1 Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section two: Griffith University to Southport...75 Section three: Southport to Broadbeach...80 Project staging

2 72

3 Route selection and staging Chapter four Route selection and staging As discussed in Chapter 1: Introduction, the South East Queensland Infrastructure Plan and Program 2005 defined a proposed route for Stage One and Two of the Gold Coast Rapid Transit project. Stage One to connect the heavy rail line at Helensvale (or a new heavy rail station to be built at Parkwood) to Broadbeach. Stage Two was the proposed extension from Broadbeach to Coolangatta. To assist with planning the Gold Coast Rapid Transit route was broken down into 5 sections as shown on the right. However there were many different options for how the Gold Coast Rapid Transit could travel between Helensvale and Broadbeach and these options were assessed and compared in order to establish the preferred route for Satge one of the Gold Coast Rapid Transit system. What planning has taken place? At this stage, high level concept planning has been undertaken for section one and detailed planning has been undertaken for sections two and three. Planning for sections four and five has so far been limited to desktop studies and transport modelling. Further planning work is expected as the project progresses. The route of the Gold Coast Rapid Transit system in Sections 2 and 3 is described in Chapter 5: Route, from page 85. Key Proposed rapid transit corridor Option H1 Helensvale via Harbour Town Option H2 Helensvale via Parkwood Helensvale Harbour Town Parkwood Griffith University Nerang Robina Runaway Bay Bond University Varsity Lakes Section 1 Southport Section 2 Surfers Paradise Broadbeach Miami Tallebudgera Burleigh Heads Elanora Section 3 Section 4 Section 5 Existing heavy rail line Proposed heavy rail line extension (Queensland Rail project) Tugun Coolangatta 73

4 Section one: Helensvale (linking the Gold Coast heavy rail line) to Griffith University Three route options were considered to link the heavy rail line and the site of the new University Hospital at Parklands Drive. Helensvale, or a new rail station at Parkwood, were considered to give the best connectivity to the new Gold Coast Knowledge Precinct at Parklands Drive. See page 82 for why Nerang or Robina were not considered. The options considered were: Option one Parkwood to Griffith University via Smith Street (this would require a new heavy rail station to be constructed at Parkwood) Option two Helensvale to Griffith University via Brisbane Road and Olsen Avenue Option three Helensvale to Griffith University via the Intra Regional Transport Corridor (adjacent to the Pacific Motorway) and Smith Street. As part of the initial planning stage of the project, preliminary designs and cost estimates for all 3 options were prepared. The alignments were based upon the location of the Gold Coast University Hospital, which at that time was intended to be located within Griffith University land on the southern side of Smith Street. The alignments were evaluated against a number of criteria including: transport and traffic integration and impacts engineering issues urban design environmental impacts. In December 2006, a planning focus workshop took place to formally evaluate these options. It was determined that while Option One had the least environmental impacts, it produced poor transport and traffic and urban design outcomes. Additionally, creating an additional station on the Gold Coast to Brisbane Rail Line between Robina and Helensvale, is not favoured by Government. The rail line in the Parkwood area is bounded by the M1 motorway as well as the Smith Street interchange. This presents accessibility problems for pedestrians and bus movements as well as access to a potential park n ride facility. Furthermore, this location is not ideal as a gateway to the Gold Coast for the rapid transit system. The planning focus workshop recommended that Option one, which would involve the construction of a new heavy rail station at Parkwood, not be considered further. Consequently, the 2 remaining options were taken forward to community consultation in March 2007 and were referred to as: Option H1: Helensvale to Griffith University via Harbour Town Option H2: Helensvale to Griffith University via Parkwood See Chapter 5: Gold Coast Rapid Transit Route (page 85) for further detail on the H1 and H2 options. 74

5 Chapter four Route selection and staging Section two: Griffith University to Southport Four options were considered between Griffith University and Southport: Option one: Option two: via Queen Street (west) and Nerang Street (preferred route) via Smith Street, or via Johnston Street and High Street Option three: via Queen Street (east) Option four: alternate route through Queen Street (west) using existing open space and High Street. Option one The project s preferred route alignment connects Loders Creek/existing Gold Coast City Council Depot with the western side of Wardoo Street, then Queen Street and Nerang Street including the existing Gold Coast Hospital. This alignment uses existing road reserve as much as possible and is the shortest and most direct route between the new and existing hospitals. Several sub-options were examined. This included consideration of a route adjacent to Loders Creek but travelling through the existing Equestrian Centre and Owen Park Sports Reserve Land. While this route had advantages in terms of reduced private land and road impacts, the design would need to address the important challenges of flood protection, impacts on sporting facilities and a route that enables a station to be located near the existing hospital site. Overall, this route was not favoured over the preferred route. However, the initial proposal for the preferred route did involve some changes to traffic arrangements on Queen Street (west). See page 105 for more details. Option two During initial planning, northern routes were investigated utilising either Smith Street or Johnston Street. Smith Street was discounted as it is the main traffic route into Southport and experiences heavy volumes of traffic every day. There is also limited residential development around Smith Street leading to low levels of potential patronage. Johnston Street could have connected to Southport via High Street and Nind Street however the steep sections of this street would have presented engineering challenges. There would also have been significant property impacts required in this street. This route would also not be able to service the existing Gold Coast Hospital as well as the western areas of Southport. Option three A potential route following the length of Queen Street to the Gold Coast Highway was also assessed but discounted as it was unable to effectively service the existing Gold Coast Hospital as well as the central business district of Southport. 75

