Berbera Tog Wajaale Road. Herb Miedema Manager Design HP Gauff Ingenieure JBG
|
|
- Veronica Shields
- 5 years ago
- Views:
Transcription
1 Berbera Tog Wajaale Road Herb Miedema Manager Design HP Gauff Ingenieure JBG
2 Connects Berbera Port to Addis Ababa Important for Regional and Local Trade 240 Km in Somaliland Built 30 years ago No substantial maintenance received
3 Causeway to Berbera Port
4 Road Section Berbera Hargeisa. Potholes, bleeding and stripping of the road surface are hazards for traffic.
5 Road Section Hargeisa Town cattle, turning traffic, handcarts all fighting for space
6 Road Section Hargeisa Town parked cars, pedestrians and road side stalls also fighting for space
7 Road Section Hargeisa Tog Wajaale. One of the 35 drifts in the alignment. Traffic is sometimes blocked for hours.
8 Road Section Hargeisa Tog Wajaale. Flash floods eat away the protection of the drift and will collapse soon.
9 Road Section Berbera - Hargeisa. Many new culverts have been constructed. The design has included these.
10 Design Study Appropriate solution for rehabilitation Widening of existing road Raises alignment and provides bridges Provides parking lanes in Hargeisa Town Center Provides bypass for Hargeisa Town Improves Safety
11 ESIA Carried out according to World Bank Standards Cons: Some destruction of property Loss of habitat, biodiversity Soil erosion Increased dust levels, noise, poor waste management etc.
12 ESIA Pros Improved connection to Berbera Port Increase in international transit trade Increase livestock, agricultural trade Stimulation of local trade and business in area of influence Decrease in road accidents Decongestion of Hargeisa Town
13 X-Section Outside Hargeisa 7 m wide carriage way + 2 m wide hard shoulders on either side Inside Hargeisa Median m wide lane m parking lane m footpath* *Where space allows
14
15 Six sections: 1. Berbera Dacarbuduqh 2. Dacarbuduqh Hargeisa East 3. Hargeisa East Hargeisa West 4. Hargeisa West Kalabaydh 5. Kalabaydh Tog Wajaale 6. Hargeisa Bypass
16
17 Section 1 Construction length: 90.9 Km inclusive of 2.2 Km in Berbera Town Section includes 4 major bridges (10.4m USD) Length: 80 meter (Km 36.6, Km 67.0) Length: 96 meter (Km 53.5) Length: 128 meter (Km 64.6) Section includes 1 climbing lane Length 825 meter (Km 85.5) Estimated construction cost: 66.8m USD Contingencies: 17.7m USD Total cost: 84.5m USD EIRR 8.6% Section includes works on road through Berbera to port as well as causeway to port Streetlights foreseen in section through Berbera town
18 Section 2 Construction length: 61.5 Km Section includes one major bridge (2.3m USD) Length: 80 meter (Km 124.3) Estimated construction cost: 39.2M USD Section include two climbing lanes Length 867 meter (Km 97) Length 520 meter (Km 117) Contingencies: 10.3m USD Total cost: 49.5m USD EIRR 14.0%
19 Section 3 Construction length: 15.7 Km Urban town section Parking lanes, footpaths, streetlights where possible/necessary Estimated construction cost: 19.3m USD Contingencies: 5.1m USD Total cost: 24.4m USD EIRR 16.3%
20 Section 4 Construction length: 62.8 Km Section includes 1 major bridge (3.3m USD) Length: 96 meter (Km 197.1) Estimated construction cost: 46.5m USD Contingencies: 12.3m USD Total cost: 58.9m USD EIRR 12.4%
21 Section 5 Construction length: 19.2 Km Construction on Black Cotton Soil Estimated construction costs: 27.7m USD Contingencies: 7.3m USD Total cost: 35.0m USD EIRR 21.9%
22 Section 6 Construction length: 18.1 Km New alignment Section includes one climbing lane Length 825 meter (Km 7) Estimated construction cost: 18.2m USD Contingencies: 4.8m USD Total cost: 23m USD EIRR 24.3%
23 Overall Total overall project length: Km Total overall project costs: 217.8m USD Contingencies: 57.7m USD Total overall cost: 275.5m USD Overall EIRR 14.2%
24 Summary in million USD: Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Total Total Cont Overall Total EIRR (%)
Project Evaluation Final Report Addendum
UNITED NATIONS DEVELOPMENT PROGRAMME INTERNATIONAL CIVIL AVIATION ORGANIZATION CIVIL AVIATION CARETAKER AUTHORITY FOR SOMALIA (PROJECT SOM/03/016) Project Evaluation Final Report Addendum 26 August 2009
