1 Runway Safety Margin Enhancement Project Ann Arbor Municipal Airport Matt Kulhanek Director-Facilities Management 1
2 Agenda Background Safety Issues being Addressed Environmental Assessment Study Airport Improvement Process Airport Economic Impact to the Community Q & A 2
3 Agenda Background Safety Issues being Addressed Environmental Assessment Study Airport Improvement Process Airport Economic Impact to the Community Q & A 3
4 Background Discussions began late 2002/2003 for the 2007 ALP Snow Removal Equipment (SRE)/Maintenance Building Box Hangars FBO Start-Up Business State Road Corridor Project Study 4
5 Background Most airport improvements paid with FAA (95%) & State (2.5%) airport improvement trust funding requires the improvement be shown on an approved airport layout plan (ALP) ARB had poor history with ALP s prior to 2007 Prior attempts failed due to airport opposition: 1960 s (8,000 runway) 1970 s (5,000 runway) 1990 s (5,000 runway) 2007 ALP approved to include State Road rerouting plan (curve in road) SRE building and box hangar improvements 5
6 Background 6
7 Background 2007 ALP 7
8 Background Prior to vote approving 2007 ALP, City Council asked does this ALP address all of the necessary security and safety needs in this post 9/11 environment? Former airport manager said no, it didn t adequately address: State Road separation (curve was impractical, avoided having the runway debate) Control tower line-of-site obstruction Unusual number of overruns (11 between , rest of MI one at KBTL) Council passed resolution adopting 2007 ALP and asked airport manager to return with a recommendation within 60 days 8
9 Background 9
10 Background 10
11 Background 11
12 Background 12
13 Background Delays by MDOT contributed to having FAA review for approval recommended safety enhancements until late June 2008 Airport Advisory Committee (AAC) approved its recommendation at its August 2008 meeting. City Council approved the amended 2008 ALP including the safety enhancement without changing airport design classification (B-II) 13
14 Agenda Background Safety Issues being Addressed Environmental Assessment Study Airport Improvement Process Airport Economic Impact to the Community Q & A 14
15 Safety Issues being Addressed Separation & Clearance of State Road from Rwy 06/24 Control Tower Line-of-Site Unusually High Number of Runway Overruns 15
16 Safety Issues being Addressed Separation & Clearance of State Road from Rwy 06/24 Option #1: Do nothing at all and State Road may not be widened to accommodate State Road Corridor Project (to 4 lane boulevard). Option #2: Curve the State Road right-of-way to the east through floodplain and wetlands (opposed by Pittsfield Twp). Option #3: Shift runway southwest 150 (preferred by Washtenaw Co. Road Commission) 16
17 Safety Issues being Addressed Separation & Clearance of State Road from Rwy 06/24 Option #1 (do nothing) Reasons why AAC recommended Option #3 State Road & intersection at Ellsworth Road has out grown its original traffic volume design capacity, requires modernization Does not cure Part 77 obstacle clearance concern if road widened without separation from runway Part 77 obstacle clearance is 15 above road surface to bottom of obstacle clearance surface, currently 13.4 without shifting VASI, may require steeper glide slope (i.e., 3 to 3. 5 or up to 3.77 ) shift VASI to SW preserving 3 glide slope without replacing displaced runway would effective shorten runway by moving touch down point to SW Does not resolve control tower line-of-site obstruction (raise tower cab or build new taller tower) Risk management liability cost avoidance Do nothing is not an option 17
18 Safety Issues being Addressed Separation & Clearance of State Road from Rwy 06/24 18
