DHS Consolidation at St. Elizabeths Master Plan Amendment. Transportation Interstate 295 / Malcolm X Avenue Interchange
|
|
- Jasmine Cook
- 5 years ago
- Views:
Transcription
1 Transportation Interstate 295 / Malcolm X Avenue Interchange Consulting Parties Meeting November 08, 2011 (Revised December 20, 2011)
2 Transportation I-295 / Malcolm X Avenue Interchange AGENDA Follow-up to October Consulting Parties meeting Evaluation Process for Hybrid Alternatives DDOT Contributions to Minimization Effort Current Hybrid Alternate 2B. Lane Widths Retaining Wall Heights Exhibits Cross Sections at selected locations Bridge Heights Renderings 2
3 Evaluation Process for Hybrid Alternatives 3
4 Evaluation Process for Hybrid Alternatives Variations of the DEIS alternatives were developed to: Further minimize footprint impacts to the parkland Address operational comments from the community, DDOT and DHS Alternative 2B will be identified as the preferred based on the following: Least amount of parkland impact acres Best addresses traffic movements, efficient access for DHS, JBAB and the community, traffic safety and operations through the corridor DDOT identified 2B as its preferred Early support from FHWA Hdqtrs and Division offices and no design exceptions increases our likelihood for the design getting approved during the IJR process Protects the integrity of the design and the achievements obtained through the 106 process Interchange design process: Preferred Alternative GSA ROD/MOA/NCPC MP Approval FHWA ROD Interchange Justification Report to DDOT IJR to FHWA FHWA Approval Design Development Final Design MOA/NCPC Final Design Approval 4
5 DDOT Contributions to Minimization Effort Construction of ramps to Malcolm X within DDOT ROW allowed for a reduction of parkland impact (quantified in the interchange cross sections identified in slides 18-31) A typical Bridge Design (where the bridge crosses the loop ramp) allowed for removing impact for an order of magnitude of 50' linearly over a distance of a few hundred feet. Lower Design Speed (25 mph design speed when 35 mph is preferred) allowed for minimized loop and smaller footprint 5
6 Hybrid Alternative 2B 6
7 South End South Capitol Street/I-295 7
8 Lane Widths 8
9 Lane Widths 9
10 Retaining Wall Heights Exhibits 10
11 Retaining Walls- Hybrid 2B 11
12 Retaining Walls - Hybrid 2B 12
13 Retaining Walls - Hybrid 2B 13
14 Retaining Walls - Hybrid 2B 14
15 Cross Sections at selected locations 15
16 I-295/Malcolm X Interchange Hybrid Alternative 2B 16
17 Access Rd - Hybrid 2B Profile 17
18 I-295/Malcolm X Interchange- Hybrid 2B Sta Minimized Parkland impacts approximately 23 feet by shifting toward I
19 I-295/Malcolm X Interchange- Hybrid 2B Sta Minimized Parkland impacts approximately 23 feet by shifting toward I
20 I-295/Malcolm X Interchange- Hybrid 2B Sta Minimized Parkland impacts 60 feet by shifting toward I-295 and moving Access Road over loop ramps 20
21 I-295/Malcolm X Interchange- Hybrid 2B Sta Minimized Parkland impacts 65 feet by shifting toward I-295 and moving Access Road over loop ramps 21
22 I-295/Malcolm X Interchange- Hybrid 2B Sta Minimized Parkland impacts 13.5 feet by shifting toward I-295 (partially into interstate ROW) 22
23 Shepherd Parkway south of Gate 4 Area Hybrid Alternative 2B 23
24 Shepherd Pkwy South of Gate 4 Area-Hybrid 2B Sta Minimized Parkland impacts 12 feet by shifting toward I
25 Shepherd Pkwy South of Gate 4 Area-Hybrid 2B Sta Minimized Parkland impacts 5 feet by shifting toward I
26 Shepherd Pkwy South of Gate 4 Area-Hybrid 2B Sta Minimized Parkland impacts 1.5 feet by shifting toward I
27 I-295/MLK/SCS (south end) Interchange Hybrid Alternative 2B 27
28 I-295/MLK/SCS (south end) Interchange-Hybrid 2B Sta Minimized Parkland impacts 13 feet by shifting toward I-295 (Partially into Interstate ROW) 28
29 I-295/MLK/SCS (south end) Interchange-Hybrid 2B Sta Minimized Parkland impacts 10 feet by shifting toward I-295 (Partially into Interstate ROW) 29
30 I-295/MLK/SCS (south end) Interchange-Hybrid 2B Sta Minimized Parkland impacts 77 feet by shifting toward I-295 (Partially into Interstate ROW) 30
31 I-295/MLK/SCS (south end) Interchange-Hybrid 2B Sta Minimized Parkland impacts 36 feet by shifting toward I-295 and South Capitol Street (Partially into existing ROW) 31
32 Bridge Heights Exhibit 32
33 Bridge Heights - Hybrid 2B 33
34 Questions & Answers 34
CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206)
CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA 98040-3732 (206) 275-7600 www.mercergov.org August 18, 2016 Mr. Daniel M. Mathis Division Administrator Federal
More informationHAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT
HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem
More informationInterstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by
Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section
More informationI-94 at Grand Avenue Interchange: The Ride before the Roller Coaster
I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster Introduction Presenters Lanyea Griffin, Executive Project Engineer, Illinois Tollway Rob Deming, Project Manager, Primera Engineers,
More information395 Express Lanes Project Update
395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement
More informationNDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT
NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT PM DIVISION RESPONSIBILITIES FHWA MAJOR PROJECTS TOTAL PROJECT COST
More informationPublic Informational Meeting
Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives
More information6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i June 22, 2015 6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY Last year, VDOT commissioned the Route 58 Corridor Study to develop a planning
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationWelcome to Dayton Parkway Interchange Open House. November 26, 2018
Welcome to Dayton Parkway Interchange Open House November 26, 2018 Project Partners Minnesota DOT Hennepin County City of Rogers Dayton Project History NW Hennepin County I94 Study 2007/08 Interchange
More informationPDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
o U.S. Department Washington Division Suite 501 Evergreen Plaza of Transportation 711 South Capitol Way Olympia, Washington 98501-1284 Federa' Highway (360) 753-9480 Administration (360) 753-9889 (FAX)
More informationAdd-A-Lane Contract V. along a Section of I-95 includes 6 Bridges
Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1 Agenda Project Update Overview Bid and Contract Award Schedule
More informationSCOPE Chapter 2D shall Apply to Any Road or
SCOPE Chapter 2D shall Apply to Any Road or Street other then Low-Volume Roads, Expressways, and Freeways Low Volume Roads: Shall be a Facility Lying Outside Built-Up Areas & Having a Traffic Volume Less
More informationMEETING MINUTES Page 1 of 5
Page 1 of 5 50178.000 May 26, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Citizens Advisory Committee Meeting MEETING LOCATION MEETING PURPOSE Amy Eckland ISSUED BY SIGNATURE PARTICIPANT See attached
More informationUS 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD
US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD PUBLIC MEETING JUNE 8, 2017 Talk Text Crash 2 AGENDA TECHNICAL PRESENTATION (Roma Area Engineer Eduardo Gracia, P.E.) PROJECT SCHEDULE
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationQEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.
SKYVIEW DRIVE KERNS and Highway 403 Freeman Interchange - ALTERNATIVE 3 Ÿ Widen by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange. Ÿ Widen Highway 403 by
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the
More informationRoute 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016
Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty
More informationDEIS Comments 1. Page iv, Permit or Approval, Federal, Franchise for use ofinterstate Right-of-Way (ROW)
RECEiVED 2 ~~ El751 u.s. Department of Transportation Federal Highway Administration Sound Transit Union Station 401 South Jackson Street Seattle, Washington 98104 Attention: East Link DEIS Comments Washington
More informationWELCOME US 83 Public Meeting
WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:
More informationMemorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV
More informationNFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue
Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationUS 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012
US 83 Relief Route City of La Joya City of Peñitas Hidalgo County November 15, 2012 TxDOT Mission: Work with others to provide safe and reliable transportation solutions for Texas. Public Meeting Agenda
More informationMeeting Notes Public Open House
Meeting Notes Public Open House, 5:30-8:00 pm Fairbanks Pipeline Training Center, 3605 Cartwright Court, Fairbanks, Alaska= Agenda: Open House: 30 minutes Presentation: 45 minutes Question and Answers:
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationRoad School. Project Overview. March 8, 2011
Road School March 8, 2011 Project Overview Roadway upgraded to freeway standards 13 miles of US 31 from I-465 to 216th Street Construction to begin in 2011 @ SR 38 and 146 th St Construction complete in
More informationPioneer Events Center
Planning Workshop for the Concept Design of the Pioneer Events Center Filer, Idaho May 3, 2014 With The Twin Falls County Fair Board and Staff By: Populous Architects / Planners David Forkner ASLA Principal
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationNCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes
More informationCITY OF APPLE VALLEY PLANNING COMMISSION MINUTES JULY 19, 2017
PLANNING COMMISSION MINUTES JULY 19, 2017 1. CALL TO ORDER The City of Apple Valley Planning Commission meeting was called to order by Chair Melander at 7:00 p.m. Members Present: Tom Melander, Ken Alwin,
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationRECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS
RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS National Scenario Planning Peer Exchange July 10, 2012 2012, All Rights Reserved. 1 MAG Transportation
More informationTYPICAL SECTION OF IMPROVEMENT
TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE 8 8 OR END TREATMENT IS REQUIRED FOR BRIDGE APOACH, ADD.5 TO
More informationGO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.
GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop. I-10 & Mesa Continuous Until further notice The right turn-only
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationMemorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility
Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,
More informationPARTS BOOK STANDARD FRAMELESS ELLIPTICAL TRAILER 40' LENGTH 76" SIDES
VERSION: APRIL 0 D PARTS BOOK STANDARD FRAMELESS ELLIPTICAL TRAILER 0' LENGTH " SIDES CONSTRUCTION TRAILER SPECIALISTS, INC. ROSE PARKWAY SIKESTON, MO 0 TOLL FREE: --000 PH: --0 FX: --0 E-MAIL:parts@trailerbuilders.com
More informationWork Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent
Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE
More informationStudy Overview and Context
Study Overview and Context North Shore Coordination Plan Study Study Highlights Early 2016 to December 2017 Consultant team assistance Steering Committee review Two rounds of public open house events Project
More informationPARTS BOOK STANDARD "PACK MULE" BOTTOM DUMP TRAILER
VERSION: MARCH 0 D PARTS BOOK STANDARD "PACK MULE" BOTTOM DUMP TRAILER CONSTRUCTION TRAILER SPECIALISTS, INC. ROSE PARKWAY SIKESTON, MO 60 TOLL FREE: -66-000 PH: --0 FX: --0 E-MAIL: parts@trailerbuilders.com
More informationPURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40
PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major
More informationEvaluation of Ramp Meter Effectiveness for Wisconsin Freeways, A Milwaukee Case Study: Part 2, Ramp Metering Effect on Traffic Operations and Crashes
Evaluation of Ramp Meter Effectiveness for Wisconsin Freeways, A Milwaukee Case Study: Part 2, Ramp Metering Effect on Traffic Operations and Crashes Project identification number 92-45-17 Final Report
More informationCommunity Development Department Council Chambers, 7:30 PM, December 20, 2012
STAFF REPORT 2012-56P: Alley Vacation Community Development Department Council Chambers, 7:30 PM, December 20, 2012 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Mike Voitik, Planning Technician
More informationProject Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your
More informationSelection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.
ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate
More information1.0 Purpose and Organization of the Community Impact Assessment Addendum
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,
More informationREPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE
REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE INFORMATION REPORT ON METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SUPPORT TO REGIONAL TRANSPORTATION PLANNING EFFORTS JUNE 2013 Purpose To inform
More informationSwanwick Airspace Optimisation. Work Package 1. November 2016: v1.6
Swanwick Airspace Optimisation Work Package 1 November 2016: v1.6 Contents Background Design Principles & Benefits Impact Assessment: Proposed STARs Change to Hold Definition Timeline/Engagement Slide
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationThornton Water Project. Larimer County Route Study and Project Update September 12, 2017
Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 6, 2010 SUBJECT: LAKE SHORE BOULEVARD STREETCAR SERVICE ACTION ITEM RECOMMENDATION It is recommended that the Commission
More informationGrade Crossings in High Speed Rail Corridors
Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission
More informationSR 934 Project Development And Environment (PD&E) Study
SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW
More information4.19 Parks, Recreation, and Conservation Lands
interchange would have on the Reed Paige Clark Homestead located on the north side of Stonehenge Road. Alternative D would also affect Palmer Homestead, E.F. Adams House, and Knapp Brothers Shoe Manufacturing
More informationMcLean Citizens Association Transportation Committee Project Briefing
McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight
More informationRECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES
RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES Proposed Amendment to the Regulation that Establishes Toll Rates for Use of the Dulles Toll Road November 2018 Purpose To brief the Dulles Corridor
More informationIntent to Request Revision From OMB of One Current Public Collection of. Information: Certified Cargo Screening Standard Security Program
This document is scheduled to be published in the Federal Register on 12/13/2018 and available online at https://federalregister.gov/d/2018-26931, and on govinfo.gov 9110-05-P DEPARTMENT OF HOMELAND SECURITY
More informationChicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014
Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»
More information2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION
2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION Travel Forecasting Subcommittee Friday, May 22, 2015 C. Patrick Zilliacus Figure 1 HOV System Overview Montgomery
More informationI-70/I-71 Project Public Meeting Presented By
I-70/I-71 Project Public Meeting Presented By Ohio Department of Transportation ms consultants, inc. engineers, architects, planners MSI Design June 9, 2010 W e l c o m e Thom Slack Planning Administrator,
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 24, 2010 SUBJECT: ACTION ITEM EXTENSION TO EXHIBITION LOOP RECOMMENDATIONS It is recommended that the Commission: 1.
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests
More informationSan Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center
San Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center Committee Members Present: Alex Amoroso Al Boro John Dupar Phil Frank Steve Kinsey Joan Lundstrom for Larry
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationSR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5
SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.
More informationMETROBUS SERVICE GUIDELINES
METROBUS SERVICE GUIDELINES In the late 1990's when stabilization of bus service was accomplished between WMATA and the local jurisdictional bus systems, the need for service planning processes and procedures
More informationSection 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps
Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and
More informationNoise Abatement Decision Report
Mid County Parkway NADR Noise Abatement Decision Report Noise Study Report, January 212 Riverside County, California 8-RIV-MCP PM./16.3; 8-RIV-2 PM 28./34.3 EA 8-F32 (PN 8125) April 212 This page intentionally
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationTRANSPORTATION PROGRAMS
High Speed Transit Corridor Studies Rail/Freight Session 2011 ITE/MSA Spring Conference Black Canyon Conference Center Phoenix, Arizona March 9, 2011 The Maricopa Association of Governments (MAG) is the
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationMEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017
Minutes of the MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017 Committee Members Present: Tony Yarusso, Rick Theisen, Robert Moeller, Todd Kemery, Sarah Hietpas, Margie
More informationRETAIL POTENTIAL ON 1/2 ACRE SITE
NO STANDING FEATURES: NEARBY: RETAIL POTENTIAL ON 1/2 ACRE SITE 20,000 SF ONE-STORY BUILDING ADJACENT TO NEWLY BUILT AUTOZONE CANARSIE - DIVISIONS AVAILABLE Building Dimensions: 200 x 100 Brooklyn Terminal
More informationURBANDALE TURNING ACCESS INTO OPPORTUNITY GRIMES JOHNSTON DES MOIN WINDSOR HEIGHTS CLIVE WEST DES MOINES
00th Street & I-/ Interchange Open In 08 Iowa Highway Flyover Ramp Open In 00 Meredith Drive & I-/ Interchange Open In 00 Meredith Drive & I-/ Northwest st Street Corridor GRIMES JOHNSTON Northpark Drive
More informationA number of goals were identified during the initial work on this Big Lake Transportation Plan.
