SE-3, 06 DEC 2018 to 03 JAN SE-3, 06 DEC 2018 to 03 JAN 2019
|
|
- Gregory Lee
- 5 years ago
- Views:
Transcription
1 (BEANO.BEANO3) BEANO THREE ARRIVAL HARDE ELMUC 132 (78) (90) 175 ARRIVALROUTE DESCRIPTION ELMUC TRANSITION (ELMUC.BEANO3): HARDE TRANSITION (HARDE.BEANO3): KATOK TRANSITION (KATOK.BEANO3): Landing East Rwy 08: From over BEANO on track 140 to MYLET, then on track 154 to W ESEN. Landing East Rwy 10: From over BEANO on track 140 to MYLET, then on track 140 to. Landing W est Rwy 26/28: From over BEANO on track 105 (W est & Southwest) BEANO THREE ARRIVAL (BEANO.BEANO3) (RNAV) N SHMUU KATOK 104 (79) 132 (68) 6 NM to MAELO, then on track 105 heading. Expect radar vectors. BEANO 140 (24) 105 MAELO (45) (RNAV) MYLET 140 (7) NOTE: This STAR applicable to Turbojet aircraft only. NOTE: Radar Required. (10) W ESEN
2 (CHAKA.CHAKA4) CHAKA FOUR ARRIVAL (RNAV) (W est & Southwest) ARRIVALROUTE DESCRIPTION ST MAARTEN TRANSITION (PJM.CHAKA4): Landing East Rwy 08: From CHAKA on track 279 to REKUA, then on track 260 to PLENA, then on track 347 to W ESEN. Landing East Rwy 10: From CHAKA on track 279 to REKUA, then on track 281 to GARCY, then on track 011 to. N GARCY W ESEN REKUA 6 NM CHAKA 5100 (4) (19) (13) (11) 3500 (113) 347 PLENA JUICE (32) NOTE: This STAR applicable to Prop and Turboprop aircraft only. NOTE: RADAR Required. ST. MAARTEN PJM CHAKA FOUR ARRIVAL (RNAV) (CHAKA.CHAKA4) 13JAN11
3 (JOSHE.JOSHE3) (WEST & SW) (NORTH & EAST) PAPPO MAELO MYLET (8) (20) (17) (16) MELLA 099 (86) JOSHE NM 5700 ZUGOD (6) (12) VARNA YEPUP NOTE: This STAR applicable to turbojet aircraft only. NOTE: Radar required. (35) (6) NOTE: GPS required. GABYY KYAAK (120) (35) (126) (35) ZNDER 351 (165) SCAPA ARMUR KIKER (NARRATIVE ON FOLLOWING PAGE) (JOSHE.JOSHE3)
4 (JOSHE.JOSHE3) ARRIVAL ROUTE DESCRIPTION ARMUR TRANSITION (ARMUR.JOSHE3): KIKER TRANSITION (KIKER.JOSHE3): MELLA TRANSITION (MELLA.JOSHE3): SCAPA TRANSITION (SCAPA.JOSHE3): LANDING EAST RWY 8: From over JOSHE on track 078 to YEPUP, then on track 078 to VARNA. LANDING EAST RWY 10: From over JOSHE on track 067 to ZUGOD, then on track 067 track to. LANDING WEST RWYS 26/28: From over JOSHE on track 049 to MYLET, then on track 049 to PAPPO, then on track 105 to MAELO, then on heading 105. Expect RADAR vectors to final approach course. (JOSHE.JOSHE3)
5 (SAALR.SAALR2) SAALR TWO ARRIVAL(RNAV) NOTE: This STAR applicable to Turbojet aircraft only. NOTE: Radar Required. LENNT 204 (115) THANK (West & Southwest) (106) WEXET (30) SAALR 4 NM (24) PLENO FLABO 197 (4) (15) 162 (27) (15) 3200 FRNDO PAPPO 194 (8) (16) MAELO WESEN ARRIVAL ROUTE DESCRIPTION LENNT TRANSITION (LENNT.SAALR2): THANK TRANSITION (THANK.SAALR2): From WEXET on track 172 to SAALR, then via assigned runway transition. Landing East Rwy 08: From over SAALR on track 167 to FLABO, then on track 194 to FRNDO, then on track 194 to WESEN. Landing East Rwy 10: From over SAALR on track 167 to FLABO, then on track 197 to PLENO, then on track 197 to. Landing West Rwys 26/28: From over SAALR on track 162 to PAPPO, then on track 105 to MAELO, then on heading 105. Expect radar vectors to final approach course. SAALR TWO ARRIVAL(RNAV) (SAALR.SAALR2) 23SEP10
6 (TROCO.TROCO3) TROCO THREE ARRIVAL (RNAV) 011 GARCY NOTE: This STAR applicable to Turbojet aircraft only. NOTE: Radar Required. W ESEN REKUA (4) 347 PLENA (13) (11) 322 (16) YUNKE 7 NM TROCO MAVIE ARRIVALROUTE DESCRIPTION GABAR TRANSITION (GABAR.TROCO3): ILURI TRANSITION (ILURI.TROCO3): MODUX TRANSITION (MODUX.TROCO3) ST MAARTEN TRANSITION (PJM.TROCO3): N From over MAVIE on track 315 to TROCO, thence via assigned runway (9) 315 transition. Landing East Rwy 08: From over TROCO on track 322 to REKUA, then on track 260 to PLENA, then on track 347 to W ESEN. Landing East Rwy 10: From over TROCO on track 322 to REKUA, then on track 281 to GARCY, then on track 011 to. Landing W est Rwy 26/28: From over TROCO on track 317 to YUNKE, then heading 023. Expect radar vectors. (14) (113) 285 (108) GOUDA DANDE 305 (160) 317 (180) SAINT MAARTEN PJM (W est & Southwest) 270 (32) (39) GABAR MODUX ILURI TROCO THREE ARRIVAL (RNAV) (TROCO.TROCO3)
