22-23 Pavement Marking Items. (Pages 7 & 8 removed)
|
|
- Kristin Dickerson
- 5 years ago
- Views:
Transcription
1
2 22-23 Pavement Marking Items (Pages 7 & 8 removed)
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19 SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable KDOT Traffic Control Standards. The contractor shall provide all signs and other traffic control devices for proper traffic control of all construction activities. Quantities listed are estimates only. Contractor operations may require additional signs and traffic control devices, this will be subsidiary to the bid item traffic control. SIGN NO. WORK ZONE SIGNS * SIZE SQ. FT & OVER R2-1 2 R4-1 2 W3-5 2 W W KM W4-2R 2 W4-2L 2 W14L-1 1 W14R-1 1 W24-1L 1 W24-1R 1 KG KI-104a 2 KI-105a 2 LIGHTED DEVICES * WORK ZONE WARNING LIGHT (TYPE A LOW INTENSITY) 10 WORK ZONE WARNING LIGHT (RED TYPE B HIGH INTENSITY) ARROW DISPLAY 1 PORTABLE CHANGEABLE MESSAGE SIGN BARRICADES * CHANNELIZING DEVICES * TYPE III (4 TO 12 ) PEDESTRIAN FIXED PORTABLE PEDESTRIAN SUMMARY OF TRAFFIC CONTROL DEVICES (EACH) WORK ZONE SIGN (SPECIAL) SIGN NO SQ. FT. & LESS SQ. FT. & OVER RECAPITULATION OF QUANTITIES ITEM QUANTITY UNIT WORK ZONE SIGNS (0 TO 9.25 SQ. FT.) EADA WORK ZONE SIGNS (9.26 TO SQ. FT.) 2700 EADA WORK ZONE SIGNS (16.26 SQ. FT. & OVER) 540 EADA WORK ZONE BARRICADES (TYPE 3 4 TO 12 ) 675 EADA WORK ZONE BARRICADES (PEDESTRIAN) EADA CHANNELIZER (FIXED) EADA CHANNELIZER (PORTABLE) EADA CHANNELIZER (PEDESTRIAN) EADA WORK ZONE WARNING LIGHT (TYPE A LOW INTENSITY) 1350 EADA WORK ZONE WARNING LIGHT (RED TYPE B HIGH INTENSITY) EADA ARROW DISPLAY 135 EADA PORTABLE CHANGEABLE MESSAGE SIGN EADA PAVEMENT MARKING (TEMPORARY) 4" SOLID (TYPE I) 51.1 STA./LINE 4" SOLID (TYPE II) STA./LINE 4" BROKEN (8')(TYPE I) STA./LINE 4" BROKEN (8')(TYPE II) STA./LINE 4" BROKEN (3')(TYPE I) STA./LINE 4" BROKEN (3')(TYPE II) STA./LINE 4" DOTTED EXTENSION (TYPE I) STA./LINE 4" DOTTED EXTENSION (TYPE II) STA./LINE SOLID (LINE MASKING TAPE) STA./LINE BROKEN (LINE MASKING TAPE) STA./LINE SYMBOL (TYPE I) EACH SYMBOL (TYPE II) EACH FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (8 )) STA./LINE FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3 )) STA./LINE PAVEMENT MARKING REMOVAL 3600 LIN. FT. CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 575 LIN. FT. CONCRETE SAFETY BARRIER (TYPE F3) (TEMP.-INSTALL ONLY) LIN. FT. CONCRETE SAFETY BARRIER (TYPE F3) (TEMP.