1 PBN Implementation inside Italian Airspace Status update Summer 2013 Paris, September 2013 enav.it

2 Contents Tasks achieved PBN implementation schedules On going activities Further aspects Conclusions 2

3 PBN Tasks achieved National PBN Task Force in place to tackle and handle PBN deployment inside National Airspace; Consultation with operators in progress by means of periodical ENAV Customer Care meeting; Spring 2011: Introduction of P-RNAV inside Italian airspace Summer 2012: Publication of National PBN implementation plan Regulator approval of National Safety Case for the introduction of RNP-APCH inside Italian Airspace Winter 2012: Publication of first RNP APCH procedure for Milan Malpensa and Milan Linate airports 3

4 PBN implementation Enroute phase Several new routes implemented according to RNAV 5 specification. Objective: Take advantage from PBN criteria to provide more direct routeings Since January 2012: 53 routes have been modified (22 Lower and 31 Upper) 22 new routes have been implemented (9 Lower and 13 Upper). Average gain approximately 3NM. 4

5 PBN implementation Arrival/Departure phases 2013 Implementation: LIEO: New P-RNAV STARs and SIDs for both runway ends, initially deployed as ATC Discretion ones. Achievements: Average track miles reduction: 11NM for arrivals; 1NM for departures Benefits: Arrivals/departures separated each other. Procedures enabling CDO/CCO. 5

6 STAR P-RNAV: Olbia Runway 23 6

7 STAR P-RNAV: Olbia Runway 05 7

8 SID P-RNAV: Olbia Runways 05/23 8

9 PBN implementation Arrival/Departure phases 2013 Implementation: LIPZ: New P-RNAV STARs and SIDs for runway 22. Achievements: Average track miles reduction: 7NM Benefits: Better traffic management on coded path, compared with the previous scenario (totally based on radar vectoring in order to maintain the same airport capacity) 9

10 STAR P-RNAV: Venice Runway 22 10

11 PBN implementation Arrival/Departure phases Planning: Several airports planned between winter 2013 and spring 2014: LIRQ: New arrival/departure network LIPE: New arrival/departure network LIMF; LIMC; LIME For LIMF and LIME the main objective is to provide P-RNAV arrival scenarios in order to deconflict arrival and departure flows enabling CDO/CCO operations. For LIMC the main objective is to provide a coded path to be flown in case of RWY 17 in use, whose radar minima downwind-base leg is affected by environmental constraints. 11

12 PBN implementation Approach phase RNP APCH procedures initially implemented with LNAV and LPV minima. Airports already involved: LIRF => Main runway ends (16L/R, 34L/R); LIML RWY 36, LIMC RWY 35L, LIPZ RWY 22L; Planning Next airports: Further 8 runway ends expected before next summer LIML (RWY 18), LIMC (RWY 35R), LIRQ (RWY 05), LIPE, LIMF (RWY 36), LIME; LIMJ Implementation, expected during next year, on two runway ends at the moment served only by circling approach (LIMJ RWY 10 LIPX RWY 22). Further objective: Introduction of BARO/VNAV (in addition to LNAV and LPV) on those runway ends served only by NPA conventional approaches, whenever practicable; 12

13 PBN implementation Training Air Traffic Controllers training completed PBN training plan Training modules on PBN familiarization and P-RNAV procedures, including operational aspects, planned starting from autumn 2012 for radar CTR. Venezia and Olbia Approach controllers training already completed Training module on GNSS approach procedure already performed in Milan and Rome TMA; Training modules for Procedure designers in the framework of continuous training activities; Training modules on PBN familiarization and P-RNAV procedures, including operational aspects, for ATCOs operating in radar CTR. Already planned: LIRQ (Florence). Next: LIPE (Bologna), LIMF (Torino) planned accordingly to implementation schedule; Training module on GNSS approach procedure for ATCOs planned accordingly to implementation schedule; Operational training modules on PBN and related procedure management for ATCOs instructors operating at ENAV Academy; Training modules on PBN familiarization for all people involved in operational activities; 13

14 PBN implementation On going activities LPV helicopter approach procedures developed and validated for Milan Linate and Bergamo airports in the framework of ACCEPTA Project; APV/BARO implementation. Assessment of present vs future criteria has been performed on a test airport (LIMC). Results show that new criteria need a new assessment of instrument flight procedures already published with the old criteria. GNSS monitoring: Activities in progress in order to deploy a national GNSS strategy and to overcome some of the Safety Requirements needed for the implementation of RNP APCH procedures. CDO operations: The objective is related to develop tailored P-RNAV Stars available for planning or to support CDO operations to existing STARs with embedded level windows. Target date: Spring Target airports: LIML, LIMC, LIRF. 14

