1 Advocates of Rockland, Abington, Weymouth & Hingham (ARAWH) Draft Report: Weymouth Water Supply & Regulatory Review Technical Assistance Services for Communities 2010 Thursday, November 4, 7:00 8:45 p.m.
2 Background Former South Weymouth Naval Air Station (Site) LNR / South Shore Tri-Town Development Corp. in early stages of site redevelopment. SouthField: 2,855 residential units 2 million square feet of commercial space Commuter rail station Golf course, trails, protected wetlands and open space ARAWH raised concerns about environmental and fiscal impacts of the Site s redevelopment. 2
3 Overview ARAWH concerns Weymouth Water Supply System Safe Yield and Firm Yield Herring Run Future Water Supply Waste Water 3
4 ARAWH Concerns Water Supply Existing interim water supply agreement for Phase 1 of SouthField (245,000 gallons per day or gpd) Potential water supply agreements for full build-out of SouthField (1.4 million gallons per day or mgd) Fluctuations ti in Whitman s Pond water levels. l Drawdown of Whitman s Pond and impacts on Herring Run 4
5 ARAWH Concerns (continued) Waste Water Interim wastewater service agreement with Weymouth for Phase 1 of SouthField (187,000 gpd). Proposed on-site wastewater treatment facility and downstream impacts. 5
6 Whitman s Pond South Cove October 2007 May 2010 Photographs were taken by Mary Parsons. 6
7 Whitman s Pond - North Side May 2010 August 2010 Photographs were taken by Mary Parsons. 7
8 Weymouth Water Supply Current Regulations Massachusetts Water Management Act (WMA) registered and permitted withdrawals. Registered Volume (90%): 4.51 mgd from seven sources. Permitted Volume (10%): 0.49 mgd from one source. Allowable Withdrawal: 5.0 mgd. 8
9 Regulated Sources and Withdrawal Volumes for Town of Weymouth Withdrawal Type Source Average Volume per Day Registered Sources Great Pond 4.51 mgd Old Swamp River/South Cove Whitman s Pond Circuit Avenue Well Main Street Well Libbey Park Winter Street Well #2 Permitted Sources Winter Street Well # mgd 9
10 Safe Yield An estimate of the maximum amount of water available from a source, given historic drought trends and potential environmental impacts of water withdrawals. MassDEP uses Safe Yield to assess basin-wide water supply capacity. For Weymouth, additional water needed above current allocations would require a permit and consideration of Safe Yield limits. 10
11 Firm Yield An estimate of the maximum amount of water available from a reservoir, calculated based on historic drought conditions; may not consider environmental impacts of withdrawals. MassDEP uses Firm Yield as the basis for permitting maximum annual withdrawals from a reservoir. 11
12 Safe Yield Study and Approvals Estimates Firm Yield of Great Pond System mgd Documents the approved Safe Yield of ground water sources mgd. Approved yield of Weymouth s ground and surface water sources mgd. 12
13 Weymouth Water Production ( )) Year Total Production Volume (mgd) Average Daily Production Volume (mgd) Annual Rainfall (inches) 2000* 1, N/A 2001* 1, N/A , , , , , , , , year average 1,
14 Current Usage / Available Capacity Weymouth s allowable withdrawal volume is 5.0 mgd. Estimated yield of Weymouth s surface water and ground water sources is 6.27 mgd. In 2009, the Town of Weymouth s average daily withdrawal volume was 3.87 mgd (77% of allowable withdrawal / 62 % of the estimated yield). From , the Town s average daily withdrawal volume was 4.17 mgd (83% of allowable withdrawal volume / 66 % of the estimated yield). 14
15 Herring Run Connects Whitman s Pond (herring spawning habitat) with Back River and Atlantic Ocean. Relies on adequate Herring Run at Jackson Square in Weymouth (photograph taken by Mary streamflow and Parsons) releases from Whitman s Pond. 15
16 Herring Run Regulations Streamflow requirements for Herring Run established in permit conditions for Winter Street Well #1. Streamflow requirements considered in Firm Yield Approval. No current regulations prevent drawdown of Whitman s Pond from surface water withdrawal. 16
17 Capacity and Future Water Supply Town has agreed to supply 245,000 gpd to SSTTDC to support Phase 1 at SouthField. Weymouth is registered and permitted to withdraw 5.0 mgd and used an average of approximately 4.17 mgd over the past 10 years. There is additional capacity of 0.83 mgd, sufficient to support Phase 1 and current water supply agreement. If Town of Weymouth supplies the full 1.4 mgd projected y g j water usage for SouthField, a permit to withdraw an additional.57 mgd would likely be required. 17
