ROADWORKS BULLETIN. Period: 17/02/ /02/2017
|
|
- Flora Barnett
- 6 years ago
- Views:
Transcription
1 ROADWORKS BULLETIN Period: - Type of Works: Works Status: County: Major, Standard, Minor, Immediate - Urgent, Immediate - Emergency Forward Planning, Advance planning, Planned Work About to Start, Work in Progress The North & Mid Wales Trunk Road Agent Route Works Location County Work Type Traffic Management Dates Time Works Promoter Reference Eastbound Brookside to Ewloe ; line and stud works. starting 19:30hrs to 06:00hrs. Diversions in place Road Closure 14/02/ PD Eastbound Northop to Brookside ; line and stud works. starting 19:30hrs to 06:00hrs. Diversions in place Road Closure 14/02/ PD Eastbound on-slip from A5119 Junction 33 ; line and stud works. starting 19:30hrs to 06:00hrs. Diversions in place Road Closure 14/02/ PD Eastbound Little Chef to Northop ; line and stud works. starting 19:30hrs to 06:00hrs. Diversions in place Road Closure 14/02/ PD Brookside, Northop Hall ; line and stud works. starting 19:30hrs to 06:00hrs. Diversions in place Road Closure 14/02/ PD J33A Pinfold Lane to bridge over B5121 Holywell Camera survey and inventory recording of drainage assets between the hours of 19:00 hrs through to 06:00 hrs Lane Closure - 25/02/2017 PD
2 J33a Off-slip - full closure of slip Camera survey and inventory recording of drainage assets between the hours of 19:00 through to 06:00. Full closure of J33a off-slip No exit from at J33a westbound off-slip. All traffic will be diverted to J33 and return via A5119 Road Closure 19/02/ PD between Broughton Retail Park Roundabout and A5104 Broughton Roundabout Retexturing roundabout and J36a EB entry slip. Overnight works 21:30 hrs to 06:00 hrs No access to the at Broughton J36a Traffic (all vehicles, cyclists and pedestrians) wishing to join the eastbound at J36a onslip will take 1st exit from roundabout and follow the A5104 to re-join the at J36 eastbound. Road Closure 19/02/ PD Eastbound on-slip junction 36A Broughton Retexturing roundabout and J36a EB entry slip. Overnight works 21:30 hrs to 06:00 hrs No access to the at Broughton J36a Traffic (all vehicles, cyclists and pedestrians) wishing to join the eastbound at J36a onslip will take 1st exit from roundabout and follow the A5104 to re-join the at J36 eastbound. Road Closure 19/02/ PD Link road between Chester Road and, Broughton Retexturing roundabout and J36a EB entry slip. Overnight works 21:30 hrs to 06:00 hrs No access to the at Broughton J36a Traffic (all vehicles, cyclists and pedestrians) wishing to join the eastbound at J36a onslip will take 1st exit from roundabout and follow the A5104 to re-join the at J36 eastbound. Road Closure 19/02/ PD
3 westbound off-slip to A5104 JCT 36A, Broughton Retexturing roundabout and J36a EB entry slip. Overnight works from 21:30 hrs to 06:00 hrs No exit from to Broughton at J36a WB Traffic (all vehicles, cyclists and pedestrians) wishing to leave the westbound at J36a off-slip will stay on the and leave the at J36, take 3rd exit A5104 to Broughton. Road Closure 19/02/ PD Lane 2 WB J32a Pinfold Lane to J33 Northop Interchange Camera survey and inventory recording of drainage assets between the hours of 19:00 through to 06:00. Full closure of J33 off-slip / onslip WB. No diversions required. Road Closure PD J33 WB on-slip/off-slip - full closure of slip Camera survey and inventory recording of drainage assets between the hours of 19:00 hrs through to 06:00 hrs. Full closure of J33 offslip/onslip WB No entry to at J33 Northop All traffic will be diverted to A494 Ewloe and return on the eastbound carriageway No exit from at J33 Northop westbound off-slip All traffic will be diverted to J32a Springfield and return on the eastbound carriageway Road Closure PD near Burntwood Overbridge VRS repair in central reserve. 19:00hrs to 06:00hrs Lane Closure A470 Beaver Grove CONWY Renew Filter Drain, Arrange CONWY Betws y Coed CCTV Survey and construct additional gullies near Waterloo Bridge A494 From jct with Hafod Rd to jct with Install 1 x 100m of fibre cable - Glyndwr Rd, Gwernmynydd into existing duct PD AA108G-DEMO BC005WP Central reserve between J35 to J34 WB, Howarden Filter drain works. Overnight works from 19:30hrs to 06:00hrs Lane Closure - PD
