization of Airspace and Procedures in the Metroplex Optimization of Airspace and Procedures in the Metroplex Administration SoCal Metroplex Project Overview Brief To: By: Los Angeles World Airport Rob Henry, Manager SoCal Metroplex Jose Gonzalez, SoCal

More information

Navigation at the. Federal Aviation Administration Crossroads

Navigation at the. Federal Aviation Administration Crossroads Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 Pursuant to the California Department of Transportation

More information

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures VIA E-MAIL Date: To: From: Subject: Boston Technical Advisory Committee (BOS/TAC) Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures At the February 17, 2006 BOS/TAC meeting several issues

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department March 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview

More information

April 4, McKinney Airport Advisory Committee Airport Master Plan Update.

April 4, McKinney Airport Advisory Committee Airport Master Plan Update. McKinney Airport Advisory Committee Airport Master Plan Update http://mckinney.airportstudy.com/project-documents April 4, 2017 Paul Hendricks phendricks@fairviewtexas.org McKinney National Airport (TKI)

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department August 2007 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation

More information

AIRPORT WITH NO RUNWAYS IS A MALL

AIRPORT WITH NO RUNWAYS IS A MALL RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case

More information

Appendix A. Meeting Coordination. Appendix A

Appendix A. Meeting Coordination. Appendix A Appendix A Meeting Coordination Appendix A Philadelphia International Airport Noise Compatibility Program Update FAR Part 150 Noise Compatibility Program Update Report Prepared by: DMJM Aviation AECOM

More information

Atlanta NextGen PBN Activities

Atlanta NextGen PBN Activities Atlanta NextGen PBN Activities Presentation to: Name: Date: EWG Ops SC Meeting Jim Arrighi RNAV/RNP Group Jim Allerdice A80 May 18, 2010 0 0 Atlanta Performance Based Navigation Project Planning Seven

More information

St. Paul Downtown Airport (STP)

St. Paul Downtown Airport (STP) Reliever Airports: NOISE ABATEMENT PLAN St. Paul Downtown Airport (STP) 1 INTRODUCTION The noise abatement plan for the St. Paul Downtown Airport (STP) was prepared in recognition of the need to make the

More information

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report Ft. Lauderdale-Hollywood International Airport Prepared by: March 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview of progress of efforts to reduce

More information

FAA GBAS Program Update January 29, 2010

FAA GBAS Program Update January 29, 2010 US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department July 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview

More information

Have Descents Really Become More Efficient? Presented by: Dan Howell and Rob Dean Date: 6/29/2017

Have Descents Really Become More Efficient? Presented by: Dan Howell and Rob Dean Date: 6/29/2017 Have Descents Really Become More Efficient? Presented by: Dan Howell and Rob Dean Date: 6/29/2017 Outline Introduction Airport Initiative Categories Methodology Results Comparison with NextGen Performance

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee March 18, 2015 Audio recordings are made of this meeting Noise Oversight Committee March 18, 2015 Item 1 Review and Approve Draft Meeting Minutes Minutes from January 21, 2015

More information

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 ise Study Strategic Business Plan FAR Part 150 Meeting September 28, 2006 Agenda Introduction Part 150 Study Working Paper Two Operational Alternatives

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

SoCal Metroplex Study Area

SoCal Metroplex Study Area An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date Long Beach Daugherty, John Wayne Orange County, Los Alamitos, Fullerton Municipal and Zamperini Field Airports

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM)

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) INTRODUCTION The Noise Abatement Plan (FCM Plan) for the Flying Cloud Airport has been prepared in recognition of the need to make the

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation

More information

NextGen Priorities: Multiple Runway Operations & RECAT

NextGen Priorities: Multiple Runway Operations & RECAT NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the

More information

An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown

An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown Field Municipal and Navy North Island Airports October

More information

Portland International Jetport FAR Part 150 Update

Portland International Jetport FAR Part 150 Update Portland International Jetport FAR Part 150 Update Part 150 Noise Advisory Committee Meeting 4 December 2002 Harris Miller Miller & Hanson Inc. In association with: Vanasse Hangen Brustlin, Inc. Simat,

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee July 22, 2015 Audio recordings are made of this meeting 1 Noise Oversight Committee July 22, 2015 Item 1 Review and Approve Draft Meeting Minutes Minutes from May 20, 2015 Noise

More information

Applewood Heights Community Open House

Applewood Heights Community Open House Applewood Heights Community Open House Agenda TORONTO PEARSON BACKGROUND Toronto Pearson: For you. The World. Our goal: To become North America s premier gateway airport. Our job is to get you better connected

More information

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To: Federal Aviation Administration Memorandum Date: June 19, 2008 From: To: Subject: Richard Doucette, Environmental Protection Specialist LaVerne Reid, Airports Division Manager John Donnelly, Regional Counsel

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) November 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered

More information

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number: Phase I Submission Name of Program: Equivalent Lateral Spacing Operation (ELSO) Name of Program Leader: Dr. Ralf Mayer Phone Number: 703-983-2755 Email: rmayer@mitre.org Postage Address: The MITRE Corporation,

