VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT
|
|
- Randolph Ward
- 5 years ago
- Views:
Transcription
1 VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT SUBJECT: TERMINAL AREA CONTROL SERVICE EFFECTIVE: September 1, PURPOSE. This agreement delegates authority and establishes procedures for the control of IFR and Special VFR traffic on the VATSIM network within the terminal area described herein and is supplementary to FAA Order , Air Traffic Control Handbook and VATSIM Network Policies and Procedures. 2. SCOPE. Minneapolis ARTCC (ZMP) delegates to Minneapolis Approach Control (M98) the airspace described in Attachment A for the control of IFR traffic at and below 17,000 ft MSL. 3. RADAR PROCEDURES. Unless otherwise coordinated, the following procedures shall apply: a. Handoffs. Aircraft entering ZMP from M98 airspace shall have at least 5 NM constant or increasing radar separation when radar vectored for the same fix on similar tracks. b. Transfer of control for turns ± 30 degrees from the assigned heading to: (1) M98 shall occur when the arriving/overflight aircraft are within 10 NM of ZMP/M98 boundary providing that M98 make any necessary point outs to other affected control positions. (2) ZMP shall occur when the departing aircraft are at least 25 NM from the MSP VOR or leaving 11,000 feet providing that ZMP make any necessary point outs to other affected control positions. c. M98 shall have control for descent of satellite STAR aircraft within 10 NM of the M98/ZMP boundary, except at AGUDE. M98 shall have control for descent of 7000 MSL satellite STAR aircraft at AGUDE within 10 NM of the M98/ZMP boundary. d. Beacon Code Assignments. Normal beacon codes, as assigned by IDS or ZMP RBCAS, shall be used at all times except when IDS or RBCAS are out of service. e. Departures (1) M98 shall issue enroute clearance provided: (a) Aircraft are cleared at 17,000 feet MSL or below. (b) Departures 6,000 feet MSL and below will be as filed (c) Departures filed 7,000 or 8,000 feet MSP shall be on a heading to clear satellite STAR arrival areas.
2 (2) M98 shall establish departing aircraft filed for 9,000 feet MSL or above in the appropriate ZMP sector, clear of STAR arrival areas on: (a) The appropriate MSP SID, or (b) A heading to join the appropriate SID within 50 miles of the MSP VOR, or (c) For the ROCHESTER SID, when departing Runway 12, a heading to join at or east of FOBUG and prior to CORDY, or (d) For the DARWIN SID from a position at or north of INUNE, direct DWN, or (e) For non-sid qualified aircraft, an assigned heading for a vector to: 1 Enter ZMP airspace east of the GEP STAR on a heading to maintain a track of 350 to 020 magnetic; e.g., Brainerd, Park Rapids, Grand Forks, Duluth, or Winnipeg. 2 Enter ZMP airspace west of the GEP STAR on a heading to maintain a track of 290 to 300 magnetic; e.g. Fargo, Alexandria, Bismarck or Jamestown. 3 Enter ZMP airspace north of the ENCEE STAR on a heading to maintain a track of 265 to 285 magnetic; e.g., Aberdeen, Watertown, or Rapid City. 4 Enter ZMP airspace on a heading to maintain a track of 210 to 240 magnetic; e.g., O'Neill, Sioux Falls, Redwood Falls, Kansas City, Fort Dodge, Mason City, or Des Moines. 5 Enter ZMP airspace east of the KASPR STAR on a heading to maintain a track of 140 to 160 magnetic when filed for 10,000 MSL or above; e.g., Waterloo, Rochester, Dubuque, or Waukon. 6 Enter ZMP airspace south of the WILDD STAR on a heading to maintain a track of 100 to 130 magnetic; e.g., Nodine, Dells, La Crosse, or Madison. 7 Enter ZMP airspace north of the AGUDE STAR on a heading to maintain a track of 040 to 060 magnetic; e.g., Rhinelander, Sault Ste. Marie, Marquette, Iron Mountain, or Eau Claire. (3) Prop aircraft requesting 12,000 feet MSL or higher shall be climbed to or level at 12,000 feet. ZMP shall have control for climb of these aircraft at 25 NM from MSP VOR. (4) M98 departures filed for 5,000 feet MSL or below shall enter ZMP Sector 05 at 5,000 feet MSL and Sectors 08, 09 and 10 at 4,000 feet MSL. f. Arrivals (1) The clearance limit fix for arrivals shall be the destination airport
