1 LCR Railway Improvement Plan BID Travel and Transport Forum Tuesday 28 th February 2017

2 Liverpool City Region Railway Improvement Plan

3 Wirral Loop Line Track Renewal 3 January 18 June 2017

4 The story so far Successful rail replacement service delivered: 34 buses provided each day with no significant issues Positive customer feedback, especially for Bike Bus Ferries and Tunnels Ferries - increase in cyclists and foot passengers Tunnels -increase in cars over a longer am/pm peak period Both have coped well with increased volumes Strengthened cross river commercial bus services Both Arriva and Stagecoach increased capacity on the cross river bus network (through provision of bigger or duplicate buses) to support movement of travelling public Transport Co-ordination Centre An excellent opportunity for partners to share information/co-ordinate operational responses and messaging as and when issues arose.

5

6 Breakout machine working through Phase 2 Pouring concrete through Phase 2

7 Preparing the baseplate locations ready to receive the new Vipa system Rail launchers set up and vipas ready awaiting the new rail

8 Timescales Tuesday 3 January 2017 until Sunday 18 June 2017 inclusive Phase 1 Tuesday 3 January 2017 until Sunday 12 February 2017 No trains to/from Birkenhead Central and Birkenhead North via the Loop Phase 2 Monday 13 February 2017 until Monday 29 May 2017 Mon-Fri Trains run to/from James St platform 2 Sat/Sun No trains to/from Birkenhead Central and Birkenhead North via the Loop Some exceptions on Bank Holidays and major events Phase 3 Tuesday 30 May until Sunday 18 June 2017 No trains to/from Birkenhead Central and Birkenhead North via the Loop Saturdays/Sundays in phases 1 and 2 may vary due to other work End date for phase 3 subject to final confirmation

9 Phase 2 Plan Weeks 2 to15 Week 1 Operated out of only 1 platform making operation difficult for both passengers and Merseyrail. Week 2 onwards: Monday to Friday - Trains operate into James Street (platforms 1 and 2). 15 min Chester, 30 min West Kirby & New Brighton. 10A Bus will provide the station links in Liverpool City Centre. Cyclists will not be able to use James Street platform 1 between and and will be advised to alight from North Wirral trains and board the following Chester train. Disability vehicles will be on standby to provide a service between Hamilton Square and Liverpool if there are problems with lifts.

10 Principle Messaging Phase 2 Avoid travelling in peak times where possible- this will help keep queues at James St to a minimum. Leave more time for your journey- James St will be a lot busier than usual Cyclists and those with limited mobility will still be able to travel- read the advice & information Play your part in keeping the city region moving Plenty of cross river travel options to support travel during the week & at weekends.

11

12 Timescales Tuesday 3 January 2017 until Sunday 18 June 2017 inclusive Phase 1 Tuesday 3 January 2017 until Sunday 12 February 2017 No trains to/from Birkenhead Central and Birkenhead North via the Loop Phase 2 Monday 13 February 2017 until Monday 29 May 2017 Mon-Fri Trains run to/from James St platform 2 Sat/Sun No trains to/from Birkenhead Central and Birkenhead North via the Loop Some exceptions on Bank Holidays and major events Phase 3 Tuesday 30 May until Sunday 18 June 2017 No trains to/from Birkenhead Central and Birkenhead North via the Loop Saturdays/Sundays in phases 1 and 2 may vary due to other work End date for phase 3 subject to final confirmation

13 LCR Rail Microsite & Brand (

14 Projects Update Halton Curve The scheme is on programme with the detailed design in development and the Network Change process underway. Formal start on-site Summer 2017 Delivery and introduction of service is under discussion with Welsh Government and DfT. Maghull North Planning application approved on 18 January Aim to site start August 2017 with station opening in May Newton le Willows Construction phase of rail elements of scheme has commenced and initial 100 spaces in new car park in use. Enabling works for subway are now underway.

15 Liverpool Lime Street, Huyton and Weaver-Wavertree 2017 Updates 10-Apr-17 / 15

16 Progress at Lime Street On Christmas Day and Boxing Day enabling work at Lime Street took place to install under track crossings and OLE equipment in the station. This work was undertaken during a railway holiday to ease disruption to passengers and means we don t have to do this in the 2017 closure. 10-Apr-17 / 16

17 Key project milestones 2017 Removal of the buildings between platforms 7 and 8 (GPO/Virgin buildings/cash machines) starting now and completed by summer. First works on the Weaver-Wavertree re-signalling scheme to take place on both May bank holidays (affecting some London Midland and Virgin passengers to Runcorn). Works to Huyton fourth track on wkend of the 6 th /7 th August (bus replacement from St Helens). September 30 th October 23 rd Liverpool Lime Street closure. First 9 days is a full closure to allow work to be completed on the Huyton fourth track scheme during which services via St Helens will be replaced by buses. All other routes will run through LSP as a temporary hub allowing passengers rail to rail access to the city. 10-Apr-17 / 17

18 Communications update Key principles of the transportation plan to be delivered to stakeholders from March onwards (monthly). T-24 booking window (April) messaging about LLS through TOC channels. All owned channels used to build awareness (NR/Microsite/social/owned/internal). April July continued detailed stakeholder engagement/ work with media/advocates and MPs to grow awareness and messaging live on some external channels. Early July T-12 railway timetables are live and full marketing campaign is active. 10-Apr-17 / 18

19 Merseyrail Fleet Replacement Programme

20 The Future Face of Merseyrail

21 What New Trains Will Mean Current fleet nearly 40 years old amongst the oldest in the UK Safer, faster, able to carry more passengers and future proofed to operate on an extended network Increasing demand on the network (2.5% a year) requires increased capacity Merseyrail will be the most accessible traditional rail network in the UK Trains bought and owned by Merseytravel to stay on our network Trains to help keep Merseyrail s status as one of the best performing networks in the UK Economic boost to the city region: 70m per year, 1,000 new jobs created

22 Features State-of-the-art, innovative trains built and maintained by Stadler 4x more reliable Designed to suit our network listening to what local people want Trains can carry 60% more passengers Reduced journey times by up to 10% - eg 9 mins off journey between Southport & Hunts Cross Cornerstone of the Liverpool City Region Long Term Rail Strategy potential to run on an extended network e.g. to Warrington, Skelmersdale & Wrexham Meet stringent safety recommendations following 2011 James Street fatality Significant safety improvements, most notably in how people get on and off Best value for money option long term No additional fare increases or council tax rises to pay for them Reduced operating and maintenance costs

23 Safety & Security: Getting On & Off Platform gap greatly reduced train body customised for our network, track/platform normalised Intelligent sliding step Pioneering approach for UK Unassisted access for all passengers at all doors Sensitive door edges and illuminated portal to substantially mitigate risk of trapping in doors

24 Safety & Security: Features On-Board Safe space light, bright, and airy Saloon is a single, open, connected space Driver visible through transparent cab door Visible CCTV images & direct link to driver/control room Highest standards for crashworthiness & fire prevention Improved on-board customer service

25 Staffing on the Network: DCO Current arrangements: neither driver nor guard can see the platform edge as the train departs Bidders were asked how best to meet recommendations following 2011 James Street fatality all recommended train based Driver Controlled Operation (DCO) Multiple cameras down train side providing 100% coverage with images visible in the cab until train has left platform DCO driver responsible for doors & dispatch. Traditional role of guard no longer necessary nor affordable but saloonbased customer service role created targeted at key locations and times. Safe method of train operation & dispatch, deployed on all UK metro & many suburban networks which account for approximately 60 70% of all UK passenger journeys Widely adopted overseas

26

Merseytravel s Tickets For Young People Aged Handy information to plan your journeys.

Merseytravel s Tickets For Young People Aged Handy information to plan your journeys. Merseytravel s Tickets For Young People Aged 5-18 Handy information to plan your journeys. Valid from 7th September 2015 Contents 02 Introducing Merseytravel s 4 Tickets for Young People Summary of Recent

More information

2 January Valid from. Saveaway. The one day off-peak travel tickets for buses, trains and ferries

2 January Valid from. Saveaway. The one day off-peak travel tickets for buses, trains and ferries Valid from 2 January 2015 Saveaway The one day off-peak travel tickets for buses, trains and ferries What is a Saveaway? Saveaways are one-day tickets that you can use for travel on buses, trains and some

More information

Merseytravel Season tickets and Passes Staff Handbook

Merseytravel Season tickets and Passes Staff Handbook November 2015 Merseytravel Season tickets and Passes Staff Handbook (now includes smartcards) Contents Free Travel Passes 4 Smartcards 6 Saveaway Tickets 10 PLUSBUS Tickets 13 Trio Tickets 14 Solo Tickets

More information

Merseytravel s Tickets For Young People Aged 5-18

Merseytravel s Tickets For Young People Aged 5-18 Young People April 2017 Merseytravel s Tickets For Young People Aged 5-18 Handy information to plan your journeys. Contents 02 Introducing Merseytravel s 4 Tickets for Young People If you only travel by

More information

Transport Focus 2016 Bus Passenger Survey Briefing 22 March Liverpool

Transport Focus 2016 Bus Passenger Survey Briefing 22 March Liverpool Transport Focus 2016 Bus Passenger Survey Briefing 22 March 2017 - Liverpool Presentation of BPS 2016 results David Sidebottom & Robert Pain Bus Passenger Survey 2016 - Scope 42 areas in England: a. 6

More information

LIVERPOOL AIRPORT CONSULTATIVE COMMITTEE 25 MAY 2018 (10.30 am pm)

LIVERPOOL AIRPORT CONSULTATIVE COMMITTEE 25 MAY 2018 (10.30 am pm) LIVERPOOL AIRPORT CONSULTATIVE COMMITTEE 25 MAY 2018 (10.30 am - 1.10 pm) PRESENT: Councillor Bob Swann, Chairman of Consultative Committee Councillor Caroline Ashton, Frodsham Town Council Norman Elias,

More information

Train times. northernrail.org. Liverpool to Manchester Airport and Warrington Bank Quay via Earlestown. 13 December May 2016

Train times. northernrail.org. Liverpool to Manchester Airport and Warrington Bank Quay via Earlestown. 13 December May 2016 15 Parking available Staff in attendance Bicycle store facility Metrolink Interchange stations Disabled assistance available Airport link Train times 13 December 2015 14 May 2016 Liverpool to Manchester

More information

The resignalling scheme

The resignalling scheme & Nottingham Resignalling scheme The resignalling scheme What work is being carried out? s well as redeveloping the station, Network Rail is rebuilding the rail infrastructure around the city. The 100m

More information

NEWS RELEASE. Merseyrail Celebrates Ten Successful Years with Train Naming at Rock Ferry, Wirral

NEWS RELEASE. Merseyrail Celebrates Ten Successful Years with Train Naming at Rock Ferry, Wirral 17 October 2013 Merseyrail Celebrates Ten Successful Years with Train Naming at Rock Ferry, Wirral Merseyrail is celebrating ten years since the 25-year concession was awarded in 2003 to Merseytravel,

More information

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,

More information

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council Liverpool City Region Candidate M As at 1 May 2013 Sponsoring Authority Halton Borough Council Halton Borough Council Halton Borough Council Halton Borough Council Knowsley Council Knowsley Council Liverpool

More information

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction

More information

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it WELSH GOVERNMENT RESPONSE P-05-710 Ensure Disabled People can Access Public Transport As and When They Need it The petition submitted by Whizz Kidz seeking action to ensure that disabled people can access

More information

THE MERSEYRAIL PASSENGERS CHARTER. Covering services supported by Merseytravel and operated by Merseyrail Electrics 2002 Ltd

THE MERSEYRAIL PASSENGERS CHARTER. Covering services supported by Merseytravel and operated by Merseyrail Electrics 2002 Ltd THE MERSEYRAIL PASSENGERS CHARTER Covering services supported by Merseytravel and operated by Merseyrail Electrics 2002 Ltd 1 Introduction 1.1 Scope of the Charter 1.2 Merseyrail Concession 1.3 The Merseyrail

More information

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,

More information

Quarterly Progress Report

Quarterly Progress Report Quarterly Progress Report Team: Passenger Link Quarter: 3 Agenda Item: 6.2.4 Sponsor Ashwin Kumar Author(s): Lee Paddock 1. Highlights The paper attached provides an update on passenger facing work during

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April Appendix A Transport Focus Informed Traveller monitoring initial findings, 9 March 2018 1. Is the timetable correct six weeks ahead? In the first two weeks of our monitoring at T-6 Transport Focus has

More information

TAKING THE NORTH FURTHER

TAKING THE NORTH FURTHER TAKING THE NORTH FURTHER STAKEHOLDER NEWSLETTER JULY / AUGUST 2018 Dear Stakeholder Summer is here and things are definitely hotting up in terms of our transformation. The Class 185 upgrade is very close

More information

Merseytravel Where are we going?

Merseytravel Where are we going? Merseytravel Where are we going? TravelWatch NorthWest Conference 10 October 2013 General Overview The Transport Act 1968 established Integrated Transport Authorities (Member led) and Passenger Transport

More information

Christmas Engineering Works

Christmas Engineering Works THE GREAT NORTH RAIL PROJECT COLLEAGUE UPDATE Christmas Engineering Works 2018 until 2019 Thursday 27 December Tuesday 01 January This past year has seen significant progress in Network Rail s Great North

More information

Introduction Government 6

Introduction Government 6 CONTENTS Introduction 5 1. Government 6 The McNulty Report 6 Rail Delivery Group 6 Scotland and Wales 7 Regulation 8 Passenger Transport Executives 10 Community Rail Partnerships 11 Rail Decentralisation

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

Nomad Digital Something to Twitter about Virgin Trains has passenger WiFi

Nomad Digital Something to Twitter about Virgin Trains has passenger WiFi Nomad Digital Something to Twitter about Virgin Trains has passenger WiFi Introducing Nomad Established in 2002 A pioneer of real-time wireless broadband data connectivity platforms and solutions to fast-moving

More information

Letting Rail Franchises

Letting Rail Franchises The Department for Transport LONDON: The Stationery Office 14.35 Ordered by the House of Commons to be printed on 13 October 2008 REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1047 Session 2007-2008

More information

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018 Suffolk Chamber Transport Board Greater Anglia 16 January 2018 Greater Anglia update GEML Taskforce NRPS Spring 2017 results Fleet reliability and refresh initiatives Timetable improvements New trains

More information

London Bridge station opens upgrade works

London Bridge station opens upgrade works On board wi-fi rollout Dorking station highly commended at cycle awards Govia Railway Stakeholder Newsletter Period 9-10 February 2017-182016 Our stakeholder newsletter features business updates, news

More information

Major Schemes and the wider Strategic Network

Major Schemes and the wider Strategic Network Major Schemes and the wider Strategic Network This Chapter details the County Council s priorities for taking forward Major Scheme projects between 2006 and 2011. It also reviews longer-term major scheme

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

First Thameslink trains arrive on Great Northern

First Thameslink trains arrive on Great Northern Major Christmas engineering works Southern passengers in line for better loos and new waiting room at Eastbourne station Govia Thameslink Railway Stakeholder Newsletter Period February 7 2017-182016 Our

More information

Timetable Changes for Merseyrail Passengers

Timetable Changes for Merseyrail Passengers Timetable Changes for Merseyrail Passengers 30 September 22 October 2017 As part of Network Rail s upgrade plan, Liverpool Lime Street station is undergoing major engineering work in order to deliver substantial

More information

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee Agenda Item 9 Policy and Scrutiny Open Report on behalf of Executive Director for Environment & Economy Report to: Date: 13 June 2016 Subject: Summary: Highways and Transport Scrutiny Committee Rail Update

More information

Industry briefing NOVEMBER 2017

Industry briefing NOVEMBER 2017 Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

Bus times. Wallasey Village - Birkenhead. Changes from 7 April 2008 Some mid-journey times are changed. Buses in this timetable are run by: Southport

Bus times. Wallasey Village - Birkenhead. Changes from 7 April 2008 Some mid-journey times are changed. Buses in this timetable are run by: Southport Bus times 09 Village - Birkenhead Southport Buses in this timetable are run by: Formby Crosby Maghull West Kirby Heswall Birkenhead Bromborough Bootle Liverpool Garston West Derby Kirkby Huyton Halewood

More information

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES THE MAYOR'S VISION FOR TRANSPORT A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES VISION We will build a transport system that works for everyone, connecting people to the places they want to go within the

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Elizabeth line Services

Elizabeth line Services Elizabeth line Services Steve Murphy Managing Director MTR Crossrail 17 th April 2018 London TravelWatch Timescales Stage 0-1: Shenfield / Liverpool Street Stage 0 (May 2015) marked the commencement of

More information

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act.

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act. Director: Dave Pearson, Director of Transport Services Report to: Bradford District Consultation Sub-Committee Date: 22 January 2018 Subject: Information Report 1 Purpose 1.1 Matters of information relating

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

FirstGroup plc South Western

FirstGroup plc South Western FirstGroup plc South Western Rail franchise award Monday 27 March 2017 Overview Delighted to be selected by the Department for Transport (DfT) to operate the South Western franchise for at least seven

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

STAGECOACH-VIRGIN COMPANY AWARDED INTERCITY EAST COAST RAIL FRANCHISE

STAGECOACH-VIRGIN COMPANY AWARDED INTERCITY EAST COAST RAIL FRANCHISE 27 November 2014 STAGECOACH-VIRGIN COMPANY AWARDED INTERCITY EAST COAST RAIL FRANCHISE 140m planned investment to deliver an improved service and more personalised travel Over 25m planned spend in improving

More information

National Rail Passenger Survey Autumn 2013 Main Report

National Rail Passenger Survey Autumn 2013 Main Report National Rail Passenger Survey Autumn 2013 Main Report What is Passenger Focus? Passenger Focus is the independent consumer watchdog for Britain s rail passengers and England s bus, coach and tram passengers

More information

Don t stress over. 20 July 25 August. Pick up this leaflet for all the information you need to travel during the re-signalling works

Don t stress over. 20 July 25 August. Pick up this leaflet for all the information you need to travel during the re-signalling works Don t stress over DISRUPTIONS AT NOTTINGHAM STATION 20 July 25 August Pick up this leaflet for all the information you need to travel during the re-signalling works We re helping you stay on the move TRAVEL

More information

Part B: General Meeting of Rail North Limited

Part B: General Meeting of Rail North Limited Part B: General Meeting of Rail North Limited Meeting date: Thursday 16 March 2017 Item: 7.0 Subject: Author(s): Rail Franchise Update Gary Bogan, Rail North Partnership Director 1. Purpose of report 1.1.

More information

Investing in Greater Manchester transport 2017/2018

Investing in Greater Manchester transport 2017/2018 TRAFFIC Investing in Greater Manchester transport 2017/2018 INFORMATION www.greatermanchester-ca.gov.uk Transport is an important part of life for residents and businesses in Greater Manchester. It connects

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

North West smart motorways 100 miles of extra lanes

North West smart motorways 100 miles of extra lanes North West smart motorways 100 miles of extra lanes September 2018 North West smart motorways 100 miles of extra lanes At Highways England we believe in a connected country and our network makes these

More information

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014 West of England Joint Transport Executive Committee 13 th March 2014 Agenda Item 5 Views of Joint Scrutiny Committee Purpose 1. To inform members of the views of the West of England Joint Scrutiny Committee

More information

What is Transport Focus? The Insight Plan. Insight Plan

What is Transport Focus? The Insight Plan. Insight Plan Insight Plan 2018-19 March 2018 Insight Plan 2018-19 What is Transport Focus? We are the independent, statutory, consumer watchdog for Britain s rail passengers, bus, coach and tram passengers in England

More information

Crossrail transforming travel across London - Infrarail

Crossrail transforming travel across London - Infrarail Crossrail transforming travel across London - Infrarail Jeremy Long, MTR Corporation, CEO European Business 2 May 2018 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail the 15bn

More information

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning

More information

CONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9

CONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9 CONTENTS Introduction 5 1. Government 6 Scotland and Wales 6 Regulation 7 Passenger Transport Executives 7 2. Main Line Railway Infrastructure 9 Network Rail 9 Organisation 9 Route Utilisation Strategies

More information

FirstGroup plc TransPennine Express

FirstGroup plc TransPennine Express FirstGroup plc TransPennine Express Rail franchise award Wednesday 9 December 2015 TransPennine Express awarded to FirstGroup FirstGroup is delighted to be selected by the Department for Transport (DfT)

More information

1.1 We note that the following WCML access applications have been made:

1.1 We note that the following WCML access applications have been made: David Wearing Track Access Executive Directorate of Railway Markets and Economics Office of Rail Regulation One Kemble Street London WC2B 4AN 5th Floor, Wellington House 39/41 Piccadilly, Manchester, M1

More information

Monitoring and data acquisition for the safety related traffic information services

Monitoring and data acquisition for the safety related traffic information services Monitoring and data acquisition for the safety related traffic information services Best Practices on Monitoring Deployment Workshop 12 th September 2013 - Helsinki Contents 1. Transport Scotland and Traffic

More information

Transport Delivery Committee

Transport Delivery Committee Agenda Item No. 11 Transport Delivery Committee Date 6 th March 2016 Report title Accountable Director Accountable Employee Virgin Trains Partnership Agreement Update Pete Bond, Director of Transport Services

More information

TRANSFORMING TRANSPENNINE

TRANSFORMING TRANSPENNINE TRANSFORMING TRANSPENNINE MAY 2018 TIMETABLE We are now at a key milestone for our franchise, with the timetable change that comes into effect on Sunday 20 May 2018 the biggest and most important since

More information

Northern Rail Limited. Passengers Charter. Final Version

Northern Rail Limited. Passengers Charter. Final Version Northern Rail Limited Passengers Charter Final Version November 2004 Contents 1 PASSENGERS CHARTER...2 1.1 INTRODUCTION...2 1.2 THE INFORMED CUSTOMER...3 1.3 BUYING A TICKET...4 1.4 CUSTOMERS WITH DISABILITIES

More information

Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway

Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway Welcome Introductions: Anthony Murden Project Sponsor Adam Price Project Manager Martin Shier - Bus Partnerships Delivery Manager

More information

An Introduction to HS2

An Introduction to HS2 July 16 1 Overview HS2 is a vital part of the Government s long term economic plan, strongly supported by midland, northern English and Scottish cities. HS2 will not be a separate, standalone railway.

More information

St Helens - Rainford circulars

St Helens - Rainford circulars circulars serving: Southport Formby Eccleston West Kirby Heswall Wallasey Birkenhead Bromborough Crosby Bootle Liverpool Garston West Derby Maghull Kirkby Huyton Halewood Prescot Newton le Willows Crank

More information

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY Revitalising Passenger Transport Increasing traffic congestion in our cities and a lack of transport services in our regional towns is frustrating

More information

Reducing traffic: a new plan for public transport

Reducing traffic: a new plan for public transport Reducing traffic: a new plan for public transport Our five point plan to improve Heathrow s public transport in 2015/16 1 2 3 4 5 Make public transport more attractive for passengers Ensure major rail

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

4 Transport projects underway in Western Sydney

4 Transport projects underway in Western Sydney 4 Transport projects underway in Western Sydney About this chapter This chapter provides an overview of the Australian and NSW government s significant investments in road, bus and rail infrastructure

More information

1. Shrewsbury Aberystwyth Rail Liaison Committee held on Friday, 12 th February 2016.

1. Shrewsbury Aberystwyth Rail Liaison Committee held on Friday, 12 th February 2016. Paper to: The Montgomeryshire Committee on Wednesday, 13 th April 2016. Author: County Councillor J. Michael Williams, Powys County Council s Montgomeryshire Rail Representative. Subject: The Shrewsbury

More information

TRANSPORT UPDATE. September/October 2018

TRANSPORT UPDATE. September/October 2018 TRANSPORT UPDATE September/October 2018 TRANSPORT UPDATE Below is a list of the main local, regional and national transport projects that the Chamber is involved with, either directly or indirectly. Mention

More information

West Coast Main Line Track Access Applications Consultation:

West Coast Main Line Track Access Applications Consultation: David Wearing, Track Access Executive, Directorate of Railway Markets and Economics, Office of Rail Regulation, One Kemble Street, London WC2B 4AN 17 December 2010 Dear Mr. Wearing, West Coast Main Line

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Wessex Route and South Western Railway Transport Focus Meeting. Tuesday 9 January 2018

Wessex Route and South Western Railway Transport Focus Meeting. Tuesday 9 January 2018 Wessex Route and South Western Railway Transport Focus Meeting Tuesday 9 January 2018 / Agenda 1. Performance 2. T-12: provision of information 3. Compensation process, awareness, resourcing 4. Industrial

More information

Improving Public Transport. in Blackpool

Improving Public Transport. in Blackpool Improving Public Transport in Blackpool 2001-2007 Staffing Levels Total number of employees 784 Operations Division PCV Drivers 457 Tram Drivers 26 Trn Drivers 6 City Sightseeing 3 Snl Conductors 84 588

More information

London and Crossrail 2. Chris Moores Transport for London

London and Crossrail 2. Chris Moores Transport for London London and Crossrail 2 Chris Moores Transport for London 1 Contents 2 1 The region needs Crossrail 2 2 Crossrail 2 can be more than just a railway 3 Planning and Delivering Crossrail 2 Issues facing London

More information

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Crossrail transforming travel across the capital - Railtex conference Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail

More information

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS 2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.

More information

Performance monitoring report for first half of 2016

Performance monitoring report for first half of 2016 Performance monitoring report for first half of 2016 Gatwick Airport Limited 1. Introduction Date of issue: 5 December 2016 This report provides an update on performance at Gatwick in the first half of

More information

UNLOCKING THE BRIGHTON MAINLINE

UNLOCKING THE BRIGHTON MAINLINE UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to

More information

National Transport Plan our response. Diane McCrea Board Member for Wales

National Transport Plan our response. Diane McCrea Board Member for Wales National Transport Plan our response Diane McCrea Board Member for Wales National Transport Plan response our evidence National Rail Passenger Survey (NRPS) Over 30,000 passengers surveyed twice a year

More information

30 September Dear Mr Higgins. Ref: L/LR

30 September Dear Mr Higgins. Ref: L/LR Mr M Higgins Chairman Channel Islands Competition and Regulatory Authorities Jersey Competition Regulatory Authority 2 nd Floor, Salisbury House 1-9 Union Street St Helier Jersey JE2 3RF 30 September 2016

More information

To provide the best possible service during the Thameslink construction work at London Bridge;

To provide the best possible service during the Thameslink construction work at London Bridge; Dear stakeholder Re: Southeastern December 2014 timetable The 6 billion government-funded Thameslink Programme has entered the final construction phase. This involves a complete rebuild of London Bridge

More information

PRENTON PARK BOUND. Here s all you need to know

PRENTON PARK BOUND. Here s all you need to know PRENTON PARK BOUND Here s all you need to know WELCOME TO TRANMERE ROVERS Tranmere Rovers is a fan-friendly and local community football club, who welcomes all fellow supporters and visitors. Initially,

More information

Workplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant

Workplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant Workplace Parking Levies: the contribution of commuters to funding public transport Sue Flack Consultant Summary 1. 2. 3. 4. 5. Example of Nottingham, UK Use of Workplace Parking Levy Revenue Why Workplace

More information

Abbey Chesterton bridge Questions & Answers

Abbey Chesterton bridge Questions & Answers Abbey Chesterton bridge Questions & Answers Please click on links below to go to individual subjects: Bridge location and access routes Timescales Bridge details and accessibility Construction compound

More information

ASLEF s Response to the East Anglia Rail Franchise Consultation

ASLEF s Response to the East Anglia Rail Franchise Consultation ASLEF s Response to the East Anglia Rail Franchise Consultation 1. The Associated Society of Locomotive Engineers and Firemen (ASLEF) is the UK s largest train driver s union representing approximately

More information

Newsletter Winter 2016/7 *********************

Newsletter Winter 2016/7 ********************* Newsletter Winter 2016/7 ********************* FROM THE CHAIR Having sat on the committee for the last 5 years I was elected to chair NCRUG at the October AGM. My first duty as chair was to thank the outgoing

More information

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018 Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018 Nine weeks into our transformation As we approach the halfway point of our extended closure

More information

Liverpool Lime Street station engineering work. Experience during October 2017 improvement work November 2017

Liverpool Lime Street station engineering work. Experience during October 2017 improvement work November 2017 Liverpool Lime Street station engineering work Experience during October 2017 improvement work November 2017 Overview during the engineering work Between 30 September and 22 October engineering work at

More information

National Rail Passenger Survey Main Report Spring 2018

National Rail Passenger Survey Main Report Spring 2018 National Rail Passenger Survey Main Report Spring 2018 Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

EAST SUFFOLK LINES. Stations Investment Plan. Produced by the East Suffolk Lines Community Rail Partnership

EAST SUFFOLK LINES. Stations Investment Plan. Produced by the East Suffolk Lines Community Rail Partnership EAST SUFFOLK LINES Stations Investment Plan Produced by the East Suffolk Lines Community Rail Partnership Updated February 2016 1. Introduction 1.1 This document (originally produced in 2010, updated in

More information

Our new Great Western Franchise. Tarka Rail Association AGM June 2015

Our new Great Western Franchise. Tarka Rail Association AGM June 2015 Our new Great Western Franchise Tarka Rail Association AGM June 2015 To cover New Franchise - recap Implications for the line Taking forward the strategy 3 Second Great Western Direct Award Overview Brand

More information

The Evergreen 3 Project

The Evergreen 3 Project The Evergreen 3 Project Railway Civil Engineers Association 26 th January 2012 Allan Dare Strategic Development Manager Chiltern Railways Chiltern Railways Birmingham Solihull Warwick Parkway Virgin West

More information

Northern Beaches Transport Action Plan

Northern Beaches Transport Action Plan Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million

More information

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015) Policy committee 23.02.16 Item: 11 Ref: PC086 National Rail Performance Report - Quarter 3 2015-16 (Oct-Dec 2015) February 2016 London TravelWatch is the official body set up by Parliament to provide a

More information

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE City of Toronto Local Issues & Initiatives Bryan Bowen City Planning Waterfront Secretariat June 25, 2018 PRESENTATION OUTLINE BACKGROUND: ISSUES

More information

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT 2010-2011 Ian Rivett Chairman Reg Whittome Vice Chairman Chairman s Message: This is the ninth Annual Report of the Chiltern Railways Passenger Board and

More information

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London Come on board An introduction to accessible transport in London MAYOR OF LONDON Transport for London Contents 4 Plan your journey 6 Help from staff 8 Learning to use public transport 9 Fares and tickets

More information

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options. Welcome Welcome to the Highways England A27 Arundel Bypass public consultation. Thank you for coming. Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear

More information