1 CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from the Master Plan was reviewed for consideration as an alternative for this Environmental Assessment. In addition, this Environmental Assessment will consider the No-Action non-development alternative. The six alternatives evaluated in this chapter are as follows: Non-Development Alternative No Action; Development Alternative A Widen existing Runway and extend Runway-12 Development Alternative B Rotate Runway orientation by 3-degrees, widen the full length runway and extend Runway-12 Development Alternative C Widen existing Runway and extend Runway-30 Development Alternative D Rotate Runway orientation by 2-degrees, widen full length runway and extend Runway-30 Development Alternative E Construct new 75 x 4,800 runway with orientation of Each development alternative above includes extending the partial parallel taxiway to become a full length parallel taxiway. This also includes a new edge lighting system associated with the taxiway. Each alternative also includes a new Precision Approach Path Indicator (PAPI) for each runway end, as well as a new Automated Weather Observation System (AWOS). 3.1 NON-DEVELOPMENT ALTERNATIVE No Action The No Action Alternative would maintain the airfield in its present condition. There would not be a runway extension or widening. This will result in the airport having a non-standard runway width for a RDC Category B, Design Group II, Small aircraft. Also, the full length parallel taxiway would not be developed. The current runway length accommodates less than the minimum FAA recommendation of 95% of the small aircraft fleet. The current runway length combined with the steep slope (maximum FAA allowable gradient) presents a safety concern to departing and arriving pilots. The current pavement section and existing runway edge lighting system are in dire need of reconstruction and replacement as they will both be in complete failure in the very near future. Therefore, the result of the No Action alternative would be the inability of the airport to satisfy FAA design standards for an RDC Category B, Design Group II Small aircraft and FAA recommendations for length to accommodate 95% of the small aircraft fleet. Because of the aviation activity that has occurred and is expected to continue at the airport, some improvements will continue to be needed such as reconstructing the runway s existing pavement section and replacing the airfield s existing electrical system. Page 24

2 The region has experienced strong growth in all socioeconomic categories over the past few decades. Forecasts indicate this trend will likely continue throughout and beyond the long term planning horizon. The Town of Stevensville has a vested interest in improving airport facilities for all users. Without a commitment to ongoing improvement of the airport, regular users and future users of the airport would not be able to maximize use of the airport s air transportation capabilities CONCLUSION The No Action alternative does not meet the purpose and need of this Environmental Assessment. Regardless, NEPA regulations require the FAA to consider a no-action alternative (40 CFR (d)). This no-action alternative serves to describe the current and future state of the affected environment without considering the potential impacts of the Proposed Action or project. 3.2 DEVELOPMENT ALTERNATIVES FROM THE 2010 MASTER PLAN The 2010 Master Plan identified five (5) development alternatives designed to meet projected aviation demands, comply with FAA design standards, and improve public safety. The main components for each development alternative of the 2010 Master Plan included the following: Increase runway length from 3,800-feet to 4,800-feet Increase runway width from 60-feet to 75-feet Extend partial parallel taxiway to a full length parallel taxiway Upgrade RDC from Category B, Design Group I, Small aircraft to Category B, Design Group II aircraft Increase the dimensions of the Runway Protection Zones (RPZ) to Category B, Design Group II standards Analyze approach and departure procedures for upgraded runway classification Analyze land acquisitions to accommodate new approach and departure procedures and obstruction removals The Master Plan then analyzed each of these components in five (5) different development alternatives which are described below: Development Alternative A: Extend Runway-12 by 1,000-feet in order to achieve 95% of small aircraft fleet. Increase runway width by 15-feet in order to achieve Category B, Design Group II standards. There is substantial land acquisition associated with Runway- 30 to improve approach/departure procedures and eliminate aviation obstructions (land acquisition on the Runway-30 end is not included in proposed action as explained in section 3.4.2). Development Alternative B: Extend Runway-12 by 1,000-feet in order to achieve 95% of small aircraft fleet. Increase runway width by 15-feet in order to achieve Category B, Design Group II standards. Modify the current runway orientation by rotating alignment 3-degrees to the west about the new Runway-12 end. There is substantial land acquisition associated with Runway-30 to improve approach/departure procedures and eliminate aviation obstructions. Page 25

