Concord Road Interchange. Standard hours of work
|
|
- Annabelle Gibson
- 5 years ago
- Views:
Transcription
1 Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass of Parramatta Road and connection to the City West Link. WestConnex is part of Tomorrow s Sydney. The Concord Road Interchange will be a key entry and exit point for the M4 East tunnels, connecting road users to Homebush and Haberfield. The tunnels would bypass Parramatta Road, easing traffic congestion on local streets and enabling urban renewal of precincts along the Parramatta Road corridor. Concord Road Interchange Eastbound entry and westbound exit to M4 East tunnels at Concord would connect to Concord Road, Parramatta Road and the City West Link at Haberfield, and the existing M4 Motorway at Homebush. On-ramp bridge to the existing M4 Motorway (westbound) from Concord Road (southbound). Pedestrian bridge to provide pedestrian access from the eastern side of Concord Road over the new on and off ramps. Concord Road bridge widened for an eastbound on-ramp to the M4 East tunnel from Concord Road (northbound). Traffic lanes on the existing M4 Motorway adjusted east of Sydney Street to the intersection of Parramatta Road to accommodate on and off ramps below Concord Road bridge. Remove existing on-ramp from Concord Road (northbound) to the existing M4 Motorway (westbound). Would be replaced by new M4 westbound on-ramp from Parramatta Road west of George Street. Remove left turn to existing M4 Motorway for Parramatta Road eastbound traffic. Queen Street cycleway on-ramp. Standard hours of work Surface works Monday to Friday, 7am to 6pm. Saturday, 8am to 1pm. Generally, no work on Sunday or public holidays. Some surface work would be carried out at night in accordance with conditions of approval and Environment Protection Licence conditions. Tunnelling work 24 hours a day, seven days a week. No change to traffic movements at Concord Road/Sydney Street M4 off-ramp.
2 Construction sites and programs A number of construction sites would be established to build the Concord Road Interchange. These consist of civil sites for work that would take place on the surface, such as road works and tunnel support facilities; and tunnel sites to construct the M4 East tunnels. Once work is completed residual land would be rehabilitated and its future use would be determined in consultation with relevant authorities. Concord Road west civil site between Concord Road, Sydney Street and the M4 Motorway, and Concord Road, Sydney Street and Carrington Lane. Concord Road south civil site eastern side of Concord Road immediately adjacent to the M4 Motorway and between Alexandra Street and Ada Street extending under Concord Road to connect with the west civil site. Concord Road tunnel site eastern side of Concord Road, between Sydney Street and Alexandra Street. This would be the main tunnel construction site for the western end of the M4 East project. Figure 1: Concord Road Interchange construction sites - Indicative only
3 Table 1: Concord Road Interchange indicative construction program Construction movements Where possible heavy vehicles would not use local roads. The signalised intersection at Sydney Street and Concord Road would be modified to provide access and traffic control to the Concord Road tunnel site on the eastern side of Concord Road. Light vehicles (including light delivery vehicles) would enter the site at Alexandra Street and Ada Street and exit via the Sydney Street and Concord Road signalised intersection. Access to and from the west civil site would be via Sydney Street. The Concord Road south site would be connected to this site by excavating under the northern span of the existing Concord Road bridge over the M4 Motorway. The table below is indicative of the number and type of construction vehicle movements in and out of the proposed Concord Road construction sites. Table 2: Indicative construction vehicle movements at the Concord Road civil and tunnel site
4 Changes to local road access During the construction of the M4 East there would be changes to local roads in Concord. Table 3: Proposed temporary road changes Table 4: Proposed permanent road changes
5 Minimising impacts on the community WestConnex is working to minimise the impact of construction on the community, with most of the work proposed to occur underground. However, some work needs to occur on the surface to construct the entry and exits to the tunnel and tunnel support facilities. WestConnex would work directly with affected residents to minimise any impact. The M4 East Environmental Impact Statement outlines in detail the measures to mitigate any potential construction or operational impacts. Minimising noise WestConnex would monitor noise during the construction of the M4 East where required, and directly work with affected residents to mitigate noise. The EIS recommends noise barriers to the east of the Concord Road Interchange, which would be further investigated during detailed design and in consultation with the community. To reduce the potential for an increase in noise adjacent to the Concord Road Interchange WestConnex would, where required: Provide noise barriers and an acoustic shed to house tunnelling activity. Undertake noisy work during core work hours, where possible. Ensure all equipment is shut down when not in use and nontonal reversing beepers are used. Ensure there are periods where construction work is not scheduled to give residents respite from the works. If actual noise levels were above predicted levels WestConnex would consider additional noise mitigation measures. Protecting property Pre-condition building surveys would be carried out on properties and structures within 50 metres from the outer edge of the tunnels and within 50 metres of all surface work. Future land use WestConnex would work to improve the visual amenity around the Concord Road Interchange area following the completion of the M4 East by providing a landscape buffer to physically separate properties from the widened Concord Road and new infrastructure. The creation of two large island areas of trees and grass would form part of the new interchange landscape, which would be further developed through detailed design and in consultation with the community. Local heritage During construction heritage items and heritage materials would be preserved where possible. Heritage items directly impacted by the project would be photographed. The finding of any archaeological items during construction would be subject to stop work and evaluation procedures. Partial acquisition along the Concord Road frontage of the Sydney Cheil Uniting (formerly Wesley) Church would be required. Appropriate landscaping, noise treatments, and opportunities to increase access to green space and parking are being explored. Some heritage items within the Powells Creek Heritage Conservation Area would be impacted by the project. The interchange would also require the removal of approximately 16 to 18 street trees at the Concord Road ends of Sydney and Edward streets, which are listed as heritage items on Canada Bay LEP Landscaping plans would be developed in consultation with the community. Keeping you informed We are committed to keeping you informed and will provide regular information on the M4 East through direct mail and notifications, community updates, advertising and other consultations. You can also contact the WestConnex info line on , info@westconnex.com.au or visit westconnex.com.au for more information. Tomorrow s Sydney In the next ten years, another million people will call Sydney home. The Australian and NSW governments are building the infrastructure to support Tomorrow s Sydney, which will deliver an integrated transport solution including public transport and critical road infrastructure. WestConnex is one of the flagship projects in delivering Tomorrow s Sydney. WestConnex will widen and extend the M4 and M5 and join them together to form a continuous, free-flowing motorway with connections to the city, airport and port. WestConnex will provide relief to the hundreds of thousands of road users struggling in traffic every day and help return local streets to local residents.
M4 M5 Link Tunnels Community guide to the M4-M5 Link Modification Report September 2018
M4 M5 Link Tunnels Community guide to the M4-M5 Link Modification Report September 2018 Artist impression of the M4-M5 Link tunnel Sydney s population is set to grow by more than one million people in
More information5.7 Local road upgrades
5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationM4 East. Volume 2E. Environmental Impact Statement. Appendices M-O
M4 East Environmental Impact Statement Appendices M-O Volume 2E September 2015 Volume 2E Appendices M... Social impact assessment N... Economic impact assessment O... Soil and water quality assessment
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationDay and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April
New M5 Work notification 4 April 2018 Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April A significant amount
More informationHow is air quality managed. in Sydney s road tunnels?
