1 Business Forum 16 March

2 2 Rebuilding London Bridge: An update Mary Jordan Business Change Manager, Network Rail

3 London Bridge station update 2015 Platforms 4 to 9 are currently closed for redevelopment, with the next new platforms scheduled to open in August Major service changes planned for December 2015 Changes to Tooley Street Platforms 7-9 to open, and half of the new street level concourse Some Southeastern service changes from August St Thomas Street partially reopens 18 March, 3

4 Platform 4 Platform 3 Platform 2 Platform 1 US DS UF DF Bay Platform 2 Bay Platform 1 Up TL Platform Dn TL Platform Platform 4 Platform 3 Platform 2 Platform 1 Better capacity & performance at London Bridge N B B Blackfriars Cannon Street Before Single line connection to Cannon Street signalled for Blackfriars Junction Short single track, signalled for Bi-directional moves Bi-directional moves London Bridge Spa Road Junction Southwark Park Junction North Kent East Junction Deptford New Cross Platform C Platform B Platform A To Waterloo East & Charing Cross Borough Market Junction Edward Street Junction Metropolitan Junction Platform 2 Platform 11 Platform 12 Tiverton Street Junction Platform 13 Platform 14 Bermondsey Junction Platform 3 Platform 4 Platform 5 Elephant & Castle Platform 15 Platform 16 Platform 2 Platform 1 South Bermondsey Bricklayers Arms Junction New Cross Gate To Loughborough Jcn N B B Blackfriars CORE SECTION Siding No.1 Cannon Street South Eastern - Blackfriars Other railway infrastructure After Blackfriars Junction DN 2 DS US DF UF Tiverton St Junction DN 1 Elephant & Castle UP Metropolitan Junction Borough Viaduct Siding No.2 DN CX UP CX New Borough Market Viaduct New tracks provide dedicated access to Charing Cross London Bridge Platform A Platform B Platform C Platform D Platform E Platform F Platform G Platform H Platform J Platform K Platform L Platform M Platform N Platform P Platform Q 9 UP 10 REV 1 DN 2 REV 3 UP 4 DN TL 5 UP TL Spa Road Junction London Bridge station reconstruction Southwark Park Junction Platform 2 Platform 1 Bricklayers Arms Junction North Kent East Junction 6 DN 7 DN 7 DN 8 UP Bermondsey Junction West Bermondsey Junction East 9 REV 10 REV 11 UP 4 DN TL 5 UP TL South Bermondsey DS North Kent West Junction New Bermondsey Diveunder UP LOOP 8 UP DN LOOP 1 DN 2 REV 3 UP 6 REV Deptford Platform 2 Platform 3 Platform 4 Platform 5 New Cross Gate Bermondsey Dive-under New Cross Platform C Platform B Platform A DS DF UF US DS US DF UF Unpicking the complexity improving performance for all services Proposed under Thameslink 4

5 Milestones Changes to Tooley Street Platforms 7-9 open Half of the new street level concourse opens at London Bridge station with direct access to St Thomas Street From August Southeastern services to and from Charing Cross resume calling at London Bridge. Southeastern services to and from Cannon Street will not call at London Bridge. Some diversions will take place between Charing Cross, Cannon Street and Blackfriars. St Thomas Street partially reopens 2017 Platform 6 opens 2018 Platforms 1-5 open Completion of track, signalling and major bridges work around London Bridge station. Station work completes Southeastern and Thameslink services to and from Cannon Street resume calling at London Bridge. 5

6 So far Up to March 18 March, 6

7 18 March, 7

8 18 March, 8

9 Presentation title 18 March, 9

10 18 March, 10

11 18 March, 11

12 August

13 St Thomas Street 13

14 New station concourse 14

15 Through platforms Presentation title 18 March, 15

16 Terminating concourse Presentation title 18 March, 16

17 Station forecourt Presentation title 18 March, 17

18 Platforms Presentation title 18 March, 18

19 August service changes August to early 2018 Most Southeastern services to and from Charing Cross resume calling at London Bridge. Southeastern services to and from Cannon Street will not call at London Bridge. Some diversions will take place between Charing Cross, Cannon Street and Blackfriars. Further information will be available in due course.

