1 POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November 2017 The information and diagrams contained in this report are for illustrative purposes only and are not to be used for navigation.
2 Table of Contents 1.0 Purpose Background Usage Summary Environmental Impacts and Noise Monitoring Sample of overflights at the Enfield monitor Sample of overflights at the East Hants monitor Examples of non-aviation noise events Community Feedback Review Conclusions
3 1.0 Purpose This review examines the implementation of updated Standard Terminal Arrival Routes (STARs) and new Required Navigation Performance Authorization Required (RNP AR) instrument procedures at Halifax Stanfield International Airport (YHZ). In doing so, the review looks at operational usage, community feedback, and environmental and noise impacts of the new procedures implemented on November 10, The six-month period from November 10, 2016 to May 10, 2017 was examined. 2.0 Background Area Navigation (RNAV) and Required Navigation Performance (RNP) are part of a family of technologies known as Performance Based Navigation (PBN) that lever the capabilities of modern flight management systems and the Global Navigation Satellite System (GNSS) for safer and more efficient navigation. Together, they are a significant piece of the technology tool kit being utilized to meet commitments made by the global aviation industry to reduce greenhouse gas emissions. The shift towards PBN is also part of an ICAO-recommended approach to streamlining global navigation methods. In summer 2016, NAV CANADA proposed that the RNAV STAR structure be updated and that new RNP AR arrival procedures to runways 05, 14, 23 and 32 be implemented at YHZ. A consultation process was conducted in accordance with the industry s Airspace Change Communications and Consultation Protocol. The consultation process, which ran from July 29, 2016 to September 12, 2016, included briefings to elected officials and the airport s noise consultative committee, hosting of community open house events in two locations and use of a survey mechanism to enable the public to provide direct comment. Following the consultation process, it was recommended that the changes be implemented as proposed in November NAV CANADA committed to following up on the implementation with a review of the first sixth months of RNP operation. For background on the full scope of the airspace project and related consultation process please review the Public Engagement Report. 3.0 Usage Summary The primary change to RNAV approaches consisted of a small adjustment to the final approach fixes for respective runways, bringing them closer (roughly 1 nm) to the airport. A new Standard Terminal Arrival Route was added to the overall structure to improve how traffic was managed across the region. The overall utilization of RNP was expected to represent a relatively small proportion of overall traffic due to both equipage levels and the sequencing requirements of traffic at a busy airport. During consultation, it was stated that the percentage of aircraft equipped to utilize RNP procedures was anticipated to start at approximately 22 percent of aircraft. However, it was also acknowledged that a smaller portion would be granted an RNP approach as a result of sequencing requirements and pilots electing to employ other types of approaches. Between November 10, 2016 and May 10, 2017, approximately RNP approaches were flown to YHZ. The daily average of RNP approaches completed was less than five approaches per day. Over 1 Counts developed by NAV CANADA Operational Analysis. 3
4 Figure 2 - Pre- and Post-Implementation Flight Tracks Runway 14 time, the portion of the aircraft fleet equipped and certified for RNP will increase. A runway-by-runway usage analysis follows. Note: Maps depict traffic on given pre- and post-implementation days where each respective runway was in use. Day to day patterns will vary based on aircraft types, runway usage, wind direction and the manner of operation by pilots and air traffic controllers. Some maps may not depict all flight paths with traffic as flown due to low usage of some approaches. Operations to runways other than the one being examined have been omitted for clarity. For an overview of all flight paths view the Public Engagement Report. 3.1 Runway 05 Figure 1 below compares 24-hour samples of traffic as flown on a day prior to implementation against a day of traffic post implementation when runway 05 was in use. The turquoise lines show flight tracks prior to the change while the blue represent a day of tracks post-implementation. The main change that can be seen is a shifting of the base leg closer to the airport. As projected, traffic continues to be distributed across the region prior to lining up on final approach. Figure 1 - Pre- and Post-Implementation Flight Tracks Runway 05 The yellow tracks show the RNP approaches as flown. As expected, RNP approaches currently represent a small portion of the overall traffic. A total of 41 RNP approaches to runway 05 were flown over the first 180 days after implementation. 3.2 Runway 14 Figure 2 below compares 24-hour samples of traffic on a day prior to implementation against a day of traffic post implementation when runway 14 was in use. The turquoise lines show flight tracks prior to the change while the blue represent a day of tracks post-implementation. The main change that can be seen is a shifting of the base leg closer to the airport. Traffic continues to be distributed across the region prior to lining up on final approach and continues to overfly areas that could observe aircraft prior to the changes being implemented. The yellow tracks show the RNP approaches, 4
5 as flown. A total of 24 RNP approaches to runway 14 were flown over the first 180 days after implementation. With relatively low traffic quantities of equipped aircraft from the west and low runway 14 usage overall, it is no surprise that the RNP approaches to this runway are the least used. 3.3 Runway 23 Figure 3 below compares two 24-hour samples of traffic as flown. The turquoise flight tracks represent a day of traffic prior to the change while the blue represent a day of tracks post-implementation. The main change that can be seen is a shifting of the base leg closer to the airport, though in an area that experienced overflight before. As projected, traffic continues to be distributed across the region prior to lining up on final approach and continues to overfly areas that could observe aircraft prior to the changes being implemented. Figure 3 - Pre- and Post-Implementation Flight Tracks Runway 23 over the first 180 days after implementation. The yellow tracks show the RNP approaches as flown. As expected, RNP approaches currently represent a small portion of the overall traffic. A total of 260 RNP approaches to runway 23 were flown 3.4 Runway 32 Figure 4 below compares two 24-hour samples as flown for runway 32. The turquoise lines show flight tracks prior to the change while the blue represent a day of tracks post-implementation. The main change that can be seen is a shifting of the base leg closer to the airport, though in an area that experienced overflight before. As projected, traffic continues to be distributed across the region prior to lining up on final approach and continues to overfly areas that could observe aircraft prior to the changes being implemented. The yellow tracks show the location of the RNP approaches, as flown, which are also amongst the existing traffic distribution. A total of Figure 4 - Pre- and Post-Implementation Flight Tracks Runway 32 5
6 470 RNP approaches to runway 32 were flown over the first 180 days after implementation. Runway 32 sees the greatest RNP usage as the majority of aircraft to Halifax arrive from the west and benefit from a shorter transition when this runway is in use. 6
7 4.0 Environmental Impacts and Noise Monitoring The reduction in fuel burn resulting from the new structure is significant. Savings associated only with RNP usage during the six month period is estimated to be equivalent to greenhouse gas emission reductions of approximately 100 metric tons 2. As RNP equipage and usage grows, environmental benefits in terms of reduced fuel burn and associated greenhouse gas emissions will also grow. As part of the post-implementation review process, NAV CANADA also undertook noise monitoring to further quantify noise impacts of aircraft operations. Noise monitoring was contracted to a local environmental services company called All-Tech. The placement of monitors was determined in consultation with the Halifax Stanfield International Airport Authority. Residential areas where the new structure may be noticeable or where public feedback was received were targeted. Monitors were located in Enfield and East Hants targeting operations to runway 23. Monitors were placed in the communities over several days in September with the goal of catching a day of operation. Noise events were then correlated with specific RNP operations to provide a highly accurate indication of noise levels associated with overflight while identifying other noise events not associated with RNP approaches. The data was captured using Brüel and Kjӕr Model 2250 Type 1 Precision Integrating Sound Level Meters. Type 1 sound level meters are highly accurate instruments for environmental noise measurements. Figure 5 shows the location of noise monitors in relation to the RNP approach from the west (expected to be amongst the more frequently used). The following tables provide an overview of decibel levels, using both LAeq and LAmax, associated with usage of designated RNP arcs. LAmax represents Figure 5 Sound Monitor Locations the maximum noise level reached during an overflight event while LAeq represents a time-averaged decibel level that takes in to account fluctuations in decibel levels over the course of the event. Monitored decibel levels are typically within a 5 dba range of those modeled. 4.1 Sample of overflights at the Enfield monitor September 4, 2017 Time Aircraft Type Altitude LAmax 22:06 B738 4, :26 B737 4, :16 BE190 2, :00 E170 8, :46 DH8D 6, :32 B77L 5, :52 E190 5, Based on reduced track miles from new RNP procedures only (the delta between previous GNSS approaches and new RNP procedures) and does not include GHG reductions associated with continuous descent or resulting from improvements to non-rnp approaches. Estimate produced by NAV CANADA Operational Analysis. 7