6 Option four The option of crossing Wardoo Street and traversing the existing vacant areas to the north of the Queen Street Cemetery before rejoining Queen Street (west) at Beale Street was also considered. However the impacts of this option were significant and included the need to introduce a new signalised intersection on Wardoo Street which would adversely effect traffic and impact on residential properties in Baratta Street (east). There would also be additional impacts on Southport State School, the Queen Street Cemetery and the Ned Twohill Equestrian Centre. If the existing hospital is relocating why is it important to service this area? Although the existing hospital will be replaced by a new hospital near Griffith University the existing day care facilities and medical precinct will remain. The hospital is also a large site which will be prime for redevelopment in the future. As a result of input from a stakeholder group the project also evaluated an additional route suggestion which involved a cut and cover tunnel from the existing hospital to the Gold Coast Highway via Lawson and Short Streets, activating the existing Scarborough Street interchange as a major transport interchange. While this proposal activates the centre of the Southport central business district, this option is not favoured as it relies on tunnelling which has been discounted for the Gold Coast Rapid Transit project (see page 50 for more details) and the use of local streets for bus movements. 76

7 Chapter four Route selection and staging Southport The route options considered for travelling through the central business district of Southport were designed around current and future land use. The 2004 Light Rail Feasibility Study examined 2 core routes through Southport: Option B1: Scarborough Street, Short Street and Marine Parade Option B2: via Nerang Street Mall and Marine Parade adjacent to the Gold Coast Highway. Option B1 was recommended in the 2004 study because it was a more legible route and provides better access to key commercial and retail areas. Option B2 also would have required the realignment of the Gold Coast Highway which was not considered a desirable outcome. This work was used as a reference when the Gold Coast Rapid Transit project began detailed examination of potential routes through Southport in January In particular, the ability of both these options to provide a quality interchange with bus services through the Southport central business district was a key consideration. Another planning focus workshop, consisting of representatives from the Gold Coast Rapid Transit project, TransLink Transit Authority, Queensland Government and Gold Coast City Council, then determined that the 2 core options that should be assessed for the Gold Coast Rapid Transit project were: Option S1: Nerang Street Marine Parade Option S2: Nerang Street Scarborough Street Queen Street. Option S1 is similar to the previous option B2, whereas it was agreed that the extension of the corridor southwards along Scarborough Street to Queen Street better met the long term needs of the Southport central business district masterplan. A number of sub-options were then developed for both S1 and S2 to determine the best location for the rapid transit station and also the bus interchange (currently located on Scarborough Street outside Australia Fair). Option S1 sub-options Option S1 (A) would provide a new rapid transit station on Nerang Street (between Davenport and Scarborough Streets) and would maintain the existing bus station on Scarborough Street. There would be full or partial closure of Nerang Street between Davenport Street and the Gold Coast Highway to general traffic, effectively creating a shared pedestrian and rapid transit zone. Access would be maintained for service vehicles to properties along Nerang Street. Car parking in this shared Gold Coast Rapid Transit/ Pedestrian zone in Nerang Street between Davenport Street and Gold Coast Highway would no longer be needed as vehicle access would be restricted through this section. 77

8 Option S1 (B) would see the rapid transit station located in the existing Nerang Street shared zone (between Scarborough Street and the Gold Coast Highway), and as with S1 (A) would maintain the existing bus station on Scarborough Street. General traffic would be restricted from entering the Nerang Street shared zone, creating a shared pedestrian and rapid transit station zone. Regulated car parking on the existing Nerang Street shared zone would be removed. Some existing parking in the section of Nerang Street between Davenport and Scarborough Streets could be maintained. Option S2 Sub-options Option S2 (A) would provide a new rapid transit station on Nerang Street (between Davenport and Scarborough Streets similar to S1 (A) with buses relocated from Scarborough Street to the Nerang Street Mall. This option would create a shared pedestrian and rapid transit station zone on Nerang Street between Davenport and Scarborough Streets and vehicular traffic restricted in this section. Most of the car parking on Nerang Street between Davenport Street and Gold Coast Highway and along Scarborough Street would be removed. Option S2 (B) would see a rapid transit station located in Scarborough Street and buses relocated from Scarborough Street to the Nerang Street Mall. This option would create a shared pedestrian and rapid transit station zone on Scarborough Street between Young Street and Lawson /Short Streets with vehicular traffic restricted in this section. Most parking in Scarborough and Nerang Streets would be removed. Option S2 (C) would provide for 4 bus bays, 2 of each would be located on each side of Lawson and Young Streets with the rapid transit station located in Scarborough Street. This option would also see a shared pedestrian and rapid transit station zone on Scarborough Street between Young Street and Lawson/Short Streets with vehicular traffic restricted in this section. This option was not carried forward because of the segregation of bus stops and limitations of providing priority for buses through the Southport Business centre. 78

9 Chapter four Route selection and staging It was determined that S1 (A) and S2 (A) were both viable options that would best meet the needs of the growing town centre and provide a good public transport solution. These 2 option were then taken forward to community consultation in March 2007 and were referred to as: Option S1: Nerang Street and Marine Parade Option S2: Nerang Street and Scarborough Street. See Chapter 5: Route (from page 85) for further detail on how S1 and S2 were evaluated and which option was taken forward as the preferred route for the Gold Coast Rapid Transit project. Leaving Southport The only options for the Gold Coast Rapid Transit leaving Southport and heading south is the Gold Coast Highway. The Gold Coast Rapid Transit will rejoin the Gold Coast Highway south of Southport and cross the Nerang River on a new, dedicated bridge, on the western side of the existing bridge. However, major new residential and mixed use development in Southport, the Broadwater Parklands redevelopment and the Gold Coast Rapid Transit project have emphasised the need to improve the pedestrian and cycle connections in and out of Southport. The footpath on the existing bridge is not considered to be of a desirable standard for the level of activity now in the area. The option of including pedestrian and cycle facilities on the new Gold Coast Rapid Transit bridge, being constructed on the western side of the existing bridge, was considered but discounted due to poor pedestrian connectivity from Main Beach. Other options are now being considered by Gold Coast City Council. See page 125 for further detail on the new bridge for the Gold Coast Rapid Transit project. 79

10 Section three: Southport to Broadbeach Between Southport and Surfers Paradise the most direct route for the Gold Coast Rapid Transit system is to follow the Gold Coast Highway. This achieves the most efficient connection to Surfers Paradise and limits property impacts which would be necessary if the Gold Coast Rapid Transit system were to leave the highway and travel on local roads. The Gold Coast Rapid Transit system crosses the Nerang River on the western side of the Sundale Bridge and continues down the western edge of the Gold Coast Highway. The Gold Coast Rapid Transit project has been designed within the context of the current environment and major events that take place on the Gold Coast. Therefore, the rapid transit western alignment between the Nerang River and Surfers Paradise has been designed to avoid operational issues during Indy. However, the Gold Coast Rapid Transit project, as a result of a proposal from a stakeholder group, also investigated the proposal for an alignment on the eastern side of the Sundale Bridge, continuing on the east side of the Gold Coast Highway with a station in the vicinity of Breaker Street, and a cut and cover tunnel between the small two bridges on Macintosh Island. However, this option has been discounted as it would have a direct conflict with the Indy event and there were various issues with tunnelling in this area: a tunnel would require an excavation depth of at least 6-7 metres, potentially causing issues with the high water table dewatering of excavations is costly and can draw fines (fine particles of sand) from other areas, causing settlement of ground bearing structures property resumptions would be required for the entrance and exit portals of the tunnel. Tunnelling would, however, potentially allow greater flexibility with the location of stations, particularly relative to the Indy event. However, there are a number of disadvantages with underground stations including access and security. Therefore, within the context of the existing events on the Gold Coast, the western alignment was taken forward as the preferred alignment in this area. Route options were also considered in Surfers Paradise itself. Three route options were considered: Option one: Surfers Paradise Boulevard (preferred option) Option two: Ferny Avenue and Remembrance Drive Option three: Esplanade and Beach Parade. 80

11 Chapter four Route selection and staging Option one This option complements the work of the 2006 Surfers Paradise Traffic Management Scheme by further enforcing a slow moving, pedestrian and bicycle friendly road with calmed traffic and a more relaxed atmosphere. By utilising Surfers Paradise Boulevard the Gold Coast Rapid Transit system will serve the tourist and commercial centre of Surfers Paradise and allow good connections to the beach and other forms of public transport whilst limiting impacts. However this option would require some changes to the traffic arrangements in this area. See pages for details. Option two While Ferny Avenue could provide the fastest trip it is the key north-south route for traffic, carrying up to 40,000 cars per day. Constructing and operating the Gold Coast Rapid Transit system in this corridor would require significant traffic impacts. Also, due to the narrow road width in this area there would be significant land and property impacts required south of Cypress Avenue in order to widen the road. Ferny Avenue also has lower passenger catchments than Surfers Paradise Boulevard. Option three The Esplanade would provide a good tourist experience however there is also limited width in this corridor due to the seawall. The Gold Coast Rapid Transit system, with a retained traffic lane, requires a minimum of 26 metres, and an additional 8 metres for a station location. To use the Esplanade for the Gold Coast Rapid Transit system would significantly impact the ocean way corridor, impact on pedestrian and cycle pathways, night markets and beach side parking. The system would also not be able to service this area during events such as Schoolies and Indy. Additionally there would be challenges reconnecting the Gold Coast Rapid Transit system to the Gold Coast Highway south of Surfers Paradise without significant property impacts. See Chapter 5: Route (from page 85) for further detail on how the Gold Coast Rapid Transit will travel through Surfers Paradise and the changes to traffic arrangements in this area. 81

12 Leaving Surfers Paradise Once the Gold Coast Rapid Transit system leaves Surfers Paradise the most direct route to Broadbeach is to follow the Gold Coast Highway until the new interchange station near Pacific Fair, which is the end of Stage one of the Gold Coast Rapid Transit project. See Chapter 5: Route (from page 85) for further detail on the Gold Coast Rapid Transit alignment from Surfers Paradise to Broadbeach. Feedback from consultation During consultation, the Gold Coast Rapid Transit project responded to queries regarding the Gold Coast Rapid Transit route. In particular people asked us why the Gold Coast Rapid Transit route did not: link from the rail line at Nerang or Robina use Smith Street to travel from Parklands Drive into Southport consider Bundall Road rather than the Gold Coast Highway. Connection to rail line at Nerang or Robina A rapid transit system commencing at Nerang would not be able to connect with Griffith University and the Gold Coast Hospital. The corridor between Nerang and Southport is identified in the TransLink Network Plan as a high growth secondary network with the progressive implementation of high occupancy vehicle lanes to support high frequency bus services. Servicing Robina town centre from Broadbeach via a rapid transit spur line is considered feasible and will be investigated as part of future planning work. West east corridor to Southport via Smith Street The Smith Street motorway is the principal east west arterial connecting the M1 to the northern areas of the Gold Coast. The high speed traffic environment and surrounding land use is unsuitable to promote an accessible public transport system. This route also does not allow the Gold Coast Rapid Transit system to access the proposed depot site or service the existing Gold Coast Hospital and medical precinct. North south corridor via Bundall Road While this corridor is identified in the Gold Coast City Council Local Growth Management Strategy as a significant future employment generator, it contains no designated key activity centres. Furthermore, surrounding land use consists largely of low density commercial/retail that generates less public transport needs than residential and key activity centres. Within the walk up catchment (800m) of this corridor, there is significantly less residential population than along the Gold Coast Highway. 82

13 83

14 The Business Case prepared for the Queensland Government and Gold Coast City Council made the recommendation to implement the Gold Coast Rapid Transit project in stages based on an assessment of patronage, cost, deliverability, the ability of the project to support on-going development of the city as it grows, and the suitability of other public transport modes to meet the public transport requirements. The following indicative staging strategy has been developed: Category Needed by Description Highest priority 2011 Sections two and three, Griffith University to Broadbeach High priority Section four, Broadbeach to Burleigh Heads Section one, Helensvale to Griffith University Future stages Section five, Burleigh Heads to Coolangatta Other possible future stages However, in parallel with the community review of the draft Concept Design and Impact Management Plan, the project is undertaking detailed market sounding to determine opportunities for implementing stages in a shorter time frame than described. This indicative staging plan is based upon delivery of the Gold Coast Rapid Transit system in response to increasing demand for public transport and need to continue to support the on-going development of the city. Actual construction dates could occur earlier or later than identified based on changes in predicted demand and funding arrangements. Therefore, at this stage, the draft Concept Design and Impact Management Plan has been developed in detail for sections two and three of Stage one. For more information refer to the following chapter in the draft Concept Design and Impact Management Plan: Volume 2, Chapter 2: Alignment Selection Volume 2, Chapter 5: Project Staging. See page 24 for details of how to access the full draft Concept Design and Impact Management Plan report. 84

Gold Coast. Rapid Transit. Network Integration Strategy

Gold Coast. Rapid Transit. Network Integration Strategy Gold Coast Rapid Transit 9 Network Integration Strategy Contents 1. Introduction 9 1 1.1 Purpose 9 1 2. Gold Coast Public Transport Network 9 2 2.1 TransLink Network Plan 9 2 2.2 Review of the Network

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First 2017 POLICY DOCUMENT Putting 2 Contents Message from the Premier 3 Our Commitment 4 The Newman-Nicholls Legacy 5 The Palaszczuk 6 Government s Record Our Plans: Putting 8 Call: 07 3844 8101 Mail: PO Box

More information

GOLD COAST HOUSING REPORT SNAPSHOT

GOLD COAST HOUSING REPORT SNAPSHOT GOLD COAST HOUSING REPORT SNAPSHOT Few cities have expanded like the Gold Coast. The once iconic surfing Mecca and holiday destination has grown to become the 6th largest city in Australia with a population

More information

Northern Beaches Transport Action Plan

Northern Beaches Transport Action Plan Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million

More information

Broadbeach. Gold Coast Highway. Proposed options are indicative only and do not represent any established plans.

Broadbeach. Gold Coast Highway. Proposed options are indicative only and do not represent any established plans. Broadbeach Gold Coast Highway The sights and sounds of Miami Marketta Beautiful Burleigh Key Idea 1: B roadbeach to obby Beach and Miami, just a short stop away Idea 1 Broadbeach to Approximate distance:

More information

Important information about Broadbeach 4 15 APRIL 2018

Important information about Broadbeach 4 15 APRIL 2018 Important information about 4 15 APRIL 2018 The Gold Coast is about to host the 2018 Commonwealth Games and this is the chance for all residents to be a part of this exciting event. This once in a lifetime

More information

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue.

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue. TORONTO TRANSIT COMMISSION REPORT No S7 MEETING DATE June 4, 1968 FROM: General Manager Subway Construction Date June 3, 1968 Subject: QUEEN STREET SUBWAY FOR STREETCAR OPERATION The Commission, at its

More information

Oxenford Studios YOUR OFFICIAL VENUE GUIDE

Oxenford Studios YOUR OFFICIAL VENUE GUIDE Oxenford Studios YOUR OFFICIAL VENUE GUIDE It s known for its thrilling entertainment, but at GC2018 Oxenford Studios will put on a new kind of show. Expect dramatic scenes, loud cheers and unexpected

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University Property Strategy The property strategy delivers improved legibility, responds to the locational attributes of the site, and facilitates essential operational efficiencies. 9.1 INTRODUCTION Non-aviation

More information

SPHERE SOUTHPORT LIVING 154 Musgrave Ave, Southport Gold Coast, Queensland

SPHERE SOUTHPORT LIVING 154 Musgrave Ave, Southport Gold Coast, Queensland SPHERE SOUTHPORT LIVING 154 Musgrave Ave, Southport Gold Coast, Queensland 6 May 2010 Regional Facilities Plan & Upgrade of Public Transport Stage One of the Gold Coast Rapid Transit System is scheduled

More information

4 15 April Is your business ready for the Games? Working together

4 15 April Is your business ready for the Games? Working together 4 15 April 2018 Is your business ready for the Games? Working together The City of Gold Coast is proud to host the biggest event in Australia this decade, the Gold Coast 2018 Commonwealth Games. 70 11

More information

City of Port Adelaide Enfield Report for Port Adelaide Centre Car Parking and Movement Study. Final Report

