SW-3, 11 OCT 2018 to 08 NOV SW-3, 11 OCT 2018 to 08 NOV 2018

Size: px
Start display at page:

Download "SW-3, 11 OCT 2018 to 08 NOV SW-3, 11 OCT 2018 to 08 NOV 2018"

Transcription

1 (BRDR7.BROWS) 20AUG5 BORDER SEVEN DEPARURE AKEOFF RUNW AY 9: Climb on heading 093 to intercept MZB VORAC R-096 to BROW S IN. hence... AKEOFF RUNW AY 27: Climb on heading 278 until PGY 9 DME, then left turn on heading 23 to intercept PGY VORAC R-260 and R-069 to BROW S IN. hence..... (transition) or (assigned route). Maintain assigned altitude. Expect filed altitude/flight level 0 minutes after departure. IMPERIALRANSIION (BRDR7.IPL): From over BROW S IN on PGY R-069 and IPLR-250 to IPLVORAC. JULIAN RANSIION (BRDR7.JLI): From over BROW S IN on JLI R-82 to JLI VORAC. PGY 9 MBZ MISSION BAY 7.8 MZB Chan * 002 N (32) R-82 ASSIGNED BY AC L-4, H-4 2 JULIAN 4.0 JLI Chan 87 ILJ N '-W ' per NM to ' per NM to 400. LINDBERGH OW ER SOCALDEP CON EAS W ES Rwy 9: 400- with minimum climb of 60' per NM to 900 or standard with minimum climb of 686' Rwy 27: or standard with minimum climb of IMPERIAL 5.9 IPL Chan 06 ILP BORDER SEVEN DEPARURE (BRDR7.BROWS) R-096 N '-W ' L-4, H-4 SAN DIEGO INL (SAN) POGGI 09.8 PGY Chan 35 R-260 GPY N '-W ' () 25 BROW S N ' W ' * (64) V37 R-250 NOE: Rwy 9- RADAR required. NOE: Rwy 27- DME required. SAN DIEGO INL (SAN)

2 (CWARD2.CWARD) 8004 CWARD WO DEPARURE(RNAV) LOS ANGELES LAX SEAL BEACH SLI (0) 332 AS ASSIGNED BY AC LINDBERGH OWER (42) 3 MADOW (5) 332 CWARD 2000 (2) 337 PADRZ (0) GYWNN 6000 NOE: RADAR required. NOE: RNAV. NOE: GPS or DME/DME/IRU required. NOE: urbojet and turboprop only. NOE: ower En Route control only. Rwy 9: NA-AC. Rwy 27: or standard with minimum climb of 500' per NM to (26) WNFLD AKEOFF RUNWAY 27: Climb heading to, then right turn direct WNFLD, then on track 296 to cross GYWNN at or above 6000, then on track to PADRZ, then on track 337 to cross CWARD at or below 2000, thence on transition. Maintain AC assigned altitude. Expect filed altitude 0 minutes after departure. LOS ANGELES RANSIION (CWARD2.LAX) SEAL BEACH RANSIION (CWARD2.SLI) CWARD WO DEPARURE(RNAV) (CWARD2.CWARD) 07DEC7

3 (ECHHO2.ECHHO) 7285 ECHHO WO DEPARURE(RNAV) IKAYE (20) GEEGN 288 SEAL BEACH SLI 39 LINDBERGH OWER (WES) (EAS) (45) (36) EDEY 30 (2) MMOO 2000 NOE: RADAR required. NOE: RNAV. NOE: DME/DME/IRU or GPS required. NOE: If unable altitude restriction at GOFUR, advise AC on initial contact. 306 (7) GOFUR 8500 LANDN Rwy 9: 400- with minimum climb of 60' per NM to 900 () ECHHO 330 (9) 307 BAUCA or standard with minimum climb of 687' per NM to 900. Rwy 27: Standard with minimum climb of 500' per NM to. 095 AKEOFF RUNWAY 9: Climb heading 095 to, then left turn direct BAUCA, then on track 307 to ECHHO, thence.... AKEOFF RUNWAY 27: Climb heading to, then right turn direct LANDN, then on track 330 to ECHHO, thence on (transition), maintain. Expect filed altitude 0 minutes after departure. IKAYE RANSIION (ECHHO2.IKAYE) SEAL BEACH RANSIION (ECHHO2.SLI) ECHHO WO DEPARURE(RNAV) (ECHHO2.ECHHO) 2OC7

4 (FALCC.FALCC) 0NOV6 FALCC ONE DEPARURE SAN DIEGO INL (SAN) R-084 L-3-4, H-4 L-3-4, H-4 SXC ISL NOE: RADAR required. * (43) R-27 * (40) NOE: Aircraft filed at or below 3000 expect clearance via SEALBEACH 5.7 SLI Chan 04 N '-W ' SANA CAALINA.4 SXC Chan 5 N '-W ' SLI or SXC RANSIION. V AKEOFF RUNW AY 9: Climb heading 095 to, then left turn on heading 278 to intercept MZB R-34 to MAFAN IN. hence.... AKEOFF RUNW AY 27: Climbing right turn on heading 293 to intercept OCN R-55 to CLSR IN. Cross CLSR IN at or below, then on OCN R-55 and MZB R-34 to MAFAN IN. hence cross MAFAN IN at or above, then on MZB R-34 to FALCC IN. hen (transition) or (assigned route). Maintain assigned altitude. SANA CAALINA RANSIION (FALCC.SXC): From over FALCC IN on SXC R-084 to SXC VORAC. SEALBEACH RANSIION (FALCC.SLI): From over FALCC IN on SLI R-27 to SLI VORAC. Rwy 9: 400- with minimum climb of 60' per NM to 900 or standard with minimum climb of 686' per NM to 900. Rwy 27: FALCC 2 or standard with minimum climb of 353' per N ' NM to 400. W 7 34.' LINDBERGH OW ER OCEANSIDE 5.3 OCN NOC SOCALDEP CON Chan 00 EAS LNSAY N ' W ' R (5) MAFAN N ' W ' 20 (7) 34 BOKNE N ' W 7 2.7' (6) 23 6 CLSR 335 N ' W ' R R OCN R R-34 R-256 R-249 R-24 MISSION BAY 7.8 MZB MBZ Chan JULIAN 4.0 JLI Chan 87 ILJ ASSIGNED BY AC W ES N FALCC ONE DEPARURE SAN DIEGO INL (SAN) (FALCC.FALCC) 734

5 (MMOO2.MMOO) 2OC7 MMOO WO DEPARURE(RNAV) DINY MALI 262 (209) 27 (80) SANA CAALINA SXC 269 (37) MMOO FL ASSIGNED BY AC GOFUR Rwy 9: 400- with minimum climb of 60' per NM to 900 or ECHHO standard with minimum climb of 687' per NM to 900. Rwy 27: Standard with minimum climb of 500' per NM to. (7) N LINDBERGH OW ER SOCALDEP CON (EAS) (W ES) MMOO WO DEPARURE (RNAV) (MMOO2.MMOO) 7285 AKEOFF RUNW AY 9: Climb heading 095 to, then left turn direct BAUCA, then on track 307 to ECHHO, then on track to cross GOFUR at or above, then on track 306 to cross MMOO at or below FL90, thence... () (9) LANDN BAUCA AKEOFF RUNW AY 27: Climb heading to, then right turn direct LANDN, then on track 330 to ECHHO, then on track to cross GOFUR at or above, then on track 306 to cross MMOO at or below FL90, thence..... on (transition) maintain altitude assigned by AC, expect filed altitude 0 minutes after departure. DINY RANSIION (MMOO2.DINY) MALI RANSIION (MMOO2.MALI) 095 NOE: RADAR required. NOE: RNAV. NOE: GPS required. NOE: If unable altitude restriction at GOFUR, advise AC on initial contact. NOE: DINY transition AC only.

6 (PADRZ2.PADRZ) PADRZ WO DEPARURE(RNAV) 734 SHAFER EHF (37) 309 LINDBERGH OWER LANDO OROSZ AKEOFF RUNWAY 27: Climb heading to, then right turn direct WNFLD, then on track 296 to KERNL, then on track 296 to cross GYWNN at or above, then on track to PADRZ, thence on (transition). Maintain. Expect higher altitude 0 minutes after departure. IKAYE 327 WINE (20) (6) CHKNN RANSIION (PADRZ2.CHKNN) DINY RANSIION (PADRZ2.DINY) IKAYE RANSIION (PADRZ2.IKAYE) MALI RANSIION (PADRZ2.MALI) OROSZ RANSIION (PADRZ2.OROSZ) SHAFER RANSIION (PADRZ2.EHF) DINY (209) 0000 RIDDL (6) 326 (2) 324 CHKNN HFMNN SANA CAALINA SXC (30) 0000 (30) PADRZ (80) (0) GYWNN MALI 296 (3) KERNL Rwy 9: NA-AC. Rwy 27: or standard with minimum climb of 353' per NM to (3) WNFLD NOE: RNAV. NOE: RADAR required. NOE: urbojets and turboprops only. NOE: CHKNN, SHAFER, IKAYE, OROSZ RANSIIONS: DME/DME/IRU or GPS required. NOE: DINY, MALI RANSIIONS: GPS only. NOE: For non-gps equipped aircraft, Oceanside (OCN) must be operational. NOE: DINY RANSIION AC assigned only. NOE: DINY and MALI RANSIIONS NA from SEE, SDM and RNM airports. PADRZ WO DEPARURE(RNAV) (PADRZ2.PADRZ) 07DEC7

7 (PEBLE6.PEBLE) 7285 PEBLE SIX DEPARURE ASSIGNED BY AC SEAL BEACH 5.7 SLI Chan 04 SIL N '-W ' L-3-4, H-4 R-48 (38) 328 *2500 R-84 (SAN) SAN DIEGO INL 2.2 PARADISEZPD PDZ Chan 59 LINDBERGH OWER WES R-096 L-3-4, H-4 *3400 SXC SANA CAALINA.4 SXC Chan (32) N '-W8 25.9' Rwy 9: NA-AC operations. PEBLE N ' W7 50.7' 39 MELDY (9) 293 N ' W7 4.63' 30 R R Rwy 27: or standard with minimum climb of 353' per NM to 500. NOE: RADAR required. R-70 R-293 OCEANSIDE 5.3 OCN NOC Chan MISSION 7.8 MZB BAYMBZ Chan 25 NOE: Aircraft climbing above 3000 expect RADAR vectors northwest bound prior to PEBLE IN. AKEOFF RUNWAY 27: Climbing right turn heading 293 until crossing OCN VORAC R-70, then turn right heading 38 to intercept MZB VORAC R-293 to cross MELDY IN/MZB 30 DME at or above (or lower AC assigned altitude) then on MZB R-293 to PEBLE IN/MZB 39 DME, thence via (transition) or (assigned route). Maintain assigned altitude. SANA CAALINA RANSIION (PEBLE6.SXC): From over PEBLE IN on SXC R-096 to SXC VORAC. SEAL BEACH RANSIION (PEBLE6.SLI): From over PEBLE IN on SLI R-48 to SLI VORAC. PEBLE SIX DEPARURE (PEBLE6.PEBLE) 20AUG5

8 (SAYOW2.SAYOW) 7285 SAYOW WO DEPARURE(RNAV) JES FL90 URBOPROPS LINDBERGH OWER NSHEE 043 (2) MBAL NOE: RADAR required. NOE: RNAV. NOE: DME/DME/IRU or GPS required. NOE: If unable altitude restriction at JUNOR, advise AC on initial contact. 095 SAYOW (3) (6) (7) 026 (2) LEGUE 0000 CHRJR 7200 JULIAN JLI 022 (9) JUNOR 080 (52) IMPERIAL IPL Rwy 9: 400- with minimum climb of 60' per NM to 900 or standard with minimum climb of 687' per NM to 900. Rwy 27: NA-AC. AKEOFF RUNWAY 9: Climb heading 095 to, then direct to cross SAYOW at or above 4900, thence on (transition) jets maintain FL90, turboprops maintain, expect filed altitude 0 minutes after departure. IMPERIAL RANSIION (SAYOW2.IPL) MBAL RANSIION (SAYOW2.MBAL) SAYOW WO DEPARURE(RNAV) (SAYOW2.SAYOW) 2OC7

9 ZZOOO WO DEPARURE (RNAV) (ZZOOO2.ZZOOO) 0FEB8 SAN DIEGO INL (SAN) JEI K ZZOOO AKEOFF RUNW AY 27: Climb heading to then direct to cross JEI at or below 2000, then left turn direct ZZOOO, thence on (transition). urbojets maintain FL230, turboprops maintain, expect filed altitude 0 minutes after departure. CENZA RANSIION (ZZOOO2.CENZA) IMPERIALRANSIION (ZZOOO2.IPL) MBALRANSIION (ZZOOO2.MBAL) Rwy 27: Standard with minimum climb of 500' per NM to. 099 * * (7) JORRJ CENZA * (7) * 8800 GRIDR (25) * 8400 PIEZZ (26) 0 03 JES FL230 URBOPROPS * 7000 NSHEE 043 MBAL (38) * 8900 (2) NOE: RNAV. NOE: RADAR required. NOE: DME/DME/IRU or GPS required. NOE: Some aircraft may be RADAR vectored to CENZA, JORRJ or GRIDR. initial contact. BLUZE N * 4600 (27) LINDBERGH OW ER SOCALDEP CON NOE: Parachute jumping al hours, 3500 and below north of JORRJ at Otay Jump Zone. NOE: For non-gps equipped aircraft using MBALor IPL RANSIIONS, PGY DME must be operational. IMPERIAL IPL NOE: If unable AC altitude restriction at JORRJ, advise AC on ZZOOO WO DEPARURE (RNAV) SAN DIEGO INL (SAN) (ZZOOO2.ZZOOO) 8032

BAYPO SEVEN DEPARTURE (RNAV)

BAYPO SEVEN DEPARTURE (RNAV) (30) 005 (10) (BAYPO7.BAYPO) BAYPO SEVEN DEPARURE (RNAV) D-AIS DEP AMPA DEP CON 118.8 239.3 AMPA OWER 119.5 269.4 OP ALIUDE: ALMA 6000 AMG CAMJO FL220 013 (62) 028 FL220 (29) FL220 028 CARRD DUNKN (66)

More information

NE-2, 04 JAN 2018 to 01 FEB NE-2, 04 JAN 2018 to 01 FEB 2018

NE-2, 04 JAN 2018 to 01 FEB NE-2, 04 JAN 2018 to 01 FEB 2018 (GLDMN5.GLDMN) GLDMN FIVE DEPARURE (RNAV) D-AIS 127.05 LAGUARDIA OW ER NEW EL ELIO ZIMMZ PARKE LANNA BIGGY COAE AKEOFF OBSACLE NOES: HUGUENO HUO NEION SPARA SAX GLDMN HAAYS 340 GAYEL AKEOFF MINIMUMS: Rwy

More information

SW-3, 03 JAN 2019 to 31 JAN SW-3, 03 JAN 2019 to 31 JAN 2019

SW-3, 03 JAN 2019 to 31 JAN SW-3, 03 JAN 2019 to 31 JAN 2019 (MUELR4.FIXI) (MUELR4.FIXI) MUELR FOUR DEPARURE OP ALIUDE: (24) KW ANG 10000 SAN MARCUS RZS 10000 10000 10000 288 SCHOR 10000 273 (16) 288 (9) W GGNR 289 (11) Rwys 6L/R, 7L/R: NA-AC. Rwys 24L/R, 25L/R:

More information

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT EFFECTIVE: September 13, 2012 SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES 1. PURPOSE. This agreement establishes procedures

More information

APPENDIX B DRO INSTRUMENT APPROACH CHARTS & DEPARTURE PROCEDURES

APPENDIX B DRO INSTRUMENT APPROACH CHARTS & DEPARTURE PROCEDURES APPENDIX B INSRUMEN APPROACH CHARS & DEPARURE PROCEDURES DURANGO, COLORADO LOC I- Rwy Idg APP CRS DZE 09. Apt Elev 920 668 6685 AL-480 (FAA) ILS or LOC/DME RWY DURANGO-LA PLAA COUNY() DME from VOR/DME.

More information

An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown

An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown Field Municipal and Navy North Island Airports October

More information

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating

More information

SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 3 1-1. PURPOSE 3 1-2. SCOPE OF RESPONSIBILITIES

More information

Optimization of Airspace and Procedures in the Metroplex

Optimization of Airspace and Procedures in the Metroplex Optimization of Airspace and Procedures in the Metroplex Administration November 10, 2016 Chart Date To: By: Dispatchers Rob Henry, SoCal D&I Integration Manager Jose Gonzalez, SoCal NATCA D&I Lead Administration

More information

Optimization of Airspace and Procedures in the Metroplex (OAPM) Study Team Final Report Southern California Metroplex

Optimization of Airspace and Procedures in the Metroplex (OAPM) Study Team Final Report Southern California Metroplex Federal Aviation Administration Optimization of Airspace and Procedures in the Metroplex (OAPM) Study Team Final Report Southern California Metroplex Table of Contents 1 Background 1 2 Purpose of Southern

More information

2. ROLES AND RESPONSIBILITIES.

2. ROLES AND RESPONSIBILITIES. 1. PURPOSE. This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working minor airports in ZLA to ensure that arrival and departure flows are handled in as efficient

More information

SoCal Metroplex Study Area

SoCal Metroplex Study Area An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date Long Beach Daugherty, John Wayne Orange County, Los Alamitos, Fullerton Municipal and Zamperini Field Airports

More information

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT EFFECTIVE: July 10, 2010. SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services in the airspace described

More information

BAIRN FOUR ARRIVAL(RNAV) (BAIRN.BAIRN4) SE-3, 09 NOV 2017 to 07 DEC SE-3, 09 NOV 2017 to 07 DEC 2017 (BAIRN.BAIRN4)27APR17

BAIRN FOUR ARRIVAL(RNAV) (BAIRN.BAIRN4) SE-3, 09 NOV 2017 to 07 DEC SE-3, 09 NOV 2017 to 07 DEC 2017 (BAIRN.BAIRN4)27APR17 (BAIRN.BAIRN4) BAIRN FOUR ARRIVAL(RNAV) LEESBURG SANFORD 275 POPYE KMCO Landing South: Expect RADAR vectors after POPYE. D-ATIS APP CON 125.55 338.2 RAMEZ NOTE: RADAR required. NOTE: DME/DME/IRU or GPS

More information

Ms Chris Hulet, Tower Chief

Ms Chris Hulet, Tower Chief COURSE RULES BRIEF Ms Chris Hulet, Tower Chief North Island (KNZY) - ALL RWYS ARE ACTIVE AT ALL TIMES - 0630 Monday through Thursday Field open 24 Hrs. - Friday Field closes at 2200 - Saturday & Sunday

More information

SECTOR ROUTE/STAR INSTRUCTION NOTES

SECTOR ROUTE/STAR INSTRUCTION NOTES 1. PURPOSE: This letter of agreement establishes standard procedures for coordination of air traffic between Los Angeles Center (ZLA) and the Southern California TRACON (SCT). 2. CANCELLATION: All previous

More information

Stanfield VOR Procedures

Stanfield VOR Procedures Stanfield VOR This PowerPoint is not intended as a directive. It is intended to serve as a tool to communicate the training community s best practices. Any questions or concerns to these procedures are

More information

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:

More information

VATSIM LOS ANGELES ARTCC STANDARD OPERATING PROCEDURES

VATSIM LOS ANGELES ARTCC STANDARD OPERATING PROCEDURES VATSIM LOS ANGELES ARTCC STANDARD OPERATING PROCEDURES September 25th, 2018 1 VATSIM LOS ANGELES ARTCC STANDARD OPERATING PROCEDURES FOREWORD This document establishes facility Standard Operating Procedures

More information

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES January 3, 2017 BULLETIN NUMBER RECORD OF CHANGES SUBJECT AUTHORIZED BY DATE ENTERED DATE REMOVED 7110.100 Initial RR 1/3/17 3/25/17 7110.101 Added

More information

Southern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower

Southern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower Southern California Terminal Radar Approach Control and Ontario Airport Traffic LETTER OF AGREEMENT SUBJECT: Interfacility Coordination and Control Procedures Effective: August 16, 2013 1. PURPOSE: This

More information

Los Angeles International Airport Community Noise Roundtable LAX Departure Overflights of Palos Verdes and San Pedro

Los Angeles International Airport Community Noise Roundtable LAX Departure Overflights of Palos Verdes and San Pedro Los Angeles International Airport Community Noise Roundtable LAX Departure Overflights of Palos Verdes and San Pedro Comments by Jeff Calvagna Rancho Palos Verdes 6 March 2018 Summary of Key Points LAX

More information

SoCal Metroplex Study Area

SoCal Metroplex Study Area An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date Santa Barbara Municipal Airport, Bob Hope Airport, Palm Springs International Airport, Ontario International

More information

Optimization of Airspace and Procedures in the Metroplex

Optimization of Airspace and Procedures in the Metroplex Optimization of Airspace and Procedures in the Metroplex Administration SoCal Metroplex Project March 2, 2017 Chart - Industry Update January 26, 2017 To: By: Industry Team Members Rob Henry, SoCal D&I

More information

Following supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD

Following supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD TEL: 91 11 24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91 11 24615508 E_mail: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICES AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW

More information

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL FLIGHT STRIP MANAGEMENT - APPROACH LEVEL 1. Introduction The flight strip management for ATC is an important point in order to ensure aircraft management and improve safety when controlling. In real aviation,

More information

Pi Aero Instrument Rating Syllabus

Pi Aero Instrument Rating Syllabus This syllabus was created in order to maintain a high level of positive training as well as meet the minimum hours required by the Federal Aviation Regulations Part 61. There are four sections to this

More information

NATS Edinburgh / BGA LOA effective 24 November 2005

NATS Edinburgh / BGA LOA effective 24 November 2005 Letter of Agreement NATS Edinburgh Air Traffic Control and British Gliding Association 1. General This Letter Of Agreement (LOA) is effective from the day that Edinburgh's revised Class 'D' Airspace is

More information

FSBREAK $100 Hamburger Fly in to KSAN

FSBREAK $100 Hamburger Fly in to KSAN FSBREAK $100 Hamburger Fly in to KSAN 1. Position your aircraft off the runway. It is important to always move your aircraft to an appropriate position before connecting to VATSIM. Many simulators start

More information

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES OCTOBER 7, 2018 Definition of Airspace Colorado Springs Class C airspace is defined as show in Appendix 1. Definition of Positions

More information

U. S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIA1-ION ADlWlNlSTRATlON Southern California TRACON SUBJ: Inter-Facility Coordination Procedures Southern California TRACON and John Wayne Tower Letter of Agreement

More information

FLIGHT PROCEDURE AT SUVARNABHUMI INTERNATIONAL AIRPORT

FLIGHT PROCEDURE AT SUVARNABHUMI INTERNATIONAL AIRPORT Phone: 66 02 568 8831 Fax: 66 02 576 1903 AFTN: VTBAYOYX E-mail: aisthai@caat.or.th ais@caat.or.th THE CIVIL AVIATION AUTHORITY OF THAILAND Aeronautical Information Service Department 333/105 Lak Si Plaza,

More information

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons. GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons. The two parallel runways are about 3000 metres long while the intersecting runway (12-30) is about

More information

Burlington ATCT Standard Operating Procedures

Burlington ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

PORTUGAL DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO LISBOA CODEX

PORTUGAL DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO LISBOA CODEX PORTUGAL PHONE: +351.21.8553506 FAX: +351.21.8553399 E-Mail: desica@nav.pt AFTN: LPPPYOYC DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO 8223 1803-001 LISBOA CODEX

More information

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51) Northern Regional Training Scheme EGNT Newcastle Aerodrome Pilot s Guide REVISION 2 (Wednesday, 03 August 2011 at 15:51) PUBLISHED Wednesday, 03 August 2011 1 Contents 1 Contents... 2 2 Departures... 3

More information

Optimization of Airspace and Procedures in the Metroplex

Optimization of Airspace and Procedures in the Metroplex Optimization of Airspace and Procedures in the Metroplex Administration SoCal Metroplex Project Overview Brief To: By: Los Angeles World Airport Rob Henry, Manager SoCal Metroplex Jose Gonzalez, SoCal

More information

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 AIB/AAI/CAS.109 Air Accident Investigation Bureau of Singapore Ministry of Transport Singapore 11 November 2015 The Air

More information

NAWS CHINA LAKE TRANSIENT PILOT BRIEF For Transient Arrivals & Departures To & From China Lake Naval Air Weapons Station Effective: 20 July 2016

NAWS CHINA LAKE TRANSIENT PILOT BRIEF For Transient Arrivals & Departures To & From China Lake Naval Air Weapons Station Effective: 20 July 2016 NAWS CHINA LAKE TRANSIENT PILOT BRIEF For Transient Arrivals & Departures To & From China Lake Naval Air Weapons Station Effective: 20 July 2016 Pilots entering R-2508 and associated MOAs/ATCAAs must be

More information

Fresno Area Mid-Air Collision Avoidance Program (MACA) California Air National Guard 144 th Fighter Wing, Fresno, CA

Fresno Area Mid-Air Collision Avoidance Program (MACA) California Air National Guard 144 th Fighter Wing, Fresno, CA Fresno Area Mid-Air Collision Avoidance Program (MACA) California Air National Guard 144 th Fighter Wing, Fresno, CA As of March 2013 Mid-Air Collision Avoidance This briefing contains material that can

More information

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC. AD 2.ELLX-15 DISKI 2Y GTQ 7X GTQ 7Y MMD 7X RAPOR 4X 3.2.2 Climb Requirements RWY 24 Designator Route Remarks R-238 LUX to 8 DME LUX, RT to intercept R-222 NTM to 24 DME NTM, RT R-156 DIK, LT R-115 LUX

More information

Chapter 6. Nonradar. Section 1. General DISTANCE

Chapter 6. Nonradar. Section 1. General DISTANCE 12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG

More information

VERO BEACH VRB Chan 120 N W L-23-24, H-8 PHORD N W

VERO BEACH VRB Chan 120 N W L-23-24, H-8 PHORD N W (48) 163 (28) 165 (27) R-345 (24) 163 (40) 174 (13) 174 N (ANNEY.ANNEY1) 08157 ANNEY ONE ARRIVAL N28 32.88 W80 48.63 PCMAN ORMOND BEACH 112.6 OMN N29 18.20 - W81 06.76 L-21-23-24, H-8 Chan 73 OMN 110.0

More information

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC LETTER OF AGREEMENT Effective: April 10,2012 SUBJECT:

More information

Northern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012)

Northern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012) Northern Regional Training Scheme EGBB Birmingham Airport Pilot s Guide REVISION 1 (Monday, 30 January 2012) PUBLISHED Monday, 30 January 2012 Contents Contents... 2 Section - 1 Departures... 3 1.1 Stand

More information

Providence ATCT Standard Operating Procedures

Providence ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

Independent Parallel Runway Visual Approach in Beijing Capital Airport

Independent Parallel Runway Visual Approach in Beijing Capital Airport Independent Parallel Runway Visual Approach in Beijing Capital Airport SUMMARY Basic Concepts of Visual Approach The Promoting Process Of Visual Approach (including The Preparation) The Implementation

More information

SE-3, 06 DEC 2018 to 03 JAN SE-3, 06 DEC 2018 to 03 JAN 2019

SE-3, 06 DEC 2018 to 03 JAN SE-3, 06 DEC 2018 to 03 JAN 2019 (BEANO.BEANO3) BEANO THREE ARRIVAL HARDE ELMUC 132 (78) (90) 175 ARRIVALROUTE DESCRIPTION ELMUC TRANSITION (ELMUC.BEANO3): HARDE TRANSITION (HARDE.BEANO3): KATOK TRANSITION (KATOK.BEANO3): Landing East

More information

The NOTAM described will replace previously issued FDC NOTAMs 6/2550 and 7/7778 for the DC ADIZ/FRZ.

The NOTAM described will replace previously issued FDC NOTAMs 6/2550 and 7/7778 for the DC ADIZ/FRZ. This advisory covers published NOTAMs 7/0206 for the DC ADIZ, 7/0211 for the DC FRZ and FDC 7/0204 for the outer speed restriction. WARNING This document only contains an overview of the new rules for

More information

LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT

LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT COAST, LAKE, DESERT FNO FRIDAY, AUGUST 17, 2018 TABLE OF CONTENTS GENERAL BRIEFING 2 AIRPORT/RUNWAY CONFIGURATIONS 3 DEPARTURE BRIEFING 4 ARRIVAL BRIEFING

More information

Airservices Australia 2016

Airservices Australia 2016 Airservices Australia 2016 Airservices Australia 2016 Airservices Australia 2015 Airservices Australia 2016 Airservices Australia 2016 ATIS (H24) (TWR HR) APP TWR SMC ACD FIA (AH) GOLD COAST, QLD (YBCG)

More information

AERODROME CHART ATIS CLNC DEL

AERODROME CHART ATIS CLNC DEL EFF 10 NOV 16 AERODROME CHART ATIS 121.0 CLNC DEL 123.95 GND 121.9 275.8 -AD TWR 118.4 236.6 TML 119.2 DECL DISTS 05 23 14 32 TORA 10500 10500 7700 7700 TODA 11189 11189 8684 8684 ASDA 10500 10500 7700

More information

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR) PIARCO Control Zone (CTR) Eastern Caribbean PIARCO Virtual FIR NOT TO BE USED FOR REAL WORLD AVIATION, STRICTLY FOR USE ON THE VATSIM VIRTUAL ATC NETWORK. 1. Introduction 1.1 Objective of this SOP is to

More information

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

This section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations.

This section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations. This section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations. 13.1. Aircraft Noise Abatement 13.1.1. All aircraft

More information

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011 ZTL ARTCC Asheville Regional Air Traffic Control Tower Standard Operating Procedures AVL 7110.65B Effective: May 1, 2011 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1 1-1-1. Callsign Usage and Frequency

More information

MAR-A-LAGO TFR PROCEDURES

MAR-A-LAGO TFR PROCEDURES MAR-A-LAGO TFR PROCEDURES PBI PLAYBOOK Presented to: Pilots and Stakeholders By: USSS and FAA Date: PBI Departure PBI Arrival BCT CAYSL Arrival BCT Departure Traffic 12-26-2016 2 Table of Contents Chapter

More information

Los Angeles Basin Terminal Airspace Redesign

Los Angeles Basin Terminal Airspace Redesign Los Angeles Basin Terminal Airspace Redesign Presentation to: GT CDA Workshop Name: Walter White & Kathryn Higgins Date: January 20, 2006 0 0 SCT Airspace Redesign Overview Raise initial LAX Departure

More information

SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 4 1-1. PURPOSE 4 1-2. SCOPE OF

More information

Albuquerque Center Standard Operating Procedures

Albuquerque Center Standard Operating Procedures Albuquerque Center Standard Operating Procedures ZAB Order 7310.001 Albuquerque ARTCC 07 May 2018 Contents 1 Purpose 1 2 Roles and Responsibilites 1 3 Distribution 1 4 Positions 1 4.1 Simplified Positions...........................................

More information

Instrument Proficiency Check Flight Record

Instrument Proficiency Check Flight Record Instrument Proficiency Check Flight Record Date: Flight Time: Sim. Inst. Time: Pilot Name: Aircraft Type: Aircraft Tail Number: Act. Inst. Time: Instructor Name: Holding Procedures Task Notes N/A Satisfactory

More information

Jeppesen Mobile FliteDeck VFR

Jeppesen Mobile FliteDeck VFR Airport Information CLEARWATER INTL (PIE) 10 Rwy9730 118.30 CTAF Location Name Fuel and Services Available Identifier Length of longest runway Frequency (public airports only) Airport Elevation 118.60

More information

OMAKA OMAKA OMAKA/WOODBOURNE VICINITY ELEV 100 NZOM. Effective: 18 NOV 10 WOODBOURNE TOWER: WOODBOURNE ATIS: UNATTENDED: 122.

OMAKA OMAKA OMAKA/WOODBOURNE VICINITY ELEV 100 NZOM. Effective: 18 NOV 10 WOODBOURNE TOWER: WOODBOURNE ATIS: UNATTENDED: 122. ELEV 100 NZOM NZOM AD 2-31.1 /WOODBOURNE VICINITY WOODBOURNE TOWER: 122.8 118.1 WOODBOURNE ATIS: 126.05 UNATTENDED: 122.8 Changes from 19 NOV 09: Chart coverage, T658 amended to T654 with minor boundary

More information

MODULE 4: SIDs and STARs. Slide <#> of

MODULE 4: SIDs and STARs. Slide <#> of MODULE 4: SIDs and STARs Slide of OUTLINE Objective: To understand SIDs and STARs and their applications CONTENT: WHAT ARE SIDS AND STARS COMMON ELEMENTS CHARTS PROCESSING OF SIDS AND STARS VECTORING

More information

JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006

JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006 SUBJECT: APPROACH CONTROL SERVICE EFFECTIVE: December 22, 2006 1. PURPOSE. This agreement between Jacksonville Center and SAV TRACON covers approach control service for airports within TRACON delegated

More information

Piedmont Triad International Airport

Piedmont Triad International Airport ZTL ARTCC Piedmont Triad International Airport Airport Traffic Control Tower Standard Operating Procedures GSO 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign

More information

UNIVERSITY OF ALABAMA FOOTBALL

UNIVERSITY OF ALABAMA FOOTBALL UNIVERSITY OF FOOTBALL SPECIAL AIR TRAFFIC PROCEDURES TUSCALOOSA, AL September 16, 2017 November 18, 2017 The following procedures will be implemented to enhance safety and minimize delays during the following

More information

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016!1 GENERAL Proper use of phraseology is one of the most important thing in aviation and

More information

Noise Compatibility Report

Noise Compatibility Report ` Noise Compatibility Report 2018 1st Quarter May 22, 2018 Disclaimer Sound levels were unavailable between Oct. 6 th and May 22 nd, 2018. On May 22 nd, new state of the art monitors were installed. Adherence

More information

- Updated formatting - Re-drawn airspace delegation diagram

- Updated formatting - Re-drawn airspace delegation diagram Z D C A R T C C - Updated formatting - Re-drawn airspace delegation diagram Change Log... 2 Table of Contents... 3 Chapter 1. Positions... 4 Chapter 2. Clearance Delivery... 5 Chapter 3. Ground Control...

More information

SE-3, 01 FEB 2018 to 01 MAR SE-3, 01 FEB 2018 to 01 MAR 2018

SE-3, 01 FEB 2018 to 01 MAR SE-3, 01 FEB 2018 to 01 MAR 2018 EADEN TRANSITION (EADEN.CURSO5) then on track 072 to MNNDY. (DVALL.CURSO5) CURSO FIVE ARRIVAL 124.85 322.3 MIAMI INTLD-ATIS 119.15 MIAMI-OPA LOCKA ATIS CURSO MIAMI ATIS 124.0 072 249 069 18032 HOMESTEAD

More information

UNITED STATES DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WESTERN-PACIFIC REGION Hawthorne, California AIRSPACE DETERMINATION

UNITED STATES DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WESTERN-PACIFIC REGION Hawthorne, California AIRSPACE DETERMINATION UNITED STATES DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WESTERN-PACIFIC REGION Hawthorne, California AIRSPACE DETERMINATION PROPOSED CIVIL AVIATION REUSE OF MARINE CORPS AIR STATION

More information

SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 SUBJ: Standard Operating Procedures VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES

More information

AIP New Zealand. DUNEDIN TOWER: ATIS: UNATTENDED: By day & TWR on watch TWR off watch 120.7

AIP New Zealand. DUNEDIN TOWER: ATIS: UNATTENDED: By day & TWR on watch TWR off watch 120.7 ELEV 8 NZTI ARRIVAL/DEPARTURE TOWER: 120.7 122.4 ATIS: 128.8 UNATTENDED: By day & TWR on watch 119.1 TWR off watch 120.7 Departure procedures Contact Dunedin Tower for ATC clearance prior to departure.

More information

Standard Operational Procedures

Standard Operational Procedures Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and

More information

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Pag.1 of 11 Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Index 1. FOREWORD... 3 2. ATC UNITS... 3 3. RECOMMENDATIONS... 3 3.1. TRANSITION ALTITUDE/LEVEL... 3 3.2. SEMI-CIRCULAR FLIGHT LEVEL

More information

Noise Compatibility Year End, 2012

Noise Compatibility Year End, 2012 Year End, 2012 April 5, 2013 Noise Highlights of 2012 Airport operations for Year 2012 were down 3.97%, compared to Year 2011. The FAA issued a Record of Approval (ROA) for the new Program (NCP) Update

More information

JeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen

JeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen Airport Information For EHL Printed on 27 Jan 208 Page (c) SANERSON, INC., 208, ALL RIGHTS RESERVE jep= JeppView for Windows General Information Location: LUEBECK EU ICAO/IATA: EHL / LBC Lat/Long: N53

More information

VATUSA CHICAGO ARTCC AND VATUSA MINNEAPOLIS ARTCC LETTER OF AGREEMENT

VATUSA CHICAGO ARTCC AND VATUSA MINNEAPOLIS ARTCC LETTER OF AGREEMENT SUBJECT: INTERFACILITY COORDINATION EFFECTIVE: 04/15/2015 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA

More information

R-2515 R-2508 COMPLEX

R-2515 R-2508 COMPLEX R-2515 R-2508 COMPLEX Edwards AFB PPR Briefing Edwards AFB and Edwards Class D Surface Area lie within Restricted Area 2515: R-2515 and Edwards Class D Surface Area contain many flight hazards for aircrews

More information

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures Raleigh-Durham Air Traffic Control Tower Standard Operating Procedures 1) Purpose This order defines duties and responsibilities, depicts areas of airspace, runways, and taxiways allocated to each position

More information

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT SUBJECT: TERMINAL AREA CONTROL SERVICE EFFECTIVE: September 1, 2016 1. PURPOSE. This agreement delegates authority and establishes procedures

More information

VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT

VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT EFFECTIVE: 01/16/2019 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of

More information

Letter of Agreement (LOA)

Letter of Agreement (LOA) Page 1 of 8 Letter of Agreement (LOA) Between Sanya FIR (ZJSA), People s Republic of China Division (VATPRC) and Hong Kong FIR (VHHK), Southeast Asia Division (VATSEA) Revision: New Release Effective Date:

More information

IFR 91.157 Must be instrument rated to fly special VFR at Night (civil twilight to civil twilight, sun 6 degrees below horizon) 91.159 Unless in a holding pattern of 2 minutes or less, VFR cruising altitude

More information

Plus One Safety Brief-KOKB Parachute Operations Gregg Beaty, CFI, CFII. Tsunami Skydivers Oceanside

Plus One Safety Brief-KOKB Parachute Operations Gregg Beaty, CFI, CFII. Tsunami Skydivers Oceanside Plus One Safety Brief-KOKB Parachute Operations Gregg Beaty, CFI, CFII Tsunami Skydivers Oceanside Jump Operations Days of Operation Thursday-Sunday and Holiday Mondays 09:00-Sunset Operations will be

More information

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

SID/STAR phraseology FAQ Canadian implementation April 27, 2017 SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard

More information

AERONAUTICAL INFORMATION CIRCULAR 18/18

AERONAUTICAL INFORMATION CIRCULAR 18/18 NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA

More information

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports.

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports. Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports. surface analysis charts. radar summary charts. significant weather

More information

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY 34 19 SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D BIGRO 6 A Proceed from BIGRO to UJ. Cross GURIN at 2700 m and cross

More information

ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT

ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT EFFECTIVE: March 1, 2011 SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services

More information

IVAO Switzerland Division

IVAO Switzerland Division IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating

More information

Flying an Approach with the Garmin GTN 750

Flying an Approach with the Garmin GTN 750 Flying an Approach with the Garmin GTN 750 www.bruceair.com BruceAir at Wordpress YouTube: BruceAirFlying Using the Flight Plan Page Use the Flight Plan page to activate the approach Direct-To a fix or

More information

VIENNA INTL. AIRPORT PILOT BRIEFING

VIENNA INTL. AIRPORT PILOT BRIEFING VIENNA INTL. AIRPORT PILOT BRIEFING Welcome to Vienna Thank your for choosing Vienna as your arrival airport at the Cross The Pond 2015 Eastbound. Our VACC-Austria team is proud to provide you with our

More information

SE-3, 11 OCT 2018 to 08 NOV SE-3, 11 OCT 2018 to 08 NOV 2018

SE-3, 11 OCT 2018 to 08 NOV SE-3, 11 OCT 2018 to 08 NOV 2018 EADEN TRANSITION (EADEN.CURSO5) then on track 072 to MNNDY. (DVALL.CURSO5) CURSO FIVE ARRIVAL 124.85 322.3 INTLD-ATIS 119.15 -OPA LOCKA ATIS CURSO ATIS 124.0 072 249 069 18032 HOMESTEAD ARB ATIS 132.275

More information

Noise Compatibility Year End Report. March 7, 2011

Noise Compatibility Year End Report. March 7, 2011 2 Year End Report March 7, 2 Noise Highlights of 2 Airport operations for Year 2 were down 3.2%, compared to Year 29 Operations of aircraft meeting Stage 3 requirements through presence of a hush kit for

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information