4 Closure of J32a & J32b offslip/onslip, Pentre Halkyn Camera survey and inventory recording of drainage assets between the hours of 19:00 through to 06:00. Full closure of J32a and J32b off-slip / onslip WB No exit from westbound at J32a/b Springfield off-slip All traffic will be diverted to J31 and return on eastbound carriageway No access to westbound at J32a Springfield Halkyn All vehicles will be diverted to J33 Northop and return westbound as per LP89 Road Closure - PD Closure of J32 off slip Camera survey and inventory recording of drainage assets between the hours of 19:00 through to 06:00. Full closure of J32a and J32b off-slip / onslip WB No exit from at J32 Holywell westbound off-slip. All traffic will be directed to J31 Caerwys and leave via A5026 Road Closure - 25/02/2017 PD A40 A40 Abercamlais - Penpont Tree maintenance on verge A40 A40, Bwlch, Aberhonddu Drainage survey Traffic Control (stop/go A40 A40 From jct with B4560, west of Surveying/drain works Bwlch to Llansantffraed House A40 A40 Brecon Road, Crickhowell. LD3 0YB A40T / A479T junction (Nantyffin Cider Mill Inn) Works to complete 20mph temporary speed limit Installation of Motorbike Detection System under S50 NRSWA - no TM required Traffic Control (stop/go 14/02/ None/Signing Only PD PD PD PD PD A40 A44 A458 A40T Trecastle to Maesgwyn, Llywel, Aberhonddu A44T Llanbadarn Rd (from T Junction to Quebec Rd) FROM A POINT 100M NORTH OF COED-Y-DINAS ISLAND TO 160M SOUTH OF JUNCTION WITH RED LANE, POOL A44 A44T Llanbadarn Fawr Carriageway inlay resurfacing Install 950m of 250mm PE main and 20m of 180mm PE main and associated testing & commissioning - 15/03/ /03/ /03/ /01/ /03/2017 SEVERN TRENT WATER LTD. PD PD PD LB501A6W/ B
5 A458 A458 East of Mallwyd Roundabout, near the property of Braichllwyd SY20 9HR. 1.1km east of Nant yr Ehedydd Bridge Construction of up to 240m of retaining wall on the south side of the highway boundary and ground investigation. 15/02/ PD A470 O/S 3 Church Street Blaenau Ffestiniog EXCAVATE TO STANDARD DEPTH, OPEN CUT IN FOOTWAY, FOR UNDERGROUND LOW VOLTAGE CABLE FAULT AND RESTORE OR PREVENT LOSS OF SUPPLY. FOLLOWED BY REINSTATEMENT. None/Signing Only 16/02/ SCOTTISH POWER (MANWEB) GY I A470 Dolgellau By-Pass A470/A493 Junction, Dolgellau Traffic Management on Junction A470 ADJACENT TO TALRAFON, Water Mains Renewal - DOLGELLAU Approx 100m 11/07/ /12/ /09/ /03/ hours DCWW PD PE A470 A470T Storey Arms to Nant Ddu A470 A470 A470 T Llanbrynmair Village A470 A470T North of Brynach Roundabout, Brecon A470 Tree Tops North of Betws y Coed. CONWY with TTRO for convoy working 40/10mph and no overtaking. Provisional start date for coordination purposes. 11/01/ /02/ /01/ /02/ PD PD PD PD A470 A470 Ffordd Berthddu, Llanrwst CONWY Cycleway project Llanrwst A470 A470 Chapel House, Erwood Gully emptying works A470 A40 Felinfach Tree maintenance on verge A470 A470 A470(T) between Ganllwyd and Llanelltyd A470 Dolgellau bypass, Pont Llwyn, LL40 Heather seeding and gorse clearance works. Removal of existing parapet fencing and replace with new at Pong Llwyn Viaduct; also removal and the installation of new safety fencing on the approaches onto the viaduct. 10/03/ /02/ /03/2017 PD PD PD PD PD A470 A470 Llwyn Celyn (between Libanus and Storey Arms) Installation of T4 Traws Cymru bus kerbing and footway. A470 Outside Tyn y Fron CONWY DESILT FOLLOWING Ffordd Betws, Llanrwst BLOCKAGE - 03/03/ DCWW PD PE
6 A479 2 miles south of Talgarth, Embankment Works A479 Near Felindre Terrace, Aberhonddu Locate and excavate 2 blockage in existing duct 07/01/ /06/2017 PD BC005WP THE STRAND BUILTH WELLS A489T Hafren View to Glan Hafren Hll, Llanidloes Rd, Newtown CONSTRUCT NEW PUMPING STATION, NEW PIPEWORK AND MANHOLES T Pool Road, Newtown /A489 Newtown Bypass Construction, Severn Trent and Scottish Power Diversions Alun Griffiths Lights + Severn Trent Water, Diversions of mains, various TM set ups, lane closures plant crossings etc, as required. Only one location at a time will be erected. Lights manually controlled during peak time Lane Closure 01/12/ /03/ /01/ /03/ /01/ DCWW PE PD PD T Fron to Elwyn Cottages, Fron, Nr Abermule (T) Southbound Wrexham bypass between Gresford Junction 6 and Junction 5, Wrexham WREXHAM Major Maintenance Scheme - Works.All Works will be carried out under Full Closures Overnight between 20:00-06:00, 7 days/week. Southbound (T) will be closed between Junction 6 off slip and Junction 5 Onslip. Local Diversions will be in place via Mold Road and Chester Road to re-join the (T) at Junction 5 Onslip.Northbound works will commence following completion. 09/02/ Road Closure 03/03/2017 PD PD Rear of 6 & 8 Maesderwen, Pool Rd, Newtown EXCAVATE JOINT HOLE FOR BREECH JOINT. EXCAVATE 25 METRE TRENCH IN FOOTWAY & INSTALL DUCT. EXCAVATE JOINT HOLE FOR POT END WITH A SERVICE FOR NEW SUPPLY None/Signing Only 15/02/ SCOTTISH POWER (MANWEB) GY002U , Pentrosfa, Llandrindod Wells Transcymru T4 bus route installation of bus stop kerbs on behalf of the National Assembly for Wales 03/03/2017 PD
