FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
|
|
- Neil Bell
- 5 years ago
- Views:
Transcription
1 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report through Date: Friday, October 09, :10:36 PM Attachments: image003.png CR 714_Median Construction Begins Oct 7.pdf CR 714_Sidewalk Closures.pdf I-95 Widening Project Lane Shift Map pdf October 9, 2015 Chuck McGinness, FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 TREASURE COAST Construction and maintenance-related lane closures on state highways in Martin, St. Lucie and Indian River counties are expected during the week of October 9 through October 16. Weather permitting, work will be done at the following locations throughout the Treasure Coast. For updated lane closure information, please refer to Follow us on MyFDOT_SEFL. CONSTRUCTION PROJECTS MARTIN COUNTY 1. CR 714 / Martin Highway from west of Mapp Road to west of the Florida s Turnpike Entrance Description: This mile widening project consists of adding one lane in each direction and constructing a raised median with access points throughout the corridor. Additional improvements include: constructing an 8-foot sidewalk and a 5-foot bike lane on both sides of the roadway; milling and resurfacing of existing lanes; drainage improvements, including building two retention ponds; sound wall installation at Sunset Trace; replacing the box culvert at Danforth Creek; and signage, signalization, landscape and lighting improvements. Cost/Completion: $15.7 million. Completion is expected in fall 2016.
2 All lanes are open through October 16. Construction of the median along CR 714 east of Berry Avenue is underway. Motorists will no longer be able to turn through the median from west of the Turnpike entrance to just east of Old Palm City Town Square. In addition to the signalized intersections, there will be median openings at Armellini Avenue, Hidden Oaks Middle School Western Entrance and Isleworth Circle. ** See attached flyer Eastbound and westbound traffic on CR 714 / Martin Highway between Berry Avenue and Mapp Road is shifted north to complete the widening of CR 714. This traffic pattern is expected to be in place until late The sidewalk along the south side of CR 714 between Berry Avenue and Mapp Road and between Martin Downs Boulevard and High Meadows Avenue is closed. Pedestrians should use the sidewalk on the north side of CR 714 and cross at the signalized crosswalks at Berry Avenue, Palm City School Avenue, Sawgrass Villas Drive / Whispering Sound Drive and Mapp Road. This sidewalk closure is expected to be in place until late ** See attached flyer 2. State Road 710 / Beeline Highway from east of the Florida East Coast Railway Crossing to east of SW Fox Brown Road Description: This 10-mile design/build project consists of widening the existing two-lane roadway to add two 1.5-mile passing lane segments, one in each direction. Other improvements include milling and resurfacing of the existing lanes and construction of new shoulders, guardrail installation, and drainage modifications. Cost/Completion: $6.92 million. Completion in early Intermittent lane closures for the widening of SR 710 may occur Saturday and Monday through Friday between 7 a.m. and 8 p.m. and Sunday night through Thursday night between 8 p.m. and 7 a.m. A flag crew will maintain two-way traffic. 3. I-95 Lighting Installation between Bridge Road and High Meadows Avenue Description: This mile project includes installation of a new lighting system along both the northbound & southbound lanes of I-95 from north of CR 708 to south of High Meadows Avenue, and installation of eight pedestal mounted bridge poles on the bridge over the St. Lucie River. Cost/Completion: $2.8 million. Completion in summer The northbound outside lane of I-95 at the Kanner Highway overpass will be closed Monday between 9 a.m. and 3 p.m. The southbound outside lane of I-95 at the Kanner Highway overpass will be closed Tuesday through Thursday between 9 a.m. and 3 p.m. 4. Evans Crary and Ernest Lyons Bridges Handrail Repair Project Description: The project length totals miles, with Evans Crary Bridge at.565 miles and Ernest Lyons Bridge at.883 miles. Work being done under this contract entails repairs to cracked seals and joints in the handrails along both bridges. Cost/Completion: $186,978. Completion is expected in fall The south sidewalk on the Ernest Lyons Bridge is closed for handrail work
