Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:
|
|
- Mercy Anderson
- 5 years ago
- Views:
Transcription
1 Page 1 of SECTION: 01 COMMON ITEMS CONTRACTOR CONSTRUCTION STAKING FIELD OFFICE AND LABORATORY (TYPE A) FOUNDATION STABILIZATION (SET PRICE) MOBILIZATION MOBILIZATION (DBE) REMOVAL OF EXISTING STRUCTURES CONCRETE FOR SEAL COURSE (SET PRICE) (1) LS (1) LS (1) LS (1) LS 7, , , , , , , , , , , , , , , , , , , , , , , , , , , , FLAGGER (SET PRICE) HOUR $54, $80, $132, Section Total with LCC: $54, $80, $132,777.12
2 Page 2 of SECTION: 02 ROAD ITEMS CLEARING AND GRUBBING COMMON EXCAVATION (URB) COMMON EXCAVATION (CONTRACTOR FURNISHED) ROCK EXCAVATION WATER (GRADING) (SET PRICE) COMPACTION OF EARTHWORK (TYPE B) (MR-90) CONCRETE (GRADE 4.0) (RCB) CONCRETE (GRADE 4.0) (AE) (RCB) BRIDGE BACKWALL PROTECTION SYSTEM REINFORCING STEEL (GRADE 60) (1) LS 2, , MGAL 3, SQYD , , , , , , , , , , , , , , , , , , , , , , , ,
3 Page 3 of SECTION: 02 ROAD ITEMS REINFORCING STEEL (GRADE 60) (EPOXY COATED) FOUNDATION STABILIZATION GRANULAR BACKFILL (WINGWALLS) BRIDGE PROJECT MARKER CROSS ROAD PIPE ( 18") (ACSP) CROSS ROAD PIPE ( 5.0 SQ.FT.) (CSMAC) CROSS ROAD PIPE (10.0 SQ.FT.) (CSMAC) END SECTION ( 18") (ACS) END SECTION ( 5.0 SQ.FT.) (CSMA) END SECTION (10.0 SQ.FT.) (CSMA) 3, , , , , , , , , , , , , , , , , , , , , , , , ,500.00
4 Page 4 of SECTION: 02 ROAD ITEMS ADJUSTMENT OF MANHOLES ADJUSTMENT OF VALVE BOX (WATER) INLET (TYPE 12 CURB) MANHOLE (REINFORCED CONCRETE) STORM SEWER (24") (RCP) STORM SEWER ( 7.0 SQ.FT.) (RCPHE) STORM SEWER (10.0 SQ.FT.) (RCPHE) STORM SEWER (14.0 SQ.FT.) (RCPHE) END SECTION (10.0 SQ.FT.) (RCHE) , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,500.00
5 Page 5 of SECTION: 02 ROAD ITEMS END SECTION (14.0 SQ.FT.) (RCHE) SIDEWALK CONSTRUCTION ( 4") (AE) SIDEWALK CONSTRUCTION ( 6") (AE) SIDEWALK RAMP HANDRAIL (STEEL) (3'-6") , SQYD SQYD SQYD (1) 2, , , , , , , , , , , , , , , , , , , , , , , , REMOVAL AND RECONSTRUCTION OF EXISTING STRUCTURES LS $497, $508, $590, Section Total with LCC: $497, $508, $590,165.07
6 Page 6 of SECTION: 03 RETAINING WALL ITEMS , , , , LANDSCAPE RETAINING WALL SQFT $22, $34, $52, Section Total with LCC: $22, $34, $52,128.00
7 Page 7 of SECTION: 04 TEMP PRJ WTR POL CTL TEMPORARY FERTILIZER ( ) TEMPORARY SEED (CANADA WILDRYE) TEMPORARY SEED (GRAIN OATS) TEMPORARY SEED (STERILE WHEATGRASS) SEDIMENT REMOVAL (SET PRICE) TEMPORARY BERM (SET PRICE) BIODEGRADABLE LOG (12") FILTER SOCK ( 8") SWPPP DESIGN SWPPP INSPECTION (1) LS , , , , , , , , , , , , , , ,250.00
8 Page 8 of SECTION: 04 TEMP PRJ WTR POL CTL WATER POLLUTION CONTROL MANAGER MULCHING TON , , , , , , WATER (EROSION CONTROL) (SET PRICE) MGAL $25, $26, $26, Section Total with LCC: $25, $26, $26,304.40
9 Page 9 of SECTION: 05 BR. STA CONCRETE (GRADE 4.0) (RCB BR) CONCRETE (GRADE 4.0) (AE) (RCB BR) BRIDGE BACKWALL PROTECTION SYSTEM REINFORCING STEEL (GRADE 60) REINFORCING STEEL (GRADE 60) (EPOXY COATED) CLASS III EXCAVATION (RCB) FOUNDATION STABILIZATION GRANULAR BACKFILL (WINGWALLS) BRIDGE PROJECT MARKER SQYD 1, , , , , , , , , , , , , , , , , , , , , , , ,
10 Page 10 of $103, $103, $102, Section Total with LCC: $103, $103, $102,737.90
11 Page 11 of SECTION: 06 CONCRETE SURFACING ITEMS CURB AND GUTTER, COMBINED (AE) CURB AND GUTTER, COMBINED (AE) (SPECIAL) CONCRETE PAVEMENT ( 8" UNIFORM) (AE) CRUSHED STONE SUBGRADE ( 6") WATER (CRUSHED STONE SUBGRADE) (SET PRICE) SQYD SQYD MGAL , , , , , , , , , , GEOSYNTHETIC REINFORCEMENT (FOR BASE) SQYD $45, $51, $58, Section Total with LCC: $45, $51, $58,332.00
12 Page 12 of SECTION: 07 ASPHALT SURFACING ITEMS , , , HMA-COMMERCIAL GRADE (CLASS A) TON $32, $23, $37, Section Total with LCC: $32, $23, $37,800.00
13 Page 13 of SECTION: 08 SIGNING ITEMS SIGN (FLAT SHEET) (HIGH PERFORMANCE) SIGN POST (1-3/4" PERFORATED SQUARE STEEL TUBE) SQFT SIGN POST FOOTING ( 1-3/4" PERFORATED SQUARE STEEL TUBE) $ $ $ Section Total with LCC: $ $ $757.00
14 Page 14 of SECTION: 09 PAVEMENT MARKING ITEMS PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (18") PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE)(RAILROAD XING) , , , , , , , PAVEMENT MARKING REMOVAL $3, $4, $3, Section Total with LCC: $3, $4, $3,744.00
15 Page 15 of SECTION: 10 TRAFFIC SIGNAL ITEMS (K-15) (1) 19, , , , , , TRAFFIC SIGNAL LS $19, $19, $19, Section Total with LCC: $19, $19, $19,710.00
16 Page 16 of SECTION: 11 TRAFFIC SIGNAL ITEMS (CLIFTON) (1) 50, , , , , , TRAFFIC SIGNAL LS $50, $50, $50, Section Total with LCC: $50, $50, $50,910.00
17 Page 17 of SECTION: 12 SEEDING ITEMS FERTILIZER ( ) SEED (BLUE GRAMA GRASS) (LOVINGTON) SEED (BUFFALO GRASS) (TREATED) SEED (RYEGRASS) (PERENNIAL) SEED (PRAIRIE JUNE GRASS) SEED (SIDE OATS GRAMA) (EL RENO) SEED (FESCUE) (TALL) (ENDOPHYTE-FREE) SEED (FESCUE) (TALL TURF TYPE BLEND) SEED (KENTUCKY) (BLUEGRASS) (BARON) , , , , , , , , ,
18 Page 18 of SECTION: 12 SEEDING ITEMS MULCHING TACKING SLURRY $9, $5, $5, Section Total with LCC: $9, $5, $5,882.80
19 Page 19 of SECTION: 13 TRAFFIC CONTROL ITEMS WORK ZONE SIGNS ( 9.26 TO SQ.FT.) WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) PORTABLE CHANGEABLE MESSAGE SIGN , EADA EADA EADA (1) , , , , , , , , , TRAFFIC CONTROL (INITIAL SETUP) LS $12, $8, $12, Section Total with LCC: $12, $8, $12, Contract Item Totals $877, $918, $1,093, Contract Time Totals Contract Life Cycle Costs Totals $0.00 $0.00 $0.00 Contract Grand Totals ( ) indicates item is bid as Lump Sum $877, $918, ,093,775.29
20 Page 20 of
21 Vendor Ranking Page 1 of 1 TA-T043(301) Rank Vendor ID/Name Total Bid Percent Of Low Bid CONSPEC INC DBA $877, % PEARSON $918, % CORNEJO & SONS LLC $1,093, %
203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'
More informationADDENDUM NO. TWO AB
ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County
More informationCITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $
CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units
More informationRiverside County Transportation Department Summary of Bids
COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)
More informationBID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.
BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway
More informationTENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1
TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached).
More information22-23 Pavement Marking Items. (Pages 7 & 8 removed)
22-23 Pavement Marking Items (Pages 7 & 8 removed) SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable
More information9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF
Bu i l d i n g Co mmi t t e e T u e s d a y Au g u s t 1 3, 2 0 1 3 9' - 0" Remove Windows Fire Wall Remove Windows 1 First Floor Plan 1/8" = 1'-0" Locker Bay 237 SF Lobby 393 SF Main Vestibule 227 SF
More informationADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE
ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT
More informationDATA BOOK IV : COST ESTIMATE
The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 September 14, 2018 The Colfax County Board of Commissioners
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 21, 2018 To whom it may concern: The Colfax County
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationAnn Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB
MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:
More informationCommunity Park Capital Project. February 6, 2017
Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationHOST KA
W PLAINS E ZENITH E 00 RD E 000 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD W 00 RD W 000 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD E 00 RD E 00 RD E 0 RD E 00 RD E 00 RD E 00 RD
More informationATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More informationIS A BUDGET ONLY DESCRIPTION QUANTITY UNIT
Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION
More informationLAKE MOUNTAIN PRELIMINARY
VICINITY MAP VICINITY MAP PREPARED FOR:. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE S WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS, TO THE
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationCity of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting
City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,
More informationCAUTION - NOTICE TO CONTRACTOR
WINDSOCK 7. 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7....... CNT BOX NOEL CNT BOX.. CNT BOX NOEL CNT BOX NOEL.7 7........ 7...7.. 7..7. 7..7 TOP. TOP TOP TOP. TOP. 7.7.. TOP. TOP.7 TOP. TOP.7 TOP. PVC
More informationFINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO
City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL
More informationItem Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total
AGENCY: KENDALL Builders Paving D Construction, Inc. Gallagher Asphalt Corp. Geneva Construction Co. P. T. Ferro Construction Co. SECTION: 16-00000-00-GM, Plainfield Road, HMA Resurfacing, CMF 4413 Roosevelt
More information- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and
More informationAPPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS
Rare Development Opportunity in the Olde Carlsbad Neighborhood Ocean Views from Some Lots Lot Sizes 9,500-15,527 SF Area of New Home Prices From $1,000,000-$1,500,000 SUBMIT BEST OFFER - OFFERS DUE DECEMBER
More informationProject Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon
Date: 06-24-16 To: Derek Hackett, Public Information Officer From: Sunil Jeboo, Traffic Engineer Re: Road Closure for the Week of 06-27-16 (3236.1) 6 th Pump Station Western Ave. and 6 th SW Western Ave.
More informationSecond Street Improvements Project Project Update Archive
Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A
More informationCOON CREEK WATERSHED DISTRICT Request for Board Action
Item 13: Request to Award Work on Woodcrest Creek Bank Stabilization Project Page 1 of 6 COON CREEK WATERSHED DISTRICT Request for Board Action MEETING DATE: December 8, 2014 AGENDA NUMBER: 13 ITEM: Request
More informationLongitudinal Joint Construction. Mike Robinson, PE
Longitudinal Joint Construction Mike Robinson, PE Inherently weaker than surrounding pavement Prone to deterioration Often drives rehabilitation FOD Longitudinal Joints Two predictors of success Density
More informationABINGDON v ELEMENTARY SCHOOL
JULY 31 2017 ABINGDON v ELEMENTARY SCHOOL FCA LISTENING SESSION CONSTRUCTION UPDATE PROJECT UPDATE SUMMARY 1. Two four-plex relocatables removed, ten to stay in place; Temporary Parking lot in place and
More informationCapital Improvement Plan
PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by
More informationBID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner
BID RESULTS May 12, 2016 Award Date May 19, 2016 COMMISSION DISTRICT 1 Bob Ruwart - Commissioner Job 1 Federal Project NHPPI-I806199 involving grading, draining, milling plant mix and concrete, placing
More informationFort Bend County Tabulation BID Term Contract for Traffic Signs Posts and Supplies. Term: 1 October 2010 through 30 September 2011
Vendor Section 1: Complete Signs 3M Company St Paul MN Allied Tube Harey IL Custom Products Jackson MS Hall Signs Bloomington IN Interstate Highway Little Rock AR Ibis Signs Butler PA MD Solutions Plain
More informationRecommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:
Report to Council To: Mayor Linton and Members of Council Prepared By: Wes Snarr, Managing Director of Corporate Services Report: COR-45 Date: 12 Jul RE: Recomendation for Award of Request for Tenders
More informationCAUTION - NOTICE TO CONTRACTOR
7. WINDSOCK 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7...... CNT BOX NOEL. CNT BOX. CNT BOX NOEL. CNT BOX NOEL..7... 7. 7.......7. 7. 7..7. TOP. TOP. TOP TOP.7 7.. TOP TOP.7. TOP TOP..7 TOP. TOP.7. PVC
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More informationCONSTRUCTION COMMITTEE MEETING AGENDA
CONSTRUCTION COMMITTEE MEETING AGENDA DATE: Tuesday, December 19, 2017 TIME: 8:30 a.m. PLACE: GOAA ANNEX BUILDING, 1ST FLOOR - CONFERENCE ROOMS (APOLLO/GEMINI/TAURUS), 5855 CARGO ROAD, ORLANDO INTERNATIONAL
More informationREPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number
REPORT Pavement Evaluation Summary Brookshire Way & Duluth Park Duluth, Georgia Project Number 2013.4154.01 February 11, 2014 Revised March 20, 2014 UNITED CONSULTING 625 Holcomb Bridge Road Norcross,
More informationAPPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS
Atlantic Sunrise Project PA DEP Chapter 105 Joint Permit Application Transcontinental Gas Pipe Line Company, LLC Lancaster County APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationWeekly construction update
November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41
More informationVICINITY MAP END PROJECT BEGIN PROJECT Middle Fork Campground Middle. Lake. Moolock. Fork. Trailhead. Lake Nadeau SMC.
htr $PATH$ $DATE$ Designed by: B. W ACKER o ~ 63.4m.i Bend BEGI 7+65.00 REFERECE: APPLICAT: Federal Highway Administration ADJACET PROPERTY OWERS:. Washington Department of atural Resources (7+65 to 487+0)
More informationFULL DEPTH RECLAMATION (FDR)
FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers
More informationUniversally Accessible Canoe and Kayak Launch John H. Kerr Reservoir Tailrace Park, Mecklenburg County, VA
Accessible Canoe an Kayak Launch John H. Kerr Reservoir Tailrace Park, Mecklenburg County, VA Launch was constructe through a partnership with the U.S. Army Corps Engineers an Roanoke River Basin Association
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationFinal Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado
Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422
More informationCity of Grand Island
City of Grand Island Tuesday, January 09, 2007 Council Session Item G7 #2007-6 - Approving Certificate of Final Completion for Asphalt Maintenance Project 2006-AC-1; Various Locations Throughout Grand
More informationCHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014
CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed
More informationRECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1
PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to
More informationLAS VIRGENES MUNICIPAL WATER DISTRICT AIR-VACUUM POTABLE WATER DEVICE RELOCATION PROJECT
TOPANGA CANYON BLVD. LOS ANGELES COUNTY, CALIFORNIA CONSTRUCTION PLANS FOR AIRVACUUM POTABLE WATER DEVICE RELOCATION PROJECT ROSCOE BLVD. PROJECT AREA CIP JOB NO. 0236 SHEET INDEX SHEET NO. DESCRIPTION
More informationCorktown Parks. Public Meeting. City of Toronto
Corktown Parks Public Meeting City of Toronto 15-04-20 Agenda 1. Reasons for Study 2. Consultation to Date 3. Parks Evaluation 4. Community Context 5. Bright St. Playground 6. Orphans Green (Dog Off Leash)
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More information4-foot Economy Sign Post. 4-foot post is rated at 2 pounds per foot. 7-foot Economy Sign Post
