1 Page 1 of 7 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Neil Ralston, Airport Planner Airport Development ( ) SUBJECT: 2035 MSP LONG TERM COMPREHENSIVE PLAN FORECAST, FACILITY REQUIREMENTS, AND STAKEHOLDER OUTREACH DATE: March 31, 2015 At the April, 2015 meeting of the Planning, Development and Environment Committee, staff will provide an overview of the Forecast, Facility Requirements, and Stakeholder Outreach elements of the 2035 Long-Term Comprehensive Plan (LTCP) for the Minneapolis St. Paul International Airport (MSP). The purpose of the LTCP is to update our view of facility needs for the next 20 years and to serve as the road map to guide our development strategy for MSP. The plan will recommend concepts for the types and locations of facility improvements needed to accommodate projected demand through the planning horizon, along with providing guidance on phasing and scheduling throughout the 20-year program. The Long-Term Comprehensive Plan is updated routinely every five years to reconcile everchanging trends in the industry. It does not authorize any construction. It is helpful however in shaping the 7-year Capital Improvement Program which is the implementation vehicle of the Commission. Attachment 1 is a glossary of key terms which may be of assistance during this discussion. Activity Forecast: The 2035 MSP LTCP forecast provides aviation activity projections through the 20- year planning horizon to serve as the basis for deriving facility needs. The elements of the forecast include passenger originations and enplanements, passenger aircraft operations, aircraft fleet mix, and design day flight schedules. Also included are projections of air cargo tonnage, and air cargo, air taxi, general aviation, and military aircraft operations. The forecast is unconstrained in nature, meaning that sufficient airfield, terminal, and landside facilities are expected to be in place to accommodate the activity levels dictated by demand. The forecast includes activity projections for milestone years 2020, 2025, 2030, and A preliminary version of the forecast for passenger-related activities through 2030 was presented to the Committee in September The projection for passenger activity has now been extended through 2035 and updated to reflect actual 2014 year-end traffic levels. There are no substantial differences between the preliminary forecast presented in September 2014 and the final draft forecast presented herein. A tabular summary of the Base Case MSP 2035 LTCP forecast follows: Revenue Passenger Total Aircraft Operations Enplanements ACTUAL ,369, , ,002, ,760 Historical High 17,984,311 (2005) 541,093 (2004) FORECAST ,587, , ,798, , ,137, , ,794, , ,898, ,315 Compound Annual Growth Rate ( 14 35) 2.2% 1.0%
2 Page 2 of 7 The following table compares the results of Base Case 2035 LTCP forecast with forecasts prepared for the previous LTCP in 2009 and the 2020 Improvements Environmental Assessment (EA) in 2012: Year 2030 Revenue Passenger Enplanements Year 2030 Total Aircraft Operations 2030 LTCP (2009 forecast) 28,431, , Improvements EA (2012 forecast) 26,411, , LTCP (2015 forecast) 23,794, ,762 When compared to these previous forecasts, the Base Case 2035 LTCP forecast is lower in terms of both revenue passenger enplanements and total aircraft operations for the planning horizon year of 2030 (the out-year for the previous projections). We have also prepared High and Low forecast scenarios so that the planning team can test the sensitivity of various development options to fluctuating demand levels. The following figures graphically show the Base Case 2035 LTCP forecast in relation to the envelope of the High and Low forecast scenario ranges. FIGURE LTCP PASSENGER ENPLANEMENT FORECAST RANGE 35.0 Revenue Passenger Enplanements (millions) LTCP Forecast Scenario Envelope Historical Enplanements 2035 LTCP Base Forecast
3 Page 3 of 7 FIGURE LTCP AIRCRAFT OPERATIONS FORECAST RANGE Aircraft Operations (Thousands) LTCP Forecast Scenario Envelope Historical 2035 LTCP Base Forecast Facility Requirements: Upon completion of the activity forecasts, the next step is to assess the capabilities of existing facilities to accommodate projected demand levels through a Facility Requirements Analysis. An overview of the planning parameters (operational factors) and level of service standards (performance criteria) used to guide the facility requirements analysis was provided at the March Committee briefing. Identical to the previous LTCP document prepared in 2010, the Facility Requirements analysis is evaluating two distinct scenarios related to facility development: The Airlines Remain Scenario represents continuation of the existing condition where all non- Delta affiliated carriers operating at Terminal 1 remain and grow organically at Terminal 1 through the planning horizon; The Airlines Relocate Scenario represents the balanced terminal concept where all non-delta affiliated carriers (except Great Lakes) relocate to Terminal 2 within the planning horizon. As an example of the facility requirements analysis completed to date, Attachments 2 and 3 depict a level of service gap-assessment illustrating the adequacy of existing processing facilities within the terminals to accommodate demand levels projected for milestone years in the forecast. Additional details and findings from the analysis will be provided during the Committee briefing. Stakeholder Outreach: The LTCP outreach plan proposes three phases that are patterned after the engagement efforts conducted during the last LTCP effort five years ago.
