San Martin Boulevard over Riviera Bay Project Development & Environment (PD&E) Study Update PID A

Size: px
Start display at page:

Download "San Martin Boulevard over Riviera Bay Project Development & Environment (PD&E) Study Update PID A"

Transcription

1 San Martin Boulevard over Riviera Bay Development & Environment (PD&E) Study Update PID A June 12, 2018

2 Location & Limits Unincorporated Pinellas County City of St. Petersburg 2

3 Overview Of Alternatives No Build Alternative Alternatives Considered but Eliminated Rehabilitation / Widening Alternative Alternative High-Level and Mid-Level Fixed Span Alternatives Does not meet current design high water clearance elevations Existing bridge condition and unknown foundations not conducive to widening Significant impacts to surrounding environment and community Significant impacts to adjacent street networks Concerns with existing channel depth, canal width and dockage space Movable Bridge Alternative Significantly higher construction cost than fixed alternatives Increased long-term maintenance and operational costs Proposed Build Replacement Alternatives Left-shifted (West) Alignment Centered Alignment Right-shifted (East) Alignment Highest Feasible Profile Reconstruction Alternatives (Fixed Bridge) Improves navigational clearances Eliminates impacts to adjacent neighborhoods 3

4 Build Replacement Alternatives WEST ALIGNMENT CENTER ALIGNMENT EAST ALIGNMENT Weedon Island Weedon Island Weedon Island 4 Stakeholder Preferred Alternative

5 North Bay Trail Extension Evaluation Stakeholder Preferred Alternative 5

6 Alternatives Comparison Matrix 50 ±19 Alternative Cost Service Life No-Build / Rehabilitation NR* N/A West Alignment $ M 75 years Center Alignment $ M 75 years East Alignment $ M 75 years Stakeholder Preferred Alternative * Not recommended due to unknown foundations and existing bridge condition. 6

7 4 th St. N. Sea Level Rise Base Conditions (0 Inundation) End Weedon Island Begin Riviera Bay Renaissance 7

8 4 th St. N. Sea Level Rise Base Conditions (1 Inundation) End Weedon Island Impacts to Low Lying Natural Areas Begin Riviera Bay Renaissance 8

9 4 th St. N. Sea Level Rise Base Conditions (2 Inundation) End Impacts to San Martin Blvd. Weedon Island Begin Riviera Bay Renaissance Impacts to Residential Neighborhoods 9

10 4 th St. N. Sea Level Rise Base Conditions (3 Inundation) End Significant Impacts to San Martin Blvd. Weedon Island Begin Riviera Bay Renaissance Significant Impacts to 83 rd Ave. 10

11 4 th St. N. Sea Level Rise Base Conditions (4 Inundation) End Loss of Connectivity on San Martin Blvd. Weedon Island Begin Riviera Bay Renaissance Impacts to Streets 11

12 4 th St. N. Sea Level Rise Base Conditions (5 Inundation) End Regional Roadway Impacts Weedon Island Begin Riviera Bay Renaissance Regional Impacts to Neighborhoods 12

13 4 th St. N. Sea Level Rise Base Conditions (6 Inundation) End Weedon Island Significant Regional Impacts Begin Riviera Bay Renaissance 13

14 Sea Level Rise (LSML) Sea Level Rise ions Summary 7 6 >7 Duke Energy Power Plant Inundation Impacts to Riviera Bay Lots NOAA SEA LEVEL RISE PROJECTIONS (2012) 5 BRIDGE 75 YEAR DESIGN LIFE ~3.6 Inundation Impacts to Renaissance Lots ~3.3 Inundation Impacts to Riviera Bay Streets ~2.0 Inundation Impacts to San Martin Blvd. ~1.5 Inundation Impacts to 83 rd Ave. Low Int. Low Int. High High Begin Impacts to San Martin Blvd > Elevation Data from : NOAA Office for Coastal Management Coastal Inundation Digital Elevation Model: Aggregate Record Publication Date: Year 14