3 through late October. Pedestrians can access the north sidewalk by crossing at Sewells Point Road or MacArthur Boulevard. 5. I-95 Southbound Rest Area Improvements Project in Martin County Description: Improvements consist of widening the concrete pavement of the truck parking lot; shoulder replacement from the diverge and merge points of the car and truck parking ramps to the truck parking lot; and highway lighting along with signing & pavement markings at the I-95 Southbound Rest Area in Martin County. Cost/Completion: $1.38 million. Completion is expected in early All lanes are open through October 16. No traffic impacts are expected on this project. 6. I-95 Interchange at Kanner Highway (State Road 76 / Exit 101) Description: This mile project includes widening Kanner Highway (SR 76) at the I-95 interchange, reconstructing the I-95 entrance and exit ramps, drainage, milling and resurfacing, signing & pavement markings, and signalization. If you need additional information about the project please feel free to contact Warren Crittenden at warren.crittenden@aecom.com. Cost/Completion: $5.79 million. Completion is expected in late All lanes are open through October Kanner Highway / State Road 76 from Salerno Road to Cove Road in Stuart The north sidewalk on Kanner Highway between Salerno Road and Cove Road is closed for construction of a new business entrance. This sidewalk is expected to be closed through late Pedestrians should use the south sidewalk by crossing at Salerno Road or Cove Road. 8. Palm City Bridge in Palm City One westbound lane of the bridge will be closed Tuesday night between 7 p.m. and midnight for maintenance. 9. Kanner Highway / State Road 76 from Indian Street to Monterrey Road in Stuart One lane in each direction of Kanner Highway will be closed Monday night through Thursday night between 9 p.m. and 6 a.m. to set new concrete utility poles. Two lanes in each direction of Kanner Highway may be closed where three lanes are available. ST. LUCIE COUNTY 10. State Road A1A Bridge Rehabilitation over the FPL Discharge Canal in Jensen Beach Description: This mile-long project includes replacing the existing concrete bridge deck and approach slabs, milling and resurfacing the roadway at the approach slabs, concrete spall repairs of the piles and pile caps, and installing a corrosion protection system to the piles and pile caps.
4 Cost/Completion: $1.8 million. Completion in fall The speed limit has been reduced from 45 mph to 35 mph at the bridge until fall The southbound lane of A1A at the discharge canal will be closed intermittently Monday through Friday between 7 a.m. and 3:30 p.m. A flag crew will maintain two-way traffic. The sidewalk is open at the bridge, but there will be intermittent closures Monday through Friday between 7 a.m. and 3:30 p.m. There are no shoulders for bicyclists. Shoulders will not open until fall 2015 when the project is completed. 11. State Road 70 / Okeechobee Road and Jenkins Road Intersection in Fort Pierce Description: This.549-mile project in the City of Fort Pierce is expected to begin July 15. Work on this project includes widening the SR 70 and Jenkins Road intersection to provide additional through lanes and turning lanes, box culvert extension and installation work, drainage improvements, and lighting and signalization upgrades. Cost/Completion: $5.46 million. Completion is expected in spring One lane in either direction of Okeechobee Road between I-95 and Kerr Street may be closed intermittently Monday through Friday between 9 a.m. and 4 p.m. The sidewalk on the south side of Okeechobee Road between Jenkins Road and Roylat Road is closed through early Pedestrians may cross at the signalized intersections at Jenkins Road and McNeil Road. The sidewalk on the north side of Okeechobee Road from Jenkins Road west to the RaceTrac / Home Depot driveway entrance is closed through early Pedestrians may cross at the signalized intersections at Jenkins Road and Peters Road / Crossroads Parkway. 12. I-95 Northbound & Southbound Rest Areas in St. Lucie County Description: Improvements include repairs to the existing buildings and upgrading the power distribution at the I-95 northbound & southbound rest areas in St. Lucie County. The rest areas are located approximately two miles north of Orange Avenue (State Road 68 / Exit 131). Cost/Completion: $733,903. Completion is expected in early All lanes are open through October 16. No traffic impacts are expected. 13. U.S. 1 south of Village Green Drive in Port St. Lucie One southbound lane of U.S. 1 just south of Village Green Drive will be closed Monday through Friday between 9 a.m. and 4 p.m. for drainage and sidewalk work. 14. State Road 615 / 25 th Street from Delaware Avenue to Florida Avenue in Fort Pierce One northbound lane of 25 th Street will be closed Tuesday and Wednesday between 9 a.m. and 4 p.m. for utility work.
