HIGHWAY 26 /GREY ROAD 2 INTERSECTION IMPROVEMENTS. The Town of The Blue Mountains
|
|
- Phebe Doyle
- 6 years ago
- Views:
Transcription
1 HIGHWAY 26 /GREY ROAD 2 INTERSECTION IMPROVEMENTS The Town of The Blue Mountains MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY R.J. Bur nside & Associat es Limit ed
2 Study Area
3 Issues Traffic congestion and projected increases in transportation demands Access management and safety issues for Highway 26 Sightline deficiencies and turning movement safety issues at Georgian Trail crossing, Clark Street, Lakeshore Road Historical high collision rate along Highway 26 corridor
4 Possible Improvements Highway 26/Grey Road 2 intersection Grey Road 2/Clark Street intersection Highway 26/Lakeshore Road intersection Georgian Trail alignment at Highway 26
5 Considerations Highway 26 is subject to Highway Access Management MTO s Rehabilitation Study for the Highway 26 corridor MTO s Highway 26 Transportation Study, potential by-pass opportunities Highway 26 gateway to Thornbury
6 Alternative Solutions 1. Do Nothing (Existing Conditions) 2. Signalization 3. Four Leg Roundabout 4. Five Leg Roundabout The alternative solutions include a combination of improvement options including realignment or closure of intersections, additional turning lanes and additional through lanes.
7 Option 1: Do Nothing (Existing Conditions) Maintain stop control at Highway 26 / Grey Road 2 intersection and location of Clark Street Georgian Trail crossing Highway 26
8 Option 2: Signalization Signalization and addition of left turn lanes on the west, north and south approaches Realignment of Lakeshore Road; Closure of east Lakeshore Road access at Highway 26 Realignment of Georgian Trail to Signalized Crossing Possible area for location of realignment of Clark Street to the south Clark Street: Various improvements to the existing Grey Road 2 and Clark Street intersection were considered, however, none of the improvements fully addressed the technical concerns, therefore realignment to the south is preferred.
9 Option 3: Four Leg Roundabout Roundabout at the Highway 26 / Grey Road 2 intersection Realignment of Lakeshore Road; Closure of east Lakeshore Road access at Highway 26 Realignment of Georgian Trail to roundabout Possible area for location of realignment of Clark Street to the south Clark Street: Various improvements to the existing Grey Road 2 and Clark Street intersection were considered, however, none of the improvements fully addressed the technical concerns, therefore realignment to the south is preferred.
10 Option 4: Five Leg Roundabout Five leg roundabout for intersection of Highway 26, Grey Road 2, Clark Street, and Lakeshore Road Realignment of Lakeshore Road; Closure of east Lakeshore Road access at Highway 26 Realignment of Georgian Trail to roundabout Clark Street realigned into roundabout
11 Preliminary Preferred Alternative(s) Option 2: Signalization Option 3: Four Leg Roundabout Signalization at Hwy 26 / GR 2 / Lakeshore Road and addition of left turn lanes on the west, north and south approaches Realignment of Lakeshore Road to Hwy 26 / GR 2 intersection, closure of east Lakeshore Road access at Hwy 26 Realignment of Georgian Trail to cross at Hwy 26 signalized intersection Realignment of Clark Street to the south with stop control Single lane roundabout in short term at Hwy 26 / GR 2 / Lakeshore Road Potential for two lane roundabout to be required in the long term Realignment of Lakeshore Road to Hwy 26 / GR 2 intersection, closure of east Lakeshore Road access at Hwy 26 Realignment of Georgian Trail to cross Hwy 26 at intersection Realignment of Clark Street to the south with stop control
12 Next Steps Public Information Centre...Spring, 2014 Input from public and agencies Spring, 2014 Selection of preferred alternative Spring, 2014 Issue Notice of Study Completion and provide Project File Report for public review and comment (30 day review period).. Summer, 2014 Preliminary Design Fall, 2014
Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services
PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More informationPublic Open House. Chief Peguis Trail Project
Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationCity of Grand Island Tuesday, December 12, 2017 Council Session
City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:
More informationuser s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:
The Miles Crossing/ Jeffers Garden transportation plan (underway), will identify needed improvements to the Warrenton Astoria Highway and local street improvements to serve expected growth in the Miles
More informationFEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION
FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The
More informationGreater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave
Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Prepared by: Raelene Stratton Team Leader Integrated Transport and Land Use, North Eastern
More informationStage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge
Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium
More informationPURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40
PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major
More informationChapter 25 Route Window SE6 Plumstead portal. Transport for London
Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationQEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.
SKYVIEW DRIVE KERNS and Highway 403 Freeman Interchange - ALTERNATIVE 3 Ÿ Widen by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange. Ÿ Widen Highway 403 by
More informationCreating Connections in Niagara Region
Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION
More informationThe Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).
The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January
More information9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING
Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST
More informationRoute 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016
Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty
More informationM56. New Junction 11a Summary of the consultation report
M56 New Junction 11a Summary of the consultation report August 2017 M56 New Junction 11a Summary of the public consultation The scheme The M56 New Junction 11a scheme is part of our continued programme
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationEngagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.
Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018 Engagement Summary Report April 2018 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada Highway 1
More informationFORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.
FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible
More informationMINUTES YORBA LINDA TRAFFIC COMMISSION August 23, 2012
MINUTES YORBA LINDA TRAFFIC COMMISSION August 23, 2012 COMMISSIONERS PRESENT: Behura, Carbone, Long, Rafter, Wu STAFF PRESENT: Mercado, Song, Wang Commissioner Long led the flag salute. APPROVAL OF MINUTES
More informationEngagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017
Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationWelcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012
Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations May and June, 2012 BACKGROUND Work and consultations regarding the development of the Railway-Roadway
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationCREATING CONNECTIONS IN CLARINGTON
CREATING CONNECTIONS IN CLARINGTON ANDRE MAROIS Director, RER Corridor Infrastructure Lakeshore East CHRIS BURKE Director, Service Planning, Planning & Development CLARINGTON GENERAL GOVERNANCE COMMITTEE
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationFuller/Fuller Heights Road Improvements
Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to
More informationWelcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,
Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how
More informationThornton Water Project. Larimer County Route Study and Project Update September 12, 2017
Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing
More informationUpdate Report - Etobicoke Creek and South Mimico Creek Trails
REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward
More informationCentral Region 2013 Welcome
Central Region 2013 Welcome OHMPA Road Tour June 3, 2013 1 Presentation Overview Budget Highlights Delivery Models Innovation 2012 Year in Review 2 The 2013 Provincial Budget Ensuring the flow of people
More informationM56. New Junction 11a Preferred route announcement
New Junction 11a Preferred route announcement August 2017 New Junction 11a Preferred route announcement Introduction The New Junction 11A scheme introduces a new motorway junction to the motorway between
More informationAdditional Economic Development Strategy submissions- Klickitat County
Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of
More informationHYANNIS ACCESS IMPLEMENTATION TASK FORCE NOTES April 12, PM CAPE COD COMMISSION CONFERENCE ROOM ATTENDEES. Hyannis Area Chamber of Commerce
HYANNIS ACCESS IMPLEMENTATION TASK FORCE NOTES April 12, 2012 1 PM CAPE COD COMMISSION CONFERENCE ROOM Demetrius Atsalis Mark Ells Steve Seymour Bill Travers Chris Anzuoni JoAnn Crippen Frank Sanchez Jessica
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationDENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study
DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate
More informationPattullo Bridge Replacement Project
Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor
More informationPUBLIC INFORMATION SESSION #2
Highway 16, Highway 779 to Kapasiwin Road, Planning Study PUBLIC INFORMATION SESSION #2 Wednesday June 20, 2012 4 to 8 pm HIGHWAY 16 Highway 779 to Kapasiwin Road Functional Planning Study Blueberry Community
More informationFHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need
Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationState Route 189 Project and Draft Resolution of Support. November 2014
State Route 189 Project and Draft Resolution of Support November 2014 Corridor Location Image sources: ADOT Statewide and National Importance: CANAMEX Corridor Image source: FHWA Statewide and National
More informationLAND FOR SALE SUBDIVISION LAND: SFR DEVELOPMENT LAND OF ±100 HOMES Ave 13 1/2, Madera, CA PROPERTY FEATURES
SALE PRICE: $1,795,000 PRICE PER LOT: $18,505 PRICE PER SF: $2.35 LOT SIZE: 17.48 Acres APN #: 034-151-018 & -019 ZONING: PUD 6,000 R-1 Residential MARKET: City Of Madera PROPERTY FEATURES Shovel-ready
More informationCHAPTER FOUR: TRANSPORTATION
CHAPTER FOUR: TRANSPORTATION Barron County Comprehensive Plan: Transportation Page 61 Background Transportation facilities have a significant influence on land use, development and quality of life for
More informationALBERTA CAPITAL REGION Transportation Plan ( )
ALBERTA CAPITAL REGION Transportation Plan (2003-2012) FINAL REPORT Prepared for: Alberta Capital Region Alliance Ltd. Prepared by: Stantec Consulting Ltd. 21 June 2002 [135-37017] ACRA TRANSPORTATION
More informationSCOPING INFORMATION PACKET
SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,
More informationCurrent Corridor Characteristics
Current Corridor Characteristics Corridor Context Highway 2009 AADT: 2,350 21,000 2009 HCADT: 130 970 Key Highway Connections: MN-371, US-10, US-59, US-71 Number of lanes: 2 Public Transit Becker County
More informationCREATING CONNECTIONS IN THE CITY OF ST. CATHARINES
CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE BRIAN GALLAUGHER, DIRECTOR, PROJECT PLANNING RER ST. CATHARINES CITY COUNCIL NOVEMBER 13, 2017 A REGION
More informationCREATING CONNECTIONS IN DURHAM REGION
CREATING CONNECTIONS IN DURHAM REGION PETER ZUK CHIEF CAPITAL OFFICER, METROLINX DURHAM REGION COMMITTEE OF THE WHOLE SEPTEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY REGIONAL TRANSFORMATION 3 METROLINX:
More informationUS 19 Sunset Point Rd to Countryside Blvd.
Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started
More informationMohawk Hudson Bike Hike Trail Crossroad Connection Study
Summary Report - April 21, 2003 Mohawk Hudson Bike Hike Trail Crossroad Connection Study Summary Report Introduction The Capital District Transportation Committee (CDTC), in partnership with Albany County,
More informationCREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS
CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS NIAGARA FALLS CITY COUNCIL NOVEMBER 28,
More informationHIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM
HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationTHE RICHMOND REGION Transportation Priority Projects
Priority Order Project Description Estimated Need (in millions) 1* Main Street Station Phase III - Station facility improvements Route 360 East of I-295 Widen to 6 & 8 lanes (I-295 to Walnut Grove Rd)
More informationWELCOME US 83 Public Meeting
WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:
More informationROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia
ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia Developed by Region 2000 Regional Commission In cooperation with Bedford County, Virginia City of Bedford, Virginia Virginia Department
More informationROUTE 20 CORRIDOR STUDY ---- Orange County, Virginia
ROUTE 20 CORRIDOR STUDY ---- Orange County, Virginia Prepared by PARSONS Fairfax, Virginia on behalf of the: Rappahannock-Rapidan Regional Commission in cooperation with Orange County, Virginia Virginia
More informationSouth of Fraser Transportation Priorities March 2017 Engagement
March 20 Engagement Welcome to the South of Fraser Transportation Priorities Engagement A robust and reliable highway network is needed to serve the needs of a growing population and diverse economy. The
More information1. Acting Deputy City Manager s report, Planning and Infrastructure, dated 23 June 2015 (ACS2015-PAI-INF-0003).
6 COMITÉ DES TRANSPORTS 2. WEST TRANSITWAY EXTENSION AT GRADE CROSSING AT MOODIE DRIVE PROLONGEMENT DU TRANSITWAY OUEST PASSAGE À NIVEAU DE LA PROMENADE MOODIE COMMITTEE RECOMMENDATION That Council approve
More informationSOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER
SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER Proposal to Eliminate Traffic Gridlock in South North York Centre Area With Southbound Yonge Street to Eastbound Highway 401 Fly-UNDER A much
More informationGold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging
Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section
More informationQuiet Zone Process. Background:
Background: In order to reduce the impact of train horns on municipalities, the FRA (Federal Railroad Administration) has provided communities with the option to establish a QZ (Quiet Zone). A quiet zone
More informationMinistry of Transportation
Ministry of Topics: Hurontario Light Rail Transit & Extension Mobility Hubs Regional Express Rail (RER) & High Speed Rail (HSR) Hwy 407/410 Connections to Brampton Uptown GTA West Corridor Connecting Brampton
More informationChicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014
Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980
More informationDelaware County Engineer
2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,
More informationCaltrans District 5. District Director s Report A quarterly publication for our transportation partners. Rosales leads Program Project Management
District 5 Highway 1 near Big Sur in Monterey County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system to enhance California s economy and livability.
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More information2009 Regional Solicitation Selected Projects*
2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationOfficial Minutes of MARION COUNTY BOARD OF COUNTY COMMISSIONERS. May 8, 2018
Official Minutes of MARION COUNTY BOARD OF COUNTY COMMISSIONERS May 8, 2018 CALL TO ORDER: The Marion County Board of County Commissioners met in a special session in Commission Chambers at 5:33 p.m. on
More informationOrganization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator
Organization Puget Date Sound Regional Council Regional Project Evaluation Committee Brian Nielsen, Program Administrator October 26, 2018 TODAY S FOCUS The big picture #Realign99 closure/opening the tunnel
More information6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i June 22, 2015 6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY Last year, VDOT commissioned the Route 58 Corridor Study to develop a planning
More informationPERTH-ADELAIDE CORRIDOR STRATEGY
INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South
More informationBradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service
Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain
More informationMEETING MINUTES District 1 Trail Planning Meeting 1
MEETING MINUTES District 1 Trail Planning Meeting 1 June 1, 2017 2:00 PM 3:30 PM City of Two Harbors 2:00 Introductions Attendees: Lisa Austin, MnDOT Bryan Anderson, MnDOT Jasna Hadzic-Stanek, MnDOT Justin
More informationTown of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study
STAFF REPORT ACTION REQUIRED Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study Date: August 14, 2009 To: From: Wards: Reference Number: North York Community Council
More informationROUTE 171 & SEAL BEACH CIRCULATOR
ROUTE 81 & ROUTE 151 City College PCC Campus 1 6th St 81 92 93 94 151 45 Redondo Ave 46 10th St Ximeno Ave 4:AM - 12:00AM Park Ave Wilson Appian Way 5:00AM - 11:AM 5:00AM - 11:AM ROUTE 151 Beach Dr Atherton
More informationSouth East Traffic Solution
South East Traffic Solution A MAJORITY LIBERAL GOVERNMENT WILL: Complete the Hobart Airport Interchange project Fix the Tasman Highway near Tasmania Golf Club Replace the Midway Point Roundabout with additional
More informationFY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars
FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue
More information2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)
2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) TABLE OF CONTENTS Introduction 1 Transportation Planning Activities 2 Identification of Problem Areas and Recommended Solutions 7 DeKalb County Projects
More informationLatest Mile Marker Released
Caltrans District 5 Looking north at US 101/Los Osos Valley Road interchange in San Luis Obispo County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011
Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA
More informationSTREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate
CALENDAR YEAR 2018 / 2019 FISCAL YEAR 2019 Grandview & University Roundabout Grandview & University Intersection Street / Intersection Reconstruction 900,000 TSF, ICAAP, STP 850,000 East-West Corridor
More informationSheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities
Sheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities (City Council on July 4, 5 and 6, 2000, adopted the following recommendation: It is recommended that the report dated June 6, 2000,
More information* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties
New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More information29 June Eastern Region 15/16 Program Presentation
29 June 2015 Eastern Region 15/16 Program Presentation 2972516 Content VicRoads - Our Region, Our Direction VicRoads 15/16 Statewide Program VicRoads 15/16 Regional Program Questions Eastern Region Eastern
More informationCell: (408) Release MA June 25, 2012
VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara
More informationGrove Field Airport Environmental Assessment
Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of
More informationUS 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD
US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD PUBLIC MEETING JUNE 8, 2017 Talk Text Crash 2 AGENDA TECHNICAL PRESENTATION (Roma Area Engineer Eduardo Gracia, P.E.) PROJECT SCHEDULE
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests
More informationNORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY
NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY MAY 2011 SW1132SWD NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 CURRENT TRAVEL PATTERNS
More informationA5-M1 Link (Dunstable Northern Bypass) Explanatory Statement
A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement Broadway Broad Street Birmingham B15 1BL HIGHWAYS AGENCY A5-M1 LINK (DUNSTABLE NORTHERN BYPASS) EXPLANATORY STATEMENT Introduction The Highways
More informationCHAPTER 1 INTRODUCTION MORENO VALLEY GENERAL PLAN 1. INTRODUCTION. 1.1 What is a General Plan?
1. INTRODUCTION 1.1 What is a General Plan? A General Plan is a comprehensive long-term strategy for the physical development of a city. It determines how land may be used and the infrastructure and public
More informationN Prime Retail Pads w/ Direct CA-99 & Betty Dr Access. Direct Access to Upgraded HWY 99 Off/On Ramps
Prime Retail Pads w/ Direct CA-99 & Betty Dr Access Direct Access to Upgraded HWY 99 Off/On Ramps Optimal Visibility w/ Easy to - Over 70,000 Cars Per Day Unmatched Level of Consumer Traffic & High Volume
More informationLUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS
LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118
More informationChair and Members, The Etobicoke York Community Council. Mark Sraga, Director and Deputy Chief Building Official
STAFF REPORT ACTION REQUIRED Sign Variance Report - Revised 29 Algie Avenue Date: January 11, 2010 To: From: Chair and Members, The Etobicoke York Community Council Mark Sraga, Director and Deputy Chief
More information