15 PBN implementation Further aspects Design/Coding aspects: Strong interactions between design issues, coding issues and FMS storage capacity=> especially related to MAPt position and number of procedures to be coded inside FMS. Improve operators awareness on PBN availability and use => Pilots requests for radar vectoring even if cleared on P-RNAV segments. Future issues: Which actions need to be put in place by each stakeholder in order to support the transition of GNSS towards primary means of navigation? Proactive approach needed in order to take advantage by some lessons learnt in the past. 15

16 Conclusions Italy is working accordingly to the published National PBN implementation plan; Several procedures have been already published on each flight phase; Training modules available and completed on sites where PBN procedures are on air; Several activities in progress: GNSS monitoring activities in progress in cooperation with our Regulator; RNP APCH safety case update; Introduction of BARO/VNAV whenever practicable; Allow for CDO on new (RNAV1) Stars/existing Stars; Aspects to tackle: RNP APCH and coding issues; Improve operators awareness on PBN availability and use; Proactive approach to move towards GNSS as a primary means of navigation taking advantage from lessons of the past. 16

17 Thank you for your attention 17

PBN Implementation inside Italian Airspace

PBN Implementation inside Italian Airspace PBN Implementation inside Italian Airspace Leonardo NICOLO Airspace and Procedures Design Department TMA, CTR & Airports Unit Responsible Brussels, March, 12-14 2014 0 CONTENTS PBN Implementation Path

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

In cover a detail of new night/ week end shortest routes for overflying Sardinia Area

In cover a detail of new night/ week end shortest routes for overflying Sardinia Area FLIGHT EFFICIENCY PLAN 2014 In cover a detail of new night/ week end shortest routes for overflying Sardinia Area Flight Efficiency Plan 2014 CANSO, IATA and EUROCONTROL have identified the action points

More information

ENAV experience on LPV implementation

ENAV experience on LPV implementation ENAV experience on LPV implementation Patrizio Vanni GNSS and SES expert International Strategies Office enav.it Tunisi, 23-10-2013 Main topics Company profile ENAV role in MEDUSA ENAV role in GNSS GNSS

More information

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination RACOON PROJECT Daniele Teotino - ENAV RACOON Project Manager Head of SESAR JU Activity Coordination RACOON in a Nutshell SESAR JU Very Large Scale Demonstration First Italian initiative on Remote TWR solutions

More information

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement. RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement. Simon Young Strategy, Innovation and Service Performance Manager Australian Environment and PBN Drivers

More information

Status of PBN implementation in France

Status of PBN implementation in France Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions

More information

PBN Implementation Plan Italy. Version 1

PBN Implementation Plan Italy. Version 1 PBN Implementation Plan Italy Version 1 1 Document appl'oval The PBN Implementation pian has been prepared by Ente Nazionale per l'aviazione Civile (ENAC) and Ilalian ANSP (ENAV) in accordance with ICAO

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Flight Efficiency Plan 2012

Flight Efficiency Plan 2012 Flight Efficiency Plan 2012 Foreword... 2 Targets and Outcomes... 3 En-route Airspace Design and Network Availability... 5 Design and Use of Terminal Areas... 8 Airport Operations... 11 Operational staff

More information

The support of an European ANSP

The support of an European ANSP The support of an European ANSP Euromed GNSS II project/medusa Final event on GNSS for aviation Patrizio Vanni (GNSS expert) International Strategies Office patrizio.vanni@enav.it MEDUSA final event on

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS The objective of the project was EGNOS enabled APV SBAS (LPV) approach procedures, and related implementation at Larnaca and Paphos International

More information

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA EUROMED GNSS II Achievements and expectations Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA Presentation Overview Generalities Current Situation LPV approaches in

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

Contextual note SESAR Solution description form for deployment planning

Contextual note SESAR Solution description form for deployment planning Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival

More information

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE Practical Experiences & ATM Workshop ATM Requirements Setting the Scene Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest problems to solve 2 What is mixed

More information

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017 easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017 Overview > Your presenter > easyjet > Opportunities > Benefits Examples > Training > Operations > Summary Who am I? > Not a pilot! > easyjet

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

Evolving and improving landing networks with EGNOS

Evolving and improving landing networks with EGNOS Evolving and improving landing networks with EGNOS Benoit Roturier - DSNA EU Space Week Marseille INTRODUCTION Satellite technology opportunities allow now ANSP and airports to complete/redesign approach

More information

Atlanta NextGen PBN Activities

Atlanta NextGen PBN Activities Atlanta NextGen PBN Activities Presentation to: Name: Date: EWG Ops SC Meeting Jim Arrighi RNAV/RNP Group Jim Allerdice A80 May 18, 2010 0 0 Atlanta Performance Based Navigation Project Planning Seven

More information

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene Practical Experiences & ATM Workshop ATM Requirements Setting the Scene ATM Requirements Forum - INTRO 2 Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest

More information

Colombian PBN implementation: El Dorado case study

Colombian PBN implementation: El Dorado case study Colombian PBN implementation: El Dorado case study SDM WORKSHOP ON PBN 19.10.2017 XAVIER OUTTERS SME & PROJECT MANAGER NAVBLUE SAS Electronic Flight Bag Dispatch Pre-flight Airport Databases - FlySmart+

More information

Implementation challenges for Flight Procedures

Implementation challenges for Flight Procedures Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

EASA RNP (AR) Workshop The Landscape Working Together

EASA RNP (AR) Workshop The Landscape Working Together EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches

More information

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) PBN/TF/8 IP/03 12-13/5/2011 International Civil Aviation Organization The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) New Delhi, India 12 13 May 2011 Agenda Item 5: State/Industry

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

34 th Airline/ATS Safety Forum

34 th Airline/ATS Safety Forum 34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

Open Questions & Collecting Lessons Learned

Open Questions & Collecting Lessons Learned Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information

More information

Final Approach Operations Symposium

Final Approach Operations Symposium Final Approach perations Symposium Transition to Final Approach ATC/ATM Aspects Charlie Eliot NMD/TRG/TDD 2 February 2017 Agenda PBN to support the Approach RNP to xls What is it? Parallel Approach perations

More information

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM ICAO PBN GO TEAM PBN Implementation Workshop Tunis, 24-28 February 2014 ENAC / ATM Bertrand FOUCHER 1 PERSONAL BACKGROUND ATC in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

www.worldairops.com This document is part of the World Air Ops online Library The Library contains maps, charts, flight planning documents, international trip planning tools and other public domain resources,

More information

A Pilot s perspective

A Pilot s perspective The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes

More information

FLIGHT EFFICIENCY PLAN

FLIGHT EFFICIENCY PLAN FLIGHT EFFICIENCY PLAN 2016 BLUE MED FLIGHT EFFICIENCY PLAN 2016 The Flight Efficiency Plan builds on the solid foundations of the ongoing work among European Air Navigation Service Providers (ANSP) and

More information

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?

More information

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia REPUBLIC OF CROATIA NonAIRAC Phone: +385 1 6259 373 +385 1 6259 589 +385 1 6259 372 Fax: +385 1 6259 374 AFS: LDZAYOYX Email: aip@crocontrol.hr URL: http://www.crocontrol.hr Croatia Control Ltd. Aeronautical

More information

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

RNP AR Experience. Phil Rakena PBN Project Manager February 2015 RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from

More information

AERONAUTICAL INFORMATION CIRCULAR 18/18

AERONAUTICAL INFORMATION CIRCULAR 18/18 NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement Dr. Philipp Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) ICANA, Frankfurt, November 2016 DIESER TEXT DIENT DER NAVIGATION

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

PBN and Procedure Design training

PBN and Procedure Design training PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training

More information

SDM WORKSHOP ON PBN (19/10/2017)

SDM WORKSHOP ON PBN (19/10/2017) SDM WORKSHOP ON PBN (19/10/2017) Experience from real implementations GNSS Department 25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona

More information

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD ÁFRICA DE FRANCISCO VALERA SUMMARY Summary: Ineco company. Flight procedure design team. Flight procedure

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

What is an Airspace Concept? Module 5

What is an Airspace Concept? Module 5 What is an Airspace Concept? Module 5 European Airspace Concept Workshops for PBN Implementation Overview Learning Objectives: At the end of this presentation you should: Understand what the purpose of

More information

Performance Based Navigation Implementation in Thailand

Performance Based Navigation Implementation in Thailand Performance Based Navigation Implementation in Thailand Present by AEROTHAI 1 Thailand WG on PBN&GNSS Since May 2007, Thailand National Working Group on PBN & GNSS Implementation consists of representatives

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

IATA EUR Airline PBN implementation requirements - March State Airport TMA/Runways Specifics. Austria VIE PRNAV SIDs/STARs

IATA EUR Airline PBN implementation requirements - March State Airport TMA/Runways Specifics. Austria VIE PRNAV SIDs/STARs IATA EUR Airline PBN implementation requirements - March 2011 PBN covers a variety of aircraft and pilot qualifications. Avionics and crew authorizations no less than RNP 0.3 for approaches and RNP 0.6

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

APV IMPLEMENTATION PLAN

APV IMPLEMENTATION PLAN APV IMPLEMENTATION PLAN PRESENTATION PLAN Introduction PBN concept benefits implementation process Infrastructures assessment Operational constraints Medusa ALG civil aviation following actions conclusion

More information

Civil Aviation Authority INFORMATION NOTICE. Number: IN 2017/034. Implementation of Performance Based Navigation Guidance for Pilots

Civil Aviation Authority INFORMATION NOTICE. Number: IN 2017/034. Implementation of Performance Based Navigation Guidance for Pilots Civil Aviation Authority INFORMATION NOTICE Number: IN 2017/034 Issued: 18 August 2017 Implementation of Performance Based Navigation Guidance for Pilots This Information Notice contains information that

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

AREA NAVIGATION RNAV- MANAGEMENT

AREA NAVIGATION RNAV- MANAGEMENT 1. Introduction AREA NAVIGATION RNAV- MANAGEMENT RNAV is an instrument-based navigation method that leads to fly from a fix (geographic point inside an airspace) to another fix directly. Contrary to conventional

More information

Patrizio Vanni (Project Coordinator)

Patrizio Vanni (Project Coordinator) H2020 project funded by Patrizio Vanni (Project Coordinator) EGNOS Annual Workshop Athens, 3 October 2017 This project has received funding from the European GNSS Agency under the European Union s Horizon

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Overview of ICAO APAC FPP

Overview of ICAO APAC FPP Overview of ICAO APAC FPP Mr. LIU Song, ICAO APAC FPP Manager January 2018 FPP History ICAO Asia-Pacific Flight Procedure Programme 3 FPP Objectives To assist States to develop sustainable capability

More information

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile First LPV 200 approach in Europe Paris Charles de Gaulle Benoit Roturier DSNA ESSP Workshop Warsaw - 2016 PBN Implementation Status PBN FOR APPROACHES TARGETS FOR FRANCE Modernizing/rationalizing French

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Winnipeg James Armstrong Richardson International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November

More information

EXPLANATION OF TPP TERMS AND SYMBOLS

EXPLANATION OF TPP TERMS AND SYMBOLS U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures

More information

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches

More information

PLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013

PLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013 PLAN 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion Generalities Generalities Through the Office of Civil Aviation and Airports : OACA A contract between the OACA

More information

A-CDM Implementation: Burden or Blessing for ANSPs?

A-CDM Implementation: Burden or Blessing for ANSPs? A-CDM Implementation: Burden or Blessing for ANSPs? CANSO report on A-CDM Download it for free at: www.canso.org/publications Basic A-CDM processes, principles and benefits for managers and operational

More information

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders Statement of compliance with: COMMISSION REGULATION (EU) No 965/2012 (of 5 October 2012 laying down technical requirements and administrative procedures related to air operations pursuant to Regulation

More information

ENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU

ENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU ENABLING GREENER FLIGHT TRAJECTORIES David Bowen Chief of ATM SESAR JU 24 November 2016 SESAR vision SESAR life cycle To define, develop and deploy the technology that is needed to increase ATM performance

More information

PBN and RNAV concepts

PBN and RNAV concepts PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

Sudan PBN Implementation Plan PBN SG/3

Sudan PBN Implementation Plan PBN SG/3 Sudan PBN Implementation Plan PBN SG/3 Cairo, Egypt, 11 13 February 2018 Outline Brief of the State of SUDAN s PBN Implementation Plan Status of Implementation Sudan ATS Surveillance System Sudan ATM System.

More information

PBN Airspace Concept. ATS requirements

PBN Airspace Concept. ATS requirements INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases

More information

CUSTOMER EDITORIAL SURVEY SUMMARY OPERATIONS: IMPLEMENTATION UPDATES OPERATIONS: 4OUR PERFORMANCES 8ACKNOWLEDGEMENT

CUSTOMER EDITORIAL SURVEY SUMMARY OPERATIONS: IMPLEMENTATION UPDATES OPERATIONS: 4OUR PERFORMANCES 8ACKNOWLEDGEMENT CUSTOMER REPORT 2017 1 EDITORIAL CUSTOMER 2 SURVEY SUMMARY OPERATIONS: 4OUR PERFORMANCES 7 OPERATIONS: IMPLEMENTATION UPDATES 8 CUSTOMER FOCUS 8ACKNOWLEDGEMENT EDITORIAL I m very pleased to introduce you

More information

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Lebanon national workshop Euromed GNSS II national workshop, Beirut, 26 November 2013 1 Index EGNOS SoL operation

More information

TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW

TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW NAV CANADA Level of Service & Aeronautical Studies 77 Metcalfe Street, 5th Floor Ottawa, Ontario K1P 5L6 April, 2013 The information and diagrams contained

More information

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures Dr. Ralf H. Mayer Dennis J. Zondervan Albert A. Herndon Tyler Smith 9 th USA/EUROPE Air Traffic Management

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Edmonton International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 January 2018 The information

More information

REPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures

REPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures REPUBLIC OF CROATIA NonAIRAC Phone: +385 1 6259 373 +385 1 6259 589 +385 1 6259 372 Fax: +385 1 6259 374 AFS: LDZAYOYX Email: aip@crocontrol.hr URL: http://www.crocontrol.hr Croatia Control Ltd. Aeronautical

More information