5 15. Port St. Lucie Boulevard from Cameo Boulevard to Bayshore Boulevard in Port St. Lucie The eastbound outside lane and right turn lane of Port St. Lucie Boulevard will be closed Wednesday between 9 a.m. and 9 p.m. for utility work. INDIAN RIVER COUNTY 16. I-95 (SR 9) from just north of State Road 60 (Osceola Boulevard/Exit 147) at Vero Beach to the Indian River/Brevard County Line Description: I-95 is being widened from just north of State Road 60 to the Indian River/Brevard County line. Improvements in this 12.5-mile-long project include: adding one lane on I-95 in each direction; milling and resurfacing the existing lanes; signalization and lighting improvements; Intelligent Transportation System (ITS) improvements, including closed-circuit television cameras, Dynamic Message Signs and vehicle detectors; removal/replacement of the existing bridges over CR 512 (Fellsmere Road); construction of a noise barrier wall adjacent to the Encore Sunshine Travel RV Resort; and reconstruction of the interchange at CR 512, including the ramps and turn lanes. The design/build contract started in May For information on this project, contact the Public Information Office at (772) or I95projectinfo@gbfinc.net. Cost/Completion: $50.6 million. Completion in late Motorists should be alert for slow moving construction vehicles entering and exiting the travel lanes. One lane in either direction of I-95 will be closed intermittently Sunday night through Thursday night between 9 p.m. and 6 a.m. for construction. Southbound traffic on I-95 is shifted east to temporary lanes along the northbound side of I-95 from the Brevard County / Indian River County line to south of County Road 512 in Fellsmere. Southbound traffic on I-95 is shifted east from north of MM 151 to south of MM 149. Traffic will remain in this temporary configuration for approximately four months. ** See attached map 17. U.S. 1 from north of Kings Highway in St. Lucie County to south of Oslo Road Description: Improvements that will be made in this 2.4 mile-long project include widening U.S. 1 in Indian River County from four to six lanes from the county line to Oslo Road, replacing the bridges over the Florida East Coast railroad tracks, installing new sidewalk on both sides of U.S. 1 in various locations, constructing sound walls on the west side of U.S. 1 in front of the Cypress Bay Mobile Home Park, upgrading traffic signals at the U.S. 1 / Highland Drive intersection, installing a new roadway drainage system, removing old asphalt and resurfacing U.S. 1, and installing landscaping. Cost/Completion: $23.2 million. Completion in fall One lane in each direction of U.S. 1 will be closed intermittently Saturday between 7 a.m. and 5 p.m. and Monday through Friday between 9 a.m. and 4 p.m. One lane in each direction of Old Dixie Highway under U.S. 1 will be closed
6 intermittently Saturday and Monday through Friday between 7 a.m. and 5 p.m. A flag crew will direct traffic. Northbound traffic on U.S. 1 north of Kings Highway is shifted onto the newlyconstructed bridge. The northbound lanes will transition back to the current traffic configuration at Highland Drive. Traffic will remain in this temporary configuration through fall Northbound traffic on U.S. 1 from north of Kings Highway to north of 21 st Street Southeast is shifted onto the newly- constructed northbound lanes. Southbound traffic on U.S. 1 from south of Oslo Road to 21st Street Southeast is shifted onto the newly constructed southbound lanes. 18. U.S. 1 Lateral Ditch Restoration from south of 12 th Street SE in Vero Beach to south of Davis Street in Sebastian Description: Eleven outfall ditches will be improved along U.S. 1 over the span of miles. Improvements include clearing obstructions to flow, restoring ditch cross section areas, providing new culvert crossings, and stabilizing & placing sod on side slopes. Cost/Completion: $1.44 million. Completion in summer All lanes are open through October 16. No traffic impacts are expected on this project. 19. State Road 60 east of Florida s Turnpike in Vero Beach One eastbound lane of SR 60 east of Florida s Turnpike is closed through Monday for a culvert replacement. Beginning Monday, both eastbound lanes of SR 60 east of Florida s Turnpike will be closed and traffic will be shifted to the shoulder. This traffic shift is expected to continue through Friday, October State Road 60 between 31 st Avenue and 33 rd Avenue in Vero Beach One eastbound lane of SR 60 will be closed Tuesday between 9 a.m. and 4 p.m. Celebrating 100 Years of Innovation, Mobility and Economic Development
FDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationMay 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015
More informationBROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationMay 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014
May 16, 2014 Chuck McGinness, (954) 777-4090 chuck.mcginness@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014 FORT LAUDERDALE -- Construction and maintenance-related lane
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationFOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY
TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Fiorella Teodista 954-934-1130 January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY FORT LAUDERDALE Florida s Turnpike announces
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationFlorida Department of Transportation MIKE DEW SECRETARY
RICK SCOTT GOVERNOR Florida Department of Transportation MIKE DEW SECRETARY July 5, 2018 JoAnn May, 239-225-1900 JoAnn.May@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH REPORT #27 FOR WEEK OF
More informationFlorida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY
RICK SCOTT GOVERNOR Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY November 29, 2018 Brian R. Rick, 863-519-2828 Brian.Rick@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016
RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016
RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationRoute 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.
EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in
More informationPalm Beach County Traffic Report. Aug. 25 through Sept. 1, 2017
August 25, 2017 Meredith Cruz, (561) 641 6440 mcruz@corradino.com Palm Beach County Traffic Report Aug. 25 through Sept. 1, 2017 Palm Beach County Palm Beach County traffic will be affected this week by
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationExit 148 (Quantico) to Exit 133 (Route 17/Falmouth)
RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information
More informationTRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationTRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More information* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties
New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign
More informationTRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE January 11, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-007 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationWeekly East Tennessee Construction Report for May 31-June 6, 2018
Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane
More information- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and
More informationFlorida Department of Transportation Daniels Parkway Fort Myers, FL 33913
RICK SCOTT GOVERNOR Florida Department of Transportation 10041 Daniels Parkway Fort Myers, FL 33913 MIKE DEW SECRETARY July 27, 2017 JoAnn May, 239-225-1900 JoAnn.May@dot.state.fl.us DISTRICT ONE DISTRICTWIDE
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All
More informationWEEKLY HIGHWAY ALERT RICHMOND DISTRICT
CONTACT: VDOT Customer Service 1-800-367-7623 November 18, Richmondinfo@VDOT.virginia.gov WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Below is a forecast of road construction that is expected
More informationTRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE February 1, 2019 CONTACT: Sandy Myers 540-332-9201 (office) STA19 020 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationDistrict Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director
District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationTRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 2, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-042 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationConstruction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County
Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update
More informationUS 19 Sunset Point Rd to Countryside Blvd.
Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More informationWilliamsburg Town Hall Meeting
Williamsburg Town Hall Meeting DEVELOPMENT UPDATE ORANGE COUNTY PLANNING DIVISION November 30, 2017 1 AREA CONTEXT FUTURE LAND USE MAP MEADOW WOODS MEADOW WOODS GINN PROPERTY ZONING MEADOW WOODS MEADOW
More informationFOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69
FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, 540-387-5238 SALEM 69 Jen.Ward@vdot.virginia.gov - The following is a list of forecasted highway projects that may impact traffic traveling
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More information2 Construction Program
2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More informationTRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE December 7, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 187 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationOcean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.
PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: FEBRUARY 13, 2013 STATUS FOR FEBRUARY 18, 2013 THROUGH FEBRUARY 24, 2013 *** CONSTRUCTION WORK ZONES ADDED
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationTRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE October 12, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 167 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationFREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018
FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening
More informationTRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE February 8, 2019 CONTACT: Sandy Myers 540-332-9201 (office) STA19 027 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationWeekly construction update
November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41
More informationImportant Lane Closures, April 3 9, 2011
March 31, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures, April 3 9, 2011 RESCHEDULED: Lane Shifts of Westbound Route 7 at Route
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov Major Operation: 36 massive beams will be placed at Sunland & I 10. Operation
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: October 28, 2011 #11-267 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov (530) 741-4566 desk
More informationSierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS
Date: September 29, 2017 #17-292 District: District 3 - Marysville, www.dot.ca.gov/dist3 Amarjeet S. Benipal, District Director Contact: Liza Whitmore, liza.whitmore@dot.ca.gov Phone: Office: (530) 634-7640
More informationImportant Lane Closures March 1 5, 2010
February 26, 2010 CONTACT: Marcia McAllister 703 572 0506 marcia.mcallister@dullesmetro.com Important Lane Closures March 1 5, 2010 C aisson Load Test Scheduled for Mar. 3 Crews will perform another load
More informationTRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE September 14, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 149 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationSpringettsbury Township. Road Improvement Projects
Springettsbury Township Road Improvement Projects 2009 2016 2016 Township Road Improvement Projects Springettsbury Township is divided into the following 4 Sectors: Northwest Sector Sherman Street Route
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov August 31, 18 No closures scheduled for Labor Day weekend. Traffic lane patterns
More informationRoad Construction Ahead January-April 2015 NORTHWEST REGION
NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,
More informationAll closures this week happen at night, including full closures of Mesa and I-10
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov May 25, 2018 North Mesa Tuesday, May 29 through Thursday, May 31 9 p.m. each
More informationEl Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012
Today s Date: Friday, September 7, 2012, #12-255 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566
More informationI-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD
Florida Department of TRANSPORTATION I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD From North of State Road (SR) 44 to North of US 92 (International Speedway Boulevard) Volusia
More informationGeorgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour
www.peachpass.com NOVEMBER 2013 Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour In This Issue GA 400 Tolls End on November 22 Lanes Closures for GA 400/I-85
More informationGO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.
GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop. I-10 & Mesa Continuous Until further notice The right turn-only
More informationTREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 9
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 9 From: Date: Subject: Staff October 21, 2016 Council Meeting South Dixie Highway Corridor Improvement Plan
More informationTRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE June 1, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 090 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationPennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects
PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned
More informationSAN RAFAEL City Council January 20, 2015
SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationRoad widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.
PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: SEPTEMBER 12, 2012 STATUS FOR SEPTEMBER 17, 2012 THROUGH SEPTEMBER 23, 2012 *** CONSTRUCTION WORK ZONES ADDED
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationNortheast Corridor Transportation Update
Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More information1.0 Purpose and Organization of the Community Impact Assessment Addendum
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationProgress Report for Projects of Regional Significance
Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section
More informationTRAFFIC ALERT FOR SEPTEMBER 10-14, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE September 7, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 148 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationBICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report
BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report TABLE OF CONTENTS A Message from the Mayor... 4 Data Count Reports... 5 Count Locations... 6 Count Locations Map... 7 Trail Data... 8 International
More informationPRIORITIES COMMITTEE MEETING
PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationPenny for Pasco Renewal. FY2014/15 thru FY2024/25
Penny for Pasco Renewal FY2014/15 thru FY2024/25 1 Background Pasco Citizens Committee (PAC) Citizens Survey Results Coordination Activities Project Schedule Category Allocations Revenue Estimates Distribution
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov March 31, 2017 This Sunday, I 10 East traffic lanes will switch onto new lanes.
More informationDay and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April
New M5 Work notification 4 April 2018 Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April A significant amount
More informationRoad Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities
**11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound
More informationCell: (408) Release MA June 25, 2012
VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara
More information