15 Current Status Construction Schedule Construction funding proposed in Penny IV Stakeholder Preferred Alternatives: Eastern Bridge Alignment Eastern Trail Alignment Pinellas BCC work session SLR Presentation & Update June 12, 2018: Recommendation to finish PD&E Study with Stakeholder Preferred Alternative. 15

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

4.0 Context for the Crossing Project

4.0 Context for the Crossing Project 4.0 Context for the Crossing Project This section provides background information about key features of the North Douglas Crossing project area, and opportunities and constraints. This information is important

More information

Pinellas Suncoast Transit Authority Community Bus Plan

Pinellas Suncoast Transit Authority Community Bus Plan Pinellas Suncoast Transit Authority Community Bus Plan FINAL REPORT JANUARY 2014 Prepared by: TABLE OF CONTENTS Executive Summary... 2 Community Bus Plan Introduction... 22 Previous Studies... 25 Market

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235

More information

US 19 Sunset Point Rd to Countryside Blvd.

US 19 Sunset Point Rd to Countryside Blvd. Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

Grove Field Airport Environmental Assessment

Grove Field Airport Environmental Assessment Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Appendix B Connecting Track Options Evaluation Criteria

Appendix B Connecting Track Options Evaluation Criteria Appendix B Connecting Track Options Evaluation Criteria 608979-853_ra_July5-0_App Title Pages.Docx TTC ASHBRIDGES BAY MAINTENANCE AND STORAGE FACILITY CONNECTING TRACK ROUTE ALTERNATIVE - EVAULATION MATRIX.0

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.

More information

Hillsborough MPO Technical Advisory Committee. Monday, February 20, 2017

Hillsborough MPO Technical Advisory Committee. Monday, February 20, 2017 Hillsborough MPO Technical Advisory Committee Monday, February 20, 2017 1 Study Purpose Support the vision for a livable, connected, and competitive downtown. Evaluate alternatives for the system s modernization

More information

Flood History. Floodplain Descriptions

Flood History. Floodplain Descriptions Flood History The worst flooding in the area took place in 1966, 1969, 1971, 1995 and 1998. The storms in 1966 and 1969 caused considerable damage throughout the area due to flooding, erosion and debris

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006 Tenant Workshop July 12, 2007 1 Original 2026 Year Vision Plan DYNEGY PROPERTY SHARED AIRPORT/SUPPORT FACILITY 12 12 2 Input from Tenants Northport Convention Center carve out Expanded cruise berth at

More information

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp

More information

Panama Canal Stakeholder Working Group Meeting

Panama Canal Stakeholder Working Group Meeting Panama Canal Stakeholder Working Group Meeting POHA, Bayport Container Terminal, Houston, Texas August 27, 2012 TOTAL ECONOMIC IMPACT 9,749 Texas jobs are in some way related to the Port Of the 9,749

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

CIAB Report to Legislature September 30, 2014 Highlights of key recommendations/findings.

CIAB Report to Legislature September 30, 2014 Highlights of key recommendations/findings. CIAB Report to Legislature September 30, 2014 Highlights of key recommendations/findings. *There is a clearly established need for a new stadium on the UNLV campus, or as an extension of the campus, and

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Executive Summary. Executive Summary

Executive Summary. Executive Summary Executive Summary Executive Summary A North Douglas Crossing of Gastineau Channel is one of the City and Borough of Juneau (CBJ) Assembly s top transportation priorities. Project objectives are to improve

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT : Short Range Transit Plan Preferred Alternative August 2018 Table of Contents Executive Summary... 1 Preferred Alternative... 3 Best Practices for Route Design... 3 Project Goals... 4 Preferred Alternative...

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected. PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: SEPTEMBER 12, 2012 STATUS FOR SEPTEMBER 17, 2012 THROUGH SEPTEMBER 23, 2012 *** CONSTRUCTION WORK ZONES ADDED

More information

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES

More information

1.0 Purpose and Organization of the Community Impact Assessment Addendum

1.0 Purpose and Organization of the Community Impact Assessment Addendum Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

To: Mary Beth Avedesian B.F. Saul Company

To: Mary Beth Avedesian B.F. Saul Company 1140 Connecticut Avenue NW Suite 600 Washington, DC 20036 202.296.8625 TECHNICAL MEMORANDUM To: Mary Beth Avedesian B.F. Saul Company From: Daniel B. VanPelt, P.E., PTOE Felice B. Brychta, P.E. Tricia

