CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

Size: px
Start display at page:

Download "CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $"

Transcription

1

2

3 CITY OF IMPERIAL PROPOSAL BID SHEET ( ) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO Item No. Description Units Estimate Quantity Unit Price Amount 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $ 3. Water Pollution Control LS 1 $ $ 4. Remove & Replace 6 Concrete Curb & Gutter LF 100 $ $ 5. Remove & Replace Concrete Cross Gutter SF 100 $ $ 6. System 2 Stop Point LS 1 $ $ 7. 1 Grinding / Cold Plane Existing AC SF 143,470 $ $ 8. 3/4 AC Level Course:1/2 HMA Type A /including SS1h Tack Coat TON 6,109 $ $ 9. 3/8 Asphalt Rubber Aggregate Membrane (ARAM) SF 1, 990,318 $ $ 10. Type II Slurry Seal SF 1, 990,318 $ $ 11. Raise and Adjust Manholes Covers EA 98 $ $ 12. Raise and Adjust Water Valve Covers EA 99 $ $ 13. New pavement striping / raised markers and signage LS 1 $ $ 14. Tree Trimming LS 1 $ $ Grinding / Cold Plane Existing AC for System 4 SF 92,540 $ $ Grinding / Cold Plane Existing AC for System 4 SF 59,570 $ $ Asphalt Rubber Hot Mix - Gap Graded (ARHM-GG ) TON 1,905 $ $ 18. System 1 Stop Point LS 1 $ $ TOTAL BID PROPOSAL $ $ 23

4 CITY OF IMPERIAL PROPOSAL BID SHEET ( ) Page 2 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO NOTE 1: THE ESTIMATED QUANTITIES INDICATED ABOVE ARE APPROXIMATE. THE ENGINEER WILL NOT ASSUME RESPONSIBILITY FOR THE QUANTITIES ILLUSTRATED IN THE PROJECT PLANS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH THE QUANTITIES. NOTE 2: THE LOWEST RESPONSIVE BID WILL BE BASED ON THE LOWEST TOTAL BID PROPOSAL. TOTAL AMOUNT OF BID PROPOSAL (NUMBERS) TOTAL AMOUNT OF BID PROPOSAL (WORDS) Note: The estimated quantities listed in the Proposal Bid Sheet(s) are supplied to give an indication of the general scope of the work, but the accuracy of these figures is not guaranteed and the bidder shall make his own estimates from the drawings. In case of a variation between the unit price and the totals shown by the bidder, the unit price will be considered to be the bid. Bidder's Name and Telephone Number 24

5

6

7

8 CITY OF IMPERIAL REVISED STREET LIST_ STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO Item Street Name Functional Class From To Length Width Area (SqFt) ARAM System 1 N. IMPERIAL AVE. Minor Arterial BELFORD RD. 15TH ST , N. IMPERIAL AVE. Minor Arterial 15TH ST 14TH ST , N. IMPERIAL AVE. Minor Arterial 14TH ST 13TH ST , N. IMPERIAL AVE. Minor Arterial 13TH ST 12TH ST , N. IMPERIAL AVE. Minor Arterial 12TH ST 11TH ST , N. IMPERIAL AVE. Minor Arterial 11TH ST 10TH ST , N. IMPERIAL AVE. Minor Arterial 10TH ST 9TH ST , N. IMPERIAL AVE. Minor Arterial 9TH ST BARIONI BLVD , S. IMPERIAL AVE. Minor Arterial BARIONI BLVD. 7TH ST , S. IMPERIAL AVE. Minor Arterial 7TH ST 6TH ST , S. IMPERIAL AVE. Minor Arterial 6TH ST 5TH ST , S. IMPERIAL AVE. Minor Arterial 5TH ST 4TH ST , S. IMPERIAL AVE. Minor Arterial 4TH ST 3RD ST ,860 4 City of Imperial Page 1 of 8 Pages BID NO

9 Item Street Name Functional Class From To Length Width Area (SqFt) ARAM System 14 S. IMPERIAL AVE. Minor Arterial 3RD ST 2ND ST , S. IMPERIAL AVE. Minor Arterial 2ND ST 1ST ST , S. IMPERIAL AVE. Minor Arterial 1ST ST STATE HWY , NECKEL RD. Minor Arterial CLARK RD. MORNING SIDE DR , NECKEL RD. Minor Arterial MORNING SIDE DR. CANON DR , NECKEL RD. Minor Arterial CANON DR. RODEO DR , E. 14TH ST. Local STATE HWY. 86 N. IMPERIAL AVE , E. 13TH ST. Local STATE HWY. 86 N. IMPERIAL AVE , W. 12TH ST. Collector N. IMPERIAL AVE. "H" STREET , W. 12TH ST. Collector "H" STREET "G" STREET , W. 12TH ST. Collector "G" STREET "F" STREET , W. 12TH ST. Collector "F" STREET "E" STREET , W. 12TH ST. Collector "E" STREET "D" STREET , W. 12TH ST. Collector "D" STREET "C" STREET , W. 12TH ST. Collector "C" STREET LA BRUCHERIE RD , E. 12TH ST. Collector STATE HWY. 86 N. IMPERIAL AVE ,375 1 City of Imperial Page 2 of 8 Pages BID NO

10 Item Street Name Functional Class From To Length Width Area (SqFt) ARAM System 30 E. 11TH ST. Local STATE HWY. 86 N. IMPERIAL AVE , E. 10TH ST. Collector STATE HWY. 86 N. IMPERIAL AVE , E. 9TH ST. Local STATE HWY. 86 N. IMPERIAL AVE , E. 7TH ST. Local STATE HWY. 86 ALLEY , E. 7TH ST. Local ALLEY S. IMPERIAL AVE , E. 6TH ST. Local STATE HWY. 86 S. IMPERIAL AVE , E. 6TH ST. Local "M" STREET "L" STREET , E. 6TH ST. Local "L" STREET "K" STREET , E. 6TH ST. Local "K" STREET "J" STREET , E. 6TH ST. Local "J" STREET STATE HWY , E. 4TH ST. Collector STATE HWY. 86 S. IMPERIAL AVE , E. 2ND ST. Minor Arterial STATE HWY. 86 S. IMPERIAL AVE , W. 1ST ST. Local S. IMPERIAL AVE. "H" STREET , W. 1ST ST. Local "H" STREET ALLEY , W. 1ST ST. Local ALLEY "G" STREET , W. 1ST ST. Local "G" STREET ALLEY ,120 2 City of Imperial Page 3 of 8 Pages BID NO

11 Item Street Name Functional Class From To Length Width Area (SqFt) ARAM System 46 W. 1ST ST. Local ALLEY "F" STREET , W. 1ST ST. Local "F" STREET "E" STREET , W. 1ST ST. Local "E" STREET ALLEY , W. 1ST ST. Local ALLEY "D" STREET , W. 2ND ST. Minor Arterial S. IMPERIAL AVE. "H" STREET , W. 2ND ST. Minor Arterial "H" STREET ALLEY , W. 2ND ST. Minor Arterial ALLEY "G" STREET , W. 2ND ST. Minor Arterial "G" STREET ALLEY , W. 2ND ST. Minor Arterial ALLEY "F" STREET , W. 2ND ST. Minor Arterial "F" STREET "E" STREET , W. 2ND ST. Minor Arterial "E" STREET ALLEY , W. 2ND ST. Minor Arterial ALLEY "D" STREET , W. 2ND ST. Minor Arterial "D" STREET WEST END , W. 3RD ST. Local S. IMPERIAL AVE. "H" STREET , W. 3RD ST. Local "H" STREET "G" STREET , W. 3RD ST. Local "G" STREET "F" STREET ,100 1 City of Imperial Page 4 of 8 Pages BID NO

12 Item Street Name Functional Class From To Length Width Area (SqFt) ARAM System 62 W. 3RD ST. Local "F" STREET "E" STREET , W. 3RD ST. Local "E" STREET ALLEY , W. 3RD ST. Local ALLEY "D" STREET , W. 3RD ST. Local "D" STREET ALLEY , W. 3RD ST. Local ALLEY "C" STREET , W. 4TH ST. Collector S. IMPERIAL AVE. "H" STREET , W. 4TH ST. Collector "H" STREET "G" STREET , W. 4TH ST. Collector "G" STREET "F" STREET , W. 4TH ST. Collector "F" STREET "E" STREET , W. 4TH ST. Collector "E" STREET ALLEY , W. 4TH ST. Collector ALLEY "D" STREET , W. 4TH ST. Collector "D" STREET ALLEY , W. 4TH ST. Collector ALLEY "C" STREET , W. 5TH ST. Local S. IMPERIAL AVE. "H" STREET , W. 5TH ST. Local "H" STREET "G" STREET , W. 5TH ST. Local "G" STREET "F" STREET ,100 2 City of Imperial Page 5 of 8 Pages BID NO

13 Item Street Name Functional Class From To Length Width Area (SqFt) ARAM System 78 W. 5TH ST. Local "F" STREET "E" STREET , W. 5TH ST. Local "E" STREET "D" STREET , W. 5TH ST. Local "D" STREET "C" STREET , W. 6TH ST. Local S. IMPERIAL AVE. "H" STREET , W. 6TH ST. Local "H" STREET "G" STREET , W. 6TH ST. Local "G" STREET "F" STREET , W. 6TH ST. Local "F" STREET "E" STREET , W. 6TH ST. Local "E" STREET "D" STREET , S. "L" ST. Local 2ND ST. 4TH ST , S. "L" ST. Local 4TH ST. 5TH ST , S. "L" ST. Local 5TH ST. 6TH ST , S. "L" ST. Local 6TH ST. 7TH ST , S. "L" ST. Local 7TH ST. BARIONI BLVD , CROSS RD. Minor Arterial ATEN BLVD. BERNARDI ST , CROSS RD. Minor Arterial BERNARDI ST. SOUTH END , S. "H" ST. Local 1ST ST. 2ND ST ,860 2 City of Imperial Page 6 of 8 Pages BID NO

14 Item Street Name Functional Class From To Length Width Area (SqFt) ARAM System 94 S. "H" ST. Local 2ND ST. 3RD ST , S. "H" ST. Local 3RD ST. 4TH ST , S. "H" ST. Local 4TH ST. 5TH ST , S. "G" ST. Local 1ST ST. 2ND ST , S. "G" ST. Local 2ND ST. 3RD ST , S. "G" ST. Local 3RD ST. 4TH ST , S. "G" ST. Local 4TH ST. 5TH ST , S. "F" ST. Local 1ST ST. 2ND ST , S. "F" ST. Local 2ND ST. 3RD ST , S. "F" ST. Local 3RD ST. 4TH ST , S. "F" ST. Local 4TH ST. 5TH ST , S. "E" ST. Local 1ST ST. 2ND ST , S. "E" ST. Local 2ND ST. 3RD ST , S. "E" ST. Local 3RD ST. 4TH ST , S. "E" ST. Local 4TH ST. 5TH ST , S. "D" ST. Local 1ST ST. 2ND ST ,100 2 City of Imperial Page 7 of 8 Pages BID NO

15 Item Street Name Functional Class From To Length Width Area (SqFt) ARAM System 110 S. "D" ST. Local 2ND ST. 3RD ST , S. "D" ST. Local 3RD ST. 4TH ST , S. "D" ST. Local 4TH ST. 5TH ST , S. "C" ST. Local 3RD ST. 4TH ST , S. "C" ST. Local 4TH ST. 5TH ST , MARSHALL AVE. Local ATEN BLVD. RITTER CT , MARSHALL AVE. Local RITTER CT. CROWN CT , MARSHALL AVE. Local CROWN CT. CLAYPOOL DR , MARSHALL AVE. Local CLAYPOOL DR. AIRPORT RD ,920 1 City of Imperial Page 8 of 8 Pages BID NO

16 CITY OF IMPERIAL STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO ARHM-GG* SYSTEM 4 ARHM-GG ON ARAM (no leveling course) 11

17 CITY OF IMPERIAL STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO TERMINATION JOIN - SYSTEM 4 12

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max: Page 1 of 20 518045 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 012340 FOUNDATION STABILIZATION (SET PRICE) 4 025323 MOBILIZATION 5

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT

More information

- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses;

- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses; B710 - - OPSS 710 710.1 GENERAL 710.1.1 Tender Items Pavement marking may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly

More information

532 - PAVEMENT MARKING - OPSS 532

532 - PAVEMENT MARKING - OPSS 532 532 - - OPSS 532 532.1 GENERAL 532.1.1 Tender Items may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly a maintenance

More information

Longitudinal Joint Construction. Mike Robinson, PE

Longitudinal Joint Construction. Mike Robinson, PE Longitudinal Joint Construction Mike Robinson, PE Inherently weaker than surrounding pavement Prone to deterioration Often drives rehabilitation FOD Longitudinal Joints Two predictors of success Density

More information

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

9' - 0 Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF Bu i l d i n g Co mmi t t e e T u e s d a y Au g u s t 1 3, 2 0 1 3 9' - 0" Remove Windows Fire Wall Remove Windows 1 First Floor Plan 1/8" = 1'-0" Locker Bay 237 SF Lobby 393 SF Main Vestibule 227 SF

More information

AGGREGATE PRODUCTS INC. ASPHALT RUBBERAGGREGATE MEMBRANE (ARAM) JOB SCHEDULE

AGGREGATE PRODUCTS INC. ASPHALT RUBBERAGGREGATE MEMBRANE (ARAM) JOB SCHEDULE h_ -,f' '"", /- I~, 11',--j "../ ASPHALT RUBBERAGGREGATE MEMBRANE (ARAM) MONDAY MAY 2, 2011 DAY 1 - ORANGE 1 COMMERCIAL AVE. LA BRUCHERIE AVE. TO WEST OF 23RD. ST. 2 23RD ST. COMMERCIAL AVE. TO W. MAIN

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1 TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached).

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

RFP No C001 Fixed Base Operator, Dulles Airport. May 3, 2017

RFP No C001 Fixed Base Operator, Dulles Airport. May 3, 2017 RFP No. 6-17-C001 Fixed Base Operator, Dulles Airport May 3, 2017 Questions and Answers Notice: Questions may have been edited for clarity and relevance. 1. Question: RFP Section I.I. Is Jet Aviation Dulles,

More information

AGENDA. WEDNESDAY, SEPTEMBER 23, :00 PM or immediately after the ICTC meeting

AGENDA. WEDNESDAY, SEPTEMBER 23, :00 PM or immediately after the ICTC meeting AGENDA WEDNESDAY, SEPTEMBER 23, 2015 6:00 PM or immediately after the ICTC meeting County Administration Building, 2 nd Floor Board of Supervisors Chambers 940 W. Main St. El Centro, CA 92243 CHAIRPERSON:

More information

LAKE MOUNTAIN PRELIMINARY

LAKE MOUNTAIN PRELIMINARY VICINITY MAP VICINITY MAP PREPARED FOR:. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE S WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS, TO THE

More information

City of Shenandoah Transportation Projects. September 20, 2018 By: Derek Wind, PE, CFM

City of Shenandoah Transportation Projects. September 20, 2018 By: Derek Wind, PE, CFM City of Shenandoah Transportation Projects September 20, 2018 By: Derek Wind, PE, CFM Shenandoah Proposed Improvements Montgomery County Precinct Boundary Precinct 2 North West side of I-45 and Research

More information

FULL DEPTH RECLAMATION (FDR)

FULL DEPTH RECLAMATION (FDR) FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers

More information

Pavement LCA Where Do We Go from Here!!

Pavement LCA Where Do We Go from Here!! Pavement LCA Where Do We Go from Here!! Presented to: Pavement Life Cycle Assessment Symposium - 2017 Illinois Center for Transportation, Champaign, IL By: Navneet Garg, Ph.D. NAPMRC Program Manager (FAA)

More information

City of Grand Island

City of Grand Island City of Grand Island Tuesday, January 09, 2007 Council Session Item G7 #2007-6 - Approving Certificate of Final Completion for Asphalt Maintenance Project 2006-AC-1; Various Locations Throughout Grand

More information

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:

More information

July 5, Re: Contract ID Plan, & Proposal July 11, 2017 Letting. The Contractor is hereby advised of modifications to the bid documents.

July 5, Re: Contract ID Plan, & Proposal July 11, 2017 Letting. The Contractor is hereby advised of modifications to the bid documents. July 5, 2017 Dear Prospective Bidders: Re: Contract ID 2688050 Plan, & Proposal July 11, 2017 Letting The Contractor is hereby advised of modifications to the bid documents. The Proposal has been modified:

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special

More information

Item Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total

Item Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total AGENCY: KENDALL Builders Paving D Construction, Inc. Gallagher Asphalt Corp. Geneva Construction Co. P. T. Ferro Construction Co. SECTION: 16-00000-00-GM, Plainfield Road, HMA Resurfacing, CMF 4413 Roosevelt

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

Part 8 Street lighting DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK

Part 8 Street lighting DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK Part 8 Street lighting DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK Drawing Register Number Revision Description S2 D Minor Road, Wood or Concrete Pole with Crossarm S3 D Arterial Road, Wood Pole with

More information

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND SANDBOX 6 2 24"X36" SHEET: "=6' 23 4 2 2 8 2 5 6 6 2 28 8 26 2 2 8 22 9 Yellowstone Drive Texas Firm Registration Taylor, Texas 654 No. F36 (52) 5-4328 6 25 2 Portland, TX 834 23 8 9 illy G. Webb Drive Portland,

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

Report to Council. Report: COR Date: 25 Jul 2016

Report to Council. Report: COR Date: 25 Jul 2016 Report to Council To: Mayor Linton and Members of Council Prepared By: Mark Bradey, Financial Manager / Deputy Treasurer Report: COR2016-58 Date: 25 Jul 2016 RE: Recommendation for Award of Tender T-17-16

More information

Department of Public Works

Department of Public Works The reports that the following streets may be closed or disrupted and have CLOSURE 350569 Ryan Ave - 18th St/20th St Paving -- 4/10/2019-4/11/2019 COMBINATION 350205 10th St - At St Louis Ave Replace valve

More information

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Village of Milan, Mirabal Park /5/016 DEVELOPED LAND AREAS** Basin Basin HSG "B" HSG "C" HSG "D" Basin Basin Area Area

More information

Community Development Department Council Chambers, 7:30 PM, December 20, 2012

Community Development Department Council Chambers, 7:30 PM, December 20, 2012 STAFF REPORT 2012-56P: Alley Vacation Community Development Department Council Chambers, 7:30 PM, December 20, 2012 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Mike Voitik, Planning Technician

More information

City of Sutherlin Planning Commission Meeting Tuesday, September 15, :00 p.m. Sutherlin Civic Auditorium Agenda

City of Sutherlin Planning Commission Meeting Tuesday, September 15, :00 p.m. Sutherlin Civic Auditorium Agenda City of Sutherlin Planning Commission Meeting Tuesday, September 15, 2015 7:00 p.m. Sutherlin Civic Auditorium Agenda Pledge of Allegiance Welcome and Introductions Introduction of Media Approval of Minutes:

More information

Pavement Management Study

Pavement Management Study Town of South Bethany, DE 2016 Pavement Management Study Prepared by: Kercher Engineering, Inc. December 13, 2016 Mr. Melvin Cusick Town Manager Town of South Bethany 402 Evergreen Road South Bethany,

More information

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that

More information

Chapter 14. Design of Flexible Airport Pavements AC 150/5320-6D

Chapter 14. Design of Flexible Airport Pavements AC 150/5320-6D Chapter 14 Design of Flexible Airport Pavements AC 150/5320-6D AIRCRAFT CONSIDERATIONS. a. Load. maximum anticipated takeoff weight of the aircraft. The design procedure assumes 95 percent of the gross

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

,271

,271 Reserve Analysis by Berrera and Company (January 2016) Page 1 Section I: Capital Reserve Funding - Estimated Cash Reserve Balances And Unfunded Liability: Effective 1/1/2019 Assumption Table: Interest

More information

KDOT announces approved February bids

KDOT announces approved February bids IMMEDIATE RELEASE March 8, 2018 For more information: Kim Stich 785.296.3585 KDOT announces approved February bids The Kansas Department of Transportation announces approved bids for state highway construction

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

City of Redding Airports

City of Redding Airports City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated

More information

BID NO ANNUAL CONTRACT FOR ASPHALT ROAD SURFACING PRODUCTS

BID NO ANNUAL CONTRACT FOR ASPHALT ROAD SURFACING PRODUCTS Corp 1 Hot Mix Asphaltic Concrete Pavement Type "A" (Course - Graded Base Course) NB NB 54.70 NB NB 55.00 1A Recycled Hot Mix Asphaltic Concrete NB NB 52.70 NB NB 53.00 2 Hot Mix Asphaltic Concrete Pavement

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG

More information

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS Rare Development Opportunity in the Olde Carlsbad Neighborhood Ocean Views from Some Lots Lot Sizes 9,500-15,527 SF Area of New Home Prices From $1,000,000-$1,500,000 SUBMIT BEST OFFER - OFFERS DUE DECEMBER

More information

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number REPORT Pavement Evaluation Summary Brookshire Way & Duluth Park Duluth, Georgia Project Number 2013.4154.01 February 11, 2014 Revised March 20, 2014 UNITED CONSULTING 625 Holcomb Bridge Road Norcross,

More information

Great Things to Come in El Centro!

Great Things to Come in El Centro! Great Things to Come in El Centro! 2009-2010 City of El Centro Budget Total Balanced Budget amount for Fiscal Year 2009-2010 is $121,675,692 Included reserves in the amount of: $2,490,907 10% $980,000

More information

WMA A Contractors Experience. NAPA 56 th Annual Meeting February 5-9, 2011 Orlando, FL. Tony Limas Granite Construction Company

WMA A Contractors Experience. NAPA 56 th Annual Meeting February 5-9, 2011 Orlando, FL. Tony Limas Granite Construction Company WMA A Contractors Experience NAPA 56 th Annual Meeting February 5-9, 2011 Orlando, FL Tony Limas Granite Construction Company 1 Today's Discussion WMA By the Numbers Granite WMA Experience Observations

More information

Preliminary Agenda Indianapolis Airport Authority August 3, :30 a.m. 2. Approve Minutes of the Regular Meeting of July 20, 2007.

Preliminary Agenda Indianapolis Airport Authority August 3, :30 a.m. 2. Approve Minutes of the Regular Meeting of July 20, 2007. Preliminary Agenda Indianapolis Airport Authority August 3, 2007 8:30 a.m. 1. Call to order. 2. Approve Minutes of the Regular Meeting of July 20, 2007. 3. Ordinances and Resolutions PUBLIC HEARING ON

More information

Fall 2015 Tender Release

Fall 2015 Tender Release Tender Close 001-05-00 Hwy. 1, Thin Overlay, 4km past the sintaluta access to 4km short of the JCT. Hwy 1, km 43.25 to 53.40 Thin Overlay Southern December 2015 January 2016 Length = 10.15 km Asphalt Concrete

More information

Wellington International Airport Runway Overlay

Wellington International Airport Runway Overlay Wellington International Airport Runway Overlay 2009. Parties involved Fulton Hogan Wellington Contractor. BECA - Consultant. Wellington international airport Ltd - Client. Contract Scope The contract

More information

Fall 2016 Tender Release

Fall 2016 Tender Release Tender Close 001-05-00 001-05-80 Hwy. 1, Grade & Pave, Indian Head, km 54.77 to 55.53 & km 0.00 to 0.33 Grade and Pave Southern November 2016 November 2016 Length = 1.09 km Base = 12 000 t Asphalt Concrete

More information

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019 City of Madera Engineering Division Citizen s Oversight Committee February 13, 2019 INTRODUCTION The City of Madera uses Measure T funds to support various programs as outlined in the Annual Expenditure

More information

PROJECT UPDATES October 26, 2017

PROJECT UPDATES October 26, 2017 PROJECT UPDATES October 26, 2017 40 th Street Water Tower Painting Project On September 12, 2017 City Council awarded a contract to Allied Painting of Cherry Hill, New Jersey in the amount of $667,500

More information

2017 APC/PennDOT Fall Seminar. Deputy Secretary for Highway Administration George W. McAuley Jr., P.E.

2017 APC/PennDOT Fall Seminar. Deputy Secretary for Highway Administration George W. McAuley Jr., P.E. 2017 APC/PennDOT Fall Seminar Deputy Secretary for Highway Administration George W. McAuley Jr., P.E. Introduction 30 year Career Deputy Secretary Role Goals & Objectives Strengthen Relationships Improve

More information

Appendix E. System Issues

Appendix E. System Issues Appendix E System Contents Page System... E-1 E.1 Introduction...E-1 E.2 Existing Model - System...E-2 E.2.1 Location: Country Ridge Collector, at Queensgate Drive...E-2 E.3 Committed Model - System...E-3

More information

Planning & Development Group

Planning & Development Group Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

Table Of Contents RV WEATHERSTRIPPING

Table Of Contents RV WEATHERSTRIPPING Table Of Contents RV WEATHERSTRIPPING SLIDE OUT SEALS....................... 2 DRIP RAIL SEALS....................... 4 VENT HATCH......................... 4 STATIONARY GLASS.................... 5 SLIDING

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

DATA BOOK IV : COST ESTIMATE

DATA BOOK IV : COST ESTIMATE The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55

More information

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019 Abbotsford, BC 65,000 SF in Available Q 209 33,229 SF in Available Q2 209 NOW UNDER CONSTRUCTION! CHRIS MORRISON, Executive Vice President 604 66 085 chris.morrison@colliers.com VITO DECICCO, Senior Vice

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form Submitted By 2018 0531 Legistar File ID November 20th, 2018 City Council Meeting Date Agenda Item Only N/A for Non Agenda Item Matt Mihalevich 10/25/2018 ENGINEERING

More information

2850 GREEN STREET HOLLYWOOD, FLORIDA 33020

2850 GREEN STREET HOLLYWOOD, FLORIDA 33020 2850 GREEN STREET HOLLYWOOD, FLORIDA 33020 Fronting The Hollywood Commerce Center Newly Renovated Industrial, Flex and Showroom Space! Location, Location, Location Minutes to I-595, Port and Airport GRIFFIN

More information

Treviso Condominiums. Retail for Lease TREVISO PHASE II. A Slice of Italy, at the Corner of Dufferin & Lawrence CONDOMINIUMS

Treviso Condominiums. Retail for Lease TREVISO PHASE II. A Slice of Italy, at the Corner of Dufferin & Lawrence CONDOMINIUMS PHASE II TREVISO CONDOMINIUMS Treviso Condominiums Retail for Lease A Slice of Italy, at the Corner of Dufferin & Lawrence THE OPPORTUNITY TREVISO CONDOMINIUMS PHASE II Size: Net Rent: TMI: Possession:

More information

MUNICIPEX. Product Catalog

MUNICIPEX. Product Catalog MUNICIPEX Product Catalog TABLE OF CONTENTS 1. MUNICIPEX Water Service Pipe 3 2. MUNICIPEX Pre-insulated Pipe 4 3. MUNICIPEX Force Main Pipe 5 AWWA C904 For updates to this publication and the most current

More information

COASTAL CONSERVANCY. Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION

COASTAL CONSERVANCY. Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION COASTAL CONSERVANCY Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION File No. 07-037-02 Project Manager: Michelle Jesperson RECOMMENDED ACTION: Authorization

More information

Culpeper District. Albemarle County Monthly Report December 2011

Culpeper District. Albemarle County Monthly Report December 2011 Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204) Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY

More information

GILBANE BUILDING COMPANY North Shore School District #112. Dan Sullivan Project Executive. Date: S. Mackall, D. Danker, J. Masters

GILBANE BUILDING COMPANY North Shore School District #112. Dan Sullivan Project Executive. Date: S. Mackall, D. Danker, J. Masters Gilbane Building Company 80 West Bryn Mawr Avenue Suite 00 Chicago, Illinois 60631 Telephone: 773-69-300 Facsimile: 773-69-301 February 14, 2017 Mr. John Fuhrer Director of Operations, Facilities & Transportation

More information

ITY OF COMMUNITY NEWSLETTER COMMUNITY L CENTRO NEWSLETTER SPRING 2017 E D I T I O N

ITY OF COMMUNITY NEWSLETTER COMMUNITY L CENTRO NEWSLETTER SPRING 2017 E D I T I O N ITY OF COMMUNITY NEWSLETTER COMMUNITY L CENTRO NEWSLETTER SPRING 2017 E D I T I O N ITY OF COMMUNITY NEWSLETTER L CENTRO In this Issue City Council Meetings Change in Election Date Community Clean-up Event

More information

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422

More information

22-23 Pavement Marking Items. (Pages 7 & 8 removed)

22-23 Pavement Marking Items. (Pages 7 & 8 removed) 22-23 Pavement Marking Items (Pages 7 & 8 removed) SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable

More information

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION TO: FROM: SUBJECT: ATTACHMENTS: June 1,2017. Aaron Kunz, Deputy Director

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION TO: FROM: SUBJECT: ATTACHMENTS: June 1,2017. Aaron Kunz, Deputy Director CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION June 1,2017 TO: FROM: SUBJECT: ATTACHMENTS: Traffic & Parking Commission Aaron Kunz, Deputy Director North Santa Monica Boulevard Reconstruction Project

More information

DEVELOPMENT PLAN REVIEW PROCESS and APPLICANT GUIDELINES

DEVELOPMENT PLAN REVIEW PROCESS and APPLICANT GUIDELINES DEVELOPMENT PLAN REVIEW PROCESS and APPLICANT GUIDELINES DEVELOPMENT DEPARTMENT 120 Gary Wade Boulevard Sevierville, TN 37862 (865) 453-5504 seviervilletn.org Pamela S. Caskie, Development Director Judith

More information

PARKS & RECREATION BOARD MISSION STATEMENT

PARKS & RECREATION BOARD MISSION STATEMENT I. Call to order II. III. IV. Welcome Student Representatives 151 Martin Street Birmingham, Mi 48009 248-530-1800 Parks and Recreation Board Agenda Department of Public Services 851 South Eton-Conference

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form Matt Mihalevich 1/16/2019 DEVELOPMENT SERVICES (620) Submitted By 2019 0050 Legistar File ID February 5th, 2019 City Council Meeting Date Agenda Item Only N/A for

More information

HOST KA

HOST KA W PLAINS E ZENITH E 00 RD E 000 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD W 00 RD W 000 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD E 00 RD E 00 RD E 0 RD E 00 RD E 00 RD E 00 RD