4 Page 4 of 7 First, we will meet with stakeholders in the mid-april through June timeframe, before the draft plan is finalized, to provide information about the plan s purpose, process, preliminary findings, and timeline. This will include briefings with: Municipal planning departments in surrounding communities, and to their plan commissions and/or City Councils if requested Other agencies such as the FAA, MnDOT, and the Metropolitan Council Internal tenant groups Interested members of the public at an informational meeting The second phase will be the formal public review period after the draft plan has been completed and approved by the MAC for public distribution. We are envisioning a 30 to 45-day written comment period, with two public information meetings scheduled during this timeframe. Finally, after the public comment period closes, we will work to incorporate feedback into the plan and prepare a final draft for MAC adoption and Metropolitan Council formal review. During this time, we will continue to conduct stakeholder outreach on an as-needed basis. THIS IS AN INFORMATIONAL ITEM ONLY; NO COMMITTEE ACTION IS REQUIRED.
5 Page 5 of 7 Glossary of Key Terms: Aircraft Fleet Mix: The types of aircraft operating at MSP grouped into categories with similar size and performance characteristics. Aircraft Operations: Total aircraft takeoffs and landings. Airlines Relocate Scenario: An LTCP forecast scenario where all non-delta affiliated carriers (except Great Lakes) relocate to Terminal 2 within the planning horizon. Airlines Remain Scenario: An LTCP forecast scenario where all non-delta affiliated carriers operating at Terminal 1 remain and grow organically at Terminal 1 through the planning horizon. Check-in Positions: Ticket counter locations where passengers interact with airline agents or kiosk devices to obtain boarding passes and/or check baggage. Checkpoint: The passenger security screening checkpoint operated by the Transportation Security Administration (TSA). Claim Devices: Carousels in the baggage claim area where passengers retrieve checked baggage from an arriving flight. Connecting Passengers: Passengers who arrive at MSP from another airport and depart from MSP on a connecting flight. Design-Day Flight Schedule: A sample flight schedule representing the average weekday in the peak month for a particular forecast scenario. The schedule includes flight information such as origin and destination, arrival and departure time, and aircraft type. Enplaned Passengers: Total revenue passengers boarding at MSP; includes both originating and connecting passengers. Gates: Parking positions where aircraft load and unload passengers and baggage. LTCP: Long-Term Comprehensive Plan. Originating Passengers: Passengers who start their trip at MSP. Outbound Carts: Staging position for carts used by airlines to sort and transport outbound baggage from the terminal to departing aircraft. ATTACHMENT 1
6 Page 6 of 7 MSP 2035 LTCP Facility Requirements Analysis Level of Service Gap Analysis Summary Terminal Requirements Airlines Remain Scenario Facility Shortfall Facility Adequacy Terminal 2-Humphrey Terminal 1-Lindbergh Source: Ricondo & Associates ATTACHMENT 2
7 Page 7 of 7 MSP 2035 LTCP Facility Requirements Analysis Level of Service Gap Analysis Summary Terminal Requirements Airlines Relocate Scenario Terminal 1-Lindbergh Facility Shortfall Facility Adequacy Terminal 2-Humphrey Source: Ricondo & Associates ATTACHMENT 3
Noise Oversight Committee
Noise Oversight Committee March 18, 2015 Audio recordings are made of this meeting Noise Oversight Committee March 18, 2015 Item 1 Review and Approve Draft Meeting Minutes Minutes from January 21, 2015
More informationStudy Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History
MIA BASELINE ACTIVITY FORECASTS, DERIVATIVE DATA AND FLEET MIX PROJECTIONS RESULTS SUMMARY ACCEPTANCE BRIEFING FOR THE AIRPORT AND SEAPORT COMMITTEE (ASC) JULY 15, 2010 Study Design Outline Background
More informationmsp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010
MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September
More informationNoise Oversight Committee
Noise Oversight Committee May 20, 2015 Audio recordings are made of this meeting Noise Oversight Committee May 20, 2015 Item 1 Review and Approve Draft Meeting Minutes Minutes from January 21 Noise Oversight
More informationCHAPTER 4: ALTERNATIVES
MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the
More informationChapter 1: Introduction Draft
Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...