3 (2) Conventional STARs. Speeds between 250 and 320 knots, if assigned, do not require coordination. (3) All turbojet and turboprop aircraft shall be routed via STAR routings. The appropriate crossing altitude restriction shall be issued as follows: (a) MSP Arrivals: STAR ROUTING (Turbojets) (Turboprops) EAU Arrival X TWINZ at X TWINZ at 9000 WILDD Arrival (ATC Assigned) X BITLR at KASPR Arrival X DELZY at TWOLF Arrival X TRGET at SKETR Arrival X SHONN at X SHONN at 9000 GEP Arrival (b) Satellite Arrivals: STAR ROUTING X GEP at (RWY 30L/R) X OLLEE at (All other rwys) (Turbojets) X OLLEE at 9000 (Turboprops) TWOLF Arrival X TRGET at 8000 X TRGET at 7000 AGUDE ARRIVAL X AGUDE at 8000 X AGUDE at 7000 ENCEE Arrival X RIXIE at 8000 X RIXIE at 7000 GEP Arrival X OLLEE at 8000 X OLLEE at 7000 (MSP Landing RWY 17) X OLLEE at 5000 or as coordinated (c) RNAV Arrivals (Turboprops NA) STAR ROUTING (MSP Land 12) (MSP Land 30) MUSCL Arrival Descend via, 12L Descend via, 30R KKILR Arrival Descend via, 12R Descend via, 30L BLUEM Arrival Descend via, 12R Descend via, 30L NITZR Arrival Descend via, 12R Descend via, 30L TORGY Arrival Descend via, 12R Descend via, 30L BAINY Arrival Descend via, 12L Descend via, 30R - 3 -
4 (4) STP arrivals routed over BITLR shall be assigned direct GEP and cross BITLR at 6,000 ft. (5) Except when landing Runway 35, ZMP shall provide MSP Approach with a minimum of 5 miles in trail or staggered spacing along the BLUEM/NITZR arrivals. For purposes of this restriction the BLUEM and NITZR arrivals shall be considered as one arrival. (6) All piston engine aircraft terminating in M98 airspace, regardless of altitude, shall enter M98 airspace from ZMP at 4,000 or 5,000 feet MSL as coordinated. (7) M98 will accept a reasonable number of aircraft to accommodate ZMP to recover from an unanticipated, drastic reduction in the arrival rate. These aircraft may be redirected as coordinated by M98 out the departure gates for holding or rerouting by ZMP. (8) All aircraft arriving MSP on any RNAV STAR must be on published speeds prior entering M98 unless otherwise coordinated. g. STC departures landing M98 airports shall enter M98 airspace at 5,000 feet MSL. When Runways other than 12L/R are in use, turbojet and turboprop aircraft departing STC and landing MSP shall be on a STAR arrival at the appropriate altitude. h. MKT departures landing M98 satellite airports shall enter M98 airspace at 5,000 ft. MSL direct destination. i. ZMP shall have control for descent to 10,000 feet MSL on aircraft exiting M98 airspace and landing RST airspace when the aircraft are 25 NM from MSP. j. Aircraft landing OEO, RNH, or RGK from the east (through Sector 5) shall be level at, or descending to, 4,000 feet MSL and M98 shall have control for descent and turns, up to 30 degrees either side of course, when aircraft are within10 NM of the M98 boundary. k. Aircraft landing STC or MKT shall enter ZMP airspace level at 4,000 feet MSL. ZMP shall have control for descent and turns, up to 30 degrees either side of course, when the aircraft are 25 NM from the MSP VOR. l. Aircraft landing STC filed at or above 14,000 ft. MSL shall enter M98 airspace level at 14,000 feet MSL. m. Overflight aircraft that will transit M98 airspace shall be on course and at the correct altitude for direction of flight, unless otherwise coordinated. n. During any time period in which ZMP assumes Rochester Approach Controls (RST) airspace, unless otherwise coordinated, all turboprop aircraft routed via the KASPR STAR shall cross the DELZY intersection at 9,000 feet MSL and all piston engine aircraft terminating in M98 airspace shall exit RST airspace at 4,000 feet MSL
