2 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments, Questions, and Discussion Adjourn

3 Project Overview/Planning Process Project Initiation/Working Group Start up Public Involvement Program Inventory of Existing Conditions AGIS Survey & Mapping Update Aiti Aviation Atiit Activity Demand dforecast Capacity & Facility Requirements Determination Airport Development Alternatives & Plan Formulation Implementation Analysis (Facilities & Operation) Documentation & Deliverables (Working Papers, Draft & Final Reports, ALP Drawing Set Update)

4 Project Overview/Planning Process Project Initiation/Working Group Start up Public Involvement Program Inventory of Existing Conditions AGIS Survey & Mapping Update Ai Aviation i Activity i Demand dforecast Capacity & Facility Requirements Determination Airport Development Alternatives & Plan Formulation Implementation Analysis (Facilities & Operation) Documentation & Deliverables (Working Papers, Draft & Final Reports, ALP Drawing Set Update)

5 Project Schedule

6 Capacity Analysis Airside Annual Service Volume Meteorological Data (wind & weather) Operational Demand Characteristics Landside Vehicular Access Terminal Curb Terminal Parking

7 Capacity Analysis Meteorological Data (Existing) Visual Flight Rules (VFR): 92.3% Instrument Flight Rules (IFR 427 & 1½ mile: 4.43% (Runway 36L) Instrument Flight Rules (IFR 200 & ¾ mile: 6.09% (Runway 18R & 26) Instrument Flight Rules (IFR 200 & ½ mile: 6.43% (Runway 18L & 36R) Instrument Flight Rules (IFR 100 & ¼ mile: 6.45% (Runway 36R) Below Minimums: 0.66%

8 Capacity Analysis All Weather Wind Coverage Summary (Table C2 ) Runway 10.5 Knot 13 Knot 16 Knot 20 Knot Runways 18L/36R & 18R/36L 95.43% 97.70% 99.22% 99.80% Runway 18L & 18R 76.74% 78.00% 78.91% 79.85% Runway 36R & 36L 62.17% 63.72% 64.95% 65.44% Runway 8/ % 83.68% 93.89% 98.40% Runway % 75.05% 84.09% 86.71% Runway % 73.68% 82.64% 81.61% Combined Runways 98.67% 99.67% 99.95% 99.99% Source: Wind analysis tabulation provided by Mead & Hunt utilizing the FAA Airport Design Tools, Wind Analysis. Wind data obtained from NOAA, NCDC, Station /Tulsa International Airport. Period of Record: NOTE: A 5 knot tailwind component was used for the individual runway end analysis.

9 Capacity Analysis IFR Weather Wind Coverage Summary (Table C3 ) Runway 10.5 Knot 13 Knot 16 Knot 20 Knot Runways 18L/36R & 18R/36L 93.78% 96.43% 98.41% 99.41% Runway 18L & 18R 60.53% 61.83% 62.92% 63.47% Runway 36R & 36L 78.07% 80.05% 81.65% 82.48% Runway 8/ % 86.82% 95.39% 98.83% Runway % 77.54% 84.55% 86.78% Runway % 75.12% 82.70% 85.88% Combined Runways 97.94% 99.31% 99.81% 99.95% Source: Wind analysis tabulation provided by Mead & Hunt utilizing the FAA Airport Design Tools, Wind Analysis. Wind data obtained from NOAA, NCDC, Station /Tulsa International Airport. Period of Record: NOTE: A 5 knot tailwind component was used for the individual runway end analysis.

10 Capacity Analysis Operational Demand Characteristics Runway 75.5% Runway 47.1% Runway 28.4% Runway 22.8% Runway 14.4% Runway 8.4% Runway 3.6% Runway 1.9% Runway 1.7%

11 Capacity Analysis Airfield Capacity Forecast Summary, (Table C5 ) Year Annual Operations Design Hour Operations Annual Service Volume (ASV) , , , , , , , ,406 Source: Mead & Hunt using FAA AC 150/5060 5, Airport Capacity and Delay, September 2005.

12 Facility Requirements Airside Airfield Dimensional Criteria Runway/Taxiway Layout Configuration Runway Length Airfield Instrumentation & Lighting Landside Existing/Future General Aviation Development Areas Access Taxiway Development Aviation Related/Non Aviation Industrial Development Air National Guard Expansion Utility & Infrastructure Expansion Airport Vehicular Access Infill Redevelopment Support Facilities

13 Facility Requirements Runway 18L/36R Design Standards Matrix RDC D IV 1600 (< ¾ Mile Visibility Minimums) Item Existing Dimension FAA Criteria Standard Met RUNWAY DESIGN Runway Width 150 FT 150 FT Yes Shoulder Width 50 FT 25 FT Yes Blast Pad Width 200 FT 200 FT Yes Blast Pad Length 200 FT 200 FT Yes Crosswind Component 20 Knots 20 Knots Yes RUNWAY PROTECTION Runway Safety Area (RSA) Both Runway Ends Length beyond departure end 1,000 FT 1,000 FT Yes Length prior to threshold 600 FT 600 FT Yes Width 500 FT 500 FT Yes Runway Object Free Area (ROFA) Both Runway Ends Length beyond departure end 1,000 FT 1,000 FT Yes Length prior to threshold 600 FT 600 FT Yes Width 800 FT 800 FT Yes Runway Obstacle Free Zone (ROFZ) Both Runway Ends Length 200 FT 200 FT Yes Width 400 FT 400 FT Yes Precision Obstacle Free Zone (POFZ) Both Runway Ends Length 200 FT 200 FT Yes Width 800 FT 800 FT Yes Approach Runway Protection Zone (RPZ) Length 2,500 FT/2,500 FT 2,500 FT/2,500 FT Yes 1, 2 Inner Width 1,000 FT/1,000 FT 1,000 FT/1,000 FT Yes Outer Width 1,750 FT/1,750 FT 1,750 FT/1,750 FT Yes Departure Runway Protection Zone (RPZ) Length 1,700 FT 1,700 FT Yes 1, 2 Inner Width 500 FT 500 FT Yes Outer Width 1,010 FT 1,010 FT Yes RUNWAY SEPARATION Runway centerline to: Parallel runway centerline 5,104 FT 5,000 FT Yes Holding position 250 FT 250 FT Yes Parallel taxiway/taxilane centerline (TW E ) FT 400 FT Yes Parallel taxiway/taxilane centerline (TW J ) 500 FT 400 FT Yes Parallel taxiway/taxilane centerline (TW G ) 712 FT 400 FT Yes Aircraft parking area (east) 780 FT 500 FT Yes Aircraft parking area (west) 844 FT 500 FT Yes

14 Facility Requirements Airfield Dimensional Criteria Runway 18L/36R (Primary Runway) RDC D IV 1600 (< ¾ Mile Visibility Minimums) Meets or Exceeds Criteria

15 Facility Requirements Airfield Dimensional Criteria Runway 8/26 (Crosswind/Secondary Runway) RDC D III 4000 (¾ Mile Visibility Minimums) Meets or Exceeds Criteria

16 Facility Requirements Airfield Dimensional Criteria 18R/36L (Secondary Runway) RDC D II 4000 (¾ Mile Visibility Minimums) Existing Non Standard Conditions RSA Length North & South ROFA Length South

17 Facility Requirements Existing Runway Length Information 18L/36R (Primary 10,000 ) 8/26 (Crosswind/Secondary 7,376 /7,776 ) 18R/36L (Secondary 6,101 ) 18L/36R (3 rd Parallel 9,000 /12,000 )

18 Facility Requirements Existing Aircraft Runway Takeoff Length Options, In Feet SecondaryAir Carrier 8,500 Secondary GA 7,000 Aircraft Type Engine Type/Model Existing Runways: Runway 10,000 (Primary) Runway 7,376 (Crosswind) Runway 6,101 (Secondary) 3 Aircraft Operator Max Takeoff Weight (MTOW) (lbs.) Runway Length Standard Day 1, 2 Runway Length Hot Day 1, 2 Cargo Aircraft Boeing (Douglas) DC 10 CF6 50C1 FEDEX 555,500 10,383 12,383 Boeing (Douglas) MD 11 PW4460 FEDEX 602,500 10,483 11,583 Airbus A 310* PWJT9D 7R4 FEDEX 337,304 9,133 9,883 Airbus A 300* PWJT9D 7R4H1 FEDEX, UPS 363,760 7,883 8,483 Boeing * PW 2040 UPS, FEDEX 255,000 7,183 8,383 Passenger Aircraft Boeing PW4060 American 412,000 9,983 10,483 Boeing (Douglas) MD 83* JT8D 219 American 160,000 8,583 9,383 Boeing (Douglas) MD 88* JT8D 217A Delta, Allegiant 149,500 8,183 8,583 Boeing * PW 2040 American 255,000 8,183 8,383 Boeing * CFM56 3B2 Southwest 139,500 7,883 8,383 Bombardier CRJ 200* Boeing * CF34 3B1 CFM56 7B27 United & Delta (Skywest Airlines) American, Sun Country, Southwest 53,000 6,883 8, ,500 7,633 8,183 Bombardier CRJ 900* CF34 8C5 United (Skywest, Expressjet, Gojet) 84,500 7,133 8,183 Embraer 145* AE3007 A1P United (Expressjet, Trans States) 48,502 7,383 7,783 Airbus A 320 CFM56 Allegiant, Delta 169,756 7,133 7,783 Boeing * CFM56 7B24B1 Southwest 154,500 6,583 6,883 Bombardier CRJ 700* CF34 8C1 United & Delta (Skywest, Expressjet, Gojet) 72,750 5,683 6,733 Embraer 190 CF 34 10E7 United (Republic) 110,892 6,083 6,583 Airbus A 319 CFM56 Delta, American, United 154,323 6,283 6,383 Boeing BR715 Delta 119,000 5,883 6,133

19 Facility Requirements Runway 18R/36L Takeoff Length Options, In Feet Secondary GA 7,000

20 Facility Requirements Runway 18R/36L Takeoff Length Options, In Feet Secondary Air Carrier 8,200

21 Facility Requirements Taxiway Dimensional Criteria Runway 18L/36R Taxiway System Airplane Design Group (ADG) IV Taxiway Design Group (TDG) 5 Parallel TWs Meet or Exceed Criteria Review TW Exit Geometry Runway/Taxiway Hot Spot Resolution

22 Facility Requirements Taxiway Exit Criteria Runway 18L/36R Exit Taxiway System North Flow South thflow 5,500 to 7,500 Exit Range 90 degree vs. High Speed

23 Existing Passenger Terminal Area 2 Pier Concourse w/22 gates Looped Access Roadway Terminal Curb Parking Facilities: Public, Rental Car, & Employee Cargo Facilities Hotel Facilities Corporate GA & FBO Facilities

24 Potential GA Infill Development Areas Five (5) Areas (36.5 Acres) Development Constraints ATCT Line of Sight Vehicular Access Utility Infrastructure

25 Potential On Airport Development Areas Aircraft Maintenance & Assembly General Aviation Retail/Hotel Industrial Military

26 Existing Air Traffic Control Tower (ATCT) Five (5) Shadow Areas Aging Structure (1960s Construction) Future ATCT Previously Identified/Site Confirmation Required New ATCT Technology Development Considerations

27 Existing Environmental Conditions Wetlands Floodplain (100 & 500 Year) Prime Farmland Historic Property

28 Draft Planning Issues Summary Confirm Future Layout of Airport s Runway/Taxiway System 3 rd Parallel Runway Runway 18R/36L Extension/Upgrades Confirm Runway Design Code (RDC) for each Runway Design Aircraft Update Airfield Dimensional Criteria & Design Standards Runway/Taxiway Design Geometry Hot Spots ATCT Line of Sight Maximize/Diversify Airport Revenue Generating Capabilities Passenger Terminal Area Improvements Aviation & Aviation Related Industrial Land Leases Non Aviation Industrial/Commercial Land Leases Airport Compliance Grant Assurances Land Release Guidelines (Concurrent Land Use/Release From Aeronautical vs. Interim Land Use vs. Sale of Property) Land Use Compatibility

29 Draft Planning Issues Summary Passenger Terminal Area Improvements Automobile Parking Expansion Terminal Curb Improvements/ Expansion Terminal Roadway Reconfiguration New U.S. Customs Facility (Passenger Processing & Aircraft Parking) New Retail/Commercial Development

30 Questions & Comments

31 Next Steps Production & Distribution of 3 rd Working Paper Discuss Development Alternatives Study Advisory Committee Meeting (December)

32 Contacts Mike Kerr, Project Manager Tulsa International Airport Phone Number: Address: Cody Fussell, Aviation Services Mead & Hunt, Inc. Phone Number: Address:

33 Thank You!

Public Information Meeting. September 2015

Public Information Meeting. September 2015 W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

Chapter 4: Facility Requirements

Chapter 4: Facility Requirements Chapter 4: Facility Requirements 1 Rapid City Regional Airport Master Plan Update Chapter 4 Facility Requirements Introduction This chapter of the Airport Master Plan analyzes the existing and anticipated

More information

Technical Advisory Committee Meeting February 29, 2016

Technical Advisory Committee Meeting February 29, 2016 Technical Advisory Committee Meeting February 29, 2016 Meeting Agenda Introduction Recap of Planning Process Project Status Goals and Objectives Forecasts of Aviation Demand Overview of Facility Requirements

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS

4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS 4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS A key step in the Airport Master Plan (AMP) process is determining future requirements for airport facilities that will allow for airside and landside development

More information

Chapter 5 Facility Requirements

Chapter 5 Facility Requirements Chapter 5 Facility Requirements 50 INTRODUCTION This chapter describes the airside and landside facility requirements necessary to accommodate existing and forecasted demand in accordance with Federal

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

Facility Requirements

Facility Requirements 4. This chapter presents the airside and landside facility requirements necessary to accommodate existing and forecasted demand at Erie International Airport (ERI or the Airport) in accordance with Federal

More information

Capacity Analysis & Facility Requirements

Capacity Analysis & Facility Requirements CHAPTER C Capacity Analysis & Facility Requirements 1. Introduction This chapter considers the ability of facilities at Friedman Memorial Airport (SUN) to accommodate existing and projected activity. Current

More information

TECHNICAL REPORT #3 Palm Beach International Airport Demand/Capacity and Facility Requirements

TECHNICAL REPORT #3 Palm Beach International Airport Demand/Capacity and Facility Requirements TECHNICAL REPORT #3 Palm Beach International Airport Demand/Capacity and Facility Requirements Technical Report #3 Palm Beach International Airport Demand/Capacity and Facility Requirements Palm Beach

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

CHAPTER 3. Airside Facilities

CHAPTER 3. Airside Facilities CHAPTER 3 Airside Facilities 3.0 AIRSIDE OVERVIEW This chapter focuses on airside facilities at Spokane International Airport (GEG or the Airport ). Airside facilities include runways, taxiways, support

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

FACILITY REQUIREMENTS

FACILITY REQUIREMENTS FACILITY REQUIREMENTS In order to ensure that Bradley International Airport (BDL) is capable of supporting the expected increase in passenger traffic, care must be taken to ensure that the recommendations

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

Chapter 5 Facility Requirements

Chapter 5 Facility Requirements Chapter 5 Facility Requirements 5.0 INTRODUCTION The Facility Requirements chapter of this Sustainable Master Plan Update describes airside and landside facilities, which are needed to accommodate existing

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

C > Capacity Analysis and Facility Requirements

C > Capacity Analysis and Facility Requirements Buchanan Field Buchanan Field Airport Master Planning Program C. CAPACITY ANALYSIS & FACILITY REQUIREMENTS C > Capacity Analysis and Facility Requirements INTRODUCTION. The capacity of an airfield is primarily

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

FACILITY REQUIREMENTS CHAPTER

FACILITY REQUIREMENTS CHAPTER FACILITY REQUIREMENTS CHAPTER Introduction This chapter presents requirements for airside, landside, terminal, and support facilities to meet aviation demand at RNO over the next 20 years. Facilities are

More information

Chapter 4 Facility Requirements

Chapter 4 Facility Requirements Chapter 4 Facility Requirements Introduction This chapter evaluates the existing airport facilities and identifies improvements needed to effectively meet the forecasted demand levels discussed in the

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

Chapter 3. Demand/Capacity & Facility Requirements

Chapter 3. Demand/Capacity & Facility Requirements Chapter 3. Demand/Capacity & Facility Requirements Chapter 3. DEMAND/CAPACITY & FACILITY REQUIREMENTS This chapter provides an assessment of future airport development requirements based upon the forecasts

More information

MASTER PLAN UPDATE WORKING PAPER NO. 3. Demand/Capacity Analysis and Facility Requirements. March 18, 2013

MASTER PLAN UPDATE WORKING PAPER NO. 3. Demand/Capacity Analysis and Facility Requirements. March 18, 2013 MASTER PLAN UPDATE WORKING PAPER NO. 3 Demand/Capacity Analysis and Facility Requirements March 18, 2013 Contents 4 Demand/Capacity Analysis and Facility Requirements... 4 1 4.1 Summary of Aviation Demand

More information

Facility Requirements

Facility Requirements C H A P T E R T H R E E Facility Requirements 3.0 OVERVIEW Airport planning for facility requirements is based upon addressing any existing issues and accommodating the probable demand that may occur over

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting

More information

Capacity Analysis and Facility Requirements

Capacity Analysis and Facility Requirements Capacity Analysis and Facility Requirements Introduction The capacity analysis for Paine Field is composed of two distinct elements: the ability of airport facilities to accommodate existing and projected

More information

Chapter 4 Airport Capacity Assessment and Identification of Facility Needs

Chapter 4 Airport Capacity Assessment and Identification of Facility Needs Chapter 4 Airport Capacity Assessment and Identification of Facility Needs 4.1 Introduction The purpose of the airport capacity assessment and identification of facility needs is to evaluate the single

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

CHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION

CHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION CHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION The capacity of an airfield is primarily a function of the major aircraft operating surfaces that compose the facility and the configuration

More information

Table of Contents Facility Requirements Overview Airport Capacity and Delay Analysis... 1

Table of Contents Facility Requirements Overview Airport Capacity and Delay Analysis... 1 Table of Contents Table of Contents... 2 3.1 Overview... 1 3.2 Airport Capacity and Delay Analysis... 1 Airspace Capacity... 1 Aircraft Mix Index... 3 Arrivals Percentage... 3 Touch-and-Go Percentage...

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

3.1 Facility Requirements Overview Airfield Facility Requirements... 1

3.1 Facility Requirements Overview Airfield Facility Requirements... 1 Table of Contents 3.1 Overview... 1 3.2 Airfield... 1 Airspace Capacity...1 Airside Capacity... 2 Aircraft Mix Index... 3 Arrivals Percentage... 4 Touch-and-Go Percentage... 4 Taxiway Access Factors...

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

Planning Horizon Activity Levels Airfield Capacity and Delay Airport Physical Planning Criteria Airfield and Landside Facility Requirements

Planning Horizon Activity Levels Airfield Capacity and Delay Airport Physical Planning Criteria Airfield and Landside Facility Requirements Proper airport planning requires the translation of forecast aviation demand into the specific types and quantities of facilities that can adequately serve the identified demand. This chapter will analyze

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

Chapter 4 Airport Facility Requirements. Introduction

Chapter 4 Airport Facility Requirements. Introduction Chapter 4 Airport Facility Requirements Introduction The airport facility requirements analysis combines the results of the inventory and forecasts contained in Chapters Two and Three, and the applicable

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, 2014 1:30 PM Casper/Natrona County International Airport Master Plan Update Policy

More information

General Aviation Master Plan Update

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System

More information

Appendix 6.1: Hazard Worksheet

Appendix 6.1: Hazard Worksheet Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

Master Plan Update Community Advisory Committee Kick-off Meeting

Master Plan Update Community Advisory Committee Kick-off Meeting Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision

More information

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

CHAPTER 3 FACILITY REQUIREMENTS

CHAPTER 3 FACILITY REQUIREMENTS CHAPTER 3 FACILITY REQUIREMENTS 3.1 INTRODUCTION To properly plan for the future requirements of Newport News/Williamsburg International Airport, it is necessary to translate the forecasts of aviation

More information

Inventory of Existing Conditions

Inventory of Existing Conditions CHAPTER A. Inventory of Existing Conditions INTRODUCTION. The layout/configuration of the Snohomish County Airport (Paine Field) runway and taxiway system has evolved over many years. In the early 1940

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

4. Demand/Capacity Assessment and Facility Requirements

4. Demand/Capacity Assessment and Facility Requirements 4. This chapter presents an evaluation of the existing airfield facilities, buildings, and other facilities at the Airport and an assessment of their potential use under the demand scenarios defined for

More information

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan 1.2.7 2010 Eau Claire County Comprehensive Plan According to Eau Claire County s most recent comprehensive plan, the County will limit land use development adjacent to EAU in order to preserve the ability

More information

3.0 Facility Requirements

3.0 Facility Requirements 3.0 Facility Requirements The facility requirements chapter includes an assessment of the aviation and non-aviation components of Rickenbacker International Airport (LCK) including the runway and taxiway

More information

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

CHAPTER 4 DEMAND/CAPACITY ANALYSIS CHAPTER DEMAND/CAPACITY ANALYSIS INTRODUCTION The demand/capacity analysis examines the capability of the airfield system at Blue Grass Airport (LEX) to address existing levels of activity as well as determine