3 Development Alternative C: Extend Runway-30 by 1,000-feet in order to achieve 95% of small aircraft fleet. Increase runway width by 15-feet in order to achieve Category B, Design Group II standards. There is substantial land acquisition associated with Runway- 30 to achieve 1,000-foot extension and to improve approach/departure procedures and eliminate aviation obstructions. Development Alternative D: Extend Runway-30 by 1,000-feet in order to achieve 95% of small aircraft fleet. Increase runway width by 15-feet in order to achieve Category B, Design Group II standards. Modify the current runway orientation by rotating alignment 2-degrees to the west about the current Runway-12 end. There is substantial land acquisition associated with Runway-30 to achieve 1,000-foot extension and to improve approach/departure procedures and eliminate aviation obstructions. Development Alternative E: A complete reconstruction of the entire airfield. New runway orientation would become with 1,000-feet in order to achieve 95% of small aircraft fleet and 75-foot with in order to achieve Category B, Design Group II standards. Modify the current runway orientation by rotating alignment 2-degrees to the west. There is substantial land acquisition associated with the new runway orientation and approach/departure protections. 3.3 ELIMINATION OF DEVELOPMENT ALTERNATIVES All development alternatives from the 2010 Master Plan were analyzed per the purpose and need objectives of Chapter 2 of this Environmental Assessment. Any development alternatives that did not meet the purpose and need of this EA, or that were considered to be unrealistic alternatives, were eliminated from consideration in the master planning process. It should be mentioned that a significant change to the FAA s Advisory Circulars was made on February 26, This change created a new design category within the Runway Design Code. This new category is for small or light aircraft (less than 12,500 pounds) within the Category B, Design Group II designation. At the time the 2010 Master Plan was created, there was no designation for small aircraft within the Category B, Design Group II design standards. This change does not affect the purpose and need of this Environmental Assessment, nor does it diminish the efforts of the 2010 Master Plan. Rather, the new design category allows the Proposed Action to be developed for small aircraft instead of upgrading the airfield classification to large aircraft. Through the planning process of this EA and evaluation of all the development alternatives in the 2010 Master Plan, it was determined that four of the five development alternatives from the 2010 Master Plan were no longer considered as realistic, or financially obtainable alternatives, and thereby eliminated from consideration in this EA. The table below identifies the development alternatives that were eliminated from further consideration with the EA, as well as detail the reasoning behind the elimination. Page 26

4 Development Alternatives Eliminated From Consideration Development Alternative Reasons for Elimination Alternative B Extend RW-12 by 1,000-ft and rotate RW orientation 3 west Alternative C Extend RW-30 by 1,000-ft Alternative D Extend RW-30 by 1,000-ft and rotate RW orientation 2 west Socioeconomic impact of relocating one residential property due to the runway rotation. Additional costs and time associated with negotiations, acquisition and relocation of residential property per the federal Uniform Act and FAA policies. Requires the removal of existing structures and obstructions (trees) on the property after acquisition. Requires additional extension of the existing taxiway to RW-30 and the mid-field taxiway due to the RW rotation Requires the demolition of existing RW. Socioeconomic impact of relocating eight residential properties due to the RW-30 extension. Additional costs and time associated with negotiations, acquisition and relocation of residential properties per the federal Uniform Act and FAA policies. Requires the removal of existing structures and obstructions (trees) on the properties after acquisition. Requires the closure and removal of a portion of Hollibaugh Road. Requires the relocation of two residential driveways due to the Hollibaugh Road closure. Requires the removal and relocation of a significant portion of the existing Wildlife Fence. Socioeconomic impact of relocating nine residential properties due to the RW-30 extension. Additional costs and time associated with negotiations, acquisition and relocation of residential properties per the federal Uniform Act and FAA policies. Requires the removal of existing structures and obstructions (trees) on the properties after acquisition. Requires the closure and removal of a portion of Hollibaugh Road. Requires the relocation of two residential driveways due to the Hollibaugh Road closure. Requires the removal and relocation of a significant portion of the existing Wildlife Fence. Requires additional extension of the existing taxiway to RW-30 and the mid-field taxiway due to the RW rotation Requires the demolition of existing RW. Alternative E Socioeconomic impact of relocating five residential properties due to the RW-30 extension. Page 27