8 14:42 DH8D 5, :34 E190 4, :04 E145 5, :26 DH8D 5, :46 DH8D 5, :40 DH8D 5, :56 B737 4, :36 A321 4, :28 DH8D 5, = RNP approach Note: At this stage of flight, RNP equipped aircraft are following a similar pattern to those using more traditional navigation methods. 4.2 Sample of overflights* at the East Hants monitor September 8, 2017 Time Aircraft Type Altitude LAmax 20:18 E190 2, :16 BE30 2, :24 DH8D 2, :58 A320 2, :20 A320 2, :52 B738 2, :00 B722 2, :46 B763 2, = RNP approach *Most aircraft noise events were not directly overhead (with the exception of the RNP approach) and were lined up on final approach 2.5 kilometres east of the monitor location. 4.3 Examples of non-aviation noise events Activity dba Chainsaw 120 Motorcycle (at 25 feet) 90 Freeway (at 50 feet from pavement edge at 10am) 76 Conversation in Restaurant 60 Quiet Suburb 50 8
9 5.0 Community Feedback The Halifax Stanfield International Airport Authority confirmed that there have been no complaints associated with the implementation of RNP. NAV CANADA did not receive any complaints or inquiries subsequent to implementation from either residents or public officials. 6.0 Review Conclusions Significant operational and environmental benefits associated with the new arrival structure are being realized. Reductions in flying time of up to three minutes, while relatively small, provide benefits to the flying public. During the review period as well as subsequent to the review period, no community concerns have been associated with the November 2016 implementation. Noise monitoring confirms that noise levels are within close range of those that were modeled and discussed during the consultation phase. Both the low community concerns and modeling accuracy reinforce that the changes have resulted in very little negative impact to communities as it relates to noise from aviation. NAV CANADA and the Halifax Stanfield International Airport Authority will continue to monitor and respond to questions related to changes. Future changes to the airspace will be subject to the appropriate consultation and/or communication process based on the Airspace Change Communications and Consultation Protocol. 9
POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW
POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Edmonton International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 January 2018 The information
More informationPOST-IMPLEMENTATION COMMUNITY IMPACT REVIEW
POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Winnipeg James Armstrong Richardson International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November
More informationAIRSPACE CHANGE COMMUNITY ENGAGEMENT REPORT
AIRSPACE CHANGE COMMUNITY ENGAGEMENT REPORT Proposed RNP AR approaches and STAR updates at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 October 2016 The
More informationUpdates to Procedures at St. John s International Airport
October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International
More informationAIRSPACE CHANGE COMMUNITY ENGAGEMENT REPORT
AIRSPACE CHANGE COMMUNITY ENGAGEMENT REPORT Proposed RNP AR approaches and STAR updates at Ottawa Macdonald Cartier International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 August 2016
More informationUPDATE ON THE 6 IDEAS (1-4) NAV CANADA
UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationTWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.
International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationChristchurch PBN Flight Paths Trial. Interim Report
Christchurch PBN Flight Paths Trial Interim Report Christchurch PBN Flight Paths Trial Interim Report PBN trial partners have prepared the following summary outlining progress of the PBN flight paths trial.
More informationLAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter.
LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter July 8, 2015 Southern California Metroplex Environmental Assessment Presentation
More informationEnvironmental Assessment. Runway 14 Smart Tracking Approach Gold Coast Airport
Environmental Assessment Runway 14 Smart Tracking Approach Gold Coast Airport Table of Contents Introduction ` 3 Runway 14 Smart Tracking approach 3 Assessment 3 Assumptions 3 Nominated aircraft 3 How
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationFederal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration
DCA Presented to: Arlington County By: Terry Biggio, Vice President Air Traffic Services Date: June 18, 2015 Air Traffic Roles and Responsibilities As aviation technology advances, the FAA is putting in
More informationUSE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR
BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference
More informationTRAFFIC MANAGEMENT PLAN FINAL STAGE. Implementation of Standard Instrument Departure and Standard Instrument Arrival Flight Paths.
TOWNSVILLE AIRPORT TRAFFIC MANAGEMENT PLAN FINAL STAGE Implementation of Standard Instrument Departure and Standard Instrument Arrival Flight Paths. Airservices and the Department of Defence are implementing
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationRNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.
RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement. Simon Young Strategy, Innovation and Service Performance Manager Australian Environment and PBN Drivers
More informationOperators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11
Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance
More informationName of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:
Phase I Submission Name of Program: Equivalent Lateral Spacing Operation (ELSO) Name of Program Leader: Dr. Ralf Mayer Phone Number: 703-983-2755 Email: rmayer@mitre.org Postage Address: The MITRE Corporation,
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationFramework Brief. Edinburgh SIDs
Framework Brief 11-Nov-2015 CAA House Edinburgh SIDs 2 Security Statement Unclassified This presentation has been approved for public distribution and publication on the CAA website. Copyright 2015 NATS/
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace
ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO/IATA/CANSO PBN/2 San Jose December 8, 2016 Big Data process Quantitative Quantitative / Qualitative
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationCAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL
Directorate of Airspace Policy NATMAC Representatives 13 July 2012 CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 During late
More informationIRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority
IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationHave Descents Really Become More Efficient? Presented by: Dan Howell and Rob Dean Date: 6/29/2017
Have Descents Really Become More Efficient? Presented by: Dan Howell and Rob Dean Date: 6/29/2017 Outline Introduction Airport Initiative Categories Methodology Results Comparison with NextGen Performance
More informationHOBART AIRSPACE DESIGN
HOBART AIRSPACE DESIGN BREAM CREEK COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway
More information(Presented by the United States)
International Civil Aviation Organization 31/07/09 North American, Central American and Caribbean Office (NACC) Tenth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/10) Grand
More informationShort Term Monitoring Program NSW, Carlingford Report. February 2013
NSW, Carlingford Report February 2013 Version Control Version Number Date Detail 1.0 February 2013 Initial Release. 2.0 May 2013 Updated formatting for table 2. 3.0 January 2014 Figure 5 and L90 values
More informationAERONAUTICAL INFORMATION CIRCULAR 18/18
NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual
More informationCanberra Airport Aircraft Noise Information Report
Canberra Airport Aircraft Noise Information Report Quarter 3 2012 (July to September) 1 Version Control Version Number Detail Prepared by Date 1 - Environment 5 December 2012 2 - Environment 13 December
More informationHOBART AIRSPACE DESIGN
HOBART AIRSPACE DESIGN DODGES FERRY COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and
More informationEuropean Joint Industry CDA Action Plan
Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in
More informationShort Term Monitoring Program NSW, Caringbah Report. February 2013
NSW, Caringbah Report February 2013 Version Control Version Number Date Detail 1.0 February 2013 Initial Release. 2.0 May 2013 Updated formatting for table 2. 3.0 January 2014 Figure 5 and L90 values updated
More informationRESPONSE TO THE INDEPENDENT TORONTO AIRSPACE NOISE REVIEW
RESPONSE TO THE INDEPENDENT TORONTO AIRSPACE NOISE REVIEW Independent Airspace Noise Review NAV CANADA Response 1 TABLE OF CONTENTS FOREWORD... 4 SUMMARY OF RECOMMENDATIONS... 5 RECOMMENDATION 1A...8 Sunset
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More informationFUTURE AIRSPACE CHANGE
HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement
More informationGold Coast Airport Aircraft Noise Information Report
Gold Coast Airport Aircraft Noise Information Report Quarter 2 2014 (April to June) 1 Version Control Version Number Detail Prepared by Date 1 - Environment September 2014 Airservices Australia. All rights
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationPerth Noise Abatement Procedures - Change to Preferred Runways
Environmental Analysis Summary Preferred Runways Perth Perth Airport Perth Noise Abatement Procedures - Change to Preferred Runways Environmental Analysis Summary April 2016 1 of 10 Environment Analysis
More informationQUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS
QUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS FOREWORD It takes a cross-industry effort to ensure that every flight happens safely and efficiently airlines, air navigation services, airport authorities,
More information2012 Performance Framework AFI
2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical
More informationCOMMUNITY NOISE MITIGATION SUGGESTIONS
COMMUNITY NOISE MITIGATION SUGGESTIONS Toronto Pearson is one of North America's fastest growing global hub airports, handling nearly 40 million passengers today, and well on its way to reaching greater
More informationCONNECTING WITH THE COMMUNITY: ANNUAL NOISE REPORT