More informationState Project Reconstruction I-84
State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant
More informationwaterview connection Completing the Western Ring Route the Waterview Connection
waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting
More informationWelcome Land Use Element... LU-1
Welcome Land Use Element... LU-1 Land Use Plan... LU-3 Residential Land Uses... LU-12 Commercial Land Uses... LU-14 Mixed Use... LU-16 Industrial Land Uses... LU-18 Automobile-Related Land Uses... LU-19
More informationSERENJE NAKONDE ROAD PROJECT PROJECT
SERENJE NAKONDE ROAD PROJECT PROJECT 2 nd German Africa Infrastructure Forum Munich 3 rd -4 th December 2014 Eng. Amos Phiri Contracts Manager (PPIU COMESA-EAC-SADC TRIPARTITE) Serenje Nakonde Road Project
More information1. Key development issues and rationale for Bank involvement
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationM621. Junctions 1 to 7 Improvement scheme. Share your views
M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,
More informationAirport Planning Area
PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose
More informationAlternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas
Roadless Area Conservation FEIS Summary Table S-1. Comparison of Key Characteristics and Effects by Prohibition Alternative. The effects summarized in this table A would occur in inventoried roadless areas
More informationDECONGESTION OF ROADS IN NAIROBI
DECONGESTION OF ROADS IN NAIROBI PRESENTED DURING THE REGIONAL WORKSHOP ON PROMOTING SUSTAINABLE TRANSPORT SOLUTIONS HELD ON 7 TH AUGUST, 2012 UNEP HEADQUARTERS NAIROBI By: ENG. M. M. NJONGE KENYA URBAN
More informationTbilisi Railway Bypass Project
Your opinion and comments in the process of project assessment have significant importance Tbilisi Railway Bypass Project The Brochure will introduce you with Tbilisi Railway Bypass project and give a
More informationLogo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road
Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District
More informationChorley Park Trail Connection New Design Options. Information Booklet Prepared for June 9, 2014 Public Meeting
Chorley Park Trail Connection New Design Options Information Booklet Prepared for June 9, 2014 Public Meeting Chorley Park Trail Booklet June 9, 2014 Page 1 of 12 Our Goals for the Chorley Park Trail Connection
More informationAnother achievement for a GEF/Small Grants Programme project as a presenter of a National example for Sustainable Ecotourism in Iran
Another achievement for a GEF/Small Grants Programme project as a presenter of a National example for Sustainable Ecotourism in Iran Protection and Instauration of Mountain Environment Society (Parow)
More informationDraft Length 10 Thorness Bay to Cowes Chain Ferry
Draft Length 10 Thorness Bay to Cowes Chain Ferry Introduction The southern section of this length of coast is largely (mud and sand) beach edged with landslip. Landward of this is agricultural land with
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationMESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management
MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management 200 S. Spruce St. P.O. Box 20,000 Grand Junction, Colorado 81502-5022
More informationThe implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.
The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10
More information$866,000. $1,400,000 Health Benefits $13,156,000 TOTAL ANNUAL DIRECT BENEFITS. $10,890,000 Economic Benefits
SINGING RIVER TRAIL Trails Create Value + Generate Economic Activity Trails generate economic returns through improved health, safety, and environmental conditions, raise property values, and attract visitors.
More informationUNIT 5 AFRICA PHYSICAL GEOGRAPHY SG 1 - PART II
UNIT 5 AFRICA PHYSICAL GEOGRAPHY SG 1 - PART II III. CLIMATE & VEGETATION A. The four main climate zones are tropical wet, tropical wet/dry (split into monsoon & savanna), semiarid, and arid. Other climate
More informationTransit s forecasts of expenditure in Waikato for the next 10 years are set out in Table WK1.