7 T & A458T Welshpool Town Diversionary Route for Town closure on Mill Lane WESTBOUND ON LLANIDLOES ROAD, O/S MAYFIELD TERRACE, NEWTOWN, SY16 1HQ ACCESS REQUIRED TO UNDERGROUND STRUCTURE TO RESTORE SERVICE HIGHWAY SURFACE WILL BE UNAFFECTED. WORK BEING CARRIED OUT ON EXISTING LINE PLANT 2 WAY LIGHTS TO BE USED FOR 1 DAY. ALL TEMPORARY TRAFFIC MANAGEMENT SHALL BE REMOVED AS SOON AS WORKS HAVE BEEN COMPLETED. None/Signing Only 01/03/ PD BC005CM789W21FEBWN7JMF28 IN VERGE 280M SOUTH OF THE OLD SCHOOL, FROM ABERGWENLAS BRIDGE LLANBADARN FYNYDD TO JUNCTION WITH B4355 AT DOLFOR, LLANDRINDOD Replace 1 existing pole - BC005WP OPP MOUNT COTTAGE TO OPP NORTH VIEW, NORTH ROAD, LLANYMYNECH Install 1mt of 1 way poly duct in carriageway,33m of 1 way poly duct in Footway,Install 4m of 1 way poly duct in Verge - BC005WP T Abermule Flood Arch to Brynhyfryd 63M SOUTH EAST FROM FORESTRY (LODGE PARK) ON, T FROM THE ENTRANCE TO YNYS GREIGOG TO TRE'R DDOL Replace 1 jointbox frame and cover(s) (1220mm x 680mm) in Carriageway - 15/03/ /02/ PD BC005WP T Furnace and Street Lighting Repairs prior Eglwysbach to resurfacing from Near Caemorgan Rd, Cardigan to Penparc Village (T) from Dafarn Faig to Bryncir T Furnace and Eglwysfach Villages inc kerbing T Llwyncelyn, Aberaeron Reconstruct Llwyncelyn Layby Phase 2 works to replace street lighting electrical cabling. Daytime = Convoy. Night = Road Closure nights of 22nd-24th Feb Traffic Control (stop/go T Talybont Village Street Lighting Renewal Traffic Control (stop/go 04/01/ /01/ /02/ /02/ /03/ /02/ /02/ PD PD PD PD PD PD
8 OPP LANE ENTRANCE TO FRONFELEN UCHAF - O/S MORWELIR, BRYNHOFFNANT, 16/02/ BC005WP O/S CRUD YR AWEL - O/S TALARGOCH, BRYNHOFFNANT, MAES CRUGIAU TO OPP NO 4, ANTARON AVENUE, SOUTHGATE, ABERYSTWYTH, 16/02/ /02/ BC005WP BC005WP FROM OPP EL SUB STATION TO REAR OF CRYNGOED, T RHYDYFELIN VILLAGE, RHYDYFELIN, 16/02/ BC005WP FRM O/S 1 NORTH ROAD TO S/O FILLING STATION, NORTH ROAD, ABERAERON - BC005WP O/S ENTRANCE FOR CILGWGAN TO O/S ENTRANCE FOR DREFNEWYDD,T FROM ABERARTH TO ABERAERON - BC005WP O/S FILLING STATION TO TURNING OFF FOR DREFNEWYDD FARM, T ABERAERON TOWN T Penmorfa to Penteg section, Aberaeron Plas Brereton, Bangor Road, Caernarfon, From O/S telephone exchange to Graeanfryn, Llanwnda T Derwenlas to Ceredigion Boundary O/S RHYDYPENNAU C.P. SCHOOL, BOW STREET Tree felling Install 1x 100m of fibre cable into existing duct (Daytime Road Closure 27th Feb - 7th March) LAY NEW SERVICE - 11M PUBLIC 35M PRIVATE Traffic Control (stop/go /02/ /02/ /02/ /03/2017 Wales & West Utilities BC005WP PD PD BC005WP PD XY Ty Llan, Penmorfa. Repair retaining wall OPP TEGFAN, T FFOS-Y- FFIN VILLAGE Replace 1 jointbox frame and cover(s) (2315mm x 737mm) in Footway T Bridge St, Aberystwyth under Overnight Road Closure 18:30pm - 06:00am 26/02/ Road Closure - 26/02/2017 PD BC005WP PD
9 O/S NANT DYFFRYN, TALIESIN VILLAGE OS ENT TO CAR PARK TO TAN Y COED AREA, (T) FROM BRAICH GOCH INN PASSING ESGAIRGEILIOG TO LLWYN GWERN LODGE JUNCTION Replace 1 jointbox frame and cover(s) (1220mm x 680mm) in Carriageway Replace 1 existing pole - - BC005WP BC005WP IN VERGE JUNCTION FFORDD O (T) GYFERBYN? HEOL BETHANIA I FRYN IDRIS, (T) FROM TY'N Y BERTH MOUNTAIN CENTRE TO B Provide 1 pole - BC005WP T, South of Llanddeiniol junction, (North of Llanrhystud) Repair damaged barrier in southbound lane 24 Bridge Street, Aberystwyth Install New Service Connection With Excn - Traffic Control (give and - DCWW PD PE ERW COED, SYNOD INN, LLANDYSUL, RENEW BOX DEFECT - DCWW PE O/S WESLEY VILLA, TRE'R DDOL VILLAGE Install 8m of 1 way poly duct in Carriageway. Some carriageway incursion. Near Pencae, Tre Taliesin Install 2m of 1 way poly duct in Footway,Install 36m of 1 way poly duct in Carriageway and footway with excavation. Some carriageway and footway incursion. - - BC005WP BC005WP T JUNCTION B4321 LLANDYSUL SA44 6HP 100m west of Capel Ffynnon, Plwmp, Llandysul T JUNCTION B4321 LLANDYSUL o/s 4 PENTREGAT VILLAGE Multi-phase 4 way traffic lights. Stand alone crossroads, junctions a-plant operative on site also. Access to Underground structure - cabling for new customer connection Multi-phase 4 way traffic lights. Stand alone crossroads, junctions a-plant operative on site also. Access to Underground structure - cabling for new customer connection T Aberystwyth to Bow Street Street Lighting lantern replacement (mobile works as most lanterns in the area to be replaced) Traffic Control (stop/go /02/2017 Felinheli bypass Soft estate work lane closure 09/01/ PD on 3 lane sections BC005CB1W00000IBPTVCDXDV BC005CB1W0000IBPTVCDXDV2 PD South Road, Caernarfon Gwynedd Minor patching work 20/01/ PD and re-set gullies
