Alaska Airport Needs Directory. Department of Transportation & Public Facilities

Size: px
Start display at page:

Download "Alaska Airport Needs Directory. Department of Transportation & Public Facilities"

Transcription

1 Alaska Airport Needs Directory Department of Transportation & Public Facilities As of: August 12, 2013

2 ADAK ISLAND (ADK) Runway(s): 05/ ' x 200' 18/ ' x 200' Surface: Asphalt/Grooved NAVAIDS: TACAN/DME/NDB Lighting: BCN/HIRL/REIL/PAPI Classification: Community # Enplanements: 1,897 Borough: Aleutians West Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $5, USPS Hub: No School Facility: Yes Ops Cost/Yr: $- Part 139 Cert: Yes On/Off Road: Off Last Major Improvement: Airfield Manager: VINCE TUTIAKOFF, Pavement repair (M&O DM) Extend RSA on both runways RSA expansion SRE building upgrades (M&O DM) Dump truck, grader, loader, ARFF vehicle, snow plow equip 4x4 pickup, sweeper, large capacity van Runway grip tester, new radios (9) for SRE equipment 1 of 254

3 AKHIOK (AKK) Runway(s): 04/ ' x 50' Surface: Gravel Lighting: N/A Classification: Community # Enplanements: 991 Borough: Kodiak Island Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $6, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1985 Airfield Manager: ROBERT GREENE, Runway, traxiway, and apron pavement rehabilitation Improve runway to accomidate additional use Expand the existing runway to 3,120' x 50' Demolish SRE building & construct new SRE building Extend 1-bay SREB to include 1 additional bay and heated SREB Loader & grader Rehabilitate access road Resurface airport access road Install lighting (rwy, taxiway, approach lts, navigational) 2 of 254

4 AKIACHAK (Z13) Runway(s): 01/ ' x 60' Surface: Gravel Lighting: BCN/Rwy_Lts/MIRL Classification: Community # Enplanements: 3,499 Borough: Bethel Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $45, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2010 Airfield Manager: DAVE CUMMINGS, Bulldozer and grader with attachments 3 of 254

5 AKIAK (AKI) Runway(s): 03/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 2,180 Borough: Bethel Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $ USPS Hub: No School Facility: Yes Ops Cost/Yr: $14, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1998 Airfield Manager: DAVE CUMMINGS, Runway, taxiway, and apron pavement rehabilitation Provide a new SREB Loader and grader with attachments 4 of 254

6 AKUTAN (7AK) Runway(s): 09/ ' x 75' Surface: Asphalt Lighting: BCN/App_Lts Classification: Community # Enplanements: Borough: Aleutians East Air Carrier Hub: No Medical Facility: Yes Annual Revenue: USPS Hub: No School Facility: Yes Ops Cost/Yr: Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2012 Airfield Manager: DALE RUCKMAN, Runway broom, grader, loader, 4x4 utility truck, & snow blower 5 of 254

7 ALAKANUK (AUK) Runway(s): 16/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 3,378 Borough: Wade Hampton Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $61, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2011 Airfield Manager: HARRY JOHNSON, Loader Wheeled 1.5 CY -- $350,000 U-Blade Loader 5 CY -- $350,000 6 of 254

8 ALEKNAGIK (5A8) Runway(s): 15/ ' x 80' Surface: Gravel Lighting: N/A Classification: Community # Enplanements: 1 Borough: Dillingham Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $19, Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: NORMAN HEYANO, Extend current runway to 3,000' Construct a new SREB Grader Intent to close or transfer airport to community once aleknagik wood river bridge is constructed connecting Aleknagik to Dillingham Construct a new float plane dock Install runway lighting system 7 of 254

9 ALLAKAKET (6A8) Runway(s): 05/ ' x 100' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 2,661 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $2, USPS Hub: No School Facility: Yes Ops Cost/Yr: $107, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2009 Airfield Manager: JEREMY WORRALL, Allakaket SRE Building Replacement -- $2,000,000 Snow Wing Grader -- $350,000 U/V Plow Grader/Loader -- $350,000 Grader 30,000# -- $350,000 Dozer Crawler 8-10T -- $350,000 8 of 254

10 AMBLER (AFM) Runway(s): 18/ ' x 60' 09/ ' x 60' Surface: Gravel NAVAIDS: NDB Lighting: BCN/VASI/Rwy_Lts Classification: Community # Enplanements: 2,368 Borough: Northwest Arctic Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $2, USPS Hub: No School Facility: Yes Ops Cost/Yr: $107, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1989 Airfield Manager: CALVIN SCHAEFFER, Ambler Airport Improvements -- $15,200,000 Ambler SRE Building Replacement -- $2,000,000 Ambler Access Road Improvements -- $5,500,000 Snowplow Grader -- $350,000 Snow Wing Grader -- $350,000 Grader 34,000# -- $350,000 Dozer Crawler 10-15T -- $350,000 Extend the main and crosswind runway, rehab the operational surfaces and safety area and upgrade the lighting. 9 of 254

11 ANCHORAGE (ANC) - Ted Stevens Anchorage Intl Runway(s): 7R/25L ' x 200' 7L/25R ' x 150' 15/ ' x 150' Surface: Conc/Asph/Grvd NAVAIDS: ILS/DME/VOR Lighting: BCN/App-Rwy_Lts/HIRL/ REIL/PAPI Classification: International # Enplanements: 2,354,987 Borough: Anchorage Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: $98,640, USPS Hub: Yes School Facility: Yes Ops Cost/Yr: $111,653, Part 139 Cert: Yes On/Off Road: On Last Major Improvement: 2012 Airfield Manager: JOHN PARROTT, Pavement maintenance including runway and taxiway rehab Additional runway widening and taxiway widening to meet DGVI standards Regular planned vehicle fleet replacement 10 of 254

12 ANCHORAGE (Z41) - Lake Hood Strip Runway(s): 14/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Local # Enplanements: 1,190 Borough: Anchorage Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: USPS Hub: No School Facility: Yes Ops Cost/Yr: $2,000, Part 139 Cert: No On/Off Road: On Last Major Improvement: 2006 Airfield Manager: JOHN PARROTT, Separation of aircraft and auto traffic on Floatplane Drive None 11 of 254

13 ANCHORAGE SPB (LHD) - Lake Hood SPB Runway(s): N/S, E/W, NW/SE ' Surface: Water Lighting: BCN Classification: Local # Enplanements: 23,497 Borough: Anchorage Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: USPS Hub: No School Facility: Yes Ops Cost/Yr: Part 139 Cert: No On/Off Road: On Last Major Improvement: 2011 Airfield Manager: JOHN PARROTT, Additional bank stabilization 12 of 254

14 ANGOON SPB (AGN) Runway(s): NW/SE ' x 900' Surface: Water Lighting: N/A Classification: Community # Enplanements: 1,819 Borough: Hoonah-Angoon Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $ USPS Hub: No School Facility: Yes Ops Cost/Yr: $- Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1987 Airfield Manager: PAUL KHERA, of 254

15 ANIAK (ANI) Runway(s): 10/ ' x 150' Surface: Asphalt/Grooved NAVAIDS: ILS/DME/NDB Lighting: BCN/App_Lts/HIRL/VASI/Seq Flshr Classification: Regional # Enplanements: 16,217 Borough: Bethel Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: $79, USPS Hub: Yes School Facility: Yes Ops Cost/Yr: $397, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1995 Airfield Manager: TERRY HOFFMAN, Pavement rehab/improvement Crack sealing on runway, taxiways, & apron Correct pavement markings on runway, taxiways, & apron Improve RSA Construct helipad, floatplane ramp, and crosswind runway Expand apron ARFF vehicle, grader, snow plow, snow blower 14 of 254