More informationAirlake Airport 2035 Long Term Comprehensive Plan (LTCP)
Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan
More informationJOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012
1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationChapter 1: Introduction
Chapter 1: TABLE OF CONTENTS 1... 4 1.1 Master Plan Study Content... 4 1.2 Purpose and Scope of Master Plan Study... 4 1.3 Airport History and Role... 6 1.4 Airport Location and Service Area... 6 1.5 ABIA
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationIntroduction DRAFT March 9, 2017
Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout
More informationNoise Oversight Committee
Noise Oversight Committee July 22, 2015 Audio recordings are made of this meeting 1 Noise Oversight Committee July 22, 2015 Item 1 Review and Approve Draft Meeting Minutes Minutes from May 20, 2015 Noise
More informationSTUDY WORK GROUP MEETING No. 4. July 12, 2017
STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,
More information3rd Quarter 2015 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting
3rd Quarter 2015 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting Metropolitan Airports Commission Noise Program Office July 28, 2015 Meeting Goals To hear the views and concerns of
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More information2. 1:45 to 1:50 Review and Approval of November 18, 2009 NOC Meeting Minutes
Minneapolis/St. Paul International Airport (MSP) Noise Oversight Committee (NOC) Meeting Agenda January 2, 21 1:3 P.M. Lindbergh Conference Room MAC General Office Building 64 28 th Avenue South Minneapolis,
More informationACTION TRANSMITTAL
Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED
More informationSTAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D
STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings
More informationSavannah / Hilton Head International Airport Master Plan Update
EXECUTIVE SUMMARY Savannah / Hilton Head International Airport Master Plan Update Prepared for: The Savannah Airport Commission Prepared by: URS Corporation In Association With: RS&H and Ruth and Associates,
More informationDRAFT. Airport Master Plan Update Sensitivity Analysis
Dallas Love Field Sensitivity Analysis PREPARED FOR: The City of Dallas Department of Aviation PREPARED BY: RICONDO & ASSOCIATES, INC. August 201 Ricondo & Associates, Inc. (R&A) prepared this document
More informationAIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA
AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationAIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI
AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents
More informationWelcome to the Boise Airport Master Plan Update Open House
Welcome to the Boise Airport Master Plan Update Open House Get the facts and sign up for the Master Plan Update newsletter at http://www.iflyboise.com/about-boi/master-plan/ What does the Master Plan Update
More informationDocument prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN
LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support
More informationTampa International Airport Master Plan Update. December 12, 2012
Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationCity of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018
City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan Public Workshop #2 April 19, 2018 DISCUSSION TOPICS Introduction About the Master Plan Public Workshop #1 Recap
More informationForecast and Overview
Forecast and Overview DENVER INTERNATIONAL AIRPORT Overall goals of the (MPR): Work with DEN to refine the preferred airport development plan to guide the development over an approximate 25-year planning
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationTed Stevens Anchorage International Airport
Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the
More informationRegular Board Meeting August 4, 2015
Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate
More informationTed Stevens Anchorage International Airport
Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the
More informationFort Wayne International Airport Master Plan Study. Executive Summary
Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationHILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1
HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationAIRPORT MASTER PLAN UPDATE
AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo
More informationAPPENDIX D MSP Airfield Simulation Analysis
APPENDIX D MSP Airfield Simulation Analysis This page is left intentionally blank. MSP Airfield Simulation Analysis Technical Report Prepared by: HNTB November 2011 2020 Improvements Environmental Assessment/
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationSAN JOSÉ INTERNATIONAL AIRPORT
SAN JOSÉ INTERNATIONAL AIRPORT NEAR-TERM TERMINAL CAPACITY ANALYSIS AIRPORT COMMISSION AUGUST 14, 2017 August 14, 2017 AGENDA 1. Forecast Review (with 14 MAP High Case) 2. Gate Requirements and Aircraft
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationNantucket Memorial Airport Master Plan Update
Nantucket Memorial Airport Master Plan Update CHAPTER 1 - INTRODUCTION & PUBLIC OUTREACH PROGRAM REVIEW DRAFT SUBJECT TO CHANGE Prepared for: Nantucket Memorial Airport Commission 14 Airport Road Nantucket,
More informationRunway Length Analysis Prescott Municipal Airport
APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section
More informationThe presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3
This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7
More informationPresentation Outline. We will leave with:
Presentation Outline We will leave with: Knowledge of work done to-date Awareness of the methodology and preliminary findings of the aviation demand forecasting Understanding of public outreach efforts
More informationSummary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.
Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed
More informationGeneral Aviation Master Plan Update
Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationAirport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017
Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY Agenda (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR
More informationChapter 1 Introduction and Project Overview
EPHRATA MUNICIPAL AIRPORT Chapter 1 Introduction and Project Overview The Port of Ephrata in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Ephrata Municipal
More informationMaster Plan Update Community Advisory Committee Kick-off Meeting
Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationForecast of Aviation Activity
DETROIT METROPOLITAN WAYNE COUNTY AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE CHAPTER B FORECAST OF AVIATION ACTIVITY Forecast of Aviation Activity Introduction This chapter summarizes past aviation
More informationENVISIONING AUSTIN s Airport of the Future
ENVISIONING AUSTIN s Airport of the Future ABIA 2040 Master Plan Public Workshop #1 October 12, 2017 WHAT IS THE PURPOSE OF TODAY S WORKSHOP? Educate & Inform Solicit Input Answer Questions 2 WHAT IS A
More informationERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS
EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2
More informationAccording to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:
4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity
More informationExisting Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276
More information~ s: Memorandum
Memorandum CITY OF DALLAS DATe November 13, 2015 ro sva..rc~ Members of the Economic Development Committee: Rickey D. Callahan (Chair), Casey Thomas, II (Vice Chair), Lee M. Kleinman, Adam Medrano, Carolyn
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationPartnership for Quieter Skies Report
Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department August 2007 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview
More informationKelly Field at Port San Antonio Airport Master Plan
Kelly Field at Port San Antonio Airport Master Plan Board of Directors / Steering Committee Briefing Today s Agenda What is an Airport Master Plan? Master Planning Process and Project Background Community
More informationThe CLE Master Plan Includes:
The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing
More informationGSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT
About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationTable E-3 Phased Capital Improvement Program...E - 11
Ni ag ar af r ont i e rt r ans por t at i onaut hor i t y Buffa l oni a ga r ai nt e r na t i ona l Ai r por t Execut i vesummar y AI P#33600097010 NF T APr oj ec t#30bg0916 NYS DOTPI N#5913 11 Ma y2013
More informationMONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES
MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the
More informationAppendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update
Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on
More informationAIRPORT DEVELOPMENT PLAN. Design-Build Institute of America September 8, 2015
AIRPORT DEVELOPMENT PLAN Design-Build Institute of America September 8, 2015 Lindbergh Field - 1935 3 Page 2 Lindbergh Field - 1944 3 Page 3 Lindbergh Field - 1955 3 Page 4 San Diego International Airport
More informationNantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012
Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach
More informationEXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES
EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationPartnership for Quieter Skies Report
Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department March 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview
More information3 Aviation Demand Forecast
3 Aviation Demand 17 s of aviation demand were prepared in support of the Master Plan for Harrisburg International Airport (the Airport or HIA), including forecasts of enplaned passengers, air cargo, based
More informationChapter 1 Introduction and Project Overview
Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier
More informationBremerton National Airport Airport Master Plan Project Update February 12, 2013
Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific
More informationAlternatives. Introduction. Range of Alternatives
Alternatives Introduction Federal environmental regulations concerning the environmental review process require that all reasonable alternatives, which might accomplish the objectives of a proposed project,
More informationEAT Master Plan Planning Advisory Committee (PAC) Meeting #2 Summary (FINAL)
PAC Meeting #2: November 10, 2016 Meeting Participants: Pangborn Airport: Port of Chelan County: Consultant Team: PAC Members: Trent Moyers, Tina Stadther, Ron Russ Mark Urdahl Damon Smith, Jeff Smith,
More informationCurrent and Forecast Demand
Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual
More informationFLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016
FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and
More informationNorfolk International Airport
Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport
More informationSession Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau
Session Six: State Aviation System Plan Overview 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau STUDY GOALS AND OBJECTIVES The purpose of the Georgia Statewide
More informationFLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017
FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY PAC Committee (PRELIMINARY DRAFT) WORK IN PROGRESS -
More informationLove Field Modernization Program Update: Master Planning Recommendations
Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and
More informationChapter 1 Introduction
Chapter 1 Introduction Introduction and Purpose The Airport Master Planning process evaluates an airport s physical facilities, establishes a forecast for future demand, and identifies a development plan
More informationCasper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM
Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, 2014 1:30 PM Casper/Natrona County International Airport Master Plan Update Policy
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationCHAPTER 4 DEMAND/CAPACITY ANALYSIS
CHAPTER DEMAND/CAPACITY ANALYSIS INTRODUCTION The demand/capacity analysis examines the capability of the airfield system at Blue Grass Airport (LEX) to address existing levels of activity as well as determine
More informationFLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING
(PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING May 15, 2018 Master Plan Schedule Overview Progress Since Last Master Plan
More informationAustin-Bergstrom International Airport Master Plan Update
FINAL REPORT Prepared for: City of Austin Department of Aviation 3600 Presidential Boulevard Austin, Texas 78719 Prepared by: P&D Aviation A Division of P&D Consultants, Inc. 999 Town & County Road, 4
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationMASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4
MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis
More informationWashington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. 6th Working Group Briefing 1/7/19
Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update 6th Working Group Briefing 1/7/19 Study Purpose Agenda Background Summary of last stakeholder meetings Refresher on DNL,
More information2 Aviation Demand Forecast
2 Aviation Demand Forecast 2.1 Historic Passenger and RPT Aircraft Movements Historic passenger and Regular Public Transport (RPT) aircraft movements from 1980 to 2007, with significant events that have
More informationMeeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012
Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns