1 District Letter Dated Project % to ADA Amount Granted Buffalo Grove March 10, 2014 Woodland Park - asphalt path 100% $4, Buffalo Grove March 10, 2014 Wellington Commons Bike path repairs including: repair of slope and cross slope issues and truncated domes installed in areas 4 & % $15, Buffalo Grove March 10, 2014 Kilmer Park - asphalt path 100% $83, Olmsteak Park - replace existing walkway from parking lot to exisiting tennis courts, relocate curb cuts and provide two handicap van accessible parking spaces. 100% $11, Willow Rec Park - remove and replace concrete walks, ramps and walkways at Willow Recreation Center to meet ADA standards. 60% $7, Willow Rec Park - remove and replace concrete walks, ramps and walkways at Willow Recreation Center to meet ADA standards. 100% $ Seascape Aquatic Park - remove and replace existing concrete curb, re-pave and level asphalt to reduce side slopes greater than 2% in existing handicap stalls. 100% $8, River Trails May 28, 2014 Mount Prospect June 25, 2014 Palatine Park District September 3, 2014 Poplar Park - remove and replace concrete walks and ramps not in conformance with ADA minimum standards 100% $14, Cottonwood Park - remove and replace concrete walks and ramps not in conformance with ADA minimum standards and supply tactile surface plate. 100% $5, Locust Park - remove and replace concrete walks and ramps not in conformance with ADA minimum standards. 100% $1, Maple Trails Park - curb cut and ADA ramp on north side leading to gate, connecting path on south side and resurfacing court 100% $15, RecPlex - renovation of eight handicap accessible parking spaces and four concrete squares that are part of the accessible route to the facility. 100% $13, Parkside Preschool - removal and replacement of the walkway to access each facility. Fred Hall Ampitheater - deck overlooking ampitheater 100% $6,402.00

2 Mount Prospect September 2, 2014 Mount Prospect Golf Club - excavation and installation of a continuous cart path system and range tees. 100% $226, Palatine Park District October 10, 2014 Install surfacing to allow patrons with mobility disabilities to access the table. 100% $2, Elk Grove November 17, 2014 Shenandoah Park - seating and picnic tables were relocated near the playground and a concrete access ramp brings visitors on the engineered wood fiber safety surface 20% $4, Hoffman Estates March 6, 2015 Triphahn Center - remove and replace existing concrete walks and ramps with existing cracks greater than 1/2" and rise greater than 1/4". Install tactile plats, level asphalt to reduce running and side slopes greater than 2% in handicap parking stalls. 82% $65, Hoffman Estates March 6, 2015 Joseph Fabbrini Park - rebuild existing pathway network to eliminate running slopes greater than 5% and cross slopes greate than 2%. 99% $250, Willow Stream Parking Lot - 5' width of the sidewalk work, curb and gutter work and detectable warnings, hadicap parking stalls and signage for those stalls. 100% $34, Alcott Center Park - 5' width of the 6' wide sidewalk installation. 83% $12, Willow Stream Park - mulit use trails and sidewalks % $76, Willow Stream Park - trail asphalt and concrete removal 62.50% $16, Reservoir 7 - fence work, concrete removal, 5' wide sidewalk installation, detectable warnings and turf restoration. 100% $8, Community Arts Center - ADA ramp (labor & materials), guardrail/handrail. 100% $15, Salt Creek Janaury 20, 2015 Concrete ramps/curbs and asphalt repair. 100% $56, Mount Prospect May 19, 2015 Aceessibility improvements to thewalking Path as well as to Friendship Park and Studio parking lots. 100% $46, Palatine May 15, 2015 Ost Field playground - remove the seating area and entrance walk and replace with concrete. In addition a connecting concrete walk will be installed so the playground will be accessible from the track and the sidewalk. An accessible family picnic table will also be installed. 100% $9,045.00

3 Palatine June 24, 2015 Palatine Senior Center - removal and replacement of the walkway and install ADA tactile strips to the northwest entrance. 100% $3, Mount Prospect September 2, 2015 Einstein Park Playground - improvements to accessible routes of travel 100% $4, Mount Prospect August 28, 2015 Meadows Ballfields - accessible routes of travel to viewing area and athletic fields % $8, Palatine August 19, 2015 Willowwood Park - accessible path installed from the existing park path to the ball field, entry ramps constructed at the depressed curb for each playground space, a depressed curb contructed for the existing swing area and ashphalt pathway to ballfield. 100% $6, Palatine August 5, 2015 Plum Grove Reservoir - replacement of walkway and parking area. 100% $8, River Trails May 22, 2015 Maple Trails Park - safety surfacing and asphalt path. 100% $21, Mount Prospect November 13, 2015 Melas Park - route of travel from Weller Lane across 100% $11, Elk Grove November 12, 2015 Audubon Park - concrete walks to provice an accessible route to playground and equipment 100% $9, Elk Grove November 12, 2015 Johnson Park - concrete access ramp and walk 100% $11, Elk Grove November 12, 2015 Mead Park - replace concrete and provide smooth 100% $7, Hoffman Estates January 5, 2016 Canterbury Place Park - concrete walks and ramp 100% $23, Hoffman Estates Janaury 5, 2016 Victoria Playground - replacement ramps and decks 17% $6, Schaumburg February 26, 2016 Mraz Park - concrete curbing 19% $9, Buffalo Grove February 29, 2016 Cherbourg Park remove and replace 5 width of the 8 wide sidewalk installation 62.50% $3, Palatine July 21, 2016 Palatine July 21, 2016 Mount Prospect July 19, 2016 Mount Prospect July 19, 2016 Palatine September 16, 2016 Celtic Park accessible walkway from the southwest sidewalk to the northwest sidewalk 100% $45, Dutch Schultz Recreation Area installation of accessible walkway from parking lot to tennis courts 100% $32, Clearwater Park - earth excavaion, hot mix ashphatl pavement removal, Portland cement concrete sidewalk, hot mix asphalt pavement and engineered wood fiber 100% $37, We-Go Park - earth excavaion, hot mix ashphatl pavement removal, Portland cement concrete sidewalk, hot mix asphalt pavement and engineered wood fiber Tom T. Hamilton Sports Complex - sawcut, misc. 100% $17, removals and concrete paving 28% $2,914.00

4 Palatine September 16, 2016 Palatine Park District (north section) - site grading and prep, concrete paving, sloped playground entry and intregal curb to playgroud 30% $16, Prospect Heights November 3, 2016 Lions Park - woodfiber 100% $2, Audubon Park - accessible routes to ballfield 24% $1, Appleseed Park - accessible route to spectator area along first base side 75% $1, Roosevelt Park - accessible route from ball field and playground to acceible portable toilet 93% $1, Hattendorf Park - overlay the area when new inclusive playground was installed 100% $1, Andrews Park - 2 concrete walks to provide an accessible route to playground and equipment 18% $5, Raven Park - installation of new 5' - 9' wide accessible concrete walks, concrete pads for player's bnesches and bleachers around the southwest baseball field, concrete pad for an accessible portable toilet unit and concrete pads for new site amenities. 91% $93, Arlington Heights February 24, 2017 Arlington Lakes - accessible 8' asphalt paths throughout the golf course. 50% $205, Hasbrook Park - baseball field #1 installation of a new 5' wide concrete walk from existing park path fo the baseball field, baseball field #2 installation of a new 9' wide concrete walk and concrete pads for player's benches and bleachers. 57% $22, Recreation Park - installation of an asphalt overlay for an exisiting driveway/drop off area. 20% $4, Buffalo Grove March 9, 2017 Willow Stream - path renovation 5' of 8' path 100% $4, Buffalo Grove March 9, 2017 Winfield Park - removing and relocating a 6' wide asphalt path to make the path ADA compliant with a 5% slope and a cross slope of 2%. 100% $15, Victoria Park - remove existing asphalt and concrete surfaces and re-grade subgrade so as to conform to less than the maximum running and cross slope requirement. Re=pave surface with asphalt, 5/8 of the 8-foot wide path width. 42% $17,380.00

5 Mount Prospect March 22, 2017 Mount Prospect March 9, 2017 Mount Prospect March 9, 2017 Salt Creek February 15, 2017 Schaumburg March 8, 2017 Evergreen Park - remove exisiting asphalt surface and regrade subgrade so as to conform to less than the maximum running and cross slope. Re-pave surface with asphalt, 5/8 of the 8-foot wide path width. 42% $38, Westbury Park - remove existing asphalt surface that has settled and/or heaved over time. Re-grade subgrade so as to conform to less than the maximum running and cross slope. Re-pave surface with asphalt, 5/8 of the 8- foot wide path width. 42% $7, Friendship Park Conservatory - accessible routes of travle and entry to Conservatory 100% $2, Einstein Park - asphalt parking lot, asphalt pathways, concrete paving, surfacing and concrete curb and estimate of fees and asbuilt survey. 36% $115, Lions Memorial Park Bandshell - compliant paths of travel for public assemblies and entertainment events. 26% $19, South Park - concrete walkway, ramps, playground surface and asphalt parking area. 67% $68, Spring Valley Nature Center, Bison's Bluff - concrete paving of playground area, playground protective surfacing, boardwalk to main structure, foot bridges (A,B, & C) and concrete paving of parking lot area. 13% $298,170.00

No 30 x 48 space is provided for a wheelchair under the picnic table.

No 30 x 48 space is provided for a wheelchair under the picnic table. ITEM: LLOYD PARK PICNIC TABLE ADA GUIDELINE: 305, 902.2 No 30 x 48 space is provided for a wheelchair under the picnic table. Remove one of the picnic table arms. Photo of Picnic Table on the bluff PARK:

More information

Skokie Park District 2011 ADA Evaluation & Transition Plan. March 17, 2015 Update

Skokie Park District 2011 ADA Evaluation & Transition Plan. March 17, 2015 Update Skokie Park District 2011 ADA Evaluation & Transition Plan March 17, 2015 Update The Skokie Park District has made substantial progress with the Americans with Disabilities Act (ADA) transition plan the

More information

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION PIONEER PARK INTRODUCTION Pioneer Park is a 7 acre neighborhood park located east of Interstate 270 and south of Manchester Road along Tallie Road. The park is situated in a residential neighborhood with

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

Capital Prioritization

Capital Prioritization 14 Capital Prioritization 279 279 280 Park & Recreation CAPITAL PRIORITIZATION As described in Chapter 8, the recommendations presented in Chapter 9 are prioritized to provide a guide for future capital

More information

35 Bee Tree Park Planning Zone 3

35 Bee Tree Park Planning Zone 3 35 Bee Tree Park Planning Zone 3 2701 Finestown Road Visit Date: August 2016 St. Louis County Parks Master Plan Page 1 35 Bee Tree Park 2701 Finestown Road St. Louis County Parks Master Plan Planning Zone

More information

17 Mathilda Welmering Park Planning Zone 3

17 Mathilda Welmering Park Planning Zone 3 17 Mathilda Welmering Park Planning Zone 3 8301 Mathilda Visit Date: September 2016 St. Louis County Parks Master Plan Page 1 Description: The six acre Mathilda Welmering Park is named for two streets

More information

2014 SPLOST Final Draft County-wide Parks System Rehabilitation

2014 SPLOST Final Draft County-wide Parks System Rehabilitation Page 1 of 5 ADA Improvements (County Wide) Accessibility projects related to trails/walkways, door entrances, pool access, curb cuts, ramps, etc. Additionally, ADA Audit of facilities to identify and prioritize

More information

7. Plan Implementation

7. Plan Implementation 7. Plan Implementation 7.1 Implementation Timeline This section includes a list of achievable park and recreation actions. In the Implementation Action Matrix that follows, the implementation actions have

More information

Trail Etiquette. Hours of Operation. Trail Accessibility

Trail Etiquette. Hours of Operation. Trail Accessibility Trail Guide The Elmhurst Park District, with 28 parks and over 460 acres of land, offers nearly six miles of paved or asphalt park trails and maintains an additional 3.6 miles of trails within Elmhurst.

More information

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 It Starts in Parks Fun Facts How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 Fun Facts How many people visit Central Winds Park Annually? a. Over 100,000 b. 20,000 c. 10,000 d. 1,000 It Starts

More information

CAPITAL PROGRAM SUMMARY

CAPITAL PROGRAM SUMMARY 2017 2018 CAPITAL PROGRAM SUMMARY MISC A 2017 NEIGHBOURHOOD REHABILITATION Pitt River Road - Mary Hill to Kingsway Victoria Drive - Toronto to Holtby Pooley Avenue - High Pressure Watermain Culvert Replacement

More information

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access

More information

PARKS & BEACHES PROJECTS

PARKS & BEACHES PROJECTS #18 72ND STREET PARK, LIBRARY, #19 BLUEWAYS & AQUATIC CENTER $1.1 MILLION $60 MILLION New facility to include: Create Kayak Launches with All Wheels Skate Park Floating Docks and Seating at: Library/Media

More information

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017 Frederickson LUAC Community Plan Update Parks & Recreation September 25, 2017 Kimberly Freeman Resource Stewardship Superintendent kimberly.freeman@co.pierce.wa.us 253-798-4261 Joseph Coppo Senior Parks

More information

Board of Park Commissioners Project Summary

Board of Park Commissioners Project Summary Board of Park Commissioners Project Summary Lawton Park Cannon Monument Restoration Project Scope of Work: Work includes but is not limited to the removal of cannon from its base, surface cleaning, corrosion

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS

APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS Appendices Gwinnett County 2004 Comprehensive Parks and Recreation Master Plan APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS March 2004 Monteith Brown Planning Consultants & The Jaeger Company

More information

Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R)

Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R) Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R) Action Park/projects Total 2,014 2,015 2,016 2,017 2,018 2,019 2020+ Athletic fields ac stop ep ace e t, o e u

More information

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District Chapter eight Parks and Recreation Introduction One of the indicators of quality of life in a city is the parks and recreation system. The City of Crystal Lake is fortunate to have an excellent parks and

More information

City of Haslett. City of East Lansing. City of East Lansing

City of Haslett. City of East Lansing. City of East Lansing Central Park North (Nancy L. Moore Park) Lake Park North Expansion White Park Expansion #2 White Park Expansion #1 County East East Haslett East East TF87-212 Acquisition $90,000.00 Park. TF08-138 Acquisition

More information

Community Park Capital Project. February 6, 2017

Community Park Capital Project. February 6, 2017 Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016

More information

DEPARTMENT OF PARKS & RECREATION

DEPARTMENT OF PARKS & RECREATION DEPARTMENT OF PARKS & RECREATION 2016 Budget Presentation 1 RONALD ZUBER, DIRECTOR March 7, 2016 2015 ACCOMPLISHMENTS OFFICE OF DIRECTOR Hosted the National Junior Disability Championships from July 16

More information

BEDFORD TOWNSHIP PARK COMMISSION REPORT TO THE TOWNSHIP BOARD

BEDFORD TOWNSHIP PARK COMMISSION REPORT TO THE TOWNSHIP BOARD BEDFORD TOWNSHIP PARK COMMISSION REPORT TO THE TOWNSHIP BOARD Carr s Grove Park Carr Community Center Carr Comm. Center Interior Carr Comm. Center Kitchen Carr s Grove Playground Carr s Grove Shelter Gazebo

More information

French Regional Park Creative Play Area

French Regional Park Creative Play Area French Regional Park Creative Play Area A TURF MAINTENANCE STRIP EXISTING BASSWOOD TREE PLAY AREA SIGN EXISTING MAPLE TREES B BIKE PARKING C SLIDE TREE TOWER SHADE UMBRELLA PICNIC TABLE SEATING K-5 NET

More information

Webber Park Master Plan Charrette Summary

Webber Park Master Plan Charrette Summary SMALL GROUP #1 - September 29, 2011 Webber Park Master Plan Charrette Summary More trash cans, especially near picnic grounds A year round pool is very needed-physical & mental health are significantly

More information

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park.

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park. Lakeside Beach TF00-136 $122,550.00 in fee simple of approximately one-half acre of property on the shore of Spring Lake to exp the Lakeside Beach. 2000 River Ravines TF00-150 $910,000.00 in fee simple

More information

Southwest Quadrant Distinctive Features

Southwest Quadrant Distinctive Features SOUTHWEST QUADRANT Southwest Quadrant Distinctive Features LAND USE The 31.17 square mile Southwest Quadrant includes all the area within the planning area west of I-5 and south of the Sacramento River.

More information

City of Galion Park Satisfaction Survey Results

City of Galion Park Satisfaction Survey Results City of Galion Park Satisfaction Survey Results Dec. 5, 2016 Goal: To get feedback from the community on: 1. General satisfaction of city-owned parks 2. How to improve park facilities and recreation opportunities

More information

CITY COUNCIL WORK SESSION MEETING AGENDA April 17, :30 6:30pm

CITY COUNCIL WORK SESSION MEETING AGENDA April 17, :30 6:30pm CITY COUNCIL WORK SESSION MEETING AGENDA April 17, 2017 5:30 6:30pm 1) Call to Order 2) 2017 Park Dedication Fund Budget 3) 2016 Positive General Fund Audit Balance Discussion 4) Adjourn WS Item 2 CITY

More information

20 Grant s Trail. Planning Zone 3. Visit Date: September St. Louis County Parks Master Plan

20 Grant s Trail. Planning Zone 3. Visit Date: September St. Louis County Parks Master Plan 20 Grant s Trail Planning Zone 3 Visit Date: September 2016 Page 1 20 Grant s Trail Planning Zone 3 Visit Date: September 2016 Page 2 20 Grant s Trail Planning Zone 3 Visit Date: September 2016 Page 3

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

Fall 2016 Tender Release

Fall 2016 Tender Release Tender Close 001-05-00 001-05-80 Hwy. 1, Grade & Pave, Indian Head, km 54.77 to 55.53 & km 0.00 to 0.33 Grade and Pave Southern November 2016 November 2016 Length = 1.09 km Base = 12 000 t Asphalt Concrete

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

City / Village Name. Picked Up So Far = 1245 lbs of Holiday Lights. Arlington Heights / SWANCC. Barrington /

City / Village Name. Picked Up So Far = 1245 lbs of Holiday Lights. Arlington Heights / SWANCC. Barrington / City / Village Name Arlington Heights / Barrington / Buffalo Grove / Elk Grove Village / LBS Recycled 2011-2012 Drop Off Locations Arlington Heights Public Works 222 N Ridge Avenue Monday - Friday: 7:30

More information

Capital Project Item. Maintenance Item

Capital Project Item. Maintenance Item CO Headquarters Replace worn detectable warning domes. June, 0 CO Training West Broad St Lower slope to accessible entrance door or add ramp. Add detectable warning domes. May, 0 Due to snow and ice removal,

More information

City of Somersworth. Recreation Division

City of Somersworth. Recreation Division City of Somersworth Recreation Division 2018 Park Inventory Table of Contents I. Ash Street Park..1-3 II. Jules Bisson Park..6-10 III. Malley Farm Recreational Area.11-12 IV. Mast Point Dam Recreation

More information

Langton Lake Park Implementation Planning Session One 6 June Attendees signed in

Langton Lake Park Implementation Planning Session One 6 June Attendees signed in 27 Attendees signed in Meeting summary Following an overview of the Parks and Recreation Renewal Program and the key directions of the Parks and Recreation System Master Plan, meeting participants were

More information

We would like to clarify a few things related to the enclosed report:

We would like to clarify a few things related to the enclosed report: 550 Pilgrim Drive Foster City, CA 94404 phone 650.522.2500 fax 650.522.2599 www.csgengr.com October 12, 2018 City of Pacifica Engineering Division 151 Milagra Drive Pacifica, CA 94044 Attention: Sam Bautista

More information

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, , FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000

More information

2013 Construction Accomplishments

2013 Construction Accomplishments 2013 Construction Accomplishments MOA Parks & Recreation Key Accomplishments in 2013 1. Over 10 Million Dollars in MOA Park Improvements 2. A Successful Volunteer Program with over 9,000 Volunteer Hours

More information

Bowden Park (Ceadar Park) Passive Recreation W. Emerson St., Vinton St. Cabbage Patch

Bowden Park (Ceadar Park) Passive Recreation W. Emerson St., Vinton St. Cabbage Patch Name of Field or Facility USAGE Location PLAYGROUND FEATURES SUN/SHADE FENCING OTHER FEATURES Bowden Park (Ceadar Park) Passive Recreation W. Emerson St., Vinton St. Open Space Very Shady None Farmer's

More information

Capital Planning City of Ocean City 1

Capital Planning City of Ocean City 1 City of Ocean City Capital Planning 2015-2019 City of Ocean City 1 Road Improvements Project Completion Date 2012 Fall Road Improvement Spring, 2014 Program - (Paving 7 th Street, 8 th Street, 800 Block

More information

POLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks.

POLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks. September 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Brewers Park and Clinton Park Renewal Concept Plans RECOMMENDATION THAT the

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Glenview/ Central/ Fairfield/ Everett/ Old Elm. Quentin 60% 49% 0% 45% 16% 40% 25% 47% 52% 0% 0%

Glenview/ Central/ Fairfield/ Everett/ Old Elm. Quentin 60% 49% 0% 45% 16% 40% 25% 47% 52% 0% 0% How many municipalities involved? (number) How many member municipalities involved? (number and percent) 1 1 10 1 4 25% 4 6 67% 11 8 73% 2 8 25% 3 4 75% 6 9 67% 13 10 73% 12 13 92% 3 5 6 8 8 10 4 6 67%

More information

CEMVP-PD-C MEMORANDUM FOR FILE SUBJECT: Supplement No. 4,, Design Memorandum 10, Kaskaskia River, Illinois 1. References: a., Design Memorandum No. 10, approved 1997 (includes Supplements 1-3) b. ER 1130-2-550,

More information

Yuba Creek Natural Area Acquisition. Acme Township. Acme Township. TF Acquisition $1,576, Grand Traverse

Yuba Creek Natural Area Acquisition. Acme Township. Acme Township. TF Acquisition $1,576, Grand Traverse Yuba Creek Natural Area TF00-162 $1,576,021.00 in fee simple of 403 acres of critical wetls upl habitat with over 5,000 feet of frontage on Yuba Creek, a tributary to the east arm of Bay. 2000 Petobago

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

Corktown Parks. Public Meeting. City of Toronto

Corktown Parks. Public Meeting. City of Toronto Corktown Parks Public Meeting City of Toronto 15-04-20 Agenda 1. Reasons for Study 2. Consultation to Date 3. Parks Evaluation 4. Community Context 5. Bright St. Playground 6. Orphans Green (Dog Off Leash)

More information

Handy Superabile ASSOCIAZIONE ONLUS

Handy Superabile ASSOCIAZIONE ONLUS TOSCANA BAGNO LA PERLA Viale del Tirreno, Tirrenia (Pi) Telefono 050 37571 TESTED FOR YOU TO: With the goal of putting at your disposal all relevant information to a conscious choice Consult the following

More information

DISTRICT OF NORTH COWICHAN. Dated: May Municipal Parks. Prepared By Ernie Mansueti, Parks and Recreation Director

DISTRICT OF NORTH COWICHAN. Dated: May Municipal Parks. Prepared By Ernie Mansueti, Parks and Recreation Director Dated: May 2006 Municipal Parks Prepared By Ernie Mansueti, Parks and Recreation Director TABLE OF CONTENTS PARK NAME Page # Abbey Road Park...4-5 Alan Wilson Park...6-7 Art Mann Park...8-9 Askew Creek

More information

Community Input Meeting. Fairgrounds Master Planning Update. January 7, 2016, 7 pm

Community Input Meeting. Fairgrounds Master Planning Update. January 7, 2016, 7 pm Community Input Meeting Fairgrounds Master Planning Update January 7, 2016, 7 pm Fiesta Hall Santa Clara County Fairgrounds 355 Tully Road, San Jose, CA Tonight s Agenda 1) Board of Supervisors Direction

More information

Capital Five-Year Fiscal Forecast

Capital Five-Year Fiscal Forecast Capital Five-Year Fiscal Forecast Budget Forecast Forecast Forecast Forecast REVENUES 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 State sources: CO&DS distributed to district $ 310,000 $ 310,000

More information

Town of Queen Creek Park and Facility Rentals Click on each park or facility for additional information

Town of Queen Creek Park and Facility Rentals Click on each park or facility for additional information Town of Queen Creek Park and Facility Rentals Click on each park or facility for additional information Queen Creek Library Ocotillo Road Hawes Road Desert Mountain Park Ellsworth Loop Road Ellsworth Road

More information

AGENDA REGULAR PARKS COMMISSION MEETING May 26, :15 A.M Monticello Public Works Office

AGENDA REGULAR PARKS COMMISSION MEETING May 26, :15 A.M Monticello Public Works Office Park Commission Agenda: 05/26/2016 AGENDA REGULAR PARKS COMMISSION MEETING May 26, 2016 9:15 A.M Monticello Public Works Office To enhance community pride through developing and maintaining city parks

More information

AGENDA MEMORANDUM Community Services Department. CSAB Meeting Date: April 10, 2018

AGENDA MEMORANDUM Community Services Department. CSAB Meeting Date: April 10, 2018 AGENDA MEMORANDUM Community Services Department CSAB Meeting Date: April 10, 2018 To: Community Services Advisory Board From: Dana A. Souza, Director Date: April 4, 2018 Legislative Quasi-Judicial SUBJECT:

More information

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020 Capital Improvement Plan Projects ECONOMIC VIABILITY PROJECTS 2016 2017 2018 2019 Page Coffee Creek Regional Detention 20905B 1,688,005 - - - - 1,688,005 31 Hedge Lane Relocation - Olathe Schools 3-B-080-13

More information

KoenigRubloffLovesTheNorthwestSuburbs COMMUNITY GUIDE

KoenigRubloffLovesTheNorthwestSuburbs COMMUNITY GUIDE KoenigRubloffLovesTheNorthwestSuburbs COMMUNITY GUIDE THE NORTHWEST SUBURBS OF COOK COUNTY ARE VERY SPECIAL PLACES THAT WE ARE THRILLED TO SERVE Few places in America can compare to the communities in

More information

CAPITAL IMPROVEMENT PROGRAM 2018 CAPITAL BUDGET ADOPTED CITY OF ELMIRA, NEW YORK

CAPITAL IMPROVEMENT PROGRAM 2018 CAPITAL BUDGET ADOPTED CITY OF ELMIRA, NEW YORK 2018 CAPITAL BUDGET 2018 FIVE-YEAR PROJECTION FUNDING SOURCES State & Other Government Funding CHIPS Funding (NYSDOT) 791,000 791,000 791,000 791,000 791,000 PAVE NY (NYSDOT) 172,153 172,153 172,153 172,153

More information

CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group

CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group CAPITAL PROJECT LIST Based on extensive public outreach in 2008 and 2013-2014, the 2014 Parks, Recreation, and Open Space (PROS) Plan

More information

APPENDIX C: PARK AND FACILITY SCORECARDS

APPENDIX C: PARK AND FACILITY SCORECARDS APPENDI C: PARK AND FACILITY SCORECARDS 127 SCORECARD OVERVIEW Elmhurst Park District park lands and facilities are beloved and visible assets of the community. There are over 20 public park spaces within

More information

Schachtner Street. Village Park Somerset, Wisconsin

Schachtner Street. Village Park Somerset, Wisconsin Schachtner Street Village Park Village Park Schachtner Street Softball Field Lower Terrace Parking Area Baseball Field Upper Terrace Parking Lot Mid Terrace Parking Area Restroom Building Path to Bridge

More information

9/8/2016. Transition Planning. One Agency s Ongoing Experience

9/8/2016. Transition Planning. One Agency s Ongoing Experience Transition Planning One Agency s Ongoing Experience 1 Background per the Fairfax County Park Authority The Fairfax County Park Authority owns approximately 23,000 acres and maintains 425 park facilities

More information

Design Considerations For Accessible Parks & Trails

Design Considerations For Accessible Parks & Trails Design Considerations For Accessible Parks & Trails Measuring Up: Campbell River 2008 Dave Calver Consulting City of Campbell River Legacies Now: Measuring Up Design Guidelines Design Considerations for

More information

Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior.

Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior. COMMUNITY DESCRIPTION Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior. The township is largely rural but has one main population

More information

EXISTING CONDITIONS AND CHARACTER

EXISTING CONDITIONS AND CHARACTER DEMING HEIGHTS PARK LOCATION AND HISTORY Located in the Audubon Park neighborhood, Deming Heights Park is surrounded by a residential area. The first land for the park was acquired in 1913 along with the

More information

NORTH OLMSTED PARKS & RECREATION RESERVATIONS

NORTH OLMSTED PARKS & RECREATION RESERVATIONS NORTH OLMSTED PARKS & RECREATION RESERVATIONS Rink Reservations: Betsy Drenski, Recreation Commissioner Outdoor & Room Reservations: Colin Kilbane, Sport Supervisor Aquatic Reservations: Michael Tilenni,

More information

Parks & Facilities. Chapter 4. Assessment

Parks & Facilities. Chapter 4. Assessment Parks & Facilities Chapter 4 Assessment Parks & Facilities Assessment The primary objectives of the Manhattan Parks and Recreation Strategic Facility Improvement Plan are to define improvements desired

More information

WASHTENAW COUNTY PARKS AND RECREATION COMMISSION

WASHTENAW COUNTY PARKS AND RECREATION COMMISSION WASHTENAW COUNTY PARKS AND RECREATION COMMISSION - BUDGET PROPOSED FISCAL YEARS JANUARY 1, DECEMBER 31, And PROJECTED FISCAL YEARS JANUARY 1, DECEMBER 31, Robert L. Tetens, Director TABLE OF CONTENTS Millage

More information

CITY OF WATERLOO ACCESSIBILITY STANDARDS. FINAL ACCESSIBILITY STANDARDS June 20, 2016

CITY OF WATERLOO ACCESSIBILITY STANDARDS. FINAL ACCESSIBILITY STANDARDS June 20, 2016 CITY OF WATERLOO ACCESSIBILITY STANDARDS FINAL ACCESSIBILITY STANDARDS June 20, 2016 Waterloo City Centre 100 Regina Street South, Waterloo, ON N2J 4A8 P. 519.886.1550 F. 519.747.8760 TTY. 1.866.786.3941

More information

Parks, Recreation, Trails and Open Space Master Plan Survey Results. October 2018

Parks, Recreation, Trails and Open Space Master Plan Survey Results. October 2018 Parks, Recreation, Trails and Open Space Master Plan Survey Results October 2018 Conducted by Qualtrics subconsultant 300 completed responses Random attempt to get a balanced response from all four Council

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 18, 2016 DATE: May 5, 2016 SUBJECT: Award of construction contract under ITB No. 16-240-ITB for the reconstruction of the playground,

More information

TJ Park and Community Center ::: General Information

TJ Park and Community Center ::: General Information TJ Park and Community Center ::: General Information Located within the Arlington Heights Civic Association at 3501 South 2nd Street, Arlington, VA 22204, County Board-owned TJ Park offers various outdoor

More information

Parks & Open Space Observations. Park & Recreation Board December 2018

Parks & Open Space Observations. Park & Recreation Board December 2018 Parks & Open Space Observations Park & Recreation Board December 2018 Fireman s Park Shelter Area Thom Evans/Andrew Kitslaar Playground equipment needs to be replaced Walkway around perimeter of park would

More information

Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming

Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Table of Contents Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Table

More information

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK LUCY LANEY COMMUNITY SCHOOL N 33RD AVE N 33RD AVE SINGLE-FAMILY RESIDENTIAL MULTI-USE DIAMOND

More information

Corabelle Park. Inventory. Future Development

Corabelle Park. Inventory. Future Development Corabelle Park Size: Approximately 4 acres Site Description: Corabelle Park is a relatively new park within the Murray County Park System. It is located on the south side of Corabelle Lake just off gravel

More information

Location: Cariboo, Williams Lake, Cariboo Chilcotin Coast - Recreation : Site (Heritage Discovery Circle Route)

Location: Cariboo, Williams Lake, Cariboo Chilcotin Coast - Recreation : Site (Heritage Discovery Circle Route) Mt Robson Visitors Centre Information Date of Audit: 2016-07-28 Park Name: Dugan Lake Key Features: View_Point,Camping,Picnic_Site,Playground,Fishing Location: Cariboo, Williams Lake, Cariboo Chilcotin

More information

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division MIAMI-DADE AVIATION DEPARTMENT MIA Runway 8R8R-26L Pavement Pavement Rehabilitation Civil Environmental Engineering Division The Project Team Mission Statement C EXPERTISE + COMMITMENT = OWNERSHIP Project

More information

WELCOME TO THE NATURAL WORLD CENTRE.

WELCOME TO THE NATURAL WORLD CENTRE. WELCOME TO THE NATURAL WORLD CENTRE. Accessibility Statement updated April 2018 This access statement does not contain personal opinions as to our suitability for those with disabilities, but aims to accurately

More information

Concert Tent Anderson Building Entry

Concert Tent Anderson Building Entry Anderson Park Renovation Concept #1 Concert Tent Anderson Park Renovation Concept #2 Concert Tent Anderson Park Renovation Concept #3 Concert Tent Anderson Park Renovation Concept Tally Renovation Concept

More information

Dunsmuir Community Park

Dunsmuir Community Park Dunsmuir Community Park Master Plan September 2016 ENGAGEMENT SUMMARY #2 Introduction Public engagement is integral to the development of the Dunsmuir Community Park Master Plan. Two park open houses were

More information

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000.