City of Port Adelaide Enfield Report for Port Adelaide Centre Car Parking and Movement Study. Final Report City of Port Adelaide Enfield Report for Port Adelaide Centre Car Parking and Movement Study October 2011 This Report: 1. has been prepared by GHD Pty Ltd for the City of Port Adelaide Enfield; 2. may

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

The State of Transport in Macquarie Park

The State of Transport in Macquarie Park The State of Transport in Macquarie Park 31st August 2015 Overview Macquarie Park is a major economic centre that contributes over $9billion to Australia s economy each year. Providing access to and from

More information

AUCKLAND WATERFRONT VISION 2040

AUCKLAND WATERFRONT VISION 2040 AUCKLAND WATERFRONT VISION 2040 HARBOUR BRIDGE WESTHAVEN MARINA WYNYARD POINT WESTERN RECLAMATION VIADUCT HARBOUR FANSHAWE STREET VICTORIA PARK PRINCES WHARF QUEENS WHARF PORT CAPTAIN COOK WHARF QUAY STREET

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

Your Transport Levy Your Transport Future. Sunshine Coast Council Transport Levy Annual Report

Your Transport Levy Your Transport Future. Sunshine Coast Council Transport Levy Annual Report Your Transport Levy Your Transport Future Sunshine Coast Council Transport Levy Annual Report 2016-2017 www.sunshinecoast.qld.gov.au T 07 5475 7272 F 07 5475 7277 Locked Bag 72 Sunshine Coast Mail Centre

More information

Map showing location of public transport projects in vicinity of railway station

Map showing location of public transport projects in vicinity of railway station Map showing location of public transport projects in vicinity of railway station Market Town Transport Strategy 2013 39 ID PT1a Specific Location Approach at Detail of Project Develop Area Master plan

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

4. Proposed Transit Improvements

4. Proposed Transit Improvements 4. Proposed Transit Improvements The following proposed transit improvements have been assembled based on input received from the community meetings and from review and coordination with the TAC as well

More information

West of England. Priority Places Requiring Public Investment

West of England. Priority Places Requiring Public Investment West of England Priority Places Requiring Public Investment Development Urban Regeneration & Suburban Intensification Bristol Central Area Bristol Central Area; Stokes Croft, Temple Meads & St Philips

More information

GOLD COAST AUSTRALIA

GOLD COAST AUSTRALIA GOLD COAST AUSTRALIA ARTIST S IMPRESSION FROM LAKE ORR AURA VARSITY LAKES APARTMENTS, GOLD COAST AT THE HEART OF IT ALL VARSITY LAKES WALK OR RIDE TO EVERYWHERE Surfers Paradise 12.4km Gold Coast Convention

More information

CITY RAIL LINK. New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter

CITY RAIL LINK. New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter 134 AC_BEU_CCMP_3_TM5_8_FD.indd 134 20/07/12 12:30 PM 05 CITY RAIL LINK New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter 5 MO VE 0 1 2 8 KEY 1 Britomart

More information

Moreton Bay Rail Link community consultation report. January 2016

Moreton Bay Rail Link community consultation report. January 2016 Moreton Bay Rail Link community consultation report January 2016 Contents Project background 1 How we planned your new network 2 Consultation overview 3 How you participated in consultation 4 Online survey

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

EAST-WEST STITCH. Connecting the Western Edge of the City to the Centre

EAST-WEST STITCH. Connecting the Western Edge of the City to the Centre 98 AC_BEU_CCMP_2_TM1_4 _FD.indd 98 20/07/12 12:06 PM 02 EAST-WEST STITCH Connecting the Western Edge of the City to the Centre 01 02 Northern Motorway Daldy Street Fanshawe Street Nelson Street Hobson

More information

North-South Bypass Tunnel Traffic and Transport

North-South Bypass Tunnel Traffic and Transport Technical Paper Brisbane City Council January 2005 Prepared for Brisbane City Council Prepared by Maunsell Australia Pty Ltd 12 Cribb Street PO Box 1823 Milton QLD 4064 Australia ABN 20 093 846 925 Tel

More information

Future Network Requirements

Future Network Requirements Future Network Requirements Presenters: Mahesh Narotam, Manager Portfolio Planning and Optimisation Daniel Andersen, Manager Network Strategy Roslyn Stewart, Senior Portfolio Planning Engineer May 2017

More information

PIMPAMA JUNCTION SHOPPING VILLAGE QUEENSLAND NOW LEASING INFORMATION MEMORANDUM. Your New Local

PIMPAMA JUNCTION SHOPPING VILLAGE QUEENSLAND NOW LEASING INFORMATION MEMORANDUM. Your New Local QUEENSLAND NOW LEASING Your New Local WELCOME TO PIMPAMA JUNCTION SHOPPING VILLAGE OVERVIEW Situated only 35 minutes south of Brisbane CBD and 25 minutes north of Surfers Paradise, Pimpama Junction Shopping

More information

Gold Coast. Rapid Transit. Concept Design and Impact Management Plan. Volume 7 Technical Report - Soils, Geology and Topography Report

Gold Coast. Rapid Transit. Concept Design and Impact Management Plan. Volume 7 Technical Report - Soils, Geology and Topography Report Gold Coast Rapid Transit Concept Design and Impact Management Plan Volume 7 Technical Report - Soils, Geology and Topography Report Contents 1. Introduction 1 1.1 Gold Coast Rapid Transit Project 1 1.2

More information

Industry briefing NOVEMBER 2017

Industry briefing NOVEMBER 2017 Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start