More information

KSFO RNAV TO GLS DEMONSTRATION

KSFO RNAV TO GLS DEMONSTRATION Delta Air Lines - Noah Flood GLS GLS DTT 1.9 DTT 1.9 GLS1 GLS1 KSFO RNAV TO GLS DEMONSTRATION Key Components Three Key Components 1. Global Navigation Satellite System A. GPS/Galileo/GLONASS 2. Ground

More information

Updates to Procedures at St. John s International Airport

Updates to Procedures at St. John s International Airport October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International

More information

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration DCA Presented to: Arlington County By: Terry Biggio, Vice President Air Traffic Services Date: June 18, 2015 Air Traffic Roles and Responsibilities As aviation technology advances, the FAA is putting in

More information

Portland International Jetport FAR Part 150 Update

Portland International Jetport FAR Part 150 Update Portland International Jetport FAR Part 150 Update Part 150 Noise Advisory Committee Meeting 5 February 2003 Harris Miller Miller & Hanson Inc. In association with: Vanasse Hangen Brustlin, Inc. Simat,

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016 Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC December 8, 2016 Contents FAA/Massport RNAV MOU Context Boston Logan Context FAA RNAV MOU, Overview Q&A 12/8/2016 2 FAA/Massport RNAV

More information

2 Purpose and Need. 2.1 The Need for the Proposed Action Description of the Problem

2 Purpose and Need. 2.1 The Need for the Proposed Action Description of the Problem 2 Purpose and Need The FAA is preparing this EA to evaluate the potential environmental impacts associated with implementation of new RNAV-defined IFPs for the Atlanta Metroplex (Proposed Action). According

More information

Martin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010

Martin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010 Martin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010 Prepared for: Federal Aviation Administration (FAA) Orlando Airport District Office

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

Dallas Executive Airport Marketing Plan

Dallas Executive Airport Marketing Plan Dallas Executive Airport Marketing Plan Briefing for the Transportation & Environment Committee Department of Aviation December 13, 2010 Briefing Objectives Review Executive Airport Goals Growth opportunities

More information

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures Dr. Ralf H. Mayer Dennis J. Zondervan Albert A. Herndon Tyler Smith 9 th USA/EUROPE Air Traffic Management

More information

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR This appendix sets forth the detailed input data that was used to prepare noise exposure contours for 2022 Baseline conditions. H.1 DATA SOURCES AND ASSUMPTIONS

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee May 8, 2014 Audio/Video recordings are made of this meeting 1 Item 1 Review and Approve Draft Meeting Minutes Minutes from March 19, 2014 2 Item 2 Review of Operations Report

More information

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Systems, Civil. Thank you for the opportunity to testify before the Subcommittee today on the issue of Area Navigation (RNAV)

More information

FAA RECORD OF DECISION. Appendix D FINAL EIS ADDENDUM DOCUMENTS

FAA RECORD OF DECISION. Appendix D FINAL EIS ADDENDUM DOCUMENTS FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT FAA RECORD OF DECISION Appendix D FINAL EIS ADDENDUM DOCUMENTS This appendix contains information that has been identified as having been inadvertently omitted

More information

Airlines and Aircraft Noise Management & Reduction

Airlines and Aircraft Noise Management & Reduction Airlines and Aircraft Noise Management & Reduction January 25, 2018 Reagan National Community Working Group Meeting Nancy Young, Vice President, Environmental Affairs Airlines for America (A4A) Overview»

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017 Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment

More information

Thursday, November 8, :15 p.m. 2:30 p.m. David Chetcuti Community Room Millbrae City Hall 450 Poplar Avenue Millbrae, CA 94030

Thursday, November 8, :15 p.m. 2:30 p.m. David Chetcuti Community Room Millbrae City Hall 450 Poplar Avenue Millbrae, CA 94030 Meeting Announcement Technical Working Group Thursday, November 8, 2018 12:15 p.m. 2:30 p.m. David Chetcuti Community Room Millbrae City Hall 450 Poplar Avenue Millbrae, CA 94030 Note: To arrange an accommodation

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) March 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

Continuous Descent? And RNAV Arrivals

Continuous Descent? And RNAV Arrivals Continuous Descent? And RNAV Arrivals From an ATC Perspective Presentation to: CDA Workshop GA Tech Name: Don Porter RNP Project Lead FAA, RNAV RNP Group Date: 18 April 2006 My Background 22 years Terminal

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

SoCal Metroplex Study Area

SoCal Metroplex Study Area An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date Santa Barbara Municipal Airport, Bob Hope Airport, Palm Springs International Airport, Ontario International

More information

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority Noise Abatement 101 July 13, 2017 1 Objectives Provide context and a better understanding for how and why flights may operate at Tampa International Airport the way they do. Provide an overview of laws,

More information

Trajectory Based Operations

Trajectory Based Operations Trajectory Based Operations Far-Term Concept Proposed Trade-Space Activities Environmental Working Group Operations Standing Committee July 29, 2009 Rose.Ashford@nasa.gov Purpose for this Presentation