CONNECTING WITH THE COMMUNITY: ANNUAL NOISE REPORT - 2016 DISCLAIMER This report contains a summary of data collected over the specified period and is intended to convey the best information available
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More informationToronto Aviation Noise Group (T.A.N.G.) Response to NAV CANADA S response to the HELIOS report for Toronto Airspace Review
Toronto Aviation Noise Group (T.A.N.G.) Response to NAV CANADA S response to the HELIOS report for Toronto Airspace Review Sandra Best, Co-Chair, T.A.N.G. sandrabest62@me.com December 13, 2017 Contents
More informationShort Term Monitoring Program Tarragindi Report, QLD
Short Term Monitoring Program Change Summary Version 1: 30 Aug 2013 Section/ Clause Summary NRFC Table of Contents 1. Deployment Details...3 1.1 Deployment Purpose...3 1.2 Deployment Monitoring Period...3
More informationAtlantic Interoperability Initiative to Reduce Emissions AIRE
ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia
More informationPerformance Based Navigation (PBN) Implementation Plan. The Gambia
Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation
More informationADS-B via Low Earth Orbiting Satellites Benefits Assessment
ADS-B via Low Earth Orbiting Satellites Benefits Assessment Jeff Dawson Director, Operational Support NAM/CAR ANI/WG/1 July 2013 Aireon LLC is a joint venture between NAV CANADA and Iridium to finance,
More informationHOBART AIRSPACE DESIGN
HOBART AIRSPACE DESIGN CARLTON COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway
More informationGOLD COAST AIRPORT - Runway 14 southern departures trial
Post Implementation Review GOLD COAST AIRPORT - Runway 14 southern departures trial Version 1 Effective January 2016 Airservices Australia 2016 1 of 13 Introduction At the request of the community, Airservices
More informationHOBART AIRSPACE DESIGN
HOBART AIRSPACE DESIGN CARLTON COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway
More informationRunway 35 South & West (Jet) Departure Flight Path Amendment
Environmental Assessment Runway 35 South & West (Jet) Departure Flight Path Amendment Canberra Airport Airservices Australia 1 of 8 Environment Assessment Runway 35 South & West (Jet) Departure & North
More informationNextGen Priorities: Multiple Runway Operations & RECAT
NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationCommunity Noise Consortium Meeting (CNC)
Community Noise Consortium Meeting (CNC) September 13, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationSafety and Airspace Regulation Group
Page 1 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Title of Airspace Change Proposal Change Sponsor Isle of Man/Antrim Systemisation (Revised ATS route structure over the
More informationCaptain Jeff Martin Senior Director Flight Operations Southwest Airlines
Captain Jeff Martin Senior Director Flight Operations Southwest Airlines Southwest s Fleet Southwest achieves one of its primary competitive strengths low operating costs by operating only one aircraft
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationHOBART AIRSPACE DESIGN
HOBART AIRSPACE DESIGN RICHMOND COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway
More informationMr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation
Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Systems, Civil. Thank you for the opportunity to testify before the Subcommittee today on the issue of Area Navigation (RNAV)
More information(RN R A N V A V & & RN R P N
PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance
More informationWashington Dulles International Airport (IAD) Aircraft Noise Contour Map Update
Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input
More informationDon-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs
Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India
More informationKSFO RNAV TO GLS DEMONSTRATION
Delta Air Lines - Noah Flood GLS GLS DTT 1.9 DTT 1.9 GLS1 GLS1 KSFO RNAV TO GLS DEMONSTRATION Key Components Three Key Components 1. Global Navigation Satellite System A. GPS/Galileo/GLONASS 2. Ground
More informationIntroduction. Appendix D: Airspace Protection
Preliminary PreliminaryDraft DraftMaster MasterPlan Plan Bankstown Airport Introduction : Airspace Protection D Preliminary Master Plan Draft Master Plan Airspace protection D1 OVERVIEW The protection
More informationRequired Navigation Performance at Alaska Airlines
Required Navigation Performance at Alaska Airlines Sarah Dalton Director, Airspace and Technology Kotzebue Nome Barrow Prudhoe Bay Adak Bethel Dillingham Dutch King Salmon Fairbanks Anchorage Cordova Harbor
More informationMINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP)
3 RD QUARTER 2016 MINNEAPOLIS-ST. PAUL INTERNATIONAL AIRPORT (MSP) PUBLIC INPUT MEETING Metropolitan Airports Commission Noise Program Office July 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the
More informationShort Term Monitoring Program South Dingley Village, VIC
Short Term Monitoring Program Version Control Page Summary Version 2: 11 May 2015 4 and 5 Update of dot point 8 (page 4) regarding contribution of community noise on captured events. Deletion of Table
More informationHOBART AIRSPACE DESIGN