5 Development Alternatives Eliminated From Consideration Development Alternative Reasons for Elimination Construct new RW and all appurtenant airfield features Additional costs and time associated with negotiations, acquisition and relocation of residential properties per the federal Uniform Act and FAA policies. Requires the removal of existing structures and obstructions (trees) on the properties after acquisition. Requires the reconstruction of 4,000-ft of Airport Road. Requires the installation of a new perimeter Wildlife Fence. Requires the demolition of the existing RW. Requires the partial demolition of the existing TW and aircraft parking apron. Requires construction of new aircraft parking apron, taxilane system and new hangars. Requires the construction of a full parallel TW. 3.4 ALTERNATIVES BEING EVALUATED Two alternatives have been carried forward for a more detailed analysis in this Environmental Assessment. Those alternatives are: Non-Development Alternative No Action; Development Alternative A Widen existing Runway and extend Runway-12 The No Action Alternative is being analyzed because it creates a baseline comparison for the potential environmental impacts of Development Alternative A. Development Alternative A accomplishes the purpose and need objectives of this EA and does so in the most economical and least impactful approach available No Action Alternative The No Action alternative does not include any improvements to the airport and would maintain the airfield in its current condition. The existing runway s dimensional layout would remain unchanged from its length of 3,800-feet and width of 60-feet. The current RDC would remain as a Category B, Design Group II, Small aircraft design standard and would result in a non-standard runway for the airport. Also, the parallel taxiway expansion would not be developed. However, under the No Action alternative, the Town of Stevensville would still be required to maintain the airport s current facilities at FAA minimum standards. This will ultimately include replacing the existing electrical system for the airfield, as well as rehabilitating the pavement section of the runway. The No Action alternative does not address the length and width deficiencies of the existing runway as discussed in Chapter 2, Purpose and Need, which means that it would not meet the standards for a RDC Category B, Design Group II, Small airport. Page 28

6 Page 29 Existing Airport Layout

7 3.4.2 Development Alternative A Widen Existing Runway and Extend Runway-12 Development Alternative A would upgrade the RDC to Category B, Design Group II small aircraft design standard. This would be done through a runway extension to the northwest (RW-12) and a widening of the runway. The current runway centerline alignment would remain on its current alignment. Actions associated with Development Alternative A include: Widen RW by 15-feet for a total width of 75 ; Extend RW-12 by 1,000-feet for a total runway length of 4,800 ; Reconstruct existing 60 x 3,800 pavement section for RW 12-30; Re-grade existing ground obstructions within the RSA and OFA; Replace the existing airfield electrical system; Replace the existing Medium Intensity Runway Lights; Replace the existing RW-12 PAPI; Install a new PAPI for RW-30; Install AWOS; Extend the partial length parallel TW-A to the new end of RW-12; Install new taxiway edge lighting system Modify existing RNAV (GPS)-A procedure to reflect new runway end coordinates. It should be noted that Alternative A in the Stevensville Airport Master Plan included elements that are no longer relevant. For the purposes of this EA, Alternative A is limited to the items noted above. For example, the land acquisition associated with Runway 30 is not being considered at this time due to the change in FAA Advisory Circular 150/ A allowing for an RDC of Category B, Design Group II, Small aircraft (weighing less than 12,500 lbs). Because of this change, the Runway Protection Zone and runway approach no longer need to be enlarged or adjusted. The following exhibit portrays the airport layout under Development Alternative A. The Proposed Action (Alternative A) will upgrade the airport to meet the design and safety requirements for the critical aircraft that is currently using the airport today (Category B, Design Group II, Small aircraft). Upgrade of the airport to Category B, Design Group II, large aircraft (12,500 lbs and over) standards, as identified in the Master Plan and ALP as the ultimate design group, is not included in the proposed action. Should future activity at the airport justify an upgrade to accommodate aircraft 12,500 lbs and over, a new environmental process will be required. Page 30