19 Safety Issues being Addressed Separation & Clearance of State Road from Rwy 06/24 Option #2 (curve in road) Reasons why AAC recommended Option #3 Too costly to construct road through floodplain and wetlands Requires acquisition of private property Might not pass mandatory environmental assessment study to qualify for State and Federal funding Does not resolve control tower line-of-site obstruction (raise tower cab or build new taller tower) Does not resolve risk management liability cost avoidance 19
20 Safety Issues being Addressed Separation & Clearance of State Road from Rwy 06/24 20
Runway Safety Margin Enhancement Project. Matt Kulhanek Director Facilities Management
Runway Safety Margin Enhancement Project Ann Arbor Municipal Airport Matt Kulhanek Director Facilities Management 1 Agenda Background Environmental Assessment Study Airport Improvement Process Airport
More informationMEETING MINUTES Page 1 of 5
Page 1 of 5 50178.000 May 26, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Citizens Advisory Committee Meeting MEETING LOCATION MEETING PURPOSE Amy Eckland ISSUED BY SIGNATURE PARTICIPANT See attached
More informationDRAFT Environmental Assessment for Ann Arbor Municipal Airport Ann Arbor, Michigan
DRAFT Environmental Assessment for Ann Arbor Municipal Airport Ann Arbor, Michigan Prepared for: City of Ann Arbor Michigan Department of Transportation - Office of Aeronautics and Federal Aviation Administration
More informationMEETING SUMMARY Page 1 of 4
MEETING SUMMARY www.jjr-us.com Page 1 of 4 Ann Arbor Municipal Airport 50178.000 July 20, 2009 September 8, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Ann Arbor Municipal Airport Citizens Advisory
More informationCitizens Advisory Council Meeting #3
Citizens Advisory Council Meeting #3 Ann Arbor Municipal Airport Environmental Assessment February 22, 2010 3:00 pm 4:30 pm 1. Introductions 3:00-3:10 2. Environmental Studies Update 3:10-3:20 a. Wetland
More informationGrove Field Airport Environmental Assessment
Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of
More informationChapter 1. Draw Standard Departure Procedure
Chapter 1. Draw Standard Departure Procedure 1. Prior to drawing departure area consult the US Terminal Procedures book to determine if there are published take off special Take Off Minimums and (Obstacle)
More informationFrequently Asked Questions (Technical) Environmental Assessment Study And 800 Runway Safety Margin Extension
Frequently Asked Questions (Technical) Environmental Assessment Study And 800 Runway Safety Margin Extension PREAMBLE These frequently asked questions (FAQ) were written based on questions and concerns
More informationAnn Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB
MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:
More informationWinona Runway Shift Project
Winona Runway Shift Project Sandy DePottey Dakota-Minnesota ADO Fall MnDOT FAAWorkshop St Cloud, Minnesota November 5, 2014 Update on 0 0 Challenges we faced The main runway 12/30 at Winona Municipal Airport
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationCollier County Airport Authority. Joint Automated Capital Improvement Program
Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer
More informationDRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03
DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD Revised 12/12/03 As recommended for approval by the Plan Commission General Project Description
More informationAirport Master Plan Open House Front Range Airport February 23, 2017
Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future
More informationAirport Master Plan Update June 15, 2017
Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationAirport Master Plan Update June 15, 2017
Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationMilton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.
Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet
More informationAgenda: SASP SAC Meeting 3
Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationAIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI
AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents
More informationCONSENT DECREE & 3,500 RUNWAY
CONSENT DECREE & 3,500 RUNWAY FAA Airfield Design Standards FAA AC 150/5300-13A Change 1 (2/26/2014) Joseph Schmitz, PhD Airport Commission Member Graphics: Andrew Wilder Resolves Ongoing FAA v. City of
More informationFrequently Asked Questions (Condensed) Environment Assessment Study And 800 Runway Safety Margin Extension
Frequently Asked Questions (Condensed) Environment Assessment Study And 800 Runway Safety Margin Extension PREAMBLE These frequently asked questions (FAQ) were written based on questions and concerns expressed
More informationLopez Island Airport Master Plan Update. Public Meeting June 15, 2017
Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,
More informationAirlake Airport 2035 Long Term Comprehensive Plan (LTCP)
Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan
More informationTHE ANN ARBOR MUNICIPAL AIRPORT RULES AND REGULATION. Adopted July 17, 2013
THE ANN ARBOR MUNICIPAL AIRPORT RULES AND REGULATION Adopted July 17, 2013 Section 1 DEFINITIONS 1.1 AIRPORT: the Ann Arbor Municipal Airport and all properties owned or maintained in connection with its
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Recommendation to Approve the Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route
More information[1] Gleim #: Source: AIM Para Learning Statement Code: PLT141
Gleim FAA Test Prep: Private Pilot (15 questions) Unit 3a: Airports, Air Traffic Control, and Airspace Name: Date: Circle the correct answer on the question sheets and fill in the corresponding circle
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationAnn Arbor Municipal Airport (ARB), Ann Arbor Michigan - Draft Environmental Assessment FAA Combined Comment Matrix --May thru October
Comment Number Ann Arbor Municipal Airport (ARB), Ann Arbor Michigan - Draft Environmental Assessment FAA Combined Comment Matrix --May thru October 2016-- Page Number 1 1 title page n/a Section Number
More informationII. Purpose and Need. 2.1 Background
II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and
More informationOverview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM
Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM References ICAO SARPS Annex 14 Vol. I, 7 th Edition, July 2016 ICAO SARPS Annex 15, 15 th Edition, July 2016
More informationHartford-Brainard Airport Potential Runway Closure White Paper
Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)
More informationBEFORE THE SECRETARY OF TRANSPORTATION WASHINGTON, D.C.
BEFORE THE SECRETARY OF TRANSPORTATION WASHINGTON, D.C. IN RE: PROPOSED MAJOR RUNWAY ) EXTENSION PROJECT AT ANN ARBOR ) MUNICIPAL AIRPORT. ) ) PITTSFIELD CHARTER TOWNSHIP ) MICHIGAN, and COMMITTEE FOR
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationGENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS ON-CALL AVIATION PLANNING SERVICES
GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS ON-CALL AVIATION PLANNING SERVICES The County of Montrose, Colorado is accepting Statements of Qualifications from qualified firms to provide
More informationTRANSPORTATION ADVISORY BOARD. Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101
TRANSPORTATION ADVISORY BOARD 1) Call to Order 2) Adoption of Agenda Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101 NOTICE OF A MEETING of the PLANNING COMMITTEE Thursday, June
More informationHarvey Field Airport. Planning Advisory Committee & Public Open House. April 1, Comment Responses
Harvey Field Airport Planning Advisory Committee & Public Open House April 1, 2015 Comment Responses In an effort to respond to comments received at both the Planning Advisory Committee (PAC) meeting and
More informationACTION TRANSMITTAL
Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED
More informationPunta Gorda Airport Master Plan Update
Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationCHAPTER 2.0 ALTERNATIVES
CHAPTER 2.0 ALTERNATIVES 2.1 INTRODUCTION 2.1.1 SCOPE OF THE ALTERNATIVES ANALYSIS This chapter summarizes the screening analysis conducted to identify the range of reasonable and practicable alternatives
More informationTeterboro Airport Overview
Teterboro Airport Overview Teterboro Airport consists of two intersecting runways. Runway 6-24 is 6,013 ft long and 150 ft wide, and is equipped with High Intensity Runway Edge Lights (HIRL) and Runway
More informationFrom concept through completion, CGA is your AVIATION engineering firm!
The State of Iowa has 120 general aviation airports. Our staff specializes in serving these airports with their engineering needs. Aviation lighting and navigational aids Environmental and financial feasibility
More informationConsideration will be given to other methods of compliance which may be presented to the Authority.