WAIKATO STATE HIGHWAY PLAN EXECUTIVE SUMMARY Transit s forecasts of expenditure in Waikato for the next 10 years are set out in Table WK1. These forecasts of expenditure are based on a 10-year plan of
More informationOut of sight, out of mind? Managing distributed workers occupational safety and health
Out of sight, out of mind? Managing distributed workers occupational safety and health Examples of hazards and risks encountered by different types of distributed workers 01 The purpose of this document
More informationAuburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012
Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse
More informationADVICE ON Cattle Grids
ADVICE ON 2 Definition A cattle grid, for highway purposes, is a device designed to prevent the passage of animals, or animals of any particular description, but to allow the passage of all or some other
More information1. Case Study Area and Character Sections
ARAGO STREET 1. Case Study Area and Character Sections Case Study Area Calle Aragó is an important streets in the centre of Barcelona. The street belongs to the Eixample district. The origins of Barcelona
More informationRangiriri Bypass. A top priority. The route. Timing WAIKATO EXPRESSWAY
A top priority The Waikato Expressway is a key transport corridor for the Waikato region and is a top priority for the government. It is made up of 10 separate sections between Mercer and Cambridge. When
More informationMaputo improving resilience by implementing Cities and Climate Change Initiative. By: Raul Chilaule (Head of the Environmental Department of MMC)
Maputo improving resilience by implementing Cities and Climate Change Initiative By: Raul Chilaule (Head of the Environmental Department of MMC) Local Climate Solutions for Africa, CTICC, Cape Town, 27
More informationHudson Highlands Fjord Trail Draft Master Plan. April 29, 2015
Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation
More informationFEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION
FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The
More informationAdd-A-Lane Contract V. along a Section of I-95 includes 6 Bridges
Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1 Agenda Project Update Overview Bid and Contract Award Schedule
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationClackamas County Development Agency
Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners
More informationMajor Scheme Business Case Summary Report for Programme Entry
Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date
More informationCurrent Corridor Characteristics
Current Corridor Characteristics Corridor Context Highway 2009 AADT: 2,350 21,000 2009 HCADT: 130 970 Key Highway Connections: MN-371, US-10, US-59, US-71 Number of lanes: 2 Public Transit Becker County
More informationLIFE+ URBANCOWS - Restoration of urban coastal meadow complex in Pärnu town, Estonia. Bert Holm, PhD.
LIFE+ URBANCOWS - Restoration of urban coastal meadow complex in Pärnu town, Estonia Bert Holm, PhD. bert.holm@saaremaavald.ee Pärnu town, West-Estonia A coastal town, the population of ca 40 000 inhabitants;
More information(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY
(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY 26 May 04 TABLE OF CONTENTS CONTENTS... PAGE SECTION 1: INTRODUCTION...3 SECTION 2: RVSM OPERATIONAL CONCEPT...3 SECTION 3: AFI
More informationL&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)
National Highways Authority of India (Ministry of Shipping, Road Transport & Highways) 4 Laning of the Existing 2 Lane Section from Km. 80.050 (Jadcherla) to Km. 135.740 (end of Kothakota Bypass) On NH-44
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationDD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X
ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES
More informationFirst Steps Towards Sustainable Operation of Road Tunnels. George Mavroyeni Australia
First Steps Towards Sustainable Operation of Road Tunnels George Mavroyeni Australia Road Tunnel Operations First steps towards sustainable operation of road tunnels Available on PIARC website here PIARC
More informationMaximising Commercial Revenues Dwell Time. Nigel Dolby Founder
Maximising Commercial Revenues Dwell Time Nigel Dolby Founder Core Objective To Maximise Airport Shopping & Dining Revenues: Every Passenger Every Customer Every Visitor All Day Every Day Achieving Our
More informationThe City s Strategic Economic Support Projects
INTEGRATED FOOD TERMINAL The Integrated Food Terminal is envisioned as a strategic location of wholesale agricultural produce marketing facility with separate hog and cattle/goat/sheep abattoirs and a
