Manitoba Infrastructure
|
|
- Oscar Fox
- 5 years ago
- Views:
Transcription
1 Manitoba Infrastructure Reference No SUPPLY OF THREE TRUCK TRACTORS FOR 2017/2018 SEALCOAT AND ASPHALT MIXING SEASONS Project No. X19234 Due: 1:00 PM, February 3, 2017 Owner: Manitoba Infrastructure Download info from Merx Note: The supply of three (3) truck tractors, on a rental basis for use in various locations throughout the Province of Manitoba with the 2017 / 2018 Provincial Sealcoat and Asphalt Mixing Programs. Reference No DEVELOPMENT OF CONSTANT SLOPE PORTABLE PRECAST CONCRETE BARRIER Solicitation No. RFP TEBRFP-01 Location: Winnipeg, Manitoba Due: 1:00 PM, February 6, 2017 Owner: Manitoba Infrastructure Phone: Note: Manitoba Infrastructure (MI) requires the services of an Engineering Service Provider to develop a portable precast concrete barrier (PPCB) design with a symmetrical cross section that will satisfy the latest revision of Manual for Assessing Safety Hardware Test Level 3 (MASH TL-3) criteria. Reference No SUPPLY OF 5 SELF PROPELLED SWEEPERS FOR 2017/18 SEALCOAT CONSTRUCTION SEASONS Project No. X19251 Due: 1:00 PM, February 7, 2017 Owner: Manitoba Infrastructure Download info from Merx Reference No DELIVERY OF BULK FUEL Solicitation No. X23145 Location: Central Manitoba Due: 1:00 PM, February 7, 2017 Owner: Manitoba Infrastructure Phone: Note: Provide delivery of bulk fuel over the winter road network to various locations throughout Central Manitoba. Reference No SUPPLY OF 4 ASPHALT TANDEM DRUM COMPACTION STEEL ROLLERS Project No. X19253 Due: 1:00 PM, February 9, 2017 Owner: Manitoba Infrastructure Download info from Merx Reference No STE. AGATHE COMMUNITY DIKE LAND DRAINAGE REVIEW STUDY Solicitation No. RFP WMS-O Location: Ste. Agathe, Manitoba Due: 1:00 PM, February 17, 2017 Owner: Manitoba Infrastructure Phone: Construction Order No. X03752 SUPPLY OF TWO STREET SWEEPERS Location: Brandon, Manitoba Due: 12:00 PM, February 17, 2017 Owner: Manitoba Infrastructure Phone: Note: The work involves the supply of street sweepers to be used in the South Western Region Brandon for the 2017 and 2018 seasons. Reference No HOURLY RENTAL RATES FOR VARIOUS EQUIPMENT Project No. RFQ 04-17/18 Location: West Central Region, Manitoba Due: 1:00 PM, February 23, 2017 Owner: Manitoba Infrastructure Phone: Note: INTENT to establish pay rates and a hiring order for all classes of equipment for the construction and maintenance season from April 1/17 to March 31/18. Reference No HOURLY RENTAL RATES FOR VARIOUS EQUIPMENT Project No /18-The Pas Location: The Pas, Cranberry Portage, Snow Lake & Grand Rapids Areas Due: 1:00 PM, February 27, 2017 Owner: Manitoba Infrastructure Phone:
2 Note: Intent To establish pay rates and a hiring order for various equipment types and groupings for the 2017/18 construction and maintenance season. Reference No HOURLY RENTAL RATES FOR VARIOUS EQUIPMENT Project No /18-Thompson Location: Lynn Lake, Gillam, Thompson, Wabowden, & Norway House Areas Due: 1:00 PM, February 27, 2017 Owner: Manitoba Infrastructure Phone: Note: Intent To establish pay rates and a hiring order for various equipment types and groupings for the 2017/18 construction and maintenance season. 12 City of Winnipeg TENDER NO RFP FOR PROFESSIONAL CONSULTING SERVICES FOR CONCEPTUAL DESIGN OF THE PROPOSED SOUTH WINNIPEG RECREATION CAMPUS Tender Due: 12:00 PM, February 7, 2017 Owner: City of Winnipeg Phone: TENDER NO RFP FOR PROFESSIONAL CONSULTING SERVICES FOR 2017 THIN BITUMINOUS OVERLAY PROGRAM Tender Due: 12:00 PM, February 13, 2017 Owner: City of Winnipeg Phone: Note: Addendum issued: January 30, 2017 Part to Part A & B TENDER NO RFP FOR PROFESSIONAL CONSULTING SERVICES FOR CONDITION ASSESSMENT OF HIGH RISK SEWER & WATER RIVER CROSSING PHASE TWO Tender Due: 12:00 PM, February 14, 2017 Owner: City of Winnipeg Phone: TENDER NO RFP FOR