18 Waste Water Town of Weymouth has agreed to accept up to 187,000 gpd in sewer flows from SSTTDC to support Phase 1 at SouthField. Infrastructure upgrades in Weymouth would be needed to accept waste water flows of 1.47 mgd projected for full build-out. SSTTDC has initiated the permitting process for a proposed on-site water reclamation facility that would be permitted for ground water discharge up to 1.9 mgd. 18
1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationBrevard County Utility Services Department
Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES
More information2013 Regional Water System Improvements Program Public Hearing March 14, 2013
In support of Illinois Environmental Protection Agency State Revolving Fund Loan Application 2013 Regional Water System Improvements Program Public Hearing March 14, 2013 Village of Oak Lawn Customer Communities:
More informationCITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1
Funding Prior Years Expenditures to 6-30-10 Total Project Cost Estimated Expenditures for FY 2006 Non- Taxable Non- Housing RDA Bonds Bond Proceeds 2005 Prop. 1B USDA Loans/ Grants Dev Impact Fees TUMF
More informationPart Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction
Special study Areas Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN Introduction Beyond the boundaries of the 2030 General Plan, the City has defined Special Study
More informationCOUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR 2015-16 INTRODUCTION County Sanitation District No. 8 of Los Angeles County encompasses all or portions of the cities of Carson, Compton,
More informationRestoration and Redevelopment of the Former Durango Paper Mill Site
Restoration and Redevelopment of the Former Durango Paper Mill Site 1 Durango Site Overview and History Durango-Georgia Bankruptcy LandMar Group Overview The Durango Challenge Environmental Challenges
More informationPaul Sturm Roberto Viqueira Ríos
Paul Sturm Roberto Viqueira Ríos In this talk Brief Background on Land Based Sources Historical Perspective Guánica watershed characteristics/ issues High priority restoration projects Other key issues
More informationCOUNTY SANITATION DISTRICT NO. 19 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 19 SERVICE CHARGE REPORT FOR FISCAL YEAR 2018-19 INTRODUCTION County Sanitation District No. 19 of Los Angeles County encompasses all or portions of the cities of Artesia,
More informationCOUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 8 of Los Angeles County encompasses all or portions of the cities of Carson, Compton,
More informationHydrological study for the operation of Aposelemis reservoir Extended abstract
Hydrological study for the operation of Aposelemis Extended abstract Scope and contents of the study The scope of the study was the analytic and systematic approach of the Aposelemis operation, based on
More informationWater, Sewer and Stormwater General Facilities & Connection Charges
City of Snoqualmie Water, Sewer and Stormwater General Facilities & Connection Charges City Council Meeting March 9, 2015 Presented by: Sergey Tarasov, Project Manager Presentation Overview New customer
More informationCOUNTY SANITATION DISTRICT NO. 19 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 19 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 19 of Los Angeles County encompasses all or portions of the cities of Artesia,
More informationCOUNTY SANITATION DISTRICT NO. 21 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 21 SERVICE CHARGE REPORT FOR FISCAL YEAR 2018-19 INTRODUCTION County Sanitation District No. 21 of Los Angeles County encompasses all or portions of the cities of Claremont,
More informationCOUNTY SANITATION DISTRICT NO. 21 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 21 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 21 of Los Angeles County encompasses all or portions of the cities of Claremont,
More informationCOUNTY SANITATION DISTRICT NO. 1 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 1 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 1 of Los Angeles County encompasses all or portions of the cities of Bell, Compton,
More informationCOUNTY SANITATION DISTRICT NO. 18 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 18 SERVICE CHARGE REPORT FOR FISCAL YEAR 2018-19 INTRODUCTION County Sanitation District No. 18 of Los Angeles County encompasses all or portions of the cities of Artesia,
More informationWelcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT
Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps
More informationCOUNTY SANITATION DISTRICT NO. 22 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 22 SERVICE CHARGE REPORT FOR FISCAL YEAR 2018-19 INTRODUCTION County Sanitation District No. 22 of Los Angeles County encompasses all or portions of the cities of Arcadia,
More informationReview administrative work required to accept a new SIU Work with other municipality Work with regional planning commission
Review administrative work required to accept a new SIU Work with other municipality Work with regional planning commission Work with outside design engineer Mutual private/public inspections Coordinate
More informationWelcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority
Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority Massachusetts Water Resources Authority Presentation to the Environmental
More informationCOUNTY SANITATION DISTRICT NO. 4 SERVICE CHARGE REPORT FOR FISCAL YEAR 2018-19 INTRODUCTION County Sanitation District No. 4 of Los Angeles County encompasses all or portions of the cities of Beverly Hills,
More informationCITY OF HOBART SANITARY DISTRICT/STORM WATER BOARD MEETING MEETING OF
CITY OF HOBART SANITARY DISTRICT/STORM WATER BOARD MEETING MEETING OF February 27, 2018 Mr. Fulton called the meeting of the Hobart Sanitary District to order at 5:00 p.m. Members in attendance: Mr. Robert
More informationCOUNTY SANITATION DISTRICT NO. 18 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 18 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 18 of Los Angeles County encompasses all or portions of the cities of Artesia,
More informationCOUNTY SANITATION DISTRICT NO. 22 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 22 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 22 of Los Angeles County encompasses all or portions of the cities of Arcadia,
More informationCOUNTY SANITATION DISTRICT NO. 2 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 2 SERVICE CHARGE REPORT FOR FISCAL YEAR 2018-19 INTRODUCTION County Sanitation District No. 2 of Los Angeles County encompasses all or portions of the cities of Alhambra,
More informationAtlantic Surveying, P.A. Professional Land Surveyors
A S Atlantic Surveying, P.A. Professional Land Surveyors 111 S. Queen Street Kinston, N.C. 28501 (252) 527-6994 Fax: (252) 522-0139 Email: wcbutler@embarqmail.com fwdavenport@embarqmail.com Established
More informationPUBLIC WORKS DEPARTMENT
PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,
More informationCOUNTY SANITATION DISTRICT NO. 15 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 15 SERVICE CHARGE REPORT FOR FISCAL YEAR 2018-19 INTRODUCTION County Sanitation District No. 15 of Los Angeles County encompasses all or portions of the cities of Arcadia,
More informationKansas Airport Improvement Program (Pilot Program)
N1 950 Kansas Airport Improvement Program (Pilot Program) R oa d E 1600 Road N 1900 Road City of Lawrence ^ _ 24/59 70 40/59 40 10 P O Bryant Way 59 70 E 1600 Rd 10 P O Airport Rd Taylorcraft Rd Waco St
More informationCOUNTY SANITATION DISTRICT NO. 2 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 2 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 2 of Los Angeles County encompasses all or portions of the cities of Alhambra,
More informationCOUNTY SANITATION DISTRICT NO. 15 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 15 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 15 of Los Angeles County encompasses all or portions of the cities of Arcadia,
More informationPlan for Water Recycling Centers
Updated Master Plan for Water Recycling Centers Steve Clouse Chief Operating Officer Page 2 Historic sewerage systems 191: Mitchell Lake 1933: Rilling Road 1894 collection system Page 3 Major and Minor
More information2016 Development Cost Charges (DCC) UPDATE