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

NOISE ABATEMENT PLAN. St. Paul Downtown Airport Holman Field

NOISE ABATEMENT PLAN. St. Paul Downtown Airport Holman Field NOISE ABATEMENT PLAN St. Paul Downtown Airport Holman Field MAC Department of Environment Office of Aviation Noise and Satellite Programs June 2008 1 INTRODUCTION The noise abatement plan for the St. Paul

More information

APPENDIX H NOISE COMPATIBILITY PROGRAM ALTERNATIVES

APPENDIX H NOISE COMPATIBILITY PROGRAM ALTERNATIVES CHICAGO MIDWAY INTERNATIONAL AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE DRAFT APPENDIX H NOISE COMPATIBILITY PROGRAM ALTERNATIVES This appendix discusses the consideration and evaluation of

More information

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP)

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP) 3 RD QUARTER 2016 MINNEAPOLIS-ST. PAUL INTERNATIONAL AIRPORT (MSP) PUBLIC INPUT MEETING Metropolitan Airports Commission Noise Program Office July 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the

More information

Review of Airport Noise Issues East Airfield Development Area

Review of Airport Noise Issues East Airfield Development Area Review of Airport Noise Issues East Airfield Development Area Orlando International Airport April 21, 2011 Agenda Review of Meeting Minutes from April 21 When last we met Airport Noise 101 Cyrus Callum

More information

Dallas Executive Airport Town Hall Meeting April 3, 2014

Dallas Executive Airport Town Hall Meeting April 3, 2014 Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,

More information

COMMUNITY NOISE MITIGATION SUGGESTIONS

COMMUNITY NOISE MITIGATION SUGGESTIONS COMMUNITY NOISE MITIGATION SUGGESTIONS Toronto Pearson is one of North America's fastest growing global hub airports, handling nearly 40 million passengers today, and well on its way to reaching greater

More information

ARRIVALS REVIEW GATWICK

ARRIVALS REVIEW GATWICK ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

The Law of Noise Regulation Daniel S. Reimer

The Law of Noise Regulation Daniel S. Reimer The Law of Noise Regulation Daniel S. Reimer Today s Presentation Division of responsibility 2 Federal responsibility Noise source control Local responsibility Land use compatibility Aircraft restrictions

More information

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating

More information

Mr. Steve Domino began the meeting by introducing the RS&H team, the intent and scope of the project and the agenda for the presentation.

Mr. Steve Domino began the meeting by introducing the RS&H team, the intent and scope of the project and the agenda for the presentation. Meeting Minutes - Advisory Committee Start time 9:00 a.m. The Advisory Committee meeting presentation consisted of an introduction and overview of the project and a discussion of the preliminary inventory

More information

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Winnipeg James Armstrong Richardson International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November

More information

Review of brisbane Airport Noise Abatement Procedures

Review of brisbane Airport Noise Abatement Procedures Review of brisbane Airport Noise Abatement Procedures 1. Summary This document presents an overview of the findings of the review of the Noise Abatement Procedures in place for Brisbane Airport. The technical

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

Quieter Skies Report. Partnership for. Fort Lauderdale-Hollywood International Airport. Prepared by: Broward County Aviation Department

Quieter Skies Report. Partnership for. Fort Lauderdale-Hollywood International Airport. Prepared by: Broward County Aviation Department Fort Lauderdale-Hollywood International Airport Prepared by: February 2016 Partnership for Quieter Skies Report The Report provides an overview of progress of efforts to reduce the noise impacts of Fort

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

Minneapolis-St. Paul International Airport (MSP)

Minneapolis-St. Paul International Airport (MSP) 2 nd Quarter 2016 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting Metropolitan Airports Commission Noise Program Office April 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California

NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California All Rights Reserved 1 Topics Innovation Objective Scientific & Mathematical Framework Distinctions

More information

Airport Community Roundtable

Airport Community Roundtable Airport Community Roundtable Agenda November 15 th, 2017 1. Call to Order 2. Approval of Meeting Minutes 3. Special Priority Items a. Presentation by N.O.I.S.E. b. Presentation by Airlines For America

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Camille Shiotsuki Dr. Gene C. Lin Ed Hahn December 5, 2007 Outline Background Objective and Scope Study Approach

More information

Environmental Assessment Las Vegas Area Airspace Optimization Project

Environmental Assessment Las Vegas Area Airspace Optimization Project Environmental Assessment Las Vegas Area Airspace Optimization Project John Williams, Senior Vice President, Ricondo & Associates, Inc. ACI-NA Environmental Affairs Committee Conference May 16, 2013 Halifax,

More information

Noise Compatibility Year End Report. March 7, 2011

Noise Compatibility Year End Report. March 7, 2011 2 Year End Report March 7, 2 Noise Highlights of 2 Airport operations for Year 2 were down 3.2%, compared to Year 29 Operations of aircraft meeting Stage 3 requirements through presence of a hush kit for

More information