8 Page 31 Development Alternative A

9 Alternative A would not require any land acquisition or residential relocations, nor would it require the removal of any ground or airspace obstructions that may be located on private property. All objectives of this EA s purpose and need would be accomplished within the current airport property boundary, and within the existing airport perimeter fence. This development alternative alleviates all immediate safety concerns on the airfield and meets the minimum runway length requirements of the FAA at the 95% of the small aircraft fleet, bringing the airport to RDC Category B, Design Group II, Small aircraft standards as justified by the critical aircraft currently using the airport. The project costs (at planning stage*) associated with Development Alternative A are estimated at $4.96 million. The estimated project costs include (but are not limited to) the following: Widen RW by 15-feet for a total width of 75 ; Extend RW-12 by 1,000-feet for a total runway length of 4,800 ; Reconstruct existing 60 x 3,800 pavement section for RW 12-30; Re-grade existing ground obstructions within the RSA and OFA; Replace the existing airfield electrical system; Replace the existing Medium Intensity Runway Lights; Replace the existing RW-12 PAPI; Install a new PAPI for RW-30; Install AWOS; Extend the partial length parallel TW-A to the new end of RW-12; Install new taxiway edge lighting system. The estimated project costs are summarized in the table below. Development Alternative A Estimated Project Costs* 90% FAA Participation 10% Sponsor Match Total Project Cost RW Widening, Lengthening, Reconstruction $3,622,500 $402,500 $4,025,000 TW-A Extension $841,500 $93,500 $935,000 Total $4,464,000 $496,000 $4,960, SELECTION OF THE PROPOSED ACTION The No Action Alternative would not produce any improvements on the airfield with exception to continued maintenance of the facility. This alternative does not address existing safety concerns, or meet the purpose and need of this Environmental Assessment. Development Alternative A does satisfy the purpose and need of this Environmental Assessment. It mitigates existing safety concerns, meets the FAA s design standards, and satisfies the FAA s minimum runway length recommendations for 95% of small aircraft fleet. This alternative Page 32

10 upgrades the RDC to Category B, Design Group II, Small aircraft all within the existing property boundary and perimeter fence of the airport. Therefore, the Town Council for the Town of Stevensville has formally selected Development Alternative A as its Proposed Action. 3.6 SELECTION OF THE PREFERRED ALTERNATIVE By regulation, a federal agency is required to identify a Preferred Alternative as defined in CEQ s 40 CFR As defined in CEQ s 40 Most Asked Questions Concerning CEW s National Environmental Policy Act Regulations, an agency s preferred alternative is the alternative which the agency believes would fulfill its statutory mission and responsibilities, giving consideration to economic, environmental, technical, and other factors. This Environmental Assessment provides a detailed analysis of the No Action alternative and Development Alternative A. Development Alternative A has been selected as the FAA s Preferred Alternative based on the analysis presented in this document and this Alternative s ability to meet the purpose and need of this Environmental Assessment. Page 33

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

CHAPTER 1 BACKGROUND AND PROPOSED ACTION CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Grants Pass Airport Master Plan & Airport Layout Plan Update

Grants Pass Airport Master Plan & Airport Layout Plan Update Attendees: Grants Pass Airport Master Plan & Airport Layout Plan Update Meeting #3 January 26, 2010 Merlin Community Center 100 Acorn Street, Merlin 5:45 7:15 p.m. Josephine County Department of Airports:

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

MASTER PLAN CONCEPT 1 DRAFT

MASTER PLAN CONCEPT 1 DRAFT The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development

More information

MEETING MINUTES Page 1 of 5

MEETING MINUTES   Page 1 of 5 Page 1 of 5 50178.000 May 26, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Citizens Advisory Committee Meeting MEETING LOCATION MEETING PURPOSE Amy Eckland ISSUED BY SIGNATURE PARTICIPANT See attached

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

Chapter Four ALTERNATIVES

Chapter Four ALTERNATIVES Chapter Four ALTERNATIVES Master Plan Update This chapter walks through the process of identifying and evaluating development alternatives to serve the (Airport) in the near-term to the distant future.