10 A489 A489T Hafren View to Glan Hafren Hll, Llandiloes Rd, Newtown Alun Griffths Lights + Severn Trent Water, Diversions of mains, various TM set ups, lane closures plant crossings etc, as required. Only one location at a time will be erected. Lights manually controlled during peak time 09/01/ PD A489 FARM ACCESS NEAR TY- MAWR ON A489, CAERSWS Replacement of culvert under railway track through farmers field. Traffic lights on main road to allow works vehicles to drive from farm track to main road safely. Lights to be green on main road until manually operated by requirement of site vehicle leaving farm track to access A489. Site times Week days 08:00 to 16:00 and one weekend Friday 3/2/17 at 16:00 to Monday 6/2/17 at 08:00 30/01/ NETWORK RAIL - PROMOTERS NATIONAL KL237SBA251M17C A489 Penegoes, Machynlleth Lay duct and construct jointing chamber, to erect cab also 16/02/ /03/2017 BC005WP A489 A489 A489 A489T / A470T at Caersws Junction A489 Newtown Road, Machynlleth. SY20 8UH 80M EAST FROM O/S RED HOUSE ON, A489T FROM ACCESS TRACK TO TY-MAWR FARM TO JUNCTION WITH TRACK BY BRON FELIN, CAERSWS Works to complete 20mph temporary speed limit. Replace 1 jointbox frame and cover(s) (1220mm x 680mm) in Carriageway Traffic Control (stop/go - 25/02/ PD PD BC005WP A489 WESTBOUND ON LLANIDLOES ROAD O/S MAYFIELD TERRACE, NEWTOWN, SY16 1HQ ACCESS REQUIRED TO UNDERGROUND STRUCTURE TO RESTORE SERVICE HIGHWAY SURFACE WILL BE UNAFFECTED. WORK BEING CARRIED OUT ON EXISTING LINE PLANT 2 WAY LIGHTS TO BE USED FOR 1 DAY. ALL TEMPORARY TRAFFIC MANAGEMENT SHALL BE REMOVED AS SOON AS WORKS HAVE BEEN COMPLETED. - BC005CM789W21FEBWN7JMF28
11 A493 A470 Dolgellau bypass - Tywyn (A493) Junction Construction of new roundabout at A470/A493, Tywyn junction to replace 3 way traffic signals. A470 TM will extend up to 1km either side of junction and effect both directions including A493 traffic. 3 way temp traffic signals - 24 hours, 7 days a week. TTRO restrictions, 30mph and no overtaking 08/01/ PD A494 O/S WERN VETERINARY SURGEONS, RUTHIN DENBIGHSHIRE REPLACE 17M OF 150MM DI WITH 17M OF 125MM PE AND REPLACE OR TRANSFER ANY AFFECTED SERVICES. Traffic Control (give and 09/01/ Wales & West Utilities XY A494 A494 A494 Rhyd Ddwl, Bala to Dolgellau. A494 Gwegl Y Bryn to Craig Lelo Works Jtc, Bryn Saith Marchog (Capel Farm to Bryn SM Garage) DENBIGHSHIRE Retaining wall repair Kerbing works and resetting of 4 gullies. PD PD A494 A494 High Street, Bala. of carriageway, convoy system in place speed limit reduces to 10 MPH 13/04/2017 PD A494 A494 Hywel Ddar, Rhydymain. Retaining wall repair A5 From the rear of 4 Dol Goch to o/s the playground, Bangor Rd, Bethesda REPLACE 553M OF 4IN SI WITH 553M OF 75MM PE AND REPLACE OR TRANSFER ANY AFFECTED SERVICES. Traffic Control (give and 09/01/ Wales & West Utilities PD XY A5 A5 Gledrid Roundbout Improvement Works by Highways England. WREXHAM Improvements works to the roundabout and the approaches. starting at 20:00hrs to 06:00hrs. Full carriageway closures at night between Halton Roundabout and Gledrid Roundabout. Lane closures at roundabout during the day. Diversion: Via A5 & B5070. Road Closure 23/01/ /03/2017 PD A5 A5 East of Afon Bedal CONWY Retaining wall repair Capel curig A5 A5 Rhydlydan to Pentrefoelas CONWY works with TTRO for convoy working 40/10mph no overtaking. Provisional start date for coordination purposes. 03/02/ /03/ /02/ PD PD A5 A5 Berwyn Road, Llangollen DENBIGHSHIRE Repair stone wall following road traffic collision PD
12 A5 A5 Froncysyllte to Cwm Alis WREXHAM Retaining wall repairs. A5 A5 by hotel, Nant Ffrancon. Repairing retaining wall A5 A5 A5 Halfway Bridge towards Bryn Bella A5 31.5m South East form junction with B4406 Betws y Cped. Conwy LL24 0PN CONWY Tree maintenance, 2 way lights under manual control. Access required to Underground structure to repair service - No structural changes. Work being carried out on existing Plant 14/02/ /02/ /02/ /02/2017 PD PD PD BC005CC1W0019FEBWN7HNB74 A5 A5 Ty Nant, Llangwm. CONWY Safety fence replacement. 24 hour maintenance. Lane closures and 3 way lights. A5 A5 Holyhead Road VMS6. Works will be done in (near the Antelope) the morning. A5 A5 Padog, Betws y Coed CONWY Tree felling Conwy Tunnel bores and adjacent approaches - Eastbound CONWY Improvement works - Installation of Sologuard gated systems; Immediate stop line; install new gantry M1C; Pavement resurfacing; Street Lighting; Fire protection installation; Fire hydrant improvements. Lane 2 closure, contraflow & full road closure. DIVERSION: Temporary (overnight) road closures will be required to take down the existing gantry M1C and install the new gantry M1C. Diversion in westerly direction through Conwy town for cars and LGV only; HGV to use A5/A470 strategic diversion 04/03/2017 Lane Closure - - Road Closure 22/01/ PD PD PD PD
13 Conwy Tunnel bores and adjacent approaches - Westbound CONWY Improvement works - Installation of Sologuard gated systems; Immediate stop line; Install new gantry M1C; Pavement resurfacing; Street Lighting; Fire protection installation; Fire hydrant improvements. Lane 2 closure, contraflow & full road closure. DIVERSION: Temporary (overnight) road closures will be required to take down the existing gantry M1C and install the new gantry M1C. Diversion in westerly direction through Conwy town for cars and LGV only; HGV to use A5/A470 strategic diversion Road Closure 22/01/ PD EB J21 to J22 Old Colwyn CONWY Network Rail works Lane Closure 16/02/ between J12 and J13 Eastbound and Westbound - Abergwyngregyn to Tai'r Meibion. Eastbound from Abergwyngregyn to Llanfairfechan western junction, Abergwyngregyn Works to complete the drainage works on the Tai'r Meibion Scheme. Lane 1 closure (24 hours) Vegetation removal and preparation for MS4 Madryn freetext sign installation Lane Closure 12/02/ /03/2017 Lane Closure PD PD PD Eastbound from Llanfairfech west junction to county boundary Vegetation removal and preparation for MS4 Madryn freetext sign installation. Lane Closure PD Report Version 1.13 ####### 09:10:36
Cyngor Gwynedd Council
Gwaith Stryd / Streetworks Adran Amgylchedd / Environment Department Gwasanaeth Trafnidiaeth a Chefn Gwlad / Transport and Countryside Service Bwletin Gwaith Stryd / Road Works Bulletin Rhif Ffon / Phone
More informationTraffic Signs for Tourist Destinations on Trunk Roads and Motorways in Wales. Guidance for the Tourism Industry
Traffic Signs for Tourist Destinations on Trunk Roads and Motorways in Wales Guidance for the Tourism Industry August 2013 Figure 1: Motorway and Trunk Roads in Wales Holyhead A55 Bangor Conwy Llandudno
More informationRoad Closures for w/c 13 th February 2016
Road Closures for w/c 13 th February In the attachment Diversion Route Maps (for this week) please scroll to the appropriate Log No. to view the actual diversion route plan Log No. Type (i.e. f/w or road
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 4 th February 2017 to Friday, 10 th February 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below
More informationA63 Castle Street, Hull HullBID Network Lunch 24 August 2017
A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 24 th June 2017 to Friday, 30 th June 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below are
More informationMinutes of Trawsgoed Community Council held at Llanfihangel-y-Creuddyn School on Monday 20th February, 2017 at 7.30 p.m.
601 Minutes of Trawsgoed Community Council held at Llanfihangel-y-Creuddyn School on Monday 20th February, 2017 at 7.30 p.m. Present: Cllr. Sh. Edwards (Chairman) Cllr. T.A.G. Davies Cllr. H.M. Evans Cllr.
More informationCAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS
KEY: Organisation/Contractor Road Locality Traffic UK POWER NETWORKS EASTERN& LONDON HIGH STREET BABRAHAM TWO-WAY CAMBRIDGESHIRE SHEPRETH ROAD BARRINGTON TWO-WAY CAMBRIDGESHIRE HALL CLOSE BOURN SOME C/W
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 23 rd September 2017 to Friday, 29 th September 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed
More informationTEAM PLAY THROUGH FAIR PLAY
TEAM PLAY THROUGH FAIR PLAY Welsh Premier League Huws Gray Alliance League The New Saints 2 53 55 234 Llanrhaeadr 2 34 36 158 Airbus UK Broughton 7 49 56 268 Caersws 3 33 36 164 Newtown 4 56 60 268 Rhyl
More informationTEAM PLAY THROUGH FAIR PLAY
TEAM PLAY THROUGH FAIR PLAY Welsh Premier League Huws Gray Alliance League Airbus UK Broughton 4 33 37 172 Rhyl 2 25 27 120 The New Saints 2 40 42 182 Llanrhaeadr 1 31 32 134 Carmarthen Town 3 42 45 198
More informationHighway and Street Works Bulletin
Highway and StreetWorks Bulletin Network Rail Works ECCLESTON BRIDGE VIR-00-22-130816 NETWORK RAIL -PROMOTERS Bridge (Road over Rail) ECCLESTON NATIONAL BRIDGE 05/09/2016 00:0 30/04/2018 00:0 Bridge refurbishment
More informationDenbighshire County Council Local Development Plan EXAMINATION
Denbighshire County Council Local Development Plan 2006-2021 EXAMINATION Denbighshire Housing Land Supply on adoption of LDP EXAM0143A This document sets out the potential housing land supply for Denbighshire
More informationTEAM PLAY THROUGH FAIR PLAY
TEAM PLAY THROUGH FAIR PLAY Welsh Premier League Welsh Premier Women's League The New Saints 0 35 140 Cyncoed Ladies FC 0 3 12 Cardiff Met University FC 2 40 180 Swansea City LFC 0 5 20 Gap Connah's Quay
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 25 th February 2017 to Friday, 3 rd March 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below
More informationChapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London
Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin
More informationCAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS
KEY: Organisation/Contractor Road Locality Traffic LITLINGTON ROAD ABINGTON PIGOTTS ROAD CLOSURE 07-Aug-2017 28-Aug-2017 Connections Projects:NEW INDIVIDUAL SUPPLY::350m of road& verge to install new low
More informationspectator information
spectator information ACKNOWLEDGEMENTS The organisers are indebted to the following: Association of North Western Car Clubs British Trials & Rally Drivers Association Betws Y Coed Anglers Club Betws Y
More informationCAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: HUNTS
KEY: CAMBRIDGESHIRE STATION ABBOTS RIPTON CAMBRIDGESHIRE OLD NORTH ALCONBURY WESTON CAMBRIDGESHIRE STATION BLUNTISHAM TWO-WAY CAMBRIDGESHIRE STATION BLUNTISHAM BROMHOLME LANE BRAMPTON MULTI-WAY HUNTINGDON
More informationSummer Special Offers 2013
Summer Special Offers 2013 -Snowdonia, Mountains and Coast -Llyn Peninsula -North Wales Coastal Resorts -Isle of Anglesey -North East Wales Why not take a break and discover North Wales - we have plenty
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 24 th March 2018 to Friday, 30 th March 2018 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below
More informationBangor Area House Bungalow Flat Maisonette Accommodation Aber General 1
9. Gwynedd housing stock Here is a list of the current social housing stock in Gwynedd. It includes accommodation by Cartrefi Cymunedol Gwynedd, Grŵp Cynefin and North Wales Housing. Bangor Area Aber General
More informationBRYNFORD COMMUNITY COUNCIL CYNGOR CYMUNED BRYNFFORDD.
BRYNFORD COMMUNITY COUNCIL CYNGOR CYMUNED BRYNFFORDD. Minutes of the meeting of Brynford Community Council held 13 th October, 2015 at Brynford C.P. School. PRESENT: Councillor D. Jones Chairman Councillor
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 9 th September 2017 to Friday, 15 th September 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed
More informationWVS/WRVS Centres. Wales. Alphabetical by Centre. WRVS Archive & Heritage Collection
WVS/WRVS s Alphabetical by Wales WRVS Archive & Heritage Collection v.12 12 2012 List of WVS/WRVS centres in Wales Alphabetical by 1 Aberaeron UD Abercarn UD Abercrave Aberdare Abergavenny B Abergavenny
More informationA350 and C13 route management scheme
A350 and C13 route management scheme Dorset County Council is working with town and parish councils to agree a medium-term solution for the A350 and C13. Dorset County Council has received 2,492,000 from
More informationSnowdonia Expedition Assessment Service Campsite List
rthern Snowdonia OS OL17 West Sheet +Explorer 13 L Bethesda Dinas Farm, Halfway Bridge 610685 Mrs Jones 01248 364227 Small level site, book in advance all facilities Ogwen Valley Gwern Gof Uchaf 674604
More informationMajor Scheme Business Case Summary Report for Programme Entry
Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date
More informationMoving North Wales Forward
Moving North Wales Forward Our Vision for North Wales and the North East Wales Metro March 2017 1 Foreword by Ken Skates AM Cabinet Secretary for Economy and Infrastructure North Wales Opportunities for
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationExecutive Summary. North Wales Joint Local Transport Plan Executive Summary Page 1
Executive Summary Page 1 North Wales Joint Local Transport Plan 2015: Executive Summary Overview The Local Transport Plan (LTP) has been jointly produced by the six North Wales Local Authorities. Welsh
More informationBRYNFORD COMMUNITY COUNCIL CYNGOR CYMUNED BRYNFFORDD
BRYNFORD COMMUNITY COUNCIL CYNGOR CYMUNED BRYNFFORDD Minutes of the meeting of Brynford Community Council held 14 th March, 2017 at Brynford C.P. School. PRESENT: Councillor D. Jones Chairman Councillor
More informationRAMBLERS' ASSOCIATION: ABERYSTWYTH GROUP WALKS PROGRAMME 1ST MAY 2016 TO 30TH OCTOBER Date. Grade/Miles. Start Time. Grid Ref.
RAMBLERS' ASSOCIATION: ABERYSTWYTH GROUP WALKS PROGRAMME 1ST MAY 2016 TO 30TH OCTOBER 2016 On the first and third Monday of each month, there will be a short leisurely walk of one to two level miles (with
More informationPlease would it be possible to receive information on the following questions for the North Wales area;
Uned Rhyddid Gwybodaeth / Freedom of Information Unit Response Date: 22/11/2017 2017/972 - Speeding Offences In response to your recent request for information; Please would it be possible to receive information
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationSky Temporary Car Park Transport Statement
001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility
More informationLLANBEDR ACCESS IMPROVEMENTS
LLANBEDR ACCESS IMPROVEMENTS NON-MOTORISED USER SUPPLEMENTARY REPORT CPF: 5111 Client: Gwynedd Council Document Control Sheet Document Title: Document Author: Project Manager: Project Title: A496 Llanbedr
More informationCambrian Line Railcard. Pwllheli - Machynlleth - Aberystwyth - Shrewsbury. Take your children for 2 each! Valid to 13 October 2018
Cambrian Line Railcard Pwllheli - Machynlleth - Aberystwyth - Shrewsbury. Take your children for 2 each! Valid to 13 October 2018 W Cambrian Railcard.indd 1 17/07/2018 11:0 Value for money The Cambrian
More informationHertfordshire Highways WATFORD - Active Works Bulletin - July 2011
Part 1 on site or due to start within the next 6 weeks Hertfordshire Highways WATFORD - Active Bulletin - July 2011 on site or due to start on site within the next 6 weeks Hertfordshire Highways - Scheme
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationACORNS PROJECTS LIMITED
ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project
More informationCymdeithas Hanes Teuluoedd Clwyd Clwyd Family History Society. Bookstall List - December 2013
Cymdeithas Hanes Teuluoedd Clwyd Clwyd Family History Society Registered Charity no. 512068 Bookstall List - December 2013 To help you with your research the Clwyd FHS Bookstall sells a wide range of books
More informationCOLEG LLANDRILLO CYMRU STUDENTS TRANSPORT 2011/2012 RHOS-ON-SEA CAMPUS
COLEG LLANDRILLO CYMRU STUDENTS TRANSPORT 20/202 Introduction This publication provides information on towns and villages served by free College bus transport available to all eligible 6-9 year old full-time
More informationGwynedd Council pay and display car parks - December 2016 onwards
Stay Parking fee, = 1 March to 31 October Aberdyfi Up to 7.50 Enforcement hours Main, Aberdyfi, LL35 0EA 248 8 Long Penhelyg, Aberdyfi, LL35 0NB 53 4 Long Barmouth Black Patch, Barmouth, LL42 1LY 121 3
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More information2 Construction Program
2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationTHE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05
OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY
More informationSioe Cerrigydrudion Show Results 2014
Sioe Cerrigydrudion Show Results 2014 Cattle Interbreed Competitions Individual Supreme Pairs Tom Stephenson, Sylfaen Farm, Flint Cai Edwards, Pencraig Fawr, Betws GG (Commercial, Youth Section) TC Edwards,
More informationGwynedd Council s Part B Installations
Gwynedd Council s Part B Installations Permit Ref Holder / Address Permit / Monitoring Data Activity Risk Rating ARF/EPA/009A/93/PPC1 Welsh Slate Ltd, Penrhyn Quarry, Bethesda, LL57 4YG. Quarry process
More informationMEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM
MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationA31 Ringwood improvement scheme
A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationAbergele Town Council
Abergele Town Council MINUTES A meeting of the GENERAL PURPOSES and PLANNING COMMITTEE, held at 6.45 p.m. on Thursday 16 th July 2009 in the Town Hall, Llanddulas Road, Abergele. 125/09 Attendance Register:
More informationRoad Closure & Traffic Mangement Information during the 2018 ASICS Windermere Marathon Race.
Road Closure & Traffic Mangement Information during the 2018 ASICS Windermere Marathon Race. This document provides information about the Temporary Traffic Orders & Permits in place for the 2018 events.
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationNorth Wales Miners Association Trust Ltd Wrexham South Mine Trail
North Wales Miners Association Trust Ltd Wrexham South Mine Trail An 18 mile circular trail by car or bike, passing features relating to the local coal, lead and iron industries. Note that some of the
More informationAppendix 6 Fulbourn Greenway Review
Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationPARKING ENFORCEMENT IS NOW IN PLACE USE THE DESIGNATED CAR PARKS.
Wycombe Leisure Centre Address: Handy Cross, Off Marlow Hill, High Wycombe, Buckinghamshire, HP11 1UP, For Sat Nav: please enter HP11 1TJ M40 Roadworks: We regret to say that we have been informed that
More informationWhere (O) appears in the Approximate Contract Value box in the question 7 table indicates the contract value is above OJEU threshold values.
Freedom of Information Request 7517-14 Procurement Best Value (Following on from FOI Request 6321-13 Statistics and Collaborative Procurements made in July 2013) Where (O) appears in the Approximate Contract
More informationProposed End Date. Proposed Start Date. 18-Oct Oct-2016 Skip. 19-Oct Nov-2016 SKIP
KEY: Organisation/Contractor Road Locality Traffic POTTON ROAD ABBOTSLEY FIELD CLOSE ALCONBURY PRIORITY HIGH STREET ALCONBURY WESTON COLNE ROAD BLUNTISHAM COLNE ROAD BLUNTISHAM WOOD END BLUNTISHAM BT THRAPSTON
More informationCustomer Profile Report for PONT Y PAIR, BETWS Y COED (Punch Outlet Number: ) HOLYHEAD ROAD, BETWS-Y-COED, LL24 0BN (LL24 0BN)
Customer Profile Report for PONT Y PAIR, BETWS Y COED (Punch Outlet Number: 113470) HOLYHEAD ROAD, BETWS-Y-COED, LL24 0BN (LL24 0BN) Age Data Table Count: Index: 0.5 1.5 3.0 5.0 0.5 1.5 3.0 5.0 0-15 56
More informationBCU Choose Pharmacy Roll-out plan: Trading As Address Locality
BCU Choose Pharmacy Roll-out plan: Trading As Address Locality Site due to go live Morrisons Pharmacy Holyhead Road, Bangor, LL57 2EE Former Builders Yard, Corporation Road, Menai Bridge, Anglesey, LL59
More informationAfon Adda Refurbishment Bangor
Afon Adda Refurbishment Bangor Archaeological Assessment Revised Report GAT Project No. 1876 Report No. 628 April 2006 Ymddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust Craig Beuno, Ffordd
More informationQueen s Circus Roundabout
Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member
More informationN11 Arklow / Rathnew & N7 Newlands Cross PPP Contract. Kieran Kelly
N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract Kieran Kelly N7/N11 PPP CONTRACT - OVERVIEW Section A N11 Arklow/Rathnew Scheme Section B Upgrade Works on Existing M11 (Arklow Bypass & Arklow to
More informationMaidenhead Bridge. Proposed Work
W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be
More informationChapter 25 Route Window SE6 Plumstead portal. Transport for London
Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a
More information* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties
New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign
More informationLLANRWST VISION ACTION PLAN OPEN DAY Making it Happen!
LLANRWST VISION ACTION PLAN OPEN DAY Making it Happen! In 2011, Conwy County Borough Council ran a consultation about the Llanrwst Vision: Llanrwst is a key market town and service centre, supporting the
More informationupgrade It s time to the gas pipes in Rhiwbina Welcome to our information day
It s time to upgrade the gas pipes in Rhiwbina Welcome to our information day Here you can find out more about our plans to invest 2m to upgrade 15km of gas pipes in Rhiwbina. We hope you find the information
More informationLlandudno Junction. Regeneration Proposals for the Future. December 2009
Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration
More informationNEWSLETTER #04 June 2018
A5 Old Stratford Roundabout Improvements NEWSLETTER #04 June 2018 PROJECT TIMING UPDATE We are now entering into the final stages of the roundabout improvement works. Despite a number of operational challenges,
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationTransport Assessment Appendix M: Avonmouth Impacts
Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay
More informationUnlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe
Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe In order to provide a safe route for users of the South West Coast Path this project realigned 265m of the A399 coast road to incorporate
More informationBespoke Lines. BWYDLYN
2017 Now firmly established as a premium meat supplier in the wholesale sector, Bwydlyn have proven that whilst rapidly growing their customer base and geographical area, quality and consistency are never
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationDistrict Town Road Number Road Type of Works Date From Date To Traffic Management Likely impact Conditions if Applicable
Road works likely to affect journeys in the coming week: This list is only a guide as some works may have been cancelled and/or re-scheduled. For further information on East Sussex County Council road
More informationJOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,
JOINT TRANSPORTATION BOARD 10 June 2008 Subject: Director/Head of Service: Decision Issues: Decision: CCC Ward/KCC Division: Summary: To Resolve: Southern Gas Networks Gas Main Replacement Scheme - Broad
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationCity of Cardiff Council: Weekly Road Report 2017 Period from 1 st November 2017 Christmas Embargo Dates 20 th Nov 2017 until 7 th Jan 2018
City of Cardiff Council: Weekly Road Report 2017 Period from 1 st November 2017 Christmas Embargo Dates 20 th Nov 2017 until 7 th Jan 2018 City Operations Network Management Room 301, County Hall, City
More informationWOKING INTEGRATED TRANSPORT PROJECT
Civic Offices Gloucester Square Woking Surrey GU21 6YL Telephone (01483) 755855 Facsimile (01483) 768746 DX 2931 WOKING Email wokbc@woking.gov.uk Website www.woking.gov.uk 20 January 2017 Dear Resident/Business
More informationCardiff Council: Weekly Road Report 2017 Period from 6 th July 2018
Cardiff Council: Weekly Road Report 2017 Period from 6 th July 2018 City Operations Network Management Room 301, County Hall, Cardiff Council, CF10 4UW highwaysnetworkmanagement@cardiff.gov.uk www.roadworks.org
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationEXPLANATORY STATEMENT
THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.
More informationM621. Junctions 1 to 7 Improvement scheme. Share your views
M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationCenturion Way Chichester
Centurion Way Chichester Work book of plans to show details of the Centurion Way, its links, and potential developments and enhancements from linking to the South Downs National Park all the way to the
More informationAbergele Town Council
1 Abergele Town Council MINUTES A meeting of the GENERAL PURPOSES and PLANNING COMMITTEE, was held at 6:45pm on Thursday 21 st April 2016 in the Town Hall, Llanddulas Road, Abergele. 677/15 Chairman In
More informationHILGAY PARISH COUNCIL
HILGAY PARISH COUNCIL Draft minutes of the Parish Council meeting held on Thursday 9 th January 2014 7.00pm in Hilgay village hall. Present: Chairman Cllr G Carter, vice chair Cllr R Houghton, Cllr C Wills,
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationGwynedd Regeneration Strategy Supporting Document. Part of the Gwynedd Regeneration Framework PART 1(b)
Gwynedd Regeneration Strategy 2007-2013 Supporting Document Part of the Gwynedd Regeneration Framework PART 1(b) www.gwynedd.go.uk foreword This supporting document includes data, information, and maps
More informationSpeed control humps - Scotland, England and Wales
Traffic Advisory Leaflet 3/91 September 1991 Speed control humps - Scotland, England and Wales Introduction Road humps are an extremely effective means of keeping vehicle speeds low. The standard round
More information12. Sowter Road Introduction Christchurch Court
12. Sowter Road 12.1 Introduction 12.1.1 The flood defences at Sowter Road are located between St Alkmund s Way and the Silk Mill on the west bank of the River Derwent. 12.1.2 This site is split into the
More informationYstwyth and Rheidol Bridleway Routes. Route 2:Llanilar Circular
Ystwyth and Rheidol Bridleway Routes Route 2:Llanilar Circular Route overview and terrain: A long circle using connecting ridges with fine views to link the Rheidol and Ystwyth river valleys. The route
More informationVictoria Inn High Street, Borth Ceredigion SY24 5HZ Offers in the region of 300,000
Victoria Inn High Street, Borth Ceredigion SY24 5HZ Offers in the region of 300,000 Upon instructions of Mr Gary Stones acting as administrator of Victoria Leisure Limited, an opportunity has arisen to
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationEryri Local Development Plan
Eryri Local Development Plan Background Paper 21 Zones of Influence May 2017 Introduction The Authority has identified eight Zones of influence which are within and straddle the National Park. These areas
More information