16 ANVIK (ANV) Runway(s): 17/ ' x 75' Surface: Gravel NAVAIDS: NDB Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 911 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $ USPS Hub: No School Facility: Yes Ops Cost/Yr: $78, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2004 Airfield Manager: ERIK WEINGARTH, Anvik Airport Improvements -- $8,000,000 Anvik SRE Building Replaceemnt -- $2,000,000 U-Blade Loader 5CY -- $350,000 Loader Wheeled 2CY -- $350,000 Resurface runway, apron and taxiway, and upgrade lighting. 15 of 254

17 ATKA (AKA) Runway(s): 16/ ' x 100' Surface: Asphalt/Grooved Lighting: BCN/Rwy_Lts/REIL Classification: Community # Enplanements: 302 Borough: Aleutians West Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $ USPS Hub: No School Facility: Yes Ops Cost/Yr: $7, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2008 Airfield Manager: DALE RUCKMAN, X4 Pickup, loader, grader, and sander truck 16 of 254

18 ATMAUTLUAK (4A2) Runway(s): 15/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts/REIL/PAPI Classification: Community # Enplanements: 2,376 Borough: Bethel Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $9, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2002 Airfield Manager: DAVE CUMMINGS, Construct a 1-bay heated SREB with floor Grader and loader with attachments 17 of 254

19 BARANOF SPB (BNF) - Warm Spring Bay Runway(s): E/W ' x 1000' Surface: Water Lighting: N/A Classification: Local # Enplanements: Borough: Wrangell Air Carrier Hub: No Medical Facility: No Annual Revenue: USPS Hub: No School Facility: No Ops Cost/Yr: Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: PAUL KHERA, of 254

20 BARROW (BRW) - Wiley Posts/Will Rogers Memorial Runway(s): 07/ ' x 150' Surface: Asphalt/Grooved NAVAIDS: ILS/DME/NDB/VOR Lighting: BCN, HIRL, REIL, MALSR Classification: Regional # Enplanements: 41,083 Borough: North Slope Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: $145, USPS Hub: Yes School Facility: Yes Ops Cost/Yr: $1,775, Part 139 Cert: Yes On/Off Road: Off Last Major Improvement: 2010 Airfield Manager: JOHN OLSEN, Barrow Apron Expansion -- $7,000,000 Barrow Airport Runway Surface Repairs -- $3,500,000 Barrow SREB/ARFF Building Replacement -- $5,500,000 Barrow Deicing Chemical Storage Building -- $3,000,000 Barrow Airport Security Upgrades -- $2,500,000 Barrow Ahkovak Road Improvements (FHWA Funding) -- $7,700,000 Utility Wagon Mid 4x4 -- $350,000 Broom Runway Towed -- $350,000 Apron Exp-Construct apron and aviation support area expansion. Runway Surface Repairs-Complete surface repairs to address dips on the west end of the runway and longitudinal cracking. 19 of 254

21 BASIN CREEK Runway(s): 16/ ' x 60' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: Borough: Nome Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $19, Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: JEREMY WORRALL, Acquire 110 acres of land at the Basin Creek Airport. 20 of 254

22 BEAVER (WBQ) Runway(s): 05/ ' x 75' Surface: Gravel Lighting: N/A Classification: Community # Enplanements: 1,021 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $1, USPS Hub: No School Facility: Yes Ops Cost/Yr: $93, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1988 Airfield Manager: JEREMY WORRALL, Beaver Airport Improvements ---$9,000,000 Beaver SRE Building Replacement -- $2,000,000 Resurface runway and taxiway, expand the apron, apply a dust palliative, and install new lighting. 21 of 254

23 BETHEL (BET) Runway(s): 1L/19R ' x 150' 1R/19L ' x 75' Surface: Asphalt/Grooved NAVAIDS: VORTAC/ILS/DME Lighting: BCN/App-Rwy_Lts/HIRL/ VASI/REIL Classification: Regional # Enplanements: 152,366 Borough: Bethel Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: $326, USPS Hub: Yes School Facility: Yes Ops Cost/Yr: $2,952, Part 139 Cert: Yes On/Off Road: Off Last Major Improvement: 2011 Airfield Manager: DAVE CUMMINGS, Runway, taxiway, and apron pavement rehabilitation Construct new gravel runway (02S/20S) Construct 695,000 sqft air taxi/cargo apron, 385,000 sqft GA apron Construct 4,600' x 140' RSA Expand northwest apron & west heavy apron Expand existing RSA to 500's x 8,400' Expand crosswind runway (11/29) to 3,300' Construct a 6-bay SREB, regulator enclosure, and sand storage bldg ARFF vehicle, dumptruck, sander truck, grader, bulldozer 40,000 gal de-icing system, 10,000 gal storage tank 22 of 254

24 BETTLES (BTT) Runway(s): 01/ ' x 150' Surface: Turf/Gravel NAVAIDS: VOR/ILS/DME Lighting: BCN/Rwy-App_Lts/VASI Classification: Local # Enplanements: 1,802 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $39, USPS Hub: No School Facility: Yes Ops Cost/Yr: $122, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1988 Airfield Manager: JEREMY WORRALL, Bettles Airport Rehabilitation -- $2,000,000 Bettles Airport Paving -- $4,000,000 U/V Plow Grader/Loader -- $350,000 Grader Rural Airport -- $350,000 Resurface the runway, apron and taxiway, upgrade the lighting, remove obstructions and complete grading and drainage improvements. 23 of 254

25 BETTLES SPB (2A4) Runway(s): 14/ ' x 200' Surface: Water Lighting: N/A Classification: Local # Enplanements: Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $4, USPS Hub: No School Facility: No Ops Cost/Yr: $- Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2001 Airfield Manager: JEREMY WORRALL, Bettles VOR Lake SPB Improvements -- $3,000,000 Refurbish the water lane, lease lots and access road to accommodate additional aviation operations, including lease lot development, apron and access road improvements and water lane dredging. 24 of 254

26 BIG LAKE (BGQ) Runway(s): 07/ ' x 70' Surface: Gravel NAVAIDS: VORTAC Lighting: BCN/Rwy_Lts Classification: Local # Enplanements: 10 Borough: Matanuska-Susitna Air Carrier Hub: No Medical Facility: No Annual Revenue: $38, USPS Hub: No School Facility: Yes Ops Cost/Yr: $34, Part 139 Cert: No On/Off Road: On Last Major Improvement: Airfield Manager: NEAL HENSLEE, Runway paving Construct a GA apron with gravel surface adjacent to airport Construct taxiways between apron and runway Extend taxiway to the east Expand apron Construct a 2-bay heated SREB Loader and 16' snow blade 25 of 254

27 BIRCH CREEK (Z91) Runway(s): 16/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Local # Enplanements: 772 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $89, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2003 Airfield Manager: JEREMY WORRALL, Birch Creek Airport Improvements -- $12,000,000 Birch Creek SRE Building Replacement -- $2,000,000 Resurface runway and taxiway, expand apron, apply a dust palliative and install new lighting. 26 of 254

28 BIRCHWOOD (BCV) Runway(s): 2L/20R ' x 100' 2R/20L ' x 50' Surface: Asphalt Lighting: BCN/Rwy_Lts/VASI Classification: Local # Enplanements: Borough: Anchorage Air Carrier Hub: No Medical Facility: No Annual Revenue: $182, USPS Hub: No School Facility: Yes Ops Cost/Yr: $53, Part 139 Cert: No On/Off Road: On Last Major Improvement: 2012 Airfield Manager: TOM GRMAN, Rehabilitate taxiway, and apron pavement Change runway 02/20 desingation marking Construct new gravel runway 02S/20S & ultralight runway Relocate Taxiway A, construct taxiway D Expand northwest apron 27 of 254