20 Retail Update

21 Retail uses phase 1 (street level) SU34 Clothing SU35 Newsagent SU36 Cards & Stationary SU43 Café SU42 Health and Beauty SU41 Clothing SU40 Coffee SU58&SU59 Affordable Business Units SU52 Bakery SU51 Confectionary SU37 Bureau De Change SU39 Coffee SU53 Restaurant 18-Mar-16 / 21

22 Retail uses phase 1 (terminus level) SU61 Florist SU62 Grocery SU63 Grocery SU64 Grocery 18-Mar-16 / 22

23 Retail uses phase 2 (street level) SU74 Restaurant SU75 Restaurant SU76 Coffee SU77 Café SU78 Newsagent SU79 Cards & Stationary LES03 Leisure Facilities SU81/SU82 Tourist Booking SU31 Gifting SU32 Health & Beauty SU33 Groceries SU46 Restaurant SU48 Restaurant SU49 Restaurant SU50 Bar (Left to right) SU15 Supermarket SU16 Technology SU17 Left Luggage SU18 Clothing SU19 Clothing SU20 Clothing SU21 Books SU22 Accessories SU23 Accessories SU24 Health & Beauty SU25 Health & Beauty SU26 Health & Beauty (Left to right) SU01 Groceries SU02 Off Licence SU03 Confectionary SU04 Jewellery SU05 Health and Beauty SU07 Bakery (Left to right) SU08 Bakery SU09 Bureau de change SU10 Cards & Stationary SU11 Newsagent SU12 Dry Cleaners SU13 Florist SU44 Newsagent SU45 Sandwiches LES02 Leisure Facilities LES01 Theatre SU57 Affordable Business Unit SU56 Affordable Business Unit SU55 Affordable Business Unit SU54 Affordable Business Unit 18-Mar-16 / 23

24 Retail uses phase 2 (terminus level) SU72 Restaurant SU65 Accessories SU66 Florist SU67 Health & Beauty SU68 Cards & Stationary SU69 Confectionary SU70 Bakery 18-Mar-16 / 24

25 Tooley Street 18-Mar-16 25

26 Tooley Street closure As our work moves across the station we need to locate a worksite on Tooley Street. From 30 April, we start work on the new station entrance on Tooley Street and from August will be to rebuild platforms 1 to 3. We need to extend the worksite beyond the station footprint to safely undertake the work on the station front. This means we must close the southern footpath and one lane to traffic. These works are taking place as part of the Transport & Works Act for London Bridge and are essential to the rebuild of London Bridge station. London Bridge and the surrounding area remain open for business throughout the rebuilding of London Bridge station. 18 March, 26

27 View from More London 18 March, 27

28 Ariel view 18 March, 28

29 Overview of changes 30 April to 3 May (May Day Bank Holiday) there will be a complete closure of Tooley Street between Borough High Street and Bermondsey Street to enable hoarding to be put up. From 3 May to February 2018 Tooley Street will be closed to eastbound traffic. westbound traffic will travel in the eastbound lane. The southern footpath on the station side of the road will be closed from Cottons Bridge to Bermondsey Street. Cyclists will be able to travel in both directions on Tooley Street: westbound with the traffic and eastbound in a segregated lane. For further information on the upcoming changes visit - thameslinkprogramme.co.uk/tooley-street 18 March, 29

30 30 April 3 May road closure 30 April to 3 May (May Day Bank Holiday) there will be a complete closure of Tooley Street between Borough High Street and Bermondsey Street to enable hoarding to be put up. Pedestrian access will be maintained. Controlled entry will be maintained for deliveries and residents via Borough High Street only. Presentation title 18 March, 30

31 Hoarding boundary 18 March, 31

32 Pedestrians The southern footpath on the station side of the road will be closed from Cottons Bridge to Bermondsey Street. The southern footpath from Joiner Street to Cottons Bridge will close from 27 August until February Removal of street furniture on northern pavement. Widening pavement on northern pavement. The pedestrian crossing near the Pret will be removed and there will be a temporary crossing under Cottons Bridge. Alternative routes including St Thomas Street entrance opening August. 18 March, 32

33 Pedestrians 18 March, 33

34 Pedestrians 18 March, 34

35 Cyclists Cyclists will be able to travel in both directions on Tooley Street: westbound with the traffic and eastbound in a segregated lane. The eastbound cycle lane will be segregated from traffic and pedestrians. 18 March, 35

36 Road users Tooley Street will be closed to eastbound traffic from Borough High Street to Bermondsey Street. There will be a signed diversion route via Borough High Street, Great Dover Street and Tower Bridge Road. Allow more time for your journey, especially during the peak hours of 07:00 10:00 and 16:00 19:00 on weekdays. 18 March, 36

