ICAO framework for LPV

Size: px
Start display at page:

Download "ICAO framework for LPV"

Transcription

1 ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon,

2 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2

3 The challenges Air Traffic is going to growth in next decades (but less than previously estimated) Transition to GNSS-based services PBN concept Fuel consumption and CO2 emission reduction 3

4 What and why PBN? Performance-based Navigation (PBN) defines performance requirements for aircraft navigating on an ATS route, terminal procedure or in a designated airspace. Benefits: reduce aviation congestion (capacity, efficiency) conserve fuel protect the environment reduce the impact of aircraft noise great flexibility Increase of safety A37-11 urges all States to complete a national PBN implementation plan as soon as possible to achieve: PBN for en route and terminal areas, NAV application NAV specification NAVAID infrastructure PBN Concept according to established timelines and intermediate milestones; PBN approach procedures with vertical guidance (APV) for all instrument runway ends (as primary or back-up for precision approach) by

5 ICAO Performance Based Navigation Concept Airspace Concept Com Nav Surv ATM Nav Applications Nav Specifications RNAV Specifications RNAV10 (RNP 10) RNAV 5 RNAV 2 RNAV 1 Nav Infrastructure RNP Specifications RNP 4 RNP 2 RNP 1 Advanced RNP RNP 0.3 RNP APCH RNP AR APCH RNP w/ Added Requirements e.g. 3D, 4D 5

6 Relevant ICAO Annexes Annex 10 Aeronautical Telecommunications Annex 11 Air Traffic Services Annex 4 Aeronautical charts Annex 14 Aerodromes Annex 15 Aeronautical Information Services SARPs NOTAM SIS performance GNSS receiver performance 6

7 Relevant ICAO publications Doc 4444 Air Traffic Management PANS ATM ATC phraseology Doc 9992 PBN Airspace design manual PBN implementation processes Doc 9849 GNSS Manual GNSS context Doc 9613 PBN Manual Doc 8168 PANS--OPS PANS Implementation guidance Obstacle clearance Specifications Procedure design Doc 9905 RNP AR APCH Doc 8071 Manual on testing of radio navigation aids GNSS testing FPL Applicability Nov 2014 (subject to ANC review) 7

8 Air Navigation Conference #12 Held from 19 till 30 November 2012 Attended by 1032 participants from 120 Contracting States and 30 Observer Delegations Endorsement of Global Air Navigation Plan as unified planning mechanism Endorsement for short term Block Upgrades (Block1) Strategic directions for medium and long term Block Upgrades (Block 2 & 3) Today s priorities are: PerfomancePerfomance-based Navigation Continuous Descent Operations Continuous Climb Operations GNSS is a key element for Air Navigation Systems 8

9 ANC#12 recommendations Rationalization of radio systems That ICAO and other stakeholders to explore strategies for the decommissioning of some navigation aids and ground stations, and the rationalization of the on-board communications, navigation and surveillance systems while maintaining safety and coordinating the need for sufficient system redundancy. PBN for terminal and approach operations implementation That States and stakeholders: urgently implement, where appropriate, PBN for terminal and approach operations in accordance with Assembly Resolution A37-11; urgently adopt efficient operations approval procedures and support the mutual recognition of other States operational approvals; share their best practices including required navigation performance authorization-required implementation initiatives as well as relevant flight operational safety assessment documentation with other States; determine operational requirements in support of their airspace concept in accordance with the processes described in the Performance-based Navigation (PBN) Manual in order to select the appropriate PBN specification; including regulators, airport authorities, air navigation service providers, commercial operators, General Aviation and the military, work together at all levels and in close coordination to ensure successful performance-based navigation implementation 9

10 ICAO General Assembly #38 Hosted in Montreal from 24th September till 4th of October Endorsement of ICAO Doc 9750 Global Air Navigation Plan Areas related to GNSS: SBAS L1/L5 signal specification Reflection of GPS L5 specifications in Annex 10 Request from Russian federation on developing instructions material to assist States on implementing GNSS Output assessment on going 10

11 ICAO Global Air Navigation Plan First draft presented at ANC#12, reviewed by States, ICAO Aviation partners and industry stakeholders Provides the potentials to increase system capacity and efficiency, decreasing impacts on environment Block Upgrade concept is a flexible approach to implementation, not all modules are necessary for States and Regions Ch.1 Global Air Navigation Policy Ch.2 Standardization: Aviation System Block Upgrades Ch.3 Continuing Strategic Planning Ch.4 Implementing Globally Interoperable ATM Ch.5. Aviation System Reporting & Performance Adjustments 11