More information

LUXURIOUS & LARGE RIVERFRONT RESIDENCES

LUXURIOUS & LARGE RIVERFRONT RESIDENCES LUXURIOUS & LARGE RIVERFRONT RESIDENCES IMMACULATELY DESIGNED FOR SOPHISTICATED LIVING, LA RIVIÈRE S 16 APARTMENTS WELCOME THE LIGHT AND WATERSIDE BREEZES. FREE-FLOWING INDOOR LIVING SPACES, GENEROUS PRIVATE

More information

Whangarei Airport. Prepared by Carine Andries 10/20173

Whangarei Airport. Prepared by Carine Andries 10/20173 Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2

More information

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017 Smart Cities Plan IMPLEMENTATION Townsville City Deal April 2017 ACKNOWLEDGEMENTS The Commonwealth Government, Queensland Government and the Townsville City Council would like to thank the Townsville community

More information

CARRARA SUBURBPROFILE

CARRARA SUBURBPROFILE 1 SUBURBPROFILE Carrara is considered a unique residential address being a quiet, leafy suburb yet within close proximity of all the Gold Coast has to offer. OVERVIEW Carrara is situated within the heart

More information

South East Queensland Stabling Site Selection Report January 2014

South East Queensland Stabling Site Selection Report January 2014 South East Queensland Stabling Site Selection Report January 2014 1 Contents Page 1. Introduction... 3 2. Project Background... 3 2.1 Stabling Options... 3 3. Site Selection Process... 4 4. Site Assessment

More information

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity

More information

GOLD COAST AUSTRALIA WELCOME PACK AUSTRALIA/NEW ZEALAND MAY 2016

GOLD COAST AUSTRALIA WELCOME PACK AUSTRALIA/NEW ZEALAND MAY 2016 GOLD COAST AUSTRALIA 28 29 MAY 2016 AUSTRALIA/NEW ZEALAND WELCOME PACK ANNUAL JEUNESSE CONFERENCE UNIVERSITY 2016 2015 Wesley Jupiters Conference Hotel & Casino Centre 220 CASINO PITT DRIVE, STREET, BROADBEACH

More information

Green Fields Leppington

Green Fields Leppington Green Fields Leppington CONNTENTS 1.0 URBAN GROWTH - SYDNEY 2.0 MACRO CONTEXT 3.0 LOCAL ENVIRONMENTAL PLAN - LEPPINGTON 4.0 CONCEPT 5.0 GREEN ROOFS 6.0 APARTMENT REALISATION SCHEDULE 7.0 INFRASTRUCTURE

More information

PERTH-ADELAIDE CORRIDOR STRATEGY

PERTH-ADELAIDE CORRIDOR STRATEGY INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South

More information

A selection of the Gold Coast s finest projects

A selection of the Gold Coast s finest projects A selection of the Gold Coast s finest projects WELCOME to the Ray White Projects lift-out, where we review what s driving the growth of the Gold Coast market and take a look inside some of the city s

More information

Issue 16, June 2012 FREE TRANSPORT THINGS TO DO. shopping

Issue 16, June 2012 FREE TRANSPORT THINGS TO DO. shopping Issue 16, June 2012 FREE THINGS TO DO TRANSPORT shopping Welcome to the magnificent GOLD COAST! A location famous for spoiling the people who visit our pristine beaches, subtropical rainforests, amusement

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

H1: BIRMINGHAM CURZON STREET STATION

H1: BIRMINGHAM CURZON STREET STATION HIGH SPEED TWO INFORMATION PAPER H1: BIRMINGHAM CURZON STREET STATION This paper outlines the proposals for Curzon Street Station. It will be of particular interest to those potentially affected by the

More information

PARTNERING FOR SUCCESS

PARTNERING FOR SUCCESS PARTNERING FOR SUCCESS PARTNERING FOR SUCCESS WE HELP SHAPE THE WORLD AROUND US TO BECOME A BETTER PLACE. W e are the leading design and consultancy firm for natural and built assets. With a global network

More information

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS 2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.

More information

NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT

NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT 1 July 2016 Planning Manager Westland District Council 36 Weld Street HOKITIKA Attn Alex Dunn Dear Alex NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT On 15 June 2016 you issued

More information

21.07 ECONOMIC DEVELOPMENT AND EMPLOYMENT 19/03/2015 C323 Proposed C Key issues and influences. Economic Role and Function

21.07 ECONOMIC DEVELOPMENT AND EMPLOYMENT 19/03/2015 C323 Proposed C Key issues and influences. Economic Role and Function 21.07 ECONOMIC DEVELOPMENT AND EMPLOYMENT 19/03/2015 C323 Proposed C347 21.07-1 Key issues and influences 14/10/2010 C168 Economic Role and Function Geelong is the largest regional city in Victoria and

More information

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY 2015 18 National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY OVERVIEW Transport investment in the Bay of Plenty is targeted to support significant residential growth, new industrial

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

KING STREET PILOT STUDY PUBLIC MEETING

KING STREET PILOT STUDY PUBLIC MEETING KING STREET PILOT STUDY PUBLIC MEETING 2017.02.13 PUBLIC WORK with GEHL STUDIO / NEW YORK SWERHUN ASSOCIATES SAM SCHWARTZ CONSULTING LLC STARTING POINTS 17 1 - TRANSIT FIRST! Transit service is beyond

More information

CBD Rail Link Business Case

CBD Rail Link Business Case CBD Rail Link Business Case Executive Summary: CBD Link Business Case (Nov 2010) Background The CBD Rail Link will be the most significant improvement to Auckland s transport network since the opening

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Sunshine Coast Light Rail Route Options Consultation Report

Sunshine Coast Light Rail Route Options Consultation Report Sunshine Coast Light Rail Route Options Consultation Report May 2015 Sunshine Coast Light Rail Route Options Consultation Report DISCLAIMER Information contained in this document is based on available

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf

https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf GSC Sydney East Rev Draft -references Port Botany - 30 https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf Pages 6. The District s freight routes, particularly

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS NIAGARA FALLS CITY COUNCIL NOVEMBER 28,

More information

The Coalition s Policy

The Coalition s Policy The Coalition s Policy Key Commitments The Coalition s plan for a strong new economy will provide jobs and growth and secure the future for Australian families through smart investment in infrastructure.

More information

Doncaster Local Plan. Housing and Economic Land Availability Assessment (HELAA) July 2017 Update Employment Sites

Doncaster Local Plan.  Housing and Economic Land Availability Assessment (HELAA) July 2017 Update Employment Sites Doncaster Local Plan Housing and Economic Land Availability Assessment (HELAA) July 2017 Update Employment Sites www.doncaster.gov.uk 1. Introduction & Background 1.1 Doncaster Council published its Housing

More information

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i June 22, 2015 6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY Last year, VDOT commissioned the Route 58 Corridor Study to develop a planning

More information

Feasibility Study for a New Sport, Entertainment and Convention Facility in Townsville (September 2013) Information Abstract

Feasibility Study for a New Sport, Entertainment and Convention Facility in Townsville (September 2013) Information Abstract Feasibility Study for a New Sport, Entertainment and Convention Facility in Townsville (September 2013) Information Abstract 1 Introduction: Townsville has two major sporting, entertainment and events

More information

7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW. Sydney Airport Master Plan

7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW. Sydney Airport Master Plan 7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW Sydney Airport Master Plan 2033 87 7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW Key points On Airport Drive, non-airport through-traffic accounts for up

More information

PEOPLE FOCUSED PUBLIC TRANSPORT

PEOPLE FOCUSED PUBLIC TRANSPORT PEOPLE FOCUSED PUBLIC TRANSPORT A STRONG PLAN FOR REAL CHANGE 1 We re ready. Over the last four years, we ve been working hard developing our vision for the future of South Australia. Not just policies,

More information

QEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.

QEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange. SKYVIEW DRIVE KERNS and Highway 403 Freeman Interchange - ALTERNATIVE 3 Ÿ Widen by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange. Ÿ Widen Highway 403 by

More information

South of Fraser Transportation Priorities March 2017 Engagement

South of Fraser Transportation Priorities March 2017 Engagement March 20 Engagement Welcome to the South of Fraser Transportation Priorities Engagement A robust and reliable highway network is needed to serve the needs of a growing population and diverse economy. The

More information

GREAT IDEAS FOR THE GOLD COAST

GREAT IDEAS FOR THE GOLD COAST GREAT IDEAS FOR THE GOLD COAST CONTRIBUTORS Urbis drew on the diverse talent within its Gold Coast office, together with insights from its other national and international offices. URBIS TEAM MATTHEW SCHNEIDER

More information

investment ProSPeCTuS 2016 SuMMary

investment ProSPeCTuS 2016 SuMMary investment ProSPeCTuS 2016 SuMMary 2 invest SuNShiNe CoaST - The future is here MeSSaGe from The Mayor MeSSaGe from The Mayor a CiTy region of opportunity The Sunshine Coast offers investors an unrivalled

More information

port of brisbane Information Guide

port of brisbane Information Guide port of brisbane Information Guide A B O U T U S The Port of Brisbane, managed by the Port of Brisbane Pty Ltd, is Queensland s largest general cargo and container port, and a driver of economic growth

More information

GOLD COAST LIGHT RAIL

GOLD COAST LIGHT RAIL AUSTRALIAN CONSTRUCTION ACHEIVEMENT AWARD 2015 TECHNICAL PAPER ABSTRACT GOLD COAST LIGHT RAIL The $1.3 billion Gold Coast light rail is an ambitious, city-changing infrastructure project that has integrated

More information

Auckland Regional Public Transport Plan

Auckland Regional Public Transport Plan Auckland Regional Public Plan 2010 www.arta.co.nz Published in June 2010 by: The Auckland Regional Authority Private Bag 92 236 Auckland, New Zealand This document is available on the ARTA website: www.arta.co.nz

More information

FIGURES TABLES. Table 1 - Public Engagement Participation Table iii

FIGURES TABLES. Table 1 - Public Engagement Participation Table iii CONTENTS 1 Executive Summary... 1 2 Introduction... 3 2.1 Purpose... 3 2.2 Report Structure... 3 3 Project overview: Planning for the La Trobe Employment Cluster... 4 3.1 Context... 4 3.2 Plan Melbourne

More information

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council Liverpool City Region Candidate M As at 1 May 2013 Sponsoring Authority Halton Borough Council Halton Borough Council Halton Borough Council Halton Borough Council Knowsley Council Knowsley Council Liverpool

More information

Welcome to public consultation for the redevelopment of the existing leisure centre site.