37 Diversionary route 18 March, 37

38 Freight If you make or receive deliveries around London Bridge and the More London development area, you may be affected by congestion and increased journey times. Talk to your customers and suppliers, to consider if there are changes you need to make to your deliveries or collections. A signed diversion route will be in place via Borough High Street, Great Dover Street and Tower Bridge Road. You may wish to consider: Changing the times of your deliveries to avoid congestion; Using alternative routes that avoid the area to make your deliveries; Signing up to the TfL Road Freight Bulletin for regular information and advice on issues impacting deliveries in London. freight@tfl.gov.uk to sign up. Freight loading bays are available in the following locations: Loading for London Bridge station takes place from St Thomas Street. Loading for Hays will continue via Hays Lane. 18 March, 38

39 Bus users We have co-ordinated the diversions around Tooley Street in collaboration with TfL and the London Borough of Southwark. These diversion are designed to minimise the impact on customers as much as possible. Routes 47, 343, 381, N199 and RV1 will be diverted. Notices will be posted at bus stops and s will be sent to registered Oystercard users. 18 March, 39

40 Bus users Route 47 towards Catford Bus Garage will be diverted at London Bridge to run via Borough High Street, Great Dover Street, Bricklayer Arms, Tower Bridge Road and then back to its usual routeing at Tooley Street. Route 343 towards City Hall will be diverted at Borough High Street to run via Great Dover Street, Bricklayers Arms, Tower Bridge Road and then back to its usual routeing at Queen Elizabeth Street. Route N343: There will be no change to this route. Route 381- towards Peckham will be diverted at Southwark Street to run via Southwark Bridge Road, Marshalsea Road, Great Dover Street, Bricklayer s Arms, Tower Bridge Road and then back to its usual routeing at Tooley Street. Route N381 towards Peckham will be diverted at Southwark Street to run via Southwark Bridge Road, Marshalsea Road, Great Diver Street, Bricklayer s Arms, Tower Bridge Road and then back to its usual routeing at Tooley Street. Route N199 towards St Mary Cray will be diverted at London Bridge to run via Borough High Street, Great Dover Street. Bricklayer s Arms, Tower Bridge Road and then back to its usual routeing at Tooley Street. Route RV1 towards Tower Gateway Route RV1 will be diverted eastbound at Borough High Street to run via London Bridge, Eastcheap, Great Tower Street, Byward Street and Tower Hill to Tower Gateway. There will be no change to westbound routeing. 18 March, 40

41 New 7 bay taxi rank Bermondsey St The taxi rank currently located on Tooley Street will be moved to Bermondsey Street. This will be the permanent position for the taxi rank for the new station as agreed in the planning approval for the station. 18 March, 41

42 Taxi rank 18 March, 42

43 Communications collateral Briefings Face to face activity: 18 April 13 May Business drop-ins: 4 15 April Business toolkit: A5 flyers for delivery drivers Posters (cyclists, pedestrians, freight, coaches) Leaflets (walking map) Website Social media s/SMS 18 March, 43

44 How your staff & visitors can stay updated Making the information available through your internal communications channels Encouraging staff to sign up for our passenger or SMS alerts at ThameslinkProgramme.co.uk and follow us on If your business is affected, update the find us section on your website Request a business toolkit by ing contact@thameslinkprogramme.co.uk To keep up to date on our latest business advice and upcoming events visit ThameslinkProgramme.co.uk/advice-for-businesses. 18 March, 44

45 Easter service changes 18 March, 45

46 Easter Thameslink Programme: No trains from Cannon Street and no Southeastern services from London Bridge. Services will be diverted to Charing Cross, Victoria, Blackfriars or New Cross between Friday 25 and Sunday 27 March inclusive. Friday 25 and Monday 28 March inclusive. No services will run between Sittingbourne and Sheerness-on-Sea. Rail replacement buses will be in operation. No services will run between Swanley / Gravesend and Faversham / Maidstone West. There will be changes to services and rail replacement buses will be in operation. There will be changes to services and replacement buses will run between Plumstead, Abbey Wood, Belvedere, Erith, Slade Green and Dartford. Buses will run between New Cross, Deptford, Greenwich, Maze Hill, Westcombe Park and Charlton. There will be changes to other rail services across London during the Easter period. Please check before you travel at 18 March, 46

47 Questions? Presentation title 18 March, 47

Southeastern contingency timetable Issue 1

Southeastern contingency timetable Issue 1 Cannon Street Metro Services Cannon Street Gillingham Gillingham Cannon Street Cannon Street Dartford Dartford Cannon Street via Greenwich via Greenwich via Bexleyheath FIRST: 0705 then 05 & 35 past every

More information

To provide the best possible service during the Thameslink construction work at London Bridge;

To provide the best possible service during the Thameslink construction work at London Bridge; Dear stakeholder Re: Southeastern December 2014 timetable The 6 billion government-funded Thameslink Programme has entered the final construction phase. This involves a complete rebuild of London Bridge