12 Air Space Block Upgrade Concept Performance Improvement Areas AIRPORT OPERATIONS Block 0 (2013) Optimization of approaches procedures including vertical guidance Block 1 (2018) Block 2 (2023) Block 3 (2028>) Optimized airport accessibility GLOBALLY INTEROPERABLE SYSTEMS AND DATA OPTIMUM CAPACITY AND FELXIBLE FLIGHTS EFFICIENT FLIGHT PATHS Improved Operations through Optimized ATS Routing Improved Flexibility and Efficiency in Descent Profiles using Continuous Descent Operations (CDOs) Improved Flexibility and Efficiency in Descent Profiles (CDOs) using VNAV Improved Flexibility and Efficiency in Descent Profiles (CDOs) Using VNAV, Required Speed and Time at Arrival. 12

13 PBN Manual ICAO Doc 9613 Performance-based Navigation Manual 4th ed. was published on March 2013 Guidance to States, Air Navigation Service Providers and Airspace Users on how to implement RNAV and RNP applications. Volume I: Concept and Implementation guidance Part A The PBN Concept Part B Implementation Guidance Volume II: Implementing RNAV and RNP Operations Part A General Part B Implementing RNAV Operations Part C Implementing RNP Operations 13

14 Airspace design Project planning 1 Operational requirement 2 PBN Implementation team 3 Project objectives and scope 4 Reference scenario 5 Safety and Performance criteria 6 CNS/ATM Assumptions 7 Route design 8 Initial Procedure Design 9 Airspace Volumes 10 Confirm Navigation Specifications Validation & Implementation planning 11 Validate airspace concept 12 Finalize procedure design Implementation 13 Instrument flight procedure + Flight Inspection 14 ATC system integration consideration 15 Awareness and training material 16 Implementation 17 Post-implementation review 14

15 PBN Manual: Navigation Service Monitoring Information on the operational status of radio navigation service If the service is essential by the State GNSS monitoring tool NOTAMs (predictive GNSS service availability) OR Pilot reports based on status information provided by the avionics ADDITIONAL Independent real-time ground based stations (GNSS status information) Differences in RAIM algorithms Satellites in view Receiver mask angle Integration with other sensors (DME/DME, baro, inertial) risk to have conflicting status information, which sensor trust (avionic or ground)? Can be used also for data recording and archiving 15

16 PBN Manual: Implementing RNP APCH LNAV/VNAV minima Elements to be considered Missed approach (can be based also upon conventional NAVAID) Risk of loss of RNP APCH capability Obstacle clearance Verification of SBAS signal and SBAS provider against national regulation Air Traffic Controllers training FAS DB creation (quality of data) SBAS availability Can be checked by NOTAM or Prediction Services (to be decided by the operating authority) Prediction tools assess the expected capability 16

17 PBN Manual requirements for pre-flight RAIM levels required for RNP APCH down to LNAV or LNAV/VNAV minima can be verified by : NOTAMs (where available) prediction services The service may be provided by: ANSP, avionics manufacturer, other entities, airborne receiver RAIM prediction capability LP or LPV service availability prediction should take into account the latest GPS constellation and SBAS system status NOTAMs and avionics model (when available). The service may be provided by: ANSP, avionics manufacturer, other entities through an airborne receiver LP or LPV service prediction capability. 17

18 GNSS Manual ICAO DOC 9849 Global Navigation Satellite System Manual 2nd ed. 18

19 GNSS Manual GNSS vulnerabilities Effective spectrum management Adequate regulatory framework (repeaters and pseudolites) created by States Compatibility of DME/TACAN infrastructure with GNSS Risk assessment on intentional interference Ionosphere and Solar activity Certification and Operational approvals Airworthiness approval Smooth IFR operations Technology mature Acceptable risks SIS performance Quality of procedure design DB integrity Training 19

20 GNSS Manual: GNSS monitoring and recording Objective Monitor and record relevant GNSS data to support accident /incident Objective: investigation and confirm periodically GNSS performances (accuracy, integrity, continuity and availability) Recording point located in representative locations in the service area Recording system independent of the GNSS service and can be delegated to other entities (for EGNOS, in Europe done by ESSP) Parameters to be considered for all GEOs: GEO C/N0 GEO raw pseudo-range code and carrier phase SBAS data messages Receiver status information Can be used as support to RFI detection 20

21 GNSS Manual: Aeronautical Information Services Provide relevant information (terms & conditions, procedures, training req, etc) Background information about SBAS technology Means: AIP, AIC or advisory circular Service status notifications can be provided via NOTAM or on alternative ways (e.g. internet) NOTAM can be used in case of: Widespread SBAS service outages Confirmed local signal interferences 21

22 ENAV background in GNSS 1997: AIC A4/97 introduction of B-RNAV based on VOR/DME infrastructure September 2010: Italian PBN TF constitution, AIC A5/2010 EGNOS SoL introduction over Italian Airspace April 2011: AIC A1/2011 Introduction of P-RNAV in the terminal airspace of Italy based on GNSS, DME/DME November 2011: First draft for National RNP Approaches Safety Case May 2012: EWA signature with ESSP June 2012: National PBN Implementation Plan approved by National Regulator September 2012: National RNP Approaches Safety Case approval by NSA November 2012: AIC A17/2012 Introduction of RNP APCH in Italy December 2012: first LPV publication for Linate Airport 22

23 Italian LPV implementation plan The plan is in line with the ICAO Assembly Resolution A37/11 Short term LPV procedures for major airports as backup of ILS Radar monitoring mitigation Medium term Long term LPV for airports with site critical issues Cost/benefit analysis to assess where is possible to dismiss conventional navaids Future steps 1. Consider impacts of new PBN IR 2. Perform feasibility studies of LPV implementation on small airports without radar monitoring service 3. Review National safety case in order to update some mitigations 4. Consider EGNOS evolutions 5. Update National PBN plan, if necessary 23

24 Approach phase Consultation with operators in progress by means of periodical ENAV Customer Care meeting RNP APCH procedures initially implemented with LNAV and LPV minima Airports already involved: LIRF => Main runway ends (16L/R, 34L/R); LIML RWY 36, LIMC RWY 35L, LIPZ RWY 22L; Next airports: Further 8 runway ends expected before next summer LIML (RWY 18), LIMC (RWY 35R), LIRQ (RWY 05), LIPE, LIMF (RWY 36), LIME; LIMJ Implementation, expected during next year, on two runway ends at the moment served only by circling approach (LIMJ RWY 10 LIPX RWY 22). LPV helicopter approach procedures developed and validated for Milan Linate and Bergamo airports in the framework of ACCEPTA Project; GNSS monitoring: Activities in progress in order to deploy a national GNSS strategy and to overcome some of the Safety Requirements needed for the implementation of RNP APCH procedures. 24

25 Training Plan Training modules for Procedure designers in the framework of continuous training activities Training modules on PBN familiarization and P-RNAV procedures, including operational aspects, for ATCOs operating in radar CTR Training module on GNSS approach procedure for ATCOs planned accordingly to implementation schedule Operational training modules on PBN and related procedure management for ATCOs instructors operating at ENAV Academy Training modules on PBN familiarization for all people involved in operational activities. 25

26 Conclusions Some points need to be further developed under ICAO and European framework in order to have an harmonized approach: Clarifications on requirements for GNSS monitoring, Actions to take in case of SIS performance degradation GNSS vulnerabilities SBAS evolutions: DF (L1, L5) + DC (GPS, Galileo) Improvements in service flexibility, availability, level of service and safety 26

27 27

ENAV experience on LPV implementation

ENAV experience on LPV implementation ENAV experience on LPV implementation Patrizio Vanni GNSS and SES expert International Strategies Office enav.it Tunisi, 23-10-2013 Main topics Company profile ENAV role in MEDUSA ENAV role in GNSS GNSS

More information

PBN Implementation inside Italian Airspace Status update Summer 2013

PBN Implementation inside Italian Airspace Status update Summer 2013 PBN Implementation inside Italian Airspace Status update Summer 2013 Paris, 11-13 September 2013 enav.it Contents Tasks achieved PBN implementation schedules On going activities Further aspects Conclusions

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

The support of an European ANSP

The support of an European ANSP The support of an European ANSP Euromed GNSS II project/medusa Final event on GNSS for aviation Patrizio Vanni (GNSS expert) International Strategies Office patrizio.vanni@enav.it MEDUSA final event on

More information

Open Questions & Collecting Lessons Learned

Open Questions & Collecting Lessons Learned Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

Status of PBN implementation in France

Status of PBN implementation in France Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA EUROMED GNSS II Achievements and expectations Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA Presentation Overview Generalities Current Situation LPV approaches in

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

Patrizio Vanni (Project Coordinator)

Patrizio Vanni (Project Coordinator) H2020 project funded by Patrizio Vanni (Project Coordinator) EGNOS Annual Workshop Athens, 3 October 2017 This project has received funding from the European GNSS Agency under the European Union s Horizon

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS The objective of the project was EGNOS enabled APV SBAS (LPV) approach procedures, and related implementation at Larnaca and Paphos International

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/118 1 1/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation Safety and Air Navigation Implementation Support IMPACT TO

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

PBN Implementation inside Italian Airspace

PBN Implementation inside Italian Airspace PBN Implementation inside Italian Airspace Leonardo NICOLO Airspace and Procedures Design Department TMA, CTR & Airports Unit Responsible Brussels, March, 12-14 2014 0 CONTENTS PBN Implementation Path

More information

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region ICG Experts Meeting Global Navigation Satellite Systems Services 14 18 December 2015, Vienna, Austria ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian

More information

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand) INTERNATIONAL CIVIL AVIATION ORGANIZATION FIFTH MEETING OF THE ASIA/PACIFIC PERFROMANCE BASED NAVIGATION TASK FORCE (PBN TF/5) Bangkok, Thailand, 15 17 July 2009 Agenda Item 3: 3.1 State PBN Plan and Status

More information

PBN and Procedure Design training

PBN and Procedure Design training PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training

More information

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information EGNOS SERVICE PROVISION WORKSHOP 2016 DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information Agenda Facts and Figures for Approach Procedures in Germany Brief History

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

Packaging Tomorrow s Aviation System

Packaging Tomorrow s Aviation System International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile First LPV 200 approach in Europe Paris Charles de Gaulle Benoit Roturier DSNA ESSP Workshop Warsaw - 2016 PBN Implementation Status PBN FOR APPROACHES TARGETS FOR FRANCE Modernizing/rationalizing French

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

SBAS Frequently Asked Questions

SBAS Frequently Asked Questions SBAS Frequently Asked Questions 1. What is SBAS? 2. Where are SBAS networks in operation or under development? 3. What are the benefits of SBAS? 4. What is SBAS interoperability? 5. Will SBAS provide a

More information

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination RACOON PROJECT Daniele Teotino - ENAV RACOON Project Manager Head of SESAR JU Activity Coordination RACOON in a Nutshell SESAR JU Very Large Scale Demonstration First Italian initiative on Remote TWR solutions

More information

Contextual note SESAR Solution description form for deployment planning

Contextual note SESAR Solution description form for deployment planning Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015 EGNOS based Operations Implementation Status and Plans for 2016 EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015 Table of Contents Drivers for APV Implementation LPV Implementations:

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Vince Galotti Deputy Director, Safety Standardization & Infrastructure Air Navigation Bureau International Civil Aviation Organization

More information

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

RNP AR Experience. Phil Rakena PBN Project Manager February 2015 RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

NEW FPL Transition Phase & Implementation Stages

NEW FPL Transition Phase & Implementation Stages International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

EASA RNP (AR) Workshop The Landscape Working Together

EASA RNP (AR) Workshop The Landscape Working Together EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches

More information

MID Region Air Navigation Strategy

MID Region Air Navigation Strategy MID Region Air Navigation Strategy Mohamed Smaoui ICAO Deputy Regional Director Middle East Office, Cairo Cairo/23 26 November 2015 Outline Background Strategy Main Objectives MID ASBU Block 0 Modules

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/18 10/04/15 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP MEETING SECOND MEETING Rome Italy, 4 to 8 May 2015 Agenda Item 5 : New Work Programme

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY 216 INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/9-WP/15 South American Regional Office Regional Project RLA/06/901 12/04/12 Assistance for the implementation of a regional ATM system according to

More information

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1 ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

PBN Implementation Plan Tonga

PBN Implementation Plan Tonga PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using

More information

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Lebanon national workshop Euromed GNSS II national workshop, Beirut, 26 November 2013 1 Index EGNOS SoL operation

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

NEW CALEDONIA PBN PLAN

NEW CALEDONIA PBN PLAN NEW CALEDONIA PBN PLAN SUMMARY This document presents the performance-based navigation (PBN) deployment program in the New Caledonia airspace sector of NANDI Flight Information Region (FIR NFFF) as well

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) PBN/TF/8 IP/03 12-13/5/2011 International Civil Aviation Organization The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) New Delhi, India 12 13 May 2011 Agenda Item 5: State/Industry

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the INTERNATIONAL CIVIL AVIATION ORGANIZATION WORLD METEOROLOGICAL ORGANIZATION MET/14-WP/64 18/7/14 Meteorology (MET) Divisional Meeting (2014) Commission for Aeronautical Meteorology Fifteenth Session Montréal,

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).

