1 Edinburgh Waverley capacity upgrade As part of our rail upgrade plan, and in order to facilitate the introduction of longer trains and to prepare for projected future growth in demand for both track and capacity, a series of infrastructure works will be required within and around Edinburgh Waverley.

2 We need to extend platforms at Edinburgh Waverley to accommodate longer trains being introduced on both the Edinburgh to Glasgow via Falkirk (E&G) route and the East Coast Main Line (ECML). There are two programmes underway to enable the introduction of these longer trains, the Edinburgh Glasgow Improvement Programme (EGIP) and the Intercity Express Programme (IEP). EGIP is a comprehensive package of improvements to Scotland s railway infrastructure. A Scottish Government priority, EGIP is being delivered by Network Rail and includes modernisation and upgrades to key junctions and infrastructure as well as widespread electrification of the Scottish rail network. IEP is a Department for Transport led initiative to procure new trains to replace the existing rolling stock on the East Coast Mainline and Great Western Mainline. The EGIP team will deliver both EGIP and IEP s requirements for Waverley.

3 Timeline December 2018 Commissioning of platform 10/11 crossover April 2017 Preparatory works commence ahead of excavation for May 2017 Excavation for extension begins July 2018 Completion of platforms 5/6 May/ June 2017 Excavation for platforms 5/6 begins December 2017 Completion of

4 F G H I J K L M N O P Rev Date By Chkd Appd Scotstoun House, South Queensferry West Lothian, EH30 9SE T +44(0) F +44(0) Client Carillion Project Title Edinburgh Waverley Platform Extensions Drawing Title Proposed Escalator Relocation Visualisations Scale at A1 Role Suitability Arup Job No Not to Scale Civil/Structures Draft Name ARP VS-CS-0001 Rev - Arup O P Do not scale Rev Date By Chkd Appd Scotstoun House, South Queensferry West Lothian, EH30 9SE T +44(0) F +44(0) Client Princes Street View 1 - Outside WH Smiths looking South East Extension of platforms 5 and 6 View 1 - Outside WH Smiths lo Waverley Bridge View 3 - South Ramp Looking East View 4 - Platform 10 Looking N Created using CADplot 01 Carillion Waverley Bridge 02 Calton Road View 1 - Outside WH Smiths looking towards Platform 10 Extension of \\global\europe\edinburgh\jobs\250000\251000\ \04 DELIVERABLES\4-03 Drawings\ Bridge\ARP VS-CS-0001.dwg 11 Nov :11: View 4 - Platform 10 Looking North East Market Street A1 A B C D E F G H I J K L M N \\global\europe\edinburgh\jobs\250000\251000\ \04 DELIVERABLES\4-03 Drawings\ Bridge\ARP VS-CS-0001.dwg 11 Nov :11: View 1 - Outside WH Smiths looking South East View 1 - Outside WH Smiths looking towards Platform 10 Escalators repositioned from the south west corner of the concourse

5 What s happening? A number of existing platforms will be extended (platforms 5, 6 and 12) creating new long length platforms A crossover a piece of track which enables trains to move from one track to another will be created to improve flexibility to platforms 10/11 The extension of will require the repositioning of the escalators on the South West corner of the concourse The demolition of the buildings on platform 11 to enable the extension of and additionally serves to open up a separate area of concourse for pedestrian circulation What it delivers This project is about creating platforms of suitable length to facilitate the safe operation of longer trains, improving the capacity of the route as well as journey times Extensions to platforms 5 & 6 are required to accommodate 10-car IEP services on East Coast routes (extended to 275m) In addition to the platform extensions, we will undertake work on the tracks to increase flexibility on approaches to the station from the east We are installing a crossover between platforms 10 and 11 which also improves operational flexibility at the station Extension to is required to accommodate 8 car services on Edinburgh to Glasgow line via Falkirk High (extended to 204m)