2016 Development Cost Charges (DCC) UPDATE City of Richmond Public Meeting November 3, 2016 Outline Development Cost Charges (DCC) Overview DCC Rate Calculation DCC Recoverable Costs (DCC Programs) Estimated
More informationPerformance Clackamas Clackamas County Strategic Plan
June 2017 update Performance Clackamas Clackamas County Strategic Plan Strategic Goals and Milestones This is the June 2017 update to Performance Clackamas, the Clackamas County Strategic Plan. The plan
More informationParkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan
Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference
More informationPLANNING CONSIDERATIONS
12TH NOGALES PARK TUCSON ALVERNON SWAN WILMOT CAMPBELL DREXEL COUNTRY CLUB LEGEND RESERVE LAND AREA (APPROXIMATE) POTENTIAL FUTURE HSR TO AIRPORT TRANSIT CONNECTIONS VALENCIA PIMA COUNTY CITY OF TUCSON
More informationA Brief Overview of the Rio Grande Compact 04/26/06
A Brief Overview of the Rio Grande Compact 04/26/06 The New Mexico Interstate Stream Commission Investigate, Protect, Conserve, and Develop the State s Waters and Stream Systems Negotiate and Administer
More informationTown of Rocky Mountain House
Town of Rocky Mountain House Corporate Services Finance, HR, IT, Health and Safety, Legislative Services, External Municipal Employees (RCMP), Airport Equalized Assessment Alberta midsize communities
More informationSECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN
SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which
More informationDevelopmental Cost Charge (DCC) Program Summary
Developmental Cost Charge (DCC) Program Summary In 1997, Metro Vancouver implemented a Development Cost Charge (DCC) Program in the Liquid Waste function of the Greater Vancouver Sewerage and Drainage
More informationMIÑO O AND LIMIA BASINS
Miño-Sil MIÑO O AND LIMIA BASINS José Álvarez Díaz Sil River Basin District s s Planning Office, Spain WORKSHOP ON TRANSBOUNDARY WATER RESOURCES BUDAPEST, HUNGARY, 8-10 FEBRUARY 2011 INDEX 1. OVERVIEW
More informationSaginaw Charter Township Master Plan
Saginaw Charter Township Master Plan Overview of Draft & Public Hearing August 20, 2014 230 South Washington Avenue Saginaw Michigan 48607 (989) 754-4717 www.spicergroup.com Saginaw Charter Township Master
More informationCanada and New Brunswick fund 74 projects to improve water and wastewater systems across the province
Backgrounder Canada and New Brunswick fund 74 projects to improve water and wastewater systems across the province Investment of more than $57.1 million Clean Water and Wastewater Fund (CWWF) Under this
More information2) A Site Plan, Property Survey, or sketch depicting all sewer connection point(s) along with any relevant detail sketches have been enclosed.
Initial as enclosed 1) Accurate information for the applicant, owner, and project location and description have been provided in the fields on page two of this application. 2) A Site Plan, Property Survey,
More informationES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:
ES-301-1.06 Aircraft Deicing Document Identification Number ES-301-1.06 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: Aircraft deicing is the application of aircraft deicing
More informationAGENDA ITEM _C2 TAMPA WATER. Completion Date
TAMPA WATER Supply'mfl Water To The Region AGENDA ITEM _C2 DATE: February 6, 2007 TO: J err y L. Maxwell, General Manager FROM: Donald J. Polmann, Director of Science and Engineering SUBJECT: New Water
More informationPUBLIC WORKS DEPARTMENT
PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,
More information2016 Comprehensive Master Plan and CIP JULY A comprehensive plan shall not constitute zoning regulations or establish zoning district boundaries
01 Comprehensive Master Plan and CIP JULY 01 A comprehensive plan shall not constitute zoning regulations or establish zoning district boundaries TABLE OF CONTENTS PAGE NO. Executive Summary 1 I. Population
More informationI INTRODUCTION AND BACKGROUND
I INTRODUCTION AND BACKGROUND INTRODUCTION AND BACKGROUND - I I INTRODUCTION AND BACKGROUND a. project setting Looking south to the project site The Davenport Cement Plant (also referred to as the Cemex
More informationThe combined Planning and Zoning and Council Meeting was called to order at 7:00 p.m.
Lake Remediation Master Plan The combined Planning and Zoning and Council Meeting was called to order at 7:00 p.m. Roll Call: Councilman Joe Curl, Councilwoman Tiffany Hughes, Councilwoman Lori Howard,
More informationCOUNTY SANITATION DISTRICT NO. 14 SERVICE CHARGE REPORT FOR FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 14 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 14 of Los Angeles County encompasses portions of the cities of Lancaster and
More informationSilver Line Operating Plan
Customer Service and Operations Committee Information Item IV-A December 6, 2012 Silver Line Operating Plan Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information
More informationState Route 189 Project and Draft Resolution of Support. November 2014
State Route 189 Project and Draft Resolution of Support November 2014 Corridor Location Image sources: ADOT Statewide and National Importance: CANAMEX Corridor Image source: FHWA Statewide and National
More informationMassachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009
Massachusetts Port Authority Sustainable Design Standards and Guidelines AAPA Annual Convention Galveston, TX Overview of Massachusetts Port Authority Independent State Authority Governor appoints Board
More informationEAST-WEST STITCH. Connecting the Western Edge of the City to the Centre
98 AC_BEU_CCMP_2_TM1_4 _FD.indd 98 20/07/12 12:06 PM 02 EAST-WEST STITCH Connecting the Western Edge of the City to the Centre 01 02 Northern Motorway Daldy Street Fanshawe Street Nelson Street Hobson
More informationDATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration
PUBLIC WORKS COMMISSION DATE: April 19, 2016 REPORT NO. PW2016-034 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger General Manager, Public Works Commission
More information3. Coach Supporting Statement
3. Coach Supporting Statement Content 1. Setting the Scene 2. Vision 3. Coaches and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7. Strategy
More informationProject ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19
N Middlesex 608420 LOWELL- RECONSTRUCTION AND REHABILITATION OF SIX BRIDGES (ENEL BRIDGES) TIGER 07/29/2016 $100,000.00 GRANT 601426 BILLERICA- RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK
More informationINFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE
INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease
More informationCity of Penticton: Financial Plan Reporting Structure
City of Penticton: Financial Plan Reporting Structure General Utilities Transportation Services Recreation and Culture Environmental Health Services Public Health and Safety Protective Services Environmental
More informationMASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL
MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL The Massachusetts Port Authority ( Massport ) is seeking Letters of Interest for available development
More informationLake Chelan Operations
Lake Chelan Operations IPMA Executive Seminar September 17, 2013 Presented by: Janet Jaspers Chelan County PUD Lake Chelan Hydroelectric Project Today s Discussion Chelan PUD Overview Interesting Facts
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationAirport Master Planning Process & Update
Airport Master Planning Process & Update David Stewart ICAO Airport Master Planning Task Force Subgroup Leader ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 1 Speaker: David
More informationCITY OF BAINBRIDGE ISLAND, WASHINGTON REQUEST FOR PROPOSALS MANAGEMENT OF THE WATER UTILITY INTRODUCTION
CITY OF BAINBRIDGE ISLAND, WASHINGTON REQUEST FOR PROPOSALS MANAGEMENT OF THE WATER UTILITY INTRODUCTION The City of Bainbridge Island, Washington invites proposals from qualified firms and organizations
More informationMBTA Old Colony Commuter Rail Tie Replacement Project. Overview March 2011
MBTA Old Colony Commuter Rail Tie Replacement Project Overview March 2011 Project Description Emergency maintenance project to replace failing concrete ties with new timber ties Project History Failure
More informationSouth Westminster and Bridgeview