Major engine repairs are available.
irport Information etails for City State/Province Country PRI Latitude N 26' 2.4" Longitude W 66 00' 07.69" Elevation 9 Longest Runway 0400 Magnetic Variance W.0 Fuel Type 00-30 octane fuel is available
More informationZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE
ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT EFFECTIVE: July 10, 2010. SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services in the airspace described
More informationAL-469 (FAA) CARTERSVILLE BRTEN DOBBINS ARB FULTON COUNTY AIRPORT- BROWN FIELD. BOKRT Turbojets: Expect K Turboprops: Expect 9000 or 7000
(BOKRT.BOKRT2) 17285 BOKRT TWO ARRIVAL(RNAV) AL-469 (FAA) FULTON AIRPORT- ATIS COBB INTL- ATIS GWINNETT -BRISCO FIELD ATIS APP CON 119.8 354.125 BRTEN 075 (22) BAPPY CHEROKEE 082 (2) KENZI COBB INTL- LEE
More informationSE-3, 01 FEB 2018 to 01 MAR SE-3, 01 FEB 2018 to 01 MAR 2018
EADEN TRANSITION (EADEN.CURSO5) then on track 072 to MNNDY. (DVALL.CURSO5) CURSO FIVE ARRIVAL 124.85 322.3 MIAMI INTLD-ATIS 119.15 MIAMI-OPA LOCKA ATIS CURSO MIAMI ATIS 124.0 072 249 069 18032 HOMESTEAD
More informationVATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures
VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating
More informationSE-3, 11 OCT 2018 to 08 NOV SE-3, 11 OCT 2018 to 08 NOV 2018
EADEN TRANSITION (EADEN.CURSO5) then on track 072 to MNNDY. (DVALL.CURSO5) CURSO FIVE ARRIVAL 124.85 322.3 INTLD-ATIS 119.15 -OPA LOCKA ATIS CURSO ATIS 124.0 072 249 069 18032 HOMESTEAD ARB ATIS 132.275
More informationBAIRN FOUR ARRIVAL(RNAV) (BAIRN.BAIRN4) SE-3, 09 NOV 2017 to 07 DEC SE-3, 09 NOV 2017 to 07 DEC 2017 (BAIRN.BAIRN4)27APR17
(BAIRN.BAIRN4) BAIRN FOUR ARRIVAL(RNAV) LEESBURG SANFORD 275 POPYE KMCO Landing South: Expect RADAR vectors after POPYE. D-ATIS APP CON 125.55 338.2 RAMEZ NOTE: RADAR required. NOTE: DME/DME/IRU or GPS
More informationATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT
ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT EFFECTIVE: March 1, 2011 SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services
More informationVATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT
VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT SUBJECT: TERMINAL AREA CONTROL SERVICE EFFECTIVE: September 1, 2016 1. PURPOSE. This agreement delegates authority and establishes procedures
More informationVERO BEACH VRB Chan 120 N W L-23-24, H-8 PHORD N W
(48) 163 (28) 165 (27) R-345 (24) 163 (40) 174 (13) 174 N (ANNEY.ANNEY1) 08157 ANNEY ONE ARRIVAL N28 32.88 W80 48.63 PCMAN ORMOND BEACH 112.6 OMN N29 18.20 - W81 06.76 L-21-23-24, H-8 Chan 73 OMN 110.0
More informationMAR-A-LAGO TFR PROCEDURES
MAR-A-LAGO TFR PROCEDURES PBI PLAYBOOK Presented to: Pilots and Stakeholders By: USSS and FAA Date: PBI Departure PBI Arrival BCT CAYSL Arrival BCT Departure Traffic 12-26-2016 2 Table of Contents Chapter
More informationSW-3, 11 OCT 2018 to 08 NOV SW-3, 11 OCT 2018 to 08 NOV 2018
(BRDR7.BROWS) 20AUG5 BORDER SEVEN DEPARURE AKEOFF RUNW AY 9: Climb on heading 093 to intercept MZB VORAC R-096 to BROW S IN. hence... AKEOFF RUNW AY 27: Climb on heading 278 until PGY 9 DME, then left
More information2018 UNITED STATES GRAND PRIX SPECIAL AIR TRAFFIC PROCEDURES
2018 UNITED STATES GRAND PRIX SPECIAL AIR TRAFFIC PROCEDURES AUSTIN, OCTOBER 19 21, 2018 In anticipation of a large number of aircraft operating in the Austin, Texas area during the United States Grand
More informationProvidence ATCT Standard Operating Procedures
This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for
More information- Initial. - Added MCRAY and new PDC s. - General update. - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes
Z D C A R T C C - Initial - Added MCRAY and new PDC s - General update - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes - Added altitude restrictions to nearby
More information- Updated formatting - Re-drawn airspace delegation diagram
Z D C A R T C C - Updated formatting - Re-drawn airspace delegation diagram Change Log... 2 Table of Contents... 3 Chapter 1. Positions... 4 Chapter 2. Clearance Delivery... 5 Chapter 3. Ground Control...
More informationStanfield VOR Procedures
Stanfield VOR This PowerPoint is not intended as a directive. It is intended to serve as a tool to communicate the training community s best practices. Any questions or concerns to these procedures are
More informationRALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES
RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES January 3, 2017 BULLETIN NUMBER RECORD OF CHANGES SUBJECT AUTHORIZED BY DATE ENTERED DATE REMOVED 7110.100 Initial RR 1/3/17 3/25/17 7110.101 Added
More informationFLIGHT PROCEDURE AT SUVARNABHUMI INTERNATIONAL AIRPORT
Phone: 66 02 568 8831 Fax: 66 02 576 1903 AFTN: VTBAYOYX E-mail: aisthai@caat.or.th ais@caat.or.th THE CIVIL AVIATION AUTHORITY OF THAILAND Aeronautical Information Service Department 333/105 Lak Si Plaza,
More informationNextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures
NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport
More informationAirservices Australia 2016
Airservices Australia 2016 Airservices Australia 2016 Airservices Australia 2015 Airservices Australia 2016 Airservices Australia 2016 ATIS (H24) (TWR HR) APP TWR SMC ACD FIA (AH) GOLD COAST, QLD (YBCG)
More informationPiedmont Triad International Airport
ZTL ARTCC Piedmont Triad International Airport Airport Traffic Control Tower Standard Operating Procedures GSO 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign
More informationBAYPO SEVEN DEPARTURE (RNAV)
(30) 005 (10) (BAYPO7.BAYPO) BAYPO SEVEN DEPARURE (RNAV) D-AIS DEP AMPA DEP CON 118.8 239.3 AMPA OWER 119.5 269.4 OP ALIUDE: ALMA 6000 AMG CAMJO FL220 013 (62) 028 FL220 (29) FL220 028 CARRD DUNKN (66)
More informationBurlington ATCT Standard Operating Procedures
This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for
More informationProject Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures
VIA E-MAIL Date: To: From: Subject: Boston Technical Advisory Committee (BOS/TAC) Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures At the February 17, 2006 BOS/TAC meeting several issues
More informationCharlotte - Douglas International Airport Traffic Control Tower
Charlotte - Douglas International Airport Traffic Control Tower Standard Operating Procedures CLT ATCT 7110.65D Effective: May 1, 2011. 1 1-1-1. Callsign Usage and Frequency Delegation: CHAPTER 1. GENERAL
More informationTERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW
TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW NAV CANADA Level of Service & Aeronautical Studies 77 Metcalfe Street, 5th Floor Ottawa, Ontario K1P 5L6 April, 2013 The information and diagrams contained
More informationLAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT
LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT COAST, LAKE, DESERT FNO FRIDAY, AUGUST 17, 2018 TABLE OF CONTENTS GENERAL BRIEFING 2 AIRPORT/RUNWAY CONFIGURATIONS 3 DEPARTURE BRIEFING 4 ARRIVAL BRIEFING
More informationFederal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017
Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment
More informationAlbuquerque Center Standard Operating Procedures
Albuquerque Center Standard Operating Procedures ZAB Order 7310.001 Albuquerque ARTCC 07 May 2018 Contents 1 Purpose 1 2 Roles and Responsibilites 1 3 Distribution 1 4 Positions 1 4.1 Simplified Positions...........................................
More informationNoise Compatibility Report
` Noise Compatibility Report 2018 1st Quarter May 22, 2018 Disclaimer Sound levels were unavailable between Oct. 6 th and May 22 nd, 2018. On May 22 nd, new state of the art monitors were installed. Adherence
More informationOMAKA OMAKA OMAKA/WOODBOURNE VICINITY ELEV 100 NZOM. Effective: 18 NOV 10 WOODBOURNE TOWER: WOODBOURNE ATIS: UNATTENDED: 122.
ELEV 100 NZOM NZOM AD 2-31.1 /WOODBOURNE VICINITY WOODBOURNE TOWER: 122.8 118.1 WOODBOURNE ATIS: 126.05 UNATTENDED: 122.8 Changes from 19 NOV 09: Chart coverage, T658 amended to T654 with minor boundary
More informationSafety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6
Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance
More informationAERODROME CHART ATIS CLNC DEL
EFF 10 NOV 16 AERODROME CHART ATIS 121.0 CLNC DEL 123.95 GND 121.9 275.8 -AD TWR 118.4 236.6 TML 119.2 DECL DISTS 05 23 14 32 TORA 10500 10500 7700 7700 TODA 11189 11189 8684 8684 ASDA 10500 10500 7700
More informationMODULE 4: SIDs and STARs. Slide <#> of
MODULE 4: SIDs and STARs Slide of OUTLINE Objective: To understand SIDs and STARs and their applications CONTENT: WHAT ARE SIDS AND STARS COMMON ELEMENTS CHARTS PROCESSING OF SIDS AND STARS VECTORING
More informationPROPOSED CHANGES FOR THE CAR REGION ATS ROUTE STRUCTURE. (Presented by the Secretariat) SUMMARY
CNS/ATM/SG/2-WP/28 11/10/10 International Civil Aviation Organization CAR/SAM Regional Planning Implementation Group (GREPECAS) Second Meeting of the Communications, Navigation and Surveillance / Air Traffic
More informationJeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen
Airport Information For MLR Printed on 27 Jan 2018 Page 1 (c) SANERSON, INC., 2018, ALL RIGHTS RESERVE jep= JeppView for Windows General Information Location: LA ROMANA OM ICAO/IATA: MLR / LRM Lat/Long:
More informationPart 150 Update Status and Recommendation
Part 150 Update Status and Recommendation Presentation to: Noise Compatibility Committee October 26, 2010 Ted Baldwin 2 Topics Part 150 background Project status Noise Exposure Map Noise Compatibility
More informationSouthern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower
Southern California Terminal Radar Approach Control and Ontario Airport Traffic LETTER OF AGREEMENT SUBJECT: Interfacility Coordination and Control Procedures Effective: August 16, 2013 1. PURPOSE: This
More informationDenver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES
Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES OCTOBER 7, 2018 Definition of Airspace Colorado Springs Class C airspace is defined as show in Appendix 1. Definition of Positions
More informationVirtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures
Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures DAB 7210.3E Effective Date: May 11, 2015 Chapter 1. General 1 1. General Information obtained in this
More informationVirtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)
Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) KDAL Dallas Love International Airport ATCT Standard Operating Procedures Rev. December 17, 2014 Approved:
More informationUPDATE ON THE 6 IDEAS (1-4) NAV CANADA
UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival
More information9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures
Raleigh-Durham Air Traffic Control Tower Standard Operating Procedures 1) Purpose This order defines duties and responsibilities, depicts areas of airspace, runways, and taxiways allocated to each position