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000. 1 MERRYMEETING TRIL Head of Tide Park Trail (Tedford Road to athance Road) Topsham Length: 1.79 Miles nticipated ost: $719,000 D athance Road athance Road Section 1 connects residential neighborhoods and

More information

Handy Superabile ASSOCIAZIONE ONLUS

Handy Superabile ASSOCIAZIONE ONLUS TOSCANA BAGNO LIDO Viale del Tirreno, 2 Tirrenia (Pi) Telefono 050 384715 TESTED FOR YOU TO: With the goal of putting at your disposal all relevant information to a conscious choice Consult the following

More information

Community Board 12 Parks & Cultural Affairs Commitee Presentation March 7, 2017 MKW + Associates, Parks Capital Design

Community Board 12 Parks & Cultural Affairs Commitee Presentation March 7, 2017 MKW + Associates, Parks Capital Design HIGHBRIDGE PARK ACHOR PARKS PROGRAM: COCEPTUAL MASTER PLA Located along Amsterdam Avenue / Fort George Avenue from 155th Street to Dyckman Street, in the Borough of Manhattan Community Board 12 Parks &

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)

More information

NORTH HEMPSTEAD BEACH PARK MASTER PLAN

NORTH HEMPSTEAD BEACH PARK MASTER PLAN NORTH HEMPSTEAD BEACH PARK MASTER PLAN COMMUNITY DESIGN CHARRETTE Supervisor Judi Bosworth Viviana L. Russell Peter J. Zuckerman Angelo P. Ferrara Anna M. Kaplan Lee R. Seeman Dina M. De Giorgio VISIONING

More information

City of Sierra Madre STUDY AREA PROFILE

City of Sierra Madre STUDY AREA PROFILE City of Madre STUDY AREA PROFILE STUDY AREA ID #112 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES PROJECT REPORTING FORM

More information

Greater Minnesota Regional Parks and Trails Commission Designation Application

Greater Minnesota Regional Parks and Trails Commission Designation Application Greater Minnesota Regional Parks and Trails Commission Designation Application General Section Designation Application #: 14-015D Date Submitted: 08/31/2015 Park or Trail Name: Alexander Ramsey Park District

More information

HOMER GLEN AREA COMMUNITY PARKS

HOMER GLEN AREA COMMUNITY PARKS HOMER GLEN AREA COMMUNITY PARKS VILLAGE OF HOMER GLEN PARK PROPERTIES Owned and Maintained by the Village of Homer Glen Heritage Park 14110 W. 151 st Street This 103 acre park, located adjacent to Village

More information

4. Improvement Plan Elements

4. Improvement Plan Elements 4. Improvement Plan Elements Detailed description of all elements Leigh Creekside Park Improvement Plan Preliminary Conceptual Time Zone Layout Caveat: in the following plans and descriptions, specific

More information

WEST CENTRAL SECTION CONTENTS: FARWELL PARK NORTH COMMONS PARK OLIVER TRIANGLE RUSSELL PARK THEODORE WIRTH REGIONAL PARK VALLEY VIEW PARK WILLARD PARK

WEST CENTRAL SECTION CONTENTS: FARWELL PARK NORTH COMMONS PARK OLIVER TRIANGLE RUSSELL PARK THEODORE WIRTH REGIONAL PARK VALLEY VIEW PARK WILLARD PARK WEST CENTRAL SECTION CONTENTS: FARWELL PARK NORTH COMMONS PARK OLIVER TRIANGLE RUSSELL PARK THEODORE WIRTH REGIONAL PARK VALLEY VIEW PARK WILLARD PARK FARWELL PLACE THOMAS AVE N SWING BENCH PICNIC AREA

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

Summary of Recreation Sites Development Name:

Summary of Recreation Sites Development Name: Development Name: Eau Pleine Site Number: 1 Owner: WVIC Eau Pleine Tailwater Boat Launch Lanes 1 Concrete plank landing, access to Eau Pleine tailwater & Lake DuBay. (45 planks long, 62.5') Picnic Tables

More information

M E S T I Z O C U R T I S P A R K

M E S T I Z O C U R T I S P A R K ARAPAHOE CONNECTION TO BUS ROUTE AT ND AND LAWRENCE, FUTURE LIGHT RAIL STATION LEGEND SOCIAL TRAIL FLAGSTONE PAVING TO RESTORE/MAINTAIN CONCRETE PAVING DIAGONAL CURVILINEAR SOCIAL ROUTE IS OUT OF HISTORIC

More information

COUNTY OF SAN MATEO Parks Department

COUNTY OF SAN MATEO Parks Department COUNTY OF SAN MATEO Parks Department DATE: September 23, 2014 COMMISSION MEETING DATE: October 2, 2014 TO: FROM: SUBJECT: Parks and Recreation Commission Scott Lombardi, Park Superintendent Superintendent

More information

Fall 2015 Tender Release

Fall 2015 Tender Release Tender Close 001-05-00 Hwy. 1, Thin Overlay, 4km past the sintaluta access to 4km short of the JCT. Hwy 1, km 43.25 to 53.40 Thin Overlay Southern December 2015 January 2016 Length = 10.15 km Asphalt Concrete