More informationEASTERN AFROMONTANE 1,043,191 km 2
Egypt Saudi Arabia Oman EASTERN AFROMONTANE 1,043,191 km 2 Sudan Asmara Eritrea Yemen Djibouti Addis Ababa South Sudan Ethiopia BIODIVERSITY TARGET 2020 TARGET: 17% protected Democratic Republic of the
More informationExhibition Place Service Level Review
Exhibition Place Service Level Review Standing Committee Presentation June 30, 2015 Overview Recommended Service Levels by Program Program Map Service Levels and Service Performance Service Challenges
More informationSection 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3
Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3
More informationFinn Creek Park. Management Direction Statement Amendment
Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date
More informationKINGSTON HARBOUR IN THE YEAR SEMINAR SPONSORED BY NEPA 2003 November 06
KINGSTON HARBOUR IN THE YEAR 2025 SEMINAR SPONSORED BY NEPA 2003 November 06 NORMAN MANLEY INTERNATIONAL AIRPORT (NMIA) RUNWAY EXPANSION URGENTLY REQUIRED AT NMIA NMIA Brief History Previously named Palisadoes
More informatione 2 design season three New Orleans: The Water Line Episode Summary
e 2 design season three New Orleans: The Water Line Episode Summary After the devastation of Hurricane Katrina, which hit the southern coast of the United States on August 28, 2005, the residents of the
More informationDerry Hill and Bingley Road, Menston. Accidents waiting to happen.
Derry Hill and Bingley Road, Menston. Accidents waiting to happen. School Bus unable to pass on Hawksworth Drive References: Derry Hill - 10/04551/MAF Bingley Road - 10/06229/MAO Bingley Road - 11/05691/OUT
More informationMobile Farebox Repair Program: Setting Standards & Maximizing Regained Revenue
Mobile Farebox Repair Program: Setting Standards & Maximizing Regained Revenue Michael J. Walk, Chief Performance Officer Larry Jackson, Directory of Treasury Maryland Transit Administration March 2012
More informationRegional Bird/Wildlife Strike Prevention Conference Conferencia de Prevención del Peligro Aviario y Fauna
Regional Bird/Wildlife Strike Prevention Conference Conferencia de Prevención del Peligro Aviario y Fauna ICAO Regulations Land use / Reglamentos de OACI Utilización del terreno Jaime Calderon Regional
More informationDesign Meeting Presentation
Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures
More information21 WORLD CONGRESS OF SOIL SCIENCE August 12-17, 2018 Rio de Janeiro, Brazil
21 WORLD CONGRESS OF SOIL SCIENCE August 12-17, 2018 Rio de Janeiro, Brazil E5 - FIELD TRIP TO PRODUCTION SYSTEMS AND THE INTERACTION WITH SOIL AND ENVIRONMENT IN PARANÁ STATE Summary: The 5-day tour will
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationPerformance Clackamas Clackamas County Strategic Plan
June 2017 update Performance Clackamas Clackamas County Strategic Plan Strategic Goals and Milestones This is the June 2017 update to Performance Clackamas, the Clackamas County Strategic Plan. The plan
More informationCultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R
Cultural Resource Management Report R2015-05-03-10005 Undertaking Description: The proposes to perform road maintenance and meadow restoration on the Deer Valley 4wd trail and road maintenance on the Blue
More informationToday we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.
Welcome Welcome to the Highways England A27 Arundel Bypass public consultation. Thank you for coming. Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear
More informationConstruction Update. Local Officials Briefing March 2016
Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS
More informationBrain Wrinkles. Africa: The impact of location, climate, & physical characteristics on where people live, the type of work they do, & how they travel
Africa: The impact of location, climate, & physical characteristics on where people live, the type of work they do, & how they travel STANDARDS: SS7G3 The student will explain the impact of location, climate,
More informationBird Strike Control. Naoki AMITANI July 2013, Bangkok, Thailand JAPAN CIVIL AVIATION BUREAU
Bird Strike Control 01-04 July 2013, Bangkok, Thailand Naoki AMITANI JAPAN CIVIL AVIATION BUREAU Ministry of Land, Infrastructure, Transport and Tourism Summary of Presentation Bird Strike Control - Introduction
More informationPart four. In this part you will find: The next steps to deliver the master plan
Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master
More informationCULTURE AGAINST DISASTERS: FEASIBLE? USEFULL?
