Russian Federation ATM modernization program
|
|
- Charity Warner
- 5 years ago
- Views:
Transcription
1 Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency March, 2012, Moscow
2 Main strategic directions of Russian Air Navigation System development Improvement of utilization of airspace of the Russian Federation Providing the air traffic safety CNS/ATM system improvement Improvement of airborne equipment Improvement of meteorological support of the air navigation Improvement of air navigation information Improvement of regulatory and legal framework 2
3 Correspondence of RF ANP and ANS Concept to GANP and OCD of ICAO GANP (Doc. 9750) GPIs, KPAs EUR ANP (Doc. 7754) GPIs, KPAs ANP RF KPAs GPIs OCD (Doc. 9854) KPAs RF ANS concept & Implementation Plan Federal Investment Programs (1-4) 3
4 Correspondence of Federal Investment Programs to RF Implementation Plans RF ANS Concept IP FIP ATM System Modernization (1) RF ANS Concept (project) IP (project) FIP GLONASS (2) FIP Civil Aviation Equipment Development (3) RF ANP FIP Civil Aviation (4) 4
5 Timescales of RF Implementation Plans and ICAO ASBU RF ANP ( ) FIP ATM System Modernization ( ) FIP GLONASS FIP Civil Aviation Equipment Development ( ) FIP Civil Aviation ( ) IP RF ANS Concept ( ) IP RF ANS Concept ( , project) ASBU Block 0 Block 1 Block 2 Block
6 Implementation of Global Air Navigation Plan Initiatives in Russian Federation GPI GPI-1 Flexible use of Airspace GPI-2 Reduced Vertical Separation Minima GPI-3 Harmonization of Level Systems GPI-4 Alignment of Upper Airspace Classification GPI-5 RNAV and RNP (Performance Based Navigation) GPI-6 Air Traffic Flow Management GPI-7 Dynamic and Flexible ATS Route Management GPI-8 Collaborative Airspace Design and Management GPI-9 Situational Awareness GPI-10 Terminal Area Design and Management GPI-11 RNP and RNAV SIDs and STARs GPI-12 Functional Integration of Ground Systems with Airborne Systems GPI-13 Aerodrome Design and Management GPI-14 Runway Operations GPI-15 Match IMC and VMC Operations Capacity GPI-16 Decision Support Systems and Alerting Systems GPI-17 Data Link Applications GPI-18 Aeronautical Information GPI-19 Meteorological Systems GPI-20 WGS-84 GPI-21 Navigation Systems GPI-22 Communication Infrastructure GPI-23 Aeronautical Radio Spectrum GPI Implementation in RF Ongoing and will be improved Implemented Done, differences exist Being done Being done in accordance with PBN implementation plan in RF Ongoing Ongoing and will be improved Coordination is going on in Airspace Design and Management Implementation of advanced technologies is planned Implementation of advanced technologies is planned Ongoing and will be improved Implementation of advanced technologies is planned Ongoing and will be improved Ongoing and will be improved Ongoing and will be improved Implementation of advanced technologies is planned Implementation is planned Implementation of advanced technologies is planned Implementation of advanced technologies is planned In Russian Federation ПЗ is applicable There are plans to use both satellite and ground systems Exists, and is being improved RF activities are in compliance with GPI-23 6
7 Main activities of National Operational Concept (NOC) on improvement of ATM system stipulated for implementation by Air Navigation Plan ( ) Measures to improve ATM Improvement of structure and management of airspace 1.1 Introduction of ICAO airspace classification Implementation of the principles of flexible airspace utilization Implementation of the system of RNAV/RNP routes 1.4 Implementation of RVSM in the upper airspace 1.5 Implementation of SID/STAR 1.6 Implementation of UACC 2 Improvement of aerodrome operations 2.1 Implementation of GNSS-based non-precision approach 2.2 Implementation of GNSS with GBAS-based precision approach 2.3 Automation of arrival and departure procedures management 2.4 Integration of arrival, departure and surface operations management 2.5 Improvement of traffic management on the aerodrome surface area 7
8 Main activities of National Operational Concept (NOC) on improvement of ATM system (continuation) Measures to improve ATM Improvement of air traffic flow management 4 Improvement of traffic synchronization 4.1 Improvement of inter-center interaction 4.2 Utilization of air -ground data link Increasing of surveillance capabilities, ADS implementation Providing aircraft with air traffic situational awareness 5 Improvement of airspace users operations 6 Improvement of conflict management Implementation of ground and airborne 6.1 systems providing safe separation 6.2 Automation of conflict resolution 7 Improvement of service management Planned in IP ANS Improvement of information services Improvement of air navigation information provision Improvement of meteorological support of the flights 8
9 Federal Investment Programs FIP RF ATM System Modernization ( ) (1) Main goal: Increasing of flight safety and effectiveness of airspace utilization. Main activities: Creation of united ATM control centers; Improving of air navigation services in aerodrome and en-route areas ; Modernization of aviation communication networks and data links implementation; Modernization of SSR means at radar sites; Implementation of a unified system of airspace utilization planning; Transition to the modern technologies of ATM, based on implementation of CNS/ATM aids and systems; Implementation of integrated military civilian automated ATC systems; Technical upgrade and automation of systems of meteorological support for the air navigation; Improving of airspace search and rescue system. 9
10 Federal Investment Programs FIP RF ATM System Modernization ( ) (1) Planned results of the Program implementation: 1,5 times increase of air traffic safety level by 2015; 1,8 times increase of airspace capacity; More than 2,5 billion USD decrease of operation costs during the Program implementation period; Increasing of predictability of aviation weather forecasts for Russian Federation aerodromes up to the level of 91%; Increasing of state territory coverage with the aviation search and rescue capabilities up to 100%; Integration of air navigation system of Russia into the unified regional European air navigation system basing on the transition to the advanced CNS/ATM systems, technologies and procedures of ICAO. 10
11 Federal Investment Programs FIP GLONASS (2) Main FIP activities playing major role for the development of ANS of Russia: Support, control and management of GNSS orbital group ; Development of ICAO international standards for GNSS system including GBAS and SBAS; Establishment of a center for collecting and dynamically informing Russian Federation airspace users about the monitoring of GNSS and GPS orbital groups data; Creation and installation of GBAS and ADS-B stations; Creation and implementation of integrated airborne and ground systems for navigation and approach, including GNSS-based ICAO CAT II/III approach capabilities; Creation and implementation of integrated multichannel navigation facility for aircraft GNSS consumers with a capability of operating in international systems SBAS и GBAS; Creation of a data base of air navigation information (ANI) and its implementation in electronic format. 11
12 Federal Investment Programs FIP Civil Aviation Equipment Development (3) FIP main tasks and targets: Aircraft fleet upgrade to enhance reliability of the systems and units and to improve operating performance in accordance with current ICAO requirements; Overcoming of Russian aviation industry technological gap and providing its effective participation in international technological integration process; Creation of a scientific technical base in the field of airborne vehicles, engines, avionics, aviation units and assemblies for competitive national aviation industry after 2015; Creation of a modern scientific research infrastructure of the Russian aviation industry enterprises to provide the advanced level of scientific development and technologies including those delivered to the global market. 12
13 Federal Investment Programs FIP main tasks and targets: FIP Civil Aviation (4) Construction and redevelopment of big international hub airports; Construction and redevelopment of Russian internal airports; Construction and redevelopment of airports, which provide coherence of basic aerodrome network; Construction and redevelopment of socially important local airports; Realization of transit potential of the Russian Federation. 13
14 Compliance of plans of Russian ANS development with ICAO strategy of aviation system block upgrades (ASBU) 14
15 Performance Improvement Area 1: Greener Airports ASBU ICAO module Relevancy Domain Applicability RF ANP IP ANS (project) FIP Stage Times Standards B0-65 Optimization of approach procedures including vertical guidance High TMA Main airports Yes Yes 1,2 Development ICAO B1-65 Optimised Airport Accessibility High TMA Main airports Yes Yes 1,2 Development ICAO B0-70 Increased Runway Throughput through Wake Vortex Separation Low TMA Largest airports No No No IAW ICAO ICAO B1-70 Increased Runway Throughput through Dynamic Wake Vortex Separation Low TMA Largest airports No No No IAW ICAO ICAO B0-75 Improved Runway Safety (A-SMGCS) Medium APT Largest airports Yes Yes 1 Development ICAO B1-75 Enhanced Safety and Efficiency of Surface Operations (A-SMGCS / ATSA-SURF) Medium APT Largest airports No Yes No Development ICAO B0-80 Improved Airport Operations through Airport-CDM High APT Largest airports No Yes No Development Local B1-80 Optimised Airport Operations through A-CDM Total Airport Management High APT Largest airports No Yes No Planned ICAO (TBC) B1-81 Remotely Operated Aerodrome Control Medium n/a TBD No No No Study TBD ICAO (TBC) B0-15 Improve traffic flow through runway sequencing High TMA Largest airports Yes Yes 1 Development ICAO (TBC) B1-15 Improved Airport operations through Departure, Surface and Arrival Management High TMA, APT Largest airports No Yes No Planned ICAO (TBC) 15
16 Performance Improvement Area 2: Globally Interoperable Systems and Data Through Globally Interoperable System Wide Information Management ASBU ICAO module Relevancy Domain Applicability RF ANP IP ANS (project) FIP Stage Times Standards B0-25 Increased Interoperability, Efficiency and Capacity through Ground-Ground Integration Medium n/a UACC Yes Yes 1 Development ICAO B1-25 Increased Interoperability, Efficiency and Capacity though FF- ICE/1 application before Departure Medium n/a ANS No Yes No Planned ICAO B0-30 Service Improvement through Digital Aeronautical Information Management Medium n/a ANS Yes Yes No Planned ICAO B1-30 Service Improvement through Integration of all Digital ATM Information Medium n/a ANS No Yes No Planned ICAO B1-31 Performance Improvement through the application of System Wide Information Management (SWIM) High n/a ANS No Yes No Planned ICAO 16
17 Performance Improvement Area 3: Optimum Capacity and Flexible Flights Through Global Collaborative ATM ASBU ICAO module Relevancy Domain Applicability RF ANP IP ANS (project) FIP Stage Times Standards B0-10 Improved Operations through Enhanced En-Route Trajectories B1-10 Improved Operations through Dynamic ATS Routing Medium Medium ENR, TMA, ORP n/a Yes Yes No Development/ Implemented ICAO ENR, TMA, ORP n/a Yes Yes No Planned ICAO B0-35 Improved Flow Performance through Planning based on a Network-Wide view High ALL CFMU/UACC Yes Yes 1 Development ICAO B1-35 Enhanced Flow Performance through Network Operational Planning High ALL CFMU/UACC Yes Yes No Planned ICAO B1-105 Better Operational Decisions through Integrated Weather Information (Strategic >40 Minutes) Medium n/a B0-85 Air Traffic Situational Awareness (ATSA) Low ENR, TMA UACC / main airports No Yes No Planned ICAO CA, GA, Helicopters No Yes No Development/ Trials ICAO B1-85 Increased Capacity and Flexibility through Interval Management Medium ENR, TMA TBD No No No Study TBD ICAO (TBC) B0-86 Improved access to Optimum Flight Levels through Climb/Descent Procedures using ADS-B Low ORP CA/Oceanic UACC Yes Yes No Planned ICAO B0-101 ACAS Improvements High ENR, TMA CA No Yes No Planned ICAO 17
18 Performance Improvement Area 4: Efficient Flight Path Through Trajectory-based Operations ASBU ICAO module Relevancy Domain Applicability RF ANP IP ANS (project) FIP Stage Times Standards B0-05 Improved Flexibility and Efficiency in Descent Profiles (CDOs) High TMA Main airports Yes Yes 1,2 Development ICAO B1-05 Improved Flexibility and Efficiency in Descent Profiles (OPDs) High TMA Main airports Yes Yes 1,2 Development ICAO B0-40 Element 1: ADS-C over Oceanic and Remote Areas Medium ORP ORP UACC Yes Yes No Implemented/ Planned AEEC/ICAO B0-40 Element 2: Continental CPDLC Medium ENR UACC Yes Yes 1 Development ICAO (TBC) B1-40 Improved Traffic Synchronisation and Initial Trajectory- Based Operation Medium ALL TBD No Yes No Planned ICAO (TBC) B0-20 Improved Flexibility and Efficiency in Departure Profiles (CCOs) TBD ENR, TMA Main airports Yes Yes No Study TBD ICAO (TBC) 18
19 THANK YOU
Packaging Tomorrow s Aviation System
International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth
More informationAviation System Block Upgrades (ASBU), Blocks 0 and 1
ATC Global Federal Aviation Aviation System Block Upgrades (ASBU), Blocks 0 and 1 Presented by: B. Bagstad, FAA ATO International Date: September, 2014 Aviation System Block Upgrades (ASBU) ASBU is a systems
More informationOverview of the Aviation System Block Upgrades (ASBUs) Concept and PBN
Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Vince Galotti Deputy Director, Safety Standardization & Infrastructure Air Navigation Bureau International Civil Aviation Organization
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The
More informationBlock 0 to Block 1 Vaughn Maiolla
Block 0 to Block 1 Vaughn Maiolla Dakar, Senegal, September 2017 Objective To show Block 1 threads as an operational evolution from Block 0 threads. 23 September 2017 2 Flight plan - Vision - ASBUs - Evolution.
More informationBits to Blocks Aviation System Block Upgrades (ASBU)
Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011 We are here... Bits Russia Canada Australia India China 2 We Can make
More informationMID Region Air Navigation Strategy
MID Region Air Navigation Strategy Mohamed Smaoui ICAO Deputy Regional Director Middle East Office, Cairo Cairo/23 26 November 2015 Outline Background Strategy Main Objectives MID ASBU Block 0 Modules
More information2012 Performance Framework AFI
2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations
More information(Presented by United States) EXECUTIVE SUMMARY
NACC/WG/5 IP/07 27/04/17 Fifth North American, Central American and Caribbean Working Group Meeting (NACC/WG/5) Port of Spain, Trinidad and Tobago, 22-26 May 2017 Agenda Item 3 Implementation on Air Navigation
More informationWORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the
INTERNATIONAL CIVIL AVIATION ORGANIZATION WORLD METEOROLOGICAL ORGANIZATION MET/14-WP/64 18/7/14 Meteorology (MET) Divisional Meeting (2014) Commission for Aeronautical Meteorology Fifteenth Session Montréal,
More informationATFM/CDM ICAO s Perspective
ATFM/CDM ICAO s Perspective Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo/3-4 April 2016 Outline Traffic Growth in the MID Region What is ATFM/CDM Main Objectives ICAO Guidance
More informationGlobal ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization
SIP/2009-WP/8 Business case Global ATM System ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case for the
More informationAN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report
29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission
More informationThird Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia
Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July 2018 Saudi Arabia Outline High Level Plan Overall Progress in ASBU Implementation (Priority 1) Success Story(ies)/Initiatives
More informationINTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU
ASBU WORKSHOP WI/20/09//2017 Day n 3: STRATEGY ASBU STATUS OF IMPLEMENTATION OF ICAO ASBU [Presented by the Agency for the Safety of Air Navigation in Africa and Madagascar] Executive Summary The purpose
More informationART Workshop Airport Capacity
ART Workshop Airport Capacity Airport Research Bob Graham Head of Airport Research 21 st September 2016 Madrid Expectations The issues and opportunities for future research New solutions / directions for
More informationSecond Meeting of the Air Navigation System Implementation Group (ANSIG/2)
Second Meeting of the Air Navigation System Implementation Group (ANSIG/2) Cairo, Egypt, 6 8 December 2016 The United Arab Emirates Presented by Hamad Al Belushi Outline Brief on the UAE National ASBU
More informationSESAR Solutions. Display Options
SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION
APIRG/18 IP/9 12/2/2012 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP EIGHTEENTH MEETING (APIRG/18) Kampala, Uganda (27 30 March 2012) Agenda Item 3.4: Communication
More informationNACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014
17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014 Agenda Item 3 Follow-up on the NAM/CAR Regional Performance-Based Air
More informationWORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:
WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: SUPPORTING A GLOBALLY HARMONIZED AND SEAMLESS ATM SYSTEM Vince Galotti Chief/ATM ICAO 2 June 2008 Presentation Outline What is a
More informationSAMPLE TEMPLATE APPENDIX 3.5C-1
APIRG/19 Appendix 3.5 C1-C3 SAMPLE TEMPLATE APPENDIX 3.5C-1 AIR NAVIGATION REPORT FORM (ANRF) ASBU METHODOLOGY Regional and National planning for all ASBU Modules REGIONAL/NATIONAL PERFORMANCE OBJECTIVE
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative
More informationInternational Civil Aviation Organization
AN-CONF/12 International Civil Aviation Organization TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 VOLUME II AVIATION SYSTEM BLOCK UPGRADES REPORT FOLDER Only material which has been
More informationGANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation
GANP 2019/ASBUs Olga de Frutos Technical Officer Air Navigation Marrakesh/10 th December 2018 Agenda Background information GANP 2019 Global Strategic level Global Technical level BBB and ASBU framework
More informationTWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.
International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based
More informationGlobal ATM System ~Interoperability and Harmonization ~
SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case
More informationWork Programme of ICAO Panels and Study Groups
SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationICAO ASBU Implementation/ Surveillance and ATS Automation
Session 1 ICAO SARPS, DOCUMENTATION AND GLOBAL AND REGIONAL PLANS REGARDING THE IMPLEMENTATION OF AERONAUTICAL SURVEILLANCE AND AUTOMATED SYSTEMS FOR ATS OPERATIONS ICAO ASBU Implementation/ Surveillance
More informationAviation System Block Upgrades
WORKING DOCUMENT FOR THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION ISSUED: 28 MARCH 2013 This Page Intentionally Left Blank ii Table of Contents APPENDIX A SCHEMATIC DIAGRAMME
More informationCNS/ATM Systems Interoperability and Harmonization
SIP/2004-WP18 Business case Special Implementation Project CNS/ATM Systems Interoperability and Harmonization (Presented by H.V.SUDARSHAN) Workshop on the development of business case for the implementation
More informationWorkshop Exercise, EGYPT Air Navigation Plan 10 /12/2010
Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR
More informationThe evolving air navigation system and the impact on avionics
International Civil Aviation Organization The evolving air navigation system and the impact on avionics Vincent Galotti Deputy Director, Safety Standardization & Infrastructure, ICAO 18 August 2011 Introduction
More informationDate Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented
PIA 1 Block - Module B0 - ACDM Date MAY, 2017 Module Description: To implement collaborative applications that will allow the sharing of surface operations data among the different stakeholders on the
More informationATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT
AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,
More informationWorkshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont
Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community
More informationTHE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division
THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION
More informationYou and ASBU. Javier Vanegas CANSO
You and ASBU Javier Vanegas CANSO You and ASBU 4 th CANSO Latin American and Caribbean Conference Buenos Aires, 24-26 September 2012 Javier A. Vanegas Director Latin America and Caribbean Affairs TRANSFORMING
More informationPerformance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY
8/9/ International Civil Aviation Organization MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 7-9 October ) Agenda Item : Performance Framework for MID Region Air Navigation
More informationAPPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION
RASG-EUR/03 Summary of Discussions L-1 APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE REGION ST1- Improvement of the accident rate in commercial air transport Safety Target: Reduce by
More informationPresented by: Trinidad and Tobago
Presented by: Trinidad and Tobago November 2013 References ICAO PBN toolkit ICAO Global Air Navigation Plan (Doc 9750) ICAO PBN Manual (Doc 9613) Piarco FIR PBN Action Plan TTCAA PBN Core Implementation
More informationICAO Air Navigation Panels/Study Groups Work Programme
NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air
More informationModule N B1-30: Service Improvement through Integration of all Digital ATM Information 129 Performance Improvement Area 2: Globally Interoperable
Table of Contents Appendix A: Summary Table of Aviation System Block Upgrades Mapped to Performance Improvement Areas 1 Detailed Aviation System Block Upgrades 7 Performance Improvement Area 1: Greener
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region
ICG Experts Meeting Global Navigation Satellite Systems Services 14 18 December 2015, Vienna, Austria ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian
More informationPresentation of the First Deputy Director, Scientific and Research Institute of Airnavigation
Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation V. Korchagin PBN implementation plan for the Russian airspace and its first results PBN TF/8 meeting, Paris
More informationICAO framework for LPV
ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic
More informationNext Generation Airspace Developments: Key Operational Trends and Enablers
Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationTHE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION (DRAFT 2016)
THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION (DRAFT 2016) This Page Intentionally Left Blank ii Table of Contents APPENDIX A SCHEMATIC DIAGRAM OF BLOCK UPGRADES... 1 APPENDIX
More informationPROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY
NACC/WG/5 WP/32 21/04/17 Fifth North American, Central American and Caribbean Working Group Meeting (NACC/WG/5) Port of Spain, Trinidad and Tobago, 22-26 May 2017 Agenda Item 3: Implementation on Air Navigation
More informationDIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY
DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management
More informationAviation System Block Upgrades
WORKING DOCUMENT FOR THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION ISSUED: 16 NOVEMBER 2011 SUCCESSOR TO THE WORKING DOCUMENT FOR GLOBAL AIR NAVIGATION INDUSTRY SYMPOSIUM (GANIS)
More informationMET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN
MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN 1. Introduction 1.1 The ICAO Council approved the fourth edition of the Global Air Navigation
More informationDSNA NAVIGATION STRATEGY
DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally
More informationICAO GANP Requirements and Evolution
ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable
More informationASBU Block 0 Implementation and Regional ANPs
ASBU Block 0 Implementation and Regional ANPs For: Joint ACAO/ICAO ASBU Symposium for EUR/NAT and MID Region Prepared by: Midori Tanino, FAA, ATO International Global ATM Program Manager Date: December
More informationWelcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group
Welcome to AVI AFRIQUE 2017 IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group Debbie Mishael Group Technology, Human Capital, Aviation, Management and Security Consulting and Implementation
More informationTHE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS
THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq
More informationAsia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific
Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific Yoshiki Imawaka Deputy Director - ICAO Asia and Pacific Office Global Ministerial Conference Riyadh, Saudi Arabia, 29 31 August
More informationICAO provisions on data link implementation
ICAO provisions on data link implementation Crystal Kim Technical Officer, Airspace Management and Optimization Section Secretary of Operational Data Link Working Group (OPDLWG) and Air Traffic Management
More informationTWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4
26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee
More informationFF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva
International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,
More informationContinuous Improvement of the Global Air Traffic Management System
Continuous Improvement of the Global Air Traffic Management System Nancy Graham Director/Air Navigation Bureau Vince Galotti Chief/Air Traffic Management 1 Message Air traffic management contributes to
More informationInternational Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM
30/05/2014 International Civil Aviation Organization MIDANPIRG ATM Sub-Group First Meeting (ATM SG/1) (Cairo, Egypt, 9-12 June 2014) Agenda Item 3: Global and Regional Developments related to ATM GLOBAL
More informationUK Implementation of PBN
UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation
More informationNORTH ATLANTIC (NAT) AIR NAVIGATION PLAN
NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN VOLUME III 29 June 2018 ENDORSED BY NAT SPG/54 NAT ANP, Volume III June 2018 Page i TABLE OF CONTENTS PART 0 Introduction... 0-1 PART I - General Planning Aspects
More informationNAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office
NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office Outline NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP)
More informationMID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region
MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec. 2005 Status of implementation of CNS/ATM Systems in the MID Region Mohamed Smaoui RO/AIS/MAP, ICAO MID Office, Cairo Contents
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE
NPF/SIP/2010-WP/22 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10
More informationEFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY
EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL
More informationBangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)
INTERNATIONAL CIVIL AVIATION ORGANIZATION FIFTH MEETING OF THE ASIA/PACIFIC PERFROMANCE BASED NAVIGATION TASK FORCE (PBN TF/5) Bangkok, Thailand, 15 17 July 2009 Agenda Item 3: 3.1 State PBN Plan and Status
More informationSafety and efficiency performance framework ASBU methodology. H.Sudarshan Air Navigation Bureau, ICAO
International Civil Aviation Organization Safety and efficiency performance framework ASBU methodology H.Sudarshan Air Navigation Bureau, ICAO APANPIRG/22 Meeting, Bangkok, 5 9 September 2011 Presentation
More informationASSEMBLY 39TH SESSION
International Civil Aviation Organization WORKING PAPER A39-WP/278 25/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation safety and air navigation implementation support SUGGESTION
More informationSAMPLE TEMPLATE. Regional and National planning for ASBU Modules
SIP/ASBU/MEXICO/2013-WP/20 SAMPLE TEMPLATE 1. AIR NAVIGATION REPORT FORM (ANRF) (This template demonstrates how ANRF to be used. The data inserted here refers to ASBU B0-CDO as an example only) Regional
More informationBoeing Air Traffic Management Overview and Status
Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes
More informationImplementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14
of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 Julio Garriga, RO/TA International Civil Aviation Organization North American,
More informationHome LIST OF ACRONYMS
LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationAIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office
AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop Víctor Hernández ndez Regional Officer ATM/SAR ICAO NACC Office 1 CONTENTS ICAO REGIONAL OFFICES - OBJECTIVE REGIONAL AIR NAVIGATION
More informationATC automation: facts and steps ahead
ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC
More informationATM processes automatization for Runway (Airport) Throughput Enhancement
ATM processes automatization for Runway (Airport) Throughput Enhancement Paris, France, 25-26 January 2018, ICAO/EUROCONTROL Runway Throughput Enhancement Solutions Workshop About the Company Azimut is
More informationATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA
ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead
More informationFrench DSNA approach to CNS rationalization & evolution
French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single
More informationNAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms
06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional
More informationUSE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR
BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationTWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)
INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda
More informationEuropean ATM Development The Big Idea
European ATM Development The Big Idea Bo Redeborn Principal Director ATM EUROCONTROL CANSO Data Communications Conference Amsterdam, 6-8 th Sept 2011 The European Organisation for the Safety of Air Navigation
More informationPBN Implementation Plan Tonga
PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using
More informationCRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)
E/CAR/DCA/25 WP/10 International Civil Aviation Organization 13/11/13 North American, Central American and Caribbean Office (NACC) Twenty-fifth Meeting of Directors of Civil Aviation of the Eastern Caribbean
More informationMany thanks to our host
Many thanks to our host Many thanks to our Lead Sponsor Opening Addresses Eng. Hussein Massoud Minister of Civil Aviation Egypt Opening Addresses Paul Riemens CANSO Chairman of the Executive Board & CEO,
More informationAviation System Block Upgrades
THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION DRAFT 2016 EDITION This Page Intentionally Left Blank ii Table of Contents APPENDIX A SCHEMATIC DIAGRAMME OF BLOCK UPGRADES...
More informationIATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018
IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry
More information