More informationDon-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs
Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India
More informationPi Aero Instrument Rating Syllabus
This syllabus was created in order to maintain a high level of positive training as well as meet the minimum hours required by the Federal Aviation Regulations Part 61. There are four sections to this
More informationAtlanta NextGen PBN Activities
Atlanta NextGen PBN Activities Presentation to: Name: Date: EWG Ops SC Meeting Jim Arrighi RNAV/RNP Group Jim Allerdice A80 May 18, 2010 0 0 Atlanta Performance Based Navigation Project Planning Seven
More informationPTA RADAR M INI MUM ALTI TUDE S PUERTO PLATA, DOM REP MDPP/POP PTA ,000 13,000 PUERTO PLATA
10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 20-30 270^ 300^ 20-00 19-30 19-00 18-30 Approach 119.0 250^ CHANGES: New chart. 330^ 60 6000 8000 6000 R-251 2556' 6037' 7589' 4829' R-320 13,000 10128'
More informationFEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC
FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC LETTER OF AGREEMENT Effective: April 10,2012 SUBJECT:
More informationAPPENDIX B DRO INSTRUMENT APPROACH CHARTS & DEPARTURE PROCEDURES
APPENDIX B INSRUMEN APPROACH CHARS & DEPARURE PROCEDURES DURANGO, COLORADO LOC I- Rwy Idg APP CRS DZE 09. Apt Elev 920 668 6685 AL-480 (FAA) ILS or LOC/DME RWY DURANGO-LA PLAA COUNY() DME from VOR/DME.
More informationSOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC
SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 3 1-1. PURPOSE 3 1-2. SCOPE OF RESPONSIBILITIES
More informationIRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority
IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance
More informationAnnecy Airport IFR briefing For indication only
1 DISCLAIMER The pieces of information provided are published only for indication, and are not exhaustive. We make our best effort to keep them updated. They are a valuable complement for flight preparation
More informationAnchorage ARTCC Phraseology Guide. Clearance Delivery Operations
Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationEffective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@australia.com Effective: AIP SUPPLEMENT (SUP) AIRAC H 04/19 201902271600
More informationNoise Compatibility Year End, 2012
Year End, 2012 April 5, 2013 Noise Highlights of 2012 Airport operations for Year 2012 were down 3.97%, compared to Year 2011. The FAA issued a Record of Approval (ROA) for the new Program (NCP) Update
More informationRNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement
RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement Dr. Philipp Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) ICANA, Frankfurt, November 2016 DIESER TEXT DIENT DER NAVIGATION
More informationCHAPTER 1 INTRODUCTION AND BACKGROUND
CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National
More informationIndependent Parallel Runway Visual Approach in Beijing Capital Airport
Independent Parallel Runway Visual Approach in Beijing Capital Airport SUMMARY Basic Concepts of Visual Approach The Promoting Process Of Visual Approach (including The Preparation) The Implementation
More information11/21/2008 ZDC-ZTL LOA Version 1. Letter of Agreement
Letter of Agreement Atlanta ARTCC Washington ARTCC SUBJECT: INTER-CENTER COORDINATION PROCEDURES 1) PURPOSE This Agreement between the Virtual Atlanta ARTCC (vztl) and Virtual Washington ARTCC (vzdc) covers
More informationAnnecy Airport IFR briefing For indication only
1 DISCLAIMER The pieces of information provided are published only for indication, and are not exhaustive. We make our best effort to keep them updated. They are a valuable complement for flight preparation
More informationNETHERLANDS ANTILLES ATC PHRASEOLOGY GUIDE ATC OPERATIONS BY: MATHIEU LAFLAMME
NETHERLANDS ANTILLES ATC PHRASEOLOGY GUIDE ATC OPERATIONS!1 GENERAL This guide is made for controller in AN division. Use this guide if controlling Sint Maarten (TNCM) and Curaçao (TNCF). This guide is
More informationFINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014
FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 AIB/AAI/CAS.109 Air Accident Investigation Bureau of Singapore Ministry of Transport Singapore 11 November 2015 The Air
More informationFlying an Approach with the Garmin GTN 750
Flying an Approach with the Garmin GTN 750 www.bruceair.com BruceAir at Wordpress YouTube: BruceAirFlying Using the Flight Plan Page Use the Flight Plan page to activate the approach Direct-To a fix or
More informationVIRTUAL AIR TRAFFIC SIMULATION NETWORK CARIBBEAN DIVISION ZSU SAN JUAN CERAP
VIRTUAL AIR TRAFFIC SIMULATION NETWORK CARIBBEAN DIVISION ZSU SAN JUAN CERAP ORDER SJU 7110.1T SUBJ: San Juan Luis Muñoz Marín International Airport Air Traffic Control Tower Standard Operating Procedures
More informationUNIVERSITY OF ALABAMA FOOTBALL
UNIVERSITY OF FOOTBALL SPECIAL AIR TRAFFIC PROCEDURES TUSCALOOSA, AL September 16, 2017 November 18, 2017 The following procedures will be implemented to enhance safety and minimize delays during the following
More informationAERONAUTICAL INFORMATION CIRCULAR 18/18
NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual
More informationEXAMPLE RADIO SCRIPTS. Fly Safe! Flight Following Wichita Approach, this is, checking in at,
EXAMPLE RADIO SCRIPTS Wichita Approach Control offers flight following, wind & altimeter readings and practice approaches for VFR aircraft. The following scripts may prove helpful when requesting services.
More informationPBN Implementation inside Italian Airspace Status update Summer 2013
PBN Implementation inside Italian Airspace Status update Summer 2013 Paris, 11-13 September 2013 enav.it Contents Tasks achieved PBN implementation schedules On going activities Further aspects Conclusions
More informationNAVAL AIR STATION WHIDBEY ISLAND AIR TRAFFIC CONTROL FACILITY
NAVAL AIR STATION WHIDBEY ISLAND AIR TRAFFIC CONTROL FACILITY Operating within or near the Whidbey (NUW) Class Charlie Airspace CLASS C & AIRSPACE BRIEFS IMPROVE AIRSPACE KNOWLEDGE ASK QUESTIONS/EXPRESS
More informationMAR-A-LAGO POTUS TFR USER & STAKEHOLDER BRIEFING. Federal Aviation Administration. By: PBI Air Traffic Control Date: January 19, 2017
MAR-A-LAGO POTUS TFR USER & STAKEHOLDER BRIEFING By: PBI Air Traffic Control Date: 1 December 26, 2016 PBI Departure PBI Arrival BCT CAYSL Arrival BCT Departure 2 PBIA & Mar-a-Lago 2.1 NM 3 POTUS TFR Surface-17,999
More informationVATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT
VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT EFFECTIVE: 02/01/2019 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of
More informationFirstly, from VATSAF (VATSIM Southern African Division), we would like to welcome you and thank you for taking part in the Vanilla Triangle Event.
Firstly, from VATSAF (VATSIM Southern African Division), we would like to welcome you and thank you for taking part in the. In this pilot brief you will find a guide for each leg, which will assist you
More informationDubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept
DANS LIDAR wake vortex data campaign, deployment of Dependent Diagonal approaches and ongoing work to prepare RNP Parallel Approach Transition (RPAT) concept for implementation Roberto Ghidini Dubai contest
More informationLFMN / Nice Côte-d Azur / NCE
This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main
More informationWide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update
Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update Presented to: By: Date: CGSIC Leo Eldredge, FAA September 24, 2008 Agenda WAAS Architecture WAAS Services Overview
More informationIFR SEPARATION WITHOUT RADAR
1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s
More informationStandard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control
SUBJ: Air Traffic Control This order prescribes air traffic control procedures and phraseology for use by personnel providing air traffic control services. Controllers are required to be familiar with
More informationINTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME
INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016!1 GENERAL Proper use of phraseology is one of the most important thing in aviation and
More informationAmendment and Establishment of Restricted Areas; Chincoteague Inlet, VA
4910-13 This document is scheduled to be published in the Federal Register on 11/07/2016 and available online at https://federalregister.gov/d/2016-26760, and on FDsys.gov DEPARTMENT OF TRANSPORTATION
More informationNE-2, 04 JAN 2018 to 01 FEB NE-2, 04 JAN 2018 to 01 FEB 2018
(GLDMN5.GLDMN) GLDMN FIVE DEPARURE (RNAV) D-AIS 127.05 LAGUARDIA OW ER NEW EL ELIO ZIMMZ PARKE LANNA BIGGY COAE AKEOFF OBSACLE NOES: HUGUENO HUO NEION SPARA SAX GLDMN HAAYS 340 GAYEL AKEOFF MINIMUMS: Rwy
More informationVersion O January 21, 2019
Bradley ATCT and Y90 TRACON Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not
More informationAn Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown
An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown Field Municipal and Navy North Island Airports October
More informationSouthern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES
Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT EFFECTIVE: September 13, 2012 SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES 1. PURPOSE. This agreement establishes procedures
More informationSafety and Airspace Regulation Group
Safety and Airspace Regulation Group All NATMAC Representatives 18 August 2014 CAA DECISION LETTER 1. INTRODUCTION BRISTOL INTERNATIONAL AIRPORT (BIA) RNAV STARS 1.1 During January 2014, the Civil Aviation
More informationStandard Operating Procedures (SOPs) for BAGHDAD (ORBI)
Pag.1 of 11 Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Index 1. FOREWORD... 3 2. ATC UNITS... 3 3. RECOMMENDATIONS... 3 3.1. TRANSITION ALTITUDE/LEVEL... 3 3.2. SEMI-CIRCULAR FLIGHT LEVEL
More informationOptimization of Airspace and Procedures in the Metroplex
Optimization of Airspace and Procedures in the Metroplex Administration November 10, 2016 Chart Date To: By: Dispatchers Rob Henry, SoCal D&I Integration Manager Jose Gonzalez, SoCal NATCA D&I Lead Administration
More informationIFR 91.157 Must be instrument rated to fly special VFR at Night (civil twilight to civil twilight, sun 6 degrees below horizon) 91.159 Unless in a holding pattern of 2 minutes or less, VFR cruising altitude
More informationNoise Compatibility Year End Report. March 7, 2011
2 Year End Report March 7, 2 Noise Highlights of 2 Airport operations for Year 2 were down 3.2%, compared to Year 29 Operations of aircraft meeting Stage 3 requirements through presence of a hush kit for
More informationPROCEDURES SPECIAL OPERATIONS
Intentionally left blank A318/A319/A320/A321 PRELIMINARY PAGES - TABLE OF CONTENTS PRO-SPO-51 Required Navigation Performance (RNP) General...A RNAV 10 / RNP 10... B RNAV 5 / BRNAV...C RNAV 1 RNAV 2 /
More informationBOSTON ARTCC (vzbw) TRAINING SYLLABUS LEVEL: Center Controller (C1)
BOSTON ARTCC (vzbw) TRAINING SYLLABUS LEVEL: Center Controller (C1) I have lots more to do, a lot more to keep track of, so I ll do it right the first time and won t suck at it. (vzbw Center Controller
More informationSan Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)
San Juan CERAP Standard Operation Procedures Version 2.2 May 5th, 2013 Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) You are entering one of the most fascinating Combined Enroute Radar Approach Control
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationVATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT
VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT EFFECTIVE: 01/16/2019 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of
More informationDSNA NAVIGATION STRATEGY
DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,
More informationBOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB
BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE ALBANY ATCT (KALB( KALB) ALBANY APPROACH (ALB APP) RELEASE RECORD Version Date Author Notes 1.0 24 April 2009 Initial Release 1.1 30 Jan 2015 BN Match ALB5
More informationJeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen
Airport Information For EHL Printed on 27 Jan 208 Page (c) SANERSON, INC., 208, ALL RIGHTS RESERVE jep= JeppView for Windows General Information Location: LUEBECK EU ICAO/IATA: EHL / LBC Lat/Long: N53
More informationSouth Dakota Airports Conference
South Dakota Airports Conference Federal Aviation Presented to: By: Date: Conference Attendees Barry D. Cooper March 18, 2015 Legislation: FAA Reauthorization Annual Appropriation Sequester Federal Aviation
More informationGreenville Spartanburg International
ZTL ARTCC Greenville Spartanburg International Airport Traffic Control Tower Standard Operating Procedures GSP 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 2-1-1. Callsign
More information