International Conference CULTURE AGAINST DISASTERS Protecting Cultural landscapes as prevention of natural disasters CULTURE AGAINST DISASTERS: FEASIBLE? USEFULL? by Ferruccio Ferrigni Ravello, September
More informationVEOLIA GROUP IMPACT REPORT
VEOLIA GROUP IMPACT REPORT 2 VEOLIA GROUP 20 YEARS OF INNOVATIVE SOLUTIONS IN POLAND Veolia Group is celebrating 20 years of its activity in Poland. According to the Impact Report that the Group prepared
More informationDRT Performance Measurement: the U.S. Experience
DRT Performance Measurement: the U.S. Experience FOR ANYBODY GOING ANYWHER IN LA HABRA International Conference on Demand Responsive Transportation Breckenridge, Colorado September 2016 DRT Performance
More informationCHAPTER VI REHABILITATION OF FLOOD AFFECTED SETTLEMENTS
CHAPTER VI REHABILITATION OF FLOOD AFFECTED SETTLEMENTS Chapter VI REHABILITATION OF FLOOD AFFECTED SETTLEMENTS 6.1 INTRODUCTION: A term Rehabilitation is used for especially in housing policy to begin
More information2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014.
2. LEVEL CROSSING USAGE 2.1 RAIL The train service over GREEN DRIFT level crossing consists of passenger and freight trains. There are 154 trains per day. The highest permissible line speed of trains is
More informationRoadmapping Breakout Session Overview
Roadmapping Breakout Session Overview Ken Goodrich October 22, 2015 Definition Roadmap: a specialized type of strategic plan that outlines activities an organization can undertake over specified time frames
More informationRating: 5.0 (scale of 1-10)
95 Community Trail System Groundcover: 2-metre paved path, 1- metre grass buffer on either side. Location: Fort St. John Ownership: City of Fort St. John Rating: 5.0 (scale of 1-10) Strategic value: Linear
More information21 WORLD CONGRESS OF SOIL SCIENCE August 12-17, 2018 Rio de Janeiro, Brazil
21 WORLD CONGRESS OF SOIL SCIENCE August 12-17, 2018 Rio de Janeiro, Brazil E7 - FIELD TRIP TO BRAZILIAN CERRADO: GEOMORPHOLOGY, SOILS, AGRICULTURE AND LANDSCAPES Summary: The 5-day tour will take place
More informationCase Study: 1. The Clarence River Catchment
Case Study: 1. The Clarence River Catchment The NSW coastline is a great natural asset, making an enormous contribution to the economy. The resources of coastal catchments such as the Clarence River Catchment,
More informationEconomic Valuation of Heritage- Related Investments: A Case Study from China
Economic Valuation of Heritage- Related Investments: A Case Study from China By Jian Xie The World Bank jxie@worldbank.org Requirements for Economic Analysis in Investment Projects At the World Bank, there
More informationSUTTER COUNTY. General Plan Update Technical Background Report
SUTTER COUNTY General Plan Update Technical Background Report February 2008 SUTTER COUNTY GENERAL PLAN UPDATE TECHNICAL BACKGROUND REPORT PREPARED FOR: SUTTER COUNTY PREPARED BY: PBS&J IN PARTNERSHIP
More informationHurricane Keith Assessment of Damages and Needs Analysis
Page 1 of 7 The Pan American Health Organization Promoting Health in the Americas National Emergency Management Organization of Belize Damage Assessment and Evaluation Committee Hurricane Keith Assessment
More informationRSPO NOTIFICATION OF PROPOSED NEW PLANTING
RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on the RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.org/?q=page/535). It has also
More informationAppendix 6 Fulbourn Greenway Review
Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationSection 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)
Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationUnlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe
Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe In order to provide a safe route for users of the South West Coast Path this project realigned 265m of the A399 coast road to incorporate
More information2016 Regional Transportation Alternatives Program (TAP) Grant Application
2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City
More informationM E M O R A N D U M. Status of the Environmental Cleanup of the Shipyard
ECONOMIC AND WORKFORCE DEVELOPMENT MICHAEL COHEN, DIRECTOR CITY AND COUNTY OF SAN FRANCISCO GAVIN NEWSOM, MAYOR M E M O R A N D U M TO: Members of the Health Commission FROM: Michael Cohen CC: Mitch Katz,
More informationCurrent Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications
Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationMemorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV
More informationWEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.
NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway
More informationPICTURE THE FUTURE. of Odell and Killarney Lake Parks! PUBLIC CONSULTATION SUMMARY. July 2017
PICTURE THE FUTURE of Odell and Killarney Lake Parks! PUBLIC CONSULTATION SUMMARY July 2017 TOP ACTIVITIES RECREATION MOUNTAIN SOCIAL WALKING ACTIVITIES CYCLING SNOWSHOEING BIKING SWIMMING GATHERINGS DOG
More informationWater in the Amazon. By Heather and Georgie
Water in the Amazon By Heather and Georgie The Amazon is the world s largest tropical rainforest. The Amazon is so big that the U.K and Ireland would fit into it 17 times. The Amazon River It s length
More informationJune 29 th 2015 SOS LEMURS SPECIAL INITIATIVE
June 29 th 2015 SOS LEMURS SPECIAL INITIATIVE 1 SUMMARY FOREWORD...3 SOS LEMURS HELP US SAVE MADAGASCAR S ICONS...3 EMERGENCY ACTION PLAN...4 WHY PROTECT LEMURS?... 4 THE IUCN ACTION PLAN!... 5 GENERAL
More information[ ransport. Communications and Tourism Division
TRMISCOM/322 November 1989 Report of a Mission to Djibouti Republic 8-11 August 1989 by Shifarraw Regional Bizunch Advisor [ ransport. Communications and Tourism Division UN ECONOMIC COMMISSION FOR AFRICA
More informationSpencer Environmental Appendix A: Alternative Analysis for Construction Access Route
Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235
More informationCITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager
.. CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 1, 2016 Approval of City of Palmdale's 2016 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationafrica s hospitality market
africa s hospitality market Year in Review 2016 Ghana Nigeria Ethiopia Addis Ababa Kenya In this issue 3 Introduction Windhoek Zambia Lusaka Gabarone Pretoria Dar es Salaam Hahare Namibia Zimbabwe Botswana
More information2017 LRT Passenger Count Report
Urban Form & Corporate Strategic Development City Planning City of Edmonton 8 Floor, Edmonton Tower 10111 104 Avenue Edmonton, AB T5J 0J4 Tel: 780-496-6086 Email: varjinder.chane@edmonton.ca 2017 LRT Passenger
More informationThe Civil Aviation Sector as a Driver for Economic Growth in Egypt
The Civil Aviation Sector as a Driver for Economic Growth in Egypt EDSCA Conference Cairo, November 10, 2013 Agenda 1. Facts and figures 2. Socio-economic impact of the civil aviation sector 3. Options
More informationHS2 Update 19 FEBRUARY 2017
HS2 Update 19 FEBRUARY 2017 Agenda HS2 Proposal Alternatives Issues HS2 Meeting Feedback Call to Action Help and Resources HS Proposal Overview of proposed route and operations Route Overview Branch line
More informationCitrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights
September 11, 2013 9:00 11:00 am Trellis Hall, Citrus Heights Project Overview The City of Citrus Heights is studying the feasibility of establishing a multi use trail system within the City s 26 miles
More informationFY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area
KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive
More informationIRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City
IRISH PARKING ASSOCIATION The use of Pay and Display in Traffic Management in Kilkenny City Kilkenny City and Environs Draft Mobility Management Plan 2009-2014 2014 Draft Mobility Management Plan Background
More information