PROFESSIONAL CONSULTING SERVICES FOR DESIGN AND CONTRACT ADMINISTRATION FOR THE SEINE RIVERBANK STABILIZATION AT THE BRANCH 1 AQUEDUCT Tender Due: 12:00 PM, February 15, 2017 Owner: City of Winnipeg Phone: TENDER NO REQUEST FOR PROPOSAL PRE-SELECTION & DESIGN SERVICES FOR THERMAL HYDROLYSIS PROCESS SYSTEM FOR THE NORTH END SEWAGE TREATMENT PLANT Tender Due: 12:00 PM, February 15, 2017 Owner: City of Winnipeg Phone: Note: Teleconference 1:00pm Winnipeg - January 10, 2017 TENDER NO REQUEST FOR PROPOSAL PRE-SELECTION & DESIGN SERVICES FOR THERMAL HYDROLYSIS PROCESS SYSTEM FOR THE NORTH END SEWAGE TREATMENT PLANT Tender Due: 12:00 PM, February 15, 2017 Owner: City of Winnipeg Phone: Note: Teleconference 1:00pm Winnipeg - January 10, 2017 TENDER NO SUPPLY & DELIVERY OF SAND/SOIL SPREADERS Tender Due: 4:00 PM, February 16, 2017 Owner: City of Winnipeg Phone: TENDER NO SUPPLY & DELIVERY OF SIX WHEELED SWEEPERS Tender Due: 4:00 PM, February 16, 2017 Owner: City of Winnipeg Phone: TENDER NO RFP FOR PROFESSIONAL CONSULTING SERVICES FOR TRURO CREEK CULVERT REPLACEMENTS AT WINCHESTER, LINWOOD AND NESS AVENUE Tender Due: 12:00 PM, February 16, 2017 Owner: City of Winnipeg Phone: TENDER NO WAVERLEY STREET UNDERPASS AT CN MILE 3.89 RIVERS SUB: CONTRACT 2 UNDERPASS STRUCTURE, RAILWORKS, ROADWORKS, LAND DRAINAGE SEWER, PUMPING STATION AND LANDSCAPING WORKS Tender Due: 12:00 PM, February 22, 2017 Owner: City of Winnipeg Phone: Note: Bidders Conference(s): January 26, 2017 at 9:00 am OR February 2, 2017 at 9:00 am at Dillon Consulting, 1558 Wilson Place (due to limited space Bidders are to limit their attendance to two persons maximum and discouraged from attending both conferences)
3 TENDER NO NOTICE OF UPCOMING PROCUREMENT FOR SEWPCC UPGRADING/ EXPANSION PROJECT, CONTRACT 4 SITEWIDE MECHANICAL, ELECTRICAL, CONCRETE AND SITE WORKS Tender Due: 4:00 PM, March 31, 2017 Owner: City of Winnipeg Phone: Note: Notice updated November 5, 2016 posted as Notice to Bidders R1 REFERENCE NO SOUTH END SEWAGE TREATMENT PLANT UPGRADE [SEWPCC] UPGRADING/EXPANSION PROJECT Tender Due: 4:00 PM, March 31, 2017 Owner: City of Winnipeg Phone: Note: CONTRACT 4; SITE WIDE MECHANICAL, ELECTRICAL, CONCRETE AND SITE WORKS. TENDER NO NOTICE OF UPCOMING DESIGN BUILD PROCUREMENT FOR THE NORTH END SEWAGE TREATMENT PLANT (NEWPCC) UPGRADE Tender Due: 4:00 PM, September 29, 2017 Owner: City of Winnipeg Phone: Other Reference No CONSTRUCTION VEHICLES AND EQUIPMENT RENTALS Solicitation No. 02/17 Due: 5:00 PM, February 3, 2017 Owner: City of Brandon Download info from Merx Reference No. MWSB 1330 MUNICIPALITY OF NORTH NORFOLK WATER PIPELINE EXTENSIONS 2017 Location: Municipality of North Norfolk, Manitoba Due: 11:00 AM, February 3, 2017 Owner: Manitoba Water Services Board Phone: Note: The supply and installation of approximately 91,950 metres of pressure pipeline, 50 service connections, and related appurtenances all located in the Municipality of North Norfolk. Reference No. MWSB 1355 RM OF PIPESTONE LIFT STATION WORKS Location: Town of Reston, Manitoba Due: 11:00 AM, February 3, 2017 Owner: Manitoba Water Services Board Phone: Note: The Pipestone Lift Station consisting of piping and connections, underground storage tank, pumps, controls, building, access road and parking and addition of a chemical feed building and associated works at the Town of Reston Lift Station. Reference No SOIL REMEDIATION PROGRAM Location: Interlake, Manitoba Due: 3:00 PM, February 7, 2017 Owner: Kinonjeoshtegon First Nation Phone: Note: Excavation and off-site disposal of approximately 1,100 cubic metres of hydrocarbon contaminated soil. Construction and maintenance of temporary access route. Backfill excavated soil using clean backfill. Reference No. MB-MBPB-H GEOTEXTILE, NON-WOVEN, CLASS 2 Solicitation No. H Location: PR 282, MB Due: 12:00 PM, February 7, 2017 Owner: Manitoba Finance Phone: Note: Spot road improvements Reference No SUPPLY OF BOULEVARD SOIL Solicitation No. 08/17 Due: 5:00 PM, February 8, 2017 Owner: City of Brandon Download info from Merx Reference No THE CITY OF THOMPSON WWTP UPGRADE AND ASSOCIATED WORKS INVITATION TO PRE-QUALIFY Project No. MWSB Prequalification Location: City of Thompson, Manitoba Due: 3:00 PM, February 10, 2017 Owner: Manitoba Water Services Board Phone:
4 Reference No. MWSB 1302 TOWN OF VIRDEN PHASE 2: WASTEWATER TREATMENT FACILITY UPGRADES Location: Winnipeg & Dundurn Due: 11:00 AM, February 10, 2017 Owner: Manitoba Water Services Board Phone: Note: Work Site Viewing: January 25, 2017 at 12:00 Noon at the Tundra Oil and Gas Place - Pre-Bidder Conference Reference No TOWN OF VIRDEN PHASE 2: WASTEWATER TREATMENT FACILITY UPGRADES Due: 12:00 PM, February 10, 2017 Owner: The Manitoba Water Services Board Phone: Note: The work involves the supply and installation of a new 5,400 m3/day Wastewater Treatment Facility Upgrade with associated piping and appurtenances; plumbing and mechanical systems; and electrical systems and controls. The work includes a new SBR building, retrofits to the existing main building, installation of new equipment in the existing newer headworks building and miscellaneous demolition to accommodate the new works. The work also includes supply and installation of a septage receiving station, site piping, new lift station & forcemain, and appurtenances. Reference No SUPPLY AND APPLICATION OF DUST CONTROL PRODUCTS FOR 2017 Solicitation No. 08/17 Due: 5:00 PM, February 17, 2017 Owner: City Of Brandon Download info from Merx Reference No SUPPLY AND DELIVERY OF WASHED PEA GRAVEL Solicitation No. 15/17 Due: 5:00 PM, February 17, 2017 Owner: City of Brandon Download info from Merx Reference No HEAVY EQUIPMENT RENTAL Solicitation No. EW /A Due: 2:00 PM, February 21, 2017 Owner: Public Services and Procurement Canada Download info from Merx Reference No PROJECT MANAGEMENT SERVICES TO RESTORE THE DELTA BREAKWATER STRUCTURE Solicitation No. 001-ADM-017 Location: South Central Manitoba Due: 1:00 PM, February 24, 2017 Owner: Municipality of Portage la Prairie Phone: ext. 5 Reference No ADVANCE PROCUREMENT NOTICE BASE CONSTRUCTION PROGRAM FY 16/17 Solicitation No. SHICIP16 Location: Shilo, MB Due: 2:00 PM March 31, 2017 Owner: Defence Construction Canada Phone: Reference No ADVANCE PROCUREMENT NOTICE BASE CONSTRUCTION PROGRAM FY16/17 Project No. 17WCIP15 Location: Winnipeg & Dundurn Due: 3:00 PM, March 31, 2017 Owner: Defence Construction Canada Phone: ext
5 Evaluated Results MANITOBA HEAVY CONSTRUCTION ASSOCIATION Unit Ellice Ave. Winnipeg MB R3H OZ2 Tel: (204) Fax: (204) Manitoba Infrastructure Tender No LAYDOWN AND ACCESS ROAD (BRIDGE CONSTRUCTION) AT EDEN LAKE Tender Closed: January 26, 2017 (M) K & L Contracting Ltd. COR TM $298, Armcon Ltd. COR TM $304, Q.M LP $355, (M) Strilkiwski Contracting Ltd. COR TM $387, Tender No RUNWAY REHABILITATION, RED SUCKER LAKE AIRPORT Tender Closed: January 31, 2017 (M) Hugh Munro Construction Ltd. COR TM $8,775, (M) Arnason Industries Ltd. COR TM $8,862, Tender No GIRDER REPAIR STRUCTURE ON A BRIDGE OVER THE ASSINIBOINE RIVER ON PTH 34 Tender Closed: January 24, 2017 Armcon Ltd. COR TM $151, (M) M.D. Steele Construction Ltd. $192, Minty s Moving Ltd. $380, Tender No SUPPLY OF PRECAST PRESTRESSED CONCRETE GIRDERS FOR BRIDGE OVER NORTH SHANNON CREEK Tender Closed: January 26, 2017 (M) Armtec $185, Haywood Concrete Products Ltd. $238, (M) Lafarge COR TM $258, Rapid Span $269, Tender No BITUMINOUS PAVEMENT, PTH 10 Tender Closed: January 31, 2017 Potzus Paving & Load Maintenance Ltd. $6,728, (M) Maple Leaf Construction Ltd. COR TM $7,230, (M) Nelson River Construction Inc. COR TM $8,079, (M) Russell Redi-Mix Concrete Ltd. O/A Coco Paving. COR TM $8,565, (M) Borland Construction Inc. COR TM $8,612, City of Winnipeg Tender No RFP FOR PROFESSIONAL CONSULTING SERVICES FOR 2017 REGIONAL AND LOCAL STREET RENEWAL PROGRAM Tender Closed: December 16, 2016 NOTE: The following is the list of companies that won this tender. For information on who bid, contact the City of Winnipeg. (M) AECOM Canada Ltd - Pkg 17-R , (M) AECOM Canada Ltd. - Pkg 17-R , (M) MMM Group Limited - Pkg 17-R , (M) MMM Group Limited - Pkg 17-R , (M) MMM Group Limited - Pkg 17-R , (M) Morrison Hershfield - Pkg 17-C , (M) Morrison Hershfield - Pkg 17-C , (M) Stantec Consulting - Pkg 17-C , (M) Stantec Consulting - Pkg 17-C , There are no evaluated results for this week. Other 15
Tenders. Manitoba Infrastructure
Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Email: jocelyn@mhca.mb.ca Tenders Manitoba Infrastructure Reference
More informationTenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)
Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY
More informationTenders. Manitoba Infrastructure
Tenders Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Email: jocelyn@mhca.mb.ca Manitoba Infrastructure Reference
More informationThe Heavy News Weekly
November 1, 2013 Canadian Construction Association Awards Open for Nominations Twelve national awards celebrate the best in the Canadian construction industry The Canadian Construction Association national
More informationDRAFT. Dorabelle Campground Rehabilitation
DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section
More informationMicrosoft Enterprise Agreement Renewal and Software License Management Awarded to Softchoice Corporation
City of Coquitlam Closed Bids 2010 Closed Request for Information (RFI) 84431 - Engineering Consultant Design Services 2010/2011 Infrastructure Projects Kerr Wood Leidal Associates Ltd. Dayton and Knight
More informationLimestone Road Industrial Area Brandon Manitoba ~141 Acres Rail Accessible, Ready for Development
Limestone Road Industrial Area Brandon Manitoba ~141 Acres Rail Accessible, Ready for Development Dan Fontaine Business Development Specialist 204.729.2133 or 1.866.729.2132 D.Fontaine@brandon.ca EconomicDevelopmentBrandon.com
More informationCrown Lands and Property Agency. Name Client # LAST (Please Print) FIRST MIDDLE (no initials) Mailing Address. Postal Code
Manitoba Conservation and Water Stewardship Application for Permit/Lease/Purchase/Easement/Exchange/Licence of Occupation (under The Crown Lands Act c.c340) Please check one ( ) Permit Lease Purchase Easement
More informationFIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,
FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000
More informationMayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates
Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates Glebe Heights and Loch Haven Community Outreach Meeting South River High School May 17, 2016 Agenda Mayo
More informationBridges and Structures
Bridges and Structures Commitment: $2. million over five years Manitoba Infrastructure and Transportation has a five-year plan to invest $2 billion in Manitoba s road system. Of this, $.2 billion is for
More informationLake Manitoba Lake St. Martin
Lake Manitoba Lake St. Martin Outlet Channels Public Information Session June 29, 2017 July 13, 2017 Background & History 2011 Spring Flood Event High flows recorded on most streams and rivers in the Assiniboine
More informationTh e Heavy News Weekly
The Heavy News Weekly December 6, 2012 MHCA sets priorities for 2013 Manitoba Heavy Construction Association (MHCA) President, Chris Lorenc presented his 2013 Priorities Report at the Association s AGM
More informationVillage of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY
Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800
More informationWabowden. Community Overview. Economic Overview. Community Contacts. Office Hours and Staff Monday to Friday: 8:30 a.m. 4:30 p.m.
Community Overview Wabowden, situated near the geographic centre of the province, was first located at Setting Lake which is part of the historic Grass River fur trade route. With the arrival of the railway
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationCAPITAL PROGRAM SUMMARY
2017 2018 CAPITAL PROGRAM SUMMARY MISC A 2017 NEIGHBOURHOOD REHABILITATION Pitt River Road - Mary Hill to Kingsway Victoria Drive - Toronto to Holtby Pooley Avenue - High Pressure Watermain Culvert Replacement
More informationEAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009
EAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009 EAST SIDE TRANSPORTATION INITIATIVE AREA First Nations Northern Affairs Communities Metis Peoples PROCESSES EAST SIDE ROAD AUTHORITY (ESRA) CROWN
More informationCIVIL AVIATION AUTHORITY
CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview
More informationMembers of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension
To: From: Members of the Administrative Staff Committee W.H. Jackson, Director of Utility Services Meeting Date: August 26, 2015 Subject: Report USEC15-021 Award of Tender T-54-15 - Trans Canada Trail
More informationMedia Release For Immediate Release Tuesday, April 17, 2018
Media Release For Immediate Release Tuesday, April 17, 2018 2018 Budget focuses on enhancements to roads and infrastructure Investing in roads and infrastructure is a priority for the County s 2018 budget.
More informationPRIORITIES COMMITTEE MEETING
PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony
More informationCanada and Alberta announce 33 new infrastructure projects
January 28, 2010 Canada and Alberta announce 33 new infrastructure projects Stimulus funding will create jobs, stimulate regional economy Calgary... Rob Merrifield, Minister of State (Transport), and Luke
More informationTENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1
TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached).
More informationBINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016
BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 P: 08 91722341 E: binbirricontracting@hotmail.com ABN: 42 151 996 913 PO Box 2233 South Hedland WA 6722 Binbirri Contracting was established in 2010
More informationMINISTER S MESSAGE. Dear friends:
East Side Road A U T H O R I T Y EAST SIDE TRANSPORTATION INITIATIVE IN THIS ISSUE CONSTRUCTION UPDATE ON PR 304 TO BERENS RIVER ALL-SEASON ROAD PROJECT Loon and Longbody Creek bridge construction underway
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More informationCAPITAL IMPROVEMENT PLAN
CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG
More informationBID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.
BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway
More informationTRANSPORTATION: Airports and Aviation Services
TRANSPORTATION: Airports and Aviation Services Profile Our background GIBB is a leading multi-disciplinary engineering consulting firm based in South Africa with 67% Black ownership. The firm has a strong
More informationWater & Wastewater Project Activity Report
Water & Wastewater Project Activity Report A. Project Activity - Construction Phase MUNICIPALITY DESCRIPTION OR RN.08-32 Fort Erie Nigh Road Sewage PS Odour Control CRL Campbell Construction & Drainage
More informationCapital Five-Year Fiscal Forecast
Capital Five-Year Fiscal Forecast Budget Forecast Forecast Forecast Forecast REVENUES 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 State sources: CO&DS distributed to district $ 310,000 $ 310,000
More informationAloha Township Local Road Ratings Report for 2018
Cheboygan County Road Commission Aloha Township Local s Report for 2018 The goal of the Road Commission is to use Asset Management Strategies when planning projects for the roads under the jurisdiction
More informationDATA BOOK IV : COST ESTIMATE
The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55
More informationWASHTENAW COUNTY PARKS AND RECREATION COMMISSION
WASHTENAW COUNTY PARKS AND RECREATION COMMISSION - BUDGET PROPOSED FISCAL YEARS JANUARY 1, DECEMBER 31, And PROJECTED FISCAL YEARS JANUARY 1, DECEMBER 31, Robert L. Tetens, Director TABLE OF CONTENTS Millage
More informationYork Region Rapid Transit Corporation Board of Directors
Meeting of the Board of Directors on March 12, 2015 To: From: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Subject: Project Status Quarterly Q3 and Q4 2014 Ref:
More informationPROJECT UPDATES February 1, 2018
PROJECT UPDATES February 1, 2018 40 th Street Water Tower Painting Project: On September 12, 2017, City Council awarded a contract to Allied Painting, of Cherry Hill, New Jersey, in the amount of $667,500
More informationRESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM
The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport
More informationLIMESTONE ROAD BRANDON, MANITOBA INDUSTRIAL FOR SALE / FOR LEASE
59 LIMESTONE ROAD BRANDON, MANITOBA INDUSTRIAL FOR SALE / FOR LEASE Partnership. Performance. Managing Director, Broker Senior Associate Avison Young Commercial Real Estate has been appointed by the owner
More informationGravel and Rock Extraction Highway Maintenance, Recapitalization and Twinning
Gravel and Rock Extraction Highway Maintenance, Recapitalization and Twinning Backgrounder: Mountain National Parks A Need for Change Existing supplies of aggregate (sand and gravel) for highway maintenance,
More informationP U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS
P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation
More informationRecommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:
Report to Council To: Mayor Linton and Members of Council Prepared By: Wes Snarr, Managing Director of Corporate Services Report: COR-45 Date: 12 Jul RE: Recomendation for Award of Request for Tenders
More information8 Contract Awards Report July 1, 2016 September 30, 2016
Clause 8 in Report No. 19 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on December 15, 2016. 8 Awards Report July 1,
More informationSITE SELECTORS INFORMATION
SITE SELECTORS INFORMATION Location Morden is located in South Central Manitoba, 112 km from Winnipeg City Limits, 19 km from the U.S. border, 127 km from the Winnipeg International Airport. The exact
More information2016/17 Alberta Parks Capital Programs
2016/17 Alberta s Capital Programs Capital Maintenance and Renewal (CMR) Major Projects Region Description Central Blackfoot/Cooking Lake Provincial Trail System Upgrade Central Jarvis Bay Upgrade Central
More informationCity Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering
City Council Report To: From: Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering City Council Meeting: February 28, 2017 Agenda Item: 3.H Subject: Award of Feasibility/Design-Build
More informationCompletion: August 2011 LS #321 Design LS #8
1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility
More informationCAPITAL IMPROVEMENT PROGRAM 2018 CAPITAL BUDGET ADOPTED CITY OF ELMIRA, NEW YORK
2018 CAPITAL BUDGET 2018 FIVE-YEAR PROJECTION FUNDING SOURCES State & Other Government Funding CHIPS Funding (NYSDOT) 791,000 791,000 791,000 791,000 791,000 PAVE NY (NYSDOT) 172,153 172,153 172,153 172,153
More information2016 Development Cost Charges (DCC) UPDATE
2016 Development Cost Charges (DCC) UPDATE City of Richmond Public Meeting November 3, 2016 Outline Development Cost Charges (DCC) Overview DCC Rate Calculation DCC Recoverable Costs (DCC Programs) Estimated
More informationSITE SELECTORS INFORMATION
SITE SELECTORS INFORMATION Location Morden is located in South Central Manitoba, 112 km from Winnipeg City Limits, 19 km from the U.S. border, 127 km from the Winnipeg International Airport. The exact
More informationWabowden. Community Contacts
Community Status Wabowden, situated near the geographic centre of Manitoba, was first located at Setting Lake which is part of the historic Grass River fur trade route. With the arrival of the railway
More informationDEPARTMENT OF MANITOBA INFRASTRUCTURE
DEPARTMENT OF MANITOBA INFRASTRUCTURE MANITOBA AIRPORT ASSISTANCE PROGRAM PROGRAM GUIDELINES MAAP 2016 Program Guidelines THE MANITOBA AIRPORT ASSISTANCE PROGRAM Grants for airport operations and maintenance
More informationCity of Tallahassee, FL Department of Aviation
City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and
More informationCITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1
Funding Prior Years Expenditures to 6-30-10 Total Project Cost Estimated Expenditures for FY 2006 Non- Taxable Non- Housing RDA Bonds Bond Proceeds 2005 Prop. 1B USDA Loans/ Grants Dev Impact Fees TUMF
More informationPROJECT UPDATES: March 15, th Street Water Tower Painting Project:
PROJECT UPDATES: March 15, 2018 40th Street Water Tower Painting Project: On September 12, 2017, City Council awarded a contract to Allied Painting of Cherry Hill, New Jersey in the amount of $667,500
More informationIS A BUDGET ONLY DESCRIPTION QUANTITY UNIT
Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION
More informationTh e Heavy News Weekly
The Heavy News Weekly November 1, 2012 'Street Speak' infrastructure funding debate - it's really about nation building By Chris Lorenc, BA, LL.B - MHCA President The Manitoba Heavy Construction Association
More informationADDITIONAL INFORMATION
ADDITIONAL INFORMATION These schedules provide additional fiscal data considered valuable in meeting other informational needs and in providing a better understanding of the finances of the City and Borough.
More informationETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7
ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design
More informationDevelopmental Cost Charge (DCC) Program Summary
Developmental Cost Charge (DCC) Program Summary In 1997, Metro Vancouver implemented a Development Cost Charge (DCC) Program in the Liquid Waste function of the Greater Vancouver Sewerage and Drainage
More informationMinimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017
Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017 Winning Bid PERMIT FEES, FORMS, PLANS and NOTIFICATIONS Secure all necessary state and local
More informationNEWS RELEASE COMMUNIQUÉ
NEWS RELEASE COMMUNIQUÉ For Immediate Release 2010TRAN0054-000960 Aug. 19, 2010 Ministry of Transportation and Infrastructure Government of Canada 21 NEW PROJECTS TO CREATE HUNDREDS OF NEW JOBS IN B.C.
More informationFederal Gas Tax Fund-Strategic Priorities Approved and Conditionally Approved Projects 2017 Intake
Local Government Project Title Category Approved Projects Regional District of Alberni Clayoquot Asset Management Implementation Project Capacity Building -Asset Management $ 196,000.00 Regional District
More informationHutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163
Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 INTRODUCTION The City of Hutchinson is issuing a Request For Proposal (RFP) for the private or commercial use of the Hangar
More informationWeekly Bid Results. Friday, August 28, ITD - I-84 Roto Mill and Overlay Crack Test Project. Clearwater Parking Lot Sealcoat - Orofino
ITD - I-84 Roto Mill and Overlay Crack Test Project Bid Date 8/21/2015 Location Canyon County, ID $75,600.00 C & A Paving Co Clearwater Parking Lot Sealcoat - Orofino Bid Date 8/24/2015 Location Orofino,
More informationPUBLIC WORKS DEPARTMENT
PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,
More informationPlanned Procurement Opportunities Report. June 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationCAPITAL ASSET MANAGEMENT PLANNING Updated February 26, Bridges & Large Culverts Storms Sewers Vehicles (Rolling Stock), Machinery & Equipment
CAPITAL ASSET MANAGEMENT PLANNING Updated February 26, 2019 Plan Includes: Other Capital Assets: Other Assets: Roads Bridges & Large Culverts Storms Sewers Vehicles (Rolling Stock), Machinery & Equipment
More informationDay and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree
More informationDuring Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects
Page 1 of 5 May 21, 2007 HOME PROFILE SECTORS & SERVICES CAREERS SEMINARS & PAPERS LINK airport development Description of Service transportatio services link Airport Developm Pre-Construction Area Development
More informationCity of Redding Airports
City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated
More information4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE
4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation
More informationStephanie Sinnott, Executive Director, Finance, Office of the City Manager
Public Report To: From: Finance Committee Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Report
More informationAQUATICS UPDATE Park and Recreation Board
AQUATICS UPDATE Park and Recreation Board June 21, 2018 PURPOSE Provide background Provide status of: Phase 1 Package 1 Aquatic Centers Crawford/Fretz/Samuell Grand Phase 1 Package 2 Aquatic Centers Kidd
More informationWarehouse case study. Cargo Facility, Stansted. 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport
Warehouse case study Cargo Facility, Stansted 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport This new facility shows how BAA Lynton can deliver large complex
More informationUNOPS IN THE CARIBBEAN
UNOPS IN THE CARIBBEAN ENGLISH & DUTCH SPEAKING COUNTRIES / IWRM AIO SIDS UNOPS The United Nations Office for Project Services (UNOPS) is an operational arm of the United Nations, supporting the successful
More information2018 SPRING ROAD RESTRICTIONS (SRR) ORDER # 1 RESPECTING THE OPERATION OF VEHICLES ON HIGHWAYS IN THE PROVINCE OF MANITOBA
2018 SPRING ROAD RESTRICTIONS (SRR) ORDER # 1 RESPECTING THE OPERATION OF VEHICLES ON HIGHWAYS IN THE PROVINCE OF MANITOBA Pursuant to subsections 86(1), 86(2) and 86(3), The Highway Traffic Act (C.C.S.M.
More informationTown of Cary Capital Listing
FIRE Fire Apparatus Aerial Ladder Replacement 4,750,000 - - - 1,000,000 - - - 2,500,000 1,250,000 - - - Aerial Ladder Truck (new) 909,500 - - - 909,500 - - - - - - - - Fire Pumper Replacement 4,891,500-1,200,000-695,500
More informationBrevard County Utility Services Department
Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES
More informationCULTUS LAKE PARK BOARD AMENDED AGENDA
CULTUS LAKE PARK BOARD AMENDED AGENDA (1) CALL TO ORDER WEDNESDAY, MARCH 18, 2015 PARK OFFICE BOARDROOM 7:00 PM Regular Meeting (2) RESOLUTION TO PROCEED IN CAMERA (4:00) THAT the meeting be closed to
More informationNortheast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation
Northeast Anthony Henday Drive Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation Project Background 2 Edmonton Ring Road Northwest completed Nov 2011 Northeast to be completed
More informationNotice regarding expected tender
1 1 Notice regarding expected tender Section I: Contracting entity Name and address Kalaallit Airports A/S Aqqusinersuaq 48A, P.O. Box 2000 GL-3900 Nuuk Greenland Contact person: Jesper Nordskilde E-mail:
More informationProject Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon
Date: 06-24-16 To: Derek Hackett, Public Information Officer From: Sunil Jeboo, Traffic Engineer Re: Road Closure for the Week of 06-27-16 (3236.1) 6 th Pump Station Western Ave. and 6 th SW Western Ave.
More informationREPORT TO COMMITTEE. COMMITTEE: PUBLIC WORKS COMMITTEE DATE: January 9, 2018 PROPOSED 2018 CAPITAL BUDGET AND CAPITAL PLAN
REPORT TO COMMITTEE COMMITTEE: PUBLIC WORKS COMMITTEE DATE: January 9, 2018 DEPARTMENT: FINANCE & ADMINISTRATION SUBJECT: PROPOSED 2018 CAPITAL BUDGET AND 2019 2027 CAPITAL PLAN RECOMMENDATION: THAT THE
More informationAn overview. Albemarle County Service Authority s Facilities Maintenance
An overview Albemarle County Service Authority s Facilities Maintenance What We Do Electrical Facilities Pump Stations, Tanks & PRVs Landscaping Service Contracts Facilities Maintenance Michael Lynn, Operations
More informationLRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050
(All s are located at the Seaport, unless otherwise noted) Facility/ Name Detailed Description SP20000000 01 Cruise Terminal H Improv. Cruise Terminal H Improvements $13,050 $13,050 2016 Upgrade Terminal
More informationBID RESULTS FENCE-BULL RUN FIRE RESTORTATION-HUMBOLDT-TOIYABE NF, ELKO COUNTY #AG S
ELKO COUNTY JAIL MEN'S & WOMEN'S HOUSING UNIT ADDITIONS, ELKO Elko County Commissioners 994 River Street Elko, NV 89801 PH: 000-000-0000 ARCHITECT: LOMBARD-CONRAD ARCHITECTS 392 5th Street Elko, NV 89801
More informationCity of Winnipeg Concrete Mix Design Approval
PUBLIC WORKS DEPARTMENT SERVICE DES TRAVAUX PUBLICS Engineering Division Division de l ingénierie City of Winnipeg Concrete Mix Design Approval The following Concrete Producers have been approved for the
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT
More informationES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:
ES-301-1.06 Aircraft Deicing Document Identification Number ES-301-1.06 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: Aircraft deicing is the application of aircraft deicing
More informationPublic Open House. Chief Peguis Trail Project
Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your
More informationReport to Council. Report: COR Date: 25 Jul 2016
Report to Council To: Mayor Linton and Members of Council Prepared By: Mark Bradey, Financial Manager / Deputy Treasurer Report: COR2016-58 Date: 25 Jul 2016 RE: Recommendation for Award of Tender T-17-16
More informationYork Region Rapid Transit Corporation Board of Directors
Meeting of the Board of Directors on March 7, 2013 To: From: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Subject: Project Status Year-End - 2012 Ref: YORK-#4549683
More informationPennsylvania Turnpike Commission 03/30/ YEAR CAPITAL PLANNING PROCESS
Pennsylvania Turnpike Commission 3/3/29 1 YEAR CAPITAL PLANNING PROCESS PRIORITIZED LISTING OF FINAL COPY FOR FISCAL YEAR 26-27 FOR ALL EXCEPT INDEPENDENTLY FUNDED PROGRAM, ALL TYPES, ALL PHASES (in $)
More informationRAPID CITY REGIONAL AIRPORT
RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,
More informationCAPITAL IMPROVEMENT PLAN FOR THE FIVE YEAR PERIOD ENDING JUNE 30, 2023 ALLOCATION OF RESOURCES. Cash - General Fund Transfer Total
Cash - General Fund Transfer Cash - General Fund Transfer Total - - - - - - Cash - Greenbrier TIF Intersection Improvements: Battlefield Blvd. at Volvo Pkwy. 40-230 125,000 550,000 - - - 675,000 Right
More informationCanada and New Brunswick fund 74 projects to improve water and wastewater systems across the province
Backgrounder Canada and New Brunswick fund 74 projects to improve water and wastewater systems across the province Investment of more than $57.1 million Clean Water and Wastewater Fund (CWWF) Under this
More informationThe Labour Relations Act, Before the Ontario Labour Relations Board. The Utility Contractors' Association of Ontario Incorporated, - and -
File No.: 2317-12-R The Labour Relations Act, 1995 Between: Before the Ontario Labour Relations Board The Utility Contractors' Association of Ontario Incorporated, - and - Labourers International Union
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT
More information