29 BOUNDARY (BYA) Runway(s): 05/ ' x 60' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $ Part 139 Cert: No On/Off Road: On Last Major Improvement: 1989 Airfield Manager: DENNIS BISHOP, Boundary Airport Improvements -- $4,000,000 Resurface runway, apron, and taxiway, apply a dust palliative, and replace airport signage. 28 of 254

30 BREVIG MISSION (KTS) Runway(s): 11/ ' x 100' 04/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts/PAPI Classification: Community # Enplanements: 2,231 Borough: Nome Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $60, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1997 Airfield Manager: ROBERT MADDEN, Brevig Mission Airport Improvements -- $10,000,000 Brevig Mission SRE Building Replacement -- $2,000,000 U/V Plow Grader/Loader -- $350,000 Grader 30,000# -- $350,000 Resurface runway, apron, and taxiway, extend Runway 11/29 to 3,400', apply a dust palliative, and upgrade airport lighting. 29 of 254

31 BUCKLAND (BVK) Runway(s): 11/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts/VASI Classification: Community # Enplanements: 3,338 Borough: Northwest Arctic Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $83, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1996 Airfield Manager: CALVIN SCHAEFFER, Buckland Airport Improvements -- $7,500,000 Buckland SRE Building Replacement -- $2,000,000 Grader 34,000# -- $350,000 Dozer Crawler 8-10T-- $350,000 Resurface existing runway and taxiway, extend Runway 11/29 to 3,400', expand the apron, apply a dust palliative, and upgrade airport lighting. 30 of 254

32 CENTRAL (CEM) Runway(s): 07/ ' x 60' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 29 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $ USPS Hub: No School Facility: Yes Ops Cost/Yr: $12, Part 139 Cert: No On/Off Road: On Last Major Improvement: 1989 Airfield Manager: DANIEL SCHACHER, Central Airport Improvements -- $5,500,000 Central SRE Building Replacement -- $2,000,000 Resurface runway, apron, and taxiway, apply a dust palliative, and upgrade the airport lighting. 31 of 254

33 CHALKYITSIK (CIK) Runway(s): 03/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 985 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $52, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1993 Airfield Manager: JEREMY WORRALL, Chalkyitsik Airport Improvements -- $10,400,000 Chalkyitsik SRE Building Replacement -- $2,000,000 Dozer Crwlr 8-10T-- $350,000 Resurface runway and taxiway, apply a dust palliative, relocate the apron and access road, and rehabilitate the airport lighting system and correct drainage problems at the end of the runway. 32 of 254

34 CHANDALAR CAMP (5CD) - Chandalar Shelf Runway(s): 01/ ' x 70' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $ USPS Hub: No School Facility: No Ops Cost/Yr: $- Part 139 Cert: No On/Off Road: On Last Major Improvement: 2004 Airfield Manager: JEFF RUSSELL, Chandalar Camp Runway Rehabilitation -- $2,500,000 Resurface all operational surfaces, develop lease lots, upgrade signage/markings, and prepare an airport layout plan. 33 of 254

35 CHANDALAR LAKE (WCR) - Chandalar Lake Runway(s): 04/ ' x 60' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: 25 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $ USPS Hub: No School Facility: No Ops Cost/Yr: $ Part 139 Cert: No On/Off Road: On Last Major Improvement: 1994 Airfield Manager: JEFF RUSSELL, of 254

36 CHEFORNAK (CFK) Runway(s): 16/ ' x 60' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 4,087 Borough: Bethel Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $2, USPS Hub: No School Facility: Yes Ops Cost/Yr: $19, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2010 Airfield Manager: DAVE CUMMINGS, Relocate the Chefornak airport 2 miles south Construct new runway, taxiway, and apron Runway length will be no more then 3,300' Loader & grader with attachments 35 of 254

37 CHENEGA BAY (C05) Runway(s): 16/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 2,542 Borough: Valdez-Cordova Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $91, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2004 Airfield Manager: CARL HIGH, Resurface runway, taxiways and apron Construct a 2-bay SREB Snow blower, loader, and grader Airport needs fencing, obstacles/penetrations mitigated, erosion study, lease-lot development, Master Plan developed, improved access, and more. 36 of 254

38 CHEVAK (VAK) Runway(s): 02/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts/REIL/PAPI Classification: Community # Enplanements: 5,578 Borough: Wade Hampton Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $34, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2005 Airfield Manager: DAVE CUMMINGS, Resurface runway, taxiways and apron Construct a 2-bay SREB Snow blower, loader, and grader Airport needs fencing, obstacles/penetrations mitigated, erosion study, lease-lot development, Master Plan developed, improved access, and more. 37 of 254

39 CHICKEN (CKX) Runway(s): 13/ ' x 60' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: 8 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $23, Part 139 Cert: No On/Off Road: On Last Major Improvement: 1987 Airfield Manager: DENNIS BISHOP, Chicken Airport Improvements -- $4,500,000 Chicken SRE Building Replacement -- $2,000,000 Resurface runway, apron, and taxiway, apply a dust palliative, and upgrade the airport lighting. 38 of 254

40 CHIGNIK (AJC) Runway(s): 02/ ' x 60' Surface: Dirt/Gravel Lighting: N/A Classification: Community # Enplanements: 815 Borough: Lake & Peninsula Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $1, USPS Hub: No School Facility: Yes Ops Cost/Yr: $35, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1992 Airfield Manager: KYLER HYLTON, Resurface runway, taxiway, and apron with 9" of new gravel "Expand SREB to include an additional bay, heat, and insulation Install conerte pad at SREB entrance" Grader and loader wheel RSA, runway, and taxiway lighting 39 Chicken SRE Building Replacement -- $2,000,000 Resurface runway, apron, and taxiway, apply a dust palliative, and upgrade the airport lighting. 39 of 254

41 CHIGNIK LAGOON (KCL) Runway(s): 04/ ' x 60' Surface: Dirt/Gravel Lighting: N/A Classification: Community # Enplanements: 675 Borough: Lake & Peninsula Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $ USPS Hub: No School Facility: Yes Ops Cost/Yr: $35, Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: KYLER HYLTON, Construct a new 5,000' x 50' runway and associated RSA, apron, taxiway Resurface existing gravel runway Extend runway to 3,200' Construct a SREB Snow removal equipment 40 of 254

42 CHIGNIK LAKE (A79) Runway(s): 08/ ' x 60' Surface: Gravel Lighting: N/A Classification: Community # Enplanements: 35 Borough: Lake & Peninsula Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $1, USPS Hub: No School Facility: Yes Ops Cost/Yr: $15, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1985 Airfield Manager: KYLER HYLTON, Resurface runway Lengthen/widen runway to community class standards Expand RSAs and expand apron Construct a replacement SREB Grader and snow removal equipment 41 of 254

43 CHISANA (CZN) Runway(s): 12/ ' x 50' Surface: Turf/Gravel Lighting: N/A Classification: Local # Enplanements: 53 Borough: Valdez-Cordova Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $- Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: JOHN HOFFMAN, Chisana Airport Improvements -- $3,000,000 Improve airport for all-season operations, including runway surface repairs, brushing, tree clearing and stockpiling surfacing material for future maintenance. 42 of 254

44 CHISTOCHINA (CZO) Runway(s): 02/ ' x 90' Surface: Turf/Gravel Lighting: N/A Classification: Community # Enplanements: Borough: Valdez-Cordova Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $ Part 139 Cert: No On/Off Road: On Last Major Improvement: Airfield Manager: JOHN HOFFMAN, of 254

45 CHITINA (CXC) Runway(s): 13/ ' x 75' Surface: Dirt/Gravel Lighting: N/A Classification: Local # Enplanements: 65 Borough: Valdez-Cordova Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $2, USPS Hub: No School Facility: No Ops Cost/Yr: $ Part 139 Cert: No On/Off Road: On Last Major Improvement: 1991 Airfield Manager: JOHN HOFFMAN, Chitina Airport Paving -- $900,000 Chitina SRE Building Upgrade -- $300,000 Pave all operational surfaces and apply airport markings. 44 of 254