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION 1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,

More information

Chapter 9 - AIRPORT SYSTEM DESIGN

Chapter 9 - AIRPORT SYSTEM DESIGN Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance

More information

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

CHAPTER 1 INTRODUCTION AND BACKGROUND

CHAPTER 1 INTRODUCTION AND BACKGROUND CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Update on the Aspen/Pitkin County Airport Improvements

Update on the Aspen/Pitkin County Airport Improvements Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it

More information

3 INTRODUCTION. Chapter Three Facility Requirements. Facility Requirements PEAKING CHARACTERISTICS

3 INTRODUCTION. Chapter Three Facility Requirements. Facility Requirements PEAKING CHARACTERISTICS Chapter Three Facility Requirements 3 INTRODUCTION This chapter identifies the long-range airfield and terminal area facilities needed to satisfy the 20-year forecast of aviation demand at Monett Municipal

More information

Chapter 5 Airport Development Alternatives

Chapter 5 Airport Development Alternatives Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1 Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT chapter 5 Recommended Master Plan Concept airport master plan The planning process for Coolidge Municipal Airport has included several analytical efforts in the previous chapters intended to project potential

More information

5.0 ALTERNATIVES ANALYSIS

5.0 ALTERNATIVES ANALYSIS 5.0 ALTERNATIVES ANALYSIS The Alternative Analysis chapter describes and evaluates the various development alternatives considered for. In addition, it presents a preferred development plan that accommodates

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018 Meeting Agenda 1. Master Plan Status [5 Minutes] 2. Preferred Forecasts [15 Minutes] 3. Runway Length Options [45

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

1 DRAFT. General Aviation Terminal Services Aircraft Hangars Aircraft Parking Aprons Airport Support Facilities

1 DRAFT. General Aviation Terminal Services Aircraft Hangars Aircraft Parking Aprons Airport Support Facilities To properly plan for improvements at Dallas Executive Airport, it is necessary to translate forecast aviation demand into the specific types and quantities of facilities that can adequately serve the demand.

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

Collier County Airport Authority. Joint Automated Capital Improvement Program

Collier County Airport Authority. Joint Automated Capital Improvement Program Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer

More information

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.

More information

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment 1.0 INTRODCTION Morristown Municipal Airport (hereinafter referred to as MM or Airport ) is a busy general aviation reliever airport owned by the Town of Morristown and operated by DM AIRPORTS, LTD. (hereinafter

More information

FACILITY REQUIREMENTS 5.1 Introduction

FACILITY REQUIREMENTS 5.1 Introduction Chapter 5 FACILITY REQUIREMENTS 5.1 Introduction The facility requirements section of this study defines the physical facilities needed to safely and efficiently accommodate the current and future aviation

More information

JANUARY 2013 Friedman Memorial Airport Pomeroy, Chris

JANUARY 2013 Friedman Memorial Airport Pomeroy, Chris JANUARY 2013 Friedman Memorial Airport Pomeroy, Chris Friedman Memorial Airport / T-O Engineers Airport Alternatives Technical Analysis Table of Contents 1.0 Background and Purpose of Analysis... 1 1.1

More information

II. Purpose and Need. 2.1 Background

II. Purpose and Need. 2.1 Background II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and

More information

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Airport Layout Plan Report In this chapter, existing components of the Airport are evaluated so that the capacities of the overall system are identified.

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

4.0 FACILITY REQUIREMENTS

4.0 FACILITY REQUIREMENTS 4.0 FACILITY REQUIREMENTS The purpose of this chapter of Master Plan is to identify the needs for additional facilities, or improvements to existing facilities over the planning period. By comparing current

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four Airport Development Alternatives Prior to formulating a development program for Ryan Airfield, it is important to consider development potential

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

BRL LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Runway Pavement OFA RPZ Building Restriction Line Holding Position Object Free Area Runway Protection Zone Buildings Etended Clear

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017 Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

CHAPTER 3 FACILITY REQUIREMENTS

CHAPTER 3 FACILITY REQUIREMENTS CHAPTER 3 FACILITY REQUIREMENTS 3.1 INTRODUCTION To properly plan for the future requirements of Newport News/Williamsburg International Airport, it is necessary to translate the forecasts of aviation

More information

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business Plan Steering Committee December 14, 2006 Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business

More information

2015 PURDUE ROAD SCHOOL March 11, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015 2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach

More information

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs

More information

8.0 AIRPORT LAYOUT PLANS

8.0 AIRPORT LAYOUT PLANS 8.0 AIRPORT LAYOUT PLANS This chapter presents a detailed graphic and narrative description of the selected development concept for General Mitchell International Airport (MKE). The plans package presented

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update Chapter Seven Implementation Plan Master Plan Update This chapter presents the 20-year improvement program for the continued development of the. The objectives of this chapter are to identify projects

More information

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS 6.1 INTRODUCTION In the previous chapter, facility needs for the 20-year planning horizon were identified. The next step in the planning process is to identify and evaluate the various ways certain facilities

More information

Grove Field Airport Environmental Assessment

Grove Field Airport Environmental Assessment Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of

More information

JOHNSTON COUNTY AIRPORT AUTHORITY

JOHNSTON COUNTY AIRPORT AUTHORITY JOHNSTON COUNTY AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS FOR AIRPORT PLANNING SERVICES For JOHNSTON REGIONAL AIRPORT (JNX) 3149 Swift Creek Rd. Smithfield, NC 27577 PHIL LANIER AIRPORT DIRECTOR (919)

More information

Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES

Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES SOUTH ST. PAUL MUNICIPAL AIRPORT FLEMING FIELD MASTER PLAN ADVISORY GROUP MEETING #2 Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES The purpose

More information

Passenger Facility Charge Application #1

Passenger Facility Charge Application #1 Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures

More information

Chapter 4 Airport Capacity Assessment and Identification of Facility Needs

Chapter 4 Airport Capacity Assessment and Identification of Facility Needs Chapter 4 Airport Capacity Assessment and Identification of Facility Needs 4.1 Introduction The purpose of the airport capacity assessment and identification of facility needs is to evaluate the single

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

Chapter One PROJECT DESCRIPTION

Chapter One PROJECT DESCRIPTION Chapter One PROJECT DESCRIPTION Environmental Impact Report Monterey Peninsula Airport 1.1 INTRODUCTION This Environmental Impact Report (EIR) analyzes and documents the potential environmental impacts

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

CHAPTER 2.0 ALTERNATIVES

CHAPTER 2.0 ALTERNATIVES CHAPTER 2.0 ALTERNATIVES 2.1 INTRODUCTION 2.1.1 SCOPE OF THE ALTERNATIVES ANALYSIS This chapter summarizes the screening analysis conducted to identify the range of reasonable and practicable alternatives

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

Chapter 4.0 Facility Requirements

Chapter 4.0 Facility Requirements Chapter 4.0 Facility Requirements Having inventoried the existing infrastructure and forecasted demand, determining airport facility requirements is the next essential step in the airport master planning

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS

4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS 4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS A key step in the Airport Master Plan (AMP) process is determining future requirements for airport facilities that will allow for airside and landside development

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

R FAA

R FAA Chapter Four Section 01 - Introduction Section 02 - Criteria for Determination of Facility Requirement Recommendations Section 03 - FAA Design Standards & Non-Standard Conditions Section 04 - Airfield

More information

Financial Plan/Capital Improvements - DRAFT 6-1

Financial Plan/Capital Improvements - DRAFT 6-1 The analyses completed in previous chapters evaluated development needs at McKinney National Airport (TKI or Airport) over the next 20 years, based on forecast activity, facility requirements, safety standards,

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

Winona Runway Shift Project

Winona Runway Shift Project Winona Runway Shift Project Sandy DePottey Dakota-Minnesota ADO Fall MnDOT FAAWorkshop St Cloud, Minnesota November 5, 2014 Update on 0 0 Challenges we faced The main runway 12/30 at Winona Municipal Airport

More information