-RELOCATE) LIN. FT. INERTIAL BARRIER SYSTEM.1 EACH REPLACEMENT MODULES (IBS) 16 5 EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ. FT. & LESS) EACH WORK ZONE SIGN (SPECIAL) (16.26 SQ. FT. & OVER) EACH RIGID RAISED PAVEMENT MARKER (TYPE I) EACH RIGID RAISED PAVEMENT MARKER (TYPE II) EACH TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LUMP SUM TRAFFIC CONTROL (INITIAL SET UP) 1.01 LUMP SUM TRAFFIC CONTROL LUMP SUM FLAGGER (SET PRICE) 1 HOUR NOTES: /10/16 Removed Replacement Modules Summary Table, Added JGB (IBS) to Replacement Modules description NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TRAFFIC CONTROL SUMMARY OF DEVICES RECAPITULATION OF QUANTITIES TE795 FHWA APPROVAL 06/01/15 APP D Kristina Erickson DESIGNED B.A.H. DETAILED R.W.B. QUANTITIES TRACED DESIGN CK. DETAIL CK. QUAN. CK. TRACE CK. Trego Co. Proj. No KA Title: Traffic Control Page 21
20 2 6" DOTTED 12" SOLID CHEVRON LINE FULL LENGTH OF DECELERATION LANE EXTENSION LINE 6" SOLID YELLOW EDGE LINE 40 6" SOLID EDGE LINE 8" SOLID GORE MARKINGS 30 6" SOLID YELLOW EDGE LINE 12" SOLID DIAGONAL LINE 6" BROKEN LANE LINE TYPICAL DECELERATION EXIT RAMP 12" SOLID CHEVRON LINE 6" SOLID YELLOW EDGE LINE 12" SOLID DIAGONAL LINE 40 8" SOLID GORE MARKINGS 6" DOTTED EXTENSION LINE 6" SOLID EDGE LINE 30 6" BROKEN LANE LINES 6" SOLID YELLOW EDGE LINE TYPICAL TAPERED EXIT RAMP 6" SOLID YELLOW EDGE LINE 6" BROKEN LANE LINES 6" DOTTED EXTENSION LINE 6" SOLID YELLOW EDGE LINE 8" SOLID GORE MARKING FULL LENGTH OF ACCELERATION LANE 6" SOLID EDGE LINE TYPICAL ACCELERATION RAMP 5/25/12 Dotted Extension s and Lane Drop s B.A.H. B.D.G. 1 7/26/05 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D Pg 1 of 2 TE307 KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR MULTI-LANE DIVIDED ROADWAYS Page 22 FHWA APPROVAL 5/25/2012 APP D Brian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.
21 2 SHOULDER LINE EDGE OF PAVEMENT 6" SOLID EDGE LINE EDGE OF PAVEMENT 6" BROKEN LANE LINE C L 6" SOLID YELLOW EDGE LINE EDGE OF PAVEMENT " SOLID EDGE LINE EDGE OF PAVEMENT SHOULDER LINE TYPICAL LANE LINE AND EDGE LINE MARKINGS FOR FOUR LANE AND SIX LANE DIVIDED HIGHWAYS 6" SOLID YELLOW EDGE LINE 8" SOLID GORE MARKINGS 12" SOLID CHEVRON LINE MILE 6" SOLID EDGE LINE 12" SOLID DIAGONAL LINE 8" SOLID LINE 8" LANE DROP MARKING 30 6" SOLID YELLOW EDGE LINE 8" LANE DROP MARKING 6" BROKEN LANE LINES TYPICAL LANE DROP TYPICAL SPACING FOR DOTTED EXTENSION LINES, UNLESS OTHERWISE NOTED ON PLANS. TYPICAL SPACING FOR BROKEN LINES UNLESS OTHERWISE NOTED ON PLANS. TYPICAL SPACING FOR LANE DROP. UNLESS OTHERWISE NOTED ON PLANS. NOTE: LONGITUDINAL PAVEMENT MARKING LINES SHALL BE OFFSET A MINIMUM OF 2" FROM LONGITUDINAL PAVEMENT JOINTS. NOTE: AT RAMP TERMINALS WITH CROSS-ROADS, WRAP 6" EDGE LINES AROUND RADII. NOTE: ON NON I, US, AND K ROUTES, 4" EDGE LINES MAY BE INSTALLED. 6" EDGE LINES ARE NOT REQUIRED ON NON I, US, AND K ROUTES. 5/25/12 Dotted Extension s and Lane Drop s B.A.H. B.D.G. 1 7/26/05 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TE307 TYPICAL PAVEMENT MARKING DETAILS FOR MULTI-LANE DIVIDED ROADWAYS Pg 2 of 2 Page 23 FHWA APPROVAL 5/25/2012 APP D Brian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.
22 SUMMARY OF PAVEMENT MARKINGS LOCATION 4" Solid Edge 6" Solid Edge 6" Broken Lane 6" Broken Lane (PCP) 6" Dotted Extension 6" Broken Lane Drop 6" Solid Lane 8" Broken Lane Drop 8" Solid Gore 8" Dotted Extension 12" Solid Diagonal 12" Solid Chevron 12" Solid Type I Crosswalk 24" Solid Type II Crosswalk 24" Solid Stop 4" Solid YELLOW Edge 4" Solid YELLOW Double 4" Solid YELLOW 4" Broken YELLOW 6" Solid YELLOW Edge 12" Solid YELLOW Diagonal Mainline 900 4,280 1,610 x.25 / 3 X2 X.25 TOTALS , ,610 0 NOTE: For Specific pavement marking details and dimensions see plan sheets NOTE: ALL TOTALS REFLECT ACTUAL QUANTITY OF PAVEMENT MARKING MATERIALS REQUIRED Project No KA Page 24
23 Project No KA RECAPITULATION OF QUANTITIES (PAINT) (PAINT) (PAINT) (PAINT) ITEMS TOTAL UNITS PAVEMENT MARKING ()(4") PAVEMENT MARKING ()(6") 1,970 PAVEMENT MARKING ()(8") PAVEMENT MARKING ()(12") (PAINT) (PAINT) (PAINT) PAVEMENT MARKING (YELLOW)(4") PAVEMENT MARKING (YELLOW)(6") 1,610 PAVEMENT MARKING (YELLOW)(12") PAVEMENT MARKING (THERMOPLASTIC)()(4") PAVEMENT MARKING (THERMOPLASTIC)()(6") PAVEMENT MARKING (THERMOPLASTIC)()(8") PAVEMENT MARKING (THERMOPLASTIC)()(12") PAVEMENT MARKING (THERMOPLASTIC)(YELLOW)(4") PAVEMENT MARKING (THERMOPLASTIC)(YELLOW)(6") PAVEMENT MARKING (THERMOPLASTIC)(YELLOW)(12") PAVEMENT MARKING (EPOXY)()(4") PAVEMENT MARKING (EPOXY)()(6") PAVEMENT MARKING (EPOXY)()(8") PAVEMENT MARKING (EPOXY)()(12") PAVEMENT MARKING (EPOXY)(YELLOW)(4") PAVEMENT MARKING (EPOXY)(YELLOW)(6") PAVEMENT MARKING (EPOXY)(YELLOW)(12") PAVEMENT MARKING (INTERSECTION GRADE) () (12") PAVEMENT MARKING (INTERSECTION GRADE)()(24") PAVEMENT MARKING (INTERSECTION GRADE)(YELLOW)(12") PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (R/R XING) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (Lt Turn Arrow) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (Rt Turn Arrow) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () ( ONLY ) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (Rt/Thru Arrow) EACH PAVEMENT MARKING REMOVAL NOTE: WORDS & SYMBOLS SHALL CONFORM TO THE LATEST EDITION OF "STANDARD ALPHABETS FOR HIGHWAY SIGNS AND PAVEMENT MARKINGS" PRINTED BY THE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION. PRIOR TO COMMENCEMENT OF PAVEMENT MARKING WORK THE ENGINEER WILL ESTABLISH THE LIMITS FOR "NO PASSING" ZONES. THESE LIMITS SHALL BE USED FOR THE LOCATION OF " NO PASSING" LINES AND FOR THE COMPUTATION OF ACTUAL MARKING QUANTITIES FOR THIS LINE TYPE Page 25
HOST KA
W PLAINS E ZENITH E 00 RD E 000 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD W 00 RD W 000 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD E 00 RD E 00 RD E 0 RD E 00 RD E 00 RD E 00 RD
More informationK SIGNAGE & TRAFFIC CONTROL. Table of Contents
Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...
More information203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'
More information- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses;
B710 - - OPSS 710 710.1 GENERAL 710.1.1 Tender Items Pavement marking may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly
More information532 - PAVEMENT MARKING - OPSS 532
532 - - OPSS 532 532.1 GENERAL 532.1.1 Tender Items may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly a maintenance
More informationAttachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION
Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014
More informationTRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES
TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Work zone activities often create conditions on the travelled way that are hazardous particularly at night when the ability of motorists to see is
More informationMEMORANDUM. ~Department. TO: District Engineers DATE: February 3,2012. Texas. Carol T. Rawson, P.E., Director ~ t~ Pt Traffic Operations Division C /"
Texas ~Department _ of Transportation MEMORANDUM TO: District Engineers DATE: February 3,2012 FROM: Carol T. Rawson, P.E., Director ~ t~ Pt Traffic Operations Division C /" SUBJECT: Traffic Control Plan
More informationKansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:
Page 1 of 20 518045 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 012340 FOUNDATION STABILIZATION (SET PRICE) 4 025323 MOBILIZATION 5
More informationRef. AIM Para AOPA Air Safety Foundation Supported by the FAA Ref. AIM Para Supported by the FAA
ILS Critical Area Holding Position Sign: ATC may hold you at this sign, on a taxiway, when the instrument landing system is being used at the airport. Aircraft taxiing beyond this point may interfere with
More informationADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE
ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT
More informationNCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes
More informationICAO Recommended Airport Signs, Runway And Taxiway Markings. COPYRIGHT JEPPESEN SANDERSON, INC., ALL RIGHTS RESERVED. Revision Date:
ICAO Recommended Airport Signs, Runway And Taxiway Markings Revision Date: 20051230 MANDATORY INSTRUCTION SIGNS A mandatory instruction sign identifies a location beyond which an aircraft taxiing shall
More informationATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More informationSign Design Manual (SDM) Revision Log (TEM Section 295-2) April 17, 2009 Revision
Sign Design Manual (SDM) Revision Log (TEM Section 295-2) April 17, 2009 Revision The following is a detailed list of the changes made in the Sign Design Manual (SDM) as of the April 17, 2009 Revision.
More informationRECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1
PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to
More informationSCOPE Chapter 2D shall Apply to Any Road or
SCOPE Chapter 2D shall Apply to Any Road or Street other then Low-Volume Roads, Expressways, and Freeways Low Volume Roads: Shall be a Facility Lying Outside Built-Up Areas & Having a Traffic Volume Less
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationBID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.
BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway
More informationRiverside County Transportation Department Summary of Bids
COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All
More informationELECTION SIGN GUIDELINES
ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political
More informationPART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS
Part 8. Traffic Controls for Highway-Rail Grade Crossings Page 8TC-1 PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Page CHAPTER 8A. GENERAL...........................................
More informationReplace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure
Ramp Removed By Others Roadway Improvements By Others Ramp Improvements By Others Install ew Sign Structure Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Close
More informationAREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS
SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS 3.1 General Recommendations 3.1.1 36-1 Recommended Guidelines for Grade Crossing Warning Devices 5 Reaffirmed 2017 3.1.5 36-1 Recommended References
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationAVERY DENNISON Traffic Sign Fabricator
STANDARD TRAFFIC SIGN SIZES: 45cm x 45cm 60cm x 60cm 75cm x 75cm 90cm x 90cm 75cm x 75cm 90cm x 90cm 60cm x 60cm 75cm x 75cm 90cm x 90cm 120cm x 120cm 30cm x 30cm 40cm x 40cm 45cm x 45cm 60cm x 60cm 75cm
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work
More informationHIGHWAYS (ROAD HUMPS) (JERSEY) REGULATIONS 2002
HIGHWAYS (ROAD HUMPS) (JERSEY) REGULATIONS 2002 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Highways (Road Humps) (Jersey) Regulations 2002 Arrangement HIGHWAYS
More informationSection 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3
Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationTrailBOSS CHANNELIZING DEVICES
TrailBOSS CHANNELIZING DEVICES 2 TrailBOSS TM TrailBOSS TM / TrailGUIDE BASES TrailBOSS CHANNELIZER DRUM HDPE High Density Polyethylene (HDPE) with UV Inhibitors Two base options Available Plain or with
More informationSELF RE-ERECTING MARKER POSTS
ONE OF A KIND TECHNOLOGY FOR OUR TIMES MULTI APPLICATIONS SELF RE-ERECTING MARKER POSTS TEMPORARY OR PERMANENT BICYCLE LANES CROSSWALKS CHANALIZATION BRIDGES CITY US REFLECTOR WORK ZONES ALL-ROUND RUGGEDNESS
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 September 14, 2018 The Colfax County Board of Commissioners
More informationSpecial Specification 6113 Movable Barrier Transfer Operations and Maintenance for High Occupancy Vehicle Lanes
D M 6113 Special Specification 6113 Movable Barrier Transfer Operations and Maintenance for High Occupancy Vehicle Lanes 1. DESCRIPTION Provide movable barrier transfer operations and maintenance for high
More informationWork Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent
Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE
More information2003 Edition - Revision 1 Page 2F-1
2003 Edition - Revision 1 Page 2F-1 CHAPTER 2F. SPECIFIC SERVICE SIGNS Section 2F.01 Eligibility Specific Service signs shall be defined as guide signs that provide road users with business identification
More informationRAILROAD QUIET ZONE PROJECT
RAILROAD QUIET ZONE PROJECT VILLAGE OF ROSELLE Village of Roselle 31 S. Prospect Street Roselle, IL 60172 9575 WEST HIGGINS ROAD, SUITE 600 ROSEMONT, IL 60018 TEL. (847) 823-0500 FAX (847) 823-0520 Table
More informationAn Orientation to Today s Webinar
An Orientation to Today s Webinar Chuck Fuhs Parsons Brinckerhoff 1 April 1, 2010 Managed Lanes Buffer Not Separated Barrier Pylon 2 Managed Lane Operational Strategies Eligibility/occupancy Access control
More informationSnowmobile Trail Signing REF: DNR Trail Signing Handbook
AWSC FALL WORKSHOP TRAIL SIGNING & MAINTENANCE NOVEMBER 5, 2011 Workshop presenters: Larry Erickson, AWSC Trails Committee Chairman, Iron County Director Dave Peterson, Langlade County Director Snowmobile
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationprint materials visit information on free live seminars, online courses, and
The AOPA Air Safety Foundation is dedicated to making flying easier and safer for general aviation pilots. For information on free live seminars, online courses, and print materials visit. ILS Critical
More informationLincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016
Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs
More informationFort Bend County Tabulation BID Term Contract for Traffic Signs Posts and Supplies. Term: 1 October 2010 through 30 September 2011
Vendor Section 1: Complete Signs 3M Company St Paul MN Allied Tube Harey IL Custom Products Jackson MS Hall Signs Bloomington IN Interstate Highway Little Rock AR Ibis Signs Butler PA MD Solutions Plain
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationCHAPTER 2H. RECREATIONAL, HISTORICAL MARKER, TRAFFIC GENERATOR AND CULTURAL INTEREST AREA SIGNS
2006 Edition Page 2H-1 CHAPTER 2H. RECREATIONAL, HISTORICAL MARKER, TRAFFIC GENERATOR AND CULTURAL INTEREST AREA SIGNS Section 2H.01 Scope Recreational or cultural interest areas are attractions or traffic
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 21, 2018 To whom it may concern: The Colfax County
More informationDraft proposed amendments. Chapter Terminology