5 o. Knock-It-Off OPD Procedures: (1) From time to time, winds and other meteorological conditions can make it necessary to discontinue the Optimum Profile Descents (OPD) on the RNAV STARs so as to manage the arriving streams more effectively. (2) When MSP is landing 4, 22, 17, 17/22 or anytime either facility has an operational necessity to discontinue the Optimum Profile Descent portion of the STAR, ZMP must: (a) On the MUSCL arrival: Cross BAYKS at and maintain 120. (b) On the KKILR arrival: Cross HUGGI at and maintain 110. (c) On the BLUEM arrival: Cross HHAMR at and maintain 100. (d) On the NITZR arrival: Cross WRSAW at and maintain 110. (e) On the TORGY arrival: Cross OFSON at and maintain 110. (f) On the BAINY arrival: Cross LUCCY at and maintain 110. (g) Cross the M98 boundary at the published speeds of 280kts unless otherwise coordinated. (3) Coordination must be accomplished by M98 OS/CIC/TMU and ZMP TMU. (4) M98/ZMP may invoke Knock It Off OPD procedures at individual gates regardless of runway configuration when operational necessity dictates. EXAMPLE- Knock It Off procedures in effect for meteorological conditions at MSP. 4. MIDNIGHT OPERATIONS: When coordinated (between the hours of 2230 and 0530 local): a. ZMP shall clear all traffic landing at airports within M98 as follows: (1) Direct to the destination airport. (2) Via pilot discretion descent to 10,000 feet to all aircraft at altitudes at and above 10,000 feet. (3) Arrivals at and below 10,000 feet shall remain at altitude. (4) ZMP shall assign all aircraft entering M98 airspace frequency (MSP_R_APP) b. M98 shall: (1) Clear departure aircraft via the first fix in the route. (2) Point out departures to any affected Center position. (3) Climb turboprops/props to 17,000 feet, or lower altitude if requested. 5. ATTACHMENTS - 5 -
6 Attachment "A" ZMP Area/Sector Map and Frequencies. Attachment "B" SIDs. Attachment C STARs. Shane A. VanHoven Air Traffic Manager VATSIM Minneapolis ARTCC Vacant Deputy Air Traffic Manager VATSIM Minneapolis ARTCC - 6 -
7 ATTACHMENT A ZMP Area/Sector Map and Frequencies - 7 -
8 ATTACHMENT B SIDs - 8 -
9 ATTACHMENT C Conventional STARs - 9 -
VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures
VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating
More informationZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE
ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT EFFECTIVE: July 10, 2010. SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services in the airspace described
More informationVATUSA CHICAGO ARTCC AND VATUSA MINNEAPOLIS ARTCC LETTER OF AGREEMENT
SUBJECT: INTERFACILITY COORDINATION EFFECTIVE: 04/15/2015 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA
More informationERIE ATCT STANDARD OPERATING PROCEDURES
ORDER ERI ATCT 7110.10I ERIE ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION
More informationDenver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES
Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES OCTOBER 7, 2018 Definition of Airspace Colorado Springs Class C airspace is defined as show in Appendix 1. Definition of Positions
More informationBurlington ATCT Standard Operating Procedures
This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for
More informationPiedmont Triad International Airport
ZTL ARTCC Piedmont Triad International Airport Airport Traffic Control Tower Standard Operating Procedures GSO 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign
More informationATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT
ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT EFFECTIVE: March 1, 2011 SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services
More informationLetter of Agreement by and between Jacksonville ARTCC and Miami ARTCC
Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Effective Date: 1 November 2007 0400Z I. Scope: This agreement is made by and between Miami ARTCC (herein ZMA) and Jacksonville ARTCC
More informationAlbany ATCT Standard Operating Procedures
Albany ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world
More informationGreenville Spartanburg International
ZTL ARTCC Greenville Spartanburg International Airport Traffic Control Tower Standard Operating Procedures GSP 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 2-1-1. Callsign
More informationVATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT
VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT EFFECTIVE: 02/01/2019 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of
More information- Updated formatting - Re-drawn airspace delegation diagram
Z D C A R T C C - Updated formatting - Re-drawn airspace delegation diagram Change Log... 2 Table of Contents... 3 Chapter 1. Positions... 4 Chapter 2. Clearance Delivery... 5 Chapter 3. Ground Control...
More informationVirtual Minneapolis Air Route Traffic Control Center vzmp ARTCC. Air Traffic Operations Manual. Revision October 2011
Virtual Minneapolis Air Route Traffic Control Center vzmp ARTCC Air Traffic Operations Manual 20 October 2011 Volume 2 Air Traffic Control Standard Operating Procedures (ATCSOP) LIST OF EFFECTIVE PAGES
More informationJACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006
SUBJECT: APPROACH CONTROL SERVICE EFFECTIVE: December 22, 2006 1. PURPOSE. This agreement between Jacksonville Center and SAV TRACON covers approach control service for airports within TRACON delegated
More informationRALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES
RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES January 3, 2017 BULLETIN NUMBER RECORD OF CHANGES SUBJECT AUTHORIZED BY DATE ENTERED DATE REMOVED 7110.100 Initial RR 1/3/17 3/25/17 7110.101 Added
More informationVATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT
VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT EFFECTIVE: 01/16/2019 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of
More informationZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011
ZTL ARTCC Asheville Regional Air Traffic Control Tower Standard Operating Procedures AVL 7110.65B Effective: May 1, 2011 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1 1-1-1. Callsign Usage and Frequency
More informationRELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release
BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE BOSTON ARTCC (ZBW) RELEASE RECORD Version Date Author Notes 1.0 10 Dec 2006 SK Initial Release 2.0 01 Oct 2011 DO Major update, transformed from more of
More information9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures
Raleigh-Durham Air Traffic Control Tower Standard Operating Procedures 1) Purpose This order defines duties and responsibilities, depicts areas of airspace, runways, and taxiways allocated to each position
More informationVATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012
VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP EFFECTIVE OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 I. PURPOSE With the establishment of the VATNZ division of the Oceania Region on 1 January 2007, the Oakland
More informationSouthern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES
Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT EFFECTIVE: September 13, 2012 SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES 1. PURPOSE. This agreement establishes procedures
More informationFEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC
FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC LETTER OF AGREEMENT Effective: April 10,2012 SUBJECT:
More informationZTL ARTCC. Augusta Regional
ZTL ARTCC Augusta Regional Air Traffic Control Tower Standard Operating Procedures AGS 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency
More informationVirtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures
Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures TLH 7110.65 Effective Date: May 11, 2015 Chapter 1. General 1 1. General Information obtained in this
More informationProvidence ATCT Standard Operating Procedures
This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for
More informationSID/STAR phraseology FAQ Canadian implementation April 27, 2017
SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard
More informationAnchorage ARTCC Phraseology Guide. Clearance Delivery Operations
Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:
More informationCape Area Airports Standard Operating Procedures
Cape Area Airports Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world
More informationVATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION
EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA
More informationD01 TERMINAL RADAR APPROACH CONTROL
Order D01 7110.65A D01 TERMINAL RADAR APPROACH CONTROL December 5, 2016 VATSIM D01 7110.65A Effective Date: Denver TRACON December 5, 2016 Northwest Mountain District VATUSA Subject: D01 Air Traffic Control
More informationVATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION
EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA
More informationStandard Operating Procedures
Allentown TRACON Standard Operating Procedures General This document describes the standard operating procedures for controlling at any of the positions within the Allentown TRACON and the airports it
More informationHOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004
HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division Letter of Agreement Revised: July 25, 2004 Effective: July 25, 2004 Purpose Scope This Letter of Agreement (LOA) establishes operating
More informationPITTSBURGH ATCT STANDARD OPERATING PROCEDURES
ORDER PIT ATCT 7110.1I PITTSBURGH ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION
More informationGENERAL OPERATING PROCEDURES FINLAND(GOP)
[Nyckelord] 2013 GENERAL OPERATING PROCEDURES FINLAND(GOP) General operating procedures (GOP) ACC 1 Introduction This document includes general operating procedures for ACC in. A good understanding of
More information11/21/2008 ZDC-ZTL LOA Version 1. Letter of Agreement
Letter of Agreement Atlanta ARTCC Washington ARTCC SUBJECT: INTER-CENTER COORDINATION PROCEDURES 1) PURPOSE This Agreement between the Virtual Atlanta ARTCC (vztl) and Virtual Washington ARTCC (vzdc) covers
More informationVersion O January 21, 2019
Bradley ATCT and Y90 TRACON Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not
More informationSan Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)
San Juan CERAP Standard Operation Procedures Version 2.2 May 5th, 2013 Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) You are entering one of the most fascinating Combined Enroute Radar Approach Control
More informationBOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB
BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE ALBANY ATCT (KALB( KALB) ALBANY APPROACH (ALB APP) RELEASE RECORD Version Date Author Notes 1.0 24 April 2009 Initial Release 1.1 30 Jan 2015 BN Match ALB5
More informationVATUSA Approval 3/21/18
PANC SOP beta 1.0 2/30/2018 Ted Stevens Anchorage International Airport - PANC Air Traffic Control Tower STANDARD OPERATING PROCEDURES SUBJ: PANC SOP This order provides direction and guidance for the
More informationSouthern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower
Southern California Terminal Radar Approach Control and Ontario Airport Traffic LETTER OF AGREEMENT SUBJECT: Interfacility Coordination and Control Procedures Effective: August 16, 2013 1. PURPOSE: This
More informationCharlotte - Douglas International Airport Traffic Control Tower
Charlotte - Douglas International Airport Traffic Control Tower Standard Operating Procedures CLT ATCT 7110.65D Effective: May 1, 2011. 1 1-1-1. Callsign Usage and Frequency Delegation: CHAPTER 1. GENERAL
More informationSOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC
SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 3 1-1. PURPOSE 3 1-2. SCOPE OF RESPONSIBILITIES
More informationVIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures
VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION ALBUQUERQUE ARTCC ORDER PHX ATCT v7110.1a Effective Date: Sept. 18, 2014 SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating
More informationProject Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures
VIA E-MAIL Date: To: From: Subject: Boston Technical Advisory Committee (BOS/TAC) Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures At the February 17, 2006 BOS/TAC meeting several issues
More informationVirtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)
Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) KDAL Dallas Love International Airport ATCT Standard Operating Procedures Rev. December 17, 2014 Approved:
More informationVirtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures
Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures DAB 7210.3E Effective Date: May 11, 2015 Chapter 1. General 1 1. General Information obtained in this
More informationStandard Operational Procedures
Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and
More informationVIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC
VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC ZKC ORDER 01.110A Effective Date: March 18, 2017 SUBJECT: ZKC Center Standard Operating Procedures This
More informationCleveland ARTCC and Boston Virtual ARTCC Letter of Agreement
Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement Effective: 1 Oct 2017 1. PURPOSE: This agreement defines the necessary pre-defined air traffic control procedures and coordination responsibilities
More informationINTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME
INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016!1 GENERAL Proper use of phraseology is one of the most important thing in aviation and
More informationDO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES.
DO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES. Gardner Textbook Review Questions to prepare for Class #12 Answer these on notebook paper (or a text file) then
More informationLETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR. VATSIM Scandinavia 4 April 2013
2013 LETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR VATSIM Scandinavia 4 April 2013 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures
More informationJacksonville ARTCC. F11 TRACON Standard Operating Procedures
Document Number ZJX-10 Version A Effective Date 9/19/2018 Purpose Document Information ZJX 10A establishes procedures for staffing of the Central Florida TRACON radar positions (herein referred to as F11
More informationStandard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control
SUBJ: Air Traffic Control This order prescribes air traffic control procedures and phraseology for use by personnel providing air traffic control services. Controllers are required to be familiar with
More informationSOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC
SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 4 1-1. PURPOSE 4 1-2. SCOPE OF
More information- Initial. - Added MCRAY and new PDC s. - General update. - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes
Z D C A R T C C - Initial - Added MCRAY and new PDC s - General update - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes - Added altitude restrictions to nearby
More informationFederal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017
Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment
More informationLETTER OF AGREEMENT. Between
LETTER OF AGREEMENT Between Romania vacc and Moldova vacc Bucharest FIR Chisinau FIR Effective: 01/12/2015 Version: 1.0 Purpose: The purpose of this Letter of Agreement is to define the coordination procedures
More informationContinuous Descent? And RNAV Arrivals
Continuous Descent? And RNAV Arrivals From an ATC Perspective Presentation to: CDA Workshop GA Tech Name: Don Porter RNP Project Lead FAA, RNAV RNP Group Date: 18 April 2006 My Background 22 years Terminal
More informationCharlotte - Douglas International
Charlotte - Douglas International Standard Operating Procedures CLT TRACON 7110.65D Effective: May 1, 2011. 1 CHAPTER 1. Departure/Satellite Radar SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency
More informationStandard Operating Procedures (SOPs) for BAGHDAD (ORBI)
Pag.1 of 11 Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Index 1. FOREWORD... 3 2. ATC UNITS... 3 3. RECOMMENDATIONS... 3 3.1. TRANSITION ALTITUDE/LEVEL... 3 3.2. SEMI-CIRCULAR FLIGHT LEVEL
More informationDenmark FIR and Sweden FIR
Letter of Agreement between VACCSCA December 2010 Version 2 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures to be applied between when providing
More informationLAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT
LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT COAST, LAKE, DESERT FNO FRIDAY, AUGUST 17, 2018 TABLE OF CONTENTS GENERAL BRIEFING 2 AIRPORT/RUNWAY CONFIGURATIONS 3 DEPARTURE BRIEFING 4 ARRIVAL BRIEFING
More informationApproach (TMA) Air Traffic Control. An Introduction to Approach/Departure Control Airspace and Operating Positions... 2
Approach (TMA) Air Traffic Control Table of Contents An Introduction to Approach/Departure Control................. 1 Airspace and Operating Positions........................... 2 Procedural Reference....................................
More informationSECTION 4 - APPROACH CONTROL PROCEDURES
SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES
More informationUNIVERSITY OF ALABAMA FOOTBALL
UNIVERSITY OF FOOTBALL SPECIAL AIR TRAFFIC PROCEDURES TUSCALOOSA, AL September 16, 2017 November 18, 2017 The following procedures will be implemented to enhance safety and minimize delays during the following
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationIFR SEPARATION WITHOUT RADAR
1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s
More informationFLIGHT PROCEDURE AT SUVARNABHUMI INTERNATIONAL AIRPORT
Phone: 66 02 568 8831 Fax: 66 02 576 1903 AFTN: VTBAYOYX E-mail: aisthai@caat.or.th ais@caat.or.th THE CIVIL AVIATION AUTHORITY OF THAILAND Aeronautical Information Service Department 333/105 Lak Si Plaza,
More informationH O M E C O M I N G. NOTAM Aircraft Owners and Pilots Association (AOPA) Fly-In Frederick Municipal Airport (FDK) Frederick, MD
F L Y - I N AOPA H O M E C O M I N G FREDERICK, MD NOTAM Aircraft Owners and Pilots Association (AOPA) Fly-In Frederick Municipal Airport (FDK) Frederick, MD SPECIAL FLIGHT PROCEDURES EFFECTIVE 1200 NOON
More informationORDER MSY V. New Orleans. Standard Local Operating Procedures. Rev 3 December 7, 2011
ORDER MSY 7110.1V New Orleans Standard Local Operating Procedures Rev 3 December 7, 2011 Foreword This order defines the duties and responsibilities for personnel providing air traffic control services
More informationFLIGHT STRIP MANAGEMENT - APPROACH LEVEL
FLIGHT STRIP MANAGEMENT - APPROACH LEVEL 1. Introduction The flight strip management for ATC is an important point in order to ensure aircraft management and improve safety when controlling. In real aviation,
More information2 Purpose and Need. 2.1 The Need for the CLT OAPM Project Description of the Problem
2 Purpose and Need Under NEPA, an Environmental Assessment (EA) must describe the purpose and need for the Proposed Action. The following sections discuss the need for the Proposed Action and provide specific
More informationNorthern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)
Northern Regional Training Scheme EGNT Newcastle Aerodrome Pilot s Guide REVISION 2 (Wednesday, 03 August 2011 at 15:51) PUBLISHED Wednesday, 03 August 2011 1 Contents 1 Contents... 2 2 Departures... 3
More informationSTUDENT PILOT PRE-CROSS-COUNTRY WRITTEN EXAM
DO NOT WRITE ON THIS TEST FEB 2013 STUDENT PILOT PRE-CROSS-COUNTRY WRITTEN EXAM This test is required prior to solo cross-country per AFMAN This test is not required if the student has passed the FAA Knowledge
More informationFLYING CLOUD AIRPORT ADVISORY COMMISSION
FLYING CLOUD AIRPORT ADVISORY COMMISSION Eden Prairie City Council Workshop January 21, 2014 GENERAL GOALS Monitor the Final Agreement with MAC and advise the City Council and MAC with regard to matters
More information1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;
Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS
More informationThis section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations.