More information

2018 Annex Amendments

2018 Annex Amendments 2018 Annex Amendments TOPICS Introduction of remote pilot licence and the provision for the regulation of RPAS licensing to support international flights operating under IFR Amendment as a result of proposed

More information

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole

More information

PBN Implementation Plan - Fiji Version 1 19 January 2010

PBN Implementation Plan - Fiji Version 1 19 January 2010 PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......

More information

Appendix E NextGen Appendix

Appendix E NextGen Appendix Appendix E NextGen Appendix NEXTGEN BACKGROUND This appendix is intended to supplement the information provided in the chapter to give additional technological background to NextGen. ADS-B Services ADS-B,

More information

In cover a detail of new night/ week end shortest routes for overflying Sardinia Area

In cover a detail of new night/ week end shortest routes for overflying Sardinia Area FLIGHT EFFICIENCY PLAN 2014 In cover a detail of new night/ week end shortest routes for overflying Sardinia Area Flight Efficiency Plan 2014 CANSO, IATA and EUROCONTROL have identified the action points

More information

PBN/TF/7 DRAFT Appendix D to the Report D-1

PBN/TF/7 DRAFT Appendix D to the Report D-1 DRAFT STATUS OF IMPLEMENTATION TASKS LIST PBN Task Force C4/1 The APAC PBN TF encourages States to consider the GO Team visit. On-going. States are encouraged to consider the GO Team visit as required.

More information

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Jordan national workshop Euromed GNSS II national workshop, Amman, 11 December 2013 1 Index EGNOS SoL operation in

More information

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

APV IMPLEMENTATION PLAN

APV IMPLEMENTATION PLAN APV IMPLEMENTATION PLAN PRESENTATION PLAN Introduction PBN concept benefits implementation process Infrastructures assessment Operational constraints Medusa ALG civil aviation following actions conclusion

More information

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD ÁFRICA DE FRANCISCO VALERA SUMMARY Summary: Ineco company. Flight procedure design team. Flight procedure

More information

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study. Change History Version Status Date Affected Pages Author Cause and Summary of the Change 00.01 draft 2017-01-22 all M. Mlynarik New document 00.02 draft 2017-01-29 all M. Mlynarik Internal reviews 00.03

More information

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee

More information

LPV implementation to non-instrument runways

LPV implementation to non-instrument runways LPV implementation to non-instrument runways Carmen Aguilera, Aviation & H2020 Coordinator European GNSS Agency Combined GA TeB & GA Sectorial Committee Cologne, June 1 st 2017 Table of Contents 1. The

More information

ICAO GANP Requirements and Evolution

ICAO GANP Requirements and Evolution ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable

More information

European Joint Industry CDA Action Plan

European Joint Industry CDA Action Plan Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in

More information

GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013

GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013 GNSS NOTAM Aline Troadec RNAV approach specialist EUROCONTROL AI Operations-9 27-28 November 2013 The European Organisation for the Safety of Air Navigation Table of content 3 topics on which AI expertise

More information

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM ICAO PBN GO TEAM PBN Implementation Workshop Tunis, 24-28 February 2014 ENAC / ATM Bertrand FOUCHER 1 PERSONAL BACKGROUND ATC in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

Guidance for the preparation of EGNOS National Market Analysis

Guidance for the preparation of EGNOS National Market Analysis http://www.transnav.eu the International Journal on Marine Navigation and Safety of Sea Transportation Volume 12 Number 2 June 2018 DOI: 10.12716/1001.12.02.16 Guidance for the preparation of EGNOS National

More information

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System GANIS Montreal, December 2017 Paco Salabert, EUROCONTROL The European Organisation for the Safety of Air Navigation

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

International Civil Aviation Organization

International Civil Aviation Organization AN-CONF/12 International Civil Aviation Organization TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 VOLUME II AVIATION SYSTEM BLOCK UPGRADES REPORT FOLDER Only material which has been

More information

Flight Operations Inspector Manual

Flight Operations Inspector Manual 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and

More information

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU ASBU WORKSHOP WI/20/09//2017 Day n 3: STRATEGY ASBU STATUS OF IMPLEMENTATION OF ICAO ASBU [Presented by the Agency for the Safety of Air Navigation in Africa and Madagascar] Executive Summary The purpose

More information