More information

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a

More information

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction

More information

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London Chapter 16 Route Window NE15 Brentwood station BRENTWOOD STATION 16 Route Window NE15 Brentwood station Introduction 16.1 The construction activities in this route window are associated with minor refurbishment

More information

Board meeting

Board meeting Board meeting 28.11.17 Secretariat memorandum Author: Vincent Stops Agenda item: 8 Ref: LTW568 Drafted: 13.11.17 Oxford Street bus changes associated with pedestrianisation 1 Purpose of report 1.1. To

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

VISION FOR BOROUGH HIGH STREET

VISION FOR BOROUGH HIGH STREET VISION FOR BOROUGH HIGH STREET 1 FROM An unpleasant and deteriorating thoroughfare TO A destination which: is an attractive town centre meeting the retail, social & leisure needs of those who live and

More information

1 Executive Summary. 2 Introduction

1 Executive Summary. 2 Introduction 1 Executive Summary As part of Network Rail s planning application submission to London Borough of Southwark for London Bridge station, Network Rail has publicised its proposals and exhibited the plans

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

GTR 2018 timetable proposals

GTR 2018 timetable proposals GTR 2018 timetable proposals Wednesday 16 November 2016 Phil Hutchinson - Head of Strategic Planning and team Thameslink Programme and GTR The GTR franchise was created to deliver the Thameslink Programme.

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

Chapter 13 Route Window NE12 Harold Wood station. Transport for London Chapter 13 Route Window NE12 Harold Wood station HAROLD WOOD STATION 13 Route Window NE12 Harold Wood station 13.8 Harold Wood station is on Gubbins Lane close to the junction of A12 Colchester Road and

More information

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of

More information

May 2019 Timetable. Highlights and Response to Feedback

May 2019 Timetable. Highlights and Response to Feedback May 2019 Timetable Highlights and Response to Feedback Contents 1. Foreword 2 2. Overview 3 3. Highlights in the May 2019 timetable changes 4 4. Feedback from passengers & stakeholders 6 5. Feedback to

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of

More information

London Bridge station opens upgrade works

London Bridge station opens upgrade works On board wi-fi rollout Dorking station highly commended at cycle awards Govia Railway Stakeholder Newsletter Period 9-10 February 2017-182016 Our stakeholder newsletter features business updates, news

More information

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London Come on board An introduction to accessible transport in London MAYOR OF LONDON Transport for London Contents 4 Plan your journey 6 Help from staff 8 Learning to use public transport 9 Fares and tickets

More information

London Bridge Retail & Leisure Report. August 2016

London Bridge Retail & Leisure Report. August 2016 London Bridge Retail & Leisure Report August 216 CONTENTS 1. Introduction...3 2. Market Activity...4 3. Available Units.5 The Retail Arcade 6 Railway Arches...7 One Tower Bridge...8 4. Area Information

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

The resignalling scheme

The resignalling scheme & Nottingham Resignalling scheme The resignalling scheme What work is being carried out? s well as redeveloping the station, Network Rail is rebuilding the rail infrastructure around the city. The 100m

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Refurbished contemporary offices in Butler s Wharf Fourth Floor - approximately 6,540 sq ft

Refurbished contemporary offices in Butler s Wharf Fourth Floor - approximately 6,540 sq ft 45 CURLEW STREET SE1 Refurbished contemporary offices in Butler s Wharf Fourth Floor - approximately 6,540 sq ft C R E A T I V E WORK SPACE CGI with indicative tenant fit out India House is situated in

More information

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Chapter 7 Route Window C6 Farringdon station. Transport for London

Chapter 7 Route Window C6 Farringdon station. Transport for London Chapter 7 Route Window C6 Farringdon station FARRINGDON STATION 7 Route Window C6 Farringdon station Fox and Knot Street Worksite Farringdon Crossover Worksite This worksite will be situated on the triangular

More information

Thameslink Consortium 21 January Q&A 2. Department for Transport 3. Network Rail 4. First Capital Connect

Thameslink Consortium 21 January Q&A 2. Department for Transport 3. Network Rail 4. First Capital Connect Thameslink Consortium 21 January 2010 1. Q&A 2. Department for Transport 3. Network Rail 4. First Capital Connect Thameslink Annual Consortium Meeting 21 January 2010 1. Mark Miller Chairman Thameslink

More information

M2 Junction 5. improvements scheme. Preferred route announcement

M2 Junction 5. improvements scheme. Preferred route announcement M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these

More information

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament. Major Transport Infrastructure Projects Forth Replacement Crossing Principal Contract Project Office King Malcolm Drive, Rosyth KY11 2DY Steve Farrell Clerk to the Rural Economy and Connectivity Committee

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

Accessible Transport The London 2012 Legacy. Mark Dyer Olympic Delivery Authority

Accessible Transport The London 2012 Legacy. Mark Dyer Olympic Delivery Authority Accessible Transport The London 2012 Legacy Mark Dyer Olympic Delivery Authority Agenda Introduction Improving public transport infrastructure Best use of existing infrastructure Complementary modes Better

More information

2018 VIRGIN MONEY LONDON MARATHON ROAD CLOSURE INFORMATION PLEASE READ THIS LEAFLET CAREFULLY

2018 VIRGIN MONEY LONDON MARATHON ROAD CLOSURE INFORMATION PLEASE READ THIS LEAFLET CAREFULLY ROAD CLOSURES SUNDAY APRIL 08 VIRGIN MONEY LONDON MARATHON ROAD CLOSURE INFORMATION PLEASE READ THIS LEAFLET CAREFULLY Grosvenor Place Green Park Hyde Park Buckingham Palace Victoria Regent Street Piccadilly

More information

Chapter 12 Route window W15 Dog Kennel bridge. Transport for London

Chapter 12 Route window W15 Dog Kennel bridge. Transport for London Chapter 12 Route window W15 DOG KENNEL BRIDGE 12 Route window W15 12.6 southwards to North Park Road and Richings Park Golf Course. To the west side of this route window is the built-up edge of Slough

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

Sydney CBD - Partnering with the coach industry for solutions

Sydney CBD - Partnering with the coach industry for solutions Sydney CBD - Partnering with the coach industry for solutions Steve Issa Executive Director Operations and Planning Transport for NSW 16 June 2017 Tomorrow s Sydney Responding to growth: Sydney s population

More information

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017 Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.

More information

M621. Junctions 1 to 7 Improvement scheme. Share your views

M621. Junctions 1 to 7 Improvement scheme. Share your views M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,

More information

Chapter 9 Route Window C8 Whitechapel station. Transport for London

Chapter 9 Route Window C8 Whitechapel station. Transport for London Chapter 9 Route Window C8 Whitechapel station Transport for London WHITECHAPEL STATION 9 Route Window C8 Whitechapel station Pedley Street Worksite Pedley Street to Mile End (Devonshire Street) sidings

More information

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017 Network Rail Making Rail Accessible: Guide to Policies and Practices November 2017 0 Operator s Strategy Across our managed stations, Network Rail will consider accessibility issues and plan how we meet

More information

Chapter 26 Route Window SE6A Manor Wharf. Transport for London

Chapter 26 Route Window SE6A Manor Wharf. Transport for London Chapter 26 Route Window SE6A Manor Wharf Transport MANOR WHARF 26 Route Window SE6A Manor Wharf Transport Introduction 26.1 The route window lies within the London Borough of Bexley. The works in the

More information

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017 Network Rail Making Rail Accessible: Guide to Policies and Practices November 2017 0 Operator s Strategy Across our managed stations, Network Rail will consider accessibility issues and plan how we meet

More information

H1: BIRMINGHAM CURZON STREET STATION

H1: BIRMINGHAM CURZON STREET STATION HIGH SPEED TWO INFORMATION PAPER H1: BIRMINGHAM CURZON STREET STATION This paper outlines the proposals for Curzon Street Station. It will be of particular interest to those potentially affected by the

More information

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk HS2+3 GL EH GL

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Compiled by Paul Murphy August 2013 Correct as of Friday 23 rd August 2013 CONTENTS Road Closures & Map Changes

More information

DA1 5FD COMPLETION MID-SUMMER 2019 A BRAND NEW FOUR UNIT INDUSTRIAL / WAREHOUSE DEVELOPMENT IN DARTFORD 8,482-45,338 SQ FT TO LET QUADRONPARK.CO.

DA1 5FD COMPLETION MID-SUMMER 2019 A BRAND NEW FOUR UNIT INDUSTRIAL / WAREHOUSE DEVELOPMENT IN DARTFORD 8,482-45,338 SQ FT TO LET QUADRONPARK.CO. DA1 5FD COMPLETION MID-SUMMER 2019 A BRAND NEW FOUR UNIT INDUSTRIAL / WAREHOUSE DEVELOPMENT IN 8,482-45,338 SQ FT TO LET QUADRONPARK.CO.UK SPOT ON LOCATION Introducing a new high quality four unit warehouse

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

WOKING INTEGRATED TRANSPORT PROJECT

WOKING INTEGRATED TRANSPORT PROJECT Civic Offices Gloucester Square Woking Surrey GU21 6YL Telephone (01483) 755855 Facsimile (01483) 768746 DX 2931 WOKING Email wokbc@woking.gov.uk Website www.woking.gov.uk 20 January 2017 Dear Resident/Business

More information

Concord Road Interchange. Standard hours of work

Concord Road Interchange. Standard hours of work Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass

More information

Coca-Cola Zero Belfast Bikes.

Coca-Cola Zero Belfast Bikes. Coca-Cola Zero Belfast Bikes www.belfastbikes.co.uk Background BelfastBike Share Scheme October 2009 - Notice of Motion July 2011 - Outline Business Case OBC concluded that a public bike share scheme could

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

The State of Transport in Macquarie Park

The State of Transport in Macquarie Park The State of Transport in Macquarie Park 31st August 2015 Overview Macquarie Park is a major economic centre that contributes over $9billion to Australia s economy each year. Providing access to and from

More information

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator Organization Puget Date Sound Regional Council Regional Project Evaluation Committee Brian Nielsen, Program Administrator October 26, 2018 TODAY S FOCUS The big picture #Realign99 closure/opening the tunnel

More information

VISITING KENT CANTERBURY CAMPUS 2011/12

VISITING KENT CANTERBURY CAMPUS 2011/12 The UK s European university VISITING KENT CANTERBURY CAMPUS 2011/12 Maps and travel information CONTENTS Directions to the Canterbury campus 1 Campus map 4 Overnight accommodation Back cover Useful contacts

More information

Modern air-conditioned trains take over King s Lynn route as Great Northern services are doubled at Ely

Modern air-conditioned trains take over King s Lynn route as Great Northern services are doubled at Ely Ramping up accessibility at Hadley Wood Phase two 2018 timetable consultation launches Govia Thameslink Railway Stakeholder Newsletter Period February 2 2017-182016 Our stakeholder newsletter features

More information

UNIT 3 LONDON SE1 5,408 FT 2 ( M 2 ) AVAILABLE AS A WHOLE OR AS TWO UNITS OF 2,198 FT 2 AND 2,877.2 FT 2

UNIT 3 LONDON SE1 5,408 FT 2 ( M 2 ) AVAILABLE AS A WHOLE OR AS TWO UNITS OF 2,198 FT 2 AND 2,877.2 FT 2 LONDON SE1 NEWLY REFURBISHED SELF-CONTAINED B1 OFFICE / SHOWROOM SPACE 5,408 FT 2 (502.42 M 2 ) AVAILABLE AS A WHOLE OR AS TWO UNITS OF 2,198 FT 2 AND 2,877.2 FT 2 THE BUILDING CLICK HERE TO VIEW FILM

More information

Map showing location of public transport projects in vicinity of railway station

Map showing location of public transport projects in vicinity of railway station Map showing location of public transport projects in vicinity of railway station Market Town Transport Strategy 2013 39 ID PT1a Specific Location Approach at Detail of Project Develop Area Master plan

More information

SHOREDITCH STATION TO CLOSE THIS JUNE by John Thomason

SHOREDITCH STATION TO CLOSE THIS JUNE by John Thomason SHOREDITCH STATION TO CLOSE THIS JUNE by John Thomason The first indication seen was the Quad-Royal (poster size) tube map displayed at stations with text adjacent to Shoreditch stating that the station

More information

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 July 20, 2018 Media Contact: Keith Bilbrey Public Involvement Manager The Southern Gateway Project kbilbrey@kstrategies.com 972-989-9995 Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 DALLAS

More information

Investing in our local rail network June 2014

Investing in our local rail network June 2014 Investing in our local rail network June 2014 Bath & North East Somerset, Bristol, North Somerset and South Gloucestershire councils working together to improve your local transport MetroWest: Investing

More information

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre Crossrail Bulletin www.crossrail.co.uk 0345 602 3813 FREEPOST CROSSRAIL ISSUE 20 Mar 2010 Crossing the Capital Connecting the UK Jobcentre Plus - at the Visitor Information Centre Crossrail is committed

More information

Board meeting

Board meeting Board meeting 27.09.16 Secretariat memorandum Author : Sharon Malley Agenda item: 11 LTW535 Drafted: 19.09.16 Key activities 1 Purpose of report 1.1. To advise members of actions undertaken since last

More information

ELEPHANT PARK BARNARD HOUSE & LEVY BUILDING A collection of 1, 2 and 3 bedroom homes available through L&Q s Shared Ownership scheme

ELEPHANT PARK BARNARD HOUSE & LEVY BUILDING A collection of 1, 2 and 3 bedroom homes available through L&Q s Shared Ownership scheme @ BARNARD HOUSE & LEVY BUILDING A collection of 1, 2 and 3 bedroom homes available through L&Q s Shared Ownership scheme @ INTRODUCING @ @ VITAL STATISTICS HOMES S London borough of Southwark 58 10 1,

More information

London TravelWatch has commissioned two pieces of research on this issue. These can be found at :-

London TravelWatch has commissioned two pieces of research on this issue. These can be found at :- South Eastern Rail Franchise Consultation Co-ordinator Zone 4/13 Department for Transport Great Minster House 33 Horseferry Road LONDON SW1P 4DR March 2017 Dear Sir / Madame, Consultation on the new South

More information

First Thameslink trains arrive on Great Northern

First Thameslink trains arrive on Great Northern Major Christmas engineering works Southern passengers in line for better loos and new waiting room at Eastbourne station Govia Thameslink Railway Stakeholder Newsletter Period February 7 2017-182016 Our

More information

Out of Station Interchanges (October 2010)

Out of Station Interchanges (October 2010) Station NLC Exit station Operator Station NLC Entry station Operator Maximum Permitted Interchange Time 502 Aldgate LU 7490 Fenchurch Street NR 40 508 Archway LU 1524 Upper Holloway NR 20 511 Baker Street

More information

Birmingham Connected Briefing October Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council

Birmingham Connected Briefing October Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council Birmingham Connected Briefing October 2018 Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council A period of transformational change for the city centre and beyond Creating

More information

LONDON BRIDGE FUTURE STREETS: VISION AND PROJECTS A RESPONSE TO THE MAYOR OF LONDON ROADS TASK FORCE BY TEAM LONDON BRIDGE.

LONDON BRIDGE FUTURE STREETS: VISION AND PROJECTS A RESPONSE TO THE MAYOR OF LONDON ROADS TASK FORCE BY TEAM LONDON BRIDGE. es s Pr og k in LONDON BRIDGE FUTURE STREETS: VISION AND PROJECTS 2014-2018 W or k in Pr og e ss W or A RESPONSE TO THE MAYOR OF LONDON ROADS TASK FORCE BY TEAM LONDON BRIDGE. 1 16 01LONDON BRIDGE TODAY

More information

[COVER IMAGE] C2Ecampaign.com

[COVER IMAGE] C2Ecampaign.com [COVER IMAGE] C2Ecampaign.com 2 3 THE VISION BENEFITS FOR KENT A PROPORTIONATE FUNDING ASK Crossrail to Ebbsfleet (C2E) is a high-impact infrastructure scheme designed to realise the full value of Crossrail

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

Focused on partnership

Focused on partnership Southeastern Sustainability Report 2015/2016 Focused on partnership (Zone 2 & 3) (Zone 1 & 2) (Zone 2 & 3) (Zone 2 & 3) 03/16 About us Southeastern operates one of the busiest and most complex networks

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

581 sq ft to 14,370 sq ft of New Office & Commercial Space for Sale or to Let In one of London s most contemporary and vibrant new communities.

581 sq ft to 14,370 sq ft of New Office & Commercial Space for Sale or to Let In one of London s most contemporary and vibrant new communities. 581 sq ft to 14,370 sq ft of New & Commercial Space for Sale or to Let In one of London s most contemporary and vibrant new communities. Marine Wharf Introducing a new way of living & working for London

More information

AIRPORT SURFACE ACCESS STRATEGY

AIRPORT SURFACE ACCESS STRATEGY AIRPORT SURFACE ACCESS STRATEGY August 2006 SOUTHEND AIRPORT AIRPORT SURFACE ACCESS STRATEGY July 2006 CONTENTS Page Introduction 3 National, Regional and Local Transport Policies 3 The Airport Transport

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002 2.0 POLICY AND DEVELOPMENT FRAMEWORK Introduction 2.1 This section of the report highlights the key elements of both Transport21, and the Celbridge Development Plan 2002, both of which include a number

More information

Sharing the Way with Sustainable Transport Options

Sharing the Way with Sustainable Transport Options Sharing the Way with Sustainable Transport Options Planning Institute Australia Professional Development Seminar Adelaide, SA Thursday 1 st May 2008 John Devney Sustainable Transport What is Sustainable

More information

School Transport & Travel Guide

School Transport & Travel Guide School Transport & Travel Guide 2018-2019 Welcome Map Five Star Service Dear Parent, 2018-2019 Our modern fleet of minibuses is operated in house by Bromley High Thank you for taking the time to look at

More information

Green Links A Walking & Cycling Network for Southwark

Green Links A Walking & Cycling Network for Southwark Green Links A Walking & Cycling Network for Southwark www.southwarklivingstreets.org.uk 31st March 2010 www.southwarkcyclists.org.uk Contents. Proposed Green Links - Overview Page Introduction 3 What is

More information

BRENT CROSS THAMESLINK

BRENT CROSS THAMESLINK INTRODUCTION The 4.5 billion Brent Cross Cricklewood development is Barnet Council s most significant growth and regeneration programme. It will create a new sustainable mixed use town centre for Barnet

More information

Victoria Station Upgrade

Victoria Station Upgrade Kings College Construction Law Association 20 th May 2008 Peter Lynch Project Director Deryck Povey Design Manager & Assurance Manager Key drivers for change Heavy congestion and station closures currently

More information

Proposed closure of King s Cross Thameslink station and parts of the railway network at Blackfriars station and London Bridge station.

Proposed closure of King s Cross Thameslink station and parts of the railway network at Blackfriars station and London Bridge station. Annex 1 London TravelWatch Proposed closure of King s Cross Thameslink station and parts of the railway network at Blackfriars station and London Bridge station. Minutes of the Sub-committee held on 7

More information

London TravelWatch response to the Southeastern franchise extension consultation

London TravelWatch response to the Southeastern franchise extension consultation The voice of transport users London TravelWatch response to the Southeastern franchise extension consultation September 2013 London TravelWatch response to the Southeastern franchise extension consultation

More information

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017 LCR Railway Improvement Plan BID Travel and Transport Forum Tuesday 28 th February 2017 Liverpool City Region Railway Improvement Plan 2016-2019 Wirral Loop Line Track Renewal 3 January 18 June 2017 The

More information

Feasibility Study July 2017

Feasibility Study July 2017 21 A Vision for Rail Contents Introduction 3 Transport in South East London 3 Rail Transport in Lewisham 4 London s High Frequency Services 5 Access to Central London 6 Land Use Context 7 Major Development

More information

Lloyds Banking Group Lean On Me Challenge 2017

Lloyds Banking Group Lean On Me Challenge 2017 Lloyds Banking Group Lean On Me Challenge 2017 Mapbook London Loop September 20 In aid of Mental Health UK Join the Facebook Group Lean On Me Challenge For updates on the event Or follow on Twitter under

More information

International Quarter London Retail & catering

International Quarter London Retail & catering International Quarter Retail & catering 2 International Quarter Where the future works Computer generated image for illustrative purposes only 4 Vision An exciting retail opportunity Stratford is fast

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

London and Crossrail 2. Chris Moores Transport for London

London and Crossrail 2. Chris Moores Transport for London London and Crossrail 2 Chris Moores Transport for London 1 Contents 2 1 The region needs Crossrail 2 2 Crossrail 2 can be more than just a railway 3 Planning and Delivering Crossrail 2 Issues facing London

More information

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application... Threats to possible orbital light-rail in outer London from the current Brent Cross planning application... (We need safeguarding in place, for better times!) Map from Transport 2025 document. Boris photo:

More information

A31 Ringwood improvement scheme

A31 Ringwood improvement scheme A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.

More information

Peterborough. Bedford. Stevenage. Luton. St Albans. Finsbury Park. Kentish Town. St Pancras International. Farringdon. London Blackfriars

Peterborough. Bedford. Stevenage. Luton. St Albans. Finsbury Park. Kentish Town. St Pancras International. Farringdon. London Blackfriars The big picture King s Lynn Key Today In order to improve train services to and through London, we are investing 5.5bn in new and longer trains (new rolling stock), new track and new stations. This scheme,

More information

The Evergreen 3 Project

The Evergreen 3 Project The Evergreen 3 Project Railway Civil Engineers Association 26 th January 2012 Allan Dare Strategic Development Manager Chiltern Railways Chiltern Railways Birmingham Solihull Warwick Parkway Virgin West

More information

DETAILED DESIGN (Business Case Approved) OUTLINE DESIGN (Business Case Approved) FEASIBILITY (Business Case Approved - Scheme deferred until 2017/18)

DETAILED DESIGN (Business Case Approved) OUTLINE DESIGN (Business Case Approved) FEASIBILITY (Business Case Approved - Scheme deferred until 2017/18) LGF1 1 A28 Chart Road, Ashford Carriageway dualling, junction improvements and NR bridge widening. Start of works planned for Spring 2018 with an 18 month construction period. 32.77m ( 10.2m SLGF, 22.57m