Advisory Circular AC 139-11 Revision 2 Use of day-vfr aerodromes 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that
More informationTECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan
TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationRESOLUTION NO
RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY
More informationSource: Chippewa Valley Regional Airport ASOS, Period of Record
Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size
More information5.0 ALTERNATIVES ANALYSIS
5.0 ALTERNATIVES ANALYSIS The Alternative Analysis chapter describes and evaluates the various development alternatives considered for. In addition, it presents a preferred development plan that accommodates
More informationPreliminary Findings of Proposed Alternative
Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be
More informationInput Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot
Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationCHAPTER 1 INTRODUCTION MORENO VALLEY GENERAL PLAN 1. INTRODUCTION. 1.1 What is a General Plan?
1. INTRODUCTION 1.1 What is a General Plan? A General Plan is a comprehensive long-term strategy for the physical development of a city. It determines how land may be used and the infrastructure and public
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationPLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018
PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018 Meeting Agenda 1. Master Plan Status [5 Minutes] 2. Preferred Forecasts [15 Minutes] 3. Runway Length Options [45
More informationAIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:
Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared
More informationAERODROME MARKINGS AND SIGNALIZATION
1. Introduction AERODROME MARKINGS AND SIGNALIZATION This article will present the main aerodrome markings and signalization on runways and taxiways. 2. Runway Markings This chapter will show the runway
More informationPart 150 Update Status and Recommendation
Part 150 Update Status and Recommendation Presentation to: Noise Compatibility Committee October 26, 2010 Ted Baldwin 2 Topics Part 150 background Project status Noise Exposure Map Noise Compatibility
More information15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long
The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance
More informationDRAFT Chapter Six - 1
The planning process for the Albuquerque International Sunport (ABQ) Sustainable Master Plan has in cluded several analytical efforts in the previous chapters intended to provide forecasts of potential
More informationVista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington
Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington
More informationFairview Citizen Airport Advisory Committee. August 1, Paul Hendricks
Fairview Citizen Airport Advisory Committee August 1, 2017 Paul Hendricks phendricks@fairviewtexas.org pmh1004@sbcglobal.net 469-667-7750 Agenda Background Status Plan forward Airport Master Plan A visioning
More informationAGENDA Addendum 1 Special Meeting of the Board of City Commissioners June 6, :30 pm City Hall Williston, North Dakota
AGENDA Addendum 1 Special Meeting of the Board of City Commissioners June 6, 2018-3:30 pm City Hall Williston, North Dakota 1. Roll Call of Commissioners 2. Farm Plan Group 1 Bid Award 3. Farm Plan Group
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationCHAPTER FOUR AIRPORT ALTERNATIVES
4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify
More informationChapter 4. Development Alternatives
Chapter 4. Development Alternatives Chapter 4. DEVELOPMENT ALTERNATIVES This chapter identifies and evaluates airport development alternatives to fulfill the facility requirements for the airport as defined
More informationCHAPTER 6 IDENTIFICATION AND EVALUATION OF ALTERNATIVES
CHAPTER 6 IDENTIFICATION AND EVALUATION OF ALTERNATIVES This chapter identifies and evaluates development alternatives for the Duluth International Airport to satisfy the Airport Facility Requirements
More informationOctober 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION
October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationYolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California
Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,
More informationGrade Crossing Regulations
Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,
More informationHIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM
HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation
More informationTrick or Treat Process M
AIP Design Lessons Trick or Treat Halloween Sharing October 25, 2017 By: FAA DMA ADO staff Dave P. Anderson Brian P. Schuck Mark J. Holzer 1 Trick or Treat Process M FAA staff of Dave, Brian and Mark shall