6 Edinburgh Waverley: fast facts Waverley station opened in 1846 and was rebuilt between 1892 and 1902 Waverley station was originally the site of three railway stations. North Bridge Station, General Station and Canal Street Station were not fully integrated into Waverley Station until 1898 The station is also located on the former bed of the Nor Loch which was drained in 1763 Edinburgh Waverley is Scotland s second busiest railway station with a footfall of 28m Waverley has the second largest station footprint in Great Britain (23 acres) It has 20 platforms which support circa. 900 train movements per day The station s roof is 34,000m² and is made up of around 28,000 clear glass panels There is a 40ft ascent into the station via Waverley Steps

7 Q&A Why are the platforms being extended? The platforms are being extended to facilitate the safe operation of eight carriage trains () and ten carriage trains (platforms 5/6), improving the capacity of the route. When will the works be delivered? Advance works commenced in 2016 with main works beginning in April Platform 12 is due to be completed in December 2017 whilst platforms 5/6 are due to be completed in July A new crossover at platforms 10/11 will be commissioned by December How will this affect the passenger experience at Edinburgh Waverley? The work will be delivered in a way which minimises disruption for station users. Station users with a disability, and who require help around the station, can call for additional assistance. Why do you work at night? The works at Waverley station will be undertaken 24/7. It is safer for our staff and contractors to deliver work when trains are not running. We are regulated to work in a way that minimises impact on train services. Contact For the latest information on the platform extensions at Edinburgh Waverley, please visit the Edinburgh Glasgow Improvement Programme website, follow us on Twitter, or contact us via post or . Web EGIPScotland@NetworkRail.co.uk Tel Edinburgh Glasgow Improvement Programme (EGIP) Network Rail 151 St Vincent Street Glasgow G2 5NW

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013 The Edinburgh Glasgow Improvement Programme Strategic Environmental Assessment (SEA) Consultation Document October 2013 Transport Scotland Rail Directorate Table of Contents 1.0 Introduction 2.0 The Edinburgh

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

Industry briefing NOVEMBER 2017

Industry briefing NOVEMBER 2017 Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: UNION PRECINCT STATUS REPORT UPDATE ON CONSTRUCTION INFORMATION ITEM RECOMMENDATION It is recommended that

More information

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION CITY OF EDINBURGH COUNCIL Summary WRITTEN SUBMISSION Waverley and Haymarket are significant stations for Scotland as well as Edinburgh. The number of passengers using them has grown substantially in recent

More information

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017 Network Rail Making Rail Accessible: Guide to Policies and Practices November 2017 0 Operator s Strategy Across our managed stations, Network Rail will consider accessibility issues and plan how we meet

More information

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017 Network Rail Making Rail Accessible: Guide to Policies and Practices November 2017 0 Operator s Strategy Across our managed stations, Network Rail will consider accessibility issues and plan how we meet

More information

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE 1 The East Coast Main Line 1.1 The East Coast Main Line (ECML) is one of two high-capacity north-south trunk routes that run between

More information

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY January 2011 www.scdi.org.uk SCDI is an independent and inclusive economic development network which seeks to influence and inspire

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

CONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9

CONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9 CONTENTS Introduction 5 1. Government 6 Scotland and Wales 6 Regulation 7 Passenger Transport Executives 7 2. Main Line Railway Infrastructure 9 Network Rail 9 Organisation 9 Route Utilisation Strategies

More information

Stannah at: Leeds Station Southern Entrance Delivering accessibility in a 20-million Network Rail upgrade

Stannah at: Leeds Station Southern Entrance Delivering accessibility in a 20-million Network Rail upgrade Stannah at: Leeds Station Southern Entrance Delivering accessibility in a 20-million Network Rail upgrade Passenger lift and escalator installations Stannah is the supplier and installer of choice Achieving

More information

Railway Upgrade Plan Western 2017/18

Railway Upgrade Plan Western 2017/18 2 Railway Upgrade Plan 2017/18 Glossary CaSL Cancelled and Significantly Late. This measures how many trains are cancelled or are more than 29 minutes late at their terminating station. Passenger satisfaction

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

An Introduction to HS2

An Introduction to HS2 July 16 1 Overview HS2 is a vital part of the Government s long term economic plan, strongly supported by midland, northern English and Scottish cities. HS2 will not be a separate, standalone railway.