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established

More information

CHAPTER 5 - FACILITY REQUIREMENTS

CHAPTER 5 - FACILITY REQUIREMENTS CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the

More information

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

Norfolk International Airport

Norfolk International Airport Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport

More information

AIRPORT FACILITY REQUIREMENTS

AIRPORT FACILITY REQUIREMENTS 4.1 INTRODUCTION Chapter 4 AIRPORT FACILITY REQUIREMENTS The major elements of the Airport, which were described in Chapter 3, Existing Airport Facilities must be analyzed individually and balanced in

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

3.9 AIRPORT SUPPORT FACILITIES

3.9 AIRPORT SUPPORT FACILITIES 3.9 AIRPORT SUPPORT FACILITIES This section details additional airfield facilities that may be required over the next 20 years. 3.9.1 Airport Rescue and Fire Fighting (ARFF) Station GEG is certified under

More information

Chapter 5 Airport Facility Requirements

Chapter 5 Airport Facility Requirements Chapter 5 Airport Facility Requirements Introduction The evaluation of airport facility requirements uses the results of the inventory and forecasts contained in Chapters Two and Three, as well as established

More information

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four Airport Development Alternatives Prior to formulating a development program for Ryan Airfield, it is important to consider development potential

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

2015 PURDUE ROAD SCHOOL March 11, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015 2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach

More information

Assignment 3: Runway Length and EMAS Design. Aircraft Engine Remarks. CFM56-7B20/-7B22/-7B24 developing 20,000 lb of thrust at sea level

Assignment 3: Runway Length and EMAS Design. Aircraft Engine Remarks. CFM56-7B20/-7B22/-7B24 developing 20,000 lb of thrust at sea level CEE 4674: Airport Planning and Design Spring 2014 Solution! Assignment 3: Runway Length and EMAS Design Instructor: Trani Problem 1 A new airport to be constructed near Mexico City airport would like to

More information

Las Vegas McCarran International Airport. Capacity Enhancement Plan

Las Vegas McCarran International Airport. Capacity Enhancement Plan Las Vegas McCarran International Airport Capacity Enhancement Plan Las Vegas McCarran International Airport Capacity Enhancement Plan September 1994 Prepared jointly by the U.S. Department of Transportation,

More information

4.0 FACILITY REQUIREMENTS

4.0 FACILITY REQUIREMENTS 4.0 FACILITY REQUIREMENTS The purpose of this chapter of Master Plan is to identify the needs for additional facilities, or improvements to existing facilities over the planning period. By comparing current

More information

4.0 FACILITY REQUIREMENTS

4.0 FACILITY REQUIREMENTS 4.0 FACILITY REQUIREMENTS The facility requirements assesses both the aviation and non-aviation components of the New Smyrna Beach Municipal Airport (EVB) including the runways and taxiways, aircraft storage

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

R FAA

R FAA Chapter Four Section 01 - Introduction Section 02 - Criteria for Determination of Facility Requirement Recommendations Section 03 - FAA Design Standards & Non-Standard Conditions Section 04 - Airfield

More information

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Technical Advisory Committee Meeting Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives

More information

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017 Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about

More information

8.0 AIRPORT LAYOUT PLANS

8.0 AIRPORT LAYOUT PLANS 8.0 AIRPORT LAYOUT PLANS This chapter presents a detailed graphic and narrative description of the selected development concept for General Mitchell International Airport (MKE). The plans package presented

More information

Airfield Geometric Design Prof. Amedeo Odoni

Airfield Geometric Design Prof. Amedeo Odoni Airfield Geometric Design Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 5 May 25, 2015 Objective and

More information

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held

More information

4.0 FACILITY REQUIREMENTS

4.0 FACILITY REQUIREMENTS 4.0 FACILITY REQUIREMENTS This chapter documents the facilities needed to meet the demand requirements as described in Chapter 3, Aviation Activity Forecasts. Current facilities were examined to determine

More information

IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT

IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT 7 7.1 GENERAL The primary objective of this chapter is to evaluate potential development alternatives and identify

More information

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents

More information

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements The evaluation of airport facility requirements uses the results of the inventory and forecasts contained in Chapters Two and Three, as well as established planning

More information

Chapter 5. Facility Requirements

Chapter 5. Facility Requirements Chapter 5 Facility Requirements Chapter 5 Facility Requirements INTRODUCTION The Baseline Forecast was used to determine facility requirements. Chapter 4 produced a forecast of traffic volumes expected

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance