Tours 1-4 to take place on Friday 5 th September Leaving Queens University Belfast at 10.15am returning at approximately 5pm.

Size: px
Start display at page:

Download "Tours 1-4 to take place on Friday 5 th September Leaving Queens University Belfast at 10.15am returning at approximately 5pm."

Transcription

1 Tours 1-4 to take place on Friday 5 th September Leaving Queens University Belfast at 10.15am returning at approximately 5pm. Pre Conference Tour 3 September 2014 Lagan Weir and Belfast Harbour Lagan Weir Tidal and river flow control structure Boat trip of Belfast Harbour and Titanic Belfast Tour 1 The Mournes Silent Valley Earth dam Ben Crom Concrete gravity dam Fofanny stop Earth dam Optional Knockbracken Earth dam Large bus hour drive from Belfast Tour 2 Upper Bann Lough Island Reavy four earth dams Spelga Concrete gravity dam Fofanny stop Earth dam Large bus hour drive from Belfast Tour 3 North West Toome Sluice lifting sluice gate structure Altnaheglish Concrete gravity dam with rockfill berm strengthening Small bus hour drive from Belfast Tour 4 Carrickfergus South Woodburn Cascade three earth dams Copeland Dam Earth dam Titanic Pump House Small bus 35 minute drive from Belfast 1

2 Mapping courtesy of NI Water Ordnance Survey NI 1:250,000 Crown Copyright Reserved 2

3 Pre Conference Tour: Lagan Weir Lagan Weir and Titanic Boat Tour Single Large Coach Lunch Pub Lunch McHugh s Bar, Belfast City Centre Lagan Weir Department of Social Development Last Inspecting Engineer: Not Applicable (i.e. no Section 10) Supervising Engineer: Not Applicable Access: Bus access direct to the Weir. Short walk. Facilities: Toilet at Weir Building Lagan Weir (c) URS Construction completed 1994 The structure provides water level control for the tidal River Lagan. The weir consists of five hydraulically operated fish belly gates, each 20n long and 5.5m high. The structure has been recently completed through the first major maintenance with repainting of the gates and M&E upgrades. There are plans to replace the walkway with a more architecturally significant structure and may be ongoing at the time of the visit. Timings for the tour 12.30pm 12.45pm 2.00pm 3.00pm 3.15pm 4.30pm 4.45pm 5.00pm Depart University Arrive at McHugh s for Lunch Walk to Lagan Weir Lagan Weir Site Visit Likely to be divided into groups Belfast Harbour Boat Tour ( Conclude Boat Tour Depart for Belfast Arrive at University for registration Lunch at McHugh s Bar Pub Lunch Menu TBC 3

4 Lagan Weir Visit The Lagan Weir was key to the redevelopment of Belfast s Laganside Area. The Weir was originally designed by Ferguson McIlveen (now part of URS) and was constructed in the early 1990s and formally opened in The structure provides water level control on the upstream impoundment and protection against downstream extreme high tide events. Maintaining the river level avoids the exposure of the river bed at low tide and ensures a water depth suitable for various recreational pursuits in the river. The weir structure consists of five hydraulically operated fish belly gates, each 20 metres long x 5.5m high and operated by a single hydraulic ram at one end of 250 tonnes capacity. The gates are sealed rigid steel protected with an epoxy paint system. The single hydraulic cylinders incorporated rams which were coated with a form of ceramic coating to maximise cylinder seal wear in a saline environment. At the time of original design the coatings and control system operating the gates were state of art however being in the saline conditions resulted in gradual deterioration of both gate coatings and the surface coating on the ram rod. This caused wear on the cylinder seals and the gradual increase in leakage rates into the adjacent marine environment. Having carried out the condition report on the structure, URS were subsequently appointed to develop the report recommendations to detailed design level, appropriate to procurement of specialist M+E contractors. Contract documentation was produced and a two stage restricted list process managed to ensure experienced contractors tendered for these specialised structures. The procurement followed stringent government guidelines and assessed bidding consortium as a weighted quality/cost relationship, including interview stage. URS made recommendations as to the contractor appointment and subsequently managed the refurbishment contract, including detailed technical supervision on site. A very important element of this construction management was ensuring clear understanding and involvement by the client to ensure all operational constraints were incorporated in methodologies and programmes. The site works included use of 18.2m long stoplogs, designed to be used on the Ramsome and Rapier gates on the Bann River, to allow isolation of the gates for detailed cleaning, assessment, testing and refurbishment. Gates were repainted in cofferdam conditions and controlled encapsulated environments, with the cylinder rods replaced with a new and improved form of ceramic coating. The project was completed early 2011 and was on budget and time. The visit will set out a detailed explanation of the refurbishment contract giving an explanation of the gate, cylinder and control systems upgrades. 4

5 Photos - URS 5

6 Tour 1: The Mournes - Silent Valley, Ben Crom and stop at Fofanny A single large coach to be used Lunch at Silent Valley Visitor s Centre Mapping courtesy of NI Water Ordnance Survey NI 1:250,000 Crown Copyright Reserved 6

7 Silent Valley Reservoir Last Inspecting Engineer: Supervising Engineer: NI Water Alan Cooper Maynard Cousley, NI Water Access: Bus access direct to the dam. Short walk. Facilities: Public toilets at car park and visitors centre Construction (c) Alan Cooper - URS Catchment comprises much of the wilderness area of the Mourne mountains extending to 2,227 ha. The dam is also served by an indirect catchment of 1,376 ha from the Annalong River diverted through a 3.4km long tunnel. Impounds Kilkeel River with flow also from the Annalong River. Reservoir approximately 3km long and has a capacity of 13,638 Ml. The overflow is formed by a circular bellmouth spillway discharges to an outlet tunnel.forms lower reservoir in a two reservoir cascade Earth bank with a central puddle clay core. Dam structure 460m long and max height 24m. The revetment was reconstructed in The drawoff systems were refurbished in Ben Crom Reservoir Last Inspecting Engineer: Supervising Engineer: NI Water Alan Cooper Maynard Cousley, NI Water Access: Bus access direct to the dam. Short walk. Facilities: none Construction completed (c) Alan Cooper, URS Catchment comprises part of the wilderness Mournes area extending to 810ha. Impounds Mill River, a tributary of the Kilkeel River. Reservoir approximately 2km long and has a capacity of 7,728 Ml. Forms Upper reservoir in a two reservoir cascade Mass concrete gravity structure with central profiled spillway. Dam structure 213m long and max height 34m The Drawoff systems were refurbished in

8 Fofanny Reservoir Last Inspecting Engineer: Supervising Engineer: NI Water Alan Cooper Maynard Cousley, NI Water Access: Bus access direct to the dam. Short walk. Facilities: none Construction completed 1909 (c) Google David Nesbitt Timings for the tour Catchment is rough upland area of peat and rock with an area of 375ha. The dam is also served by an indirect catchment of 135 ha diverted from the Slievemeel River. Impounds Shimna River and flow from the Slievemeel River. Reservoir approximately 450m long and has a capacity of 395Ml. A wave wall and a new profiled spillweir at the Southern abutment were constructed in Earth Bank with central puddle clay core. Dam structure 238m long and max height 14.3m. The drawoff arrangements are programmed for refurbishment in am 11:45am 12:45am 1.00pm 1:45pm 2.15pm 3:15pm: 3.30pm 3.45pm 5.15pm 5:30pm Depart University Arrive at Silent Valley (allows Journey time of 1hr and 30 minutes) Silent Valley Walkover (allow 1 hour) Lunch at Silent Valley Visitors Centre Post lunch presentation History of the Silent Valley Dr PT Donald Depart on Bus for Ben Crom (Journey 5 minutes) Ben Crom Walkover (allow 1 hour) Depart Ben Crom for Belfast (allows Journey time of 1hr and 30 minutes) Stop at Fofanny (allows 15 minutes for walkover) Stop at Knockbracken Reservoir on route Optional (NO walkover) Arrive back at University Halls Lunch at Silent Valley Visitors Centre 8

9 Tour 2: Upper Bann - Lough Island Reavy, Spelga and stop at Fofanny A single large coach to be used Lunch Pub Lunch details to be confirmed Mapping courtesy of NI Water Ordnance Survey NI 1:250,000 Crown Copyright Reserved 9

10 Lough Island Reavy Reservoir NI Water Last Inspecting Engineer: Alan Cooper Supervising Engineer: Maynard Cousley, NI Water Access: Bus access direct to the dam. Short walk. Facilities: none (c) Alan Cooper, URS Spelga Dam Reservoir Last Inspecting Engineer: Supervising Engineer: NI Water Alan Cooper Maynard Cousley, NI Water Construction Completed Impounds Muddock River (tributary of River Bann). Total direct and indirect catchment area of 1336 ha of hilly farmland. The reservoir stores 9000 Ml and is formed by 4 earth embankments with a total length of approximately 1km. Between 1975 and 199 various improvements were carried out to all the dams. Earth Banks with central puddle clay cores. An eduction tower and a stability berm were constructed at the main Southern Embankment. A wave wall, stability berm and steel sheet pile core were added the Eastern embankment. An additional sluice was added in 2011, to increase the rate of drawdown in an emergency. Access: Bus access direct to the dam. Short walk from car park. Facilities: Public toilets at Car Park Construction completed (c) Alan Cooper, URS Catchment is rough upland area of peat and rock with an area of 704ha known as the Deers Meadow Impounds upper reaches of River Bann. Reservoir approximately 1.1km and has a capacity of 3327 Ml. Air-regulated saddle siphon spillway was added in Concrete gravity dam.. Dam structure 305m long and max height 28m. In 2011 the drawoff arrangement and the 12 siphon tubes were refurbished. A new access passage was cut into the inspection gallery in order to improve operational safety. 10

11 Fofanny Reservoir Last Inspecting Engineer: Supervising Engineer: NI Water Alan Cooper Maynard Cousley, NI Water Access: Bus access direct to the dam. Short walk. Facilities: Toilets at adjacent Treatment Plant Construction completed1909 (c) Google David Nesbitt Timings for the tour Catchment is a rough upland area of peat and rock with an area of 375ha. The dam is also served by an indirect catchment of 136 ha piped from the Slievemeel River. Impounds Shimna River and part of the Slievemeel River. Reservoir approximately 450m long. A new profiled spillweir at the Southern abutment and a wave wall were constructed in Earth Bank with central puddle clay core. Dam structure 238m long and max height 14.3m. The Drawoff arrangements are programmed for refurbishment in :15am Depart University 11.30am Arrive Lough Island Reavy (allow journey time of 1 hr and 15 minutes) pm Lough Island Reavy site walkover (allow 1 hour) 1.15pm Pub Lunch - Castlewellan 2.15pm Depart Castlewellan for Spelga Dam (allow journey time of 35 minutes) 2.50pm Arrive at Spelga dam 3.50pm Spelga dam site walkover (allow 1 hour) 4.00pm Depart for Belfast 4.10pm Stop at Fofanny (allows 15 minutes for walkover) 5:30pm Arrive back at University Halls Lunch at Castlewellan Pub Lunch Venue and Menu TBC 11

12 Tour 3: North West - Toome Sluice and Altnaheglish Smaller sized coaches to be used Lunch Pub Lunch details to be confirmed Mapping courtesy of NI Water Ordnance Survey NI 1:250,000 Crown Copyright Reserved 12

13 Toome Sluice Last Inspecting Engineer: Supervising Engineer: Rivers Agency, Department of Agriculture and Rural Development Not Applicable (i.e. no Section10) Not Applicable Access: Bus access close to Structure. Short walk (5-10 mins) and access over Lock Structure. Facilities: none Construction completed 1935 Impounds Lough Neagh Most extensive lake in British Isles.Reservoir (Lough Neagh) approximately 30km long. Sluice gate structure with five18.3m long lifting sluice gates, with side weirs and a fish pass. (c) BKS Surveys Rivers Agency 1992 Gates replaced and gantry constructed to facilitate installation of a maintenance stop-log system Scour apron, super structure strengthening and new access 2008 Electrification of gate operation Altnaheglish Reservoir Last Inspecting Engineer: Supervising Engineer: NI Water Alan Cooper Maurice Wright, NI Water Access: Significant journey on unclassified roads, Bus access direct to dam short walk... Facilities: Toilets at Treatment Plant. (Caugh Hill). Construction completed1934 Catchment is rough upland area of peat and forest with an area of 730ha. Impounds Altnaheglish River. Reservoir around 1.5km long with a capacity of 2270Ml. Dam structure 110m long and max height 29m. In 1987 the original concrete gravity dam was stabilised using a rock fill support berm, uplift relief wells and a new inclined grout curtain. A new profiled spillweir and stepped cascade was constructed around the East abutment and the crest reconstructed. (c) Alan Cooper, URS 13

14 Timings for the tour 10:15am Depart University 11.00am Arrive at Toome Sluices (allows journey time of 45 minutes) Toome Sluice site walkover (allow 1 hour) 12.15pm Depart for Lunch 12.30pm Pub Lunch Toome/ Castledawson 1.30pm Depart for Altnaheglish 2.15pm Arrive Altnaheglish (allows journey time of 45 minutes) 3.15pm Altnaheglish site walkover (allow 1 hour) 3.30pm Depart Altnaheglish for Belfast 5.00pm Arrive back at University Halls Lunch at Toome/ Castledawson Pub Lunch Venue and Menu TBC 14

15 Tour 4: Carrickfergus South Woodburn Cascade and Copeland Smaller sized coaches may be used Lunch Pub Lunch details to be confirmed Mapping courtesy of NI Water Ordnance Survey NI 1:250,000 Crown Copyright Reserved 15

16 South Woodburn Reservoir Cascade NI Water Last Inspecting Engineer: Alan Cooper Supervising Engineer: Maynard Cousley, NI Water Access: Bus access direct to the dam. Short walk. Facilities: none Upper South Woodburn Reservoir Series Construction completed1876 (c) Alan Cooper, URS Catchment is rough upland and forest area extending to 599ha. Impounds South Woodburn River. Reservoir approximately 840m long and impounds 1669 Ml. Earth Bank with central puddle clay core. Dam structure 500m long and max height 22m. The toe is submerged until the Middle South reservoir is drawn down by 8m. Between 1975 and 1982 a range of improvements was carried out including a wave wall, additional spillway capacity and a stability berm with a filter. The drawoff arrangements were again refurbished in 2013/14 Middle South Woodburn Reservoir Series Construction completed1868. (c) Alan Cooper, URS Catchment is rough upland and forest area extending to 1350ha. Impounds South Woodburn River and diversion from North Woodburn.. Reservoir approximately 600m long and impounds 2135 Ml. Earth Bank with central puddle clay core. Dam structure 550m long and max height 26m. Between 1975 and 1982 a range of improvements were carried out including additional spillway capacity and a rock stability berm with a filter. The drawoff arrangements were again refurbished in

17 Lower South Woodburn Reservoir Series Construction completed 1880 Catchment is rough upland and forest area extending to 1406ha. Impounds South Woodburn River. Reservoir approximately 350m long and impounds 489 Ml. Earth Bank with central puddle clay core. Dam structure 325m long with an 82m long return embankment at the Northern end. Max height 19m. A wave wall was constructed in The drawoff arrangements are programmed for further refurbishment in (c) Alan Cooper, URS Copeland Reservoir, Carrickfergus NI Water Last Inspecting Engineer: Alan Cooper Supervising Engineer: Maynard Cousley, NI Water Access: Bus access direct to the dam. Short walk. Facilities: none Construction completed 1881 (c) Google Justin Macartney Catchment is rough upland area Of peat and forest with an area of 1269ha, including the upstream Lough Mourne catchment. Impounds Beltoy River. Reservoir around m long and impounds 607 Ml. Earth Bank with central puddle clay core. Dam structure 625m long and max height 19m. Between 1975 and 1982 a range of improvements were carried out including a wave wall, a new profiled spillweir, cascade spillway channel, and a rockfill stability berm with a filter. The drawoff arrangements are programmed for further refurbishment in

18 Titanic Pumphouse Nowhere else on earth can bring you this close to Titanic the world s most famous liner, built in Belfast. She sat here in this very dry dock on the eve of her first and last voyage in April of Titanic is remembered for the dramatic story of her sinking, but in 1912, she was an icon for all that was great about the 20th century she was the most innovative, the most luxurious, the most awe-inspiring thing ever created by the hand of man. Here, in the shipyard where she came to life, you can still see the remnants of engineering brilliance that brought Titanic into being. Located in the Northern Ireland Science Park a 21st century icon of innovation and forward thinking Titanic s dry dock is the physical reminder of a bygone age in which the dreams of men soared to new heights. Inside the pump-house, the engineering achievement of the Edwardian age is almost perfectly preserved. Amongst the massive pumps and gargantuan hydraulic accumulator, you can still hear the echoes of the men whose labour built the world s largest ships. At Titanic s dock, you have a unique opportunity to explore the site where Titanic last rested on dry ground and absorb the authenticity of her physical footprint in history. What else could compare to standing where she stood on the centenary of her birth? Timings for the tour 10:15am Depart University 10.50am Arrive at South Woodburn Cascade (allow 35 minute journey time) 12.30pm South Woodland Site Walkover (allow 1 hr and 30 minutes as 3 dams in cascade) 12.40pm Depart for Lunch 1.00pm Lunch - Pub Lunch in Carrickfergus 2.00pm Depart for Copeland Reservoir (allow 20 minutes) 2.20pm Arrive at Copeland Reservoir 3.20pm Copeland Reservoir Site Walkover (allow 1 hr) 3.30 pm Depart for Belfast 4.00pm Arrive Titanic Pump House 5.15 Depart for University Halls 5.30 Arrive at University Halls Lunch at Carrickfergus Pub Lunch Venue and Menu TBC 18

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 15, 2016 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0328985 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

Hydro-Electric Schemes Compliance Report June June 2013

Hydro-Electric Schemes Compliance Report June June 2013 File Reference: 4.00212 Significance of Decision: Receives Only - No Decisions Report To: Operations, Monitoring and Regulation Committee Meeting Date: 20 June 2013 Report From: Nick Zaman, Pollution Prevention

More information

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk Location: Shannon International Airport, Co. Clare Unique ID: 275484 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 137674 Northing: 161045 River / Catchment / Sub-catchment

More information

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4. Wilts & Berks Canal Melksham River Route Study Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4. CANAL OPERATION 3 5. WEIR DESIGN 4 6. FLOOD RISK 5

More information

This programme looks at the natural environment of the Mournes and finds out about some of the human activities connected with the Mournes.

This programme looks at the natural environment of the Mournes and finds out about some of the human activities connected with the Mournes. BROADCAST DATES BBC2 NI 10.30-10.50AM Programme Title Broadcast Date 3 Mournes Tuesday 9 th May 2006 4 Lough Neagh Tuesday 16 th May 2006 PROGRAMME 3: MOURNES This programme looks at the natural environment

More information

Guide to the L. F. Manis Photographs

Guide to the L. F. Manis Photographs This finding aid was produced using ArchivesSpace on February 29, 2016. English 2016 The Regents of the University of Nevada. All rights reserved. University of Nevada, Las Vegas. University Libraries.

More information

Guide to the L. F. Manis Photographs

Guide to the L. F. Manis Photographs This finding aid was created by Lindsay Oden on February 27, 2018. Persistent URL for this finding aid: http://n2t.net/ark:/62930/f1vk60 2018 The Regents of the University of Nevada. All rights reserved.

More information

Navan Fort. Carrickfergus Castle

Navan Fort. Carrickfergus Castle MUSEUM & HERITAGE Marcon is continuing to make great strides in the museum and heritage sector, adding to its growing reputation as a specialist fit-out partner in this niche market. It has been a busy

More information

St. Patrick s Street Development Brief

St. Patrick s Street Development Brief St. Patrick s Street Development Brief Bardas Chorcai Cork Corporation August 2001 Contents Introduction and background The Development Brief Area Protected and valuable buildings Urban context Objectives

More information

Outline of the Shinryu Head Works

Outline of the Shinryu Head Works Outline of the Shinryu Head Works Midori Network Water and farmland protection Midori Network Shinryu 1. History Land reclamation began in 1890 under the initiative of the Uryu Aristocratic Farm, headed

More information

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT APPENDIX 17. 3 Water Receptors Contents Section Page 1 Water Receptors... 1-1 1.1 Surface Water Features/Receptors in the Study Area

More information

Off-Site Solutions. CPM Headwalls. Concrete for Life

Off-Site Solutions. CPM Headwalls. Concrete for Life Off-Site Solutions CPM Headwalls Concrete for Life Welcome to CPM CPM is a market leading manufacturer of concrete products with production facilities across the UK. This combined with a network of specialist

More information

Discontiguous Features Southern Adirondack Feeder Reservoirs

Discontiguous Features Southern Adirondack Feeder Reservoirs Section number 7 Page 191 Mile 17.32 Buoy R134 marking head of Cayuga-Seneca Canal at outlet of Seneca Lake limit of historic district boundary Discontiguous Features Southern Adirondack Feeder Reservoirs

More information

Book your adventure today by visiting

Book your adventure today by visiting Tribal fitness adventures 2014 programme Book your adventure today by visiting http://www.tribalfitnessbootcamps.co.uk/shop/ Follow us at Facebook.com/TribalFitnessAdventures to be the first to hear about

More information

DOCKING AND ROUTING PLAN

DOCKING AND ROUTING PLAN DOCKING AND ROUTING PLAN TABLE OF CONTENT Contents Table of content... 2 1 Introduction... 3 1.1 Background... 3 1.2 Document Scope... 3 1.3 Harbour dues... 3 2 ROUTING TO SHIPYARD... 4 2.1 General...

More information

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE ÁRNI JÓNSSON, ORION Consulting Engineers * ERIK HESTNES, Norwegian Geotechnical Institute** ABSTRACT: Steel sheet piles, primarily used as retaining

More information

Complex of flood control structures of Saint Petersburg Facility S1, Saint Petersburg, Russia

Complex of flood control structures of Saint Petersburg Facility S1, Saint Petersburg, Russia The dams for water accumulation are intended to provide raw water to downstream consumers for plants for preparation of drinking water, agricultural irrigation and biological minimum. Following hydro-mechanical

More information

Peace Project Water Use Plan

Peace Project Water Use Plan Peace Project Water Use Plan Williston Reservoir Trial Tributaries Implementation Year 5 Reference: GMSWORKS-19 6 Mile 2016 Engineering Inspection Report Study Period: 2016 KERR WOOD LEIDAL Site Inspection

More information

Magazine London. Venue Brochure. Magazine London. Created by Venue Lab A Vibration Group Greenwich Peninsula London SE10 0QE

Magazine London. Venue Brochure. Magazine London. Created by Venue Lab A Vibration Group Greenwich Peninsula London SE10 0QE Magazine London Venue Brochure Magazine London Greenwich Peninsula London SE10 0QE Created by Venue Lab A Vibration Group Company @magazinelondon +44 (0) 20 3892 4181 magazinelondon.co.uk hire@magazinelondon.co.uk

More information

NEWRY, MOURNE & DOWN DISTRICT COUNCIL

NEWRY, MOURNE & DOWN DISTRICT COUNCIL NEWRY, MOURNE & DOWN DISTRICT COUNCIL Minutes of the Enterprise, Regeneration & Tourism Committee Meeting held on Monday 13 November 2017 at 3.00pm in the Boardroom, District Council Offices, Monaghan

More information

Moneyscalp Wood. Tollymore. Lukes Mounatin NEWCASTLE. Slieve. Commedagh. Slieve. Donard. Ben Crom. Annalong Wood. Slieve Binnian ANNALONG

Moneyscalp Wood. Tollymore. Lukes Mounatin NEWCASTLE. Slieve. Commedagh. Slieve. Donard. Ben Crom. Annalong Wood. Slieve Binnian ANNALONG Mourne Way This two day walk traverses a unique granite landscape, from Newcastle to Rostrevor on forest trails and mountain paths, with stunning vistas of coast, sea and countryside. B7 NEWCASTLE ROSTREVOR

More information

Presentation Overview

Presentation Overview DON NARROWS Historical and Existing Conditions March 29, 2008 Presentation Overview 1. Project Location and Background 2. Historical Context How did the Don Narrows Come to Be? 3. The Today 4. Next Steps

More information

Wilts and Berks Canal Trust

Wilts and Berks Canal Trust Wilts and Berks Canal Trust Melksham Link Waterway, Pedestrian and Off-road Cycle Routes Engineering Design Contents Background 4 Technical Design Part 1 Semington to Berryfield 5 Part 2 Berryfield to

More information

Construction and Executive Work Major contracts

Construction and Executive Work Major contracts Construction and Executive Work Major contracts Grouting of radial expansion joints at Sv. Petka Client Subsidiary RIKO inzenering, Skopje Year 2013 Grouting work at the dam in Vishegrad, Bosnia STRABAG

More information

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.

More information

North Cruise Berth Projects PortMiami

North Cruise Berth Projects PortMiami North Cruise Berth Projects PortMiami AAPA 2017 Facilities Engineering Seminar Oct 24 26, 2017 Carlos J. Arboleda, PE Vice President Project Director Intermodal Ports 1 PortMiami The Cruise Capital of

More information

Hydraclaw Jacks. *dimensions are in mm. Powerful: 5 tonne capacity on head or toe. High Lift: 178mm. Fast Operation: 5.5mm lift per stroke

Hydraclaw Jacks. *dimensions are in mm. Powerful: 5 tonne capacity on head or toe. High Lift: 178mm. Fast Operation: 5.5mm lift per stroke Hydraclaw Jacks Powerful: 5 tonne capacity on head or toe High Lift: 178mm Fast Operation: 5.5mm lift per stroke Stable: Substantial base offers stability under load Versatile: Horizontal or vertical operation

More information

Site Formation Works of the Kai Tak Cruise Terminal Project

Site Formation Works of the Kai Tak Cruise Terminal Project Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site

More information

Dock Shelters Catalogue

Dock Shelters Catalogue Dock Shelters Catalogue Inkema One need. One solution. Welcome to Inkema, the company specialising in goods loading and unloading points. It has a team with over 30 years of experience in the sector, highly

More information

SOUTH AFRICAN NATIONAL COMMITTEE ON LARGE DAMS BIENNIAL CONFERENCE 8-10 November 2011 Management and Design of Dams in Africa

SOUTH AFRICAN NATIONAL COMMITTEE ON LARGE DAMS BIENNIAL CONFERENCE 8-10 November 2011 Management and Design of Dams in Africa SOUTH AFRICAN NATIONAL COMMITTEE ON LARGE DAMS BIENNIAL CONFERENCE 8-10 November 2011 Management and Design of Dams in Africa What s new: For list of papers see p4 About the Conference The South African

More information

The Covered Bridge of Pepperell

The Covered Bridge of Pepperell The Covered Bridge of Pepperell 1742 - An uncovered wooden bridge historically referred to as the cart bridge at Joseph Blood s Fordway, links Groton West Parish and Groton. Cost Unknown 1753 - As Pepperell

More information

DAMS OF GREATER SYDNEY AND SURROUNDS Warragamba

DAMS OF GREATER SYDNEY AND SURROUNDS Warragamba DAMS OF GREATER SYDNEY AND SURROUNDS Warragamba The Sydney Catchment Authority (SCA) manages a total of 21 storage dams, holding over 2.5 million megalitres of water. Water for these storages is collected

More information

Study Tour C: Swaziland and Kruger National Park (Pre-tour) 11 to 15 May 2016

Study Tour C: Swaziland and Kruger National Park (Pre-tour) 11 to 15 May 2016 Study Tour C: Swaziland and Kruger National Park (Pre-tour) 11 to 15 May 2016 Introduction This tour combines scenic routes in neighbouring country Swaziland with game watching in the Kruger National Park.

More information

Floating Docks. Our unique capability is your solution

Floating Docks. Our unique capability is your solution Floating Docks Our unique capability is your solution Our Experience Your Infrastructure Every floating dock facility is the unique combination of the floating dock and the infrastructure it requires to

More information

Specification for Grip blocking using Peat Dams

Specification for Grip blocking using Peat Dams Technical Guidance Note 1 Specification for Grip blocking using Peat Dams 1. Introduction Moorland drains (grips) have been dug across much of the Yorkshire upland peatlands. Many of these grips have become

More information

MEXICO CITY S NEW INTERNATIONAL AIRPORT 2017 ACI-LAC Conference. November 2017

MEXICO CITY S NEW INTERNATIONAL AIRPORT 2017 ACI-LAC Conference. November 2017 MEXICO CITY S NEW INTERNATIONAL AIRPORT 2017 ACI-LAC Conference November 2017 Millions of Passengers The need for a new airport» New Airport opening in 2020 Passenger Projections Growth: 140 120 100 80

More information

Springtime Gems of the Mournes Short Break

Springtime Gems of the Mournes Short Break Springtime Gems of the Mournes Short Break Includes, 2 Nights B&B, Afternoon Tea on arrival Dinner for Two in our Restaurant. March Special Offer 115.00 Normal Price 145.00 If you just want to get away

More information

Maximising Beneficial Reuse through the use of a Novel Dredging Contract

Maximising Beneficial Reuse through the use of a Novel Dredging Contract Maximising Beneficial Reuse through the use of a Novel Dredging Contract Nicola Clay & Katherine Harris Port of London Authority Nick Bray Dredging Research Paul Hesk Van Oord UK CEDA Dredging Days 2007

More information

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance

More information

Lake Manitou Dam and Spillway Upgrade

Lake Manitou Dam and Spillway Upgrade South Bend Lake Manitou Dam and Spillway Upgrade Fort Wayne Rochester Indiana 1828 to 2017 Lafayette Sky Medors, P.E., LFA David Nance, P.G., IDNR Project Background Location: Rochester Indiana, Central

More information

Reservoir Tin workings

Reservoir Tin workings The workings are quite over-grown and covered in moss, suggesting that they date to the earliest period of mining. This is supported by the fact that their head race was cut off by the reservoir (D49/47)

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

BUILDING BETTER COMMUNITIES

BUILDING BETTER COMMUNITIES BUILDING BETTER COMMUNITIES AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS BUILDING BETTER COMMUNITIES BUILDING BETTER ABERGELDIE COMPLEX INFRASTRUCTURE COMMUNITIES ABERGELDIE COMPLEX COMPLEX INFRASTRUCTURE

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

Historic NIAGARA S SOUTH COAST. Welland Canal. History of the Welland Canal in Port Colborne. Uncharted Unexpected.

Historic NIAGARA S SOUTH COAST. Welland Canal. History of the Welland Canal in Port Colborne. Uncharted Unexpected. Historic NIAGARA S SOUTH COAST Welland Canal History of the Welland Canal in Port Colborne Uncharted Unexpected www.portcolborne.ca The Welland Canal was originally established as solution to summer water

More information

The four elements of nature: Fire, Water Earth & Air

The four elements of nature: Fire, Water Earth & Air Why our flame is so natural... Our range of balanced flue gas stoves gives a beautiful lazy dancing flame pattern which emulates that of a traditional wood burning stove and with the added features of

More information

Shrubs and alpine meadows represent the only vegetation cover.

Shrubs and alpine meadows represent the only vegetation cover. Saldur river General description The study area is the upper Saldur basin (Eastern Italian Alps), whose elevations range from 2150 m a.s.l. (location of the main monitoring site, LSG) and 3738 m a.s.l.

More information

Upper Mississippi River Headwaters Dam and Recreation Sites

Upper Mississippi River Headwaters Dam and Recreation Sites A History Tour: Upper Mississippi River Headwaters Dam and Recreation Sites BUILDING STRONG Pine River Dam during reconstruction, 1906 T he six dams described in this he six dams described brochure in

More information

Customer consultation

Customer consultation Customer consultation Anglian Waterways navigation charges 2018/19 July 2017 Introduction We need to increase the boat registration charges payable for any boat kept, used or let for hire on our Anglian

More information

DELIVERING A NEW MARINE INDUSTRY FOR THE UK Swansea Bay Tidal Lagoon. Presented by Ioan Jenkins, Development Director, Wales

DELIVERING A NEW MARINE INDUSTRY FOR THE UK Swansea Bay Tidal Lagoon. Presented by Ioan Jenkins, Development Director, Wales DELIVERING A NEW MARINE INDUSTRY FOR THE UK Swansea Bay Tidal Lagoon Presented by Ioan Jenkins, Development Director, Wales A NEW UK INDUSTRY UK investment and growth: 60bn+ investment programme - 50%+

More information

History of the weir. Other dams

History of the weir. Other dams Weir Weir Weir is not only an important source of fresh water for Western Australians, but it is also a tourist destination with educational, historical and natural attractions for all to enjoy. History

More information

VOLUME II APPENDIX F DETAILED PHYSICAL DESCRIPTION OF PROJECT RESERVOIRS AND LANDS

VOLUME II APPENDIX F DETAILED PHYSICAL DESCRIPTION OF PROJECT RESERVOIRS AND LANDS VOLUME II APPENDIX F DETAILED PHYSICAL DESCRIPTION OF PROJECT RESERVOIRS AND LANDS THE CENTRAL NEBRASKA PUBLIC POWER AND IRRIGATION DISTRICT FERC PROJECT NO. 1417 PHYSICAL DESCRIPTION OF PROJECT LANDS

More information

CORNWALL WATERFRONT PLAN 2007

CORNWALL WATERFRONT PLAN 2007 CANAL LANDS CANAL LANDS Page 58 Introduction This chapter details areas of possible development or redevelopment, and lands to be protected from any form of development in the Canal Lands area. As outlined

More information

superior quality innovative design FACTORY DIRECT PRICES THE LEADING MANUFACTURER OF MEDICAL DEVICE DELIVERY SYSTEMS FOR OVER 60 YEARS

superior quality innovative design FACTORY DIRECT PRICES THE LEADING MANUFACTURER OF MEDICAL DEVICE DELIVERY SYSTEMS FOR OVER 60 YEARS superior quality innovative design FACTORY DIRECT PRICES THE LEADING MANUFACTURER OF MEDICAL DEVICE DELIVERY SYSTEMS FOR OVER 60 YEARS www.ivstands.com (800) 225-7710 STANDS FOR THE FIRST TIME IN OUR 63

More information

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically,

More information

October

October October 2017 Dave Lovell Programme Manager @networkrailwest Organisational Update Paul Stanford - RDD Simon Roberts - PCM Peter Corneck - PCM Stuart Hitch Head of Engineering Suzanne Renton Head of Prog

More information

TLH Leisure Resort, Accessibility Statement

TLH Leisure Resort, Accessibility Statement TLH Leisure Resort, Accessibility Statement TLH Leisure Resort comprises the Derwent, Victoria, Carlton & Toorak Hotels and the Victoria and Carlton Apartments. The Resort complex is situated on a single

More information

WELCOME TO WATER RIDES!

WELCOME TO WATER RIDES! WELCOME TO WATER RIDES! FIRST-OF-THEIR-KIND RIDES THAT GET PEOPLE IN THE WATER Differentiate with an attraction designed to get more of your guests off the lines and into the water. Breaker Beach 9 Twin

More information

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces.

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces. A trusted partner Multiplex is a trusted partner for all types of retail projects from Greenfield developments to refurbishments and vibrant mixed-use precincts, in both cities and regional locations.

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

EPCG is seated at the address no 2 Vuka Karadžića St. in Nikšić

EPCG is seated at the address no 2 Vuka Karadžića St. in Nikšić hpp Piva CONTENTS: About us 1 hpp "Piva" 3 Construction 5 Technical features 7 Generation 9 Reconstruction and modernization 11 Environment 13 Society 15 Contact 17 About us Elektroprivreda Crne Gore A.D.

More information

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI No: JPAC 841-B80-17 This Invitation for Tenders is published

More information

YORK STREET INTERCHANGE. Public Inquiry. Proof of Evidence:

YORK STREET INTERCHANGE. Public Inquiry. Proof of Evidence: Department for Regional Development - TransportNI YORK STREET INTERCHANGE Public Inquiry Proof of Evidence: (Summary) by Michael Megarry URS Beechill House 40 Beechill Road Belfast BT8 7RP THIS PAGE INTENTIONALLY

More information

Helping you work safely. Many industrial applications. Safety in design

Helping you work safely. Many industrial applications. Safety in design Stops Dropped Tools Tools@Height is produced by Snap-on Industrial, a world leader in the design, manufacture and distribution of hand tools, power tools, diagnostic and inspection equipment, tool storage,

More information

Cofferdam Performance Hurricanes Harvey & Irma

Cofferdam Performance Hurricanes Harvey & Irma Cofferdam Performance Hurricanes Harvey & Irma - 2017 Greg Hammer Senior Geotechnical Engineer CELRH-DSPC-GS DSMMCX Third Workshop on Case Histories in Dam Safety Risk-Informed Decision Making 2018 USSD

More information

Trust so far Maintenance priorities this year Major works activity Vegetation & FM priorities & new contract - Visitor moorings progress - Water

Trust so far Maintenance priorities this year Major works activity Vegetation & FM priorities & new contract - Visitor moorings progress - Water Jeff Whyatt Autumn 2013 Trust so far Maintenance priorities this year Major works activity Vegetation & FM priorities & new contract Boating - Visitor moorings progress - Water situation / Lockage volume

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 1 near Belle Plaine ESTIMATED COST: $5.1

More information

Port MacKenzie Rail Extension

Port MacKenzie Rail Extension Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough

More information

120ft Motor Yacht Listing ID:

120ft Motor Yacht Listing ID: Australia - Great Britain - Indonesia - New Zealand - Philippines - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) 120ft Motor Yacht Listing ID: 650383 DESCRIPTION: 37m

More information

Tower Bridge Learning Self-guided visit resources

Tower Bridge Learning Self-guided visit resources Tower Bridge Learning Self-guided visit resources Thank you for booking a visit to Tower Bridge Exhibition, we hope you enjoy your visit. This pack contains information and activity ideas for you to do

More information

BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES

BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES Energy & Utilities NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK We design, manufacture

More information

Park-specific management and policies Wainuiomata Recreation Area

Park-specific management and policies Wainuiomata Recreation Area Park-specific management and policies Wainuiomata Recreation Area 6.8 Wainuiomata Recreation Area 6.8.1 Legal status Title held: Legislative status: Wellington Regional Council Administered under Local

More information

Erhama bin Jaber Al Jalahma Shipyard

Erhama bin Jaber Al Jalahma Shipyard client Nakilat Erhama bin Jaber Al Jalahma Shipyard Introduction The North Field, located in the State of Qatar s territorial waters, is the one of the world s largest natural gas fields, with reserves

More information

TRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207)

TRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207) BAKER DESIGN CONSULTANTS Civil, Marine and Structural Engineering To: Alex Jaegerman FAICP Director of Planning & Development Town of Yarmouth 200 Main Street PO Box 907 Yarmouth, ME 04096 From: Barney

More information

Capable Accommodation work Barge with helideck. Large Work Deck with 400t deck crane. Accommodation for 165 pax. Mynx. Accommodation Work Barge

Capable Accommodation work Barge with helideck. Large Work Deck with 400t deck crane. Accommodation for 165 pax. Mynx. Accommodation Work Barge Capable Accommodation work Barge with helideck Large Work Deck with 400t deck crane Accommodation for 165 pax Mynx Accommodation Work Barge hnical Drawing Proven and Capable shallow water accommodation

More information

INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS

INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS Andre Frieslaar Pr.Eng and John Jones Pr.Eng Abstract Hawkins Hawkins and Osborn (South) Pty Ltd 14 Bree Street,

More information

Health and Safety Report 2016

Health and Safety Report 2016 Health and Safety Report 2016 Reg. No. OHS 508824 Health and Safety Report 2016 Contents Foreword 3 Health and Safety Context 4 Health and Safety Policy 4 Health and Safety Goals 5 Governance 5 Operational

More information

QUEENSLAND RECREATIONAL BOATING COUNCIL INC (QRBC) Report of Meeting

QUEENSLAND RECREATIONAL BOATING COUNCIL INC (QRBC) Report of Meeting QUEENSLAND RECREATIONAL BOATING COUNCIL INC (QRBC) Report of Meeting 9 08-2017 Items of interest from the August 9 th 2017 meeting of the Queensland Recreational Boating Council held at the Queensland

More information

The Vision for the San Juan Islands Scenic Byway

The Vision for the San Juan Islands Scenic Byway The Vision for the San Juan Islands Scenic Byway 2 Judd Cove, Orcas Island, Courtesy of Kurt Thorson (kurtthorson.com) and San Juan County Land Bank Vision for the San Juan Islands Scenic Byway The San

More information

Kurobegawa No.4 Power Plant Toyama Prefecture, Japan (Asia)

Kurobegawa No.4 Power Plant Toyama Prefecture, Japan (Asia) IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 14-02: Development of Regional Industries Kurobegawa No.4 Power Plant,

More information

PERSONNEL PROFILE DAVID BREADMORE

PERSONNEL PROFILE DAVID BREADMORE PERSONNEL PROFILE DAVID BREADMORE CONTACT DETAILS: Email: david@bstconsulting.com.au Phone: +61 400 899 748 QUALIFICATIONS AND PROFESSIONAL AFFILIATIONS Certificate of Business Studies (Travel & Tourism)

More information

Northern Ireland s ultimate destination for exhibitions and events

Northern Ireland s ultimate destination for exhibitions and events Northern Ireland s ultimate destination for exhibitions and events EIKON The Eikon Exhibition Centre is a state of the art venue for exhibitions and events in Northern Ireland. The bespoke and flexible

More information

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering

More information

Investigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study of Sarawak River Basin Malaysia

Investigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study of Sarawak River Basin Malaysia International Journal of Science and Engineering Investigations vol. 4, issue 42, July 2015 ISSN: 2251-8843 Investigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study

More information

MOURNE & SLIEVE CROOB AONB. VISITORS SURVEY Summary Report

MOURNE & SLIEVE CROOB AONB. VISITORS SURVEY Summary Report MOURNE & SLIEVE CROOB AONB VISITORS SURVEY Summary Report November 2004 This project was funded by 1 EXECUTIVE SUMMARY INTRODUCTION In 2004 Mourne Heritage Trust secured funding for the implementation

More information

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech mwalther@coastaltechcorp.com Prepared for the Sea Turtle Conservancy http://www.conserveturtles.org/ Introduction Overview: This

More information

4180 acre-feet minimum conservation pool

4180 acre-feet minimum conservation pool MEMORANDUM Subject: Bear River Basin Plan SULPHUR CREEK RESERVOIR Date: July 20, 2000 Location: Section 34, Township 14N, Range 119W. Located on Sulphur Creek, tributary to the Bear River. Located approximately

More information

Dam Construction in Greece

Dam Construction in Greece Dam Construction in Greece An overview By George T. Dounias Chairman of the Greek COLD 29 October 212 Dam construction in Greece 1 Presentation outline An overview of dam construction From antiquity to

More information

3 Pilbara ports provide gateways

3 Pilbara ports provide gateways COMMUNITY AND STAKEHOLDERS Community Consultation Committees 8 meetings each year across our 3 port locations Dampier, Port Hedland and Ashburton Community Support Initiative >$295,000 a year in financial

More information

PROPOSED SAFARI LODGE DEVELOPMENT AND ASSOCIATED INFRASTRUCTURE IN SKUKUZA, KRUGER NATIONAL PARK Background Information Document

PROPOSED SAFARI LODGE DEVELOPMENT AND ASSOCIATED INFRASTRUCTURE IN SKUKUZA, KRUGER NATIONAL PARK Background Information Document PROPOSED SAFARI LODGE DEVELOPMENT AND ASSOCIATED INFRASTRUCTURE IN SKUKUZA, KRUGER NATIONAL PARK Background Information Document Prepared for: Interested and Affected Parties Prepared by: Exigo Sustainability

More information

2.1 Physical and Biological Description Matabitchuan River Watershed

2.1 Physical and Biological Description Matabitchuan River Watershed 2.1 Physical and Biological Description Watershed 2.1.1 Physical Description The system watershed has a total area of about 933 km 2 and is a tributary system to Lake Temiskaming and the Ottawa River Drainage

More information

InchgreenDryDock. More than Ports. Sat Nav: PA15 2NA

InchgreenDryDock. More than Ports. Sat Nav: PA15 2NA More than Ports InchgreenDryDock Sat Nav: PA15 2NA First class port facility on the firth of Clyde with dry dock, repair quay and extensive land suitable for development Inchgreen DryDock Contents More

More information

The Soloist Building. The Soloist Information. Lanyon Place Belfast. the one and only COLLIERS CRE

The Soloist Building. The Soloist Information. Lanyon Place Belfast. the one and only COLLIERS CRE The Soloist Information The Soloist Building Lanyon Place Belfast For further information please contact: A Development By: COLLIERS CRE The Linenhall 32-38 Linenhall Street Belfast, BT2 8BG T 028 9024

More information

illing Era power for our society, in this age of alternate forms of energy, falling water may seem like a quaint old-fashioned way to power a mill.

illing Era power for our society, in this age of alternate forms of energy, falling water may seem like a quaint old-fashioned way to power a mill. Saint Anthony Falls Historic Walking Tour The tour starts at the Father Hennepin Park sign shown below, a half block south of the intersection of SE Main Street and SE 3 rd Avenue on the east side of the

More information

Port MacKenzie Rail Extension

Port MacKenzie Rail Extension Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough

More information

AUSTRALIAN HISTORIC ENGINEERING PLAQUING PROGRAMME NOMINATION FOR NATIONAL ENGINEERING LANDMARK

AUSTRALIAN HISTORIC ENGINEERING PLAQUING PROGRAMME NOMINATION FOR NATIONAL ENGINEERING LANDMARK AUSTRALIAN HISTORIC ENGINEERING PLAQUING PROGRAMME NOMINATION FOR NATIONAL ENGINEERING LANDMARK To: Date: 17/6/02 The Institution of Engineers, Australia From: South Australia Division Engineering House

More information

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which

More information

Conservatory Roof Structural Information Guide

Conservatory Roof Structural Information Guide Conservatory Roof Structural Information Guide Effective from March 2012 Now includes wide span capabilities Tel: 01623 443200 www.synseal.com Useful Information This guide displays data on the permissible

More information

The Story of the Water Supply in George A story of human needs out-stepping human vision.

The Story of the Water Supply in George A story of human needs out-stepping human vision. The Story of the Water Supply in George A story of human needs out-stepping human vision. 1811 FOUNDING of GEORGE The Magisterial District (Drostdy) and town of George, named after King George III of Britain.

More information