HOBART AIRSPACE DESIGN SORELL COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway
More informationA Pilot s perspective
The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes
More informationMassport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016
Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC December 8, 2016 Contents FAA/Massport RNAV MOU Context Boston Logan Context FAA RNAV MOU, Overview Q&A 12/8/2016 2 FAA/Massport RNAV
More informationMeasurement of environmental benefits by ICAO Secretariat
International Civil Aviation Organization Measurement of environmental benefits by ICAO Secretariat ICAO PBN TF Sven Halle ICAO EUR/NAT Office ICAO EUR/NAT Office PBN Workshop 1 Overview KPA ASSEMBLY RESOLUTION
More informationTORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT
TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT Noise and the GTAA The GTAA is sensitive to the issue of aircraft noise and how it affects our neighbours. Since assuming responsibility for Toronto
More informationSDM Workshop on PBN Airborne Perspective. Michael Hopp, Lufthansa Group Brussels,
Michael Hopp, Lufthansa Group Brussels, 19.10.2017 lufthansagroup.com Lufthansa Group SESAR Projects in the PBN Context 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Prepare and Implement High
More informationApproach Specifications
Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the
More informationContinuous Descent? And RNAV Arrivals
Continuous Descent? And RNAV Arrivals From an ATC Perspective Presentation to: CDA Workshop GA Tech Name: Don Porter RNP Project Lead FAA, RNAV RNP Group Date: 18 April 2006 My Background 22 years Terminal
More informationSupplemental Proposals to Revising the
Presentation Summary of the Supplemental Proposals to Revising the Northern California Metroplex For Alameda County/Contra Costa County NEXTGEN SUBCOMMITTEE FOR THE OAKLAND AIRPORT/COMMUNITY NOISE FORUM
More informationBuchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan
Airport Planning Program Master Plan FAR Part 150 ise Study Strategic Business Plan FAR Part 150 Meeting September 28, 2006 Agenda Introduction Part 150 Study Working Paper Two Operational Alternatives
More informationNATA 2018 AGM & CONFERENCE
NATA 2018 AGM & CONFERENCE Tracy Beeman A / VP, Stakeholder and Commercial Relations Jeff Cochrane Director, Navigation and Airspace TOPICS NAV CANADA Corporate Update Navigation and Airspace NAVAID Modernization
More informationCanberra Noise Information Pack December 2011
Canberra Noise Information Pack December 2011 Table of Contents Purpose 2 Overview 2 Canberra Airport 3 Hours of Operation/Noise Abatement Areas 3 Runway Configuration 3 Air Traffic 3 Track density plot
More informationMeasurement of environmental benefits from the implementation of operational improvements
Measurement of environmental benefits from the implementation of operational improvements ICAO International Aviation and Environment Seminar 18 19 March 2015, Warsaw, Poland Sven Halle Overview KPA ASSEMBLY
More informationREVIEW OF PERTH AIRPORT Noise Abatement Procedures
REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationClassification: Public AIRSPACE AND FUTURE OPERATIONS CONSULTATION (JANUARY-MARCH 2019)
AIRSPACE AND FUTURE OPERATIONS CONSULTATION (JANUARY-MARCH 2019) LOCAL AUTHORITY BRIEFING 8 FEBRUARY 2019 Westerly operations Easterly operations PRESENTATION OVERVIEW Intro Airspace and Future Operations
More informationContextual note SESAR Solution description form for deployment planning
Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient
More informationENRI International Workshop on ATM/CNS
NextGen Next Generation Air Transportation System ENRI International Workshop on ATM/CNS Presented by: Jay Merkle Manager, System Engineering Integration, NextGen and Operations Planning Date: 12 November
More informationPBN Implementation Plan Tonga
PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using
More informationGold Coast Noise Information pack June 2012
Gold Coast Noise Information pack June 2012 Table of Contents Purpose 2 Overview 2 Hours of Operation/Curfews 3 Runway Configuration 3 Air Traffic 4 Track Density Plot 4 Typical tracks for Wind Conditions
More informationA Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures
A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures Dr. Ralf H. Mayer Dennis J. Zondervan Albert A. Herndon Tyler Smith 9 th USA/EUROPE Air Traffic Management
More informationCAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL
Safety and Airspace Regulation Group All NATMAC Representatives 13 August 2015 CAA DECISION LETTER LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 For over 10 years
More informationGlobal ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization
SIP/2009-WP/8 Business case Global ATM System ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case for the
More informationOpportunities to improve noise management and communications at Heathrow
Opportunities to improve noise management and communications at Heathrow Summary of a dialogue between Aviation Environment Federation, British Airways, HACAN, Heathrow Airport and NATS 1. Introduction
More information