How is air quality managed in Sydney s road tunnels? The Sydney Orbital Network includes over 160 kilometres of surface roads, tunnels, bridges and underpasses. There are five main tunnels along the network;
More informationNeighbourdhood Committee NDG-Westmount. October 16, 2017
Neighbourdhood Committee NDG-Westmount October 16, 2017 2 Presentation Outline Requests from Committee members Feedback on questions Green strip consultations Work update and obstacles Work progress Phase
More informationwaterview connection Completing the Western Ring Route the Waterview Connection
waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting
More informationCUMULATIVE IMPACTS CHAPTER TWENTY-SIX
CUMULATIVE IMPACTS CHAPTER TWENTY-SIX 26 Cumulative impacts This chapter provides an assessment of the potential cumulative impacts as a result of the project, and identifies mitigation measures to minimise
More informationA63 Castle Street, Hull HullBID Network Lunch 24 August 2017
A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme
More informationDay and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree
More information4 Transport projects underway in Western Sydney
4 Transport projects underway in Western Sydney About this chapter This chapter provides an overview of the Australian and NSW government s significant investments in road, bus and rail infrastructure
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests
More informationPlanning Approval Consistency Assessment Form
Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Applicable to: Document Owner: System Owner: Status: Sydney Metro
More informationM2 Junction 5. improvements scheme. Preferred route announcement
M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these
More informationTechnical Paper 1 Traffic report
Technical Paper 1 Traffic report 1 Contents List of Tables... 3 List of Figures... 4 Preface... 6 Terminology... 7 1 Executive summary... 8 1.1 1.2 1.3 1.4 1.5 1.6 Background to this report... 8 Traffic
More informationM621. Junctions 1 to 7 Improvement scheme. Share your views
M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,
More informationKilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown
0 5 10 15 20 Kilometres Penrith Blacktown Parramatta Liverpool Bankstown Campbelltown accessibility outcomes Legend Outcomes targeted in Western Sydney are: public transport that is accessible throughout
More informationSTAKEHOLDER AND COMMUNITY ENGAGEMENT
STAKEHOLDER AND COMMUNITY ENGAGEMENT CHAPTER FIVE 5 Stakeholder and community engagement This chapter provides an outline of the consultation carried out on the project, and how this has influenced the
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationFor personal use only
11 October 2018 September Quarter Update 2018 Transurban today released its September quarter 2018 update. During the period, Average Daily Traffic (ADT) increased by 3.3%, with growth across all markets.
More information2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017
2017 Work and Launch of the Next Phase Information meeting, Montréal-Ouest September 14, 2017 2 Presentation Outline Work progress Launch of the next phase Mitigation measures Dismantling Communications
More informationNewcastle Transport Program Newcastle Light Rail Determination Report
Newcastle Transport Program Newcastle Light Rail Determination Report Date Author 25 July 2016 TfNSW Ref 5276649 Status Final TfNSW 2014 UNCONTROLLED WHEN PRINTED Page 1 of 19 Table of contents 1 Introduction
More informationFrequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More informationMajor Scheme Business Case Summary Report for Programme Entry
Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationNorthern Beaches Transport Action Plan
Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationSection 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps
Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and
More informationNSW Budget Highlights
NSW Budget 2018-19 Highlights Wednesday 20 June 2018 The industry association representing the business interests of consulting firms operating in the built and natural environment Yesterday, NSW Treasurer
More informationWellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY
National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationGold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging
Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section
More informationEast Link Project Update. Maintenance of Traffic During Construction. April 21, 2015
East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities
More informationROUTE 630 DIVERGING DIAMOND INTERCHANGE
ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,
More informationdraft planning controls
Introduction The South precinct is bounded by Danks, Bourke, McEvoy and Morehead streets. Current land uses include Sydney Water s heritage listed Waterloo Pumping Station and Valve ouse, warehouses, commercial
More informationThe State of Transport in Macquarie Park
The State of Transport in Macquarie Park 31st August 2015 Overview Macquarie Park is a major economic centre that contributes over $9billion to Australia s economy each year. Providing access to and from
More informationRE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.
Iain Macleod Project Manager Victoria Road upgrade Roads and Traffic Authority PO Box 743 Drummoyne NSW 1470 e : Victoria_Road_Info@rta.nsw.gov.au 21 February 2008 RE: Victoria Road upgrade (RTA December
More informationFEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A
VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp
More informationSEARs strategic context and project need
3 Strategic context and project need This chapter describes the strategic context of the project within the State and national planning policy framework, and explains the need for the project, across national,
More informationA31 Ringwood improvement scheme
A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationSocial infrastructure
MARION STREET BROWN STREET RAMSAY STREET 106 WATTLE STREET 93 25 4 51 26 27 FREDERICK STREET 38 91 28 23 7 Legend 10 PARRAMATTA ROAD 94 9 107 5 29 73 30 11 32 39 64 31 12 LIVERPOOL ROAD ELIZABETH STREET
More informationChapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London
Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin
More information7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW. Sydney Airport Master Plan
7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW Sydney Airport Master Plan 2033 87 7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW Key points On Airport Drive, non-airport through-traffic accounts for up
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More informationTERMINAL DEVELOPMENT PLAN
5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationMonthly Traffic Update
Brisbane Airport Corporation Monthly Traffic Update PAGE 1 ISSUE 26 DECEMBER 2009 Northern Access Road Project opens 3 December Brisbane Airport Corporation (BAC) is pleased to announce that after two
More informationWork in 2015 and Annual Mobility- Management Plan
Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector
More informationWestConnex. 6 - The Roadbuilder. Specialist hydrology & meteorology expertise & services Field sampling Training Environmental monitoring
WestConnex As peak production edges closer on Australia s largest transport infrastructure project, there is now a 3,600-strong workforce helping to deliver WestConnex. Local businesses and suppliers are
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationIndustry briefing NOVEMBER 2017
Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start
More informationCHATSWOOD TO SYDENHAM CENTRAL WALK MODIFICATION SUBMISSIONS REPORT
CHATSWOOD TO SYDENHAM CENTRAL WALK MODIFICATION SUBMISSIONS REPORT EXECUTIVE SUMMARY Executive summary Sydney Metro City & Southwest has been developed within the framework of the transport and planning
More informationThe Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway
1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway August
More informationPROJECT UPDATE BETTER TIMES AHEAD ON CLEM7 CLEM JONES TUNNEL. Fast facts AUGUST 2008
CLEM JONES TUNNEL PROJECT UPDATE AUGUST 2008 Two kilometres of tunnel has been excavated at Kangaroo Point and tunnel lining work is now under way. BETTER TIMES AHEAD ON CLEM7 Fast facts Road length 6.8
More informationSydney Motorway Corporation
Annual Review 2016 Contents About us 3 Year in review 4 Message from the Chairman 6 Message from the Chief Executive Officer 8 Our people 10 Community, environment and sustainability 12 Our projects 15
More informationWhy the. Building for growth. West Metro. is vital
Information summary West Building for growth World class public transport solutions for high demand challenges can transform the way a global city like Sydney lives, works and breathes. Sydney s busiest
More informationhttps://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf
GSC Sydney East Rev Draft -references Port Botany - 30 https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf Pages 6. The District s freight routes, particularly
More informationSOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER
SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER Proposal to Eliminate Traffic Gridlock in South North York Centre Area With Southbound Yonge Street to Eastbound Highway 401 Fly-UNDER A much
More informationPCAL Case Study Retail Areas: Rouse Hill Town Centre
PCAL Case Study Retail Areas: Rouse Hill Town Centre Introduction Rouse Hill Town Centre is a new mixed use development on a greenfield site in Sydney s North West. It has been planned to be a major hub
More informationInfrastructure Priority List. Infrastructure Priority List Printed as at 28 April
Infrastructure Priority List Infrastructure Priority List Printed as at 28 April 2018 1 High Priority Projects High Priority Projects are potential infrastructure solutions for which a full business case
More informationNSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS
2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.
More informationFREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018
FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening
More informationThe Coalition s Policy
The Coalition s Policy Key Commitments The Coalition s plan for a strong new economy will provide jobs and growth and secure the future for Australian families through smart investment in infrastructure.
More informationNeighbourhood Committee NDG - Westmount. September 12, 2016
Neighbourhood Committee NDG - Westmount September 12, 2016 2 Presentation Outline Requests from the committee members Feedback on previous questions Work update and hindrance of the Turcot Project Ministry
More informationPedestrian Safety Review Spadina Avenue
STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District
More informationFor personal use only
asx release 21 October 2015 Presentation to Morgans Queensland Conference Please find attached the presentation that Transurban CEO Scott Charlton will be delivering at today s Morgans Queensland Conference.
More informationFigure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.
Newtown Glebe Macdonaldtown Pyrmont Ultimo Sydney International Convention, Exhibition & Entertainment Precinct Sydney Education & Health Erskineville Figure 3: Global Sydney Waterloo Second Harbour Crossing
More information3 The growth of Western Sydney
3 The growth of Western Sydney About this chapter This chapter provides an overview of Western Sydney s growing population and economy, and the benefit of the proposed Western Sydney Airport. Population
More informationNDG-Westmount Neighbourhood Committee. November 16, 2015
NDG-Westmount Neighbourhood Committee November 16, 2015 2 Feedback on previous questions Order-in-Council 890-2010 - condition 8 The ministère des Transports must : Establish a buffer zone at the foot
More informationPART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT
PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support
More informationAUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION
AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected
More informationParking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,
More informationConstruction Staging Adelaide Street West
REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationChapter 4 Route Window NE3 Manor Park station. Transport for London
Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%
More informationSydney Metro West A new railway for Western Sydney
Sydney Metro West A new railway for Western Sydney PROJECT OVERVIEW, SEPTEMBER 2017 SYDNEY METRO WEST A NEW RAILWAY FOR WESTERN SYDNEY 1 CONTENTS Project snapshot 4 The need for new rail 5 Sydney Metro
More informationYonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services
PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More informationSIT BACK AND WATCH THE WORLD GO BY. FROM A CORNER THAT S ALL YOUR OWN.
SIT BACK AND WATCH THE WORLD GO BY. FROM A CORNER THAT S ALL YOUR OWN. Welcome to Luminous Garden A new kind of residence in Edmondson Park The only address to call home Blue Mountains National Park Prospect
More informationTALLAWONG STATION PRECINCT SOUTH CONCEPT PROPOSAL STATE SIGNIFICANT DEVELOPMENT APPLICATION
TALLAWONG STATION PRECINCT SOUTH CONCEPT PROPOSAL STATE SIGNIFICANT DEVELOPMENT APPLICATION ENVIRONMENTAL IMPACT STATEMENT OVERVIEW Through great partnerships, great things can happen. That s why we re
More informationEXPLANATORY STATEMENT
THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationAppendix 4.1 L. No-Build Project Descriptions
Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant
More informationConstruction Staging Area Blue Jays Way (357 King Street West)
REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All
More information2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First
2017 POLICY DOCUMENT Putting 2 Contents Message from the Premier 3 Our Commitment 4 The Newman-Nicholls Legacy 5 The Palaszczuk 6 Government s Record Our Plans: Putting 8 Call: 07 3844 8101 Mail: PO Box
More informationNDG/Westmount Neighbourhood Committee. May 16, 2016
NDG/Westmount Neighbourhood Committee May 16, 2016 2 Presentation Outline Feedback on previous questions What s new on the Turcot website Public consultations online Reconstruction of Saint-Jacques overpass
More informationDublin Airport Update Presented by Pat Molloy
Dublin Airport Update Presented by Pat Molloy daa Actions from Previous Meetings Action Item Summary 1. PM to confirm the type of fencing that will be erected around the Toberburr road site 2. daa and
More informationPSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information
PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate
More informationEngagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.
Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018 Engagement Summary Report April 2018 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada Highway 1
More informationFEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION
FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The
More informationThe Coalition s Policy to Build Melbourne s East West Link
1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build Melbourne s East West Link August 2013 Our Plan
More informationFinchley and Golders Green Area Committee 27 April 2017
Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning
More informationUnion Station Queens Quay Transit Link Study
Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationRoad Construction Ahead January-April 2015 NORTHWEST REGION
NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,
More information