More information

I I EXECUTIVE SUMMARY. A. Introduction

I I EXECUTIVE SUMMARY. A. Introduction EXECUTIVE SUMMARY EXECUTIVE SUMMARY A. Introduction I I 1 The Pinellas County Metropolitan Planning Organization (MPO) is planning extensions for the Pinellas Trail, a pedestrian and bicycle facility that

More information

The San Diego Region s Air Transportation Future

The San Diego Region s Air Transportation Future The San Diego Region s Air Transportation Future June 22, 2006 1 Ryan N. Hall, Airport System Planner II San Diego County Regional Airport Authority Presentation Overview 1. The law 2. The ballot measure

More information

Proposed Cherry Grove Canals Dredging Project

Proposed Cherry Grove Canals Dredging Project Proposed Cherry Grove Canals Dredging Project 1 Development of Cherry Grove C.D. Nixon inherited 9,940 acres of land 1924 Nixon family began planning subdivision of Cherry Grove 1950 Mr. Nixon closed natural

More information

Westshore Development Forum April 9, 2014

Westshore Development Forum April 9, 2014 Florida Department of TRANSPORTATION Westshore Development Forum April 9, 2014 District Seven Secretary Paul Steinman Agenda D7 Overview Current Projects Future Projects Vision Florida Department of TRANSPORTATION

More information

Railroad Safety Trail

Railroad Safety Trail 2.1 INTRODUCTION AND PROJECT SETTING 2.1 Introduction & Project Setting Introduction This study is the result of a directed effort on the part of the City of San Luis Obispo to carry out previously established

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

CHAPTER 4 - COMMENTS AND COORDINATION Introduction Comments and Responding to Comments

CHAPTER 4 - COMMENTS AND COORDINATION Introduction Comments and Responding to Comments Table of Contents SUMMARY...S-1 S.1 Joint CEQA/NEPA Document...S-1 S.2 Overview of Project Area... S-2 S.3 Purpose and Need... S-6 S.4 Proposed Action... S-6 S.5 Project Impacts... S-11 S.6 Coordination

More information

Austin-Bergstrom International Airport Master Plan Update

Austin-Bergstrom International Airport Master Plan Update FINAL REPORT Prepared for: City of Austin Department of Aviation 3600 Presidential Boulevard Austin, Texas 78719 Prepared by: P&D Aviation A Division of P&D Consultants, Inc. 999 Town & County Road, 4

More information

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV

More information

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION TO: FROM: SUBJECT: ATTACHMENTS: June 1,2017. Aaron Kunz, Deputy Director

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION TO: FROM: SUBJECT: ATTACHMENTS: June 1,2017. Aaron Kunz, Deputy Director CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION June 1,2017 TO: FROM: SUBJECT: ATTACHMENTS: Traffic & Parking Commission Aaron Kunz, Deputy Director North Santa Monica Boulevard Reconstruction Project

More information

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010 Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final

More information

Welcome Land Use Element... LU-1

Welcome Land Use Element... LU-1 Welcome Land Use Element... LU-1 Land Use Plan... LU-3 Residential Land Uses... LU-12 Commercial Land Uses... LU-14 Mixed Use... LU-16 Industrial Land Uses... LU-18 Automobile-Related Land Uses... LU-19

More information

Phoenix Sky Harbor transit guideway bridge

Phoenix Sky Harbor transit guideway bridge Phoenix Sky Harbor transit guideway bridge by David A. Burrows, Gannett Fleming The evolution of the PHX Sky Train s crossing of Taxiway Romeo At one of the 10 busiest airports in the United States, cast-in-place,

More information

Presentation Overview

Presentation Overview DON NARROWS Historical and Existing Conditions March 29, 2008 Presentation Overview 1. Project Location and Background 2. Historical Context How did the Don Narrows Come to Be? 3. The Today 4. Next Steps

More information

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment Figure ES-5 shows all of the possible LRT routes and stations identified for study in the Draft EIS/EIR. The features and impacts of each of the build alternatives are described in the following section.

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

I-75 in Hamilton County Project Termini

I-75 in Hamilton County Project Termini I-75 in Hamilton County Project Termini Introduction As part of the North South Transportation Initiative (NSTI), capacity improvements were recommended for the I-75 corridor through Hamilton County from

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018 West Santa Ana Branch Transit Corridor Community Meetings March 12, 13, 17 & 19, 2018 Purpose of this Meeting > Update on Public Scoping comments received > Why Metro is revisiting the Northern Alignments

More information

Dial-A-Ride Focus Group Final Report

Dial-A-Ride Focus Group Final Report Dial-A-Ride Focus Group Final Report Prepared by: April 5, 2018 El Dorado County Transit Authority 6565 Commerce Way Diamond Springs, CA 95619 (530) 642-5383 www.eldoradotransit.com DIAL-A-RIDE FOCUS GROUP

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Master Plan & Noise Compatibility Study Update

Master Plan & Noise Compatibility Study Update Working Document-Subject to Change, March 2010 Master Plan & Noise Compatibility Study Update (14 CFR Part 150) TECHNICAL ADVISORY COMMITTEE March 24, 2010 Working Document-Subject to Change, March 2010

More information

I-66 Inside the Beltway Feasibility Study

I-66 Inside the Beltway Feasibility Study I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation

More information

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts Electric System Serving Pierce County Current system and future investments Janet Olsen Steve Botts Project Manager Real Estate t / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

Lake Manitoba Lake St. Martin

Lake Manitoba Lake St. Martin Lake Manitoba Lake St. Martin Outlet Channels Public Information Session June 29, 2017 July 13, 2017 Background & History 2011 Spring Flood Event High flows recorded on most streams and rivers in the Assiniboine

More information

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California Public Review Draft South County Airport Master Plan Report County of Santa Clara San Martin, California July 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh

More information

Colorado Springs & Pikes Peak Region Destination Master Plan

Colorado Springs & Pikes Peak Region Destination Master Plan Colorado Springs & Pikes Peak Region Destination Master Plan Overview June 19, 2018 DESTINATION MASTER PLAN What is Destination Master Planning? Focus on infrastructure, facilities, services, attractions

More information

Electric System Serving Pierce County Current system and future investments

Electric System Serving Pierce County Current system and future investments Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

AASHTO AS Presented to AASHTO T 8, June 13, 2017

AASHTO AS Presented to AASHTO T 8, June 13, 2017 AASHTO AS 13 0024 Support for the HSCOBS Technical Committee on Moveable Bridges (T-8) in a Technical Advisory Role for Specification Updates Span Lock Design Study Presented to AASHTO T 8, June 13, 2017

More information

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY City of Solvang SUNNY FIELDS SPUR TRAIL STUDY project description The City of Solvang, in partnership with the County of Santa Barbara Public Works Department, is developing an alignment study for a proposed

More information

Chapter 3. Burke & Company

Chapter 3. Burke & Company Chapter 3 Burke & Company 3. WRTA RIDERSHIP AND RIDERSHIP TRENDS 3.1 Service Overview The Worcester Regional Transit Authority (WRTA) provides transit service to over half a million people. The service

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

Design Meeting Presentation

Design Meeting Presentation Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures

More information

Inverness Library Profile Annual Library Profile Inverness Library.

Inverness Library Profile Annual Library Profile Inverness Library. Annual Library Profile 2018-2019 www.highlifehighland.com 1 Introduction Library Profiles are prepared annually for each library within the Highland Libraries network as part of our commitment to service

More information

Williamsburg Town Hall Meeting

Williamsburg Town Hall Meeting Williamsburg Town Hall Meeting DEVELOPMENT UPDATE ORANGE COUNTY PLANNING DIVISION November 30, 2017 1 AREA CONTEXT FUTURE LAND USE MAP MEADOW WOODS MEADOW WOODS GINN PROPERTY ZONING MEADOW WOODS MEADOW

More information

Alternatives Study of Alignment

Alternatives Study of Alignment Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 1 of 6 Alternatives Study of Alignment 1 Objectives The following objectives were kept in view while locating the alternative bypass alignments:

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

Wesley Chapel Area Roadway Needs Study Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 2

Wesley Chapel Area Roadway Needs Study Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 2 Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 2 August 13, 2012 2:00 PM Pasco County Development Services Conference Room 1. Welcome/Introductions 2. Project Overview

More information

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project Update CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro-North RR Bridge Replacement Track & Station Infrastructure Improvements City

More information

FOR LEASE PRIME CBD COMMERCIAL SPACE. 169 : 19,284 SF on Three Levels 175 : 14,000 SF on Two Levels

FOR LEASE PRIME CBD COMMERCIAL SPACE. 169 : 19,284 SF on Three Levels 175 : 14,000 SF on Two Levels PRIME CBD COMMERCIAL SPACE FOR LEASE 169 + 175 Rosa L. Parks Boulevard, Nashville, TN 37203 169 : 19,284 SF on Three Levels 175 : 14,000 SF on Two Levels COLLIERS INTERNATIONAL 523 3rd Avenue South, Nashville,

More information

Penny for Pasco Renewal. FY2014/15 thru FY2024/25

Penny for Pasco Renewal. FY2014/15 thru FY2024/25 Penny for Pasco Renewal FY2014/15 thru FY2024/25 1 Background Pasco Citizens Committee (PAC) Citizens Survey Results Coordination Activities Project Schedule Category Allocations Revenue Estimates Distribution

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project JULY 2018 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority Need

More information

Community Development

Community Development Community Development City & Borough of Juneau Community Development 155 S. Seward Street Juneau, AK 99801 (907) 586 0715 Phone (907) 586 4529 Fax DATE: February 11, 2016 TO: FROM: Planning Commission

More information

Most people notice when ODOT builds something

Most people notice when ODOT builds something ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what

More information

PRIORITIES COMMITTEE MEETING

PRIORITIES COMMITTEE MEETING PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

COASTAL CONSERVANCY. Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION

COASTAL CONSERVANCY. Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION COASTAL CONSERVANCY Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION File No. 07-037-02 Project Manager: Michelle Jesperson RECOMMENDED ACTION: Authorization

More information

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY Isabelle Ghetti 1, B.Morgan 2, R.Massie 1, Gary Blumberg 2 1 Shoalhaven City Council, Nowra, NSW 2 Royal

More information

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge Texas Department of Transportation Corpus Christi District Corpus Christi Harbor Bridge Presented by Russel W. Lenz, P.E. Corpus Christi District Engineer For 2009 Texas Ports and Waterways Conference

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

ORCAS ISLAND AIRPORT MASTER PLAN

ORCAS ISLAND AIRPORT MASTER PLAN ORCAS ISLAND AIRPORT MASTER PLAN September 19, 2018 Public Open House #3 Introductions Port of Orcas Tony Simpson, Airport Manager DOWL Leah Henderson, Project Manager Eric Strong, P.E., Aviation Engineer

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

Bonita to Bridgeport January 24, 2019

Bonita to Bridgeport January 24, 2019 Thank you for participating 6:00-6:05 Welcome 6:05-6:55 Presentation; clarifying questions 7:00-7:30 Talk with staff; write comments Concerns with Locally Preferred Alternative (LPA) route between Bonita

More information

1.5 Facilities Inventory

1.5 Facilities Inventory 1.5 Facilities Inventory The Consultant Team reviewed the inventory of major facilities at the Port, using the data sheets provided in the Port Everglades Master Plan -2000, dated August 2001, as prepared

More information

(This page intentionally left blank.)

(This page intentionally left blank.) Executive Summary (This page intentionally left blank.) Executive Summary INTRODUCTION The Cache Valley Transit District (CVTD) contracted with the team of Transportation Consultants, Inc. () and Fehr

More information

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan PRELIMINARY ENGINEERING REPORT Abigail Eaton, Chair Intercounty Drains

More information

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2011 Annual Report

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2011 Annual Report Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2011 Annual Report The Nassau County Bridge Authority is a public benefit corporation created by the New York State Legislature in 1945

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information