Welcome to public consultation for the redevelopment of the existing leisure centre site. www.southwark.gov.uk Welcome to public consultation for the redevelopment of the existing leisure centre site. The design strategies and drawings presented here show how the projects are developing. Design

More information

Downtown Office Building for Sale Owner/user Opportunity - Reduced Price $2,700, E Street Santa Rosa CA

Downtown Office Building for Sale Owner/user Opportunity - Reduced Price $2,700, E Street Santa Rosa CA 14,374± sf Two Story Building REDUCED PRICE $2,700,000! Kevin Doran, Partner 1355 N Dutton Ave., Santa Rosa, CA 95401 (707) 528-1400 Fax: (707) 524-1419 Lic #: 01704987 KDoran@KeeganCoppin.com KEY FACTS

More information

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT.

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. Bond Street Development Plan is one of the key initiatives outlined in the West End Partnership s vision. Bond Street

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

TRANSPORT INFRASTRUCTURE FOR THE SUNSHINE COAST

TRANSPORT INFRASTRUCTURE FOR THE SUNSHINE COAST TRANSPORT INFRASTRUCTURE FOR THE SUNSHINE COAST MAY 2017 rpsgroup.com Contents 1 EXECUTIVE SUMMARY... 1 2 INTEGRATED TRANSPORT CONVERSATION... 3 2.1 Survey details and promotion... 3 2.2 Survey respondents...

More information

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment Figure ES-5 shows all of the possible LRT routes and stations identified for study in the Draft EIS/EIR. The features and impacts of each of the build alternatives are described in the following section.

More information

ESSINGTON RISE. Leichardt, IPSWICH QLD

ESSINGTON RISE. Leichardt, IPSWICH QLD ESSINGTON RISE Leichardt, IPSWICH QLD Riverlink Shopping Centre Ipswich CBD IGA Supermarket Railway Station Leichardt State School Ipswich Grammar School Home HQ Shopping Centre Sporting Fields Ipswich

More information

VOLUME 3 3. STATEMENTS OF DESIRED CHARACTER FOR PLANNING AREAS AND PRECINCTS. 3.1 Planning Area No. 1 - Maroochydore

VOLUME 3 3. STATEMENTS OF DESIRED CHARACTER FOR PLANNING AREAS AND PRECINCTS. 3.1 Planning Area No. 1 - Maroochydore 3. STATEMENTS OF DESIRED CHARACTER FOR PLANNING AREAS AND PRECINCTS 3.1 Planning Area No. 1 - Maroochydore The Maroochydore Principal Activity Centre is subject to the Maroochydore PAC Structure Plan.

More information

Fremantle Railway Station

Fremantle Railway Station Submission to Planning and Infrastructure Minister Alannah MacTiernan December 2005 Fremantle Railway Station Celebrating its centenary in 2007 The Fremantle Railway Station below opened in 1907, the same

More information

MELBOURNE METRO RAIL PROJECT SOUTH YARRA STATION OPTIONS ASSESSMENT

MELBOURNE METRO RAIL PROJECT SOUTH YARRA STATION OPTIONS ASSESSMENT MELBOURNE METRO RAIL PROJECT SOUTH YARRA STATION OPTIONS ASSESSMENT June 2015 Page 410 of 443 Table of Contents 1. Executive summary... 3 2. Introduction... 4 2.1. The Melbourne Metro Rail Project... 4

More information

Number 1 Gross Regional Product per capita in Queensland

Number 1 Gross Regional Product per capita in Queensland Number 1 Gross Regional Product per capita in Queensland Whitsunday Region is the nation building region of Australia providing over $22 billion of economic value to the Australian economy. Our region

More information

Business Case Summary

Business Case Summary This document is AT s internal business case to facilitate the Gateway Review process prior to letting contracts for enabling works construction. It is not a joint business case with government. Contents

More information

M54 to M6/M6 Toll Link Road Public consultation

M54 to M6/M6 Toll Link Road Public consultation to M6/M6 Toll Link Road Public consultation 15 September 2017 to 13 October 2017 Contents Introduction 4 5 Why do we need this scheme? 6 Previous consultation 7 8 Modified options 9 Option B West 10 Option

More information

Home About us Contact

Home About us Contact Page 1 of 5 Home About us Contact IN THIS EDITION 1. A message from IPA s Chief Executive Brendan Lyon 2. Added 3. Status Changes 4. Updates 1. A message from IPA s Chief Executive Brendan Lyon I am delighted

More information

The Master Plan focuses on forward planning, innovation and sustainability and is prepared every five years.

The Master Plan focuses on forward planning, innovation and sustainability and is prepared every five years. The Master Plan focuses on forward planning, innovation and sustainability and is prepared every five years. Connecting People Building Opportunities 8 Brisbane Airport Corporation CHAPTERs 1, 2, 3, 4

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

where memories grow Its a place to be part of a new neighbourhood, enjoy the family, explore the central parklands and create new friendships.

where memories grow Its a place to be part of a new neighbourhood, enjoy the family, explore the central parklands and create new friendships. where memories grow From the very outset, Frasers Property Australia s planning for The Rise focused on creating a family friendly neighbourhood where everyone can enjoy an active, outdoor lifestyle. With

More information

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London West London Economic Prosperity Board 21 March 2017 Title Orbital Rail in West London Report of Status Urgent Enclosures Officer Contact Details Amar Dave (LB Brent) Public No Appendix 1: Specification

More information

A better bus network for Mackay

A better bus network for Mackay A better bus network for Mackay How you shaped your new network September 2016 Project background The Mackay region has seen significant growth and development over the past 10 years, with a population

More information

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES Proposed north west runway Stanwell Moor Stanwell All maps contain OS data Crown copyright and database right 2018 INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES JANUARY 2018 Airport Expansion

More information