City of Surrey SURREY South Westminster and Bridgeview Industrial Areas WASHINGTON STATE, USA Located on the south shore of the Fraser River, the Bridgeview (307.14 acres/124.295 hec) and South Westminster
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name Rio Bogota Environmental Infrastructure Region LATIN AMERICA AND CARIBBEAN Sector Sewerage (70%); Flood protection
More informationPort of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management
Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes
More informationSuccessful Experiences in Rio Grande/Rio Bravo Watershed Management
Successful Experiences in Rio Grande/Rio Bravo Watershed Management 5 th th World Water Forum Istanbul, Turkey March 22-23, 23, 2009 Introduction A watershed with many voices a medley of cultures, customs,
More informationTown of Oakfield Agricultural and Farmland Protection Plan
SECTION III COMMUNITY OVERVIEW A. Regional Setting / Location The Town of Oakfield is located in the northwestern portion of Genesee County. Located west of New York's Finger Lakes, the Town is uniquely
More informationPort Everglades Master/Vision Plan Update
Port Everglades Master/Vision Plan Update Environmental Stakeholder Meeting June 15, 2009 Discussion to Focus On: Updating the 2006 Port Everglades Master Plan Issues dealing with the Turning Notch Potential
More informationAnnual Performance Report. easier, faster, safer
Annual Performance Report 2017 Content Introduction Choosing performance indicators Update on Corridor Traffic KPI 01: Traffic Volume (Total) KPI 02: Corridor Punctuality OM 01: Traffic Volume (Per Corridor
More informationPresentation to Planning Panel
Presentation to Planning Panel Amendment C207 & C208 to the Hume Planning Scheme Lancefield Road PSP & Sunbury South PSP August 2017 1 Historical Planning Context Sunbury has long been identified as a
More informationPERFORMANCE MEASURE INFORMATION SHEET #16
PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days
More informationThe Evolution of DFW Airport s Deicing Program Balancing Risks with Results MAY 20, 2015
Dallas/Fort Worth International Airport The Evolution of DFW Airport s Deicing Program Balancing Risks with Results MAY 20, 2015 DFW: Connecting The World The cities of Dallas and Fort Worth overcame politics
More informationJames Parker Alex Day JP Powers.
James Parker Alex Day JP Powers http://becominglast.com/tag/dirty-water/ Grey water is everything that goes down your drains, aside from human waste. Some grey water contaminates: Soap/Shampoo/Hygiene
More informationFROM: Donald J. Polmann, Director of Science and Engineering ( New Water Plan - Quarterly Report - Approve Submittal to SWFWMD
TAMPA WATER Supplying Water To The Region DATE: February 1,2008 TO: J err y L. Maxwell, General Manager AGENDA ITEM C18 FROM: Donald J. Polmann, Director of Science and Engineering ( SUBJECT: New Water
More informationPartnership for Quieter Skies Report
Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department August 2007 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview
More informationRainfall Appendix. Summary Statistics of Rainfall Data for Sites in the West-Central Florida. A Simple Conceptualized Rainfall/Discharge Relationship
Rainfall Appendix Summary Statistics of Rainfall Data for Sites in the West-Central Florida A Simple Conceptualized Rainfall/Discharge Relationship Stream or river flows are, of course, integrally associated
More informationCHAPTER FIVE ENVIRONMENTAL CONSEQUENCES
CHAPTER FIVE ENVIRONMENTAL CONSEQUENCES Pursuant to the environmental documentation requirements of FAA Order 1050.1E, Environmental Impacts, Policies and Procedures, this chapter describes the reasonably
More informationThe Atlanta BeltLine. Project Overview Map
The Atlanta BeltLine Project Overview Map The Atlanta BeltLine is a dynamic and transformative project for Atlanta. Through the development of a new transit system, multi-use trails, greenspace, and affordable
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT
More informationCouncil Committee Memorandum