More information

Proposed M9 Spur Extension. Kirkliston

Proposed M9 Spur Extension. Kirkliston Forth Road Bridge N Queensferry Proposed Scotstoun Interchange Proposed Humbie Flyover Proposed M9 Spur Extension M9 Motorway Kirkliston A720 Edinburgh City Bypass M8 Motorway This drawing has been reproduced

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

Bam's Highland rail upgrade tackles make-or-break 10 days

Bam's Highland rail upgrade tackles make-or-break 10 days Bam's Highland rail upgrade tackles make-or-break 10 days 4 October, 2017 By Daniel Kemp Long-term framework Speedier journeys Building offline Blockade pinch points Bam Nuttall s early engagement on a

More information

Creating Connections in Niagara Region

Creating Connections in Niagara Region Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION

More information

Enterprise Way. The new Airport City link road. June 2017 Progress Update

Enterprise Way. The new Airport City link road. June 2017 Progress Update Enterprise Way The new Airport City link road June 2017 Progress Update Airport City Manchester is one of the most exciting business destinations in development today. The total planning area of Airport

More information

Transport Delivery Committee

Transport Delivery Committee Agenda Item No. 11 Transport Delivery Committee Date 6 th March 2016 Report title Accountable Director Accountable Employee Virgin Trains Partnership Agreement Update Pete Bond, Director of Transport Services

More information

About this consultation

About this consultation About this consultation With under 18 months to go until the XX Commonwealth Games in Glasgow, the role of each of the Games Venues is coming sharply into focus. Glasgow 2014 Ltd. will be progressing planning

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

Making Rail Accessible Helping our Older and Disabled Guests

Making Rail Accessible Helping our Older and Disabled Guests Making Rail Accessible Helping our Older and Disabled Guests Provisional from 5th January 2015 to 31st March 2015 sleeper.scot 2 CALEDONIAN SLEEPER: MAKING RAIL ACCESSIBLE Contents 1. Serco is proud to

More information

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 201 THE LONDON BOROUGH OF HOUNSLOW RESPONSE TO WRITTEN REPRESENTATIONS BY LEGAL AND GENERAL ASSURANCE SOCIETY LIMITED

More information

WEST EDINBURGH BUSINESS PARK MODERN INDUSTRIAL ACCOMMODATION WITH TRADE COUNTER CONSENT

WEST EDINBURGH BUSINESS PARK MODERN INDUSTRIAL ACCOMMODATION WITH TRADE COUNTER CONSENT PHASE 2 UNDER CONSTRUCTION WEST EDINBURGH BUSINESS PARK MODERN INDUSTRIAL ACCOMMODATION WITH TRADE COUNTER CONSENT UNIT SIZES FROM 305 SQ M (3,283 SQ FT) TO 2,440 SQ M (26,264 SQ FT) DESIGN & BUILD OPPORTUNITIES

More information

Rail Update Station Usage Statistics and Network Rail Performance

Rail Update Station Usage Statistics and Network Rail Performance Rail Update Station Usage Statistics and Network Rail Performance Committee Operations Date of meeting 26 January 2018 Date of report 21 December 2017 Report by Senior Director 1. Object of report To update

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

SLATEFORD HOUSE Lanark Road, Edinburgh, EH14 1TL. Development Opportunity with Residential / Commercial / Leisure Potential

SLATEFORD HOUSE Lanark Road, Edinburgh, EH14 1TL. Development Opportunity with Residential / Commercial / Leisure Potential SLATEFORD HOUSE 51-53 Lanark Road, Edinburgh, EH14 1TL Development Opportunity with Residential / Commercial / Leisure Potential Slateford House 51-53 Lanark Road, Edinburgh Historic property extending

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL

AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL PROMOTER S MEMORANDUM CONTENTS INTRODUCTION 3 POLICY OBJECTIVES OF THE BILL 3 BACKGROUND 4 NECESSITY FOR A PRIVATE BILL 6 DETAILS OF THE PROPOSED RAILWAY

More information

Rail Fares Explained

Rail Fares Explained Rail Fares Explained Cover Image: Aerial view of Edinburgh Waverley Station Section Title Contents 1. Executive Summary 4 2. Fares underpin investment in better services 6 3. Government rightly influences

More information

Public consultation exhibition

Public consultation exhibition Public consultation exhibition 2018 Welcome Improving reliability, safety, local life and regional growth Welcome to the A30 Chiverton to Carland Cross consultation, and thank you for your interest in

More information

CAPABILITY STATEMENT TRANSPORT

CAPABILITY STATEMENT TRANSPORT CAPABILITY STATEMENT TRANSPORT Who is Zinfra? Zinfra is a leading power, gas, water and telco infrastructure service provider. We offer a comprehensive range of design, construction and maintenance services

More information

ScotRail. Launch Speech by Jeff Hoogesteger, CEO Abellio Group

ScotRail. Launch Speech by Jeff Hoogesteger, CEO Abellio Group ScotRail Launch Speech by Jeff Hoogesteger, CEO Abellio Group Minister, colleagues, partners, friends. It is a great privilege to be here with you in Stirling, in the heart of Scotland, to mark the launch

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Investing in our local rail network June 2014

Investing in our local rail network June 2014 Investing in our local rail network June 2014 Bath & North East Somerset, Bristol, North Somerset and South Gloucestershire councils working together to improve your local transport MetroWest: Investing

More information

Cornwall Great Western Railway. Luke Farley Assistant Regional Development Manager

Cornwall Great Western Railway. Luke Farley Assistant Regional Development Manager Cornwall 2018 Great Western Railway Luke Farley Assistant Regional Development Manager What s on at GWR? Electrification of the route from London to Bristol and South Wales Introduction of new IETs on

More information

BRENT CROSS THAMESLINK

BRENT CROSS THAMESLINK INTRODUCTION The 4.5 billion Brent Cross Cricklewood development is Barnet Council s most significant growth and regeneration programme. It will create a new sustainable mixed use town centre for Barnet

More information

National Park Authority Board Meeting

National Park Authority Board Meeting Paper for decision 1. Introduction 1.1 Preparations for the introduction of four Camping Management Zones (covering less than 4% of the National Park) have progressed significantly since Scottish Ministers

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Tourism Development Framework for Scotland Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Introduction The Tourism Development Framework for Scotland refresh 2016:

More information

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it WELSH GOVERNMENT RESPONSE P-05-710 Ensure Disabled People can Access Public Transport As and When They Need it The petition submitted by Whizz Kidz seeking action to ensure that disabled people can access

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

Locate in Falkirk. A guide for retail businesses

Locate in Falkirk. A guide for retail businesses Locate in Falkirk A guide for retail businesses Contents Introduction to Falkirk and the surrounding area Introduction to Falkirk and the surrounding area...3 Key Economic Growth Priorities...4 Transport

More information

Scottish Fire and Rescue Service a journey of change From an Asset Management Perspective

Scottish Fire and Rescue Service a journey of change From an Asset Management Perspective Scottish Fire and Rescue Service a journey of change From an Asset Management Perspective Iain Morris: Head of Asset Management Scott Roberts: Scottish Fleet Manager APSE, Seminar Aviemore 8 May 2014 The

More information

Bartlett Square Welcome. Investment Framework. London Airport Ltd

Bartlett Square Welcome. Investment Framework. London Airport Ltd 1 Welcome Welcome to Luton s public exhibition on proposals for the (formerly known as Stirling Place) project which will comprise 2.5 acres of commercial development, providing up to 2,000 jobs for local

More information

Building Connections to SUPPORT LIFE S JOURNEYS

Building Connections to SUPPORT LIFE S JOURNEYS Building Connections to SUPPORT LIFE S JOURNEYS 56 EXECUTIVE MANAGEMENT S REPORT Hong Kong Network Expansion Completed Projects LOHAS Park Station opened 26 July 2009 Austin Station opened 16 August 2009

More information

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament. Major Transport Infrastructure Projects Forth Replacement Crossing Principal Contract Project Office King Malcolm Drive, Rosyth KY11 2DY Steve Farrell Clerk to the Rural Economy and Connectivity Committee

More information

Redevelopment of Glasgow Queen Street Station

Redevelopment of Glasgow Queen Street Station September 2014 Redevelopment of Glasgow Queen Street Station Consultation Report Document Reference: 2014/CR1 September 2014 Redevelopment of Glasgow Queen Street Station Consultation Report Contents 1

More information

Monitoring and data acquisition for the safety related traffic information services

Monitoring and data acquisition for the safety related traffic information services Monitoring and data acquisition for the safety related traffic information services Best Practices on Monitoring Deployment Workshop 12 th September 2013 - Helsinki Contents 1. Transport Scotland and Traffic

More information

Changes to your services

Changes to your services Changes to your services Saturday 30 May - Sunday 26 July 2015 Glasgow - Falkirk High - Edinburgh Alloa / Dunblane / Stirling - Edinburgh Edinburgh - Glenrothes - Edinburgh (Fife Circle)...plus busier

More information

GATWICK AND WANDSWORTH

GATWICK AND WANDSWORTH GATWICK AND WANDSWORTH 1. THE FUTURE OF AVIATION 2. GATWICK S VISION 3. WHY GATWICK IS BEST FOR WANDSWORTH THE TRANSFORMATION OF AVIATION Three current and future trends are transforming aviation: 1. Growth

More information

Scotland s railways - today

Scotland s railways - today Cynulliad Cenedlaethol Cymru National Assembly for Wales Y Pwyllgor Menter a Busnes Enterprise and Business Committee Ymchwiliad i r Blaenoriaethau ar gyfer Inquiry into the Priorities for the future dyfodol

More information

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 26 January 2018

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 26 January 2018 Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 26 January 2018 Railway to Blackpool South on track to reopen The railway between Preston and Blackpool

More information

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013 Park and Ride Update Committee Strategy and Programmes Date of meeting 29 November 2013 Date of report 6 November 2013 Report by Assistant Chief Executive (Operations) 1. Object of report To update the

More information

abcde abc a = eé~äíü=aéé~êíãéåí= = aáêéåíçê~íé=çñ=méêñçêã~ååé=j~å~öéãéåí== ~åç=cáå~ååé= ISBN NHS HDL(2003)31 abcdefghijklm

abcde abc a = eé~äíü=aéé~êíãéåí= = aáêéåíçê~íé=çñ=méêñçêã~ååé=j~å~öéãéåí== ~åç=cáå~ååé= ISBN NHS HDL(2003)31 abcdefghijklm NHS HDL(2003)31 abcdefghijklm = eé~äíü=aéé~êíãéåí= = aáêéåíçê~íé=çñ=méêñçêã~ååé=j~å~öéãéåí== ~åç=cáå~ååé= Dear Colleague 8th July 2003 THE DISABILITY DISCRIMINATION ACT (1995) IMPLEMENTATION OF SECTION

More information

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners Great Western Route Utilisation Strategy Evidence Submission June 2008 Wilder House Wilder Street Bristol BS2 8PH 0117 903 6868 www.westofengland.org 1 The West of England Partnership is the sub-regional

More information

Ermine Street Environmental Enhancements

Ermine Street Environmental Enhancements Ermine Street Environmental Enhancements As part of Urban&Civic s commitment to minimise the impacts and maximise the benefits of the Alconbury Weald development, the design team have worked up a scheme

More information

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI 2014 Results Methodology This report presents the findings of the 2014 study of Transport Journalists,

More information

> close to St Andrews

> close to St Andrews > FOR SALE < Holiday Lodge COMPLEX and owners house WOODLAND HOLIDAY LODGES, Kincaple, NR St Andrews, Fife, KY16 9SH > 15 high quality holiday lodges/cottages > Attractive 5 bedroom separate owners accommodation

More information

CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT PART A

CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT PART A 21 Agenda Item 5 CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT Purpose of the Report PART A 1. To present the

More information

Passenger Voice. Rail, bus, coach and tram. High Speed 2 freeing up capacity

Passenger Voice. Rail, bus, coach and tram. High Speed 2 freeing up capacity High Speed 2 freeing up capacity The opening of the HS2 line from London to the West Midlands will free up capacity on the existing West Coast Main Line (WCML). Some existing passengers between London

More information

Dufferin Jog Elimination Project

Dufferin Jog Elimination Project Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred

More information

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by: UPDATE JANUARY 2016 HISTORY IN THE MAKING The UK s most important city centre development outside London. Being delivered by: THE HEART OF THE CITY St Philip s Square Birmingham Museum & Art Gallery A

More information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1 Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)

More information

London and Crossrail 2. Chris Moores Transport for London

London and Crossrail 2. Chris Moores Transport for London London and Crossrail 2 Chris Moores Transport for London 1 Contents 2 1 The region needs Crossrail 2 2 Crossrail 2 can be more than just a railway 3 Planning and Delivering Crossrail 2 Issues facing London

More information

CITYPOINT HAYMARKET EDINBURGH

CITYPOINT HAYMARKET EDINBURGH WWW.CITYOINT-EDINBURGH.CO.UK CITYOINT HAYMARKET EDINBURGH TO LET 65 HAYMARKET TERRACE EDINBURGH EH12 5HD GRADE A OFFICE ACCOMMODATION FLEXIBLE FLOORSACE - CAN ROVIDE SUITES IN A NUMBER OF SIZES - 1,485-24,131

More information

FOR SALE VAT FREE RETAIL INVESTMENT

FOR SALE VAT FREE RETAIL INVESTMENT FOR SALE VAT FREE RETAIL INVESTMENT 4 SOUTH CLERK STREET, EDINBURGH EH8 9NZ OFFERS OVER 240,000 (6.50% NET INITIAL YIELD) EXECUTIVE SUMMARY Prominent retail investment on South Clerk Street; VAT Free investment,

More information

Peninsula Rail Task Force Consultation on the replanning

Peninsula Rail Task Force Consultation on the replanning Peninsula Rail Task Force Consultation on the replanning of Network Rail s Investment Programme(Hendy Review) 3/15/2016 For further enquires of clarification please contact: John Hillman 07599 363711 John.Hillman@plymouth.gov.uk

More information

FOR SALE FORMER INVERGOWRIE PRIMARY SCHOOL. Total Gross Internal Area Sq M (7,512 Sq Ft) FORMER PRIMARY SCHOOL INCLUDING ANNEXE BUILDING

FOR SALE FORMER INVERGOWRIE PRIMARY SCHOOL. Total Gross Internal Area Sq M (7,512 Sq Ft) FORMER PRIMARY SCHOOL INCLUDING ANNEXE BUILDING FORMER INVERGOWRIE PRIMARY SCHOOL FOR SALE Total Gross Internal Area 697.92 Sq M (7,512 Sq Ft) FORMER PRIMARY SCHOOL INCLUDING ANNEXE BUILDING Errol Rd, Invergowrie, Perth and Kinross DD2 5AD FORMER PRIMARY

More information

Argyll & the Isles Tourism Cooperative Growth Fund Case Study. Wild About Argyll

Argyll & the Isles Tourism Cooperative Growth Fund Case Study. Wild About Argyll Argyll & the Isles Tourism Cooperative Growth Fund Case Study Wild About Argyll Project Overview The Argyll & the Isles Tourism Cooperative (AITC) is a cooperative company acting on behalf of its members.

More information

WELCOME. Living on Water offers a vibrant and exciting way of life that opens up a whole host of opportunities.

WELCOME. Living on Water offers a vibrant and exciting way of life that opens up a whole host of opportunities. LINLITHGOW WHARF WELCOME Living on Water offers a vibrant and exciting way of life that opens up a whole host of opportunities. At Linlithgow Wharf, Living on Water s residential moorings provide an exceptional

More information

The Evergreen 3 Project

The Evergreen 3 Project The Evergreen 3 Project Railway Civil Engineers Association 26 th January 2012 Allan Dare Strategic Development Manager Chiltern Railways Chiltern Railways Birmingham Solihull Warwick Parkway Virgin West

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

Quarterly Progress Report

Quarterly Progress Report Quarterly Progress Report Team: Passenger Link Quarter: 3 Agenda Item: 6.2.4 Sponsor Ashwin Kumar Author(s): Lee Paddock 1. Highlights The paper attached provides an update on passenger facing work during

More information

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre Crossrail Bulletin www.crossrail.co.uk 0345 602 3813 FREEPOST CROSSRAIL ISSUE 20 Mar 2010 Crossing the Capital Connecting the UK Jobcentre Plus - at the Visitor Information Centre Crossrail is committed

More information

Connectivity. Sport & Leisure

Connectivity. Sport & Leisure Live in Falkirk Live in Falkirk Over and above Falkirk s advantages for business, the area offers a fantastic quality of life with competitively priced housing, excellent transport connections, good schools

More information

Railways for All The Accessibility Strategy for Great Britain s Railways

Railways for All The Accessibility Strategy for Great Britain s Railways Railways for All The Accessibility Strategy for Great Britain s Railways March 2006 CONTENTS Contents Foreword 3 Chapter 1 Executive Summary 5 1.1 Objective 5 1.2 Background 5 1.3 Strategy 6 Chapter 2

More information

About Us. An introduction to Network Rail

About Us. An introduction to Network Rail About Us An introduction to Network Rail London King s Cross 02 Contents 04 A better railway for a better Britain 06 Network Rail in numbers 08 Our structure 10 Our routes 12 The national framework 14

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

Transport Infrastructure Construction and RMI Market Report - UK Analysis

Transport Infrastructure Construction and RMI Market Report - UK Analysis Transport Infrastructure Construction and RMI Market Report - UK 2017-2021 Analysis Published: 19/12/2017 / Number of Pages: 60 / Price: 845.00 Introduction and Overview The 6th Edition of the 'Transport

More information

WRITTEN SUBMISSION FROM RMT 17 OCTOBER 2008

WRITTEN SUBMISSION FROM RMT 17 OCTOBER 2008 WRITTEN SUBMISSION FROM RMT 17 OCTOBER 2008 The National Union of Rail, Maritime and Transport Workers (RMT) welcomes the opportunity to respond to the Scottish Parliament, Transport Infrastructure and

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

ScotRail Performance Improvement Plan Making Things Better, Every Single Day.

ScotRail Performance Improvement Plan Making Things Better, Every Single Day. ScotRail Performance Making Things Better, Every Single Day. Page 1 INTRODUCTION Scotland s railway is undergoing enormous change. Right now, engineers here in the UK and in Japan are building our new

More information

Agenda Item 1 9 May 2017

Agenda Item 1 9 May 2017 MINUTES OF THE HIGHLANDS & ISLANDS AIRPORTS LTD ( HIAL ) BOARD HELD AT SUMBURGH AIRPORT ON 7 TH MARCH 2017 AT 1:15PM Present Dr Mike Cantlay Chair Mr Inglis Lyon Managing Director Ms Gillian Bruton Finance