More informationSt. Mary s County Regional Airport Airport Advisory Committee Meeting 3 December 2018 Minutes
I. Call to Order Chairman Eric Pratson called the meeting to order at 6:00 pm. Committee members present were Terry Adair, Jim Alexander, Ted Klapka, Robert Lightstone, Brian Schroeder, and Alternates
More informationAGIS/eALP Project Experience
Agenda AECOM Experience Introduction to AGIS/eALP Executing an AGIS/eALP Sample Data What you can do with the Data? Data Maintenance Questions and Answers AGIS/eALP Project Experience AGIS/eALP Project
More information8.0 AIRPORT LAYOUT PLANS
8.0 AIRPORT LAYOUT PLANS This chapter presents a detailed graphic and narrative description of the selected development concept for General Mitchell International Airport (MKE). The plans package presented
More informationAVIATION ADVISORY BOARD REGULAR MEETING
AVIATION ADVISORY BOARD REGULAR MEETING City Hall Training Room 22 South Beach Street Ormond Beach, Florida April 29, 2008 7:00 p.m. Board Members Present: Bob Behnke, Larry Volenec, and Keith Riger Also
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationREPORT TO THE BOARD OF DIRECTORS
REPORT TO THE BOARD OF DIRECTORS RECOMMENDATION TO PURCHASE ENGINEERED MATERIAL ARRESTING SYSTEMS FROM ENGINEERED ARRESTING SYSTEMS CORPORATION AT RONALD REAGAN WASHINGTON NATIONAL AIRPORT MARCH 2013 ACTION
More informationU.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION Air Traffic Organization Policy
NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION Air Traffic Organization Policy N JO 7110.720 Effective Date: October 1, 2016 Cancellation Date: April 27, 2017 SUBJ: Takeoff and
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationFINAL SUMMARY REPORT
FINAL SUMMARY REPORT RUNWAY 1-19 EXTENSION ANALYSIS at MIDDLEBURY STATE AIRPORT PREPARED BY ROXBURY, VERMONT APRIL 2008 FINAL SUMMARY REPORT TABLE OF CONTENTS SECTION PAGE 1.1 INTRODUCTION...1 2.1 OBSTRUCTION
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More information5) Old Business (Public discussion permitted) a) Update and Discussion on the Runway Shortening Project Phase 2
Commissioner Peter Donald, Chair Commissioner Andrew Wilder, Vice Chair Commissioner Lael R. Rubin Commissioner Joe Schmitz Commissioner Chris Waller Special Meeting of SANTA MONICA AIRPORT COMMISSION
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationPUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application
PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport
More informationTable of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update
Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East
More informationRisk Assessments and Mitigation at Flying Sites and USHPA Chapter Events
Risk Assessments and Mitigation at Flying Sites and USHPA Chapter Events In order to reduce the possibility of incidents involving bodily injury to pilots, spectators and the general public due to hang
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationFrequently Asked Questions and Answers Bowman Field Airport Area Safety Program
Frequently Asked Questions and Answers Bowman Field Airport Area Safety Program 1. What is the proposed Bowman Field Airport Area Safety Program? The proposed Bowman Field Airport Area Safety Program has
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More informationFAA Requirements for Engine-out Procedures and Obstacle Clearance
FAA Requirements for Engine-out Procedures and Obstacle Clearance Presentation to: CAAC Engine-out Procedures Seminar Name: Chuck Friesenhahn Date: 11/29/2005 Flight Standards Senior Advisor, Advanced
More information6.0 DEVELOPMENT PLAN/FINANCIAL OVERVIEW
6.0 DEVELOPMENT PLAN/FINANCIAL OVERVIEW A goal of this Airport Master Plan was to review the requirements and alternatives necessary for the to meet their identified current and future demand. With this
More informationUSE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS
USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS A project by by Samuka D. W. F19/1461/2010 Supervisor; Dr D. N. Siriba 1 Background and Problem Statement The Airports in Kenya are the main link between
More informationApril 4, McKinney Airport Advisory Committee Airport Master Plan Update.
McKinney Airport Advisory Committee Airport Master Plan Update http://mckinney.airportstudy.com/project-documents April 4, 2017 Paul Hendricks phendricks@fairviewtexas.org McKinney National Airport (TKI)
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationThe San Diego Region s Air Transportation Future
The San Diego Region s Air Transportation Future June 22, 2006 1 Ryan N. Hall, Airport System Planner II San Diego County Regional Airport Authority Presentation Overview 1. The law 2. The ballot measure
More information