Council Committee Memorandum TO: Joint Council Committee THROUGH: Tim Murray, City Administrator FROM: Mark DuChene, City Engineer MEETING DATE: January 15, 2019 SUBJECT: Wolf Creek Motor Sports Project
More informationDepartment of Environment and Natural Resources
Department of Environment and Natural Resources Brad Ives Assistant Secretary for Natural Resources brad.ives@ncdenr.gov 919-707-8620 Mitch Gillespie Assistant Secretary for Environment mitch.gillespie@ncdenr.gov
More informationRangitikei District Council
Rangitikei District Council Assets and Infrastructure Committee Meeting Minutes Thursday 12 March 2015 9:39 a.m. Contents 1 Welcome... 3 2 Council Prayer... 3 3 Apologies/Leave of absence... 3 4 Confirmation
More informationVillage of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY
Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800
More information5 Rail demand in Western Sydney
5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network
More informationMayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates
Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates Glebe Heights and Loch Haven Community Outreach Meeting South River High School May 17, 2016 Agenda Mayo
More informationPresentation Overview
DON NARROWS Historical and Existing Conditions March 29, 2008 Presentation Overview 1. Project Location and Background 2. Historical Context How did the Don Narrows Come to Be? 3. The Today 4. Next Steps
More informationCity of Rockingham. Secret Harbour Surf Life Saving Club Redevelopment Project
City of Rockingham Secret Harbour Surf Life Saving Club Redevelopment Project ASHLEY PITTARD Manager Community Infrastructure Planning Surf Club Development Multiple Layers The Pavilion - Design and Construction
More informationAction Recommendation: Budget Impact:
City of Fayetteville Staff Review Form 20190120 Legistar File ID 3/5/2019 City Council Meeting Date Agenda Item Only N/A for NonAgenda Item Tim Nyander 2/13/2019 WATER SEWER (720) Submitted By Submitted
More informationSSO Summary Report. For overflows between: 1/1/16 And 12/31/16. Date Began. Service Area / Municipality. Overflow ID. Date Ended.
SSO Summary Report For overflows between: 1/1/16 And 12/31/16 Overflow 387 Town of Camillus County owned Camillus Forcemain 01/08/2016 01/13/2016 121.30 2,183,400 Ground Approximate six inch hole in forcemain.
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The
More informationLower St. Johns River Tributaries Fecal Coliform Basin Management Action Plan Jacksonville Environmental Symposium
Lower St. Johns River Tributaries Fecal Coliform Basin Management Action Plan Jacksonville Environmental Symposium WBIDs Addressed in This BMAP This BMAP includes 10 of the 75 (cycle 2) fecal coliform
More informationNorth Carolina Addendum Total Maximum Daily Load (TMDL) for Impaired Segments in the Dan River Watershed to Virginia TMDLs Approved by EPA Region 3
North Carolina Addendum Total Maximum Daily Load (TMDL) for Impaired Segments in the Dan River Watershed to Virginia TMDLs Approved by EPA Region 3 Assessment units (AU) for the Dan River, 22-(39)b and
More informationChair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation
P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 15.1.1 Harbour East-Marine Drive Community Council December 3, 2015 TO: SUBMITTED BY: Chair and Members of Harbour East - Marine Drive Community
More informationImplementation of the Integrated Territorial Investments in Romania ITI DANUBE DELTA
Implementation of the Integrated Territorial Investments in Romania ITI DANUBE DELTA Territory Strategy Finance European Regional Development Fund (ERDF) The Danube Delta Biosphere Reserve and its neighbouring
More informationTreats 2,271,000 gallons of greywater from the water park using the constructed lagoon and wetland, saving $8,539 in sewer charges annually.
Carmel, IN Methodology for Landscape Performance Benefits Prepared by: Research Fellow: M. Elen Deming, Professor, University of Illinois Research Assistant: Paul Littleton, MLA Candidate, University of
More information