46 CHUATHBALUK (9A3) Runway(s): 09/ ' x 60' Surface: Gravel Lighting: BCN/REIL/PAPI Classification: Community # Enplanements: 594 Borough: Bethel Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $25, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2002 Airfield Manager: TERRY HOFFMAN, Grader and bulldozer 45 of 254

47 CIRCLE (CRC) Runway(s): 15/ ' x 60' Surface: Turf Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 380 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $49, Part 139 Cert: No On/Off Road: On Last Major Improvement: 1986 Airfield Manager: JEREMY WORRALL, Circle Airport Taxiway and Apron Rehabilitation -- $1,500,000 Circle SRE Building Replacement -- $2,000, of 254

48 CIRCLE HOT SPRINGS (CHP) Runway(s): 09/ ' x 80' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Local # Enplanements: 12 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $21, Part 139 Cert: No On/Off Road: On Last Major Improvement: Airfield Manager: DANIEL SCHACHER, Circle Airport Taxiway and Apron Rehabilitation -- $1,500,000 Circle SRE Building Replacement -- $2,000, of 254

49 CLARKS POINT (CLP) Runway(s): 18/ ' x 60' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 567 Borough: Dillingham Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $ USPS Hub: No School Facility: No Ops Cost/Yr: $17, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2004 Airfield Manager: NORMAN HEYANO, Construct a new runway Grader, loader, snow removal equipment Aviation radio 3 CY LOADER WHEEL 48 of 254

50 CLEAR (Z84) Runway(s): 01/ ' x 100' Surface: Asphalt Lighting: BCN/Rwy_Lts Classification: Local # Enplanements: Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $1, USPS Hub: No School Facility: No Ops Cost/Yr: $61, Part 139 Cert: No On/Off Road: On Last Major Improvement: 1993 Airfield Manager: JEREMY WORRALL, of 254

51 COFFMAN COVE SPB (KCC) Runway(s): N/S ' x 2000' Surface: Water Lighting: N/A Classification: Community # Enplanements: 127 Borough: Prince of Wales Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $- Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2006 Airfield Manager: PAUL KHERA, of 254

52 COLD BAY (CDB) Runway(s): 15/ ' x 150' 08/ ' x 150' Surface: Asphalt/Grooved NAVAIDS: VORTAC/ILS/DME Lighting: BCN/App_Lts/HIRL/VASI Classification: Regional # Enplanements: 9,395 Borough: Aleutians East Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: $101, USPS Hub: Yes School Facility: Yes Ops Cost/Yr: $962, Part 139 Cert: Yes On/Off Road: Off Last Major Improvement: 2011 Airfield Manager: JEFF DOERNING, Rehabilitate north terminal apron, runway 14/32, taxiways Construct new pax terminal apron and taxiway Construct RSA for runway 8/26 Lengthen runway 8/26 by 40' RSA expansion to comply with FAA standards (both runways) Expand the terminal apron 1-bay addition to the existing AARF building Standby generator building and additional SRE storage ARFF vehicle, dump truck, minivan, loader, snow blower 51 of 254

53 COLDFOOT (CXF) Runway(s): 01/ ' x 100' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Local # Enplanements: 340 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $16, USPS Hub: No School Facility: No Ops Cost/Yr: $12, Part 139 Cert: No On/Off Road: On Last Major Improvement: 1993 Airfield Manager: JEFF RUSSELL, Coldfoot Airport Improvements -- $11,300,000 Coldfoot SRE Building Replacement -- $2,000,000 Resurface all airport operational surfaces, install permanent erosion control, remove obstructions and install new lighting. 52 of 254

54 COOPER LANDING (JLA) - Quartz Creek Runway(s): 04/ ' x 60' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: Borough: Kenai Peninsula Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $ Part 139 Cert: No On/Off Road: On Last Major Improvement: Airfield Manager: CARL HIGH, Resuface runway with crushed gravel Multiple items needed including ROW expansion, property acquisition, lease-lot development, security fencing, geotechnical analysis, and Master Plan update. 53 of 254

55 COPPER CENTER (Z93) - Copper Center 2 Runway(s): 13/ ' x 55' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: Borough: Valdez-Cordova Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $- Part 139 Cert: No On/Off Road: On Last Major Improvement: Airfield Manager: JOHN HOFFMAN, of 254

56 CORDOVA (CDV) - Merle K. Smith Runway(s): 09/ ' x 150' Surface: Asphalt/Grooved NAVAIDS: NDB/ILS/DME Lighting: BCN/App_Lts/HIRL/VASI Classification: Regional # Enplanements: 17,731 Borough: Valdez-Cordova Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $61, USPS Hub: No School Facility: Yes Ops Cost/Yr: $806, Part 139 Cert: Yes On/Off Road: Off Last Major Improvement: 2008 Airfield Manager: ROBERT MATTSON, Cordova Airport Apron, Taxiway and GA Improvements Stage 2 -- $8,500,000 Cordova Airport RSA Improvements (Drainage) -- $5,500,000 Cordova SREB/ARFF Building Replacement -- $5,900,000 Cordova Airport Security Upgrades -- $2,500,000 Cordova Eyak Lake SRE Building -- $2,000,000 Construct transient air parking, general aviation parking, access roads, heliport pad, aviation support areas, complete obstruction removal, expand existing apron area, resolve drainage problems and construct partial parallel and connecting taxiways. Rehabilitate the runway safety areas, including grading and drainage improvements, clearing and grubbing. 55 of 254

57 CORDOVA (CKU) - Cordova Municiple Runway(s): 06/ ' x 60' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: Borough: Valdez-Cordova Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $7, USPS Hub: No School Facility: Yes Ops Cost/Yr: $ Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: ROBERT MATTSON, Snowplow Rollerover-- $350,000 Blade Belly-- $350,000 Truck Plow Airport 4x4-- $350,000 Utility Wagon Mid 4x4-- $350,000 Handicap Pass Loader-- $350, of 254

58 COUNCIL (K29) Runway(s): 10/ ' x 60' Surface: Gravel Lighting: BCN/App_Lts Classification: Local # Enplanements: Borough: Nome Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $ Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1987 Airfield Manager: ROBERT MADDEN, of 254

59 CRAIG SPB (CGA) Runway(s): N/S ' x 2000' Surface: Water Lighting: N/A Classification: Community # Enplanements: 3,470 Borough: Prince of Wales Air Carrier Hub: No Medical Facility: Yes Annual Revenue: USPS Hub: No School Facility: Yes Ops Cost/Yr: Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1995 Airfield Manager: PAUL KHERA, of 254

60 CROOKED CREEK (CJX) Runway(s): 13/ ' x 60' Surface: Earth/Gravel Lighting: N/A Classification: Community # Enplanements: 716 Borough: Bethel Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $1, USPS Hub: No School Facility: Yes Ops Cost/Yr: $9, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1991 Airfield Manager: TERRY HOFFMAN, of 254

61 CROWN POINT (9Z0) - Lawing Runway(s): 15/ ' x 50' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: Borough: Kenai Peninsula Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $1, Part 139 Cert: No On/Off Road: On Last Major Improvement: Airfield Manager: CARL HIGH, of 254

62 DAHL CREEK (DCK) Runway(s): 08/ ' x 75' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: 174 Borough: Northwest Arctic Air Carrier Hub: No Medical Facility: No Annual Revenue: $10, USPS Hub: No School Facility: No Ops Cost/Yr: $18, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1986 Airfield Manager: CALVIN SCHAEFFER, Dahl Creek Airport improvements -- $8,000,000 Dahl Creek Airport Lease Lot Development -- $2,000,000 Develop lease lots and expand the apron, including surveying airport lease lots, placing fill material, installing fencing and developing an updated land occupancy drawing. 61 of 254

63 DEADHORSE (SCC) Runway(s): 05/ ' x 150' Surface: Asphalt/Grooved NAVAIDS: VOR/ILS/DME Lighting: BCN/App-Rwy/HIRL/VASI/Ctr Lts Classification: Regional # Enplanements: 37,711 Borough: North Slope Air Carrier Hub: No Medical Facility: No Annual Revenue: $1,394, USPS Hub: No School Facility: No Ops Cost/Yr: $1,643, Part 139 Cert: Yes On/Off Road: On Last Major Improvement: 2012 Airfield Manager: TIM PARAULT, Deadhorse Airport Apron Expansiopn -- $5,000,000 Deadhorse SREB/ARFF Building Replacement -- $5,500,000 Deadhorse Airport Security Upgrades -- $2,500,000 Snowwing Grader-- $350,000 Truck De-icer 2000 gal-- $350,000 Grader 30,000#-- $350,000 Utility Wagon Mid 4x4-- $350,000 Handicap Pass Loader-- $350,000 Friction Measure Trailer-- $350,000 Expand the existing apron to accommodate larger aircraft. Deadhorse SREB/ARFF Building Addition-Add two double equipment bays and a sand storage bay to the existing facility. 62 of 254

64 DEERING (DEE) Runway(s): 02/ ' x 75' 11/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts/REIL/PAPI Classification: Community # Enplanements: 1,488 Borough: Northwest Arctic Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $100, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2001 Airfield Manager: CALVIN SCHAEFFER, Grader 34,000#-- $350, of 254

65 DILLINGHAM (DLG) Runway(s): 01/ ' x 150' Surface: Asphalt/Grooved NAVAIDS: VOR/ILS/DME Lighting: BCN/App_Lts/VASI/PAPI Classification: Regional # Enplanements: 30,080 Borough: Dillingham Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: $102, USPS Hub: Yes School Facility: Yes Ops Cost/Yr: $1,359, Part 139 Cert: Yes On/Off Road: Off Last Major Improvement: 2012 Airfield Manager: NORMAN HEYANO, Reconstruct and pave public parking area Rehabilitate GA/commercial apron and taxiway Rehabilitate taxiway and apron Pave vehicle parking area Construct a parallel taxiway, RSA, and 2000'crosswind runway Expand RSA, main terminal apron, and vehicle parking Install new public toilets Expand the existing sand storage building ARFF vehicle, loader, minivan, SRE truck, bulldozer, snow removal equipment 5,000 gal water tanker and 4,000 gal deicer truck Install fencing & drainage, remove obstructions at west end of runway, extend lease-lot access road, and complete airport planning study. 64 of 254

66 EAGLE (EAA) Runway(s): 06/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts/VASI Classification: Community # Enplanements: 638 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $4, USPS Hub: No School Facility: Yes Ops Cost/Yr: $55, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1984 Airfield Manager: DENNIS BISHOP, Eagle Airport improvements -- $2,000,000 Resurface runway and taxiway, relocate the apron and access road to meet standards, improve subgrade and drainage, and install new lighting. 65 of 254

67 EEK (EEK) Runway(s): 17/ ' x 60' Surface: Gravel Lighting: BCN/Rwy_Lts/REIL/PAPI Classification: Community # Enplanements: 3,618 Borough: Bethel Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $23, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2002 Airfield Manager: DAVE CUMMINGS, Construct a 2,400' x 60' gravel crosswind runway w/ RSA Construct a 100,000 sqft apron and aviation support area Construct a segmented circle Construct a new SREB Grader and loader 66 of 254

68 EKWOK (KEK) Runway(s): 02/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 377 Borough: Dillingham Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $ USPS Hub: No School Facility: Yes Ops Cost/Yr: $43, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2008 Airfield Manager: NORMAN HEYANO, Expand gravel runway to 3,300' x 75' Shift runway NE by 350' & rotate 6 degrees counterclockwise Expand RSA's Grader, wheel, loader Multiple items needed including ROW expansion, property acquisition, lease-lot development, security fencing, geotechnical analysis, and Master Plan update. 67 of 254

69 ELFIN COVE SPB (ELV) Runway(s): NW/SE ' x 1500' Surface: Water Lighting: N/A Classification: Local # Enplanements: 358 Borough: Hoonah-Angoon Air Carrier Hub: No Medical Facility: No Annual Revenue: USPS Hub: No School Facility: No Ops Cost/Yr: Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: PAUL KHERA, FY'16 Replace Seaplane Float -- $500, of 254

70 ELIM (ELI) Runway(s): 01/ ' x 60' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 2,570 Borough: Nome Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $104, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2008 Airfield Manager: HARRY JOHNSON, Elim Airport Improvements -- $8,000,000 Elim SRE Building Replacement -- $2,000,000, Elim Airport Access Road Realignment -- $7,000,000 Dozer Crwlr 8-10T-- $350,000 Resurface runway, apron and taxiway, improve drainage, and install new lighting. 69 of 254

71 EMMONAK (ENM) Runway(s): 16/ ' x 100' Surface: Gravel NAVAIDS: VOR/DME Lighting: BCN/Rwy_Lts/VASI/REIL Classification: Regional # Enplanements: 9,174 Borough: Wade Hampton Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: $5, USPS Hub: Yes School Facility: Yes Ops Cost/Yr: $146, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2009 Airfield Manager: HARRY JOHNSON, Emmonak Airport Runway Extension -- $18,400,000 Emmonak Airport RSA Improvements -- $1,000,000 Emmonak Airport SRE Building -- $2,100,000 U-Blade Loader 5CY -- $350,000 Dozer Crawler 8-10T -- $350,000 Loader Wheeled 1.5 CY -- $350,000 Extend the runway to 6,000' and the existing safety area to 7,200' x 300', acquire land for extension, and install new lighting. 70 of 254

72 EXCURSION INLET SPB (EXI) Runway(s): NW/SE ' x 1000' Surface: Water Lighting: N/A Classification: Local # Enplanements: 75 Borough: Haines Air Carrier Hub: No Medical Facility: No Annual Revenue: USPS Hub: No School Facility: No Ops Cost/Yr: Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: PAUL KHERA, FY'20 Replace Seaplane Float -- $1,250, of 254

73 FAIRBANKS (FAI) - Fairbanks Intl Runway(s): 2L/20R ' x 150' 2R/20L ' x 100' Surface: Asphalt/Grooved NAVAIDS: VORTAC/ILS/DME Lighting: BCN/App-Rwy_Lts/HIRL/ REIL/PAPI Classification: International # Enplanements: 438,188 Borough: Fairbanks/North Star Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: $8,124, USPS Hub: Yes School Facility: Yes Ops Cost/Yr: $27,592, Part 139 Cert: Yes On/Off Road: On Last Major Improvement: 2012 Airfield Manager: JESSE VANDERZANDEN, Tie down apron areas, various roadways ARFF Facility remodel 9/13 thru 12/14 Regular planned vehicle fleet replacement 72 of 254

74 FAIRBANKS SPB (FAI) Runway(s): 02/ ' x 100' Surface: Water Lighting: BCN Classification: International # Enplanements: Borough: Fairbanks/North Star Air Carrier Hub: No Medical Facility: Yes Annual Revenue: USPS Hub: No School Facility: Yes Ops Cost/Yr: Part 139 Cert: No On/Off Road: On Last Major Improvement: Airfield Manager: JESSE VANDERZANDEN, of 254

