WHO IS METROLINX?
|
|
- Heather Fletcher
- 6 years ago
- Views:
Transcription
1 CROSSTOWN LRT
2 WHO IS METROLINX?
3
4
5
6
7 Construction of the Eglinton Crosstown LRT Line Background In September 2008, Metrolinx launched a regional transportation plan a 25-year, $50 billion plan -- to coordinate and integrate transportation and transit in the Greater Toronto Area In 2010, City of Toronto approved the project to build the Eglinton Crosstown from Weston Road in the west to Kennedy Station in the east. Following a competitive process, Crosslinx Transit Solutions (CTS) was awarded a contract in July 2015 to design, build, finance, and maintain the Eglinton Crosstown Light Rail Transit (LRT).
8 Project Players and Roles
9 What Are We Building a New Modern LRT 15 underground stations and 10 surface stops 9 km below ground and 10 km above ground A maintenance and storage facility A 19-kilometre route separated from regular traffic Transit communications system Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express station
10 Safety First Our #1 Priority We train and direct staff to: Always have a site specific safety plan and site specific emergency plan. Ensure pre-work hazard assessments are complete and understood. Ensure job hazards analyses are complete and understood. Do everything possible to protect themselves, co-workers, and members of the public. Stop work if the safety of themselves, co-workers and members of the public cannot be assured. Identify and report unsafe behaviour and coach each other to make improvements. Be prepared and equipped to work safely.
11 Crosstown Design Approach Street Level Contextual and Inviting An International Signature for Toronto Entrance Bright & Secure Concourse Simple & Pristine Concourse Transparent & Open Platform Spacious & Animated
12 Accessibility Station and Stops are designed to be universally accessible, including satisfaction of the AODA, applicable City of Toronto Guidelines, the OBC, and CSA Standards. Some of those features include: Barrier free paths from the entrance level to the station platform level Tactile warning strips and tactile walking surface indicators Signage systems with tactile indicators Passenger Assistance Intercoms (PAI) Low floor Light Rail Vehicles (LRV) with designated wheelchair locations Nominal gaps from platform edges to LRV entries Automated visual and audible stop announcements On-street and off-street paratransit passenger pick-ups and drop-offs
13 Environment & Sustainability During Construction Programs to minimize impact on wildlife, their habitats, watercourses and trees Reduce impact on our community neighbours through the management of dust, noise and vibration Sustainable construction practices, including active management of construction and demolition generated wastes, targeting 75% waste diversion from landfills; and off-site beneficial reuse of excess soil. Project Design Sustainability Project wide application of Toronto Green Standard LEED Certification at EMSF Bike parking for short- and long-term users Dedicated pedestrian routes High Solar Reflectance Index paving Green roofs Water use conservation/efficiency Fritted glazing (minimize bird collisions) Shielded exterior lighting (prevent offsite light trespass) Sheltered waiting areas Energy efficiency LED lighting, heat recovery systems Landscaping use of native, droughttolerant plants and large trees
14 How We re Building the Crosstown: Construction Overview
15 How We re Building: Two Methods Cut-and-Cover Stations An area the size of the station s footprint is cut, a shallow area excavated, and steel piles, braces, and tie-backs are installed. Decking is then placed over the excavation to allow traffic to resume overhead. Mined Stations Mining occurs from inside of the excavated entrances after the shoring is complete. Each underground area to be mined is divided into segments, and mined in sequence.
16 The Crosstown: 2016 in Review Tunnels complete Construction activities at all 15 underground stations Utility relocations & support in place, underway or complete Shoring work underway or nearing completion at several stations All design through 60% completion Transit system definition for underground segments 60% complete Full Building Permit application packages being finalized for submission Q1-Q3 16
17 The Crosstown: 2017 Construction Milestones 17 Year of the Dig 1 million tons to be excavated in 2017 Start excavating main station boxes Shoring & utility relocations at interchange stations Cedarvale, Eglinton, Kennedy Track work pour concrete base and first track installation Maintenance & Storage Facility buildings enclosed New Photography Bridge construction Mount Dennis foundation complete; Kodak Building moved back Mount Dennis Pedestrian/LRT Tunnel Connection
18 Fairbank Station Aerial Rendering Service Building Main Entrance Secondary Entrance 60% design rendering
19 Fairbank Station Main Entrance 60% design rendering
20 Fairbank Station Secondary Entrance 60% design rendering
21 Fairbank Station Service Building 60% design rendering
22 Fairbank Station Construction Progress Service Building Main Entrance As of March 2017
23 How We re Building Fairbank Station: Support of Excavation (Shoring) Shoring is a common step in the process of installing the foundation of a building. An area the size of the station s footprint (about 100m x 20m) called the station box is cut, steel piles are installed around the perimeter, a shallow area is excavated, and braces and tie-backs are installed at the sides to support excavation. A concrete roof slab is constructed and placed over top of the excavated area, restoring traffic while crews work safely underground. Shoring in the roadway at Fairbank Station will take approximately 1.5 years to complete
24 Fairbank Station: 2016 in Review Demolition at the Service Building Installation of geotechnical monitoring equipment Telecommunication utilities relocation Support of excavation (shoring) at the Main Entrance 60% design completion 24
25 Fairbank Station: What to Expect in 2017 Year Quarter Construction Activity / Closure Approx. Duration Q1 (January-March) Continue shoring at Main Entrance Continue shoring at the Service Building 5 weeks 1 week Continue relocation of hydro utilities 6 weeks 2017 Q2 (April-June) Q3 (July-September) Q4 (October- December) Commence wet utilities relocation Implement traffic staging on the north side of Eglinton Ave W, and commence shoring of the north side of the station box Continue shoring at the north side of the station box Continue wet utilities relocation Implement traffic staging on the north side of Eglinton Ave W, and commence shoring of the south side of the station box Combined, wet utilities and piling will take approx. 1.5 years to complete
26 Current Construction Staging Service Building Shoring CONSTRUCTION ZONE 26
27 Proposed Construction Staging Stage 7 Beginning as early as mid May
28 Proposed Construction Staging Stage 8 Beginning late September
29 Proposed Construction Staging Stage 5 Beginning early October
30 Proposed Construction Staging Stage 6 Beginning early November
31 Summary of Proposed Traffic Changes and Sequencing Stage Start Date Duration Activity Summary of Traffic Changes Mid May < 1 month Wet Utilities & Shoring Shift traffic to the south side of Eglinton Ave W and reduce to one lane in each direction Shift traffic to the west side of Dufferin St and reduce to one lane in each direction Close east crosswalk Prohibit turns in all directions Prohibit northbound left turn from Dynevor Rd onto Eglinton Ave W 8 Early June 1 month Wet Utilities & Shoring Shift traffic to the north side of Eglinton Ave W and reduce to one lane in each direction Shift traffic to the east side of Dufferin St and reduce to one lane in each direction Close west crosswalk Prohibit turns in all directions Prohibit northbound left turn from Dynevor Rd onto Eglinton Ave W 7 Early July 2.5 months Shoring Same as previous Stage 7 8 Mid September < 1 month Shoring Same as previous Stage 8 5 Early October 1 month Wet Utilities & Shoring Shift traffic to the north side of Eglinton Ave W and reduce to one lane in each direction Shift traffic to the west side of Dufferin St and reduce to one lane in each direction Close east crosswalk Prohibit turns in all directions Prohibit northbound left turn from Dynevor Rd onto Eglinton Ave W 6 Early November < 1 month Wet Utilities & Shoring Shift traffic to the north side of Eglinton Ave W and reduce to one lane in each direction Shift traffic to the east side of Dufferin St and reduce to one lane in each direction Close west crosswalk Prohibit turns in all directions Prohibit northbound left turn from Dynevor Rd onto Eglinton Ave W 5 Mid November 1 month Shoring Same as previous Stage 5 6 Mid December 1 month Shoring Same as previous Stage 6
32 Summary of Proposed Traffic Changes and Sequencing Stage Start Date Duration Activity Summary of Traffic Changes 5 Mid January 2 months 6 Mid March 4 months 7 Mid July 2 months 8 Late September 2 months Roof Slab and Shallow Excavation Roof Slab and Shallow Excavation Roof Slab and Shallow Excavation Roof Slab and Shallow Excavation 2018 Same as previous Stage 5 Same as previous Stage 6 Same as previous Stage 7 Same as previous Stage 8
33 Fairbank Station Haul Routes During peak construction, up to 15 trucks will haul up to 40 loads to-and-from Fairbank Station per day, plus daily deliveries of construction materials, travelling to-and-from site using HWY 401 via Black Creek Dr and Allen Rd, primarily Haul routes for Fairbank Station: WB Eglinton Ave W NB Black Creek Dr HWY 401 (exiting west side of work zone) EB Eglinton Ave W NB Allen Rd HWY 401 (exiting east side of work zone) SB Dufferin St WB Rogers Rd NB Caledonia Rd WB Eglinton Ave W NB Black Creek Dr HWY 401 (exiting south side of work zone) (07:00 to 19:00 only) NB Dufferin St HWY 401 (exiting north side of work zone)
34 Oakwood Station Concept: Aerial View Main Entrance Secondary Entrance Accessible Entrance *60% rendering
35 Oakwood Station Concept: Main Entrance The main entrance and technical box are designed with an art feature to animate and highlight the view from Oakwood Avenue.
36 Oakwood Station Concept: Main Entrance Outdoor bicycle parking
37 Oakwood Station Concept: Secondary Entrance On-street connections to TTC Buses Outdoor bicycle parking
38 Oakwood Station Construction Progress Secondary Entrance Main Entrance *As of March 2017
39 Oakwood Station: 2016 in Review Geotechnical Investigation completed Demolition and Eglinton Ave W completed Stage one of long-term closure (main entrance) Support of excavation (shoring) work started at Main and Secondary entrances Temporary traffic signals installations 39 60% design completion
40 Oakwood Station: What to Expect in 2017 Year Quarter Construction Activity / Closure Approx. Duration Q1 (Jan-March) Piling at Main entrance Piling at Secondary entrance Completed Underway 2017 Q2 (April-June) Piling at Secondary entrance completed Stage 3 of long term closure (WB lane from Oakwood to Times Road) Geotechnical Instrumentation and Monitoring Phase 2 Excavation at main entrance Dewatering 2.5 years Q3 (July-Sept) Q4 (Oct-Dec) Excavation at main entrance underway Mining operations from main entrance Mining operations from main entrance Mining operations from mid 2017 mid 2019, followed by final lining to end of 2019
41 How We re Building Oakwood Station: Support of Excavation Oakwood Station will be constructed using a mined method known as Sequential Excavation Method or SEM. The first stage is support of excavation. Support of excavation (shoring) is a common step in the process of installing the foundation of a building. In the first stage, crews will install steel piles around the perimeter of the entrance. In the second stage, crews excavate the area level by level, installing braces and tie-backs as they progress. Excavation of the entrances is a depth of approximately 25 m.
42 How We re Building Oakwood Station: Sequential Excavation Mining Method Mining will occur from inside of the excavated Main entrance after the support of excavation is complete in mid With the mining method, the underground area to be excavated is divided into manageable segments and the segments are excavated in a planned sequence. The excavation creates a shotcrete-lined cavern an area of 13m high x 19m wide x 150m long. Within the cavern, the station box is constructed accommodating the rail tunnels, associated platform and rail infrastructure. Mining works continue throughout Architectural and building works begin in 2019.
43 Construction Stage Sequencing Stage Traffic Changes Pedestrian Changes Other Details 3A Spring 2017 to mid B Early 2018 to mid 2019 Long-term westbound curb lane closure on Eglinton Ave W from Oakwood to Times Road Additional eastbound curb lane closure on Eglinton Ave W from Times Road to Oakwood Sidewalk closure directly in front of Main Entrance (*existing) Closure of west pedestrian crossing of Eglinton (*existing) Temporary crossing added east of Oakwood (*existing) Pedestrian route of minimum 1.5 m is maintained from Oakwood to Times Road Pedestrian reroute around east bound closure All other conditions from Stage 3 maintained Permitted hours of work, 7am 11pm, 7 days a week for current works. Nearby residents and businesses can expect noise and vibration in the area caused by a pile drill, crane, loaders, trucks and other construction equipment, as well as dust from drilling activity and removal of excavated material Structural Work No long term closures
44 Oakwood Stage 3A* *Oakwood Traffic and Transit Management Plan is currently being finalized, some details may change
45 Oakwood Stage 3B* *Oakwood Traffic and Transit Management Plan is currently being finalized, some details may change
46 Stage 3A: Bus Stop Relocations *Change in place as of 2016 #32, #63, #332, #363 Please look for signage informing passengers of the new temporary stop locations.
47 Local Area Map
48 Oakwood Haul Routes During construction, 1-2 truck per hour will haul to-and-from Oakwood Station, including deliveries of construction materials and removal of excavated material. Trucks will arrive and enter sites directly or by reversing in with flagperson present. Proposed haul routes for Oakwood Station: Allen Road Eglinton Ave W Main entrance Eglinton Ave W Black Creek Dr Black Creek Dr Eglinton Ave W Secondary entrance Eglinton Ave W Allen Road Main Entrance Oakwood Drive Rogers Rd Dufferin Lawrence Allen Road
49 Proposed Local Traffic Changes To provide alternative route options for local traffic, the following changes to local traffic conditions are proposed: Temporary relaxation of turn prohibitions Temporary conversion of Northcliffe Ave from a one-way to a twoway street between Eglinton Ave W and Vaughan Rd. The duration of the proposed traffic changes is the greater of Fairbank Stage 8 (roof slab and shallow excavation) or Oakwood long-term lane occupancy. Possible alternative routes on next slides.
50 Proposed Parking Off-set Strategy To accommodate the proposed parking off-set strategy, the following traffic changes are required: Street Name Proposed Change From To Times Road Prohibit SB LT onto Eglinton Ave W and convert existing dedicated turn to parking and/or loading zone (angle parking to increase number of possible spots) Livingstone Ave Eglinton Ave W Livingstone Ave Temporarily relax 1-hour street parking, and convert to 3-hour street parking Dufferin St Marlee Ave Livingstone Ave Temporarily relax 9 AM 4 PM on-street parking restriction Dufferin St Locksley Ave The proposed duration is Spring 2017 to late 2019
51 Community Benefits: 2016 Early Successes Employment Information Session Community Clean Up Keelesdale Park Employment Information Session ACCES Employment Speed Mentoring Marathon Business Opportunities Information Session Public Art and Youth Engagement Initiative Mount Dennis February 2016 April 2016 May 2016 May 2016 June 2016 September 2016
52 Community Benefits: 2016 Early Successes Food Sorting with North York Harvest Apprenticeship Mentor Opportunity at Habitat for Humanity GTA Signing of Apprenticeship Declaration Holiday Giving Program with New Circles October 2016 November 2016 December 2016 December 2016
53 Community Benefits: 2017 Initiatives Date March 2017 April 2017 May 2017 June 2017 Event Women in Construction Series with YWCA Toronto Community Clean Up Speed Mentoring Marathon Procurement workshops for small- and medium-sized businesses on Eglinton and social enterprises June 2017 Public Art and Youth Engagement Initiative Thorncliffe Park
54 Business Support Marketing and Advertising Support in 2017: Host focus groups with businesses to determine marketing/advertising priorities Implement Marketing and Advertising campaign to support businesses across Eglinton Rollout social media, digital, print and traditional forms of marketing and advertising Ongoing On-the-ground Business Liaison: Open for Business signage for impacted businesses Parking support strategy to identify local Green P lots along the corridor Monthly Marketing meetings with the seven local BIAs Business Marketing workshops Collaboration with Digital Main Street to provide online and digital support to businesses Monthly canvassing to obtain feedback regularly
55 Business Support OPEN FOR BUSINESS SIGNAGE SHOP LOCAL SIGNAGE
56 Stay up to date
57 Stay in Touch or hours/7days a week facebook.com/thecrosstown twitter.com/crosstownto crosstown@metrolinx.com instagram.com/eglinton_crosstown Crosstown West Office 1848 Eglinton Ave W (at Dufferin) Crosstown East Office 660 Eglinton Ave E (at Bayview)
1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier
Mission We connect our communities Vision Getting you there better, faster and easier Values Play as a team Think forward Serve with passion 1 Metrolinx overview go transit, up express, presto Serve a
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 1, 2012 SUBJECT: LRT PROJECTS IN TORONTO - STATUS REPORT INFORMATION ITEM RECOMMENDATION It is recommended that the Commission
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT
More informationMetrolinx Projects: Temporary Delegation for Long- Term Road Closures
PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation
More informationConstruction Staging Area Blue Jays Way (357 King Street West)
REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: SUBJECT: Resubmitted December 19, 2012 November 21, 2012 MODERNIZING THE TTC A NEW APPROACH TO COMMUNICATIONS, COMMUNITY
More informationYork Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016
York Region Rapid Transit Corporation City of Vaughan Committee of the Whole June 1, 2016 0 Agenda Future rapid transit projects > Yonge North Subway Extension [YNSE] > Regional Express Rail [RER] Current
More informationLESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation
LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction
More informationAs the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.
REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District
More informationOssington Station Easier Access Project - Construction & Public Art Concept Update
Ossington Station Easier Access Project Construction & Public Art Concept Update Open House College/Shaw Library 1 Easier Access Program Wide Committed to making all stations accessible by 2025 34 stations
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN
More informationList of Our Ongoing Noise and Vibration Monitoring Projects
List of Our Ongoing Noise and Vibration Monitoring Projects Project 1: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Keelesdale Station Client: Metrolinx-Eglinton Crosstown
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationEglinton-Scarborough Crosstown LRT Update
Eglinton-Scarborough Crosstown LRT Update Councillor Matlow and Councillor Stintz Town Hall February 28 2012 Presented by: Anna Pace, Director Strategic Partnerships, TTC Transit Expansion Department 2/28/2012
More informationConstruction Staging Adelaide Street West
REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationRoute 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016
Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty
More informationEP8.2 Presentation Exhibition GO Station Improvements
EP8.2 Presentation Exhibition GO Station Improvements JANUARY 30, 2018 WORKING TOGETHER Metrolinx is working collaboratively with the City of Toronto, Exhibition Place, and the TTC to co-ordinate efforts
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationThis report recommends two new TTC transit services in southwest Toronto.
Report for Action New TTC Services - Southwest Toronto Date: March 20, 2018 To: TTC Board From: Chief Customer Officer Summary This report recommends two new TTC transit services in southwest Toronto.
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 1, 2011 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT CONTRACT AMENDMENT NO. 8 ACTION ITEM RECOMMENDATION It is recommended
More informationSTAFF REPORT ACTION REQUIRED
STAFF REPORT ACTION REQUIRED 2015 Accessibility Plan Status Report Date: March 26, 2015 To: From: TTC Board Chief Executive Officer Summary This report describes, in detail, how the TTC is meeting, or
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)
More informationSecond Street Improvements Project Project Update Archive
Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A
More informationMetrolinx Board of Directors. President, Union Pearson Express Date: September 22, 2015 UP Express Quarterly Board Report
To: From: Metrolinx Board of Directors Kathy Haley President, Union Pearson Express Date: September 22, 2015 Re: UP Express Quarterly Board Report RECOMMENDATION That this report be received for information.
More informationConstruction Staging Area 19 Western Battery Road
REPORT FOR ACTION Construction Staging Area 19 Western Battery Road Date: December 6, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York
More informationRegional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017
Regional Connector Transit Project Community Leadership Council 2 nd Hope Station & Flower St Committees January 17, 2017 1 EAT SHOP PLAY LOCAL 2 Eat Shop Play Local > Free Metro marketing campaign > Make
More informationBrisbane Metro Infrastructure Association of Queensland 14 February 2018
Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning
More informationDufferin Jog Elimination Project
Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred
More informationCREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017
CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011
Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA
More informationLESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014
LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #6 January 30, 2014 Construction Liaison Group Jan 30 2014 1 OVERVIEW HAPPY BELATED NEW YEAR Works to Date Underground Utilities Bell
More informationSTAFF REPORT ACTION REQUIRED
STAFF REPORT ACTION REQUIRED Line 5 Eglinton Station Names Date: November 23, 2015 To: From: TTC Board Chief Executive Officer Summary Metrolinx is building Line 5 Eglinton LRT (Eglinton Crosstown). At
More informationPedestrian Safety Review Spadina Avenue
STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationPRIORITIES COMMITTEE MEETING
PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony
More informationYork Region Rapid Transit Corporation. City of Vaughan VMC Sub-Committee October 18, 2017
York Region Rapid Transit Corporation City of Vaughan VMC Sub-Committee October 18, 2017 0 Agenda Construction update >> current projects in Vaughan > Bathurst & Centre > Highway 7 West > Highway 7 Vaughan
More informationWellesley Station Second Exit and Automatic Entrance Public Open House. Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street
Wellesley Station Second Exit and Automatic Entrance Public Open House Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street 1 What are Second Exits? Second exits serve three functions: As a primary
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: UNION PRECINCT STATUS REPORT UPDATE ON CONSTRUCTION INFORMATION ITEM RECOMMENDATION It is recommended that
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationPublic Information Center August 12, 2010
Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General
More informationPublic Open House. Chief Peguis Trail Project
Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your
More informationTransit in Toronto. Chair Adam Giambrone Sunday, October
Chair Adam Giambrone Sunday, October 19 2008 1 TTC is a City of Toronto Commission Transit in Toronto 2 2 Serving Toronto since 1921 Transit in Toronto 3 3 Canada s largest transit agency Annual customer-trips,
More informationSt. Clair West Station Easier Access Project Community Update Open House
St. Clair West Station Easier Access Project Community Update Open House 1 Easier Access Program Wide Committed to making all 69 stations accessible by 2025 31 stations completed - almost halfway there
More information25 th Avenue Grade Separation. Community Meeting November 13, 2018
25 th Avenue Grade Separation Community Meeting November 13, 2018 Agenda I. Project Need II. Project Benefits III. Project Description IV. Funding V. Schedule VI. Construction VII. Next Steps 2 Project
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationUnion Station Rail Corridor East Enhancements Project
Union Station Rail Corridor East Enhancements Project Transit Project Assessment Process Public Meeting #1 Presentation Wednesday June 28, 2017 GRIDLOCK COSTS OUR ECONONY REGIONAL TRANSFORMATION GO EXPANSION
More informationMEETING DATE: February 17, 2010 SUBJECT: ACTION ITEM TORONTO TRANSIT COMMISSION REPORT NO. ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT
TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 17, 2010 SUBJECT: ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT ACTION ITEM RECOMMENDATION It is recommended that the Commission forward
More informationMain Street Station Upgrades
Main Street Station Upgrades Public Meeting Hope United Church 1 Main Street Station Upgrades Bus diversions Planned improvements Construction staging Pedestrian flows 2 Main Street Station Aerial Bar
More informationRidership Growth Strategy (RGS) Status Update
For Information Ridership Growth Strategy (RGS) Status Update Date: July 10, 2018 To: TTC Board From: Deputy Chief Executive Officer Summary The TTC s Ridership Growth Strategy (RGS), with all its components,
More informationYork Region Rapid Transit Corporation Board of Directors. Mary-Frances Turner, President
Meeting of the Board of Directors On June 9, 2011 To: From: Subject: Ref: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Spadina Subway Project Update YORK-#3369547
More informationCREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017
CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than an
More informationYonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services
PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More informationYork Region Rapid Transit Corporation. York Region Council Presentation April 23, 2015 York Region Administrative Building Council Chambers
York Region Rapid Transit Corporation 0 York Region Council Presentation April 23, 2015 York Region Administrative Building Council Chambers 2014 Annual Report April 2015 1 2014 Annual Report - Overview
More informationLESLIE BARNS & CONNECTION TRACK. Leslieville BIA Meeting May 2, 2014
LESLIE BARNS & CONNECTION TRACK Leslieville BIA Meeting May 2, 2014 1 OVERVIEW Communications Queen/Leslie Intersection Closure Overview Next Steps - Coordination of TTC Track Upgrades (Queen streetcar
More informationIndustry briefing NOVEMBER 2017
Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start
More informationUnion Station Queens Quay Transit Link Study
Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit
More informationCommonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017
Commonwealth Avenue Bridge Deck Replacement Project Legislative and Stakeholder Briefing April 13, 2017 1 Project Team Contractor Walsh Construction Company Design Team HDR Lead City Point Partners, LLC
More informationKING STREET TRANSIT PILOT
KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS TRANSIT RIDERSHIP TRANSIT CAPACITY To respond to this growth in ridership, the TTC has increased the capacity of
More informationPRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction
PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury
More informationDecember 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program
December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationM-F. Old New Old New Old New Old New Old New Old New Miscellaneous Changes
, September 3, 2017 Miscellaneous Changes Wheel Trans 6 Bay and 63 Ossington 22/322 Coxwell Wheel Trans will now serve bus bay 3 at Coxwell Station, and bus bay 2 at Woodbine Station. Scheduled travel
More informationYORK UNIVERSITY BUSWAY SERVICE CHANGES
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: April 27, 2009 SUBJECT: YORK UNIVERSITY BUSWAY SERVICE CHANGES ACTION ITEM RECOMMENDATIONS It is recommended that the Commission:
More informationAppendix B Connecting Track Options Evaluation Criteria
Appendix B Connecting Track Options Evaluation Criteria 608979-853_ra_July5-0_App Title Pages.Docx TTC ASHBRIDGES BAY MAINTENANCE AND STORAGE FACILITY CONNECTING TRACK ROUTE ALTERNATIVE - EVAULATION MATRIX.0
More informationSt. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes
STAFF REPORT ACTION REQUIRED St. Dennis Drive Conversion of Traffic s to On- Street Parking and Bicycle s Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationPre-Construction Public Meeting July 2017
Pre-Construction Public Meeting July 2017 Agenda Introduction to Project Team Project Description Schedule Impacts Communication/Public Outreach 2 Contractor Walsh Construction Design Team HDR Lead City
More informationConstruction Staging Area 197 Redpath Avenue
REPORT FOR ACTION Construction Staging Area 197 Redpath Avenue Date: January 31, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationCounty of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation
Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed
More informationImproving Directional Signage for TTC Services at Pearson Airport
For Action Improving Directional Signage for TTC Services at Pearson Airport Date: May 8, 2018 To: TTC Board From: Executive Director Corporate Communications Summary This report outlines the signage and
More informationDay and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree
More informationCommittee. Presentation Outline
CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017
Crenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017 1 Project Overview Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017
Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 1 Project Overview Mainline Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More information4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE
4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation
More informationCOMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.
COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4 Recommendation The Commissioner of Engineering and Public Works and the
More informationINFORMATION ONLY. Subject: Metrolinx Presentation Date: June 22, 2015
INFORMATION ONLY Subject: Metrolinx Presentation Date: June 22, 2015 At its meeting on June 22, 2015, the TTC Board will receive a presentation on Metrolinx from Robert Prichard, Metrolinx Board Chair
More informationCitrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights
September 11, 2013 9:00 11:00 am Trellis Hall, Citrus Heights Project Overview The City of Citrus Heights is studying the feasibility of establishing a multi use trail system within the City s 26 miles
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationYork Region Rapid Transit Corporation Board of Directors
Meeting of the Board of Directors on March 12, 2015 To: From: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Subject: Project Status Quarterly Q3 and Q4 2014 Ref:
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: ISLINGTON STATION TEMPORARY BUS TERMINAL ACTION ITEM RECOMMENDATIONS It is recommended that the Board: 1.
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationTECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018
TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018 2018-2019 SCHEDULE Project progress Contract signed with the winning consortia on April 12, 2018 Project office set up for the
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7
ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationGold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content
Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.
More informationSOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER
SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER Proposal to Eliminate Traffic Gridlock in South North York Centre Area With Southbound Yonge Street to Eastbound Highway 401 Fly-UNDER A much
More informationKING STREET TRANSIT PILOT
KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot UPDATE Average streetcar travel times in continued to show similar trends as first observed in November. The most significant
More informationCREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS
CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS NIAGARA FALLS CITY COUNCIL NOVEMBER 28,
More informationMetro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements
Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Jan Perry Councilwoman, District 9 Welcome Remarks Arthur T. Leahy Chief Executive Officer, Metro Metro ExpressLanes Overview
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More information