KEY MASSED PLANTING MASSED PLANTING - LOW PLANTING TYPE PLANTING MIX AREA CODE PLANTING BOUNDARY MASSED PLANTING - TREE ENRICHMENT
|
|
- Jessie Price
- 5 years ago
- Views:
Transcription
1 rawing Plotted: 5 ec 4 :00 a.m. MT A 43R-8 AREA COE BOUNARY MP MT MASSE MASSE - LOW MASSE - TREE ENRICHMENT MASSE - SWALE TREES - FORESTRY AE TREES - SPECIMEN AE TREES - POLE AE TREE WIN SHELTER WP WETLAN RIPARIAN. REFER TO SCHEULES (8) FOR PLANT MIX ETAILS.. REFER TO STANAR ETAILS (8900 SERIES)FOR ETAIL. 3. A.5m OFFSET FROM THE VERGE HAS BEEN MAE TO ACCOMOATE THE EXTENT OF CONFIRME ON SITE. ASSOCIATE SHEET NUMBER EXISTING VEGETATION TO BE RETAINE ESIGNATION 33R WG 84 BRILEWAY CONNECTION TO FINCHAM ROA A 33R-86 A 33R-86 MT B 33R-86 TALLER OWING VEGETATION MARKE WITH * IN SCHEULE PLANTE CLOSE TO CWB EGE TO FORM A BARRIER 0 A 33R-86 A 33R-86 CYCLEWAY WALKWAY BRILEWAY A 33R-86 NORTHBOUN SOUTHBOUN 33R-86 33R WG 85 CARE TO BE TAKEN NOT TO ENCROACH ON TRUNKS OF EXISTING VEGETATION MT B 33R RAUMATI ROA 35R WG 8 FOR CONSTRUCTION MP 5..4 Revision By ate Chk Appd Chk.V :0 :00 F BAGGALEY.08.4 Approved For M. POWELL.08.4 G F-B 8..4 ate 5..4 * Refer to Revision for Signature SH MACKAYS TO PEKA PEKA /0.00 TO 3/ LEINSTER AVE TO RAUMATI R SHEET 6 MPP-33R--WG-86 MPP-33R--WG-86.WG ocument
2 rawing Plotted: 5 ec 4 :3 a.m. MT A 43R-8 AREA COE BOUNARY MP MT ASSOCIATE SHEET NUMBER MASSE MASSE - LOW MASSE - TREE ENRICHMENT MASSE - SWALE TREES - FORESTRY AE TREES - SPECIMEN AE TREES - POLE AE TREE WIN SHELTER EXISTING VEGETATION TO BE RETAINE WP WETLAN RIPARIAN ESIGNATION. REFER TO SCHEULES (8) FOR PLANT MIX ETAILS.. REFER TO STANAR ETAILS (8900 SERIES)FOR ETAIL. 3. A.5m OFFSET FROM THE VERGE HAS BEEN MAE TO ACCOMOATE THE EXTENT OF CONFIRME ON SITE. 35R WG 8 3 CONNECTION TO RAUMATI ROA 0 RAUMATI ROA A 35R-8 A 35R-8 A 35R-8 CYCLEWAY WALKWAY BRILEWAY A 35R-8 B 35R-8 NORTHBOUN MT B 35R-8 SOUTHBOUN A 35R-8 MP C 3 35R-8 B 35R-8 A 35R-8 33R WG 86 35R WG 83 FOR CONSTRUCTION MP 5..4 Revision By ate Chk Appd Chk.V :0 :00 F BAGGALEY.08.4 Approved For M. POWELL.08.4 G F-B 8..4 ate 5..4 * Refer to Revision for Signature SH MACKAYS TO PEKA PEKA /0.00 TO 3/ RAUMATI R TO WHAREMAUKU SHEET MPP-35R--WG-8 MPP-35R--WG-8.WG ocument
3 rawing Plotted: 5 ec 4 :3 a.m. MT A 43R-8 AREA COE BOUNARY MP MT MASSE MASSE - LOW MASSE - TREE ENRICHMENT MASSE - SWALE TREES - FORESTRY AE TREES - SPECIMEN AE TREES - POLE AE TREE WIN SHELTER WP WETLAN RIPARIAN. REFER TO SCHEULES (8) FOR PLANT MIX ETAILS.. REFER TO STANAR ETAILS (8900 SERIES)FOR ETAIL. 3. A.5m OFFSET FROM THE VERGE HAS BEEN MAE TO ACCOMOATE THE EXTENT OF CONFIRME ON SITE. ASSOCIATE SHEET NUMBER EXISTING VEGETATION TO BE RETAINE ESIGNATION A A 3 A R WG 8 CONNECTION TO KIWI R WP G WP G REALIGNE RAIN 7 MP C A A WP WP G 3 3A WP 35R WG 84 B NORTHBOUN FOR CONSTRUCTION MP 5..4 Revision By Chk Chk.V Appd ate A :0 :00 A 35R WG 83 SOUTHBOUN F BAGGALEY.08.4 Approved For M. POWELL.08.4 G F-B 8..4 ate 5..4 * Refer to Revision for Signature B MP C B MP C 3 CYCLEWAY WALKWAY BRILEWAY WP H SH MACKAYS TO PEKA PEKA /0.00 TO 3/5.00 RAUMATI R TO WHAREMAUKU SHEET MPP-35R--WG-8 MPP-35R--WG-8.WG ocument
4 rawing Plotted: 5 ec 4 :4 a.m. MP C 4 CYCLEWAY WALKWAY BRILEWAY NORTHBOUN 35R WG 8 SOUTHBOUN WP G WP H WP 3 WP G WP H 3 WP G A 0 B A MP C REALIGNE RAIN 7 WP 3 WP H WP G WP R WG 8 MP C 3 35R WG 85 MT A 43R-8 AREA COE BOUNARY ASSOCIATE SHEET NUMBER MP MASSE MASSE - LOW MT MASSE - TREE ENRICHMENT MASSE - SWALE FOR CONSTRUCTION MP 5..4 Revision By Chk Chk.V Appd ate :0 :00 TREES - FORESTRY AE TREES - SPECIMEN AE TREES - POLE AE TREE WIN SHELTER EXISTING VEGETATION TO BE RETAINE F BAGGALEY.08.4 Approved For M POWELL.08.4 G F-B 8..4 ate 5..4 * Refer to Revision for Signature WP WETLAN RIPARIAN ESIGNATION. REFER TO SCHEULES (8) FOR PLANT MIX ETAILS.. REFER TO STANAR ETAILS (8900 SERIES)FOR ETAIL. 3. A.5m OFFSET FROM THE VERGE HAS BEEN MAE TO ACCOMOATE THE EXTENT OF CONFIRME ON SITE. SH MACKAYS TO PEKA PEKA /0.00 TO 3/5.00 RAUMATI R TO WHAREMAUKU SHEET 3 MPP-35R--WG-83 MPP-35R--WG-83.WG ocument
5 rawing Plotted: 5 ec 4 :4 a.m. MT A 43R-8 AREA COE BOUNARY MP MT MASSE MASSE - LOW MASSE - TREE ENRICHMENT MASSE - SWALE TREES - FORESTRY AE TREES - SPECIMEN AE TREES - POLE AE TREE WIN SHELTER WP WETLAN RIPARIAN. REFER TO SCHEULES (8) FOR PLANT MIX ETAILS.. REFER TO STANAR ETAILS (8900 SERIES)FOR ETAIL. 3. A.5m OFFSET FROM THE VERGE HAS BEEN MAE TO ACCOMOATE THE EXTENT OF CONFIRME ON SITE. ASSOCIATE SHEET NUMBER EXISTING VEGETATION TO BE RETAINE ESIGNATION CV A 370 C WP G 3 WP G A 35R WG 8 WP G 3A 3 WP G 5 CV CV A WHAREMAUKU STREAM 0 WP G 4 MP C CYCLEWAY WALKWAY BRILEWAY A 3 B B A 3 B NORTHBOUN SOUTHBOUN A 4 4 WP G 7 EXISTING WHAREMAUKU WALKWAY CV FOR CONSTRUCTION MP 5..4 Revision By ate Chk Appd Chk.V :0 :00 * Refer to Revision for Signature WP G 6 F BAGGALEY.08.4 Approved For M. POWELL.08.4 G F-B 8..4 ate R WG 85 SH MACKAYS TO PEKA PEKA RAUMATI R TO WHAREMAUKU /0.00 TO 3/5.00 SHEET 4 MPP-35R--WG-84 MPP-35R--WG-84.WG ocument
6 WHAREMAUKU STREAM 35R WG 84 rawing Plotted: 5 ec 4 :5 a.m. 370 WP 35R-85 WP G 3 35R-85 WP G 35R-85 WP G 35R-85 WP 35R-85 WP G 4 35R-85 WP 3 35R-85 WP H 35R-85 0 WP G 4 35R-85 WP G 4 35R-85 WP H 35R-85 WP 3 35R WG 83 MP C 35R-85 CONNECTION TO RATA R EXISTING WHAREMAUKU STREAM WALKWAY MT A 43R-8 AREA COE BOUNARY ASSOCIATE SHEET NUMBER MP MASSE MASSE - LOW MT MASSE - TREE ENRICHMENT MASSE - SWALE FOR CONSTRUCTION MP 5..4 Revision By Chk Chk.V Appd ate :0 :00 TREES - FORESTRY AE TREES - SPECIMEN AE TREES - POLE AE TREE WIN SHELTER EXISTING VEGETATION TO BE RETAINE F BAGGALEY.08.4 Approved For M. POWELL.08.4 G F-B 8..4 ate 5..4 * Refer to Revision for Signature WP WETLAN RIPARIAN ESIGNATION. REFER TO SCHEULES (8) FOR PLANT MIX ETAILS.. REFER TO STANAR ETAILS (8900 SERIES)FOR ETAIL. 3. A.5m OFFSET FROM THE VERGE HAS BEEN MAE TO ACCOMOATE THE EXTENT OF CONFIRME ON SITE. SH MACKAYS TO PEKA PEKA /0.00 TO 3/5.00 RAUMATI R TO WHAREMAUKU SHEET 5 NOT FOR CONSTRUCTION MPP-35R--WG-85 MPP-35R--WG-85.WG ocument
7 rawing Plotted: 7 ec 4 03:59 p.m. 0 FOR CONSTRUCTION MP GFB H 5..4 Revision By Chk Chk.V Appd ate N N S UNN 8..4 M POWELL 8..4 G F-B 8..4 * Refer to Revision for Signature Approved For P. BRASHAW ate 5..4 SH MACKAYS TO PEKA PEKA /0.00 TO 3/ LEINSTER AVE TO RAUMATI SCHEULE MPP-33R--WG-8 MPP-33R--WG-8.WG ocument
8 rawing Plotted: 7 ec 4 03:59 p.m. 0 FOR CONSTRUCTION MP GFB H 5..4 Revision By Chk Chk.V Appd ate N N S UNN 8..4 M POWELL 8..4 G F-B 8..4 * Refer to Revision for Signature Approved For P. BRASHAW ate 5..4 SH MACKAYS TO PEKA PEKA /0.00 TO 3/5.00 RAUMATI TO WHAREMAUKU SCHEULE MPP-35R--WG-8 MPP-35R--WG-8.WG ocument
NLTF 2020/21 ($000) Funding Priority NLTF 2018/19 ($000) NLTF 2019/20 ($000)
Funding Priority Wellington - Carterton District Council - Local road improvements Low cost / low risk improvements 2018-21 Local Roads 2 341 HM 53% 1,050 194 149 214 Approved Street Light LED conversion
More informationThe GREEN NET SHEET LIST:
Copyright 2016/2017 Design Engine Architects - Concept by Mark Wassung - Registered Architect First Issue - 6 December 2016 The GREEN NET SHEET LIST: The Green Net Bike Mount - The Mount Bike Mount - Bayfair
More informationWELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION
WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,
More informationANNEX I. Annex I (Part-M) to Regulation (EU) No 1321/2014 is amended as follows:
ANNEX I Annex I (Part-M) to Regulation (EU) No 1321/2014 is amended as follows: 1. Point M.2 is added as follows: M.2 For the purpose of this Part, the following definitions and acronyms shall apply: (e)
More informationResidential Resort Development by Royal Palm Estates Ltd. Executive Summary July The Ridge at Castara, Tobago, West Indies.
Residential Resort Development by Royal Palm Estates Ltd Executive Summary July 2017 The Ridge at Castara, Tobago, West Indies www.castarabeach.com Overall Concept The Ridge at Castara will be developed
More informationWAIKARAKA CYCLEWAY: LESSONS LEARNT. Daniel Newcombe & Ina Stenzel Auckland City Council
WAIKARAKA CYCLEWAY: LESSONS LEARNT Daniel Newcombe & Ina Stenzel Auckland City Council Introduction Waikaraka cycleway is key link in Auckland regional cycle network Lessons learnt from two sections: Pikes
More informationBetul Airport Madhya Pradesh
Betul Airport Madhya Pradesh Airports Authority of India INEX Page No 1. About The City.1-2 2. Technical etails..3-7 3. Google Earth Pictures...8 4. Site Photographs..9 5. Grid Map 10 6. Approach Rwy 07.11
More informationDraft Strategic Plans for Coillte s eight Business Area Units ( )
Draft Strategic Plans for Coillte s eight Business Area Units (2011-2015) Response to Public Consultation from Mountaineering Ireland April 2013 1 Introduction Mountaineering Ireland welcomes this opportunity
More informationTherubali Airport Orissa
Therubali Airport Orissa Airports Authority of India National Register of Airports / Airstrips THERUBALI INEX Page No 1. About The City.1-2 2. Technical etails..3-7 3. Google Earth Pictures...8 4. Site
More informationAPPLICATION TO REGISTER A HELICOPTER FOR COMMERCIAL AIR TRANSPORT OPERATIONS
. Operator: Operator: O No.: ontact person: Email: Phone:. Helicopter ata: Manufacturer: Type esignation: Type of engine(s): Year of manufacture / first o: Serial No (If available) Icetra No.: Registration:
More information4. Omokoroa Structure Plan
4. Omokoroa Structure Plan 4.1 Infrastructure Schedule Project Funding Source() Developer Council Council Other Financial Contributions Rates Water Supply 72.6 27.4 Wastewater Reticulation 73.0 11.0 16.0
More informationMemorandum of Understanding
Memorandum of Understanding In Accordance with Section V of the U.S./Canada Bilateral Aviation Safety Agreement Implementation Procedures for Design Approval, Production Activities, Export Airworthiness
More informationTitle Block / Lines descr. Vessel Name Date Scale Size Creator. 50' proposed patrol boat 02/05/194 2
Papers of, Inc. Series, Part : Naval Architectural Drawings Original Plans in Folers -8, Rolle Plans -8 Series : Part --- Original Naval Architectural Drawings (Ship s plans) Most vessels in the collection
More informationLLANBEDR ACCESS IMPROVEMENTS
LLANBEDR ACCESS IMPROVEMENTS NON-MOTORISED USER SUPPLEMENTARY REPORT CPF: 5111 Client: Gwynedd Council Document Control Sheet Document Title: Document Author: Project Manager: Project Title: A496 Llanbedr
More informationConcept Curtin Precinct Map and Code
Concept Curtin Precinct Map and Code Proposed changes from the revised Curtin Group Centre Draft Master Plan recommendations Disclaimer: This document is intended to show the proposed changes to the existing
More informationTicketing and Service Accessibility. Ticketing & PrePay Information
Timetable Use an Service Information Ticketing an Service Accessibility Syney Buses Timetable to via Timetable Use 1. Using the route map provie with this timetable, fin the two timing points your bus
More informationTO LET Unit 1-30,000 sq ft
UNIT 1 REAY FOR OCCUPATION SPEKE LIVERPOOL, L24 9GQ TO LET Unit 1-30,000 sq ft SPECIFICATION Steel portal frame construction Minimum eaves height of 8m to the underside of the haunch Level access loading
More informationThe Ridge at Castara, Tobago, West Indies
A Residential Resort Development by Royal Palm Estates Ltd Executive Summary July 2013 The Ridge at Castara, Tobago, West Indies Overall Concept The Ridge at Castara will be developed in phases by the
More informationTerms of Reference (ToR) for a Short-Term assignment
Terms of Reference (ToR) for a Short-Term assignment Technical assistance requested Expert for climate change mitigation and adaptation Project Title Outline of the Climate Adaptation Strategy and basin-wide
More informationROAD AND TRAIL PROJECT APPROVAL
ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:
More informationState Project Reconstruction I-84
State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant
More informationApplication for Outdoor Encroachment Agreement 4906 Dundas Street West
STAFF REPORT ACTION REQUIRED Application for Outdoor Encroachment Agreement 4906 Dundas Street West Date: September 23, 2009 To: From: Wards: Reference Number: Etobicoke York Community Council Curtis Sealock,
More information3.3.2 & Structural Analysis. Designed by Rafael Ramirez PLTW/IED: Spring 2012 Madison High School. Mechanical Pencil Assembled-1
.. &.. Structural nalysis esigned by Rafael Ramirez PLTW/IE: Spring 0 Madison High School RWN Rafael Ramirez 05/0/ HEKE esigned by Rafael Ramirez Q PPROVE.. &.. Structural nalysis/product Improvement SLE
More informationIEC BOARDWALK CYCLEWAY FEASIBILITY STUDY
1 IEC BOARDWALK CYCLEWAY FEASIBILITY STUDY The aim of this study is to review the role and value of including a cycleway in the proposed boardwalk under the Island Eastern Corridor, and then to consider
More informationResidential Development Opportunity, Gleneagles, Auchterarder PH3 1NQ
Residential evelopment Opportunity, Gleneagles, uchterarder PH3 1NQ evelopment site extending to 2 acres (0.8 ha) with minded to grant planning consent for 32 residential units esirable location close
More informationSavitri Jindal Airport Orissa
Savitri Jindal Airport Orissa Airports Authority of India INEX Page No 1. About The City.1-2 2. Technical etails..3-7 3. Google Earth Pictures...8 4. Site Photographs..9 5. Grid Map 10 6. Close Up View
More informationHave your say... on the Ian McKinnon Drive Cycleway Project
Have your say... on the Ian McKinnon Drive Cycleway Project The missing cycleway link connecting the Northwestern Cycleway and Dominion Road cycle lanes to the Grafton Gully Cycleway, Te Ara I Whiti Lightpath
More informationUpdate Report - Etobicoke Creek and South Mimico Creek Trails
REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward
More information141305BP Whistlers Bar Menu 2017_Layout 1 16/05/ :11 Page 1 FOOD
141305BP Wh B Mu 2017_Lu 1 16/05/2017 16:11 Pg 1 12.30 m C FOOD 141305BP Wh B Mu 2017_Lu 1 16/05/2017 16:11 Pg 2 S STARTERS Su Su f f h h D D 4.95 (50-100 C) 4.95 Fh O Su 5.15 Fh P M Su Rh bf fvu mmé wh
More informationMATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z2
TORONTO TRANSIT COMMISSION ADDENDUM NO._1 MATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z TITLE: PRINTING AND SUPPLY OF RIDE GUIDES FOR UP TO A THREE () YEAR
More informationAirports Authority of India
Beas Airport Punjab Airports Authority of India INEX Page No 1. About The City.1-2 2. Technical etails..3-7 3. Google Earth Pictures...8 4. Site Photographs..9 5. Grid Map 10 6. Close Up View...11 7. Approach
More informationGreen Line Implementation Plan Draft Conceptual Master Plan Phase 2: Public Meeting 02 April
Green Line Implementation Plan raft Conceptual Master Plan Phase 2: Public Meeting 02 April 23 2018 credit: Park People / Sammy Tangir Public Meeting 02_ Agenda No. Item 1.0 Welcome and Introductions 2.0
More informationDATABASE HEALTH INDEX - DASHBOARD
Page 1 of 8 DATABASE HEALTH INDEX - DASHBOARD Carriageway Asset Inventory Area: Date: CENTRAL WAIKATO M&O 10/10/2013 Category Measures Result Measure Capital Projects Surfacing Pavement Layer Major capital
More informationNOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT
1 July 2016 Planning Manager Westland District Council 36 Weld Street HOKITIKA Attn Alex Dunn Dear Alex NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT On 15 June 2016 you issued
More informationUnited States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017
NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic
More information1 st Steering Committee Meeting DANUBEparksCONNECTED
1 st Steering Committee Meeting DANUBEparksCONNECTED 1st period review Upcoming events & strategic actions Strategic decicions 1 st DANUBEparksCONNECTED Steering Committee Meeting Kopacki rit, 29 th June,
More informationStony Creek Master Plan Public Meeting #2. May 21, 2016
Stony Creek Master Plan Public Meeting #2 May 21, 2016 Today s Agenda 10:00 10:20 am Presentation 10:20 10:45 am Q & A 10:45 11:30 am Browse, discuss, and comment Metroparks Master Plan Process 4 months
More informationCAME-LISTA USKLAĐENOSTI SA PART M CAME-PART M COMPLIANCE LIST
Hrvatska agencija za civilno zrakoplovstvo / Croatian Civil Aviation Agency Ulica grada Vukovara 284, 10 000 Zagreb Tel.: +385 1 2369 300 ; Fax.: +385 1 2369 301 e-mail: ccaa@ccaa.hr CAME-LISTA USKLAĐENOSTI
More informationLAKE DUNSTAN TRAIL EXTRA SITE PHOTOS
LAKE DUNSTAN TRAIL EXTRA SITE PHOTOS STATUS: FOR CUMULATIVE EFFECTS ASSESSMENT NOTE: SECTIONS OF TRAIL THAT NEED CONSENT ARE NOTED. ALL OTHER SECTIONS OF TRAIL ARE WIHTIN THE WSMRA EXISTING 4WD TRACKS
More informationRenzo Piano Building Workshop
KRUSE GTEWY CENTER es Moines, Iowa Urban esign Review Board Presentation 08.04.205 02 High St. High St. High St. 5th St. Ingersoll ve. Passive Forest Building Service Linden St. Service 4th St. 6th St.
More informationGeneral Highway System SHEET 1 HILTON HEAD ISLAND URBAN AREA
5 6 7 8 A A B B General Highway System SHEET 1 HILTON HEAD ISLAND URBAN AREA SECONDARY ROUTE - - - - - 9 WETLAND OR MARSH - - - - - - - - - CHURCH AND CEMETERY - - - - - - - - CEMETERY - - - - - LM 78
More informationPO#: Job Name: Quote # Account # Phone# Quantity. Ordered: Location:
OC Last Modified Date: 12/20/2014 1:20:09 PM PO#: Job Name: 8118 Job Address: 8118 Harding ave Miami Beach FL WINDOWS El 000RS Quote # 3442372 SLC WINDOWS AND DOORS Ship Date:01/20/2015 687 N BISCAYNE
More informationPublic transport opportunity in South East Queensland
Public transport opportunity in South East Queensland AITPM Half day Seminar Peter Milward, General Manager (Passenger Transport Integration), TransLink Division 1 Agenda Our role Opportunities Working
More informationAPPLICATION TO REGISTER AN AIRCRAFT FOR COMMERCIAL AIR TRANSPORT OPERATIONS
. Operator: Operator: O No.: ontact person: Email: Phone:. ircraft ata: Manufacturer: Type esignation: Type of engine(s): Year of manufacture / first o: Serial No (If available) Icetra No.: Registration:
More informationTHE SUMMIT AT QUADRA VILLAGE THE SUMMIT AT QUADRA VILLAGE
TH SUMMIT T QU VILLG TH SUMMIT T QU VILLG 215 216 March 215 arly ngagement Community Open House January 216 Online ngagement March 216 Online ngagement June 216 Final ngagement eport ecember 215 esign
More information... Egypt & MEDUSA. 8th Euromed GNSS WG meeting Brussels, 25 November 2015
Page 1 Egypt & MEDUSA... 8th Euromed GNSS WG meeting Brussels, 25 November 2015 IBRAHIM EISSA, National Air Navigation Service Company, NANSC GENERAL SATELLITE MANAGER Ibrahim.eissa@nansceg.net NANSC company
More informationBuses in Taupō Information Pack
Buses in Taupō Information Pack Why is InterCity moving? Operating from Gascoigne Street is not financially sustainable for InterCity Why would Council like to sell the Gascoigne Street Property? The sale
More informationMinutes of Trawsgoed Community Council held at Llanfihangel-y-Creuddyn School on Monday 20th February, 2017 at 7.30 p.m.
601 Minutes of Trawsgoed Community Council held at Llanfihangel-y-Creuddyn School on Monday 20th February, 2017 at 7.30 p.m. Present: Cllr. Sh. Edwards (Chairman) Cllr. T.A.G. Davies Cllr. H.M. Evans Cllr.
More informationDATABASE HEALTH INDEX - DASHBOARD
Page 1 of 8 DATABASE HEALTH INDEX - DASHBOARD Carriageway Asset Inventory Collected Data Non-Carriageway Asset Inventory Area: Date: WELLINGTON 12/12/2013 Category Measures Result Measure Capital Projects
More informationChildren's Discovery Trail Guide - Lost Creek
Children's Discovery Trail Guide - Lost Creek Thank you for spending time learning and observing some of the secrets of Red Rock Canyon Conservation Area has to offer. Feel free to talk to a ranger if
More informationThe South Gippsland Koala. For over 60 years, the plantation industry has shared a unique relationship with the Strzelecki Koala. protection.
The South Gippsland Koala For over 60 years, the plantation industry has shared a unique relationship with the Strzelecki Koala. protection harmony THE CO-EXISTENCE OF THE KOALA WITH THE PLANTATIONS co-existence
More informationThe Geological Pacific Northwest. Wednesday February 6, 2012 Pacific Northwest History Mr. Rice
The Geological Pacific Northwest Wednesday February 6, 2012 Pacific Northwest History Mr. Rice 1 Free Response #2 Please do not simply list the items for this response. Full sentences!!! Minimum of 3-5
More informationChanging Landscapes: Glaciated Landscapes. What are glaciers?
Changing Landscapes: Glaciated Landscapes What are glaciers? What you need to know Types of ice mass at a range of scales including cirque glaciers, valley glaciers, highland ice field, piedmont glaciers,
More informationSHINGLE CREEK SECTION CONTENTS: BOHANON PARK CREEKVIEW PARK SHINGLE CREEK PARK SHINGLE CREEK REGIONAL TRAIL WEBBER PARK
SHINGLE CREEK SECTION CONTENTS: BOHANON PARK CREEKVIEW PARK SHINGLE CREEK PARK SHINGLE CREEK REGIONAL TRAIL WEBBER PARK SPLASH PAD Good condition. PARK BUILDING BRYANT AVE N Good condition and unique to
More informationwaterview connection Completing the Western Ring Route the Waterview Connection
waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting
More informationMULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING
International Civil Aviation Organization Global Tracking 2014-WP/1 5/5/14 WORKING PAPER MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING Montréal, 12 May to 13 May 2014 Agenda item 1: Explore the need
More informationSustainable Regions Executive Summary Airlie Beach Mackay Region North Stradbroke Island Winton. Prepared by
Sustainable Regions Executive Summary Airlie Beach Mackay Region North Stradbroke Island Winton Prepared by December 2009 Executive Summary In responding to global concern over climate change, Queensland
More informationExpected from the initial 5-year funding package for State Highways (2006/07 to 2010/11) SH1, Cape Reinga SH1, Waitiki Land to Cape Reinga Stage 2*
KEY DELIVERABLES Expected from the initial 5-year funding package for State Highways (2006/07 to 2010/11) BUILT AND OPENED PROJECTS BUILT SH1, Cape Reinga SH1, Waitiki Land to Cape Reinga Stage 2* SH1,
More informationProcessing and issuance of NTCA approvals
REPUBLIC OF SOUTH AFRICA SACAA Private Bag X 73 Halfway House 1685 CIVIL AVIATION AUTHORITY Tel: (011) 545-1000 Fax: (011) 545-1465 E-Mail: mail@caa.co.za GENERAL NOTICE # AIR-2016/002 Revision 2 DATED
More informationETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7
ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design
More informationAmended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort
Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance
More informationWORKING PAPER. International. Montréal, 19. of the Technical Edition TO PASSENGERS SUMMARY. shown in 1.1. other means. 1.
International Civil Aviation Organization 31/8/15 WORKING PAPER DANGEROUS GOODS PANEL (DGP) TWENTY-FIFTH MEETING Montréal, 19 to 30 October 2015 Agenda Item 2: Development of recommendations for amendments
More informationSTREAMWALKS REVISITED
STREAMWALKS REVISITED Maggie A. Kendrick, Department of Earth Sciences, University of South Alabama, Mobile, AL, 36688. Email: mak0209@aol.com. The goal of my research is to have a system of streamwalks
More informationPrivatising SOEs in Ireland Is it worth it?
Privatising SOEs in Ireland Is it worth it? Donal Palcic & Eoin Reeves Privatisation and PPP Research Group Department of Economics University of Limerick Ireland Presented to Irish Economy Conference
More informationGLACIATION. The Last Ice Age (see Chapter 12) and. Pleistocene Ice Cap. Glacial Dynamics 10/2/2012. Laurentide Ice Sheet over NYS
GLACIATION and New York State Prof. Anthony Grande The Last Ice Age (see Chapter 1) The Pleistocene Epoch began 1.6 mya. During this time, climates grew colder. There were numerous ice ages starting 100,000000
More informationEstablishing a National Urban Park in the Rouge Valley
STAFF REPORT ACTION REQUIRED Establishing a National Urban Park in the Rouge Valley Date: March 29, 2012 To: From: Wards: Reference Number: Executive Committee Deputy City Manager, Cluster B All p:\2012\cluster
More informationQUAY. This is a place where luxury awaits.
QUAY AT QUAY AT Stocklan is elighte to present a stunning collection of waterfront home sites situate within the prestigious master planne Newport community. Commaning a premier position on the water s
More informationMake Mulund your permanent address. The Prince of Suburbs Awaits You.
27.12.2017 Make Mulun your permanent aress. The Prince of Suburbs Awaits You. A&O 022 6134 4953 excellente@aorealty.com aorealty.com/excellente Site Aress : A&O Excellenté, Dr. Rajenra Prasa a, Near Mulun
More information2012 Stratford Fall Festival & Green Fair October 6, 2012
STRATFORD BUSINESS & CIVIC ASSOCIATION FALL FESTIVAL 2011 WorkingTogether! Find us on 2012 Stratford Fall Festival & Green Fair October 6, 2012 www.stratfordfallfestival.com VENDOR APPLICATION Crafters/Businesses
More informationExplanation. AMP 4.0 Rotorcraft Aircraft maintenance programme (AMP) FOCA template. includes AMP and schedule-list (due-list)
Explanation AMP 4.0 Rotorcraft Aircraft maintenance programme (AMP) FOCA template includes AMP and schedule-list (due-list) Statutory source: SR 748.215.1 VLL Verordnung des UVEK über die Lufttüchtigkeit
More informationHEALTH EXAMINATION FORM CAMP GLEN ARDEN P.O. BOX 7 Tuxedo, NC (828) THIS SIDE TO BE COMPLETED BY PARENTS
HEALTH EXAMINATION FORM CAMP GLEN ARDEN P.O. BOX 7 Tuxedo, NC 28784 (828) 692-8362 THIS SIDE TO BE COMPLETED BY PARENTS Camper s last name: First Name MI DOB Home Address Parent/Guardian Home Address (if
More informationWellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY
National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is
More informationAre You Afraid To Fly? Arnold Barnett MIT
Are You Afraid To Fly? Arnold Barnett MIT To put the question in a more neutral way: How Safe Is It to Fly? Well, how should we measure aviation safety? Given that a passenger s greatest fear is of being
More informationPresentation on the national cultural heritage in the Carpathians -.(name of the Party)
Presentation on the national cultural heritage in the Carpathians -.(name of the Party) Carpathian Convention Fifth Meeting of the Working Group on Cultural Heritage and Traditional Knowledge 4-5 April
More informationAppendix 8 Sawston Greenway Review
Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Bolin Creek West Conservation Area Date of visit: March 16, 2017 County: Orange Property Type: Restrictive Covenants
More informationISOM & ISSOM forbidden symbol comparison
& forbidden symbol comparison Forbidden symbols and their relatives Symbol 2000 (Long, Middle) 2007 (Sprint) 201 Impassable cliff An impassable cliff, quarry or earth bank (see 106) is shown with a 0.35
More informationAirworthiness Directive
Airworthiness Directive AD No.: 2017-0069 Issued: 25 April 2017 Note: This Airworthiness Directive (AD) is issued by EASA, acting in accordance with Regulation (EC) 216/2008 on behalf of the European Union,
More informationNumber 1 Gross Regional Product per capita in Queensland
Number 1 Gross Regional Product per capita in Queensland Whitsunday Region is the nation building region of Australia providing over $22 billion of economic value to the Australian economy. Our region
More informationTrails, steps, & P-Patch to be south of I- 5 Colonnade
UW Campus Trails, steps, & P-Patch to be south of I- 5 Colonnade Blaine and Howe Street steps REI N new lighting existing features connector trail new features or improvements overhead freeway and support
More informationCLAREMONT CLUB, SPA & RESIDENCES
LANDMARKS SUBMITTAL LOCATION MAP PROJECT DIRECTORY SHEET INDEX VICINITY MAP Ashby Ave PROJECT SITE Tunnel Rd PROJECT SITE Claremont Ave OWNER Claremont Hotel Properties, LP 41 Tunnel Road Oakland, CA 94705
More informationLand use and natural resource management
Land use and natural resource management Cape York Cape York BW Template.ppt -2- Cape York Ins-tute for Policy & Leadership 4 Cape York Ins-tute for Policy & Leadership 5 Cape York Ins-tute for Policy
More informationGLACIER STUDIES OF THE McCALL GLACIER, ALASKA
GLACIER STUDIES OF THE McCALL GLACIER, ALASKA T John E. Sater* HE McCall Glacier is a long thin body of ice shaped roughly like a crescent. Its overall length is approximately 8 km. and its average width
More informationElectric System Serving Pierce County Current system and future investments
Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested
More informationHARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre
78 AC_BEU_CCMP_2_TM1_4 _FD.indd 78 20/07/12 12:04 PM 01 HARBOUR EDGE STITCH Uniting the Waterfront with the City Centre 01 VISION OUR 2032 VISION IS: Quay Street as a high-quality Harbour Edge space that
More informationAlpine Glacial Features along the Chimney Pond Trail, Baxter State Park, Maine
Maine Geologic Facts and Localities September, 2009 Alpine Glacial Features along the Chimney Pond Trail, Baxter State Park, Maine 45 54 57.98 N, 68 54 41.48 W Text by Robert A. Johnston, Department of
More informationEVALUATION MANUEL PARTIE D DSA.AOC.CHKL.075
OPERATOR : MANUAL : N and edition date : N and revision date : CHECKED BY : CHECK DATE: SIGNATURE : Instructions for Use: 1. Check S column if you reviewed the record, procedure or event and it is Satisfactory.
More informationRIO VISTA MUNICIPAL AIRPORT
DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012
More informationSOURCE: Infection Prevention & Control (IPC)
GUIELINE TITLE Infection Prevention & Control (IPC) Guidelines For Correctional Centre Code Bags: Contents, Use, Cleaning And Restocking RELATE OCUMENTS June 17, 2013 SOURCE: Infection Prevention & Control
More informationPARK ISLAND NAPIER MASTER PLAN. May 2017
PARK ISLAND NAPIER MASTER PLAN May 2017 page 2 Bibliographic reference for citation: Boffa Miskell, 2016. PARK ISLAND NAPIER, Master Plan. Report by Boffa Miskell Limited for Napier City Council. Prepared
More informationFlood History. Floodplain Descriptions
Flood History The worst flooding in the area took place in 1966, 1969, 1971, 1995 and 1998. The storms in 1966 and 1969 caused considerable damage throughout the area due to flooding, erosion and debris
More informationOREGON DEPARTMENT O F JUSTICE Raffle Receipt Summary Record
OREGON DEPARTMENT O F JUSTICE Raffle Receipt Summary Record Complete this record in non-erasable ink. This record must be maintained with your official raffle records for three (3) years. DO NOT send this
More informationTRAVEL POLICY FOR THE U.S. SCIENCE SUPPORT PROGRAM OFFICE (USSSP)
TRAVEL POLICY FOR THE U.S. SCIENCE SUPPORT PROGRAM OFFICE (USSSP) Table of Contents IMPORTANT INFORMATION 2 TRAVEL AUTHORIZATION 2 AIR TRANSPORTATION GENERAL 2 EXPEDITION-RELATED TRAVEL 3 AIR CARRIER SELECTION
More informationTHE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW
THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 201 THE LONDON BOROUGH OF HOUNSLOW RESPONSE TO WRITTEN REPRESENTATIONS BY LEGAL AND GENERAL ASSURANCE SOCIETY LIMITED
More informationApplication For Initial Approval, Prior or Non-Prior Approval of Training Organisations
Application For Initial Approval, Prior or Non-Prior Approval of Training Organisations Under EU Aircrew Regulation Annex VII Part-ORA By means of this form you can apply for an initial approval, prior
More informationState Environmental Planning Policy (Sydney Region Growth Centres) Amendment (Catherine Fields Precinct) 2013
New South Wales (Sydney Region Growth Centres) Amendment (Catherine Fields Precinct) 2013 under the Environmental Planning and Assessment Act 1979 Her Excellency the Governor, with the advice of the Executive
More informationAboriginal Traditional Knowledge
Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use and is appreciative to all the communities who took time to share
More informationCase Study: 1. The Clarence River Catchment
Case Study: 1. The Clarence River Catchment The NSW coastline is a great natural asset, making an enormous contribution to the economy. The resources of coastal catchments such as the Clarence River Catchment,
More information2018 Trip Dates Spectacle Island July 17, 18, 19 July 31, August 1, 2 August 14, 15, 16 August 21, 22, 23 August 28, 29, 30
Dear Youth Program Partner: June 2018 2018 Trip Dates Spectacle Island July 17, 18, 19 July 31, August 1, 2 August 14, 15, 16 August 21, 22, 23 August 28, 29, 30 Island Highlights 5 miles of trails Lifeguarded
More informationCertificate of Release to Service (CRS)
AIRWORTHINESS NOTICE Certificate of Release to Service (CRS) No 4 Issue 3 August 2010 1 Introduction 1.1 This Airworthiness Notice sets out to provide the necessary framework under which Certificate of
More information