More information

Transport planning pays off at the 2014 Ryder Cup. Laurence Kenney, Transport Scotland

Transport planning pays off at the 2014 Ryder Cup. Laurence Kenney, Transport Scotland Laurence Kenney, Transport Scotland Laurence.Kenney@transportscotland.gsi.gov.uk 1. Introduction The paper title is a quote from the Glasgow Herald and marked the successful culmination of the intensive

More information

3 COCKBURN STREET. Superb, contemporary office suites in an historic location. Sizes from 1,248 sq ft to 4,861 sq ft.

3 COCKBURN STREET. Superb, contemporary office suites in an historic location. Sizes from 1,248 sq ft to 4,861 sq ft. 3 COCKBURN STREET Superb, contemporary office suites in an historic location. Sizes from 1,248 sq ft to 4,861 sq ft. welcome 3 Cockburn Street, Edinburgh, is your chance to acquire boutique, refurbished,

More information

space+ location Derby Commercial Park Raynesway, Derby, East Midlands Over 2 million sq ft of multi-use space

space+ location Derby Commercial Park Raynesway, Derby, East Midlands Over 2 million sq ft of multi-use space space+ location Derby Commercial Park Raynesway, Derby, East Midlands Over 2 million sq ft of multi-use space location Situated 2 miles east of Derby with excellent connections via the M1, A50 and 2 million

More information

FREEHOLD FOR SALE Prime Residential Development Opportunity

FREEHOLD FOR SALE Prime Residential Development Opportunity Prime Cambridgeshire residential development opportunity (subject to necessary planning consents) Prominent riverside location Potential for high density residential scheme Draft allocation for circa 90

More information

GRAND CENTRAL BIRMINGHAM

GRAND CENTRAL BIRMINGHAM FACT FILE JANUARY 2014 GRAND CENTRAL BIRMINGHAM Anchored by a full line John Lewis Store, Grand Central Birmingham will bring over 40 new premium and high quality stores and more than 20 new concept cafes

More information

CONTENTS Welcome Location Destination Access Design Key Statistics CACI Catchment Anchor Stores Parking Management Contacts

CONTENTS Welcome Location Destination Access Design Key Statistics CACI Catchment Anchor Stores Parking Management Contacts CONTENTS Welcome 02 03 Location 04 05 Destination 06 07 Access 08 09 Design 10 11 Key Statistics 12 13 CACI 14 15 Catchment 16 17 Anchor Stores 18 19 Parking 20 21 Management 22 23 Contacts 24 25 WELCOME

More information

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

UNLOCKING THE BRIGHTON MAINLINE

UNLOCKING THE BRIGHTON MAINLINE UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to

More information

FOR SALE SALE & LEASEBACK CONVENIENCE STORE INVESTMENT 1-7 STATION ROAD KIRKLISTON WEST LOTHIAN EH29 9BE. Sheridan Property Consultants

FOR SALE SALE & LEASEBACK CONVENIENCE STORE INVESTMENT 1-7 STATION ROAD KIRKLISTON WEST LOTHIAN EH29 9BE. Sheridan Property Consultants FOR SALE SALE & LEASEBACK CONVENIENCE STORE INVESTMENT 1-7 STATION ROAD KIRKLISTON WEST LOTHIAN EH29 9BE Sheridan Property Consultants LOVED AND EXPERIENCED BY CUSTOMERS SINCE EARLY 1859 INVESTMENT SUMMARY

More information

Investment Opportunities

Investment Opportunities Investment Opportunities Investing in Falkirk Central, well connected, affordable, industrious and ambitious. Modern, forward looking and bold. The Falkirk area is a nationally significant economic hub

More information

About Us. An introduction to Network Rail

About Us. An introduction to Network Rail About Us An introduction to Network Rail London King s Cross 02 Contents 04 A better railway for a better Britain 06 Network Rail in numbers 08 Our structure 10 Our routes 12 The national framework 14

More information