75 FALSE PASS (KFP) Runway(s): 04/ ' x 60' Surface: Gravel Lighting: REIL Classification: Community # Enplanements: 409 Borough: Aleutians East Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $ USPS Hub: No School Facility: Yes Ops Cost/Yr: $27, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1988 Airfield Manager: JEFF DOERNING, Airport reconstruction Extend airport to 2,700' with adequate safety areas Extend the runway length to 3,100' Extend 2-bay SREB Construction of 2-bay heated SREB SNOWPLOW GRADER Replace Champion Grader Champion grader 74 of 254

76 FLAT (FLT) Runway(s): 08/ ' x 90' Surface: Turf/Gravel Lighting: N/A Classification: Local # Enplanements: 10 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $- Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: DOUG LYMAN, of 254

77 FORT YUKON (FYU) Runway(s): 04/ ' x 100' Surface: Gravel NAVAIDS: VORTAC/NDB Lighting: BCN/App-Rwy_Lts/VASI Classification: Regional # Enplanements: 9,444 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $27, USPS Hub: Yes School Facility: Yes Ops Cost/Yr: $52, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2009 Airfield Manager: JEREMY WORRALL, of 254

78 FUNTER BAY SPB (FNR) Runway(s): NE/SW ' x 500' Surface: Water Lighting: N/A Classification: Local # Enplanements: 15 Borough: Hoonah-Angoon Air Carrier Hub: No Medical Facility: No Annual Revenue: USPS Hub: No School Facility: No Ops Cost/Yr: Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: PAUL KHERA, FY'23 Replace Seaplane Float -- $500, of 254

79 GALBRAITH LAKE (GBH) Runway(s): 13/ ' x 150' Surface: Gravel NAVAIDS: NDB Lighting: BCN/App-Rwy_Lts/PAPI Classification: Local # Enplanements: 719 Borough: North Slope Air Carrier Hub: No Medical Facility: No Annual Revenue: $4, USPS Hub: No School Facility: No Ops Cost/Yr: $- Part 139 Cert: Yes On/Off Road: Off Last Major Improvement: Airfield Manager: JEFF RUSSELL, Extend the land lease with the BLM. 78 of 254

80 GALENA (GAL) - Edward G. Pitka Sr. Runway(s): 07/ ' x 150' Surface: Concrete/Asphalt NAVAIDS: VOR/DME Lighting: BCN/HIRL/VASI/REIL Classification: Regional # Enplanements: 10,862 Borough: Yukon-Koyukuk Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: $56, USPS Hub: Yes School Facility: Yes Ops Cost/Yr: $586, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2009 Airfield Manager: MARVIN THURMOND, Galena Airport Improvements -- $16,300,000 Galena Airport Lighting Replacement -- $2200,000 Resurface Runway 7/25 and Taxiway "B" at the Galena Airport, repair the general aviation (GA) apron. 79 of 254

81 GAMBELL (GAM) Runway(s): 16/ ' x 96' Surface: Concrete/Asphalt NAVAIDS: NDB/DME Lighting: BCN/App-Rwy_Lts/VASI/REIL Classification: Community # Enplanements: 3,429 Borough: Nome Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $ USPS Hub: No School Facility: Yes Ops Cost/Yr: $124, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1997 Airfield Manager: ROBERT MADDEN, Grader 34,000# -- $350,000 U/V Plow Grader/Loader -- $350, of 254

82 GIRDWOOD (AQY) Runway(s): 02/ ' x 73' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: Borough: Anchorage Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $26, USPS Hub: No School Facility: Yes Ops Cost/Yr: $9, Part 139 Cert: No On/Off Road: On Last Major Improvement: 2002 Airfield Manager: LARRY BUSHNELL, Relocate both thresholds Provide 3,500 linear feet of erosion protection for runway embankment Extend parallel taxiway to the north Expand the southern RSA 116' southward Extend the RSA embankment 116' south Expand apron and runway 81 of 254

83 GLENALLEN/GULKANA (GKN) Runway(s): 15/ ' x 100' Surface: Asphalt Lighting: BCN/Rwy_Lts/VASI Classification: Community # Enplanements: 136 Borough: Valdez-Cordova Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $18, USPS Hub: No School Facility: Yes Ops Cost/Yr: $91, Part 139 Cert: No On/Off Road: On Last Major Improvement: Airfield Manager: JOHN HOFFMAN, Gulkana Airport Apron and Taxiway Repaving -- $3,000,000 Reconstruct the pavement on the apron and taxiway, remove obstacles and install airport markings/signage. 82 of 254

84 GOLD KING CREEK (AK7) Runway(s): 09/ ' Surface: Dirt/Gravel Lighting: N/A Classification: Local # Enplanements: Borough: Fairbanks/North Star Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $- Part 139 Cert: No On/Off Road: Off Last Major Improvement: Airfield Manager: JEREMY WORRALL, Gold King Airport Improvements -- $2,000,000 Improve airport for all-season operations, including runway surface repairs, brushing, tree clearing and stockpiling surfacing material for future maintenance. 83 of 254

85 GOLOVIN (GLV) Runway(s): 02/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 1,916 Borough: Nome Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $88, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 1992 Airfield Manager: ROBERT MADDEN, Golovin Airport Runway and Apron Improvements -- $14,300,000 Grader 34,000# -- $350,000 Resurface and rehabilitate the runway, construct a new taxiway, apron and access road, and replace the existing airport lighting 84 of 254

86 GOODNEWS (GNU) Runway(s): 06/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 1,599 Borough: Bethel Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $29, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2008 Airfield Manager: DAVE CUMMINGS, Airport reconstruction Grader, loader, snow plow 85 of 254

87 GOOSE BAY (Z40) Runway(s): 08/ ' x 75' Surface: Gravel Lighting: N/A Classification: Local # Enplanements: Borough: Matanuska-Susitna Air Carrier Hub: No Medical Facility: No Annual Revenue: $- USPS Hub: No School Facility: No Ops Cost/Yr: $5, Part 139 Cert: No On/Off Road: On Last Major Improvement: 1987 Airfield Manager: NEAL HENSLEE, Runway resurfacing 86 of 254

88 GRAYLING (KGX) Runway(s): 17/ ' x 75' Surface: Gravel Lighting: BCN/Rwy_Lts Classification: Community # Enplanements: 1,025 Borough: Yukon-Koyukuk Air Carrier Hub: No Medical Facility: Yes Annual Revenue: $- USPS Hub: No School Facility: Yes Ops Cost/Yr: $57, Part 139 Cert: No On/Off Road: Off Last Major Improvement: 2008 Airfield Manager: ERIK WEINGARTH, Grayling Airport Improvements -- $7,000,000 Grayling SRE Building Replacement -- $2,000,000 U/V Plow Grader/Loader -- $350,000, Grader 30,000# -- $350,000, Dozer Crawler 8-10T -- $350, of 254

89 GUSTAVUS (GST) Runway(s): 11/ ' x 150' Surface: Asphalt/Grooved NAVAIDS: NDB Lighting: BCN/Rwy_Lts/VASI/REIL Classification: Regional # Enplanements: 11,537 Borough: Hoonah-Angoon Air Carrier Hub: Yes Medical Facility: Yes Annual Revenue: $46, USPS Hub: No School Facility: Yes Ops Cost/Yr: $176, Part 139 Cert: Yes On/Off Road: Off Last Major Improvement: 2011 Airfield Manager: MIKE PEDERSEN, FY'16 RWY/TWY/Apron Rehab -- $12,000,000 FY'16 Sand and Chem Building -- $1,700,000 FY'16 ARFF/SRE Building -- $1,200,000 FY'19 ARFF Truck -- $1,000, of 254

Airports & Aviation Alaska Dept. of Transportation

Airports & Aviation Alaska Dept. of Transportation Airports & Aviation Alaska Dept. of Transportation Legislative Update February 2009 Christine Klein, AAE Deputy Commissioner 1 Overview of Airports & Aviation I II III Status of Airports Statewide Rural

More information

c and Native Population Served

c and Native Population Served Appendix C: Current Distribution of Sanitation Technologies Among Rural Alaskan Villages c and Native Population Served Chitina Mentasta Lake Chistochina Gakona Tazlina Cantwell Copper Center Guikana Akutan

More information

Alaska Aviation Emissions Inventory

Alaska Aviation Emissions Inventory Alaska Aviation Emissions Inventory Prepared by Sierra Research, Inc. CH2M HILL April 27, 2005 Purpose WRAP Emissions Forum is responsible for compiling emission inventories for use in meeting regional

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Meeting Notes Public Open House

Meeting Notes Public Open House Meeting Notes Public Open House, 5:30-8:00 pm Fairbanks Pipeline Training Center, 3605 Cartwright Court, Fairbanks, Alaska= Agenda: Open House: 30 minutes Presentation: 45 minutes Question and Answers:

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport

More information

Figure 34: Airports Not Meeting Demand for Lease Lot Space

Figure 34: Airports Not Meeting Demand for Lease Lot Space Evolution of the Alaska Aviation System Plan State of Alaska Classifications and Performance Measures September 2015 Source: CDM Smith, DOWL Figure 34: Airports Not Meeting Demand for Lease Lot Space Page

More information

Alaska Aviation System Plan (AASP) Overview. June 2010

Alaska Aviation System Plan (AASP) Overview. June 2010 Alaska Aviation System Plan (AASP) Overview June 2010 What is an Aviation System Plan? Sets 20 year vision for aviation Identifies airport improvements and standards Guides funding priorities Documents

More information

AVIATION ADVISORY BOARD MEETING

AVIATION ADVISORY BOARD MEETING AVIATION ADVISORY BOARD MEETING Dillingham, Alaska July 26, 2017 Aviation Advisory Board July 26, 2017 Dillingham Meeting Bristol Inn Conference Room 1:30p.m. 5:00p.m. Dial 907/266-2455 MEETING AGENDA

More information

43 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

43 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see TITLE 43 - PUBLIC LANDS CHAPTER 33 - ALASKA NATIVE CLAIMS SETTLEMENT 1610. Withdrawal of public lands (a) Description of withdrawn public lands; exceptions; National Wildlife Refuge lands exception; time

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

From concept through completion, CGA is your AVIATION engineering firm!

From concept through completion, CGA is your AVIATION engineering firm! The State of Iowa has 120 general aviation airports. Our staff specializes in serving these airports with their engineering needs. Aviation lighting and navigational aids Environmental and financial feasibility

More information

STATE OF ALASKA ITB NUMBER 2515H029 AMENDMENT NUMBER ONE (1)

STATE OF ALASKA ITB NUMBER 2515H029 AMENDMENT NUMBER ONE (1) STATE OF ALASKA ITB NUMBER 2515H029 AMENDMENT NUMBER ONE (1) AMENDMENT ISSUING OFFICE: Department of Transportation & Public Facilities Statewide Contracting & Procurement P.O. Box 112500 (3132 Channel

More information

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

Yupiit of Andreafski P.O. Box 88 Saint Marys, AK Tel# (907)

Yupiit of Andreafski P.O. Box 88 Saint Marys, AK Tel# (907) Native Village of Afognak 115 Mill Bay Road Suite 201 Kodiak, AK 99615 Tel# (907) 486-6357 Native Village of Akhiok P.O. Box 5030 Akhiok, AK 99615 Tel# (907) 836-2313 Yupiit of Andreafski P.O. Box 88 Saint

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary

More information

Facilities that must be inspected in 2014 (these facilities must be inspected a second time in either 2015 or 2016)

Facilities that must be inspected in 2014 (these facilities must be inspected a second time in either 2015 or 2016) Facilities that must be inspected in 2014 (these facilities must be inspected a second time in either 2015 or 2016) AIRPORT NAME ASSOCIATED CITY LOC ID FAA SITE # TERPS* AIRPORT? ALEKNAGIK ALEKNAGIK Z33

More information

1 PURPOSE AND NEED 1.1 INTRODUCTION

1 PURPOSE AND NEED 1.1 INTRODUCTION 1.1 INTRODUCTION 1 PURPOSE AND NEED This Environmental Assessment (EA) addresses projects at Juneau International Airport (JIA) that are the direct outcome of a Master Plan prepared for the airport and

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1 Budget Briefing Fiscal Year 2014 Budget Honorable Members of the City Council April 23, 2013 Page 1 FY 2014 Budget Goals and Objectives Develop and implement a plan of execution for the terminal redevelopment

More information

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet RESOLUTION 17-87 APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET By Board Member Mark Ouimet WHEREAS, the Wayne County Airport Authority (the Authority ), pursuant to the Aeronautics

More information

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence

More information

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation

More information

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County

More information

PFC Quarterly Status Report September 30, 2016

PFC Quarterly Status Report September 30, 2016 PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority

More information

Beginning balance available for Priority I Projects: $1,737,029

Beginning balance available for Priority I Projects: $1,737,029 2016 COAR Grant Cycle Priority I Projects Airport Name Project Name Requested Grant Amount Match % of Grant Match Total Project Cost or Total FAA Grant Match Amount required RUNNING TOTAL (Available Balance)

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

THE CASE OF A SUCCESSFUL PFC APPLICATION

THE CASE OF A SUCCESSFUL PFC APPLICATION THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene

More information

MATANUSKA SUSITNA BOROUGH AVIATION ADVISORY BOARD AGENDA

MATANUSKA SUSITNA BOROUGH AVIATION ADVISORY BOARD AGENDA MATANUSKA SUSITNA BOROUGH AVIATION ADVISORY BOARD Chair David Palmer - (4) Vice Chair - Mark Stigar (1) Michael Pannone (2) Norman Chance (3) Bernie Willis (5) AGENDA Staff: Christopher Cole, MSB Planner

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:

More information

Add-on for MANUAL MANU

Add-on for MANUAL MANU Add-on for MANUAL Airport Anchorage Developer: X-Plane Adaption Manual: Installation: Thorsten Loth (sim-wings) Aerosoft GmbH Thorsten Loth, Raphael Jakob Andreas Mügge Copyright: 2013/ Aerosoft GmbH Airport

More information

City of Tallahassee, FL Department of Aviation

City of Tallahassee, FL Department of Aviation City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and

More information

Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals This document is scheduled to be published in the Federal Register on 12/04/2014 and available online at http://federalregister.gov/a/2014-28535, and on FDsys.gov 1 DEPARTMENT OF TRANSPORTATION Federal

More information

3.9 AIRPORT SUPPORT FACILITIES

3.9 AIRPORT SUPPORT FACILITIES 3.9 AIRPORT SUPPORT FACILITIES This section details additional airfield facilities that may be required over the next 20 years. 3.9.1 Airport Rescue and Fire Fighting (ARFF) Station GEG is certified under

More information

FINAL REPORT

FINAL REPORT FINAL REPORT 2008-2013 FINAL REPORT 2008-2013 ALASKA AVIATION SYSTEM PLAN FINAL REPORT 2008-2013 May 2013 FINAL REPORT 2008-2013 Prepared for: State of Alaska Department of Transportation and Public Facilities

More information

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT Date of Public Notice: 8/15/2016 In accordance with the requirements of Section 158.24 of Federal Aviation

More information

PEE DEE REGIONAL AIRPORT AUTHORITY FLORENCE REGIONAL AIRPORT

PEE DEE REGIONAL AIRPORT AUTHORITY FLORENCE REGIONAL AIRPORT PEE DEE REGIONAL AIRPORT AUTHORITY FLORENCE REGIONAL AIRPORT PUBLIC NOTICE FOR PASSENGER FACILITY CHARGE APPLICATION NO. 2 AUGUST 6, 2014 Prepared By: PUBLIC NOTICE PEE DEE REGIONAL AIRPORT AUTHORITY FLORENCE