Introduction: ComplianceSigns.com offers a variety of sign posts, sign mounting hardware, sign bases, mounting tape and more to mount your safety signs indoors or out. We offer three styles of sign posts,
More informationKDOT announces approved December bids
FOR IMMEDIATE RELEASE Dec. 30, 2013 News Contact: Kim Stich, 785-296-3585 KDOT announces approved December bids The Kansas Department of Transportation announces approved bids for state highway construction
More informationCAPITAL IMPROVEMENT PLAN
CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG
More informationTrail Feasibility Study
VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way
More informationDATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration
PUBLIC WORKS COMMISSION DATE: April 19, 2016 REPORT NO. PW2016-034 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger General Manager, Public Works Commission
More informationReport to Council. Report: COR Date: 25 Jul 2016
Report to Council To: Mayor Linton and Members of Council Prepared By: Mark Bradey, Financial Manager / Deputy Treasurer Report: COR2016-58 Date: 25 Jul 2016 RE: Recommendation for Award of Tender T-17-16
More informationPage 1. Rennillo Deposition & Discovery A Veritext Company
Page 1 1 IN RE: 2 3 4 Ohio Department of Transportation 5 Pre-Bid Meeting 6 REVISED TRANSCRIPT 7 8 9 July 5, 2011 10 9:05 a.m. 11 12 13 14 15 Taken at: 16 Ohio Department of Transportation 17 906 Clark
More informationPROJECT UPDATES: March 15, th Street Water Tower Painting Project:
PROJECT UPDATES: March 15, 2018 40th Street Water Tower Painting Project: On September 12, 2017, City Council awarded a contract to Allied Painting of Cherry Hill, New Jersey in the amount of $667,500
More informationSample Estimate Reports Estimate Reports were created in XL-Pro Software
Sample Estimate Reports Estimating Pro Software Estimate Reports were created in XL-Pro Software / TIME EQUIP.. COST* AMOUNT - 1 GENERAL REQUIREMENTS 1.00 LSUM - INSURANCE - general liability 1.00 lsum
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationVillage of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY
Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800
More information14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216
Packet Pg. 216 City of Fort Walton Beach Manual November 2012 14.1.a City of Fort Walton Beach Manual TABLE OF CONTE SECTION 1.00 INTRODUCTION... 3 SECTION 2.00 POLICY... 3 SECTION 3.00 - EROSION AND SEDIMENTATION
More informationAKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"
6 2 24"X36" SHEET: "=6' 23 4 2 2 8 2 5 6 6 2 28 8 26 2 2 8 22 9 Yellowstone Drive Texas Firm Registration Taylor, Texas 654 No. F36 (52) 5-4328 6 25 2 Portland, TX 834 23 8 9 illy G. Webb Drive Portland,
More informationPlanning & Development Group
Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)
More informationTownship of Centre Wellington Special Council Agenda Wednesday, July 12, :00 pm Council Chamber, 1 MacDonald Square, Elora Page
Township of Centre Wellington Special Council Agenda Wednesday, July 12, 2017 1:00 pm Council Chamber, 1 MacDonald Square, Elora Page 1. CALL TO ORDER 2. DISCLOSURE OF PECUNIARY INTEREST UNDER THE MUNICIPAL
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationAPPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update
APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having
More informationBID RESULTS. April 14, Award Date April 21, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner
BID RESULTS April 14, 2016 Award Date April 21, 2016 COMMISSION DISTRICT 1 Job 1 Federal Project HSIP-B151109 involving installing Shur-Tite delineators and miscellaneous work at various locations in Transportation
More informationJune 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation
Capital Improvements Update June 2013: Pl dp j t Planned Projects through 2018 - $ 126,196,202 Available Funding through 2018 $ 149,783,656 pp p,, Un-appropriated - $ 23,587,454 Staff s Recommendation
More informationMINUTES OF THE SEPTEMBER 26, 2018, MONTHLY MEETING OF THE BAYLES LAKE HOMEOWNERS ASSOCIATION
MINUTES OF THE SEPTEMBER 26, 2018, MONTHLY MEETING OF THE BAYLES LAKE HOMEOWNERS ASSOCIATION The regular meeting of the Bayles Lake Homeowners Association Board of Directors was held at Lakeview Country
More informationBirthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.
TITUSVILLE Birthplace of the Oil Industry - 1895 Trail Town - 2013 City of Titusville Fleming Park Crawford County, Pennsylvania for the Authority By: STIFFLER McGRAW Engineers Surveyors Architects & TABLE
More informationTown of Luray ADA Status Research
ID PROBLEM DESCRIP SEPARA COMPLE 1 S Sidewalk - 1005 E. Main St. EAST MAIN ST 2 A Meter Box Gap - 1016 E. Main St. 32" EAST MAIN ST 3 S Sidewalk - 1005 E. Main St. EAST MAIN ST 4 S Sidewalk - across from
More informationCity of Durango 5.8 FUNDING TRAILS DEVELOPMENT
5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4
More informationDRAFT. Dorabelle Campground Rehabilitation
DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section
More informationNew Orleans Municipal Yacht Harbor
New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &
More informationKDOT announces approved November bids
IMMEDIATE RELEASE Nov. 27, 2018 For more information: Kim Stich 785.296.3585 KDOT announces approved November bids The Kansas Department of Transportation announces approved bids for state highway construction
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationWork Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent
Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE
More informationNDG/Westmount Neighbourhood Committee. May 16, 2016
NDG/Westmount Neighbourhood Committee May 16, 2016 2 Presentation Outline Feedback on previous questions What s new on the Turcot website Public consultations online Reconstruction of Saint-Jacques overpass
More informationPART 4 : TYPICAL SCHEDULES OF QUANTITIES SECTION L CONTENTS. Page Number SECTION : MEDTUM-PRESSURE PIPELINES... 1 SCHEDULE
Licensed exclusively to. 0120 : Part 4 Mediu-pressure pipelines PART 4 : TYPICAL SCHEDULES OF QUANTITIES SECTION L CONTENTS Page Nuber SCHEDULE SECTION : MEDTUM-PRESSURE PIPELINES... 1 First Revision March
More informationGreat Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project
Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Project Description: Great Pond Mountain Conservation Trust (GPMCT), a nonprofit land
More informationMUNICIPALITY OF MONROEVILLE PLANNING COMMISSION SEPTEMBER 20, 2006 MINUTES. The meeting was called to order at 8 p.m. by Vice-Chairman Frank Bole.
MUNICIPALITY OF MONROEVILLE PLANNING COMMISSION SEPTEMBER 20, 2006 MINUTES The meeting was called to order at 8 p.m. by Vice-Chairman Frank Bole. PLEDGE OF ALLEGIANCE AND PRAYER The Pledge of Allegiance
More informationFall 2016 Tender Release
Tender Close 001-05-00 001-05-80 Hwy. 1, Grade & Pave, Indian Head, km 54.77 to 55.53 & km 0.00 to 0.33 Grade and Pave Southern November 2016 November 2016 Length = 1.09 km Base = 12 000 t Asphalt Concrete
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationMinimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017
Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017 Winning Bid PERMIT FEES, FORMS, PLANS and NOTIFICATIONS Secure all necessary state and local
More informationMONTANA CONSTRUCTION REPORT 06 / 14 / 2016
MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 ROAD INCIDENTS DUE TO FIRES AND FLOODING PLEASE CHECK OUR WEBSITE FOR MORE UP TO DATE CLOSURES AND INFORMATION http://www.mdt.mt.gov/travinfo/scripts/alerts.pl
More informationPRELIMINARY PLANS END PROJECT NW 16TH AVE NW 13TH ST. BEGIN PROJECT NW 10TH AVE ALACHUA 329 W UNIVERSITY AVE MAIN ST. ALACHUA 331 LOCATION MAP
PREPARED FOR: NW 16TH AVE. PRELIMINARY PLANS INDEX OF DRAWINGS COVER SHEET CITY OF GAINESVILLE PUBLIC WORKS DEPARTMENT END PROJECT NW 16TH AVE NW 8TH AVE. UNIVERSITY OF FLORIDA 0 2000' 4000' NW 13TH ST.
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationDisaster Skokomish Indian Tribe. Photos of Roads around the Core Reservation Area. December 2007 Storm: Skokomish Tribe
Disaster 1734 Skokomish Indian Tribe Photos of Roads around the Core Reservation Area Monday, 12/03/07: Agency Road / Tribal Center Road intersection. Monday, 12/03/07: Flood waters rising in front of
More informationADA Compliance Projects Summary Sheet
District Letter Dated Project % to ADA Amount Granted Buffalo Grove March 10, 2014 Woodland Park - asphalt path 100% $4,500.00 Buffalo Grove March 10, 2014 Wellington Commons Bike path repairs including:
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All
More informationPROJECT UPDATES February 1, 2018
PROJECT UPDATES February 1, 2018 40 th Street Water Tower Painting Project: On September 12, 2017, City Council awarded a contract to Allied Painting, of Cherry Hill, New Jersey, in the amount of $667,500
More informationThe Events Structure Product Guide
Product Description The Axion range offers a extremely strong semi permanent event structure, these units can be used in all weathers and can be installed in any location. Providing a contemporary space
More informationLANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006
of hydrologic features. A substantial proportion of the land between and north of the railroad tracks contain wetlands, as identified by the US Fish and Wildlife Service National Wetlands Inventory (NWI).
More information