This section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations. 13.1. Aircraft Noise Abatement 13.1.1. All aircraft
More informationLETTER OF AGREEMENT BETWEEN POLISH VACC AND SWEDEN FIR
2016 LETTER OF AGREEMENT BETWEEN POLISH VACC AND SWEDEN FIR Polish VACC and VATSIM Scandinavia 31 March 2016 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination
More informationGleim Instrument Pilot FAA Knowledge Test Prep 2018 Edition, 1st Printing Updates April 2018
Page 1 of 8 Gleim Instrument Pilot FAA Knowledge Test Prep 2018 Edition, 1st Printing Updates April 2018 NOTE: Text that should be deleted is displayed with a line through it. New text is shown with a
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationVATSIM-UK Essex RTS STANSTED CROSS THE POND PILOT GUIDE 25th October 2014
VATSIM-UK Essex RTS STANSTED CROSS THE POND PILOT GUIDE 25th October 2014 VATSIM UK and The Essex RTS a happy to welcome you to London Stansted as part of this year s CTP Eastbound event. Please take a
More informationCLEARANCE INSTRUCTION READ BACK
CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely
More informationBFR WRITTEN TEST B - For IFR Pilots
(61 Questions) (Review and study of the FARs noted in parentheses right after the question number is encouraged. This is an open book test!) 1. (91.3) Who is responsible for determining that the altimeter
More informationUPDATE ON THE 6 IDEAS (1-4) NAV CANADA
UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival
More informationIFR 91.157 Must be instrument rated to fly special VFR at Night (civil twilight to civil twilight, sun 6 degrees below horizon) 91.159 Unless in a holding pattern of 2 minutes or less, VFR cruising altitude
More informationLetter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008
Letter of Agreement Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008 Purpose: This Letter of Agreement (LOA) outlines standard operating policies and procedures to
More informationAIR LAW AND ATC PROCEDURES
1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C
More informationFLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA
FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA EFFECTIVE October 11, 201609 0400 This Notice does not supersede restrictions pertaining to the use of airspace contained
More informationNATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION
NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION LAS VEGAS, October 10 12, 2017 In anticipation of a large number of aircraft operating to and from the Las Vegas area in conjunction with the 2017
More informationPilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR
Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR VATSIM-UK and the Heathrow Regional Training Scheme look forward to welcoming you into Heathrow! We ll have all our controllers briefed
More informationInstrument Refresher Course. Airfield Operations Flight Tower 412 OSS/OSAT
Instrument Refresher Course Airfield Operations Flight Tower 412 OSS/OSAT Overview Mission Priorities Class D Airspace Tower Services Traffic Patterns IFR Departures Lakebed Ops Miscellaneous Special Procedures
More informationLGB HELICOPTER OPERATIONS
LGB HELICOPTER OPERATIONS For informational purposes only. Textual information derived from LGB TWR/HELICOPTER OPERATORS LETTER OF AGREEMENT Dated September, 06 HELICOPTER OPERATIONS 5. b. (8) 5. a. ()
More informationEastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)
PIARCO Control Zone (CTR) Eastern Caribbean PIARCO Virtual FIR NOT TO BE USED FOR REAL WORLD AVIATION, STRICTLY FOR USE ON THE VATSIM VIRTUAL ATC NETWORK. 1. Introduction 1.1 Objective of this SOP is to
More informationV.B. Compliance with Departure, En Route, and Arrival Procedures and Clearances
References: 14 CFR part 91; FAA-H-8083-15; AIM Objectives Key Elements Elements Schedule Equipment IP s Actions SP s Actions Completion Standards The student should develop knowledge of the elements related
More informationMINIMUM FLIGHT ALTITUDES
MINIMUM FLIGHT ALTITUDES 1. Introduction Minimum flight altitudes are created first to ensure safety, awareness and adequate radio navigation reception for aircraft flying at the same time in specific
More informationPLAN Anoka County - Blaine Airport
Reliever Airports: NOISE ABATEMENT PLAN Anoka County - Blaine Airport INTRODUCTION The noise abatement plan for the Anoka County-Blaine Airport was prepared in recognition of the need to make the airport
More informationPi Aero Instrument Rating Syllabus
This syllabus was created in order to maintain a high level of positive training as well as meet the minimum hours required by the Federal Aviation Regulations Part 61. There are four sections to this
More information