More information

MADERA COUNTY. Measure T & SB-1 Projects

MADERA COUNTY. Measure T & SB-1 Projects MADERA COUNTY Measure T & SB-1 Projects Measure T Projects: Avenue 26/Road 29 Rehabilitation (Measure T/FLAP) Oakhurst Midtown Connector (Measure T/SB-1 LPP) North Fork Roundabout (Measure T/CMAQ) Road

More information

CIVIL AVIATION AUTHORITY

CIVIL AVIATION AUTHORITY CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview

More information

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA Charles A. Kilpatrick, P.E. Commissioner DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Date: January 12, 2017 Order No.: 930 Various Project: FHWA: None District: NOVA

More information

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner BID RESULTS May 12, 2016 Award Date May 19, 2016 COMMISSION DISTRICT 1 Bob Ruwart - Commissioner Job 1 Federal Project NHPPI-I806199 involving grading, draining, milling plant mix and concrete, placing

More information

2017 COUNTYWIDE STORMWATER CULVERT REPAIR/REPLACEMENT MACON-BIBB COUNTY, GEORGIA MACON WATER AUTHORITY, AGENT TPE NO. MWA October 2017

2017 COUNTYWIDE STORMWATER CULVERT REPAIR/REPLACEMENT MACON-BIBB COUNTY, GEORGIA MACON WATER AUTHORITY, AGENT TPE NO. MWA October 2017 2017 COUNTYWIDE STORMWATER CULVERT REPAIR/REPLACEMENT MACON-BIBB COUNTY, GEORGIA MACON WATER AUTHORITY, AGENT TPE NO. MWA 006 26 October 2017 ADDENDUM NUMBER NO. 1 Bidders are advised that bidding documents

More information

Implications of Construction Cost Escalation

Implications of Construction Cost Escalation Implications of Construction Cost Escalation 2007 ACI-NA Economics and Finance Conference James Gill, CPA Deputy Airport Director Finance, Business & Administration Raleigh-Durham Airport Authority Presentation

More information

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public (Y = Permitted) TABLE A (CA = Contract Agreement) PERMITTED USES BY DISTRICT Agricultural Uses (Light) Farming & Livestock related activities Y Y Y Y Y Y Agricultural Uses (Heavy) Commercial Type Animal

More information

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP 2019-2022 June 29, 2018 Red is changes from previous ATIP Seq # Rte_Sys Projnum #Year Agency MPO Description Program Fund 1 STIP 1 BB TRF-0028-19A 2019 MANKATO

More information

Meadowbank Retail Park

Meadowbank Retail Park On behalf of OPEN CLASS 1 NON-FOOD CONSENT Edinburgh This image is for indicative purposes only. Accuracy cannot be guaranteed and it expressly excluded from any contract. Norton Park Unit Sainsburys Unit

More information

8. CITY COUNCIL AGENDA

8. CITY COUNCIL AGENDA Regular 8. CITY COUNCIL AGENDA Meeting Date: 10/06/2014 TITLE: Playground Equipment Installation Contract Amendment - Gary Riedner Responsible Staff: Dwight Curtis Backup Material: Backup material attached

More information

Grove Field Airport Environmental Assessment

Grove Field Airport Environmental Assessment Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of

More information

Allegan County Board of Commissioners

Allegan County Board of Commissioners Allegan County Board of Commissioners County Services Building 3283 122 nd Avenue Allegan, MI 49010 269-673-0203 Main Office 269-686-5331 Main Fax http://www.allegancounty.org Dean Kapenga, Chairman Tom

More information

1339, 1431, TH AVENUE NE TH STREET NE

1339, 1431, TH AVENUE NE TH STREET NE 1339, 1431, 1435 40 TH AVENUE NE 3950 12 TH STREET NE INDUSTRIAL 3583, 3481, SPACE 3459, 3407 FOR Mount Lehman SALE Road, AND Abbotsford FOR LEASE 10 MINS HUNTINGTON HILLS DEERFOOT TRAIL CALGARY INTERNATIONAL

More information

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting WELCOME! TSPE DFW MID-CITIES Check-in/Networking Announcements / Lunch Service Speaker Presentation 11:30AM 12:00PM 12:00PM 12:15PM 12:15PM 1:00PM January Chapter Meeting Thank You to Our Sponsors Interested

More information

THE STATE OF GRAYSLAKE

THE STATE OF GRAYSLAKE THE STATE OF GRAYSLAKE Presented by: Mayor Rhett Taylor January 23, 2014 The State of Grayslake Economic Development Transportation Village Center Plans Economic Development Cost Savings Programs: Village

More information

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

State of the Airport Robert S. Bowen, Executive Director October 18, 2018 Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing

More information