C. Transportation General Background Information Big Lake s transportation system includes all the roads, paths and facilities that allow the movement of private vehicles, trains and planes, as well as
More informationV. DATA COLLECTION PROGRAM
V. DATA COLLECTION PROGRAM As discussed in Section IV, an extensive data assembly and data collection program was undertaken to develop the data necessary to calibrate the existing Portway Extensions model
More informationSpecial Committee on U.S. Route Numbering
Special Committee on U.S. Route Numbering Friday, May 4, 2007 Reg. 1 - K Sweeney, ME Reg. 2 - D Vaughn, AL Reg. 3 - K Keith, MO Reg. 4 - M Behrens, TX, Chair Secretary: Marty Vitale, AASHTO Staff At its
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationROUTE EBA EAST BUSWAY ALL STOPS ROUTE EBS EAST BUSWAY SHORT
ROUTE EBA EAST BUSWAY ALL STOPS ROUTE EBS EAST BUSWAY SHORT The EBA East Busway All Stops and EBS East Busway Short routes provide the core Martin Luther King Jr. East Busway services. Route EBA operates
More informationNorthfield to Ingle Farm #2 66 kv Sub transmission line
Header Reasonableness Test RT 011/11 Northfield to Ingle Farm #2 66 kv Sub transmission line RT011-11 Northfield to Inglefarm Page 1 of 8 Reasonableness Test: Northfield to Ingle Farm 66 kv line DISCLAIMER
More informationWeekly East Tennessee Construction Report for May 31-June 6, 2018
Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane
More informationProposed At-grade Crossings of Officially Recognized Trails Port MacKenzie Rail Extension Project
Proposed At-grade Crossings of Officially Recognized Trails Port MacKenzie Rail Extension Project 1.0 Introduction On November 21, 2011 the Surface Transportation Board (STB) issued a final decision (Docket
More informationU.S. 33 Ravenswood Connector
U.S. 33 Ravenswood Connector Project History When I-77 was planned to pass less than five miles east of Ravenswood, West Virginia in Jackson County, officials began taking steps to acquire an Ohio River
More informationArlington County Board Meeting Project Briefing. October 20, 2015
Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66
More informationExperience the environment
Experience it. Experience the environment The Grand is where CREATIVE, STATE-OF-THE-ART OFFICE meets inviting outdoor spaces featuring vibrant landscaping, pedestrian walkways and a two acre PROMINENT
More informationWEEKLY HIGHWAY ALERT RICHMOND DISTRICT
CONTACT: VDOT Customer Service 1-800-367-7623 November 18, Richmondinfo@VDOT.virginia.gov WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Below is a forecast of road construction that is expected
More informationT H E T O W N C E N T E R
T O W N C E N T E R T H E T O W N C E N T E R S imply redefining retail and entertainment in Southern Indiana: Jeffersonville Town Center is the first open-air retail center in the area combining upscale
More informationOctober 18, Terry Hartwick Director, North Little Rock Parks and Recreation 2700 Willow Street North Little Rock, AR 72114
October 18, 017 Terry Hartwick Director, North Little Rock Parks and Recreation 700 Willow Street North Little Rock, AR 7114 Dear Mr. Hartwick: Re: ARDOT Job Number CA060 30 Crossing Pulaski County The
More informationTraffic Calming Special Authorisations
Traffic Advisory Leaflet 3/93 May 1993 Traffic Calming Special Authorisations Introduction Legislation is now available to allow a wide range of traffic calming measures to be used on public roads. Some
More informationDEMOGRAPHICS AND EXISTING SERVICE
EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University
More informationA VISION FOR I-95. January 12, Delaware Department of Transportation
A VISION FOR I-95 January 12, 2011 Delaware Department of Transportation The East Coast s Main Street Along with SR 1, the most significant highway in Delaware 29 miles to I ".', 2 Sponsoring / Cooperating
More informationDulles Toll Road Rate Setting Process
Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On
More informationAPPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY
APPENDIX A DATA COLLECTION BIBLIOGRAPHY APPENDIX A DATA COLLECTION BIBLIOGRAPHY This section of the I-680 Corridor Study presents a summary (or bibliography) of the data that was collected and reviewed
More informationInstruction for edge trimming knife sharpening of M-Type shoe sewing machines
Instruction for edge trimming knife sharpening of M-Type shoe sewing machines 1. Introduction This instruction is a supplement to the instruction for use of electric table sharpener; thus the scope of
More informationPLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4
MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) MEETING #4 AGENDA & ACTION ITEMS Date/Time: Location: Monday, March 19, 2018 from 1:30-3:30 p.m. Thun Field Airport
More information