Draft proposed amendments Chapter 20.100 - Terminology 20.100.010 - General Terms The words and terms expressly defined in this chapter have the specific meanings assigned, unless the context expressly
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationGrade Crossings in High Speed Rail Corridors
Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission
More informationRailway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways
Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationTRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE January 11, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-007 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationKDOT announces approved February bids
IMMEDIATE RELEASE March 8, 2018 For more information: Kim Stich 785.296.3585 KDOT announces approved February bids The Kansas Department of Transportation announces approved bids for state highway construction
More informationIC Chapter 7.7. Railroad Grade Crossings Fund
IC 8-6-7.7 Chapter 7.7. Railroad Grade Crossings Fund IC 8-6-7.7-1 "Grade crossing" Sec. 1. The term "grade crossing" as used in this chapter means a crossing of any railroad and any public highway, street
More informationThe Olathe Quiet Zone
The Olathe Quiet Zone LEARNING TO LIVE WITH THE RAILROAD AS YOUR NEIGHBOR APWA August 18, 2008 1 2 BNSF At-Grade Crossings BNSF System Track Map Emporia - 88 TPD Ft Scott - 40 TPD Southgate 8 TPD 3 BNSF
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationMarch 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31
THOMAS P. DiNAPOLI STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER March 4, 2008 Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All
More informationProgress Report for Projects of Regional Significance
Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section
More informationROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982
ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Road Traffic (Pedestrian Crossings) (Jersey) Order 1982
More informationPART 2. SIGNS Chapter 2D. Guide Signs - Conventional Roads
PART 2. SIGNS Chapter 2D. Guide Signs - Conventional Roads TABLE OF CONTENTS Chapter 2D. GUIDE SIGNS - CONVENTIONAL ROADS Page Section 2D.1 Scope of Conventional Road Guide Sign Standards.............................
More informationFINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO
City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL
More informationAppendix E. Build Alternative Design Information
Appendix E. Build Alternative Design Information NORTHERN LIGHTS EXPRESS C/L SHIFTED MAINLINE TRACK C/L MAINLINE TRACK 5" 24: PROFILE GRADE 24: 24: PROFILE GRADE 24: 22' - 0" 22' - 0" SINGLE TRACK ON CURVES
More informationAGENDA ITEM I-6 Public Works
AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming
More information1.0 Purpose and Organization of the Community Impact Assessment Addendum
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,
More informationDEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA
Charles A. Kilpatrick, P.E. Commissioner DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Date: January 12, 2017 Order No.: 930 Various Project: FHWA: None District: NOVA
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations
ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This
More informationNational Highway-Rail Crossing Inventory Rule & GCIS
F E D E R A L R A I L R O A D A D M I N I S T R A T I O N National Highway-Rail Crossing Inventory Rule & GCIS 2015 National Highway-Rail Grade Crossing Safety Training Conference Arlington, TX November
More informationUS 19 Sunset Point Rd to Countryside Blvd.
Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started
More informationProvincial Railway Technical Standards
GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements
More informationNavigating Indiana Road Signage
Navigating Indiana Road Signage JOE BRUNO Traffic Administration Engineer Indiana Department of Transportation Presentation Overview Background Logo Program (Gas, Food, Lodging, & Camping Services) Attraction
More information(DEFINITIONS); FLAGS AND SIGNS:
153.002 (DEFINITIONS); FLAGS AND SIGNS: (adopted 07/12/16) Flag: A. Description: a piece of durable fabric of distinctive design attached to a permanent pole that is used as a symbol or decorative feature
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationPART 2. SIGNS Chapter 2M. Recreational and Cultural Interest Area Signs
PART 2. SIGNS Chapter 2M. Recreational and Cultural Interest Area Signs TABLE OF CONTENTS Chapter 2M. RECREATIONAL AND CULTURAL INTEREST AREA SERVICE SIGNS Page Section 2M.1 Scope.................................................................
More informationSouth Norfolk Jordan Bridge a private proposal by FIGG Bridge Developers. Chesapeake City Council Update June 23, 2009
South Norfolk Jordan Bridge a private proposal by FIGG Bridge Developers Chesapeake City Council Update June 23, 2009 A Private Bridge Proposal To: Restore a critical regional transportation link Reconnect
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationDriving Training Class. Presented by: Lancaster Airport Authority
Driving Training Class Presented by: Lancaster Airport Authority Driving is a Privilege Driving on the airport, airport apron and ramps is a privilege and can be revoked at anytime for any reason. Violations
More informationWorldwide Aircraft Services, Inc
Worldwide Aircraft Services, Inc Worldwide Aircraft Services, Inc. Springfield / Branson Regional Airport 2755 N. General Aviation Ave., Springfield, Missouri 65803 (417) 865-1879 # 0r Fax (417) 865-6884
More informationCity of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting
City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,
More informationADDENDUM NO. TWO AB
ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County
More informationCulpeper District. Albemarle County Monthly Report December 2011
Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed
More informationLUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS
LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118
More informationTransport Impact Assessment
Transport Impact Assessment Springbok Hotel Erf 5206, Springbok Northern Cape March 2018 5th Floor Imperial Terraces Carl Cronje Drive Tyger Waterfront Bellville, 7530 (021) 914 6211 (T) e mail: mail@itsglobal.co.za
More informationAldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering
Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 182 Chimney Rock Road Colorado Registered Professional Engineer Highlands
More informationNon-Motorized Transportation
Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can
More informationHIGHWAY GUIDE AND INFORMATION SIGN MANUAL
HIGHWAY GUIDE AND INFORMATION SIGN MANUAL Date of Issue: October 2006 Copyright October 2006 The Crown in the right of the Province of Alberta as represented by the Minister of Infrastructure and Transportation
More informationRunway and Taxiway Marking
Lecture-38 10CV63 TE-II Runway and Taxiway Marking In order to aid pilots in guiding the aircraft on runways and taxiways, pavements are marked with lines and numbers. These markings are of benefit primarily
More informationTENTS, CANOPIES AND TEMPORARY MEMBRANE STRUCTURES
INFORMATION BULLETIN TENTS, CANOPIES AND TEMPORARY MEMBRANE STRUCTURES Code Reference: Title 19 California Code of Regulations California Fire Code (CFC), 2001 Edition, Article 32 California Building Code
More informationTRANSMITTAL LETTER. Revisions to Publication 213 "Temporary Traffic Control Guidelines"
OS-299 (7-08) TNSMITTL LETTE PUBLICTION: 213 - pril 2010 Edition DTE: 04/01/10 SUBJECT: evisions to Publication 213 "Temporary Traffic Control Guidelines" INFOMTION ND SPECIL INSTUCTIONS: This replaces
More informationMichigan s Engineering Safety Program for Local Roadways
Michigan s Engineering Safety Program for Local Roadways Local Road Safety Peer Exchange October 2018 Timothy J. Gates, Ph.D., P.E., P.T.O.E. Michigan State University Andrew Ceifetz, P.E. WSP For More
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationSteven Bauer, Policy Advisory Committee Chairperson, Presiding
MINUTES BAY-LAKE REGIONAL PLANNING COMMISSION SHEBOYGAN METROPOLITAN AREA TECHNICAL AND POLICY ADVISORY COMMITTEES October 26, 2017 Sheboygan County Administration Building (Room 119), Sheboygan MEMBERS
More informationMajor Runway/Taxiway Maintenance Work Bangalore International Airport (Devanahalli) (08 MAR 2012 TO 04 MAY 2012)
AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS : VIDDYXAX FAX : 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN
More informationMemorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV
More informationAir Transport Safety & Security Checklist
Air Transport Safety & Security Checklist Air Transport Safety Components Item Description Example / Picture CAA Technical Library CAA Computer System CAA General Equipment Airport Emergency Planning Technical
More informationKDOT announces approved November bids
IMMEDIATE RELEASE Nov. 27, 2018 For more information: Kim Stich 785.296.3585 KDOT announces approved November bids The Kansas Department of Transportation announces approved bids for state highway construction
More information