More information

Bend Municipal Airport Urban Renewal Plan. Tashman Johnson LLC Elaine Howard Consulting LLC

Bend Municipal Airport Urban Renewal Plan. Tashman Johnson LLC Elaine Howard Consulting LLC Bend Municipal Airport Urban Renewal Plan Tashman Johnson LLC Elaine Howard Consulting LLC Urban Renewal Background The purpose of urban renewal is to improve certain areas that are poorly developed or

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

Aviation, Rail, & Trucking 6-1

Aviation, Rail, & Trucking 6-1 6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be

More information

Alaska Aviation System Plan Update

Alaska Aviation System Plan Update Alaska Aviation System Plan Update Yukon-Kuskokwim Region Air Versus Roads Access Construction and Maintenance Baseline Cost Comparison YUKON-KUSKOKWIM REGION AIR VERSUS ROADS ACCESS CONSTRUCTION AND MAINTENANCE

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update AIRPORTS DIVISION DEPARTMENT OF TRANSPORTATION March 13, 2012 AGENDA Introduction Purpose and Meeting Objectives Kahului

More information

COMMERCIAL AND GENERAL AVIATION Historic and forecast FDOT aviation activity information on file for Pensacola Regional Airport:

COMMERCIAL AND GENERAL AVIATION Historic and forecast FDOT aviation activity information on file for Pensacola Regional Airport: Existing Facilities Pensacola Regional Airport is served by a number of airside and landside facilities. Two intersecting, grooved asphalt runways serve the airport. These runways are runway 17/35 (7,004

More information

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, 2018 Airport Master Plan WELCOME & INTRODUCTIONS Kimberly Moss, Doug Hammon (The Ohio State University) 2 Member Introduction Name Organization 3 MEETING

More information

Stakeholders Meeting

Stakeholders Meeting Stakeholders Meeting for the Expansion of Runway 9R-27L, Terminal 4 Gate Relocation and Land Acquisition for Runway 9R-27L September 22, 2011 Stakeholders Meeting AGENDA Introduction FLL Airport Improvements

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

YUKON AVIATION. Mark Ritchie Superintendent of Airports Aviation Branch

YUKON AVIATION. Mark Ritchie Superintendent of Airports Aviation Branch YUKON AVIATION Mark Ritchie Superintendent of Airports Aviation Branch Introductions Presentation Questions Door Prizes! WHAT WE DID LAST YEAR Started Water & Sewer Extension to South End WHAT WE DID LAST

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

Development Program and Implementation Plan

Development Program and Implementation Plan CHAPTER 8 Development Program and Implementation Plan 8.1 INTRODUCTION The FAA identifies airports that are significant to national air transportation through the development of the National Plan of Integrated

More information

MOST aircraft need a runway for landing and takeout.

MOST aircraft need a runway for landing and takeout. 38th Annual Concrete Paving Workshop Upcoming Airport Projects January 17, 2017 MOST aircraft need a runway for landing and takeout. 1 Airport Improvement Program AIP Eligibility The federal AIP grants

More information

8.0 AIRPORT LAYOUT PLANS

8.0 AIRPORT LAYOUT PLANS 8.0 AIRPORT LAYOUT PLANS This chapter presents a detailed graphic and narrative description of the selected development concept for General Mitchell International Airport (MKE). The plans package presented

More information

AIRPORT WITH NO RUNWAYS IS A MALL

AIRPORT WITH NO RUNWAYS IS A MALL RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case

More information

The CLE Master Plan Includes:

The CLE Master Plan Includes: The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS FAITH ADAMS AGENDA AIRPORT RELOCATION CHALLENGES AIRFIELD LIGHTING & SIGNAGE NAVAIDS AIRFIELD LIGHTING VAULT L-890 ALCMS AIR TRAFFIC CONTROL TOWER (ATCT) CONCLUSION AIRPORT RELOCATION OLD AIRPORT (PFN)

More information

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record: 1410 Memorandum 9 DATE October 20, 2014 CITY OF DALLAS TO Rosa Rios City Secretary SUBJECT Correction to Council Resolution No. 14-1030, dated Please add the following correction as part of the permanent

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

Planning Advisory Committee - PAC Welcome

Planning Advisory Committee - PAC Welcome Planning Advisory Committee - PAC Welcome Opening Comments Dave Ruppel, HDN Airport Manager Introductions Planning Advisory Committee (PAC) members HDN Airport staff Jviation staff Work-to-Date Progress

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four Airport Development Alternatives Prior to formulating a development program for Ryan Airfield, it is important to consider development potential

More information

Alaska Airports. Page 1 of 5

Alaska Airports. Page 1 of 5 ICAO Town Airport name IATA Usage Type IFR Rwy length PAAQ Palmer Palmer Mun PAQ Civ. Paved Yes 6,000 PABA Barter I Lrrs Barter I Lrrs BTI Civ. Unpaved Yes 4,800 PABE Bethel Bethel BET Civ. Paved Yes 6,300

More information

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Chapter 4. Development Alternatives

Chapter 4. Development Alternatives Chapter 4. Development Alternatives Chapter 4. DEVELOPMENT ALTERNATIVES This chapter identifies and evaluates airport development alternatives to fulfill the facility requirements for the airport as defined

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

Existing Facilities. Current and Forecast Demand

Existing Facilities. Current and Forecast Demand Existing Facilities Albert Whitted Airport is owned and operated by the City of St. Petersburg ( City ). The airport property encompasses approximately 119 acres. The airport is served by two intersecting

More information

Request for Scoping Comments Regarding Environmental Issues of Concern

Request for Scoping Comments Regarding Environmental Issues of Concern March 16, 2009 Request for Scoping Comments Regarding Environmental Issues of Concern Environmental Assessment for Proposed Airport Land Lease and Airport Construction Pahrump Valley General Aviation Airport,

More information

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 Please find attached for your review prior to the PAC Meeting #4,

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Passenger Facility Charge Application #1

Passenger Facility Charge Application #1 Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures

More information

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business Plan Steering Committee December 14, 2006 Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business

More information

Hollaway Consulting Engineers, LLC Statement of Qualifications

Hollaway Consulting Engineers, LLC Statement of Qualifications Deliberate, Strategic, Connected.Delivering tangible solutions for aviation design and construction management. Hollaway Consulting Engineers, LLC Statement of Qualifications Professional Experience Sheri

More information

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico.

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico. Passenger Facility Charge: No. 7 Application December 2013 Public Notice Materials Luis Muñoz Marín International Airport San Juan Puerto Rico INTRODUCTION Aerostar Airport Holdings has initiated the process

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

State of the Airport Robert S. Bowen, Executive Director October 18, 2018 Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing

More information

INDEPENDENCE STATE AIRPORT (7S5)

INDEPENDENCE STATE AIRPORT (7S5) INDEPENDENCE STATE AIRPORT (7S5) Airport Master Plan Update 2018 Planning Advisory Committee PAC Meeting #3 April 11, 2018 1994-2016 AGENDA The second PAC workshop will cover the following topics: Recap

More information

Aviation Development

Aviation Development Aviation Development Gold Coast Airport has efficient and cost effective passenger processing and aircraft turn-around times that is underpinned by a strong focus on safety. 6.1 INTRODUCTION This focus

More information

Collier County Airport Authority. Joint Automated Capital Improvement Program

Collier County Airport Authority. Joint Automated Capital Improvement Program Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer

More information

Chapter 9 - AIRPORT SYSTEM DESIGN

Chapter 9 - AIRPORT SYSTEM DESIGN Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington