1 WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment: 6 p.m. Why am I here? Learn about the proposed project Provide comments on the proposed project
2 Project Purpose and Need What problems are we trying to address? Significant increase in heavy truck traffic Upgrades needed as this corridor is part of the Texas Trunk System* What are we trying to do? Improve capacity Upgrade facility to meet the Texas Trunk System Maintain access to communities * A rural network of four-lane or better divided roadways that will serve as a principal connector of all Texas cities with over 20,000 population as well as major ports and points of entry, not to exceed total mileage of 11,500 miles.
3 Project Scope Proposed four-lane divided rural highway Proposed highway will be built within proposed 300-foot right of way (ROW) Construct bridges at FEMA flood zones Future major intersection at FM 2098 with turnarounds and proposed 450-foot ROW Crossovers at approximate quarter mile intervals
4 Project Limits US 83 N Project Start: miles north of Starr/Zapata county line Project End: 0.09 miles north of Loma Blanca Road Total Length: 10.5 miles Project will be completed in two segments: Segment 1: miles north of Starr/Zapata county line to 0.31 miles north of FM 2098 Segment 2: 0.31 miles south of Placido Road to 0.09 miles north of Loma Blanca Road
5 Preliminary Project Schedule * US 83 Ongoing Public Involvement Schematic Environmental Clearance Final Design Acquire ROW Spring 2019 Letting Begin Construction Summer 2017 Fall 2017 Fall 2018 Utilities Spring 2021 Spring 2021 Summer 2021 * This project schedule and dates are preliminary and subject to change. The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 16, 2014, and executed by FHWA and TxDOT.
6 US 83 Existing Typical Section Two-Lane Segment 100'-280' existing ROW 50' overall width of existing roadway typical sections: Two 11' outside shoulder Two 12' vehicle travel lane 4' buffer
7 US 83 Existing Typical Section Five-Lane Segment 100'-280' existing ROW 80' overall width of existing roadway typical sections: Two 8' outside shoulder Four 12' vehicle travel lane 16' continuous left turn lane
8 US 83 Proposed Typical Section Four-Lane Continuous 130' 160' existing ROW 84' typical section: Two 10' outside shoulder Four 12' vehicle travel lane 16' continuous left turn lane
9 US 83 Proposed Typical Section Rural Four-Lane Divided 300' proposed ROW 38' overall width of new roadway typical sections 4' inside shoulder Two 12' vehicle travel lane 10' outside shoulder With a 63' 88' grassy median
10 US 83 Proposed Typical Section Major Intersections 450' proposed ROW at proposed major intersections 38' overall width of new roadway typical sections Southbound and northbound direction: 4' inside shoulder Two 12' vehicle travel lane 10' outside shoulder With a 163' 188' grassy median
11 How Can I Make Comments? Mail or drop off written comments to: TxDOT Pharr District Office Attn: US W. Interstate 2 Pharr, TX Submit a written comment form tonight Fax comments to (956) comments to Robin.Gelston@txdot.gov Visit and search US 83 from Starr-Zapata County Line to view information and provide comments Comments must be received or postmarked by Friday, June 23, 2017
12 Next Steps Compile and consider community input from tonight s public meeting and during commenting period Finalize project design details Prepare and finalize environmental documentation
US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD
US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD PUBLIC MEETING JUNE 8, 2017 Talk Text Crash 2 AGENDA TECHNICAL PRESENTATION (Roma Area Engineer Eduardo Gracia, P.E.) PROJECT SCHEDULE
More informationUS 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012
US 83 Relief Route City of La Joya City of Peñitas Hidalgo County November 15, 2012 TxDOT Mission: Work with others to provide safe and reliable transportation solutions for Texas. Public Meeting Agenda
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationI-35 Reconstruction Project
I-35 Reconstruction Project Business Community Meeting McLennan County Projects Jodi Wheatley, I 35 Information Specialist, TxDOT John Jasek, PE, Waco Area Engineer, TxDOT Jacob Bell, PE, Project Manager,
More informationWELCOME TO THE OPEN HOUSE
WELCOME TO THE OPEN HOUSE US 281 North Loop 1604 to Borgfeld Drive CSJ: 0253-04-146 & 0253-04-138 May 12, 2016 Please sign in Explore the exhibits Submit a comment form Ask questions We want to know your
More informationTEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES
TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES January 2018 Table of Contents Page List of Figures... ii List of Tables... iii Introduction... 1 Purpose of the Report... 3 TxDOT s El Paso District:
More informationLANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS
LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,
More informationHAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT
HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem
More informationFederal Register / Vol. 83, No. 155 / Friday, August 10, 2018 / Notices
39809 DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway Projects in Texas AGENCY: Texas Department of Transportation (TxDOT), Federal
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationROADWAY INVENTORY. The biggest and badest
ROADWAY INVENTORY The biggest and badest Thanks in Advance for your Attention THE CONFERENCE 2 Presentation Overview Roadway Inventory Purpose Extent Structure Content Maintenance Use Availability Challenges
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationFORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.
FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible
More informationPURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40
PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major
More informationRoadside Management Manual
RSMM 550-10 Roadside Management Manual Section: DEVELOPMENTS OUTSIDE INTRODUCTION Setbacks of objects along provincial highways are controlled for various reasons: To protect the right-of-way for future
More informationTRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationROUTE 630 DIVERGING DIAMOND INTERCHANGE
ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,
More informationSection 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps
Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationPUBLIC INFORMATION SESSION #2
Highway 16, Highway 779 to Kapasiwin Road, Planning Study PUBLIC INFORMATION SESSION #2 Wednesday June 20, 2012 4 to 8 pm HIGHWAY 16 Highway 779 to Kapasiwin Road Functional Planning Study Blueberry Community
More informationImportant Lane Closures, April 3 9, 2011
March 31, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures, April 3 9, 2011 RESCHEDULED: Lane Shifts of Westbound Route 7 at Route
More informationPattullo Bridge Replacement Project
Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor
More informationPublic Informational Meeting
Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives
More informationSouth Bay Metro Green Line Extension
South Bay Metro Green Line Extension Spring 2011 Community Meetings 1 2 Agenda Introduction Where We ve Been Project Status What s Next Discussion 3 Where We ve Been Scoping Meetings April/May 2010 4 Meetings
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More information6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i June 22, 2015 6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY Last year, VDOT commissioned the Route 58 Corridor Study to develop a planning
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationProject Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your
More informationTexas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge
Texas Department of Transportation Corpus Christi District Corpus Christi Harbor Bridge Presented by Russel W. Lenz, P.E. Corpus Christi District Engineer For 2009 Texas Ports and Waterways Conference
More informationSpringettsbury Township. Road Improvement Projects
Springettsbury Township Road Improvement Projects 2009 2016 2016 Township Road Improvement Projects Springettsbury Township is divided into the following 4 Sectors: Northwest Sector Sherman Street Route
More informationTHE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions
City of Buda Accepting Applications For Boards and Commissions The deadline is approaching to submit applications for the City of Buda's various boards and commissions. Deadline to submit a completed application
More informationTRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE January 11, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-007 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More information77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington &
77 McDonnell- - Monday thru Friday NORTHBOUND Effective: March 18, 2019 & Valley Industries 4:53A 4:59A 5:10A 5:18A 5:27A 5:39A 5:33A 5:39A 5:50A 5:58A 6:07A 6:19A 6:13A 6:19A 6:31A 6:39A 6:49A 7:02A 6:53A
More informationSUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia
Project Profile: SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia In 1989, the General Assembly established the Route 58 Corridor Development Program to enhance economic development potential across
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia
ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia Developed by Region 2000 Regional Commission In cooperation with Bedford County, Virginia City of Bedford, Virginia Virginia Department
More informationIMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:
IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),
More informationViaduct Demolition at Girard Interchange
i-95news summer/fall 2015 2015 Stay current with construction at the Cottman Avenue, Betsy Ross Bridge/Aramingo Avenue and Girard Avenue interchanges at. PennDOT is enhancing communications with its I-95
More informationAPPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS
APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS Appendix K contains a list of projects that are not planned for construction within the four-year time frame of the Rural TIP, but are referenced in the
More informationDALLAS COUNTY PUBLIC WORKS
93 DALLAS COUNTY PUBLIC WORKS January 12, 2011 MEMORANDUM TO: Commissioners Court THROUGH: Maurine Dickey, Commissioner District No. I FROM: Alberta L. Blair, P.E. Director of Public Works SUBJECT: MCIP
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationThe Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.
The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. JOINT MEETING OF THE CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BOARD AND LEE
More informationCHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS
CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider
More informationU.S. 33 Ravenswood Connector
U.S. 33 Ravenswood Connector Project History When I-77 was planned to pass less than five miles east of Ravenswood, West Virginia in Jackson County, officials began taking steps to acquire an Ohio River
More informationThe Transportation Corridor Overlay District
The Transportation Corridor Overlay District The Transportation Corridor Overlay District is a policy framework under which certain potentially beneficial development proposals may be considered, given
More informationTRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 2, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-042 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationProject Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design
RECONSTRUCTION AND WIDENING PROJECT Project Location A44.5 - A57 (Future Project) MP A44.5 Steinsburg Road (Fall 2015 - Fall 2016) John Fries Highway (Fall 2017 - Fall 2019) A42 - A44.5 (Fall 2017 - Fall
More informationGrade Crossings in High Speed Rail Corridors
Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More informationThornton Water Project. Larimer County Route Study and Project Update September 12, 2017
Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing
More informationTRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE February 1, 2019 CONTACT: Sandy Myers 540-332-9201 (office) STA19 020 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationB. Congestion Trends. Congestion Trends
B. Congestion Trends Congestion Trends There are two types of congestion that impact mobility: recurring and non-recurring congestion. Recurring congestion is related to segments of roadway that are over
More informationLESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation
LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationUS 19 Sunset Point Rd to Countryside Blvd.
Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationEXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report
II. EXISTING CONDITIONS A. INTRODUCTION The Route 107 study area extends from the south at Chestnut Street in Lynn approximately 3.7 miles to the north to Boston Street in Salem. The study area has three
More informationFHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need
Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS
More informationSCOPE Chapter 2D shall Apply to Any Road or
SCOPE Chapter 2D shall Apply to Any Road or Street other then Low-Volume Roads, Expressways, and Freeways Low Volume Roads: Shall be a Facility Lying Outside Built-Up Areas & Having a Traffic Volume Less
More informationOFFICE OF THE CITY MANAGER
OFFICE OF THE CITY MANAGER December 6, 2013 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information Notable Items: On Wednesday, the ribbon was cut to signal
More informationMAIN POINTS OF PRESENTATION BY RUTH BONSIGNORE, JON FEINSTEIN AND TONY GRANDE, VHB
Maine Department of Transportation Aroostook County Transportation Study Public Advisory Committee (PAC) Meeting Minutes PAC Meeting No. 22 Tuesday, March 16 th, 2004 Caribou Inn and Convention Center
More informationONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1
ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City
More informationNorthaven Trail Phase 2 Initial Project Overview
Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails
More informationNORTH REGION RIGHT OF WAY SECTION RECOGNIZED FOR INNOVATION, TEAMWORK
October 2011 NORTH REGION RIGHT OF WAY SECTION RECOGNIZED FOR INNOVATION, TEAMWORK EMBRACING SOCIAL MEDIA @TXDOT PROTECTING OUR PAST A TXDOT PRIORITY HISTORY AND PROGRESS: THE ROBERTSON PLANTATION AND
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More informationExecutive Summary. Introduction. Lower Rio Grande Valley Tamaulipas Border Master Plan
Executive Summary Introduction Border master plans as defined and supported by the U.S./Mexico Joint Working Committee (JWC) on Transportation Planning and Programming, the Federal Highway Administration
More informationDRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026
Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway
More informationScore. Category. Access Aesthetics Community Resources
NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93
More informationDALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016
DALLAS HORSESHOE PROJECT Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 Agenda 1. Horseshoe Project 2. Purpose and Need 3. Construction
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationTraffic Management Plan 2018
Traffic Management Plan 2018 Jesuit College Preparatory School of Dallas Amendment to Planned Development No. 353 Dallas, Texas June 6, 2018 Prepared for Jesuit College Preparatory School of Dallas Prepared
More informationTRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationWord Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250
Katherine F. Turnbull, Ken Buckeye, Nick Thompson 1 Corresponding Author Katherine F. Turnbull Executive Associate Director Texas Transportation Institute Texas A&M University System 3135 TAMU College
More informationACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT. June 7, 2018 Transportation Planning Conference June 7, 2018
ACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT June 7, 2018 Dallas District Accelerated Construction Techniques Accelerated Construction Techniques commonly used by the Dallas
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationTHE BIG PICTURE. Week of March 4, Bring your dog. Bring your kids. Bring a picnic and spend the day with us! Free and open to the public.
We're celebrating Buda's 138th Birthday with free cupcakes and bubble fun! Come hang out with us at the visitor center in Stagecoach Park for a free cupcake donated by our local Walmart and play under
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More information--DRAFT INTRODUCTION. Transportation Land Development Environmental S e r v i c e s
Transportation Land Development Environmental S e r v i c e s Memorandum To: Raymond Faucher, P.E. Project Manager Maine Department of Transportation State House Station 16 Augusta, ME 04333 Date: August
More informationHIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM
HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation
More informationI-70/I-71 Project Public Meeting Presented By
I-70/I-71 Project Public Meeting Presented By Ohio Department of Transportation ms consultants, inc. engineers, architects, planners MSI Design June 9, 2010 W e l c o m e Thom Slack Planning Administrator,
More informationImportant Lane Closures March 1 5, 2010
February 26, 2010 CONTACT: Marcia McAllister 703 572 0506 marcia.mcallister@dullesmetro.com Important Lane Closures March 1 5, 2010 C aisson Load Test Scheduled for Mar. 3 Crews will perform another load
More informationN O R T H T E X A S T O L L W A Y A U T H O R I T Y
N O R T H T E X A S T O L L W A Y A U T H O R I T Y On he Move NTTA Board Names New Interim Executive Director Current Assistant Executive Director of Project Delivery Gerry Carrigan Assumes New Post The
More informationState Route 189 Project and Draft Resolution of Support. November 2014
State Route 189 Project and Draft Resolution of Support November 2014 Corridor Location Image sources: ADOT Statewide and National Importance: CANAMEX Corridor Image source: FHWA Statewide and National
More informationSCOH Report. From. Special Committee on U.S. Route Numbering Annual Meeting
SCOH Report From Special Committee on U.S. Route Numbering Annual Meeting Friday, November 16, 2012 Meeting Minutes The Special Committee on U.S. Route Numbering and U.S. Bicycle Route Systems (USRN) convened
More informationSpecial Committee on U. S. Route Numbering May 24, 2016 Waterloo Des Moines, Iowa Meeting Minutes
May 25, 2016 Des Moines, IA Special Committee on U. S. Route Numbering May 2, 2016 Waterloo Des Moines, Iowa Meeting Minutes Call to Order at 5:15 PM by chair Mark McConnell, MS. In attendance. Region
More informationFEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION
FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The
More informationChapter 2: Entire US287 Corridor
Chapter 2: Entire US287 Corridor The US287 Study Area spans four incorporated jurisdictions and two counties. Due to the length and density of infrastructure along the US287 Study Area, corridor-wide maps
More informationLBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. Agenda.
Texas Department of Transportation Project Office - Matt MacGregor, Project Manager IH 635 ( Freeway) West Section Public Hearing Public Hearing Charles R. Tucker, P.E. ( Freeway - West Section) From:
More informationFrequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More information2013 El Paso County Comprehensive Mobility Plan. December 16, 2013
2013 El Paso County Comprehensive Mobility Plan December 16, 2013 2013 El Paso County Comprehensive Mobility Plan Map No. Project Name 01 I-10 COLLECTOR DISTRIBUTOR LANES 02 I-10/BORDER HIGHWAY CONNECTORS
More informationDepartment of Public Works P.O Box 4186, San Rafael, CA / Fax: 415/
Department of Public Works P.O Box 4186, San Rafael, CA 94913-4186 415/499-7877 Fax: 415/499-3724 Raul M. Rojas DIRECTOR San Antonio Road Bridge Replacement September 9, 2015 Community Meeting Summary
More informationDHS Consolidation at St. Elizabeths Master Plan Amendment. Transportation Interstate 295 / Malcolm X Avenue Interchange
Transportation Interstate 295 / Malcolm X Avenue Interchange Consulting Parties Meeting November 08, 2011 (Revised December 20, 2011) Transportation I-295 / Malcolm X Avenue Interchange AGENDA Follow-up
More informationWelcome to the Cross County Trail Public Input Session!
Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.
More informationSilver Center Development USA Parkway & Highway 50 Silver Springs, Nevada
O f f e r i n g M e m o r a n d u m Silver Center Development USA Parkway & Highway 50 Silver Springs, Nevada 25.7 Acres presented exclusively by Ron Cobb Principal Direct: (775) 329-4000 x103 Cell: (775)
More informationProjected Advertisement Date
2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over
More informationProgress Report for Projects of Regional Significance
Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section
More information